Post on 24-Jan-2016
CITRIS Building Startup Space Committees
Carlo Séquin, Gary Baldwin, Keat Saw, Scott Shackleton
Design of the “Macro-Lab”
February 22, 2006
2CITRIS Building Facilities Design
West View (Floors 2-7 Visible)
3CITRIS Building Facilities Design
Looking South on “Engineering Esplanade”
4CITRIS Building Facilities Design
CyberCafe, West Facade
5CITRIS Building Facilities Design
A Few Typical SpacesSmall conference roomSmall conference room Signature conference roomSignature conference room
(sixth floor)(sixth floor)
Entrance to main auditoriumEntrance to main auditoriumEntrance corridorEntrance corridor
6CITRIS Building Facilities Design
College EntranceLevel 3
7CITRIS Building Facilities Design
Floorplan Level 3
to CEE Dept. (Davis Hall)
8CITRIS Building Facilities Design
Main Auditorium (third floor)
9CITRIS Building Facilities Design
Level 3M: NanoFab(Lower Level)
10CITRIS Building Facilities Design
Level 3M: NanoFab(Lower Level)
11CITRIS Building Facilities Design
Level 7
12CITRIS Building Facilities Design
Floorplan Level 7
13CITRIS Building Facilities Design
Level 6
14CITRIS Building Facilities Design
Floorplan Level 6
to CEE Dept. (Davis Hall)
to C
ory H
all
15CITRIS Building Facilities Design
Level 5
Entrance toMicro/Nano-Lab
16CITRIS Building Facilities Design
FloorplanLevel 5
Entrance toMicro/Nano-Lab
17CITRIS Building Facilities Design
Level 4
18CITRIS Building Facilities Design
Floorplan Level 4
19CITRIS Building Facilities Design
Level 2
20CITRIS Building Facilities Design
Floorplan Level 2
21CITRIS Building Facilities Design
Level 1 (Basement)
22CITRIS Building Facilities Design
Floorplan Level 1 (Basement)
23CITRIS Building Facilities Design
Approximate Schedule
Jan 3 - Jan 31, 2006 Bid Period
Feb 27, 2006 Contract Award
Mar 15, 2006 Construction Start
Spring, 2008 Construction Completion
Summer, 2008 Move In
24CITRIS Building Facilities Design
MacroLab-Level 1
45x68
44x4526x66
21x70
25CITRIS Building Facilities Design
MacroLab-Level 2
75x2132x15
26CITRIS Building Facilities Design
Role of Design Committees
Help us to make the CITRIS building truly functional Think through what should comprise the basic infrastructure Make sure we didn’t miss anything in the infrastructure design Help develop usage guidelines for open, collaborative research spaces Fit-out of open office spaces for cubicle furniture Furniture plan for key conference rooms Specify needs for facilities fit-out for computer rooms and collaboratories Define A/V, networking, broadcasting, and other infrastructure Specify needs for Distance Learning Center Help with security guidelines (e.g., space accessibility to students after 5
PM ) Content for open spaces: entrance, café, tech “museum”
27CITRIS Building Facilities Design
A Few Guidelines Successful functioning of the building heavily depends on works of these committees CITRIS goals and mission embrace highly multi-disciplinary, collaborative research CITRIS Headquarters serves many colleges, departments, and four UC campuses Plan for general occupancy model of temporary space - - for the life of projects/programs only The basic structure, both interior and exterior, is designed and fixed. We want to minimize any
changes: they’re costly. Generally, throughout the building, design for consistency in every aspect: cubicles, furniture,
networking, telephony, displays, amenities, etc. Specific goals and objectives for each committee will be distributed during the first meeting of
each committee (after 1/1/06). Meet monthly, for the first few months (approximately through Spring ’06 term). Following that,
probably quarterly update. Report quarterly Plenary session twice each semester to review checkpoints Have tentative design documents ready by early summer 2006 Dedicated webspace on www.citris-uc.org for document sharing, diagrams, updates, etc. To
obtain access and instructions, go to: http://www.citris-uc.org/file_repositories
28CITRIS Building Facilities Design
Committee Members NanoFab Suite (fifth floor)
Bill Flounders, Costas Spanos, Arun Majumdar, Luke Lee, Eicke Weber, Per Peterson, Gary Baldwin (chair)
Macrolab Suite (Rooms 200, 201, 244 and portions of 140, 145, 148) Alice Agogino (chair), John Canny, Kara Nelson, Ruzena Bajcsy, Karl Hedrick
Basement Laboratory (Room 145) Kathy Yelick, Eric Brewer, Stephen Brenner, Andrew Packard, Mark Hansen, Gary Baldwin
(chair) Technology Museum
Kris Pister, Homayoun Kazerooni, Stephen Connolly, Yuri Suzuki, Jasmina Vujic, Ken Goldberg, Gary Baldwin (chair)
Classrooms 240, 250, 254 and Auditorium-related (301, 310, 306, 311, 312) Anthony St. George, Pam Atkinson (chair), Lisa Pruitt, Dan Garcia, Paul Wright, Raja
Sengupta Computer Server Room (131)
Eric Brewer, Kathy Yelick, Jasmina Vujic, Hua Pei Chen, Gary Baldwin (chair) Cyber Café
Dan Garcia, Alex Bayen, Kimmen Sjolander, Jose Carmena, Roberto Horowitz, Ellen Zeng (HKN), James Li (TBP), May Chu (SWE)
Members-at-large: Richard Newton, Gary Baldwin, Carlo Sequin, Scott Shakleton, Keat Saw