Post on 16-Nov-2021
1
February 26, 2021 Railroad Commission of Texas Gas Services Division P.O. Box 12967 Austin, Texas 78711-2967
Ladies and Gentlemen:
Enclosed for filing in accordance with the provisions of Section 104.301 of the Texas
Utilities Code (“Section 104.301”) please find tariffs for gas services provided to
customers within the unincorporated areas served by Atmos Energy Corporation’s Mid-
Tex Division, (the “Mid-Tex Division” or the “Company”). These tariffs will be effective on
April 27, 2021 and are attached within the enclosed package in the section designated
“IRA Application” following IRA-3. The section includes a clean and red-line copy of each
tariff. Under Section 104.301, as amended, and the effective portions of 16 Tex. Admin.
Code §7.7101, the Railroad Commission of Texas (the “Commission”) is provided the
opportunity to review the filing and either (i) take final action before April 27, 2021, or (ii)
suspend the effective date of these Tariffs for forty-five (45) days after April 27, 2021.
These tariffs establish an interim rate adjustment (“IRA”) that will affect the monthly
customer charge or meter charge applicable in the unincorporated areas of the Mid-Tex
Division. The IRA will recover the incremental cost of new investment in facilities used to
provide gas utility services and will remain in effect until the issuance of a final order in a
rate case that is filed after the implementation of these tariffs. All amounts collected under
these tariffs are subject to refund.
Christopher A. Felan Vice President Rates & Regulatory Affairs
2
The IRA set forth in these tariffs was calculated using the factors approved in GUD No.
10742, as required by Section 104.301 of the Texas Utilities Code and the Railroad
Commission’s rule on Interim Rate Adjustments, 16 T.A.C. §7.7101, except for the
property tax factor which was calculated as detailed in GUD No. 10742, Final Order
Finding of Fact 20 (b). The depreciation expense in this filing was calculated for each
gas plant account utilizing the approved depreciation rate for that specific account as
required in GUD No. 10742, Final Order Finding of Fact 20 (d). GUD No. 10742
established the latest effective rates for the unincorporated areas of the Mid-Tex Division.
Upon approval, the IRA adjustment will be added to the customer/meter charges that are
effective for the Mid-Tex division.
In this interim rate tariff filing, the Mid-Tex Division is implementing an interim rate
adjustment based on the difference between the values of the invested capital for the
Mid-Tex Division’s system as of December 31, 2020 and the value of the invested capital
for Mid-Tex Division’s system as of December 31, 2019, as approved by the Commission
in GUD No. 10944.
The source documentation supporting the new investment is available for review through
Atmos Energy’s electronic databases. If you wish to schedule an opportunity to review
the electronic databases or any hard copy project files related to the new investment,
please contact me.
Also enclosed for filing are additional informational materials:
(a) The Railroad Commission of Texas’ Interim Rate Adjustment Application (“IRA
Application” Section) and the Annual Earnings Monitoring Report (“EMR Report”
Section).
(b) The Project Report describing the investment projects used by the Company in
providing utility service which were both completed and placed in service from
January 1, 2020 through December 31, 2020 as well as the investments retired or
3
abandoned from January 1, 2020 through December 31, 2020 (“Project Report”
Section). The Project Report also states the cost, need, and customers benefited
by the change in investment. A Project Report is also included which states the
project by FERC Account and amount.
(c) The Relocation Project Report providing certain supplemental information
about relocation project costs included in the Project Report for the period of
January 1, 2020 through December 31, 2020 (“Relocation Project Report”
Section).
(d) The affidavits of Christopher A. Felan and Barbara W. Myers. Mr. Felan’s
affidavits attest to (i) the method and date on which notice will be given to all
customers, and (ii) relocations. Ms. Myers provides an affidavit which verifies that
the Mid-Tex Division’s books and records are kept in accordance with the rules of
the Railroad Commission of Texas and verifies that the schedules enclosed are
summaries of the Mid-Tex Division’s books and records related to the invested
capital used by the Company in providing utility service (“Affidavits” Section).
The Company has elected to make certain adjustments in this filing. These adjustments
are detailed in the Interim Rate Adjustment Application on IRA-5B. Elective adjustments
have been made to remove certain employee expenses identified via a detailed review of
every employee expense report for items recorded to capital projects for the Shared
Services Division and the Mid-Tex Division. These expenses have been removed to
reduce controversy. The Company reserves its right to seek recovery of these expenses
in a rate proceeding involving a review of the Company’s invested capital through at least
December 31, 2020.
Notice of this proceeding will be provided to affected customers in unincorporated areas
by bill insert or individual mailing within 45 days after the date of this filing in accordance
with Section 104.301. Finally, the Company respectfully requests that the Commission
4
not suspend consideration of this filing. Instead, we urge the Commission to expedite
review of the filing and attempt to take final action by April 27, 2021.
Please accept for filing the above mentioned tariffs, filing package and enclosures and
return the enclosed copy of this letter with your file mark thereon to acknowledge such
filings for our records. A copy of this letter with all filings and enclosures is being provided
to the Commission staff members indicated below.
Respectfully Submitted,
Christopher A. Felan cc (with enclosures): Ms. Kari French, Railroad Commission of Texas Mr. Stephen Cooper, Railroad Commission of Texas Mr. Mark Evarts, Railroad Commission of Texas Ms. Ann Coffin, Coffin Renner LLP
ATMOS ENERGY CORP., MID-TEX DIVISION UNINCORPORATED AREAS
INTERIM RATE ADJUSTMENT APPLICATION
TABLE OF CONTENTS
Interim Rate Adjustment Application – Railroad Commission of Texas (“IRA Application”) – IRA-1 through IRA-23 Annual Earnings Monitoring Report – Railroad Commission of Texas (“EMR Report”) – EMR-1 through EMR-5 Project Report: Mid-Tex: Additions Retirements SSU: Additions Retirements Relocation Project Report Affidavits Christopher A. Felan (2)
Barbara W. Myers
This is an original submission.
Date of Submission:
Twelve (12) Month Period Ending December 31, 2020
February 26, 2021
Interim Rate Adjustment Application
of
Atmos Energy Corp., Mid-Tex Division
to the
Railroad Commission of Texas
for the
Tab Reference Schedule Description
IRA-1 General Information
IRA-2 Notice
IRA-3 Rate Schedules
IRA-4 Bill Comparisons
IRA-5 Interim Rate Adjustment Summary
IRA-5A Allocation Factors
IRA-5B Miscellaneous Adjustments
IRA-6 Direct Initial or Prior Year Plant
IRA-7 Direct Current Year Plant (Adjusted)
IRA-7A Direct Current Year Plant Adjustments
IRA-8 Direct Incremental Plant
IRA-9 Allocated Initial or Prior Year Plant - SSU
IRA-10 Allocated Current Year Plant (Adjusted) - SSU
IRA-10A Allocated Current Year Plant Adjustments - SSU
IRA-11 Allocated Incremental Plant - SSU
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Table of Contents
Table of Contents Page 1 of 2
Tab Reference Schedule Description
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Table of Contents
IRA-12 Direct Additions Project Report
IRA-13 Direct Retirements Project Report
IRA-14 Allocated Additions Project Report
IRA-15 Allocated Retirements Project Report
IRA-16 Direct Additions Detail
IRA-17 Direct Retirements Detail
IRA-18 Allocated Additions Detail
IRA-19 Allocated Retirements Detail
IRA-20 Federal Income Taxes
IRA-21 Ad Valorem and Other Taxes
IRA-22 Footnotes Page
IRA-23 Signature Page
Table of Contents Page 2 of 2
1. Provide the exact name of the utility.Atmos Energy Corp., Mid-Tex Division
2. Provide the date when the utility was originally organized.
3.
4.
Name: Christopher FelanTitle: Vice President, Rates and Regulatory AffairsAddress: 5420 LBJ Freeway, Suite 1800
Dallas, Texas 75240
Phone: 214.206.2568Email: christopher.felan@atmosenergy.com
5.
Name: Douglas C. WaltherTitle: Deputy General CounselAddress: 5430 LBJ Freeway, Suite 1800
Dallas, Texas 75240-2601
Phone: 972.855.3102Email: douglas.walther@atmosenergy.com
6. Provide the address for the office where the Company's records are kept.
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020General Information
December 11, 1942
Describe any change in the utility name. Include the effective date of the change and state in which the change took effect.None.
Provide the name, title, phone number, email address, and office address for the Company representative to whom correspondence should be addressed concerning this report.
Provide the name, title, phone number, email address, and office address of any other individual designated by the utility to answer questions regarding this report (optional).
IRA-1 General Info Page 1 of 3
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020General Information
7. This rate adjustment will impact the:
8. How many months are included in the filing period?Twelve (12)
9. In what year does the test period end?2020
10. What is the test period ending date for the prior filing? MM/DD/YYYY (Either a rate case or IRA)Month (MM) 12Day (DD) 31Year (YYYY) 2019
11. What is the submission date for this filing?February 26, 2021
12. Is this an original or a revised submission? (Enter either 'an original' or 'a revised' below.)an original
13. In what Gas Utilities Docket were current rates set? Provide the docket number only.10742
14. Enter the docket number for the most recent rate case in which rates were set in this service area.10944
15. What is the cost of gas and transportation used in calculating average bills for IRA-4?Rate R 0.47805$ per Ccf
5420 LBJ Freeway, Suite 1800, Dallas, Texas 75240
Initial Block RateMonthly Customer ChargeMonthly Capacity Charge
IRA-1 General Info Page 2 of 3
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020General Information
Rate C 0.38350$ per CcfRate I 1.89640$ per MMBtuRate T 0.39620$ per MMBtu
16. What Federal Income Tax rate was approved in the most recent rate case for this service area?21%
17. What is the ad valorem tax rate based on the most recent rate case updated for the current period?Direct 1.91% Please see IRA-21Allocated SSU GO 0.84% Please see IRA-21Allocated SSU CS 0.44% Please see IRA-21
18.
Capital Structure Cost
Weighted Cost
Common Equity 60.18% 9.80% 5.90%Debt 39.82% 5.20% 2.07%Total 100.00% 7.97%
19. If this is a revised application, identify each schedule number, line number, and column designation where revised input data appears.
Complete the following weighted average cost of capital table using factors set in the most recent rate case for this service area:
Please see Finding of Fact: 19GUD No. 10742 Final Order References:
Please see Finding of Fact: 19
IRA-1 General Info Page 3 of 3
1. Attach the Company's proposed Notice.
Attached are sample copies of the Notices to be sent to Rate Schedules R, C, I, and T.
2. Please also provide an electronic copy of the proposed Notice in Microsoft Word with the filing.
3.
Included in the filing is an Affidavit by Christopher Felan that notice will be provided.
4. Completion of notice is required within 45 days from date of filing.
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Notice
Attach an affidavit that Notice has been or will be provided by direct mail or bill insert and include the date notice was or will be provided.
Please see the attached files named, "MTX Notice_Rate R and C.docx" and "MTX Notice_Rate I and T.docx"
IRA-2 Notice Page 1 of 1
CUSTOMER NOTICE OF INTERIM RATE ADJUSTMENT
Pursuant to Texas Utilities Code Section 104.301, the Mid-Tex Division of Atmos Energy Corporation (the “Company”), filed an application for an Interim Rate Adjustment with the Railroad Commission of Texas on February 26, 2021. This proposed Interim Rate Adjustment applies to all customers served by the Company within the unincorporated areas of the Mid-Tex Division and provides for the recovery of additional capital investment incurred from January 1, 2020 through December 31, 2020. The request is for capital investment not included in any previous rate case or rates for service and is subject to refund. The Company proposes to increase the customer/meter charge used to calculate the customer’s monthly bill by the amount listed below. The proposed Interim Rate Adjustment effective date is April 27, 2021. In accordance with Texas Utilities Code Section 104.101, the increase constitutes a major change in the Company’s rates.
TABLE 1
Rate Schedule
Current Customer
Charge
Proposed 2020
Interim Rate Adjustment
Adjusted Charge
Increase Per Bill
Rate R – Residential
Sales
$ 24.60 per customer
per month
$ 4.55 per customer
per month
$ 29.15 per customer
per month $ 4.55
Rate C – Commercial
Sales
$ 63.30 per customer
per month
$ 14.52 per customer
per month
$ 77.82 per customer
per month$ 14.52
Persons with questions or who want more information about this filing may contact the Company at 1-888-286-6700. A copy of the filing will be available for inspection during normal business hours at the Company’s office at 5400 LBJ Freeway, Suite 1800, Dallas, Texas, 75240 or on the Company's website at www.atmosenergy.com/MTXtariffs. Any affected person within the unincorporated areas may file written comments or a protest concerning this proposed Interim Rate Adjustment with Gas Services, Market Oversight Section, Railroad Commission of Texas, P.O. Box 12967, Austin, Texas 78711-2967.
Please reference the Atmos Energy Mid-Tex Division 2021 Interim Rate Adjustment Application in your written comment or protest.
AVISO A NUESTROS CLIENTES: AJUSTE INTERINO DE TARIFAS
Conforme a la sección 104.301 del Código de Servicios Públicos de Texas, la División Mid-Tex de Atmos Energy (la “Compañía”) presentó una solicitud para un ajuste interino de tarifas con la Comisión Ferroviaria de Texas el 26 de febrero del 2021. El ajuste interino de tarifas propuesto aplicará a todos los clientes servidos por la Compañía dentro de las áreas no incorporadas de la División Mid-Tex de Atmos Energy y provee la recuperación del costo de inversión adicional de capital incurrida desde el 1 de enero, 2020 hasta el 31 de diciembre, 2020. Esta solicitud es por inversión de capital no incluida en cualquier ajuste de tarifas por servicio anterior y está sujeta a reembolso. La Compañía propone aumentar el cargo de cliente/medidor utilizado para calcular la factura mensual del cliente según indicado en la tabla. La fecha efectiva del Ajuste Interino de Tarifas propuesto es el 27 de abril, 2021. El aumento constituye un cambio mayor en las tarifas de la Compañía, tal como es definido en la sección 104.101 del Código de Servicios Públicos de Texas.
TABLA 1
Tabla de Tarifas
Cargo de Cliente Actual
Propuesto Ajuste Interino
2020 Cargo Ajustado
Aumento de
Cada Factura
Tarifa R - Ventas
Residenciales
$24.60 por cliente
por mes
$4.55 por cliente
por mes
$29.15 por cliente
por mes $4.55
Tarifa C - Ventas
Comerciales
$63.30 por cliente
por mes
$14.52 por cliente
por mes
$77.82 por cliente
por mes $14.52
Aquellas personas con preguntas o que deseen más información sobre esta solicitud pueden ponerse en contacto con la Compañía al 1-888-286-6700. Una copia de la solicitud estará disponible para inspección durante las horas normales de negocio en la oficina de la Compañía situada en 5400 LBJ Freeway, Suite 1800, Dallas, Texas 75240 y en la página web de la Compañía en www.atmosenergy.com/MTXtariffs. Cualquier persona afectada dentro de las áreas no incorporadas puede presentar comentarios por escrito o una protesta con respecto a esta solicitud con la Gas Services Division, Market Oversight Section, Railroad Commission of Texas, P.O. Box 12967, Austin, Texas 78711-2967. Debe incluir el referente “Atmos Energy Mid-Tex Division 2021 Interim Rate Adjustment Application” en su comentario o protesta por escrito.
CUSTOMER NOTICE OF INTERIM RATE ADJUSTMENT
Pursuant to Texas Utilities Code Section 104.301, the Mid-Tex Division of Atmos Energy Corporation (the “Company”), filed an application for an Interim Rate Adjustment with the Railroad Commission of Texas on February 26, 2021. This proposed Interim Rate Adjustment applies to all customers served by the Company within the unincorporated areas of the Mid-Tex Division and provides for the recovery of additional capital investment incurred from January 1, 2020 through December 31, 2020. The request is for capital investment not included in any previous rate case or rates for service and is subject to refund. The Company proposes to increase the customer/meter charge used to calculate the customer’s monthly bill by the amount listed below. The proposed Interim Rate Adjustment effective date is April 27, 2021. In accordance with Texas Utilities Code Section 104.101, the increase constitutes a major change in the Company’s rates.
TABLE 1
Rate Schedule
Current Customer
Charge
Proposed 2020
Interim Rate Adjustment
Adjusted Charge
Increase Per Bill
Rate I – Industrial
Sales
$ 1,201.70 per meter
per month
$ 262.44 per meter per month
$ 1,464.14 per meter per month
$ 262.44
Rate T – Transportation
$ 1,201.70 per meter
per month
$ 262.44 per meter per month
$ 1,464.14 per meter per month
$ 262.44
Persons with questions or who want more information about this filing may contact the Company at 1-888-286-6700. A copy of the filing will be available for inspection during normal business hours at the Company’s office at 5400 LBJ Freeway, Suite 1800, Dallas, Texas, 75240 or on the Company's website at www.atmosenergy.com/MTXtariffs. Any affected person within the unincorporated areas may file written comments or a protest concerning this proposed Interim Rate Adjustment with Gas Services, Market Oversight Section, Railroad Commission of Texas, P.O. Box 12967, Austin, Texas 78711-2967. Please reference the Atmos Energy Mid-Tex Division 2021 Interim Rate Adjustment Application in your written comment or protest.
1. Attach the Company's proposed rate schedules.
Please see the following attached Rate Schedules:Rate R - Residential SalesRate C - Commercial SalesRate I - Industrial SalesRate T - Transportation
2.
Please see the enclosed flash drive containing following files:Residential (Environs) Tariff - Clean.docxCommercial (Environs) Tariff - Clean.docxIndustrial (Environs) Tariff - Clean.docxTransportation (Environs) Tariff - Clean.docxResidential (Environs) Tariff - Redline.docxCommercial (Environs) Tariff - Redline.docxIndustrial (Environs) Tariff - Redline.docxTransportation (Environs) Tariff - Redline.docx
Proposed Implementation Date: April 27, 2021 (60 days from date of filing)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Rate Schedules
Please also provide clean and redlined electronic copies of the proposed rate schedules in Microsoft Word with the filing.
IRA-3 Rate Schedules Page 1 of 1
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: R – RESIDENTIAL SALES
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
Application Applicable to Residential Customers for all natural gas provided at one Point of Delivery and measured through one meter.
Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts due under the riders listed below:
Charge Amount
GUD 10742 Customer Charge per Bill $ 17.00 per month
Rider CEE Surcharge $ 0.05 per month1
Interim Rate Adjustment (“IRA”) $ 12.10 per month2
Total Customer Charge $ 29.15 per month Commodity Charge – All Ccf $ 0.18653 per Ccf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated in accordance with Rider WNA. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service.
1 Reference Rider CEE – Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2020. 2 2018 IRA - $2.84, 2019 IRA - $4.71, 2020 IRA - $4.55.
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: C – COMMERCIAL SALES
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
Application Applicable to Commercial Customers for all natural gas provided at one Point of Delivery and measured through one meter and to Industrial Customers with an average annual usage of less than 30,000 Ccf. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts due under the riders listed below:
Charge Amount GUD 10742 Customer Charge per Bill $ 40.00 per month
Rider CEE Surcharge $ 0.02 per month1
Interim Rate Adjustment (“IRA”) $ 37.80 per month2
Total Customer Charge $ 77.82 per month
Commodity Charge - All Ccf $ 0.10494 per Ccf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated in accordance with Rider WNA. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service.
1 Reference Rider CEE – Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2020. . 2 2018 IRA - $8.74, 2019 IRA - $14.54, 2020 IRA - $14.52.
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
1 2018 IRA - $155.84, 2019 IRA - $261.86, 2020 IRA - $262.44.
Application Applicable to Industrial Customers with a maximum daily usage (MDU) of less than 3,500 MMBtu per day for all natural gas provided at one Point of Delivery and measured through one meter. Service for Industrial Customers with an MDU equal to or greater than 3,500 MMBtu per day will be provided at Company's sole option and will require special contract arrangements between Company and Customer. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and MMBtu charges to the amounts due under the riders listed below:
Charge Amount GUD 10742 Customer Charge per Meter $ 784.00 per month Interim Rate Adjustment (“IRA”) $ 680.14 per month1
Total Customer Charge $1,464.14 per month First 0 MMBtu to 1,500 MMBtu $ 0.3701 per MMBtu Next 3,500 MMBtu $ 0.2712 per MMBtu All MMBtu over 5,000 MMBtu $ 0.0582 per MMBtu
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Curtailment Overpull Fee Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day in the table entitled “Daily Price Survey.” Replacement Index In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing a daily price index recognized as authoritative by the natural gas industry and most closely approximating the applicable index.
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
1 2018 IRA - $155.84, 2019 IRA - $261.86, 2020 IRA - $262.44.
Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Special Conditions In order to receive service under Rate I, Customer must have the type of meter required by Company. Customer must pay Company all costs associated with the acquisition and installation of the meter.
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
1 2018 IRA - $155.84, 2019 IRA - $261.86, 2020 IRA - $262.44.
Application Applicable, in the event that Company has entered into a Transportation Agreement, to a customer directly connected to the Atmos Energy Corp., Mid-Tex Division Distribution System (Customer) for the transportation of all natural gas supplied by Customer or Customer’s agent at one Point of Delivery for use in Customer's facility. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's bill will be calculated by adding the following Customer and MMBtu charges to the amounts and quantities due under the riders listed below:
Charge Amount GUD 10742 Customer Charge per Meter $ 784.00 per month
Interim Rate Adjustment (“IRA”) $ 680.14 per month1
Total Customer Charge $1,464.14 per month First 0 MMBtu to 1,500 MMBtu $ 0.3701 per MMBtu Next 3,500 MMBtu $ 0.2712 per MMBtu All MMBtu over 5,000 MMBtu $ 0.0582 per MMBtu
Upstream Transportation Cost Recovery: Plus an amount for upstream transportation costs in accordance with Part (b) of Rider GCR. Retention Adjustment: Plus a quantity of gas as calculated in accordance with Rider RA.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Imbalance Fees All fees charged to Customer under this Rate Schedule will be charged based on the quantities determined under the applicable Transportation Agreement and quantities will not be aggregated for any Customer with multiple Transportation Agreements for the purposes of such fees. Monthly Imbalance Fees Customer shall pay Company the greater of (i) $0.10 per MMBtu, or (ii) 150% of the difference per MMBtu between the highest and lowest “midpoint” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” during such month, for the MMBtu of Customer’s monthly Cumulative Imbalance, as defined in the applicable Transportation Agreement, at the end of each month that exceeds 10% of Customer’s receipt quantities for the month.
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
1 2018 IRA - $155.84, 2019 IRA - $261.86, 2020 IRA - $262.44.
Curtailment Overpull Fee Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day in the table entitled “Daily Price Survey.” Replacement Index In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing a daily price index recognized as authoritative by the natural gas industry and most closely approximating the applicable index. Agreement A transportation agreement is required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Special Conditions In order to receive service under Rate T, customer must have the type of meter required by Company. Customer must pay Company all costs associated with the acquisition and installation of the meter.
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: R – RESIDENTIAL SALES
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
Deleted: RRC Tariff No: 29849
Deleted: Bills Rendered on or after 09/01/2020
Deleted: PAGE: 43 Application Applicable to Residential Customers for all natural gas provided at one Point of Delivery and measured through one meter.
Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts due under the riders listed below:
Charge Amount
GUD 10742 Customer Charge per Bill $ 17.00 per month
Rider CEE Surcharge $ 0.05 per month1
Interim Rate Adjustment (“IRA”) $ 12.10 per month2
Total Customer Charge $ 29.15 per month Commodity Charge – All Ccf $ 0.18653 per Ccf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated in accordance with Rider WNA. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service.
1 Reference Rider CEE – Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2020. 2 2018 IRA - $2.84, 2019 IRA - $4.71, 2020 IRA - $4.55.
Deleted: 7.55
Deleted: 24.60
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: C – COMMERCIAL SALES
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
Deleted: RRC Tariff No: 29850
Deleted: Bills Rendered on or after 09/01/2020
Deleted: PAGE: 44 Application Applicable to Commercial Customers for all natural gas provided at one Point of Delivery and measured through one meter and to Industrial Customers with an average annual usage of less than 30,000 Ccf. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the amounts due under the riders listed below:
Charge Amount GUD 10742 Customer Charge per Bill $ 40.00 per month
Rider CEE Surcharge $ 0.02 per month1
Interim Rate Adjustment (“IRA”) $ 37.80 per month2
Total Customer Charge $ 77.82 per month
Commodity Charge - All Ccf $ 0.10494 per Ccf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR. Weather Normalization Adjustment: Plus or Minus an amount for weather normalization calculated in accordance with Rider WNA. Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service.
1 Reference Rider CEE – Conservation and Energy Efficiency as approved in GUD 10170. Surcharge billing effective July 1, 2020. . 2 2018 IRA - $8.74, 2019 IRA - $14.54, 2020 IRA - $14.52.
Deleted: 23.28
Deleted: 63.30
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
1 2018 IRA - $155.84, 2019 IRA - $261.86, 2020 IRA - $262.44.
Deleted: RRC Tariff No: 29851
Deleted: Bills Rendered on or after 09/01/2020
Deleted: PAGE: 45
Application Applicable to Industrial Customers with a maximum daily usage (MDU) of less than 3,500 MMBtu per day for all natural gas provided at one Point of Delivery and measured through one meter. Service for Industrial Customers with an MDU equal to or greater than 3,500 MMBtu per day will be provided at Company's sole option and will require special contract arrangements between Company and Customer. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's monthly bill will be calculated by adding the following Customer and MMBtu charges to the amounts due under the riders listed below:
Charge Amount GUD 10742 Customer Charge per Meter $ 784.00 per month Interim Rate Adjustment (“IRA”) $ 680.14 per month1
Total Customer Charge $1,464.14 per month
First 0 MMBtu to 1,500 MMBtu $ 0.3701 per MMBtu Next 3,500 MMBtu $ 0.2712 per MMBtu All MMBtu over 5,000 MMBtu $ 0.0582 per MMBtu
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated in accordance with Part (a) and Part (b), respectively, of Rider GCR.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s). Curtailment Overpull Fee Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day in the table entitled “Daily Price Survey.” Replacement Index In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing a daily price index recognized as authoritative by the natural gas industry and most closely approximating the applicable index.
Deleted: 417.70
Deleted: 1,201.70
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: I – INDUSTRIAL SALES
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
1 2018 IRA - $155.84, 2019 IRA - $261.86, 2020 IRA - $262.44.
Deleted: RRC Tariff No: 29851
Deleted: Bills Rendered on or after 09/01/2020
Deleted: PAGE: 46Agreement An Agreement for Gas Service may be required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Special Conditions In order to receive service under Rate I, Customer must have the type of meter required by Company. Customer must pay Company all costs associated with the acquisition and installation of the meter.
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
1 2018 IRA - $155.84, 2019 IRA - $261.86, 2020 IRA - $262.44.
Deleted: RRC Tariff No: 29852
Deleted: Bills Rendered on or after 09/01/2020
Deleted: PAGE: 47 Application Applicable, in the event that Company has entered into a Transportation Agreement, to a customer directly connected to the Atmos Energy Corp., Mid-Tex Division Distribution System (Customer) for the transportation of all natural gas supplied by Customer or Customer’s agent at one Point of Delivery for use in Customer's facility. Type of Service Where service of the type desired by Customer is not already available at the Point of Delivery, additional charges and special contract arrangements between Company and Customer may be required prior to service being furnished. Monthly Rate Customer's bill will be calculated by adding the following Customer and MMBtu charges to the amounts and quantities due under the riders listed below:
Charge Amount GUD 10742 Customer Charge per Meter $ 784.00 per month
Interim Rate Adjustment (“IRA”) $ 680.14 per month1
Total Customer Charge $1,464.14 per month First 0 MMBtu to 1,500 MMBtu $ 0.3701 per MMBtu Next 3,500 MMBtu $ 0.2712 per MMBtu All MMBtu over 5,000 MMBtu $ 0.0582 per MMBtu
Upstream Transportation Cost Recovery: Plus an amount for upstream transportation costs in accordance with Part (b) of Rider GCR. Retention Adjustment: Plus a quantity of gas as calculated in accordance with Rider RA.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Imbalance Fees All fees charged to Customer under this Rate Schedule will be charged based on the quantities determined under the applicable Transportation Agreement and quantities will not be aggregated for any Customer with multiple Transportation Agreements for the purposes of such fees. Monthly Imbalance Fees Customer shall pay Company the greater of (i) $0.10 per MMBtu, or (ii) 150% of the difference per MMBtu between the highest and lowest “midpoint” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” during such month, for the MMBtu of Customer’s monthly Cumulative Imbalance, as defined in the applicable Transportation Agreement, at the end of each month that exceeds 10% of Customer’s receipt quantities for the month.
Deleted: 417.70
Deleted: 1,201.70
MID-TEX DIVISION ATMOS ENERGY CORPORATION
RATE SCHEDULE: T – TRANSPORTATION
APPLICABLE TO: UNINCORPORATED AREAS
EFFECTIVE DATE:
1 2018 IRA - $155.84, 2019 IRA - $261.86, 2020 IRA - $262.44.
Deleted: RRC Tariff No: 29852
Deleted: Bills Rendered on or after 09/01/2020
Deleted: PAGE: 48Curtailment Overpull Fee Upon notification by Company of an event of curtailment or interruption of Customer’s deliveries, Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the applicable Gas Day in the table entitled “Daily Price Survey.” Replacement Index In the event the “midpoint” or “common” price for the Katy point listed in Platts Gas Daily in the table entitled “Daily Price Survey” is no longer published, Company will calculate the applicable imbalance fees utilizing a daily price index recognized as authoritative by the natural gas industry and most closely approximating the applicable index. Agreement A transportation agreement is required. Notice Service hereunder and the rates for services provided are subject to the orders of regulatory bodies having jurisdiction and to the Company’s Tariff for Gas Service. Special Conditions In order to receive service under Rate T, customer must have the type of meter required by Company. Customer must pay Company all costs associated with the acquisition and installation of the meter.
Line No. Rate Class Current* Proposed Difference % Change(a) (b) (c) (d) (e) (f)
1011 Residential Tariff (Rate R)12 Customer Charge per Bill 24.60$ 29.15$ 4.55$ 18.50%13 Consumption Charge (Ccf) 0.18653$ 0.18653$ -$ 0.00%14 Average Monthly Bill @ 37.7 Ccf 49.65$ 54.20$ 4.55$ 9.16%1516 Commercial Tariff (Rate C)17 Customer Charge per Bill 63.30$ 77.82$ 14.52$ 22.94%18 Consumption Charge (Ccf) 0.10494$ 0.10494$ -$ 0.00%19 Average Monthly Bill @ 335.9 Ccf 227.34$ 241.86$ 14.52$ 6.39%2021 Industrial Tariff (Rate I)22 Customer Charge per Meter 1,201.70$ 1,464.14$ 262.44$ 21.84%23 First 1,500 MMBtu 0.3701$ 0.3701$ -$ 0.00%24 Next 3,500 MMBtu 0.2712$ 0.2712$ -$ 0.00%25 Over 5,000 MMBtu 0.0582$ 0.0582$ -$ 0.00%26 Average Monthly Bill @ 8,213.1 MMBtu 18,468.31$ 18,730.75$ 262.44$ 1.42%2728 Transportation Tariff (Rate T)29 Customer Charge per Meter 1,201.70$ 1,464.14$ 262.44$ 21.84%30 First 1,500 MMBtu 0.3701$ 0.3701$ -$ 0.00%31 Next 3,500 MMBtu 0.2712$ 0.2712$ -$ 0.00%32 Over 5,000 MMBtu 0.0582$ 0.0582$ -$ 0.00%33 Average Monthly Bill @ 8,213.1 MMBtu 6,147.07$ 6,409.51$ 262.44$ 4.27%3435
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Bill Comparisons
Current and Proposed Bill Information - With Gas Cost
IRA-4 Bill Comparisons Page 1 of 2
Line No. Rate Class Current* Proposed Difference % Change(a) (b) (c) (d) (e) (f)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Bill Comparisons
3637 Residential Tariff (Rate R)38 Customer Charge per Bill 24.60$ 29.15$ 4.55$ 18.50%39 Consumption Charge (Ccf) 0.18653$ 0.18653$ -$ 0.00%40 Average Monthly Bill @ 37.7 Ccf 31.63$ 36.18$ 4.55$ 14.38%4142 Commercial Tariff (Rate C)43 Customer Charge per Bill 63.30$ 77.82$ 14.52$ 22.94%44 Consumption Charge (Ccf) 0.10494$ 0.10494$ -$ 0.00%45 Average Monthly Bill @ 335.9 Ccf 98.54$ 113.06$ 14.52$ 14.73%4647 Industrial Tariff (Rate I)48 Customer Charge per Meter 1,201.70$ 1,464.14$ 262.44$ 21.84%49 First 1,500 MMBtu 0.3701$ 0.3701$ -$ 0.00%50 Next 3,500 MMBtu 0.2712$ 0.2712$ -$ 0.00%51 Over 5,000 MMBtu 0.0582$ 0.0582$ -$ 0.00%52 Average Monthly Bill @ 8,213.1 MMBtu 2,893.05$ 3,155.49$ 262.44$ 9.07%5354 Transportation Tariff (Rate T)55 Customer Charge per Meter 1,201.70$ 1,464.14$ 262.44$ 21.84%56 First 1,500 MMBtu 0.3701$ 0.3701$ -$ 0.00%57 Next 3,500 MMBtu 0.2712$ 0.2712$ -$ 0.00%58 Over 5,000 MMBtu 0.0582$ 0.0582$ -$ 0.00%59 Average Monthly Bill @ 8,213.1 MMBtu 2,893.05$ 3,155.49$ 262.44$ 9.07%6061 Note:62 *Current rates - Please see IRA-1 General Information, No. 14.
Current and Proposed Bill Information - Without Gas Cost
IRA-4 Bill Comparisons Page 2 of 2
Line No. Description Ref
As per GUD No. 10742 At 12/31/19 (1)
Per Book As of 12/31/2020 Adjustments
Per Book Adjusted As of 12/31/2020
Change in Investment
(a) (b) (c) (d) (e) (f) = (g) - (e) (g) (h) = (g) - (d)
11 Direct Utility Plant Investment 5,776,831,892$ 6,587,251,764$ 41,085,236$ 6,628,337,000$ 851,505,108$ 12 Direct Accumulated Depreciation 1,401,173,680 1,570,124,950 (77,916,877) 1,492,208,073 91,034,393 13 Allocated Utility Plant Investment (If applicable) 147,483,342 159,555,476 (730,375) 158,825,101 11,341,759 14 Allocated Accumulated Depreciation (If applicable) 60,171,083 66,335,180 (472,987) 65,862,193 5,691,110
15 Miscellaneous Adjustments (17,989,131) (19,597,310) (19,597,310) (1,608,180)
16 Net Utility Plant Investment (Ln 11 - 12 + 13 - 14 + 15) 4,444,981,341$ 5,110,347,110$ 99,147,415$ 5,209,494,524$ 764,513,183$
1718 Calculation of the Interim Rate Adjustment Amount:19 Rate of Return IRA-1 7.97%20 Return Col (h), Ln 16 times Col (h), Ln 19 60,908,765$ 21 Depreciation Expense IRA-8 plus IRA-11 24,023,673 22 Property-related Taxes (Ad Valorem) IRA-21 14,577,982 23 Revenue-related Taxes and State Margin Tax 2 - 24 Federal Income Tax IRA-20 11,986,212 25 Interim Rate Adjustment Amount (Sum of Ln 20 through Ln 24) 111,496,633$
26
27 Interim Rate Adjustment Amount per Rate Class:Allocation Factors
per GUD No. 10742: Total Service Area: RRC Jurisdiction:28 Rate Schedule R 77.95% 86,915,510$ 4,080,968$ 29 Rate Schedule C 19.40% 21,630,195 378,972 30 Rate Schedule I and T 2.65% 2,950,927 182,658 31 Total (Sum of Ln 28 through Ln 30) 100.00% 111,496,633$ 4,642,598$
32
33 Monthly Customer Charge Adjustment:Annual Service Area
Bill Count:
Annual RRC Jurisdiction Bill Count:
Monthly Customer Charge Adjustment:
34 Rate Schedule R 19,083,564 896,916 4.55$ 35 Rate Schedule C 1,490,016 26,100 14.52$ 36 Rate Schedule I and T 11,244 696 262.44$ 37 Total (Sum of Ln 34 through Ln 36) 20,584,824 923,712
38 - OR -
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Interim Rate Adjustment Summary
IRA-5 IRA Summary Page 1 of 2
Line No. Description Ref
As per GUD No. 10742 At 12/31/19 (1)
Per Book As of 12/31/2020 Adjustments
Per Book Adjusted As of 12/31/2020
Change in Investment
(a) (b) (c) (d) (e) (f) = (g) - (e) (g) (h) = (g) - (d)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Interim Rate Adjustment Summary
39 Monthly Initial Block Rate Adjustment:Annual Service Area
Volumes:
Annual RRC Jurisdiction
Volumes:Monthly Initial Block
Rate Adjustment:40 Rate Schedule R N/A N/A N/A41 Rate Schedule C N/A N/A N/A42 Rate Schedule I and T N/A N/A N/A4344 Current
Customer ChargeOther
AdjustmentsCurrent Year IRA
AdjustmentProposed
Customer Charge45 Change to Customer Charge 346 Rate Schedule R 17.00$ 7.60$ 4.55$ 29.15$ 47 Rate Schedule C 40.00$ 23.30$ 14.52$ 77.82$ 48 Rate Schedule I and T 784.00$ 417.70$ 262.44$ 1,464.14$ 4950 Notes:51 1. The amounts are updated as per GUD No. 10742 Final Order.52 2. Revenue related taxes are collected through Rider FF and Rider TAX.53 3. Column (d) is from GUD No. 10742, Final Order, Finding of Fact 18. Column (e) encompasses the Rider CEE Tariff per the Compliance Filing (2019-2020 CEE Program Report), GUD No.
10822 (2018 IRA Filing), and GUD No. 10944 (2019 IRA Filing).
IRA-5 IRA Summary Page 2 of 2
Line No. DescriptionPrior Year
Allocation Factors (1)Current Year
Allocation Factors (2) Amounts or Factors(a) (b) (c) (d) (e)
10 SSU General Office (Division 002) 37.66% 38.39%1112 SSU General Office - Greenville Data Center 14.06% 14.11%1314 SSU General Office - Distribution and Marketing 47.52% 48.71%1516 SSU General Office - Aligne Pipe Projects 4.16% 5.54%1718 SSU Customer Support (Division 012) 52.44% 52.60%1920 SSU Customer Support - Charles K. Vaughn Training Center 73.97% 77.16%212223 Weighted Average Cost of Capital Table (3): Capital Structure Cost Weighted Cost24 (b) (c) (d) (e) = (c) * (d)2526 Common Equity 60.18% 9.80% 5.90%27 Debt 39.82% 5.20% 2.07%28 Total 100.00% 7.97%
293031 Return Factor - GUD No. 10742 Final Order, Sch. G, Col (b), Ln. 20 7.97%
323334 Federal Income Tax Factor Calculation ((1 / .79) * (.21)) (4) 26.58%
35
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocation Factors
IRA-5A Allocation Factors Page 1 of 2
Line No. DescriptionPrior Year
Allocation Factors (1)Current Year
Allocation Factors (2) Amounts or Factors(a) (b) (c) (d) (e)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocation Factors
36 Allocation Factors:37 Rate Schedule R GUD No. 10742 Final Order, Finding of Fact 20 (g) 77.95%38 Rate Schedule C GUD No. 10742 Final Order, Finding of Fact 20 (g) 19.40%39 Rate Schedule I and T GUD No. 10742 Final Order, Finding of Fact 20 (g) 2.65%40 Total Sum of Ln 37 through Ln 39 100.00%
4142 2020 Year-end Number of Customers (Rate R and C) / Number of Meters (Rate I and T) times 12: (5)43 Rate Schedule R 19,083,564 44 Rate Schedule C 1,490,016 45 Rate Schedule I and T 11,244 46 Total Sum of Ln 43 through Ln 45 20,584,824
4748 Notes:49 1. The allocation factors above are for Fiscal Year 2020 and based on the 4-factor formula.50 2. The allocation factors above are for Fiscal Year 2021 and based on the 4-factor formula.51 3. Capital Structure and Cost Components are per GUD No. 10742, Final Order, Finding of Fact 19.52 4. The Federal Income Tax rate of 21% as per GUD No. 10742, Final Order, Finding of Fact 20 (f).53 5. Utilizing the current year number of customers or meters is per the methodology in GUD No. 9560 Final Order, Finding of Fact 49.
IRA-5A Allocation Factors Page 2 of 2
Line No. Description Ref Adjustments
Total Adjustments
(a) (b) (c) (d) (e)
11 GUD No. 10742 Miscellaneous Adjustments:12 To remove the Rate Base Adjustments as per WP_B-1, Col (b), Ln 13 as of December 31, 2017 1 (11,562,966)$ 13 Ending Balance, 2017 Miscellaneous Adjustments (11,562,966)$ 1415 2018 Miscellaneous Adjustments:16 To reverse the Amortized Rate Base Adjustments as of December 31, 2017 1 11,562,966$ 17 To remove the Amortized Rate Base Adjustments as of December 31, 2018 1 (11,047,844) 18 To remove CY2018 Employee Expense Account Charges from Mid-Tex and SSU 2018 Additions. 2 (113,619) 19 To remove CY2018 Employee Related Expenses found through the 5400 subaccount review. 3 (132,799) 20 To remove CY2018 Employee Related Expenses found through the 900 account review. 3 (109,090) 21 To remove CY2018 Incentive Compensation (SSU MIP/VPP and LTIP). 4 (4,635,624) 22 To remove CY2018 Severance Pay in order to reduce controversy. 6 - 23 Ending Balance, 2018 Miscellaneous Adjustments (4,476,010)$ 2425 2019 Miscellaneous Adjustments:26 To reverse the Amortized Rate Base Adjustments as of December 31, 2018 1 11,047,844$ 27 To remove the Amortized Rate Base Adjustments as of December 31, 2019 1 (10,532,723) 28 To remove CY2019 Employee Expense Account Charges from Mid-Tex and SSU 2019 Additions. 2 (65,054) 29 To remove CY2019 Employee Related Expenses found through the 5400 subaccount review. 3 (31,275) 30 To remove CY2019 Employee Related Expenses found through the 900 account review. 3 82,198 31 To remove CY2019 Incentive Compensation (FY19 Proxy Statement Named Executive Officers). 5 (2,382,433) 32 To remove CY2019 Severance Pay in order to reduce controversy. 6 (68,713) 33 Ending Balance, 2019 Miscellaneous Adjustments (1,950,155)$ 3435 Total Miscellaneous Adjustments as of December 31, 2019 (IRA-5, Col (d), Ln 15) (17,989,131)$ 36
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Miscellaneous Adjustments
IRA-5B Misc AdjustmentsPage 1 of 2
Line No. Description Ref Adjustments
Total Adjustments
(a) (b) (c) (d) (e)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Miscellaneous Adjustments
37 2020 Miscellaneous Adjustments:38 To reverse the Amortized Rate Base Adjustments as of December 31, 2019 1 10,532,723$ 39 To remove the Amortized Rate Base Adjustments as of December 31, 2020 1 (10,017,602) 40 To remove CY2020 Employee Expense Account Charges from Mid-Tex and SSU 2020 Additions. 2 (18,824) 41 To remove CY2020 Employee Related Expenses found through the 5400 subaccount review. 3 (32,158) 42 To remove CY2020 Employee Related Expenses found through the 900 account review. 3 (13,478) 43 To remove CY2020 Incentive Compensation (FY20 Proxy Statement Named Executive Officers). 5 (1,992,281) 44 To remove CY2020 Severance Pay in order to reduce controversy. 6 (66,560) 45 Ending Balance, 2020 Miscellaneous Adjustments (1,608,180)$ 4647 Total Miscellaneous Adjustments as of December 31, 2020 (IRA-5, Col (g), Ln 15) (19,597,310)$ 4849 Notes:50 1. This adjustment rolls forward the balances disallowed in GUD Nos. 9670, 9762, 9869, 10170, and 10742 Final Orders.51 2. This adjustment removes the capital amounts of certain employee expense account charges.52 3. This adjustment removes the capital amounts of other employee related expenses.53 4. This adjustment removes the capital amounts associated with SSU MIP/VPP and LTIP per GUD No. 10742.54
55 6. This adjustment removes the capital portion of severance pay. There was no severance pay during CY2018.
5. This adjustment removes the capital incentive compensation amounts associated with the named executive officers in the Company's proxy statement per TEX. UTIL. CODE § 104.060 effective June 2019.
IRA-5B Misc AdjustmentsPage 2 of 2
Line No.
FERC Account No. FERC Account Titles Ref
Prior Year Adjusted Gross Plant @
12/31/19
Depreciation Rate per
GUD No. 10742Depreciation
Expense
Adjusted Accumulated Depreciation @ 12/31/19 Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) = (e) - (h)
11 1. INTANGIBLE PLANT12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents 18,896 0.00% - 7,231 11,665 14 303.00 Miscellaneous Intangible Plant 709,231 0.00% - 797,603 (88,372) 15 Subtotal 728,128$ -$ 804,834$ (76,707)$ 1617 5. DISTRIBUTION PLANT18 374.01 Land 990,029$ 0.00% -$ 7,827$ 982,203$ 19 374.02 Land Rights 3,446,318 0.98% 33,774 1,567,659 1,878,659 20 375.00 Structures and Improvements 1,759,128 1.71% 30,081 1,054,412 704,716 21 376.00 Mains - Cathodic Protection 141,037,978 1.85% 2,609,203 36,266,703 104,771,275 22 376.01 Mains - Steel 778,860,412 3.97% 30,920,758 190,714,460 588,145,952 23 376.02 Mains - Plastic 2,316,630,637 2.21% 51,197,537 503,109,576 1,813,521,062 24 378.00 M&R Station Equipment 145,586,988 3.09% 4,498,638 43,153,197 102,433,791 25 379.00 City Gate Equipment 6,048,688 1.88% 113,715 3,417,961 2,630,727 26 380.00 Services 1,659,722,656 3.67% 60,911,821 451,850,123 1,207,872,533 27 381.00 Meters 335,633,004 3.31% 11,109,452 65,776,754 269,856,250 28 382.00 Meter Installations 148,784,417 3.66% 5,445,510 35,985,203 112,799,214 29 383.00 House Regulators 99,901,479 3.50% 3,496,552 23,617,931 76,283,547 30 385.00 Industrial M&R Station Equipment 3,082,623 2.80% 86,313 487,423 2,595,200 31 Subtotal 5,641,484,356$ 170,453,355$ 1,357,009,228$ 4,284,475,128$ 3233 6. GENERAL PLANT34 389.00 Land and Land Rights 5,141,158$ 0.00% -$ 114$ 5,141,045$ 35 390.00 Structures and Improvements 59,400,426 2.54% 1,508,771 18,250,421 41,150,005 36 390.04 Air Conditioning Equipment 395,562 2.75% 10,878 71,435 324,128 37 391.00 Office Furniture and Equipment 8,660,394 4.00% 346,416 (691,195) 9,351,590 38 392.00 Transportation Equipment 1 931,072 9.04% 9,932 540,338 390,734 39 393.00 Stores Equipment 1 106,629 4.00% 501 32,300 74,329 40 394.00 Tools, Shop, and Garage Equipment 1 28,731,371 5.00% 168,670 9,215,149 19,516,222 41 395.00 Laboratory Equipment 1 361,884 10.00% 4,252 282,740 79,144 42 396.00 Power Operated Equipment 1 2,285,043 7.24% 3,309 973,378 1,311,665
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Initial or Prior Year Plant
IRA-6 Direct Initial Plant Page 1 of 2
Line No.
