October 14, 2015 Benjamin Strunk Confidential & Proprietary

Comcast Energy

Tech Team

Comcast and Bloom Energy – A Good Fit

October 14, 2015 Confidential & Proprietary Comcast Energy

Tech Team

Berlin CT Western New England Regional HQ Yearly Electrical Consumption – 8600kwh per year Business Center Customer Care Center Technical Equipment Location

Where we began….

October 14, 2015 Confidential & Proprietary Comcast Energy

Tech Team

Options for Solutions….

October 14, 2015 Confidential & Proprietary Comcast Energy

Tech Team

We selected….

Why we selected Bloom Energy….

ü  Solves our back up generator requirement ü  Solves our cost containment on electricity ü  Solves our limited footprint needs ü  Solves our environmental impact objectives ü  Solves our need for limited battery storage

October 14, 2015 Confidential & Proprietary Comcast Energy

Tech Team

Construction of the System

Project Kicked off – 11/7/2014 Ø Underground trenching - Electrical Ø Underground Trenching - Gas Ø Excavation for Server pads Ø Water access for the Server Ø Electrical Room Readiness

October 14, 2015 Confidential & Proprietary Comcast Energy

Tech Team

Construction of the System

In Construction – Week 3 Ø Room Build out Ø Concrete pours

October 14, 2015 Confidential & Proprietary Comcast Energy

Tech Team

Construction of the System

In Construction – Week 5 Ø Equipment deliveries Ø Equipment integration Ø Gas and water Ø Drive protection

October 14, 2015 Confidential & Proprietary Comcast Energy

Tech Team

Construction of the System

In Construction – Week 10 Ø Electrical Integration

Ø Utility Back feed Ø Head End Connect

0 to 320 kW (Total Output de-rated by 20% for N+1 redundancy)

Grid

Industry Standard Transfer Switch

99.99+ % Power Continuity

2 ES-5700 200 kW Energy Servers

Campus Load

Protected Load

320 kW

Primary power source is the UPM

80 to 400 kW

380V DC Bus

M Panel

October 14, 2015 Confidential & Proprietary Comcast Energy

Tech Team

Before Bloom Integration Post Bloom Integration

October 14, 2015 Confidential & Proprietary Comcast Energy

Tech Team

In Conclusion…

Energy 2020 Goal - Lower Grid Dependency Energy 2020 Goal - Energy Cost Reduction