Post on 10-Aug-2020
CLTP7 REPORT Presented By / Eng. Mohammed Ali Abo Arais
Cubesat Systems Engineer
Satellites Systems Development and testing lab
Egyptian Space Program
NARSS "National Authority for Remote Sensing and Space Sciences"
Day 1: 21-9-2016
-Meeting the Great CLTP 7 Team
-General Points about the Program TimeLine
-Learning Some Tips about HW Electronics
Day 2: 22-9-2016 -Self Introductory for all team
-Tips about the can-sat system Fabrication
1-GPS Board
2-Power Board
3-User Board
4-OBC Board
5-Camera Board
6-Communication Board
-Starting Can-sat
system Fabrication
Day 3: 23-9-2016
-Getting
All Can-sat Boards Working
Day 4: 24-9-2016 -Testing the System Functions HW and SW
-Designing the recovery System using Parachute
-Drop Test to test Recovery System
Day 5: 25-9-2016
-User Board Fabrication and Testing
-Testing the System Functions HW and SW
Day 6: 26-9-2016 Outing Day
Day 7: 27-9-2016
Testing
-Sine Vibration Test
-Random Vibration Test
-Shock Test
-Thermal test
Testing Results
-Vibration Testing Results
Testing Results
-5
0
5
10
15
20
25
30
35
40
45
11
52
94
35
77
18
59
911
312
714
115
516
918
319
721
122
523
925
326
728
129
530
932
333
735
136
537
939
340
742
143
544
946
347
749
150
551
953
3
-Thermal Testing Cycle
Day 8: 28-9-2016
-Paper Rocket Model Fabrication
- Tips About Rockets Design
Day 9: 29-9-2016
-Can-sat System
Testing
-First Launching
Preparation
-Successful Launching
Day 10: 30-9-2016
-Can-sat System Testing
-2nd Launching Preparation
-Successful 2nd Launching
Launching Results
-GPS Receiver
-Sensors :
-Pressure Sensor
-Gyro Sensor
-Accelerometer Sensor
-Camera
Launching Results
Launching Results
Launching Results
985
990
995
1000
1005
1010
1015
1020
1025
1030
30
26
30
44
31
02
31
20
31
38
31
56
32
14
32
31
32
49
33
07
33
25
33
43
34
01
34
19
34
37
34
55
35
13
35
31
35
49
36
07
36
27
36
45
37
03
37
21
37
39
37
59
38
17
38
35
38
53
39
11
39
29
39
47
40
05
40
23
40
41
40
59
41
17
41
35
41
53
42
11
Time
Mohammed Abo Arais Can-Sat 30-9-2016 Launching Results
Pressure
Launching
Launching Results
0
200
400
600
800
1000
1200
30
26
30
40
30
54
31
08
31
22
31
36
31
50
32
04
32
17
32
31
32
45
32
59
33
13
33
27
33
41
33
55
34
09
34
23
34
37
34
51
35
05
35
19
35
33
35
47
36
01
36
15
36
31
36
45
36
59
37
13
37
27
37
41
37
57
38
11
38
25
38
39
38
53
39
07
39
21
39
35
39
49
40
03
40
17
40
31
40
45
40
59
41
13
41
27
41
41
41
55
42
09
Time
Mohammed Abo Arais Can-Sat 30-9-2016 Launching Results
x-Acc
y-Acc
z-acc
x-Gyro
y-Gyro
Launching
Launching Results
-Camera Photos
After CLTP:
1- create a local can-sat network inside Egyptians universities
By leading Can-sat TOT "training of trainers" program from all
Egyptian universities
2-To solve the problem of launching sites
I have two plans short term plan is to build an professional
launching site for educational satellites inside the space
operation center which I'm working in now and on long
term plan I will use this model to to help other universities
to build their own launching site with low cost.
After CLTP:
After CLTP:
3- Launching the first can-sat design competition for
all Egyptian university students
Thanks for your time Facebook :
https://www.facebook.com/mohammed.aboarais
E-mail :
mohamed.aboarais@narss.sci.eg
m.aboarais@gmail.com
LinkedIn:
https://www.linkedin.com/in/aboarais