FERC Account No. FERC Account Titles Ref
Prior Year Adjusted Gross Plant @
12/31/19
Depreciation Rate per
GUD No. 10742Depreciation
Expense
Adjusted Accumulated Depreciation @ 12/31/19 Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) = (e) - (h)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Initial or Prior Year Plant
43 397.00 Communication Equipment 5,369,548 6.67% 358,149 4,268,700 1,100,848 44 398.00 Miscellaneous Equipment 2,037,059 2.50% 50,926 1,075,894 961,164 45 399.00 Other Tangible Property 238,280 14.29% 34,050 127,289 110,991 46 399.01 Other Tangible Property - Servers Hardware 2 85,063 14.29% - 85,063 - 47 399.02 Other Tangible Property - Servers Software 258,852 14.29% 36,990 149,841 109,011 48 399.03 Other Tangible Property - Network Hardware 1,331,188 11.11% 147,895 546,767 784,420 49 399.06 Other Tangible Property - PC Hardware 13,273,863 14.29% 1,896,835 7,249,523 6,024,340 50 399.07 Other Tangible Property - PC Software 601,782 14.29% 85,995 196,258 405,524 51 399.08 Other Tangible Property - Application Software 5,410,234 14.29% 773,122 4,578,217 832,017 52 RWIP Retirement Work In Progress - - (3,592,614) 3,592,614 53 Subtotal 134,619,409$ 5,436,692$ 43,359,618$ 91,259,791$ 5455 TOTAL 5,776,831,892$ 175,890,047$ 1,401,173,680$ 4,375,658,213$ 56 Accrual for Reserve Deficiency (AR 15) - 200,352 - - 57 Adjusted Total 5,776,831,892$ 176,090,398$ 1,401,173,680$ 4,375,658,213$ 5859 Note:60 1. The following accounts have a portion of their depreciation expense capitalized to projects:61 Account Numbers Cap Percentage62 392 88.20%63 393 88.25%64 394 88.26%65 395 88.25%66 396 98.00%67 2. Depreciation expense was not calculated, since the account is fully depreciated.
IRA-6 Direct Initial Plant Page 2 of 2
Line No.
FERC Account No. FERC Account Titles Ref
Adjusted Gross Plant As of
12/31/20
Depreciation Rate per
GUD No. 10742Depreciation
Expense
Adjusted Accumulated
Depreciation As of 12/31/20 Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h)
11 1. INTANGIBLE PLANT12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents 18,896 0.00% - 7,231 11,665 14 303.00 Miscellaneous Intangible Plant 709,231 0.00% - 797,603 (88,372) 15 Subtotal 728,128$ -$ 804,834$ (76,707)$ 1617 5. DISTRIBUTION PLANT18 374.01 Land 990,029$ 0.00% -$ 7,827$ 982,203$ 19 374.02 Land Rights 3,446,318 0.98% 33,774 1,601,433 1,844,885 20 375.00 Structures and Improvements 1,759,128 1.71% 30,081 1,084,493 674,635 21 376.00 Mains - Cathodic Protection 148,521,636 1.85% 2,747,650 38,715,525 109,806,111 22 376.01 Mains - Steel 861,010,433 3.97% 34,182,114 181,482,583 679,527,850 23 376.02 Mains - Plastic 2,837,127,705 2.21% 62,700,522 545,648,599 2,291,479,106 24 378.00 M&R Station Equipment 156,511,264 3.09% 4,836,198 45,613,049 110,898,216 25 379.00 City Gate Equipment 6,092,846 1.88% 114,546 3,531,419 2,561,428 26 380.00 Services 1,837,177,335 3.67% 67,424,408 491,040,483 1,346,136,851 27 381.00 Meters 359,766,215 3.31% 11,908,262 72,168,872 287,597,343 28 382.00 Meter Installations 180,533,548 3.66% 6,607,528 39,538,265 140,995,283 29 383.00 House Regulators 99,875,094 3.50% 3,495,628 25,703,849 74,171,245 30 385.00 Industrial M&R Station Equipment 3,001,018 2.80% 84,028 520,212 2,480,806 31 Subtotal 6,495,812,569$ 194,164,740$ 1,446,656,607$ 5,049,155,961$ 3233 6. GENERAL PLANT34 389.00 Land and Land Rights 5,141,158$ 0.00% -$ 114$ 5,141,045$ 35 390.00 Structures and Improvements 59,949,670 2.54% 1,522,722 19,744,139 40,205,530 36 390.04 Air Conditioning Equipment 418,803 2.75% 11,517 77,325 341,478 37 391.00 Office Furniture and Equipment 8,218,420 4.00% 328,737 (818,203) 9,036,624 38 392.00 Transportation Equipment 1 784,662 9.04% 7,630 461,739 322,923 39 393.00 Stores Equipment 1 106,629 4.00% 459 36,744 69,885 40 394.00 Tools, Shop, and Garage Equipment 1 29,652,854 5.00% 159,317 10,692,332 18,960,522
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Current Year Plant (Adjusted)
IRA-7 Direct Current Plant Page 1 of 2
Line No.
FERC Account No. FERC Account Titles Ref
Adjusted Gross Plant As of
12/31/20
Depreciation Rate per
GUD No. 10742Depreciation
Expense
Adjusted Accumulated
Depreciation As of 12/31/20 Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Current Year Plant (Adjusted)
41 395.00 Laboratory Equipment 1 295,595 10.00% 3,181 248,387 47,208 42 396.00 Power Operated Equipment 1 1,821,898 7.24% 2,638 647,076 1,174,822 43 397.00 Communication Equipment 3,882,926 6.67% 258,991 3,125,999 756,927 44 398.00 Miscellaneous Equipment 2,083,045 2.50% 52,076 1,217,095 865,950 45 399.00 Other Tangible Property 229,663 14.29% 32,819 156,662 73,001 46 399.01 Other Tangible Property - Servers Hardware 2 82,622 14.29% - 82,622 - 47 399.02 Other Tangible Property - Servers Software 258,852 14.29% 36,990 186,831 72,021 48 399.03 Other Tangible Property - Network Hardware 1,340,931 11.11% 148,977 688,848 652,083 49 399.06 Other Tangible Property - PC Hardware 12,315,688 14.29% 1,759,912 6,745,609 5,570,080 50 399.07 Other Tangible Property - PC Software 525,447 14.29% 75,086 191,026 334,422 51 399.08 Other Tangible Property - Application Software 4,687,439 14.29% 669,835 3,718,850 968,589 52 RWIP Retirement Work In Progress - - (2,456,562) 2,456,562 53 Subtotal 131,796,304$ 5,070,888$ 44,746,632$ 87,049,672$ 5455 TOTAL 6,628,337,000$ 199,235,627$ 1,492,208,073$ 5,136,128,927$
56 Accrual for Reserve Deficiency (AR 15) - 167,863 - - 57 Adjusted Total 6,628,337,000$ 199,403,490$ 1,492,208,073$ 5,136,128,927$
5859 Notes:60 1. The following accounts have a portion of their depreciation expense capitalized to projects:61 Account Numbers Cap Percentage62 392 89.24%63 393 89.25%64 394 89.25%65 395 89.24%66 396 98.00%67 2. Depreciation expense was not calculated, since the account is fully depreciated.
IRA-7 Direct Current Plant Page 2 of 2
Line No.
FERC Account
No. FERC Account Titles Ref
Per Book Gross Plant As of
12/31/20Plant
Adjustments
Adjusted Gross Plant as of
12/31/20
Per Book Accumulated
Depreciation As of 12/31/20
Accumulated Depreciation Adjustments
Adjusted Accumulated
Depreciation as of 12/31/20
(a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i)
11 1. INTANGIBLE PLANT12 301.00 Organization -$ -$ -$ -$ -$ -$ 13 302.00 Franchises and Consents 18,896 - 18,896 7,231 - 7,231 14 303.00 Miscellaneous Intangible Plant 921,324 212,093 709,231 921,324 123,721 797,603 15 Subtotal 940,220$ 212,093$ 728,128$ 928,555$ 123,721$ 804,834$ 1617 5. DISTRIBUTION PLANT18 374.01 Land 990,029$ -$ 990,029$ 7,827$ -$ 7,827$ 19 374.02 Land Rights 3,446,318 - 3,446,318 1,601,433 - 1,601,433 20 375.00 Structures and Improvements 1,759,128 - 1,759,128 1,084,493 - 1,084,493 21 376.00 Mains - Cathodic Protection 196,591,345 48,069,708 148,521,636 81,670,230 42,954,705 38,715,525 22 376.01 Mains - Steel 842,137,459 (18,872,974) 861,010,433 181,483,369 787 181,482,583 23 376.02 Mains - Plastic 2,768,639,270 (68,488,435) 2,837,127,705 545,892,171 243,572 545,648,599 24 378.00 M&R Station Equipment 154,467,163 (2,044,101) 156,511,264 45,613,049 - 45,613,049 25 379.00 City Gate Equipment 6,078,362 (14,484) 6,092,846 3,531,419 - 3,531,419 26 380.00 Services 1,843,404,549 6,227,215 1,837,177,335 525,600,169 34,559,686 491,040,483 27 381.00 Meters 356,289,299 (3,476,916) 359,766,215 72,168,872 - 72,168,872 28 382.00 Meter Installations 178,565,171 (1,968,377) 180,533,548 39,539,460 1,195 39,538,265 29 383.00 House Regulators 99,092,463 (782,631) 99,875,094 25,703,961 112 25,703,849 30 385.00 Industrial M&R Station Equipment 2,980,547 (20,470) 3,001,018 520,212 - 520,212 31 Subtotal 6,454,441,103$ (41,371,465)$ 6,495,812,569$ 1,524,416,663$ 77,760,056$ 1,446,656,607$ 32
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Current Year Plant Adjustments
IRA-7A Adjustments Direct Page 1 of 2
Line No.
FERC Account
No. FERC Account Titles Ref
Per Book Gross Plant As of
12/31/20Plant
Adjustments
Adjusted Gross Plant as of
12/31/20
Per Book Accumulated
Depreciation As of 12/31/20
Accumulated Depreciation Adjustments
Adjusted Accumulated
Depreciation as of 12/31/20
(a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Current Year Plant Adjustments
33 6. GENERAL PLANT34 389.00 Land and Land Rights 5,141,158$ -$ 5,141,158$ 114$ -$ 114$ 35 390.00 Structures and Improvements 60,003,891 54,222 59,949,670 19,761,195 17,056 19,744,139 36 390.04 Air Conditioning Equipment 418,803 - 418,803 77,325 - 77,325 37 391.00 Office Furniture and Equipment 8,218,420 - 8,218,420 (818,203) - (818,203) 38 392.00 Transportation Equipment 804,577 19,915 784,662 477,784 16,045 461,739 39 393.00 Stores Equipment 106,629 - 106,629 36,744 - 36,744 40 394.00 Tools, Shop, and Garage Equipment 29,652,854 - 29,652,854 10,692,332 - 10,692,332 41 395.00 Laboratory Equipment 295,595 - 295,595 248,387 - 248,387 42 396.00 Power Operated Equipment 1,821,898 - 1,821,898 647,076 - 647,076 43 397.00 Communication Equipment 3,882,926 - 3,882,926 3,125,999 - 3,125,999 44 398.00 Miscellaneous Equipment 2,083,045 - 2,083,045 1,217,095 - 1,217,095 45 399.00 Other Tangible Property 229,663 - 229,663 156,662 - 156,662 46 399.01 Other Tangible Property - Servers Hardware 82,622 - 82,622 82,622 - 82,622 47 399.02 Other Tangible Property - Servers Software 258,852 - 258,852 186,831 - 186,831 48 399.03 Other Tangible Property - Network Hardware 1,340,931 - 1,340,931 688,848 - 688,848 49 399.06 Other Tangible Property - PC Hardware 12,315,688 - 12,315,688 6,745,609 - 6,745,609 50 399.07 Other Tangible Property - PC Software 525,447 - 525,447 191,026 - 191,026 51 399.08 Other Tangible Property - Application Software 4,687,439 - 4,687,439 3,718,850 - 3,718,850 52 RWIP Retirement Work In Progress - - - (2,456,562) - (2,456,562) 53 Subtotal 131,870,440$ 74,137$ 131,796,304$ 44,779,732$ 33,101$ 44,746,632$ 5455 TOTAL 6,587,251,764$ (41,085,236)$ 6,628,337,000$ 1,570,124,950$ 77,916,877$ 1,492,208,073$
56 Miscellaneous Adjustments57 Adjusted Total 6,587,251,764$ (41,085,236)$ 6,628,337,000$ 1,570,124,950$ 77,916,877$ 1,492,208,073$
IRA-7A Adjustments Direct Page 2 of 2
Line No.
FERC Account
No. FERC Account Titles Ref
Change in Gross Plant as
of 12/31/20
Depreciation Rate per GUD
No. 10742Depreciation
ExpenseAccumulated Depreciation Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i)
11 1. INTANGIBLE PLANT12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents - 0.00% - - - 14 303.00 Miscellaneous Intangible Plant - 0.00% - - - 15 Subtotal -$ -$ -$ -$ 1617 5. DISTRIBUTION PLANT18 374.01 Land -$ 0.00% -$ -$ -$ 19 374.02 Land Rights - 0.98% - 33,774 (33,774) 20 375.00 Structures and Improvements - 1.71% - 30,081 (30,081) 21 376.00 Mains - Cathodic Protection 7,483,658 1.85% 138,448 2,448,822 5,034,836 22 376.01 Mains - Steel 82,150,021 3.97% 3,261,356 (9,231,877) 91,381,898 23 376.02 Mains - Plastic 520,497,068 2.21% 11,502,985 42,539,023 477,958,044 24 378.00 M&R Station Equipment 10,924,276 3.09% 337,560 2,459,852 8,464,425 25 379.00 City Gate Equipment 44,159 1.88% 830 113,458 (69,299) 26 380.00 Services 177,454,678 3.67% 6,512,587 39,190,360 138,264,318 27 381.00 Meters 24,133,211 3.31% 798,809 6,392,118 17,741,093 28 382.00 Meter Installations 31,749,131 3.66% 1,162,018 3,553,062 28,196,069 29 383.00 House Regulators (26,384) 3.50% (923) 2,085,918 (2,112,302) 30 385.00 Industrial M&R Station Equipment (81,606) 2.80% (2,285) 32,789 (114,394) 31 Subtotal 854,328,213$ 23,711,385$ 89,647,380$ 764,680,833$ 32
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Incremental Plant
IRA-8 Direct Incremental Plant Page 1 of 2
Line No.
FERC Account
No. FERC Account Titles Ref
Change in Gross Plant as
of 12/31/20
Depreciation Rate per GUD
No. 10742Depreciation
ExpenseAccumulated Depreciation Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Incremental Plant
33 6. GENERAL PLANT34 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 35 390.00 Structures and Improvements 549,244 2.54% 13,951 1,493,718 (944,474) 36 390.04 Air Conditioning Equipment 23,240 2.75% 639 5,890 17,350 37 391.00 Office Furniture and Equipment (441,974) 4.00% (17,679) (127,008) (314,966) 38 392.00 Transportation Equipment (146,410) 9.04% (2,302) (78,599) (67,811) 39 393.00 Stores Equipment - 4.00% (43) 4,443 (4,443) 40 394.00 Tools, Shop, and Garage Equipment 921,483 5.00% (9,353) 1,477,183 (555,700) 41 395.00 Laboratory Equipment (66,289) 10.00% (1,071) (34,353) (31,935) 42 396.00 Power Operated Equipment (463,144) 7.24% (671) (326,301) (136,843) 43 397.00 Communication Equipment (1,486,622) 6.67% (99,158) (1,142,701) (343,921) 44 398.00 Miscellaneous Equipment 45,987 2.50% 1,150 141,201 (95,215) 45 399.00 Other Tangible Property (8,617) 14.29% (1,231) 29,373 (37,989) 46 399.01 Other Tangible Property - Servers Hardware (2,441) 14.29% - (2,441) - 47 399.02 Other Tangible Property - Servers Software - 14.29% - 36,990 (36,990) 48 399.03 Other Tangible Property - Network Hardware 9,743 11.11% 1,082 142,080 (132,338) 49 399.06 Other Tangible Property - PC Hardware (958,175) 14.29% (136,923) (503,914) (454,261) 50 399.07 Other Tangible Property - PC Software (76,335) 14.29% (10,908) (5,232) (71,103) 51 399.08 Other Tangible Property - Application Software (722,795) 14.29% (103,287) (859,367) 136,572 52 RWIP Retirement Work In Progress - - 1,136,052 (1,136,052) 53 Subtotal (2,823,105)$ (365,804)$ 1,387,014$ (4,210,119)$ 5455 TOTAL 851,505,108$ 23,345,581$ 91,034,393$ 760,470,714$ 56 Accrual for Reserve Deficiency (AR 15) - (32,489) - - 57 Adjusted Total 851,505,108$ 23,313,091$ 91,034,393$ 760,470,714$
IRA-8 Direct Incremental Plant Page 2 of 2
Line No.
FERC Account
No. FERC Account Titles Ref
Prior Year Adjusted Gross
Plant As of 12/31/19
Depreciation Rate per GUD
No. 10742Depreciation
Expense
Adjusted Accumulated
Depreciation As of 12/31/19 Net Plant
Prior Year Allocation
Factor
Allocated Adjusted Gross
Plant
Allocated Depreciation
Expense
Allocated Adjusted
Accumulated Depreciation
Allocated Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT13 390.00 Structures and Improvements 1,438,336$ 3.34% 48,040$ 561,551$ 876,786$ 37.66% 541,677$ 18,092$ 211,480$ 330,197$ 14 390.09 Improvements to Leased Premises 8,535,185 4.06% 346,528 8,521,619 13,565 37.66% 3,214,350 130,503 3,209,242 5,109 15 391.00 Office Furniture and Equipment 4,626,018 4.03% 186,429 1,808,952 2,817,066 37.66% 1,742,158 70,209 681,251 1,060,907 16 392.00 Transportation Equipment 7,125 28.96% 2,064 6,070 1,055 37.66% 2,683 777 2,286 397 17 393.00 Stores Equipment - 10.00% - - - 37.66% - - - - 18 394.00 Tools, Shop, and Garage Equipment 76,071 8.88% 6,755 41,838 34,234 37.66% 28,648 2,544 15,756 12,892 19 395.00 Laboratory Equipment - 10.00% - - - 37.66% - - - - 20 397.00 Communication Equipment 375,195 5.54% 20,786 (42,486) 417,681 37.66% 141,299 7,828 (16,000) 157,299 21 398.00 Miscellaneous Equipment 136,510 1.72% 2,348 51,675 84,835 37.66% 51,409 884 19,461 31,949 22 399.00 Other Tangible Property - 13.84% - 1,773 (1,773) 37.66% - - 668 (668) 23 399.01 Other Tangible Property - Servers Hardware 27,466,266 8.62% 2,367,592 5,860,681 21,605,585 37.66% 10,343,796 891,635 2,207,132 8,136,663 24 399.02 Other Tangible Property - Servers Software 7,980,711 8.78% 700,706 7,368,391 612,320 37.66% 3,005,536 263,886 2,774,936 230,600 25 399.03 Other Tangible Property - Network Hardware 5,581,523 8.72% 486,709 2,398,358 3,183,166 37.66% 2,102,002 183,295 903,222 1,198,780 26 399.06 Other Tangible Property - PC Hardware 2,810,690 8.78% 246,779 234,599 2,576,091 37.66% 1,058,506 92,937 88,350 970,156 27 399.07 Other Tangible Property - PC Software 1,193,151 6.64% 79,225 80,980 1,112,171 37.66% 449,341 29,836 30,497 418,844 28 399.08 Other Tangible Property - Application Software 76,165,349 6.57% 5,004,063 33,775,086 42,390,263 37.66% 28,683,870 1,884,530 12,719,698 15,964,173 29 399.09 Other Tangible Property - Mainframe Software - 6.21% - 6,843 (6,843) 37.66% - - 2,577 (2,577) 30 RWIP Retirement Work In Progress - - - - 37.66% - - - - 31 Subtotal 136,392,131$ 9,498,025$ 60,675,929$ 75,716,202$ 51,365,276$ 3,576,956$ 22,850,555$ 28,514,722$ 3233 SSU GENERAL OFFICE - GREENVILLE DATA CENTER34 6. GENERAL PLANT35 390.05 Structures and Improvements 9,187,142$ 3.34% 306,851$ 4,032,012$ 5,155,130$ 14.06% 1,292,069$ 43,155$ 567,057$ 725,011$ 36 391.04 Office Furniture and Equipment 71,036 4.03% 2,863 35,769 35,268 14.06% 9,990 403 5,031 4,960 37 Subtotal 9,258,178$ 309,713$ 4,067,781$ 5,190,398$ 1,302,059$ 43,558$ 572,088$ 729,971$ 3839 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING40 6. GENERAL PLANT41 390.20 Structures and Improvements 2,116$ 3.34% 71$ 104$ 2,012$ 47.52% 1,006$ 34$ 49$ 956$ 42 390.29 Improvements to Leased Premises 31,824 4.06% 1,292 965 30,859 47.52% 15,123 614 459 14,664 43 391.20 Office Furniture and Equipment 42,049 4.03% 1,695 11,469 30,580 47.52% 19,982 805 5,450 14,532 44 394.20 Tools, Shop, and Garage Equipment - 8.88% - 388 (388) 47.52% - - 184 (184) 45 397.20 Communication Equipment 8,824 5.54% 489 4,515 4,309 47.52% 4,193 232 2,146 2,048 46 398.20 Miscellaneous Equipment 7,388 1.72% 127 1,131 6,257 47.52% 3,511 60 537 2,974 47 399.21 Other Tangible Property - Servers Hardware 1,063,473 8.62% 91,671 470,520 592,953 47.52% 505,362 43,562 223,591 281,771 48 399.22 Other Tangible Property - Servers Software 1,461,672 8.78% 128,335 604,806 856,866 47.52% 694,587 60,985 287,404 407,183 49 399.23 Other Tangible Property - Network Hardware 22,205 8.72% 1,936 10,880 11,325 47.52% 10,552 920 5,170 5,382 50 399.26 Other Tangible Property - PC Hardware 314,379 8.78% 27,603 99,423 214,957 47.52% 149,393 13,117 47,246 102,147 51 399.28 Other Tangible Property - Application Software 21,262,294 6.57% 1,396,933 13,081,830 8,180,464 47.52% 10,103,842 663,822 6,216,486 3,887,356 52 Subtotal 24,216,225$ 1,650,151$ 14,286,031$ 9,930,194$ 11,507,550$ 784,152$ 6,788,722$ 4,718,828$ 5354 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS55 6. GENERAL PLANT56 399.31 Other Tangible Property - Servers Hardware 297,267$ 8.62% 25,624$ 95,781$ 201,486$ 4.16% 12,374$ 1,067$ 3,987$ 8,387$
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Initial or Prior Year Plant - SSU
IRA-9 Alloc. Initial Plant Page 1 of 3
Line No.
FERC Account
No. FERC Account Titles Ref
Prior Year Adjusted Gross
Plant As of 12/31/19
Depreciation Rate per GUD
No. 10742Depreciation
Expense
Adjusted Accumulated
Depreciation As of 12/31/19 Net Plant
Prior Year Allocation
Factor
Allocated Adjusted Gross
Plant
Allocated Depreciation
Expense
Allocated Adjusted
Accumulated Depreciation
Allocated Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Initial or Prior Year Plant - SSU
57 399.32 Other Tangible Property - Servers Software 783,917 8.78% 68,828 99,769 684,148 4.16% 32,630 2,865 4,153 28,477 58 399.38 Other Tangible Property - Application Software 19,742,145 6.57% 1,297,059 5,343,246 14,398,899 4.16% 821,762 53,990 222,411 599,351 59 Subtotal 20,823,328$ 1,391,511$ 5,538,796$ 15,284,532$ 866,766$ 57,921$ 230,551$ 636,215$ 6061 TOTAL SSU GENERAL OFFICE 190,689,863$ 12,849,400$ 84,568,536$ 106,121,326$ 65,041,652$ 4,462,587$ 30,441,916$ 34,599,736$
6263 SSU CUSTOMER SUPPORT (DIVISION 012) 64 6. GENERAL PLANT65 389.00 Land and Land Rights 1 2,874,240$ 0.00% -$ -$ 2,874,240$ 52.44% 1,507,251$ -$ -$ 1,507,251$ 66 390.00 Structures and Improvements 12,784,514 3.34% 427,003 2,440,846 10,343,668 52.44% 6,704,199 223,920 1,279,979 5,424,219 67 390.09 Improvements to Leased Premises 2,812,746 4.06% 114,197 1,810,493 1,002,253 52.44% 1,475,004 59,885 949,422 525,581 68 391.00 Office Furniture and Equipment 2,570,820 4.03% 103,604 960,132 1,610,688 52.44% 1,348,138 54,330 503,493 844,645 69 397.00 Communication Equipment 1,913,117 5.54% 105,987 1,194,748 718,369 52.44% 1,003,239 55,579 626,526 376,713 70 398.00 Miscellaneous Equipment 57,552 1.72% 990 11,692 45,860 52.44% 30,180 519 6,131 24,049 71 399.00 Other Tangible Property - 13.84% - (154,265) 154,265 52.44% - - (80,896) 80,896 72 399.01 Other Tangible Property - Servers Hardware 9,861,431 8.62% 850,055 5,066,673 4,794,758 52.44% 5,171,335 445,769 2,656,963 2,514,371 73 399.02 Other Tangible Property - Servers Software 2,208,691 8.78% 193,923 1,420,725 787,966 52.44% 1,158,238 101,693 745,028 413,210 74 399.03 Other Tangible Property - Network Hardware 629,226 8.72% 54,868 429,474 199,751 52.44% 329,966 28,773 225,216 104,750 75 399.06 Other Tangible Property - PC Hardware 559,825 8.78% 49,153 (117,174) 676,999 52.44% 293,572 25,776 (61,446) 355,018 76 399.07 Other Tangible Property - PC Software - 6.64% - (57,199) 57,199 52.44% - - (29,995) 29,995 77 399.08 Other Tangible Property - Application Software 97,212,522 6.57% 6,386,863 37,765,538 59,446,983 52.44% 50,978,246 3,349,271 19,804,248 31,173,998 78 Subtotal 133,484,683$ 8,286,643$ 50,771,683$ 82,713,000$ 69,999,368$ 4,345,516$ 26,624,670$ 43,374,697$ 7980 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER81 6. GENERAL PLANT82 389.10 Land and Land Rights 1 1,886,443$ 0.00% -$ -$ 1,886,443$ 73.97% 1,395,486$ -$ -$ 1,395,486$ 83 390.10 Structures and Improvements 12,542,660 3.34% 418,925 3,375,175 9,167,484 73.97% 9,278,368 309,897 2,496,769 6,781,599 84 391.10 Office Furniture and Equipment 519,438 4.03% 20,933 69,717 449,721 73.97% 384,252 15,485 51,573 332,679 85 392.10 Transportation Equipment 96,290 28.96% 27,886 95,301 989 73.97% 71,230 20,628 70,498 732 86 394.10 Tools, Shop, and Garage Equipment 545,570 8.88% 48,447 172,023 373,547 73.97% 403,582 35,838 127,253 276,329 87 395.10 Laboratory Equipment 23,632 10.00% 2,363 18,932 4,700 73.97% 17,482 1,748 14,005 3,477 88 397.10 Communication Equipment 307,842 5.54% 17,054 176,253 131,590 73.97% 227,725 12,616 130,382 97,343 89 398.10 Miscellaneous Equipment 526,525 1.72% 9,056 153,253 373,272 73.97% 389,494 6,699 113,368 276,126 90 399.10 Other Tangible Property 295,692 13.84% 40,924 132,997 162,695 73.97% 218,737 30,273 98,384 120,353 91 399.16 Other Tangible Property - PC Hardware 72,357 8.78% 6,353 41,096 31,260 73.97% 53,526 4,700 30,401 23,125 92 399.17 Other Tangible Property - PC Software 3,299 6.64% 219 (28,068) 31,367 73.97% 2,440 162 (20,763) 23,204 93 399.18 Other Tangible Property - Application Software - 15.89% - (9,966) 9,966 73.97% - - (7,373) 7,373 94 Subtotal 16,819,748$ 592,160$ 4,196,713$ 12,623,035$ 12,442,322$ 438,047$ 3,104,497$ 9,337,826$ 9596 TOTAL SSU CUSTOMER SUPPORT 150,304,431$ 8,878,803$ 54,968,396$ 95,336,036$ 82,441,690$ 4,783,563$ 29,729,167$ 52,712,523$
9798 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 340,994,294$ 21,728,203$ 139,536,932$ 201,457,362$ 147,483,342$ 9,246,150$ 60,171,083$ 87,312,259$
99100 Miscellaneous Adjustments - - - - - - - - 101 Adjusted Total 340,994,294$ 21,728,203$ 139,536,932$ 201,457,362$ 147,483,342$ 9,246,150$ 60,171,083$ 87,312,259$
102
IRA-9 Alloc. Initial Plant Page 2 of 3
Line No.
FERC Account
No. FERC Account Titles Ref
Prior Year Adjusted Gross
Plant As of 12/31/19
Depreciation Rate per GUD
No. 10742Depreciation
Expense
Adjusted Accumulated
Depreciation As of 12/31/19 Net Plant
Prior Year Allocation
Factor
Allocated Adjusted Gross
Plant
Allocated Depreciation
Expense
Allocated Adjusted
Accumulated Depreciation
Allocated Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Initial or Prior Year Plant - SSU
103 Note:104 1. The account is either non-depreciable or fully depreciated. Therefore, no depreciation expense was calculated.
IRA-9 Alloc. Initial Plant Page 3 of 3
Line No.
FERC Account
No. FERC Account Titles Ref
Adjusted Gross Plant As of
12/31/20
Depreciation Rate Per
GUD No. 10742Depreciation
Expense
Adjusted Accumulated
Depreciation As of 12/31/20 Net Plant
Current Year
Allocation Factor
Allocated Adjusted
Gross Plant
Allocated Depreciation
Expense
Allocated Adjusted
Accumulated Depreciation
Allocated Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT13 390.00 Structures and Improvements 5,883,128$ 3.34% 196,496$ 681,372$ 5,201,756$ 38.39% 2,258,533$ 75,435$ 261,579$ 1,996,954$ 14 390.09 Improvements to Leased Premises 9,225,653 4.06% 374,562 8,706,946 518,708 38.39% 3,541,728 143,794 3,342,597 199,132 15 391.00 Office Furniture and Equipment 5,038,365 4.03% 203,046 1,998,112 3,040,253 38.39% 1,934,228 77,949 767,075 1,167,153 16 392.00 Transportation Equipment 315,337 28.96% 91,322 46,300 269,037 38.39% 121,058 35,058 17,774 103,283 17 393.00 Stores Equipment - 10.00% - - - 38.39% - - - - 18 394.00 Tools, Shop, and Garage Equipment 76,071 8.88% 6,755 47,248 28,823 38.39% 29,204 2,593 18,139 11,065 19 395.00 Laboratory Equipment - 10.00% - - - 38.39% - - - - 20 397.00 Communication Equipment 381,531 5.54% 21,137 (9,429) 390,960 38.39% 146,470 8,114 (3,620) 150,090 21 398.00 Miscellaneous Equipment 136,510 1.72% 2,348 56,012 80,498 38.39% 52,406 901 21,503 30,903 22 399.00 Other Tangible Property - 13.84% - (0) 0 38.39% - - (0) 0 23 399.01 Other Tangible Property - Servers Hardware 26,950,627 8.62% 2,323,144 441,744 26,508,883 38.39% 10,346,346 891,855 169,586 10,176,760 24 399.02 Other Tangible Property - Servers Software 7,599,664 8.78% 667,250 7,300,916 298,748 38.39% 2,917,511 256,157 2,802,822 114,689 25 399.03 Other Tangible Property - Network Hardware 3,810,974 8.72% 332,317 828,352 2,982,622 38.39% 1,463,033 127,576 318,004 1,145,028 26 399.06 Other Tangible Property - PC Hardware 2,901,276 8.78% 254,732 (232,389) 3,133,665 38.39% 1,113,800 97,792 (89,214) 1,203,014 27 399.07 Other Tangible Property - PC Software 1,182,201 6.64% 78,498 155,702 1,026,500 38.39% 453,847 30,135 59,774 394,073 28 399.08 Other Tangible Property - Application Software 84,686,429 6.57% 5,563,898 38,694,988 45,991,441 38.39% 32,511,120 2,135,981 14,855,006 17,656,114 29 399.09 Other Tangible Property - Mainframe Software - 6.21% - - - 38.39% - - - - 30 RWIP Retirement Work In Progress - - - - 38.39% - - - - 31 Subtotal 148,187,766$ 10,115,506$ 58,715,874$ 89,471,892$ 56,889,283$ 3,883,343$ 22,541,024$ 34,348,259$ 3233 SSU GENERAL OFFICE - GREENVILLE DATA CENTER34 6. GENERAL PLANT35 390.05 Structures and Improvements 9,187,142$ 3.34% 306,851$ 4,313,636$ 4,873,506$ 14.11% 1,296,397$ 43,300$ 608,697$ 687,700$ 36 391.04 Office Furniture and Equipment 71,036 4.03% 2,863 38,593 32,444 14.11% 10,024 404 5,446 4,578 37 Subtotal 9,258,178$ 309,713$ 4,352,229$ 4,905,949$ 1,306,421$ 43,704$ 614,143$ 692,278$ 3839 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING40 6. GENERAL PLANT41 390.20 Structures and Improvements 2,116$ 3.34% 71$ 172$ 1,944$ 48.71% 1,031$ 34$ 84$ 947$ 42 390.29 Improvements to Leased Premises 31,824 4.06% 1,292 2,185 29,639 48.71% 15,502 629 1,064 14,437 43 391.20 Office Furniture and Equipment 42,049 4.03% 1,695 13,388 28,661 48.71% 20,482 825 6,521 13,961 44 394.20 Tools, Shop, and Garage Equipment - 8.88% - 388 (388) 48.71% - - 189 (189) 45 397.20 Communication Equipment 8,824 5.54% 489 5,013 3,811 48.71% 4,298 238 2,442 1,856 46 398.20 Miscellaneous Equipment 7,388 1.72% 127 1,343 6,045 48.71% 3,599 62 654 2,945 47 399.21 Other Tangible Property - Servers Hardware 1,323,831 8.62% 114,114 566,983 756,848 48.71% 644,838 55,585 276,177 368,661 48 399.22 Other Tangible Property - Servers Software 5,420,538 8.78% 475,923 903,833 4,516,704 48.71% 2,640,344 231,822 440,257 2,200,087 49 399.23 Other Tangible Property - Network Hardware 182,873 8.72% 15,947 13,368 169,505 48.71% 89,077 7,768 6,512 82,566 50 399.26 Other Tangible Property - PC Hardware 333,279 8.78% 29,262 128,951 204,328 48.71% 162,340 14,253 62,812 99,528 51 399.28 Other Tangible Property - Application Software 24,900,954 6.57% 1,635,993 14,566,172 10,334,782 48.71% 12,129,255 796,892 7,095,182 5,034,072 52 Subtotal 32,253,676$ 2,274,912$ 16,201,796$ 16,051,880$ 15,710,766$ 1,108,110$ 7,891,895$ 7,818,871$ 5354 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS55 6. GENERAL PLANT56 399.31 Other Tangible Property - Servers Hardware 297,267$ 8.62% 25,624$ 123,996$ 173,271$ 5.54% 16,480$ 1,421$ 6,874$ 9,606$ 57 399.32 Other Tangible Property - Servers Software 783,917 8.78% 68,828 155,188 628,729 5.54% 43,460 3,816 8,604 34,857 58 399.38 Other Tangible Property - Application Software 20,190,158 6.57% 1,326,493 6,626,068 13,564,089 5.54% 1,119,338 73,541 367,348 751,990 59 Subtotal 21,271,341$ 1,420,946$ 6,905,252$ 14,366,088$ 1,179,279$ 78,777$ 382,826$ 796,453$ 6061 TOTAL SSU GENERAL OFFICE 210,970,961$ 14,121,076$ 86,175,151$ 124,795,810$ 75,085,748$ 5,113,933$ 31,429,887$ 43,655,861$
62
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Current Year Plant (Adjusted) - SSU
IRA-10 Alloc. Current Plant Page 1 of 2
Line No.
FERC Account
No. FERC Account Titles Ref
Adjusted Gross Plant As of
12/31/20
Depreciation Rate Per
GUD No. 10742Depreciation
Expense
Adjusted Accumulated
Depreciation As of 12/31/20 Net Plant
Current Year
Allocation Factor
Allocated Adjusted
Gross Plant
Allocated Depreciation
Expense
Allocated Adjusted
Accumulated Depreciation
Allocated Net Plant
(a) (b) (c) (d) (e) (f) (g) = (e) * (f) (h) (i) = (e) - (h) (j) (k) = (e) x (j) (l) = (g) x (j) (m) = (h) x (j) (n) = (i) x (j)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Current Year Plant (Adjusted) - SSU
63 SSU CUSTOMER SUPPORT (DIVISION 012) 64 6. GENERAL PLANT65 389.00 Land and Land Rights 1 2,874,240$ 0.00% -$ -$ 2,874,240$ 52.60% 1,511,850$ -$ -$ 1,511,850$ 66 390.00 Structures and Improvements 13,222,274 3.34% 441,624 2,860,554 10,361,720 52.60% 6,954,916 232,294 1,504,651 5,450,265 67 390.09 Improvements to Leased Premises 2,812,746 4.06% 114,197 1,917,919 894,827 52.60% 1,479,504 60,068 1,008,825 470,679 68 391.00 Office Furniture and Equipment 2,600,799 4.03% 104,812 1,064,051 1,536,748 52.60% 1,368,020 55,131 559,691 808,329 69 397.00 Communication Equipment 1,913,117 5.54% 105,987 1,302,493 610,624 52.60% 1,006,300 55,749 685,111 321,188 70 398.00 Miscellaneous Equipment 57,552 1.72% 990 13,334 44,219 52.60% 30,272 521 7,013 23,259 71 399.00 Other Tangible Property - 13.84% - (154,265) 154,265 52.60% - - (81,143) 81,143 72 399.01 Other Tangible Property - Servers Hardware 9,861,030 8.62% 850,021 5,934,625 3,926,404 52.60% 5,186,902 447,111 3,121,613 2,065,289 73 399.02 Other Tangible Property - Servers Software 2,208,691 8.78% 193,923 1,614,224 594,468 52.60% 1,161,772 102,004 849,082 312,690 74 399.03 Other Tangible Property - Network Hardware 338,088 8.72% 29,481 172,095 165,993 52.60% 177,834 15,507 90,522 87,312 75 399.06 Other Tangible Property - PC Hardware 792,277 8.78% 69,562 (206,503) 998,780 52.60% 416,738 36,590 (108,621) 525,359 76 399.07 Other Tangible Property - PC Software - 6.64% - (57,199) 57,199 52.60% - - (30,087) 30,087 77 399.08 Other Tangible Property - Application Software 97,655,808 6.57% 6,415,987 44,039,962 53,615,846 52.60% 51,366,955 3,374,809 23,165,020 28,201,935 78 Subtotal 134,336,622$ 8,326,584$ 58,501,289$ 75,835,333$ 70,661,063$ 4,379,783$ 30,771,678$ 39,889,385$ 7980 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER81 6. GENERAL PLANT82 389.10 Land and Land Rights 1 1,886,443$ 0.00% -$ -$ 1,886,443$ 77.16% 1,455,658$ -$ -$ 1,455,658$ 83 390.10 Structures and Improvements 12,562,619 3.34% 419,591 3,786,528 8,776,091 77.16% 9,693,844 323,774 2,921,844 6,772,000 84 391.10 Office Furniture and Equipment 534,049 4.03% 21,522 91,078 442,972 77.16% 412,095 16,607 70,279 341,816 85 392.10 Transportation Equipment 96,290 28.96% 27,886 95,866 424 77.16% 74,302 21,518 73,974 327 86 394.10 Tools, Shop, and Garage Equipment 595,549 8.88% 52,885 203,821 391,728 77.16% 459,551 40,808 157,277 302,274 87 395.10 Laboratory Equipment 23,632 10.00% 2,363 21,260 2,372 77.16% 18,235 1,824 16,405 1,831 88 397.10 Communication Equipment 327,905 5.54% 18,166 194,113 133,793 77.16% 253,026 14,018 149,786 103,240 89 398.10 Miscellaneous Equipment 545,396 1.72% 9,381 165,491 379,905 77.16% 420,850 7,239 127,700 293,151 90 399.10 Other Tangible Property 301,111 13.84% 41,674 176,005 125,106 77.16% 232,350 32,157 135,813 96,537 91 399.16 Other Tangible Property - PC Hardware 72,357 8.78% 6,353 47,601 24,756 77.16% 55,833 4,902 36,731 19,103 92 399.17 Other Tangible Property - PC Software 3,299 6.64% 219 (27,849) 31,148 77.16% 2,546 169 (21,489) 24,035 93 399.18 Other Tangible Property - Application Software - 15.89% - (9,966) 9,966 77.16% - - (7,691) 7,691 94 Subtotal 16,948,650$ 600,040$ 4,743,946$ 12,204,704$ 13,078,289$ 463,016$ 3,660,628$ 9,417,662$ 9596 TOTAL SSU CUSTOMER SUPPORT 151,285,272$ 8,926,624$ 63,245,235$ 88,040,037$ 83,739,353$ 4,842,799$ 34,432,306$ 49,307,047$
9798 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 362,256,234$ 23,047,700$ 149,420,386$ 212,835,847$ 158,825,101$ 9,956,732$ 65,862,193$ 92,962,908$
99100 Miscellaneous Adjustments - - - - - - - - 101 Adjusted Total 362,256,234$ 23,047,700$ 149,420,386$ 212,835,847$ 158,825,101$ 9,956,732$ 65,862,193$ 92,962,908$
102103 Note:104 1. The account is either non-depreciable or fully depreciated. Therefore, no depreciation expense was calculated.
IRA-10 Alloc. Current Plant Page 2 of 2
Line No.
FERC Account
No. FERC Account Titles Ref
Per Book Gross Plant As of
12/31/20Plant
Adjustments
Adjusted Gross Plant as
of 12/31/20
Per Book Accumulated
Depreciation As of 12/31/20
Accumulated Depreciation Adjustments
Adjusted Accumulated
Depreciation as of 12/31/20
Current Year
Allocation Factor
Allocated Gross Plant
as of 12/31/20
Allocated Gross Plant Adjustments
Allocated Accumulated Depreciation as of 12/31/20
Allocated Accumulated Depreciation Adjustments
(a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) (k) (l) = (e) * (k) (m) = (f) * (k) (n) = (h) * (k) (o) = (i) * (k)
11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT13 390.00 Structures and Improvements 5,883,128$ -$ 5,883,128$ 681,372$ -$ 681,372$ 38.39% 2,258,533$ -$ 261,579$ -$ 14 390.09 Improvements to Leased Premises 9,873,727 648,074 9,225,653 9,355,019 648,074 8,706,946 38.39% 3,790,524 248,795 3,591,392 248,795 15 391.00 Office Furniture and Equipment 6,052,207 1,013,842 5,038,365 2,413,036 414,923 1,998,112 38.39% 2,323,442 389,214 926,364 159,289 16 392.00 Transportation Equipment 315,337 - 315,337 46,300 - 46,300 38.39% 121,058 - 17,774 - 17 393.00 Stores Equipment - - - - - - 38.39% - - - - 18 394.00 Tools, Shop, and Garage Equipment 76,071 - 76,071 47,248 - 47,248 38.39% 29,204 - 18,139 - 19 395.00 Laboratory Equipment - - - - - - 38.39% - - - - 20 397.00 Communication Equipment 381,531 - 381,531 (9,429) - (9,429) 38.39% 146,470 - (3,620) - 21 398.00 Miscellaneous Equipment 136,510 - 136,510 56,012 - 56,012 38.39% 52,406 - 21,503 - 22 399.00 Other Tangible Property - - - (0) - (0) 38.39% - - (0) - 23 399.01 Other Tangible Property - Servers Hardware 26,950,627 - 26,950,627 441,744 - 441,744 38.39% 10,346,346 - 169,586 - 24 399.02 Other Tangible Property - Servers Software 7,599,664 - 7,599,664 7,300,916 - 7,300,916 38.39% 2,917,511 - 2,802,822 - 25 399.03 Other Tangible Property - Network Hardware 3,810,974 - 3,810,974 828,352 - 828,352 38.39% 1,463,033 - 318,004 - 26 399.06 Other Tangible Property - PC Hardware 2,901,276 - 2,901,276 (232,389) - (232,389) 38.39% 1,113,800 - (89,214) - 27 399.07 Other Tangible Property - PC Software 1,182,201 - 1,182,201 155,702 - 155,702 38.39% 453,847 - 59,774 - 28 399.08 Other Tangible Property - Application Software 85,151,126 464,697 84,686,429 38,727,445 32,456 38,694,988 38.39% 32,689,517 178,397 14,867,466 12,460 29 399.09 Other Tangible Property - Mainframe Software - - - - - - 38.39% - - - - 30 RWIP Retirement Work In Progress - - - - - - 38.39% - - - - 31 Subtotal 150,314,379$ 2,126,613$ 148,187,766$ 59,811,327$ 1,095,453$ 58,715,874$ 57,705,690$ 816,407$ 22,961,569$ 420,545$ 3233 SSU GENERAL OFFICE - GREENVILLE DATA CENTER34 6. GENERAL PLANT35 390.05 Structures and Improvements 9,187,142$ -$ 9,187,142$ 4,313,636$ -$ 4,313,636$ 14.11% 1,296,397$ -$ 608,697$ -$ 36 391.04 Office Furniture and Equipment 71,036 - 71,036 38,593 - 38,593 14.11% 10,024 - 5,446 - 37 Subtotal 9,258,178$ -$ 9,258,178$ 4,352,229$ -$ 4,352,229$ 1,306,421$ -$ 614,143$ -$ 3839 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING40 6. GENERAL PLANT41 390.20 Structures and Improvements 2,116$ -$ 2,116$ 172$ -$ 172$ 48.71% 1,031$ -$ 84$ -$ 42 390.29 Improvements to Leased Premises 31,824 - 31,824 2,185 - 2,185 48.71% 15,502 - 1,064 - 43 391.20 Office Furniture and Equipment 263,338 221,289 42,049 128,530 115,142 13,388 48.71% 128,272 107,790 62,607 56,086 44 394.20 Tools, Shop, and Garage Equipment - - - 388 - 388 48.71% - - 189 - 45 397.20 Communication Equipment 8,824 - 8,824 5,013 - 5,013 48.71% 4,298 - 2,442 - 46 398.20 Miscellaneous Equipment 7,388 - 7,388 1,343 - 1,343 48.71% 3,599 - 654 - 47 399.21 Other Tangible Property - Servers Hardware 1,323,831 - 1,323,831 566,983 - 566,983 48.71% 644,838 - 276,177 - 48 399.22 Other Tangible Property - Servers Software 5,420,538 - 5,420,538 903,833 - 903,833 48.71% 2,640,344 - 440,257 - 49 399.23 Other Tangible Property - Network Hardware 182,873 - 182,873 13,368 - 13,368 48.71% 89,077 - 6,512 - 50 399.26 Other Tangible Property - PC Hardware 333,279 - 333,279 128,951 - 128,951 48.71% 162,340 - 62,812 - 51 399.28 Other Tangible Property - Application Software 24,436,263 (464,691) 24,900,954 14,533,717 (32,455) 14,566,172 48.71% 11,902,903 (226,351) 7,079,373 (15,809) 52 Subtotal 32,010,274$ (243,402)$ 32,253,676$ 16,284,483$ 82,687$ 16,201,796$ 15,592,204$ (118,561)$ 7,932,172$ 40,277$ 5354 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS55 6. GENERAL PLANT56 399.31 Other Tangible Property - Servers Hardware 297,267$ -$ 297,267$ 123,996$ -$ 123,996$ 5.54% 16,480$ -$ 6,874$ -$ 57 399.32 Other Tangible Property - Servers Software 783,917 - 783,917 155,188 - 155,188 5.54% 43,460 - 8,604 -
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Current Year Plant Adjustments - SSU
IRA-10A Adjustments AllocPage 1 of 2
Line No.
FERC Account
No. FERC Account Titles Ref
Per Book Gross Plant As of
12/31/20Plant
Adjustments
Adjusted Gross Plant as
of 12/31/20
Per Book Accumulated
Depreciation As of 12/31/20
Accumulated Depreciation Adjustments
Adjusted Accumulated
Depreciation as of 12/31/20
Current Year
Allocation Factor
Allocated Gross Plant
as of 12/31/20
Allocated Gross Plant Adjustments
Allocated Accumulated Depreciation as of 12/31/20
Allocated Accumulated Depreciation Adjustments
(a) (b) (c) (d) (e) (f) (g) = (e) - (f) (h) (i) (j) = (h) - (i) (k) (l) = (e) * (k) (m) = (f) * (k) (n) = (h) * (k) (o) = (i) * (k)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Current Year Plant Adjustments - SSU
58 399.38 Other Tangible Property - Application Software 20,190,158 - 20,190,158 6,626,068 - 6,626,068 5.54% 1,119,338 - 367,348 - 59 Subtotal 21,271,341$ -$ 21,271,341$ 6,905,252$ -$ 6,905,252$ 1,179,279$ -$ 382,826$ -$ 6061 TOTAL SSU GENERAL OFFICE 212,854,172$ 1,883,211$ 210,970,961$ 87,353,292$ 1,178,141$ 86,175,151$ 75,783,594$ 697,845$ 31,890,709$ 460,822$
6263 SSU CUSTOMER SUPPORT (DIVISION 012) 64 6. GENERAL PLANT65 389.00 Land and Land Rights 2,874,240$ -$ 2,874,240$ -$ -$ -$ 52.60% 1,511,850$ -$ -$ -$ 66 390.00 Structures and Improvements 13,222,274 - 13,222,274 2,860,554 - 2,860,554 52.60% 6,954,916 - 1,504,651 - 67 390.09 Improvements to Leased Premises 2,820,614 7,868 2,812,746 1,921,828 3,910 1,917,919 52.60% 1,483,643 4,138 1,010,882 2,057 68 391.00 Office Furniture and Equipment 2,640,950 40,151 2,600,799 1,079,744 15,693 1,064,051 52.60% 1,389,140 21,119 567,946 8,255 69 397.00 Communication Equipment 1,913,117 - 1,913,117 1,302,493 - 1,302,493 52.60% 1,006,300 - 685,111 - 70 398.00 Miscellaneous Equipment 71,377 13,825 57,552 16,859 3,525 13,334 52.60% 37,544 7,272 8,868 1,854 71 399.00 Other Tangible Property - - - (154,265) - (154,265) 52.60% - - (81,143) - 72 399.01 Other Tangible Property - Servers Hardware 9,861,030 - 9,861,030 5,934,625 - 5,934,625 52.60% 5,186,902 - 3,121,613 - 73 399.02 Other Tangible Property - Servers Software 2,208,691 - 2,208,691 1,614,224 - 1,614,224 52.60% 1,161,772 - 849,082 - 74 399.03 Other Tangible Property - Network Hardware 338,088 - 338,088 172,095 - 172,095 52.60% 177,834 - 90,522 - 75 399.06 Other Tangible Property - PC Hardware 792,277 - 792,277 (206,503) - (206,503) 52.60% 416,738 - (108,621) - 76 399.07 Other Tangible Property - PC Software - - - (57,199) - (57,199) 52.60% - - (30,087) - 77 399.08 Other Tangible Property - Application Software 97,655,808 - 97,655,808 44,039,962 - 44,039,962 52.60% 51,366,955 - 23,165,020 - 78 Subtotal 134,398,465$ 61,843$ 134,336,622$ 58,524,417$ 23,128$ 58,501,289$ 70,693,593$ 32,530$ 30,783,843$ 12,165$ 7980 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER81 6. GENERAL PLANT82 389.10 Land and Land Rights 1,886,443$ -$ 1,886,443$ -$ -$ -$ 77.16% 1,455,658$ -$ -$ -$ 83 390.10 Structures and Improvements 12,562,619 - 12,562,619 3,786,528 - 3,786,528 77.16% 9,693,844 - 2,921,844 - 84 391.10 Office Furniture and Equipment 534,049 - 534,049 91,078 - 91,078 77.16% 412,095 - 70,279 - 85 392.10 Transportation Equipment 96,290 - 96,290 95,866 - 95,866 77.16% 74,302 - 73,974 - 86 394.10 Tools, Shop, and Garage Equipment 595,549 - 595,549 203,821 - 203,821 77.16% 459,551 - 157,277 - 87 395.10 Laboratory Equipment 23,632 - 23,632 21,260 - 21,260 77.16% 18,235 - 16,405 - 88 397.10 Communication Equipment 327,905 - 327,905 194,113 - 194,113 77.16% 253,026 - 149,786 - 89 398.10 Miscellaneous Equipment 545,396 - 545,396 165,491 - 165,491 77.16% 420,850 - 127,700 - 90 399.10 Other Tangible Property 301,111 - 301,111 176,005 - 176,005 77.16% 232,350 - 135,813 - 91 399.16 Other Tangible Property - PC Hardware 72,357 - 72,357 47,601 - 47,601 77.16% 55,833 - 36,731 - 92 399.17 Other Tangible Property - PC Software 3,299 - 3,299 (27,849) - (27,849) 77.16% 2,546 - (21,489) - 93 399.18 Other Tangible Property - Application Software - - - (9,966) - (9,966) 77.16% - - (7,691) - 94 Subtotal 16,948,650$ -$ 16,948,650$ 4,743,946$ -$ 4,743,946$ 13,078,289$ -$ 3,660,628$ -$ 9596 TOTAL SSU CUSTOMER SUPPORT 151,347,116$ 61,843$ 151,285,272$ 63,268,363$ 23,128$ 63,245,235$ 83,771,882$ 32,530$ 34,444,471$ 12,165$
9798 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 364,201,288$ 1,945,054$ 362,256,234$ 150,621,655$ 1,201,269$ 149,420,386$ 159,555,476$ 730,375$ 66,335,180$ 472,987$
99100 Miscellaneous Adjustments - - - - - - - - - - 101 Adjusted Total 364,201,288$ 1,945,054$ 362,256,234$ 150,621,655$ 1,201,269$ 149,420,386$ 159,555,476$ 730,375$ 66,335,180$ 472,987$
IRA-10A Adjustments AllocPage 2 of 2
Line No.
FERC Account
No. FERC Account Titles Ref
Change in Gross Plant
as of 12/31/20
Depreciation Rate per GUD
No. 10742Depreciation
ExpenseAccumulated Depreciation Net Plant (1)
Allocated Gross Plant
Allocated Depreciation
Expense
Allocated Accumulated Depreciation
Allocated Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n)
11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT13 390.00 Structures and Improvements 4,444,792$ 3.34% 148,456$ 119,821$ 4,324,971$ 1,716,855$ 57,343$ 50,099$ 1,666,757$ 14 390.09 Improvements to Leased Premises 690,469 4.06% 28,033 185,327 505,142 327,378 13,292 133,355 194,023 15 391.00 Office Furniture and Equipment 412,347 4.03% 16,618 189,161 223,186 192,070 7,740 85,824 106,246 16 392.00 Transportation Equipment 308,212 28.96% 89,258 40,230 267,982 118,374 34,281 15,489 102,886 17 393.00 Stores Equipment - 10.00% - - - - - - - 18 394.00 Tools, Shop, and Garage Equipment - 8.88% - 5,411 (5,411) 555 49 2,383 (1,827) 19 395.00 Laboratory Equipment - 10.00% - - - - - - - 20 397.00 Communication Equipment 6,335 5.54% 351 33,056 (26,721) 5,171 286 12,380 (7,209) 21 398.00 Miscellaneous Equipment - 1.72% - 4,337 (4,337) 997 17 2,042 (1,046) 22 399.00 Other Tangible Property - 13.84% - (1,773) 1,773 - - (668) 668 23 399.01 Other Tangible Property - Servers Hardware (515,639) 8.62% (44,448) (5,418,937) 4,903,298 2,550 220 (2,037,547) 2,040,097 24 399.02 Other Tangible Property - Servers Software (381,047) 8.78% (33,456) (67,475) (313,572) (88,025) (7,729) 27,886 (115,910) 25 399.03 Other Tangible Property - Network Hardware (1,770,550) 8.72% (154,392) (1,570,006) (200,544) (638,969) (55,718) (585,217) (53,752) 26 399.06 Other Tangible Property - PC Hardware 90,586 8.78% 7,953 (466,988) 557,575 55,294 4,855 (177,564) 232,858 27 399.07 Other Tangible Property - PC Software (10,950) 6.64% (727) 74,722 (85,671) 4,506 299 29,277 (24,770) 28 399.08 Other Tangible Property - Application Software 8,521,080 6.57% 559,835 4,919,902 3,601,178 3,827,250 251,450 2,135,309 1,691,941 29 399.09 Other Tangible Property - Mainframe Software - 6.21% - (6,843) 6,843 - - (2,577) 2,577 30 RWIP Retirement Work In Progress - - - - - - - - 31 Subtotal 11,795,635$ 617,481$ (1,960,055)$ 13,755,690$ 5,524,007$ 306,387$ (309,531)$ 5,833,538$ 3233 SSU GENERAL OFFICE - GREENVILLE DATA CENTER34 6. GENERAL PLANT35 390.05 Structures and Improvements -$ 3.34% -$ 281,625$ (281,625)$ 4,328$ 145$ 41,639$ (37,312)$ 36 391.04 Office Furniture and Equipment - 4.03% - 2,824 (2,824) 33 1 415 (382) 37 Subtotal -$ -$ 284,449$ (284,449)$ 4,361$ 146$ 42,055$ (37,693)$ 3839 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING40 6. GENERAL PLANT41 390.20 Structures and Improvements -$ 3.34% -$ 68$ (68)$ 25$ 1$ 34$ (9)$ 42 390.29 Improvements to Leased Premises - 4.06% - 1,220 (1,220) 379 15 606 (227) 43 391.20 Office Furniture and Equipment - 4.03% - 1,919 (1,919) 500 20 1,071 (571) 44 394.20 Tools, Shop, and Garage Equipment - 8.88% - - - - - 5 (5) 45 397.20 Communication Equipment - 5.54% - 498 (498) 105 6 296 (191) 46 398.20 Miscellaneous Equipment - 1.72% - 212 (212) 88 2 117 (29) 47 399.21 Other Tangible Property - Servers Hardware 260,358 8.62% 22,443 96,463 163,895 139,476 12,023 52,586 86,889 48 399.22 Other Tangible Property - Servers Software 3,958,866 8.78% 347,588 299,027 3,659,839 1,945,757 170,837 152,853 1,792,904 49 399.23 Other Tangible Property - Network Hardware 160,668 8.72% 14,010 2,488 158,179 78,525 6,847 1,342 77,184 50 399.26 Other Tangible Property - PC Hardware 18,899 8.78% 1,659 29,528 (10,629) 12,947 1,137 15,566 (2,619) 51 399.28 Other Tangible Property - Application Software 3,638,660 6.57% 239,060 1,484,342 2,154,319 2,025,413 133,070 878,697 1,146,716 52 Subtotal 8,037,451$ 624,761$ 1,915,765$ 6,121,686$ 4,203,215$ 323,958$ 1,103,173$ 3,100,042$ 53
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Incremental Plant - SSU
IRA-11 Alloc. Incremental Plant Page 1 of 3
Line No.
FERC Account
No. FERC Account Titles Ref
Change in Gross Plant
as of 12/31/20
Depreciation Rate per GUD
No. 10742Depreciation
ExpenseAccumulated Depreciation Net Plant (1)
Allocated Gross Plant
Allocated Depreciation
Expense
Allocated Accumulated Depreciation
Allocated Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Incremental Plant - SSU
54 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS55 6. GENERAL PLANT56 399.31 Other Tangible Property - Servers Hardware -$ 8.62% -$ 28,215$ (28,215)$ 4,107$ 354$ 2,887$ 1,219$ 57 399.32 Other Tangible Property - Servers Software - 8.78% - 55,419 (55,419) 10,830 951 4,451 6,379 58 399.38 Other Tangible Property - Application Software 448,013 6.57% 29,434 1,282,822 (834,809) 297,576 19,551 144,937 152,640 59 Subtotal 448,013$ 29,434$ 1,366,456$ (918,444)$ 312,513$ 20,856$ 152,275$ 160,238$ 6061 TOTAL SSU GENERAL OFFICE 20,281,099$ 1,271,676$ 1,606,615$ 18,674,484$ 10,044,096$ 651,346$ 987,972$ 9,056,125$
6263 SSU CUSTOMER SUPPORT (DIVISION 012) 64 6. GENERAL PLANT65 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 4,599$ -$ -$ 4,599$ 66 390.00 Structures and Improvements 437,761 3.34% 14,621 419,708 18,053 250,717 8,374 224,672 26,045 67 390.09 Improvements to Leased Premises - 4.06% - 107,426 (107,426) 4,500 183 59,403 (54,902) 68 391.00 Office Furniture and Equipment 29,979 4.03% 1,208 103,919 (73,940) 19,882 801 56,198 (36,315) 69 397.00 Communication Equipment - 5.54% - 107,745 (107,745) 3,061 170 58,585 (55,524) 70 398.00 Miscellaneous Equipment - 1.72% - 1,641 (1,641) 92 2 882 (790) 71 399.00 Other Tangible Property - 13.84% - - - - - (247) 247 72 399.01 Other Tangible Property - Servers Hardware (402) 8.62% (35) 867,953 (868,354) 15,567 1,342 464,650 (449,083) 73 399.02 Other Tangible Property - Servers Software - 8.78% - 193,499 (193,499) 3,534 310 104,054 (100,520) 74 399.03 Other Tangible Property - Network Hardware (291,138) 8.72% (25,387) (257,379) (33,759) (152,132) (13,266) (134,694) (17,437) 75 399.06 Other Tangible Property - PC Hardware 232,452 8.78% 20,409 (89,329) 321,782 123,166 10,814 (47,175) 170,340 76 399.07 Other Tangible Property - PC Software - 6.64% - - - - - (92) 92 77 399.08 Other Tangible Property - Application Software 443,286 6.57% 29,124 6,274,424 (5,831,138) 388,709 25,538 3,360,772 (2,972,063) 78 Subtotal 851,939$ 39,941$ 7,729,606$ (6,877,667)$ 661,695$ 34,267$ 4,147,007$ (3,485,312)$ 7980 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER81 6. GENERAL PLANT82 389.10 Land and Land Rights -$ 0.00% -$ -$ -$ 60,172$ -$ -$ 60,172$ 83 390.10 Structures and Improvements 19,959 3.34% 667 411,353 (391,394) 415,476 13,877 425,076 (9,600) 84 391.10 Office Furniture and Equipment 14,611 4.03% 589 21,361 (6,749) 27,843 1,122 18,707 9,137 85 392.10 Transportation Equipment - 28.96% - 565 (565) 3,071 889 3,476 (405) 86 394.10 Tools, Shop, and Garage Equipment 49,979 8.88% 4,438 31,798 18,182 55,968 4,970 30,023 25,945 87 395.10 Laboratory Equipment - 10.00% - 2,328 (2,328) 754 75 2,400 (1,646) 88 397.10 Communication Equipment 20,063 5.54% 1,111 17,860 2,203 25,301 1,402 19,404 5,897 89 398.10 Miscellaneous Equipment 18,870 1.72% 325 12,237 6,633 31,356 539 14,331 17,025 90 399.10 Other Tangible Property 5,418 13.84% 750 43,008 (37,589) 13,613 1,884 37,429 (23,816) 91 399.16 Other Tangible Property - PC Hardware - 8.78% - 6,504 (6,504) 2,308 203 6,330 (4,022) 92 399.17 Other Tangible Property - PC Software - 6.64% - 219 (219) 105 7 (726) 831 93 399.18 Other Tangible Property - Application Software - 15.89% - - - - - (318) 318 94 Subtotal 128,902$ 7,880$ 547,233$ (418,332)$ 635,967$ 24,968$ 556,131$ 79,836$ 9596 TOTAL SSU CUSTOMER SUPPORT 980,841$ 47,820$ 8,276,839$ (7,295,999)$ 1,297,662$ 59,236$ 4,703,139$ (3,405,476)$
97
IRA-11 Alloc. Incremental Plant Page 2 of 3
Line No.
FERC Account
No. FERC Account Titles Ref
Change in Gross Plant
as of 12/31/20
Depreciation Rate per GUD
No. 10742Depreciation
ExpenseAccumulated Depreciation Net Plant (1)
Allocated Gross Plant
Allocated Depreciation
Expense
Allocated Accumulated Depreciation
Allocated Net Plant
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Incremental Plant - SSU
98 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 21,261,939$ 1,319,497$ 9,883,454$ 11,378,485$ 11,341,759$ 710,582$ 5,691,110$ 5,650,649$
99100 Miscellaneous Adjustments - - - - - - - - 101 Adjusted Total 21,261,939$ 1,319,497$ 9,883,454$ 11,378,485$ 11,341,759$ 710,582$ 5,691,110$ 5,650,649$
102103 Note:104 1. The Allocation Factor is not needed on this schedule. All amounts are the result of IRA-10 minus IRA-9; therefore, no allocation factor is required and the Column reference has been removed.
IRA-11 Alloc. Incremental Plant Page 3 of 3
Line No. Asset No. Project Reason Project Description
FERC Plant Acct. No.
In Service Date
Customers Benefited (Location)
Customer Class
BenefitedTotal
Project Cost(a) (b) (c) (d) (e) (f) (g) (h) (i)
11
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Investment Report - Direct Additions Project Report
Please see the current year Project Report found on the flash drive provided at filing and the tabs, "MTX Additions" and "MTX Additions by FERC" for the direct additions by project and by utility account, respectively.
IRA-12 Direct Additions Report Page 1 of 1
Line No. Asset No. Project Reason Project Description
FERC Plant Acct. No.
Retirement Date
Customers Benefited (Location)
Customer Class
BenefitedTotal
Project Cost(a) (b) (c) (d) (e) (f) (g) (h) (i)
11
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Investment Report - Direct Retirements Project Report
Please see the current year Project Report found on the flash drive provided at filing and the tabs, "MTX Retirements" and "MTX Retirements by FERC" for the direct retirements by project and by utility account, respectively.
IRA-13 Direct Retire Report Page 1 of 1
Line No. Asset No. Project Reason Project Description
FERC Plant Acct. No.
In Service Date
Customers Benefited (Location)
Customer Class
BenefitedTotal
Project CostAllocation
FactorAllocated
Cost(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k)
11
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Investment Report - Allocated Additions Project Report
Please see the current year Project Report found on the flash drive provided at filing and the tabs, "SSU Additions" and "SSU Additions by FERC" for the allocated additions by project and by utility account, respectively.
IRA-14 Alloc Add Report Page 1 of 1
Line No. Asset No. Project Reason Project Description
FERC Plant Acct. No.
Retirement Date
Customers Benefited (Location)
Customer Class
BenefitedTotal
Project CostAllocation
FactorAllocated
Cost(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k)
11
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Investment Report - Allocated Retirements Project Report
Please see the current year Project Report found on the flash drive provided at filing and the tabs, "SSU Retirements" and "SSU Retirements by FERC" for the allocated retirements by project and by utility account, respectively.
IRA-15 Alloc Retire Report Page 1 of 1
Line No.
FERC Account No. FERC Account Titles Ref
Additions Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
(a) (b) (c) (d) (e) (f) (g) (h) (i)
11 1. INTANGIBLE PLANT12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents - 0.00% - - - 14 303.00 Miscellaneous Intangible Plant - 0.00% - - - 15 Subtotal -$ -$ -$ -$ 1617 5. DISTRIBUTION PLANT18 374.01 Land -$ 0.00% -$ -$ -$ 19 374.02 Land Rights - 0.98% - - - 20 375.00 Structures and Improvements - 1.71% - - - 21 376.00 Mains - Cathodic Protection 7,567,592 1.85% - - - 22 376.01 Mains - Steel 96,941,938 3.97% - - - 23 376.02 Mains - Plastic 501,593,843 2.21% - - - 24 378.00 M&R Station Equipment 11,801,439 3.09% - - - 25 379.00 City Gate Equipment 41,758 1.88% - - - 26 380.00 Services 185,044,815 3.67% - - - 27 381.00 Meters 28,056,680 3.31% - - - 28 382.00 Meter Installations 32,755,904 3.66% - - - 29 383.00 House Regulators 1,177,389 3.50% - - - 30 385.00 Industrial M&R Station Equipment (33,112) 2.80% - - - 31 Subtotal 864,948,247$ -$ -$ -$ 3233 6. GENERAL PLANT34 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 35 390.00 Structures and Improvements 572,478 2.54% - - - 36 390.04 Air Conditioning Equipment 25,987 2.75% - - - 37 391.00 Office Furniture and Equipment 64,906 4.00% - - - 38 392.00 Transportation Equipment 79,724 9.04% - - - 39 393.00 Stores Equipment - 4.00% - - - 40 394.00 Tools, Shop, and Garage Equipment 924,286 5.00% - - - 41 395.00 Laboratory Equipment - 10.00% - - - 42 396.00 Power Operated Equipment 3,445 7.24% - - -
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Additions Detail
IRA-16 Direct Additions Detail Page 1 of 2
Line No.
FERC Account No. FERC Account Titles Ref
Additions Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
(a) (b) (c) (d) (e) (f) (g) (h) (i)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Additions Detail
43 397.00 Communication Equipment 9,085 6.67% - - - 44 398.00 Miscellaneous Equipment 45,987 2.50% - - - 45 399.00 Other Tangible Property - 14.29% - - - 46 399.01 Other Tangible Property - Servers Hardware - 14.29% - - - 47 399.02 Other Tangible Property - Servers Software - 14.29% - - - 48 399.03 Other Tangible Property - Network Hardware 16,459 11.11% - - - 49 399.06 Other Tangible Property - PC Hardware 1,367,393 14.29% - - - 50 399.07 Other Tangible Property - PC Software - 14.29% - - - 51 399.08 Other Tangible Property - Application Software 763,985 14.29% - - - 52 Subtotal 3,873,734$ -$ -$ -$ 5354 TOTAL 868,821,981$ -$ -$ -$ 55 Miscellaneous Adjustments56 Adjusted Total 868,821,981$ -$ -$ -$ 5758 Notes:59
60 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available.
1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Col (g) is not available for individual assets of utility plant.
IRA-16 Direct Additions Detail Page 2 of 2
Line No.
FERC Account No. FERC Account Titles Ref
Retirements Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
(a) (b) (c) (d) (e) (f) (g) (h) (i)
11 1. INTANGIBLE PLANT12 301.00 Organization -$ 0.00% -$ -$ -$ 13 302.00 Franchises and Consents - 0.00% - - - 14 303.00 Miscellaneous Intangible Plant - 0.00% - - - 15 Subtotal -$ -$ -$ -$ 1617 5. DISTRIBUTION PLANT18 374.01 Land -$ 0.00% -$ -$ -$ 19 374.02 Land Rights - 0.98% - - - 20 375.00 Structures and Improvements - 1.71% - - - 21 376.00 Mains - Cathodic Protection (193,022) 1.85% - - - 22 376.01 Mains - Steel (19,984,884) 3.97% - - - 23 376.02 Mains - Plastic (6,203,671) 2.21% - - - 24 378.00 M&R Station Equipment (1,398,398) 3.09% - - - 25 379.00 City Gate Equipment - 1.88% - - - 26 380.00 Services (15,944,865) 3.67% - - - 27 381.00 Meters (4,864,185) 3.31% - - - 28 382.00 Meter Installations (1,974,708) 3.66% - - - 29 383.00 House Regulators (1,318,802) 3.50% - - - 30 385.00 Industrial M&R Station Equipment (51,040) 2.80% - - - 31 Subtotal (51,933,576)$ -$ -$ -$
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Retirement Detail
IRA-17 Direct Retirement Detail Page 1 of 2
Line No.
FERC Account No. FERC Account Titles Ref
Retirements Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
(a) (b) (c) (d) (e) (f) (g) (h) (i)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Direct Retirement Detail
3233 6. GENERAL PLANT34 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 35 390.00 Structures and Improvements (23,234) 2.54% - - - 36 390.04 Air Conditioning Equipment (2,746) 2.75% - - - 37 391.00 Office Furniture and Equipment (506,880) 4.00% - - - 38 392.00 Transportation Equipment (232,773) 9.04% - - - 39 393.00 Stores Equipment - 4.00% - - - 40 394.00 Tools, Shop, and Garage Equipment (2,803) 5.00% - - - 41 395.00 Laboratory Equipment (66,289) 10.00% - - - 42 396.00 Power Operated Equipment (466,590) 7.24% - - - 43 397.00 Communication Equipment (1,495,708) 6.67% - - - 44 398.00 Miscellaneous Equipment - 2.50% - - - 45 399.00 Other Tangible Property (8,617) 14.29% - - - 46 399.01 Other Tangible Property - Servers Hardware (2,441) 14.29% - - - 47 399.02 Other Tangible Property - Servers Software - 14.29% - - - 48 399.03 Other Tangible Property - Network Hardware (6,716) 11.11% - - - 49 399.06 Other Tangible Property - PC Hardware (2,325,568) 14.29% - - - 50 399.07 Other Tangible Property - PC Software (76,335) 14.29% - - - 51 399.08 Other Tangible Property - Application Software (1,486,780) 14.29% - - - 52 Subtotal (6,703,478)$ -$ -$ -$ 5354 TOTAL (58,637,054)$ -$ -$ -$ 55 Miscellaneous Adjustments56 Adjusted Total (58,637,054)$ -$ -$ -$ 5758 Notes:59
60 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available.
1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Col (g) is not available for individual assets of utility plant.
IRA-17 Direct Retirement Detail Page 2 of 2
Line No.
FERC Account
No. FERC Account Titles RefAdditions
Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
Allocation Factor
Allocated Additions
Original Cost
Allocated Depreciation Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT13 390.00 Structures and Improvements 4,444,792$ 3.34% -$ -$ -$ 38.39% 1,706,356$ -$ 14 390.09 Improvements to Leased Premises 666,574 4.06% - - - 38.39% 255,898 - 15 391.00 Office Furniture and Equipment 426,959 4.03% - - - 38.39% 163,909 - 16 392.00 Transportation Equipment 308,212 28.96% - - - 38.39% 118,322 - 17 393.00 Stores Equipment - 10.00% - - - 38.39% - - 18 394.00 Tools, Shop, and Garage Equipment 70,099 8.88% - - - 38.39% 26,911 - 19 395.00 Laboratory Equipment - 10.00% - - - 38.39% - - 20 397.00 Communication Equipment 20,063 5.54% - - - 38.39% 7,702 - 21 398.00 Miscellaneous Equipment 18,870 1.72% - - - 38.39% 7,244 - 22 399.00 Other Tangible Property 5,418 13.84% - - - 38.39% 2,080 - 23 399.01 Other Tangible Property - Servers Hardware 6,854,849 8.62% - - - 38.39% 2,631,577 - 24 399.02 Other Tangible Property - Servers Software 294,440 8.78% - - - 38.39% 113,035 - 25 399.03 Other Tangible Property - Network Hardware 119,929 8.72% - - - 38.39% 46,041 - 26 399.06 Other Tangible Property - PC Hardware 797,395 8.78% - - - 38.39% 306,120 - 27 399.07 Other Tangible Property - PC Software - 6.64% - - - 38.39% - - 28 399.08 Other Tangible Property - Application Software 8,926,313 6.57% - - - 38.39% 3,426,811 - 29 399.09 Other Tangible Property - Mainframe Software 23,895 6.21% - - - 38.39% 9,173 - 30 Subtotal 22,977,807$ -$ -$ -$ 8,821,180$ -$ 3132 SSU GENERAL OFFICE - GREENVILLE DATA CENTER33 6. GENERAL PLANT34 390.05 Structures and Improvements -$ 3.34% -$ -$ -$ 14.11% -$ -$ 35 391.04 Office Furniture and Equipment - 4.03% - - - 14.11% - - 36 Subtotal -$ -$ -$ -$ -$ -$ 3738 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING39 6. GENERAL PLANT40 390.20 Structures and Improvements -$ 3.34% -$ -$ -$ 48.71% -$ -$ 41 390.29 Improvements to Leased Premises - 4.06% - - - 48.71% - -
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Additions Detail
IRA-18 Alloc. Additions Detail Page 1 of 3
Line No.
FERC Account
No. FERC Account Titles RefAdditions
Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
Allocation Factor
Allocated Additions
Original Cost
Allocated Depreciation Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Additions Detail
42 391.20 Office Furniture and Equipment - 4.03% - - - 48.71% - - 43 394.20 Tools, Shop, and Garage Equipment - 8.88% - - - 48.71% - - 44 397.20 Communication Equipment - 5.54% - - - 48.71% - - 45 398.20 Miscellaneous Equipment - 1.72% - - - 48.71% - - 46 399.21 Other Tangible Property - Servers Hardware 260,358 8.62% - - - 48.71% 126,820 - 47 399.22 Other Tangible Property - Servers Software 3,958,866 8.78% - - - 48.71% 1,928,363 - 48 399.23 Other Tangible Property - Network Hardware 160,668 8.72% - - - 48.71% 78,261 - 49 399.26 Other Tangible Property - PC Hardware - 8.78% - - - 48.71% - - 50 399.28 Other Tangible Property - Application Software 3,396,422 6.57% - - - 48.71% 1,654,397 - 51 Subtotal 7,776,313$ -$ -$ -$ 3,787,842$ -$ 5253 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS54 6. GENERAL PLANT55 399.31 Other Tangible Property - Servers Hardware -$ 8.62% -$ -$ -$ 5.54% -$ -$ 56 399.32 Other Tangible Property - Servers Software - 8.78% - - - 5.54% - - 57 399.38 Other Tangible Property - Application Software 448,013 6.57% - - - 5.54% 24,838 - 58 Subtotal 448,013$ -$ -$ -$ 24,838$ -$ 5960 TOTAL SSU GENERAL OFFICE 31,202,132$ -$ -$ -$ 12,633,860$ -$
6162 SSU CUSTOMER SUPPORT (DIVISION 012) 63 6. GENERAL PLANT64 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 52.60% -$ -$ 65 390.00 Structures and Improvements 437,761 3.34% - - - 52.60% 230,262 - 66 390.09 Improvements to Leased Premises - 4.06% - - - 52.60% - - 67 391.00 Office Furniture and Equipment 29,979 4.03% - - - 52.60% 15,769 - 68 397.00 Communication Equipment - 5.54% - - - 52.60% - - 69 398.00 Miscellaneous Equipment - 1.72% - - - 52.60% - - 70 399.00 Other Tangible Property - 13.84% - - - 52.60% - - 71 399.01 Other Tangible Property - Servers Hardware (402) 8.62% - - - 52.60% (211) - 72 399.02 Other Tangible Property - Servers Software - 8.78% - - - 52.60% - - 73 399.03 Other Tangible Property - Network Hardware - 8.72% - - - 52.60% - - 74 399.06 Other Tangible Property - PC Hardware 370,254 8.78% - - - 52.60% 194,754 - 75 399.07 Other Tangible Property - PC Software - 6.64% - - - 52.60% - - 76 399.08 Other Tangible Property - Application Software 443,286 6.57% - - - 52.60% 233,169 - 77 Subtotal 1,280,879$ -$ -$ -$ 673,742$ -$ 78
IRA-18 Alloc. Additions Detail Page 2 of 3
Line No.
FERC Account
No. FERC Account Titles RefAdditions
Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
Allocation Factor
Allocated Additions
Original Cost
Allocated Depreciation Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Additions Detail
79 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER80 6. GENERAL PLANT81 389.10 Land and Land Rights -$ 0.00% -$ -$ -$ 77.16% -$ -$ 82 390.10 Structures and Improvements 19,959 3.34% - - - 77.16% 15,401 - 83 391.10 Office Furniture and Equipment - 4.03% - - - 77.16% - - 84 392.10 Transportation Equipment - 28.96% - - - 77.16% - - 85 394.10 Tools, Shop, and Garage Equipment 1 8.88% - - - 77.16% 1 - 86 395.10 Laboratory Equipment - 10.00% - - - 77.16% - - 87 397.10 Communication Equipment 6,335 5.54% - - - 77.16% 4,888 - 88 398.10 Miscellaneous Equipment - 1.72% - - - 77.16% - - 89 399.10 Other Tangible Property - 13.84% - - - 77.16% - - 90 399.16 Other Tangible Property - PC Hardware - 8.78% - - - 77.16% - - 91 399.17 Other Tangible Property - PC Software - 6.64% - - - 77.16% - - 92 399.18 Other Tangible Property - Application Software - 15.89% - - - 77.16% - - 93 Subtotal 26,295$ -$ -$ -$ 20,290$ -$ 9495 TOTAL SSU CUSTOMER SUPPORT 1,307,174$ -$ -$ -$ 694,033$ -$
9697 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT 32,509,306$ -$ -$ -$ 13,327,892$ -$
9899 Miscellaneous Adjustments
100 Adjusted Total 32,509,306$ -$ -$ -$ 13,327,892$ -$
101102 Notes:103
104 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available.
1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Cols. (g) and (l) are notavailable for individual assets of utility plant.
IRA-18 Alloc. Additions Detail Page 3 of 3
Line No.
FERC Account
No. FERC Account Titles RefRetirements
Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
Allocation Factor
Allocated Retirements
Original Cost
Allocated Depreciation Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
11 SSU GENERAL OFFICE (DIVISION 002) 12 6. GENERAL PLANT13 390.00 Structures and Improvements -$ 3.34% -$ -$ -$ 38.39% -$ -$ 14 390.09 Improvements to Leased Premises 23,895 4.06% - - - 38.39% 9,173 - 15 391.00 Office Furniture and Equipment (14,611) 4.03% - - - 38.39% (5,609) - 16 392.00 Transportation Equipment - 28.96% - - - 38.39% - - 17 393.00 Stores Equipment - 10.00% - - - 38.39% - - 18 394.00 Tools, Shop, and Garage Equipment (85,711) 8.88% - - - 38.39% (32,904) - 19 395.00 Laboratory Equipment - 10.00% - - - 38.39% - - 20 397.00 Communication Equipment (13,728) 5.54% - - - 38.39% (5,270) - 21 398.00 Miscellaneous Equipment (18,870) 1.72% - - - 38.39% (7,244) - 22 399.00 Other Tangible Property (5,418) 13.84% - - - 38.39% (2,080) - 23 399.01 Other Tangible Property - Servers Hardware (7,370,488) 8.62% - - - 38.39% (2,829,530) - 24 399.02 Other Tangible Property - Servers Software (675,487) 8.78% - - - 38.39% (259,319) - 25 399.03 Other Tangible Property - Network Hardware (1,890,478) 8.72% - - - 38.39% (725,755) - 26 399.06 Other Tangible Property - PC Hardware (706,809) 8.78% - - - 38.39% (271,344) - 27 399.07 Other Tangible Property - PC Software (10,950) 6.64% - - - 38.39% (4,204) - 28 399.08 Other Tangible Property - Application Software (288,224) 6.57% - - - 38.39% (110,649) - 29 399.09 Other Tangible Property - Mainframe Software (23,895) 6.21% - - - 38.39% (9,173) - 30 Subtotal (11,080,775)$ -$ -$ -$ (4,253,909)$ -$ 3132 SSU GENERAL OFFICE - GREENVILLE DATA CENTER33 6. GENERAL PLANT34 390.05 Structures and Improvements -$ 3.34% -$ -$ -$ 14.11% -$ -$ 35 391.04 Office Furniture and Equipment - 4.03% - - - 14.11% - - 36 Subtotal -$ -$ -$ -$ -$ -$ 3738 SSU GENERAL OFFICE - DISTRIBUTION AND MARKETING39 6. GENERAL PLANT40 390.20 Structures and Improvements -$ 3.34% -$ -$ -$ 48.71% -$ -$
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Retirement Detail
IRA-19 Alloc. Retire Detail Page 1 of 3
Line No.
FERC Account
No. FERC Account Titles RefRetirements
Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
Allocation Factor
Allocated Retirements
Original Cost
Allocated Depreciation Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Retirement Detail
41 390.29 Improvements to Leased Premises - 4.06% - - - 48.71% - - 42 391.20 Office Furniture and Equipment - 4.03% - - - 48.71% - - 43 394.20 Tools, Shop, and Garage Equipment - 8.88% - - - 48.71% - - 44 397.20 Communication Equipment - 5.54% - - - 48.71% - - 45 398.20 Miscellaneous Equipment - 1.72% - - - 48.71% - - 46 399.21 Other Tangible Property - Servers Hardware - 8.62% - - - 48.71% - - 47 399.22 Other Tangible Property - Servers Software - 8.78% - - - 48.71% - - 48 399.23 Other Tangible Property - Network Hardware - 8.72% - - - 48.71% - - 49 399.26 Other Tangible Property - PC Hardware 18,899 8.78% - - - 48.71% 9,206 - 50 399.28 Other Tangible Property - Application Software 125,230 6.57% - - - 48.71% 61,000 - 51 Subtotal 144,129$ -$ -$ -$ 70,205$ -$ 5253 SSU GENERAL OFFICE - ALIGNE PIPE PROJECTS54 6. GENERAL PLANT55 399.31 Other Tangible Property - Servers Hardware -$ 8.62% -$ -$ -$ 5.54% -$ -$ 56 399.32 Other Tangible Property - Servers Software - 8.78% - - - 5.54% - - 57 399.38 Other Tangible Property - Application Software - 6.57% - - - 5.54% - - 58 Subtotal -$ -$ -$ -$ -$ -$ 5960 TOTAL SSU GENERAL OFFICE (10,936,646)$ -$ -$ -$ (4,183,704)$ -$
6162 SSU CUSTOMER SUPPORT (DIVISION 012) 63 6. GENERAL PLANT64 389.00 Land and Land Rights -$ 0.00% -$ -$ -$ 52.60% -$ -$ 65 390.00 Structures and Improvements - 3.34% - - - 52.60% - - 66 390.09 Improvements to Leased Premises - 4.06% - - - 52.60% - - 67 391.00 Office Furniture and Equipment - 4.03% - - - 52.60% - - 68 397.00 Communication Equipment - 5.54% - - - 52.60% - - 69 398.00 Miscellaneous Equipment - 1.72% - - - 52.60% - - 70 399.00 Other Tangible Property - 13.84% - - - 52.60% - - 71 399.01 Other Tangible Property - Servers Hardware - 8.62% - - - 52.60% - - 72 399.02 Other Tangible Property - Servers Software - 8.78% - - - 52.60% - - 73 399.03 Other Tangible Property - Network Hardware (291,138) 8.72% - - - 52.60% (153,138) - 74 399.06 Other Tangible Property - PC Hardware (137,802) 8.78% - - - 52.60% (72,484) - 75 399.07 Other Tangible Property - PC Software - 6.64% - - - 52.60% - -
IRA-19 Alloc. Retire Detail Page 2 of 3
Line No.
FERC Account
No. FERC Account Titles RefRetirements
Original Cost
Depreciation Rate per GUD No. 10742 (1)
Depreciation Expense (1)
Accumulated Depreciation (2) Net Plant (2)
Allocation Factor
Allocated Retirements
Original Cost
Allocated Depreciation Expense (1)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) = (e) * (j) (l)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Allocated Retirement Detail
76 399.08 Other Tangible Property - Application Software - 6.57% - - - 52.60% - - 77 Subtotal (428,940)$ -$ -$ -$ (225,622)$ -$ 7879 SSU CUSTOMER SUPPORT - CHARLES K. VAUGHN TRAINING CENTER80 6. GENERAL PLANT81 389.10 Land and Land Rights -$ 0.00% -$ -$ -$ 77.16% -$ -$ 82 390.10 Structures and Improvements - 3.34% - - - 77.16% - - 83 391.10 Office Furniture and Equipment 14,611 4.03% - - - 77.16% 11,275 - 84 392.10 Transportation Equipment - 28.96% - - - 77.16% - - 85 394.10 Tools, Shop, and Garage Equipment 65,590 8.88% - - - 77.16% 50,612 - 86 395.10 Laboratory Equipment - 10.00% - - - 77.16% - - 87 397.10 Communication Equipment 13,728 5.54% - - - 77.16% 10,593 - 88 398.10 Miscellaneous Equipment 18,870 1.72% - - - 77.16% 14,561 - 89 399.10 Other Tangible Property 5,418 13.84% - - - 77.16% 4,181 - 90 399.16 Other Tangible Property - PC Hardware - 8.78% - - - 77.16% - - 91 399.17 Other Tangible Property - PC Software - 6.64% - - - 77.16% - - 92 399.18 Other Tangible Property - Application Software - 15.89% - - - 77.16% - - 93 Subtotal 118,218$ -$ -$ -$ 91,222$ -$ 9495 TOTAL SSU CUSTOMER SUPPORT (310,721)$ -$ -$ -$ (134,400)$ -$
9697 TOTAL SSU GENERAL OFFICE AND CUSTOMER SUPPORT (11,247,367)$ -$ -$ -$ (4,318,104)$ -$
9899 Miscellaneous Adjustments100 Adjusted Total (11,247,367)$ -$ -$ -$ (4,318,104)$ -$
101102 Notes:103
104 2. The Company does not maintain accumulated depreciation by individual asset. Therefore, the accumulated depreciation in Col (h) and net plant in Col (i) are not available.
1. The Company calculates depreciation expense using group depreciation. Therefore, the depreciation rates in Col (f) are for informational purposes only, and depreciation expense in Cols. (g) and (l) are not available for individual assets of utility plant.
IRA-19 Alloc. Retire Detail Page 3 of 3
Line No.(a) (b) (c) (d) (e) (f) (g) (h)
10 Return on Investment11 Invested Capital (Rate Base) 3,820,189,713$ 4,584,702,896$ 12 Rate of Return 7.97% 7.97%13 Return on Investment 304,354,514$ 365,263,280$ 1415 Interest Expense16 Invested Capital (Rate Base) 3,820,189,713$ 4,584,702,896$ 17 Weighted Cost of Debt 2.07% 2.07%18 Interest Expense 79,039,725$ 94,857,503$ 1920 After Tax Income 225,314,789$ 270,405,777$ 2122 Gross-up Factor =1+(E26/(1-E26)) 1.27 =1+(H26/(1-H26)) 1.272324 Before Tax Return 285,208,594$ 342,285,793$ 2526 Federal Income Tax Rate 21.00% 21.00%2728 Federal Income Tax 59,893,805$ 71,880,017$ 2930 Change in Federal Income Tax 11,986,212$
3132 Notes:33 1. Invested Capital (Rate Base) Prior Year is Balance of Rate Base approved in GUD No. 10944, IRA-20, Col g), Ln 11.34 2. Invested Capital (Rate Base) Current Year is Balance of Rate Base (Prior Year) plus IRA Change for current year. 3536
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Calculation of Federal Income Tax
Description Prior Year Current Year
IRA- 20 FIT Page 1 of 2
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Calculation of Federal Income Tax
37 Alternative Calculation: 3839 Calculation40 (e) (f)4142 Cost of Common Equity 151,728,018$ GUD No. 10742, Sch G, Col (c), Ln 443 Total Invested Capital 2,572,634,525 GUD No. 10742, Sch G, Col (c), Ln 1344 Return Rate, per GUD No. 10742 5.898% Ln 42 divided by Ln 4345 Federal Income Tax Factor 26.58228% (1 /.79) * (.21)46 Federal Income Tax Adjustment Factor 1.568% Ln 44 times Ln 4547 Change in Invested Capital - Net Utility Plant 764,513,183$ IRA-5, Col (h), Ln 1648 Change in Federal Income Tax 11,986,212$ Ln 46 times Ln 47
Description Reference(b through d) (g through h)
IRA- 20 FIT Page 2 of 2
Line No. Description Beginning Tax Change Current Tax Notes:(a) (b) (c) (d) (e) (f)
10 Non Revenue - Related1112 Ad Valorem Tax 57,790,672$ 14,577,982$ 72,368,655$ 1314 Revenue - Related1516 State Gross Receipts - Tax NA NA NA 117 Local Gross Receipts - Tax NA NA NA 118 Railroad Commission - Gas Utility Tax NA NA NA 11920 Total Revenue Related Taxes -$ -$ -$ 212223 TOTAL TAXES OTHER THAN INCOME 57,790,672$ 14,577,982$ 72,368,655$ 2425
26Ad Valorem Tax Change: Direct
Allocated SSU General Office
Allocated SSU Customer Support Total
27 Change in Net Plant (IRA-8 and IRA-11) 760,470,714$ 9,056,125$ (3,405,476)$ 28 Current Year Ad Valorem Tax Rate % 1.91% 0.84% 0.44%29 Calculated Ad Valorem Tax Change 14,516,691$ 76,297$ (15,006)$ 14,577,982$ 30
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Ad Valorem and Revenue-Related Tax
IRA- 21 Ad Valorem Page 1 of 2
Line No. Description Beginning Tax Change Current Tax Notes:(a) (b) (c) (d) (e) (f)
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Ad Valorem and Revenue-Related Tax
31 Ad Valorem Calculation:32 Mid-Tex Ad Valorem Tax 60,205,501$ 2020 Ad Valorem Taxes Paid for Mid-Tex Direct Property33 Capitalized Mid-Tex Ad Valorem Tax (623,688) 2020 Ad Valorem Taxes Capital for Mid-Tex34 Total Mid-Tex Ad Valorem 59,581,813$ Sum of Line 32 through Line 3335 Mid-Tex Net Plant per GUD No. 10742 3,121,250,119 GUD No. 10742, Sch C, Col (f), Ln 42 minus Sch D, Col (f), Ln 4236 Mid-Tex Ad Valorem Tax Rate 1.91% Line 34 divided by Line 353738 SSU General Office Ad Valorem Tax 676,496$ 2020 Ad Valorem Taxes Paid for SSU General Office Property39 Capitalized SSU General Office Ad Valorem Tax - 2020 Ad Valorem Taxes Capital for SSU General Office40 Total SSU General Office Ad Valorem 676,496$ Sum of Line 38 through Line 3941 FY21 Allocation Factor 38.39% IRA-5A, Col (d), Line 1042 Allocated SSU General Office Ad Valorem 259,707$ Line 40 times Line 4143 SSU General Office Net Plant per GUD No. 10742 30,826,048 GUD No. 10742, Sch C, Col (f), Ln 146 minus Sch D, Col (f), Ln 14844 SSU General Office Ad Valorem Tax Rate 0.84% Line 42 divided by Line 434546 SSU Customer Support Ad Valorem Tax 476,774$ 2020 Ad Valorem Taxes Paid for SSU Customer Support Property47 Capitalized SSU Customer Support Ad Valorem Tax - 2020 Ad Valorem Taxes Capital for SSU Customer Support48 Total SSU Customer Support Ad Valorem 476,774$ Sum of Line 46 through Line 4749 FY21 Allocation Factor 52.60% IRA-5A, Col (d), Line 1850 Allocated SSU Customer Support Ad Valorem 250,783$ Line 48 times Line 4951 SSU Customer Support Net Plant per GUD No. 10742 56,912,952 GUD No. 10742, Sch C, Col (f), Ln 81 minus Sch D, Col (f), Ln 8252 SSU Customer Support Ad Valorem Tax Rate 0.44% Line 50 divided by Line 515354 Note:55 1. Amounts are recovered through Rider FF and TAX.
IRA- 21 Ad Valorem Page 2 of 2
Line No. IRA Schedule Reference(a) (b) (c)
11 IRA-211
12 IRA-21 213 IRA-6 and IRA-7A,
IRA-9 and IRA-10A
3
1415 IRA-10A 4 The following CY 2018 projects have been removed from this filing:161718 010.31067 010.34108
(d)
Column (c) is the amount authorized in most recent rate case or interim rate adjustment.This tax is collected through a separate surcharge.
All projects removed in GUD No. 10742 (prior dockets) have been removed from this filing.
SSU
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Footnotes
Comments
IRA-22 Footnotes Page 1 of 1
Date Signature
Title: Vice President, Rates and Regulatory Affairs
Address: 5420 LBJ Freeway, Suite 1800Dallas, Texas 75240
Phone: 214.206.2568
Email address: christopher.felan@atmosenergy.com
Alternative contact regarding this report:
Name: Douglas C. Walther
Title: Deputy General Counsel
Address: 5430 LBJ Freeway, Suite 1800Dallas, Texas 75240-2601
Phone: 972.855.3102
Email address: douglas.walther@atmosenergy.com
February 18, 2021
I certify that I am the responsible official of Atmos Energy Corp., Mid-Tex Division; that I have examined the foregoing report; that to the best of my knowledge, information, and belief, all statements of fact contained in the said report are true and the said report is a correct statement of the business and affairs of the above-named respondent in respect to each and every matter set forth therein during the Period Ending December 31, 2020.
I understand that until the issuance of a final order or decision by a regulatory authority in a rate case that is filed after the implementation of a rate schedule under this section, all amounts collected under the rate schedules before the filing of the rate case are subject to refund.
Atmos Energy Corp., Mid-Tex DivisionInterim Rate Adjustment Application
Twelve (12) Month Period Ending December 31, 2020Signature Page
IRA‐23 Signature Page Page 1 of 1
Check one:
This is an original submission [ X ]
This is a revised submission [ ]
Date of submission: February 26, 2021
RAILROAD COMMISSION OF TEXAS
FOR THE
Twelve Month Period Ending December 31, 2020
ANNUAL EARNINGS MONITORING REPORT
OF
ATMOS ENERGY CORP.
TO THE
MID-TEX DIVISION - UNINCORPORATED AREAS
Line No. Description Total Reference
Adjustment Amount Total Accounts
Increase / Decrease Amount Total
(a) (b) (c) (d) (e) (f) (g) (h)
1 Total Operating Revenues 1,554,302,507$ 1, 2 (17,200,994)$ 1,537,101,513$ 3 (144,332,595)$ 1,392,768,918$ 23 Operating Expenses:4 Gas Cost 816,991,827$ -$ 816,991,827$ (211,963,461)$ 605,028,365$ 5 Operation and Maintenance Expenses 189,078,329 1, 2 (2,206,683) 186,871,646 4 33,392,075 220,263,720 6 Depreciation and Amortization Expense 144,339,944 1, 2 (634) 144,339,310 403 22,553,694 166,893,004 7 Taxes Other Than Income Taxes 139,999,731 (1,065,587) 138,934,144 408.1 8,675,040 147,609,183 8 Interest on Customer Deposits and Advances 117,764 1, 2 - 117,764 431 83,675 201,439 9
10 Total Operating Expenses Before Federal Income Taxes (Sum of Line 4 through 8) 1,290,527,595$ 1, 2 (3,272,904)$ 1,287,254,690$ (147,258,979)$ 1,139,995,712$
1112 Total Operating Income Before Federal Income
Taxes (Line 1 - Line 10) 263,774,912$ 1, 2 (13,928,089)$ 249,846,823$ 2,926,384$ 252,773,206$ 1314 Federal Income Taxes 47,917,632$ 1, 2, 5 (3,015,871)$ 44,901,761$ (10,533,134)$ 34,368,627$ 1516 Return on Rate Base (Line 12 - Line 14) 215,857,280$ 1, 2 (10,912,218)$ 204,945,062$ 13,459,517$ 218,404,579$
171819 Rate Base 2,573,522,770$ 6 (888,245)$ 2,572,634,525$ 1,734,425,762$ 4,307,060,287$ 20 Percent Return on Rate Base - Proposed and
Approved (Cols (b)(e)(h)) 8.39% 7.97% 7.97%21 Calculated Allowed Return
(Line 19 * Line 20) 204,945,062$ 343,115,483$
2223 Excess Return (Deficit) (Line 16 - Line 21) (124,710,904)$
2425 Allowed Rate of Return - GUD No. 10742 Final Order, Finding of Fact 19 7.97%26 Actual Rate of Return - Year 2020 (Line 16 / Line 19) 5.07%27
ATMOS ENERGY CORP. - MID-TEX DIVISION - UNINCORPORATED AREASANNUAL EARNINGS MONITORING REPORT
AS OF DECEMBER 31, 2020
At Rates At 12/31/20At Rates At 12/31/17
EMR-1 EMR Summary Page 1 of 2
Line No. Description Total Reference
Adjustment Amount Total Accounts
Increase / Decrease Amount Total
(a) (b) (c) (d) (e) (f) (g) (h)
ATMOS ENERGY CORP. - MID-TEX DIVISION - UNINCORPORATED AREASANNUAL EARNINGS MONITORING REPORT
AS OF DECEMBER 31, 2020
At Rates At 12/31/20At Rates At 12/31/17
28 Notes:29
3031323334
5. The amount in Column (h) is from EMR-2 Tax, Column (b), Line 16.6. The amount in Column (h) is from EMR-3 Rate Base, Column (f), Line 24.
1. Column (b) is the Company's Proposed Cost of Service from GUD No. 10742. Column (e) which represents the Cost of Service from the Settlement approved in the Final Order issued in GUD No. 10742; Column (d) is the calculated adjustment (Column (e) minus Column (b)).2. Column (h) represents the current year amounts; Column (g) is the calculated adjustment (Column (h) minus Column (e)).
4. The amount includes the following accounts: 840, 870-872, 874, 875, 877-881, 885, 887-889, 891-894, 901-904, 908, 910-913, 920-926, 928, 930.1-932.3. Column (h), Line 1 includes revenues and unbilled revenues reported in FERC Accounts 480, 481, 487, 488, 489.3, 495, and 496.
EMR-1 EMR Summary Page 2 of 2
Line No. Description Adjusted Amount Reference
(a) (b) (c)
1 Total Revenues 1,392,768,918$ EMR-1, Column (h), Line 123 Deduct:4 Gas Cost 605,028,365$ EMR-1, Column (h), Line 45 Operation and Maintenance Expenses 220,263,720 EMR-1, Column (h), Line 56 Depreciation and Amortization Expense 166,893,004 EMR-1, Column (h), Line 67 Taxes Other Than Income Taxes 147,609,183 EMR-1, Column (h), Line 78 Interest on Customer Deposits and Advances 201,439 EMR-1, Column (h), Line 89 Interest Expense 89,113,077 See Note 1
10 Total Deducts 1,229,108,789$ Sum of Lines 4 through 91112 Book Taxable Income 163,660,129$ Line 1 - Line 101314 Tax Rate 21% Statutory Tax Rate1516 Total Federal Income Taxes 34,368,627$ Line 12 times Line 141718 Note:19 1. This amount is calculated by applying the weighted cost of debt to the total rate base (EMR-4, Column (e), Line 120 times EMR-4, Column (b), Line 5).
ATMOS ENERGY CORP. - MID-TEX DIVISION - UNINCORPORATED AREASANNUAL EARNINGS MONITORING REPORT
FEDERAL INCOME TAX SCHEDULE AT END OF REPORTING PERIODAS OF DECEMBER 31, 2020
EMR-2 Tax Page 1 of 1
Line No. Description Per Books (1) Ref (2) Adjustments Ref (3) Adjusted Amount
(a) (b) (c) (d) (e) (f)
1 Net Plant in Service2 Utility Plant in Service 6,746,807,240$ 101 41,169,596$ 3 6,787,976,837$ 3 Accum. Provision for Depreciation and Amort. 1,636,460,130 108/111 (77,882,761) 3 1,558,577,369 4 Net Gas Distribution Plant in Service (Line 2 - Line 3) 5,110,347,110$ 119,052,357$ 5,229,399,467$ 56 Additions:7 Materials & Supplies 5,366,272$ 154/163 (3,995,816)$ 4 1,370,456$ 8 Prepayments 21,964,488 165 3,178,267 4 25,142,755 9 Gas Stored Underground 51,577,960 164.1 (51,577,960) 5 -
10 Other - - 6 - 11 Total Additions (Sum of Line 7 through Line 10) 78,908,720$ (52,395,508)$ 26,513,211$ 1213 Deductions:14 Customer Deposits 9,826,515$ 235 -$ 9,826,515$ 15 Customer Advances for Construction - 252 - - 16 Injuries and Damages Reserve 2,236,370 228.2 - 2,236,370 17 Accum. Deferred Income Taxes 687,728,536 190/282/283 (64,342,850) 7 623,385,686 18 Regulatory Liability 267,306,077 242/253 - 8 267,306,077 19 Rate Base Adjustments - 19,597,310 9 19,597,310 20 Total Deductions (Sum of Line 14 through Line 19) 967,097,498$ (44,745,539)$ 922,351,959$ 2122 Total Cash Working Capital -$ (26,500,433)$ 10 (26,500,433)$ 2324 Total Rate Base (Line 4 + Line 11 - Line 20 + Line 22) 4,222,158,331$ 84,901,956$ 4,307,060,287$
2526 Notes:27 1. Column (c) references the FERC Account numbers associated with the amounts included in Column (b).28 2. The information listed in Column (e) refers to the footnote explanation of the adjustment shown in Column (d).29 3. Column (d) includes adjustments for Poly 1 and the Rule 8.209 Regulatory Asset.30 4. Adjusted to 13 month averages for 2020.31 5. Working Gas in Storage (FERC Account 164.1) moved to Pipeline to reflect GUD No. 9400 Final Order classification for rate purposes.32 6. Line 10 is an input area for adjustments.33 7. Includes an adjustment for the Federal NOL Carryover - Non Reg; Federal NOL Carryover - Other; and Storage Gas (See Footnote 5). 34 8. The Regulatory Liability represents the excess deferred income taxes resulting from the revaluation of ADIT due to the Tax Cuts and Jobs Act.35 9. Adjusted to include the Miscellaneous Adjustment amount for the current period and amounts included in prior dockets.36 10. The Cash Working Capital is the amount included in the GUD No. 10742 Settlement Model, Schedule B, Column (e), Line 20.
ATMOS ENERGY CORP. - MID-TEX DIVISION - UNINCORPORATED AREASANNUAL EARNINGS MONITORING REPORT
TOTAL RATE BASEAS OF DECEMBER 31, 2020
EMR-3 Rate Base Page 1 of 1
Line No. Description Balance Percent of Total Cost Weighted Cost
(a) (b) (c) (d) (e) = (c) x (d)
1 Long-Term Debt 1,715,015,105$ 39.82% 5.20% 2.07%23 Common Equity 2,592,045,181 60.18% 9.80% 5.90%45 Total (Line 1 + Line 3) 4,307,060,287$ 100.00% 7.97%
67 Notes:8 1. Column (c) is the approved Capital Structure from GUD No. 10742, Schedule G, Lines 10 and 11.9 2. Column (d) figures are the approved rates of return from GUD No. 10742, Schedule G, Lines 3 and 4.
ATMOS ENERGY CORP. - MID-TEX DIVISION - UNINCORPORATED AREASANNUAL EARNINGS MONITORING REPORTWEIGHTED AVERAGE COST OF CAPITAL
AS OF DECEMBER 31, 2020
EMR-4 Cost of Capital Page 1 of 1
Date Signature
Title: Vice President, Rates and Regulatory Affairs
Address: 5420 LBJ Freeway, Suite 1800Dallas, TX 75240
Phone: 214.206.2568
Email address: Christopher.Felan@atmosenergy.com
Alternative contact regarding this report:
Name: Douglas C. WaltherTitle: Deputy General Counsel
Address: 5430 LBJ Freeway, Suite 1800Dallas, Texas 75240-2601
Phone: 972.855.3102
Email address: Douglas.Walther@atmosenergy.com
ATMOS ENERGY CORP. - MID-TEX DIVISION - UNINCORPORATED AREASRAILROAD COMMISSION OF TEXAS - INTERIM RATE ADJUSTMENT APPLICATION
I certify that I am the responsible official of Atmos Energy Corp., Mid-Tex Division; that I have examined the foregoing report; that to the best of my knowledge, information, and belief, all statements of fact contained in the said report are true and the said report is a correct statement of the business and affairs of the above-named respondent in respect to each and every matter set forth therein during the period from January 1, 2020 to December 31, 2020 inclusive.
I understand until the issuance of a final order or decision by a regulatory authority in a rate case that is filed after the implementation of a tariff or rate schedule under this section, all amounts collected under the tariff or rate schedule before the filing of the rate case are subject to refund.
February 18, 2021
EMR-5 Signature Page Page 1 of 1
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE MTX ADDITIONS
1 080.33149 (30)SOUTHEAST REGION, DALLAS AREA OPERATIONS BLANKET FOR NEW SERVICE LINES. ALL CUSTOMERS DALLAS GROWTH SEPTEMBER
2 080.33150 (16,224)SOUTHEAST REGION, SOUTH AREA OPERATIONS BLANKET FOR NEW SERVICE LINES. ALL CUSTOMERS WACO GROWTH JUNE
3 080.33345 8,516
NORTH REGION, NORTHEAST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
4 080.33346 18,980
NORTH REGION, NORTHWEST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
5 080.33347 41,217
SOUTHEAST REGION, DALLAS AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
6 080.33348 12,266
SOUTHEAST REGION, EAST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
7 080.33349 11,085
SOUTHEAST REGION, SOUTH AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
8 080.33350 25,233
SOUTHWEST REGION, FT. WORTH AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
9 080.33351 8,364
SOUTHWEST REGION, SOUTH AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
10 080.33352 9,282
SOUTHWEST REGION, WEST AREA OPERATIONS BLANKET FOR REPLACE/RETIRE SERVICE LINES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
11 080.33353 6,659
NORTH REGION, NORTHEAST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
12 080.33354 21,302
NORTH REGION, NORTHWEST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
13 080.33355 21,952
SOUTHEAST REGION, DALLAS AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
14 080.33356 4,251
SOUTHEAST REGION, EAST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
15 080.33357 14,364
SOUTHEAST REGION, SOUTH AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
16 080.33358 12,481
SOUTHWEST REGION, FT. WORTH AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
17 080.33359 4,653
SOUTHWEST REGION, SOUTH AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
18 080.33360 17,808
SOUTHWEST REGION, WEST AREA OPERATIONS BLANKET FOR PIPE 5 FEET TO 250 FEET LESS THAN 8 INCH DIAMETER DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
19 080.33487 833
INSTALL 500 FEET OF 8 INCH POLY ALONG HIGHWAY 83-84 AND ABANDON 500 FEET OF 10 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
20 080.33492 238
INSTALL 1950 FEET OF 2 INCH POLY ALONG BENSON STREET AND ABANDON 1950 FEET OF 2 INCH POLY AND 122 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINGATE
SYSTEM INTEGRITY DECEMBER
21 080.33502 236
INSTALL 375 FEET OF 6 INCH POLY ALONG RICHLAND DRIVE AND ABANDON 375 FEET OF 6 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
22 080.33506 99 ABANDON 772 FEET OF 4 INCH STEEL IN AN ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
23 080.33507 135
INSTALL 480 FEET OF 2 INCH POLY AT SOUNDOWN AND CALVERT STREETS AND ABANDON 1250 FEET OF 10 INCH STEEL AND 507 FEET OF 4 INCH AND 212 FEET OF 2 INCH POLY DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
24 080.33513 16
INSTALL 433 FEET OF 2 INCH POLY ALONG AVENUE G AND ABANDON 433 FEET OF 1.25 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY DECEMBER
25 080.33519 6
INSTALL 331 FEET OF 2 INCH POLY IN AN ALLEY N OF 19TH STREET AND ABANDON 331 FEET OF 2 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON
SYSTEM INTEGRITY DECEMBER
26 080.33520 255 ABANDON 297 FEET OF 3 INCH STEEL ALONG ELM STREET IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE
SYSTEM INTEGRITY DECEMBER
27 080.33546 382
INSTALL 550 FEET OF 4 INCH POLY ALONG AVENUE B AND 14TH STREET AND ABANDON 162 FEET OF 4 INCH, 342 FEET OF 3 INCH AND 1290 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
28 080.33548 179
INSTALL 288 FEET OF 2 INCH POLY IN AN ALLEY EAST OF WILLIS AND ABANDON 288 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
29 080.33561 3,021
INSTALL 600 FEET OF 12 INCH STEEL ALONG 23RD STREET AND ABANDON 540 FEET OF 12 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
30 080.33604 352
INSTALL 197 FEET OF 4 INCH AND 263 FEET OF 2 INCH POLY ALONG MURRAY STREET AND COULTER STREET AND ABANDON 153 FEET OF 4 INCH AND 209 FEET OF 3 INCH STEEL AND 11 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ROCKDALE
SYSTEM INTEGRITY DECEMBER
31 080.33654 371
INSTALL 260 FEET OF 4 INCH POLY ALONG 21ST STREET AND ABANDON 260 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 1 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
32 080.33662 16
INSTALL 147 FEET OF 2 INCH POLY ALONG ELIZABETH STREET AND ABANDON 147 FEET OF 2 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
33 080.33663 15
INSTALL 400 FEET OF 6 INCH POLY ALONG 10TH STREET AND ABANDON 400 FEET OF 10 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
34 080.33676 106 INSTALL 199 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 199 FEET OF 4 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD
SYSTEM INTEGRITY DECEMBER
35 080.33726 288
INSTALL 328 FEET OF 4 INCH AND 218 FEET OF 2 INCH POLY ALONG HILLYER STREET AND COULTER STREET AND ABANDON 310 FEET OF 3 INCH AND 216 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE
SYSTEM INTEGRITY DECEMBER
36 080.33733 79
INSTALL 215 FEET OF 2 INCH POLY ALONG PEAR STREET AND ABANDON 200 FEET OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
37 080.33734 79
INSTALL 315 FEET OF 2 INCH POLY ALONG FM 381 AND ABANDON 300 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
38 080.33735 65
INSTALL 215 FEET OF 4 INCH POLY ALONG EAST 33RD STREET AND ABANDON 200 FEET OF 3 INCH BARE STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
39 080.33742 825
INSTALL 1135 FEET OF 2 INCH POLY AND ABANDON 1132 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN
SYSTEM INTEGRITY DECEMBER
40 080.33746 22 INSTALL 151 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 151 FEET OF 4 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS
SYSTEM INTEGRITY DECEMBER
41 080.33776 60
INSTALL 850 FEET OF 4 INCH POLY ALONG CLARKSVILLE STREET AND ABANDON 850 FEET OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
42 080.33798 602
INSTALL 10 FEET OF 10 INCH STEEL ALONG EDGEWOOD STREET AND ABANDON 10 FEET OF 10 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
43 080.33801 24
INSTALL 130 FEET OF 2 INCH POLY ALONG PEARL STREET AND ABANDON 128 FEET OF 2 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
44 080.33840 29
INSTALL 470 FEET OF 2 INCH POLY ALONG 8TH STREET AND ABANDON 470 FEET ON 1.75 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEGARGEL
SYSTEM INTEGRITY DECEMBER
45 080.33842 380
INSTALL 150 FEET OF 4 INCH POLY IN MYRTLE STREET AND ABANDON 150 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
46 080.33844 130
INSTALL 182 FEET OF 2 INCH POLY ALONG US HIGHWAY 380 AND ABANDON 182 FEET OF 3 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD
SYSTEM INTEGRITY DECEMBER
47 080.33849 313 ABANDON 130 FEET OF 2 INCH STEEL ALONG GRACE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
48 080.33870 40
INSTALL 118 FEET OF 4 INCH POLY ALONG 11TH STREET AND ABANDON 110 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
49 080.33900 294 INSTALL 360 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 360 FEET OF 4 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH
SYSTEM INTEGRITY DECEMBER
50 080.33906 19
INSTALL 229 FEET OF 2 INCH POLY ALONG COLQUITT STREET AND ABANDON 246 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
51 080.33907 218
INSTALL 325 FEET OF 2 INCH POLY ON LOOP 254 AND ABANDON 325 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER
SYSTEM INTEGRITY DECEMBER
52 080.33909 348
INSTALL 400 FEET OF 2 INCH POLY ALONG LOOP 3363 AND ABANDON 400 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLDEN
SYSTEM INTEGRITY DECEMBER
53 080.33951 120
INSTALL 545 FEET OF 2 INCH POLY ALONG MILLS STREET AND ABANDON 975 FEET OF 3 INCH STEEL IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTCHINS
SYSTEM INTEGRITY DECEMBER
54 080.33979 286
INSTALL 200 FEET OF 4 INCH POLY ALONG 9TH STREET AND ABANDON 200 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
55 080.33981 32
INSTALL 265 FEET OF 4 INCH POLY IN AN ALLEY EAST OF ELM STREET AND ABANDON 265 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
56 080.34037 114
INSTALL 230 FEET OF 2 INCH POLY ON EAST HOUSTON STREET AND ABANDON 230 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COOPER
SYSTEM INTEGRITY DECEMBER
57 080.34048 18
INSTALL 165 FEET OF 6 INCH AND 117 FEET OF 3 INCH POLY ALONG AMBLER AVENUE AND ABANDON 165 FEET OF 6 INCH AND 117 FEET OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
58 080.34070 86
INSTALL 145 FT OF 4 INCH POLY AT METCALF AND HIGHLAND AND ABANDON 145 FT OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
59 080.34087 71
INSTALL 100 FEET OF 4 INCH POLY IN A PUBLIC UTILITY EASEMENT AND ABANDON 100 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
60 080.34091 298
INSTALL 90 FEET OF 6 INCH AND 32 FEET OF 4 INCH POLY AT THE INTERSECTION OF 20TH STREET AND 11TH AVENUE AND ABANDON 90 FEET OF 6 INCH AND 32 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
61 080.34136 68
INSTALL 143 FT OF 2 IN POLY ON STRATFORD AND ABANDON 150 FEET OF 1.25 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
62 080.34137 22
INSTALL 185 FEET OF 2 INCH POLY AT BANK AND PENN STREETS AND ABANDON 110 FEET OF 3 INCH AND 75 FEET OF 2 STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK
SYSTEM INTEGRITY DECEMBER
63 080.34143 384
INSTALL 1040 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 905 FEET OF 3 INCH CAST IRON, 121 FEET OF 3 INCH AND 15 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
64 080.34146 276
INSTALL 237 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 235 FEET OF 4 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 2 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
65 080.34175 335
INSTALL 155 FEET OF 3 INCH POLY ALONG MCCRACKEN STREET AND ABANDON 155 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO
SYSTEM INTEGRITY DECEMBER
66 080.34176 160
INSTALL 300 FEET OF 2 INCH STEEL ALONG ELM STREET AND ABANDON 300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVORD
SYSTEM INTEGRITY DECEMBER
67 080.34177 633
INSTALL 625 FEET OF 2 INCH POLY ALONG SEALY STREET AND ABANDON 625 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JUSTIN
SYSTEM INTEGRITY DECEMBER
68 080.34187 289
INSTALL 1220 FEET OF 4 INCH POLY ALONG VARIOUS STREETS AND ABANDON 1850 FEET OF 4 INCH AND 125 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT
SYSTEM INTEGRITY DECEMBER
69 080.34188 1,420
INSTALL 2100 FEET OF 4 INCH POLY IN ALLEY BETWEEN NORTH ELM AND NORTH CRUMP AND ABANDON 2100 FEET OF 2.5 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
70 080.34208 686
INSTALL 800 FEET OF 4 INCH POLY ALONG 15TH STREET AND ABANDON 800 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HONEY GROVE
SYSTEM INTEGRITY DECEMBER
71 080.34210 241
INSTALL 305 FEET OF 2 INCH POLY ALONG NORTH REAGAN STREET AND ABANDON 456 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY DECEMBER
72 080.34228 588
INSTALL 710 FEET OF 2 INCH POLY AND ABANDON 710 FEET OF 4 INCH OF STEEL PIPE DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY
SYSTEM INTEGRITY DECEMBER
73 080.34251 73
INSTALL 50 FEET OF 4 INCH POLY ALONG MILLS STREET AND ABANDON 50 FEET OF 3 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
74 080.34286 153
INSTALL 356 FEET OF 2IN POLY IN THE ALLEY NORTH OF FOURTH ST AT AVE E AND ABANDON 356 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS KNOX CITY
SYSTEM INTEGRITY DECEMBER
75 080.34294 792
INSTALL 1350 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 1350 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
76 080.34320 34
INSTALL 460 FT OF 2 IN POLY AT WENONAH AND SEYMOUR AND ABANDON 360 FEET OF 4 INCH STEEL AND 50 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
77 080.34326 212 ABANDON 40 FEET OF 2 INCH STEEL ALONG EDDIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
78 080.34395 110
INSTALL 485 FEET OF 2 INCH POLY ALONG 2ND STREET AND ABANDON 485 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD
SYSTEM INTEGRITY DECEMBER
79 080.34402 208 ABANDON 932 FEET OF 2 INCH STEEL IN AN EASEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
80 080.34403 152 ABANDON 203 FEET OF 2 INCH STEEL ALONG ADAMS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STRAWN
SYSTEM INTEGRITY DECEMBER
81 080.34417 242
INSTALL 215 FEET OF 2 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON 2OO FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
82 080.34432 308
INSTALL 160 FEET OF 2 INCH POLY ALONG ANDERSON STREET AND ABANDON 950 FEET OF 2 INCH CAST IRON DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
83 080.34470 83
INSTALL 288 FEET OF 2 INCH POLY ALONG HILL ST AND ABANDON 288 FEET OF 2 INCH STEEL DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
84 080.34491 97
INSTALL 5 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 5 FEET OF 4 INCH AND 10 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
85 080.34502 567
INSTALL 1250 FEET OF 2 INCH POLY ALONG EAST PARK AND ABANDON 1250 FEET OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
86 080.34508 66
INSTALL 30 FEET OF 8 INCH POLY ALONG BROTHERS BLVD AND ABANDON 12 FEET OF 8 INCH STEEL AND 18 FEET OF 8 INCH POLY DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
87 080.34520 503
INSTALL 270 FEET OF 4 INCH POLY ALONG WALNUT AND NEW STREETS AND ABANDON 254 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
88 080.34532 31
INSTALL 1240 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 1240 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
89 080.34543 74
INSTALL 450 FEET OF 2 INCH POLY ALONG 6TH STREET AND ABANDON 450 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORMANGEE
SYSTEM INTEGRITY DECEMBER
90 080.34555 129
INSTALL 265 FEET OF 2 INCH POLY ALONG13TH STREET AND ABANDON 265 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HASKELL
SYSTEM INTEGRITY DECEMBER
91 080.34560 623
INSTALL 1260 FEET OF 2 INCH POLY ALONG 24TH STREET AND ABANDON 1255 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
92 080.34562 206
INSTALL 405 FEET OF 2 INCH POLY ALONG 3RD STREET AND ABANDON 405 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
93 080.34579 363
INSTALL 428 FEET OF 6 INCH, 23 FEET OF 3 INCH AND 16 FEET OF 2 INCH POLY ALONG 23RD STREET AND ABANDON 428 FEET OF 6 INCH, 23 FEET OF 3 INCH AND 16 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
94 080.34704 12
INSTALL 142 FEET OF 3 INCH POLY ALONG 7TH AND ABANDON 142 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
95 080.34729 53
INSTALL 150 FEET OF 4 INCH POLY ALONG COLORADO STREET AND ABANDON 150 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
96 080.34737 677
INSTALL 100 FEET OF 6 INCH POLY ALONG JEFFERSON STREET AND ABANDON 100 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
97 080.34741 9
INSTALL 315 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 315 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH
SYSTEM INTEGRITY DECEMBER
98 080.34745 109
INSTALL 107 FEET OF 4 INCH POLY IN AN ALLEY AND ABANDON 107 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
99 080.34747 155
INSTALL 120 FEET OF 2 INCH POLY ALONG COUNTRY CLUB ROAD AND ABANDON 70 FEET OF 2 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 3 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
100 080.34753 113 ABANDON 256 FEET OF 2 INCH STEEL AT 5TH AND BROWN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT
SYSTEM INTEGRITY DECEMBER
101 080.34776 8
INSTALL 175 FEET OF 2 INCH POLY ALONG WILDWOOD STREET AND ABANDON 175 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
102 080.34785 82
INSTALL 250 FEET OF 2 INCH POLY ALONG TELLERSON AND ABANDON 1570 FEET OF 1,25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
103 080.34862 139
INSTALL 488 FEET OF 1.25 INCH POLY ALONG CR 357 AND ABANDON 476 FEET OF 1 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET
SYSTEM INTEGRITY DECEMBER
104 080.34866 124 INSTALL 339 FEET OF 2 INCH POLY AND ABANDON 317 FEET OF 1 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET
SYSTEM INTEGRITY DECEMBER
105 080.34881 310
INSTALL 300 FEET OF 6 INCH POLY ALONG 28TH STREET AND ABANDON 300 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
106 080.34960 168 ABANDON 95 FEET OF 2 INCH STEEL ALONG BROWNING STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR
SYSTEM INTEGRITY DECEMBER
107 080.34982 187
INSTALL 397 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 397 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
108 080.34994 595
INSTALL 200 FEET OF 4 INCH AND 120 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 200 FEET OF 4 INCH AND 120 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
109 080.34998 135
INSTALL 51 FEET OF 2 INCH POLY AT HACKBERRY AND 20TH STREET AND ABANDON 920 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
110 080.35032 221
INSTALL 150 FEET OF 4 INCH POLY ALONG BALCH SPRINGS ROAD AND ABANDON 150 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
111 080.35156 82 INSTALL 148 FEET OF 2 INCH POLY AND ABANDON 148 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
112 080.35164 54
INSTALL 275 FEET OF 2 INCH POLY IN AN ALLEY AND ABANDON 275 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON
SYSTEM INTEGRITY DECEMBER
113 080.35180 5 ABANDON 425 FEET OF 4 INCH STEEL ALONG BURNETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT
SYSTEM INTEGRITY DECEMBER
114 080.35242 20
INSTALL 334 FEET OF 2 INCH POLY ALONG BROYLES AND ABANDON 334 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT
SYSTEM INTEGRITY DECEMBER
115 080.35255 63
INSTALL 1071 FEET OF 1.25 INCH POLY ALONG CR 357 AND ABANDON 1071 FEET OF 1 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET
SYSTEM INTEGRITY DECEMBER
116 080.37203 0
INSTALL 325 FEET OF 2 INCH POLY ALONG ROSE MARIE BLVD AND ABANDON 325 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY SEPTEMBER
117 080.38117 134
INSTALL 1235 FEET OF 4 INCH AND 65 FEET OF 2 INCH POLY NEAR RUTH LANE AND ABANDON 1235 FEET OF 4 INCH AND 65 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
118 080.38382 0
INSTALL 1200 FEET OF 4 INCH STEEL ON LINE M14 ACROSS CHAMBERS CREEK AND ABANDON 1200 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY SEPTEMBER
119 080.38667 2,869
RELOCATE FACILITIES. INSTALL 597 FEET OF 4 INCH POLY AND ABANDON 850 FEET OF 4 INCH STEEL NEAR IH35 TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT. ALL CUSTOMERS GEORGETOWN
RELOCATION OF FACILITIES JUNE
120 080.39929 (94,305)INSTALL AC MITIGATION ON LINES KPD1, KPD1-4, KP1-4-2, AND U17 TO PREVENT AC CORROSION AND/OR INJURY BY TOUCHING THE LINE. ALL CUSTOMERS DUBLIN
SYSTEM INTEGRITY MARCH
121 080.40366 0
INSTALL AC MITIGATION ALONG LINES L40, L40-2-1, L40-2, AND L40-2-2 IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. . ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY SEPTEMBER
122 080.40413 86 INSTALL AC MITIGATION ALONG LINES P7 AND L TO PREVENT AC CORROSION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUSTIN
SYSTEM INTEGRITY DECEMBER
123 080.40669 553 INSTALL AC MITIGATION SYSTEM ON LINE P7 IN WILLIAMSON COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
124 080.40785 0
RELOCATE FACILITIES. INSTALL 2,957 FEET OF 2 INCH, 642 FEET OF 4 INCH, AND 7,270 FEET OF 6 INCH POLY, AND 380 FEET OF 6 INCH STEEL AND 20 FEET OF 8 INCH STEEL ALONG RANDOL MILL AVENUE AND ABANDON 4,521 FEET OF 2 INCH, AND 252 FEET OF 3 INCH POLY, AND 390 FEET OF 4 INCH POLY AND 504 FEET OF 6 INCH STEEL AND 34 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
SYSTEM INTEGRITY SEPTEMBER
125 080.41157 (2,204)
INSTALL 249 POLY SERVICE LINES IN THE SOUTHWEST REGION, FT. WORTH AREA AND ABANDON 249 STEEL SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
126 080.41251 0
INSTALL 2074 FEET OF 2 INCH POLY ALONG PRESTON AND TURNER STREETS AND ABANDON 1977 FEET OF 4 INCH CAST IRON AND 97 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY SEPTEMBER
127 080.41262 (12)
RELOCATE FACILITIES. INSTALL 210 FEET OF 2 INCH POLY ALONG JORDAN LANE TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET AND STORM SEWER IMPROVEMENTS AND ABANDON 215 FEET OF 1-1/4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
128 080.41748 18,112 INSTALL 320 FEET OF 4 INCH AND 2116 FEET OF 6 INCH POLY TO SERVE BROWNSTONE AT THE SUMMIT. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH JANUARY
129 080.41874 358
RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH STEEL, 1465 FEET OF 8 INCH, 397 FEET OF 4 INCH AND 186 FEET OF 2 INCH POLY AND ABANDON 1460 FEET OF 6 INCH, 850 FEET OF 4 INCH, AND 430 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
130 080.42117 939 INSTALL 2280 FEET OF 4 INCH AND 7500 FEET OF 2 INCH POLY ALONG THE STREETS OF TANNERS MILL. DEVELOPER INSTALLED PROJECT. RESIDENTIAL PROSPER GROWTH FEBRUARY
131 080.42131 0
INSTALL 3000 FEET OF 4 INCH STEEL ON LINE E10-5 AND ABANDON 3000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE
SYSTEM INTEGRITY SEPTEMBER
132 080.42141 38
INSTALL 23193 FEET OF 4 INCH POLY ON M11 AND ABANDON 23193 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
133 080.42372 (5)
INSTALL DISTRICT REGULATOR STATION AND RELIEF VALVE ALONG ABRAM STREET AND ABANDON DISTRICT REGULATOR STATION AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 4 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
134 080.42388 15,203
INSTALL 425 FEET OF 2 INCH STEEL, A 2 INCH REGULATOR STATION, AND METER OFF OF THE 6 INCH HIP LINE ALONG LOOP 340. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL TEMPLE GROWTH OCTOBER
135 080.42454 3,847
RELOCATE FACILITIES. INSTALL 1781 FEET OF 4 INCH, 387 FEET OF 8 INCH, AND 10 FEET OF 6 INCH POLY AND ABANDON 1228 FEET OF 4 INCH, 370 FEET OF 6 INCH AND 343 FEET OF 2 INCH POLY ALONG FM 407 TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS LEWISVILLE
RELOCATION OF FACILITIES JUNE
136 080.43732 1,492
INSTALL 1228 FEET OF POLY ALONG PIERCE AND ABANDON 1228 FEET STEEL AND 72 FEET OF POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY OCTOBER
137 080.44243 1,080
INSTALL 2523 FEET OF 6 INCH, 205 FEET OF 4 INCH AND 4005 FEET OF 2 INCH POLY ALONG STREETS OF SANTA RITA PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SYSTEM WIDE GROWTH OCTOBER
138 080.44473 154 INSTALL 708 FEET OF 4 INCH AND 2272 FEET OF 2 INCH ALONG STREETS OF SANTA RITA PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SYSTEM WIDE GROWTH OCTOBER
139 080.44481 308
INSTALL 1097 FEET OF 6 INCH, 567 FEET OF 4 INCH AND 2943 FEET OF 2 INCH POLY ALONG STREETS OF SANTA RITA PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SYSTEM WIDE GROWTH OCTOBER
140 080.44697 206
INSTALL 2,761 FEET OF 6 INCH, 3,625 FEET OF 4 INCH AND 6,167 FEET OF 2 INCH POLY ALONG STREETS OF AVERY NORTH PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
141 080.44814 3,608 INSTALL 8,900 FEET OF 2 INCH POLY ALONG STREETS OF PHASE 1A OF THE CREEKS OF LEGACY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH AUGUST
142 080.44865 206 INSTALL 5,450 FEET OF 2 INCH POLY ALONG STREETS OF PHASE 1B OF THE CREEKS OF LEGACY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH AUGUST
143 080.45244 27
INSTALL 1200 FEET OF 2 INCH POLY ALONG ABRAMS ROAD AND ABANDON 1200 FEET OF 2 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
144 080.45245 307
INSTALL 1720 FEET OF 2 INCH POLY ALONG WORTH STREET AND ABANDON 1720 FEET OF 4 INCH AND 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
145 080.45301 0
INSTALL 1385 FEET OF 4 INCH POLY ALONG WHISPERING HILLS DRIVE AND ABANDON 1385 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL
SYSTEM INTEGRITY SEPTEMBER
146 080.45509 (225)
INSTALL 800 FEET OF 12 INCH POLY ALONG FM 1417 AND ABANDON 800 FEET OF 12 INCH STEEL ALONG FM 1417 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
147 080.45614 122
INSTALL 1650 FEET OF 2 INCH POLY ALONG VICTOR STREET AND ABANDON 1650 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
148 080.45638 (8,964)
RELOCATE FACILITIES. INSTALL 41 FEET OF 6 INCH, 37 FEET OF 8 INCH, 30 FEET OF 10 INCH AND 4409 FEET OF 16 INCH STEEL AND ABANDON 237 FEET OF 6 INCH, 787 FEET OF 8 INCH, 30 FEET OF 10 INCH, 170 FEET OF 12 INCH AND 3396 FEET OF 16 INCH STEEL ALONG EAST AVENUE H TO ACCOMMODATE TXDOT STREET PROJECT. ALL CUSTOMERS ARLINGTON
RELOCATION OF FACILITIES MARCH
149 080.45650 0
INSTALL 6100 FEET OF 2 INCH POLY ALONG LYLE AVENUE AND ABANDON 3023 FEET OF 4 INCH CAST IRON, 377 FEET OF 2 INCH STEEL AND 116 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
150 080.45658 18,012
INSTALL 1227 FEET OF 12 INCH STEEL, 80 FEET OF 2 INCH AND 284 FEET OF 4 INCH POLY ALONG LIVE OAK AND ABANDON 61 FEET OF 2 INCH, 1281 FEET OF 12 INCH STEEL, 300 FEET OF 3 INCH AND 162 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
151 080.45693 41
INSTALL 2694 FEET OF 2 INCH POLY ALONG PINE AND ABANDON 2770 FEET OF 4 INCH CAST IRON, 157 FEET OF 2 INCH CAST IRON, AND 66 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
152 080.45700 903
INSTALL 335 FEET OF 6 INCH AND 425 FEET OF 4 INCH POLY ALONG GLENCO TERRACE AND ABANDON 169 FEET OF 3 INCH POLY, 256 FEET OF 4 INCH CAST IRON, AND 335 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
153 080.45737 297
INSTALL 4020 FEET OF 4 INCH POLY AND ABANDON 3995 FEET OF 4 INCH CAST IRON AND 1581 FEET OF 4 INCH STEEL ALONG N 21ST STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
154 080.45825 464
INSTALL 4600 FEET OF 6 INCH, AND 8850 FEET OF 2 INCH POLY. INSTALL 52 SHORT COMPANION STUBS, 38 LONG COMPANION STUBS, 7 SHORT INDIVIDUAL STUBS, AND 4 LONG INDIVIDUAL STUBS ALONG THE STREETS OF WILLOW WOOD PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH JUNE
155 080.45874 0 INSTALL 450 FEET OF 6 INCH STEEL ALONG LINE U AND ABANDON 450 FEET OF 6 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROTAN
SYSTEM INTEGRITY DECEMBER
156 080.46022 6,140
INSTALL GRADIENT CONTROL MATS AND DEEP VERTICAL POINT GROUNDS AND 3 MILES OF ZINC RIBBON ALONG PLANO SOUTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
157 080.46065 649
INSTALL 1000 FEET OF 2 INCH POLY ALONG WINDSOR PARKWAY AND ABANDON 1000 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
158 080.46146 2,020
RELOCATE FACILITIES. INSTALL 125 FEET OF 6 INCH, 250 FEET OF 4 INCH, 2920 FEET OF 2 INCH POLY ALONG YEWPON AND ABANDON 90 FEET OF 6 INCH, 215 FEET OF 4 INCH, 2700 FEET OF 2 INCH STEEL AND 120 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
159 080.46332 309 INSTALL 160 FEET OF 4 INCH AND 5050 FEET OF 2 INCH POLY ALONG CREEKS OF LEGACY PHASE 1C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH AUGUST
160 080.46343 11
RELOCATE FACILITIES. INSTALL 2600 FEET OF 6 INCH, 260 FEET OF 4 INCH, AND 20 FEET OF 2 INCH POLY ALONG SMITHFIELD ROAD AND ABANDON 2450 FEET OF 6 INCH, 200 FEET OF 4 INCH POLY, AND 15 FEET OF 2 INCH STEEL TO ACCOMMODATE NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
SYSTEM INTEGRITY DECEMBER
161 080.46369 650
RELOCATE FACILITIES. ABANDON 1015 FEET OF 3 INCH POLY ALONG 2ND AVENUE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
162 080.46447 2,009,313
INSTALL 3500 FEET OF 24 INCH STEEL ALONG SH114 AND ABANDON 3500 FEET OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
163 080.46449 1,272
INSTALL 1420 FEET OF 2 INCH AND 600 FEET OF 4 INCH POLY ALONG LIVE OAK AND ABANDON 76 FEET OF 2 INCH STEEL, 1843 FEET OF 4 INCH CAST IRON, AND 17 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 5 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
164 080.46450 1,490
INSTALL 2617 FEET OF 4 INCH POLY ALONG CUMBERLAND AVENUE AND ABANDON 178 FEET OF 2 INCH POLY AND 2553 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
165 080.46479 1,652
INSTALL 2809 FEET OF 4 INCH AND 47 FEET OF 8 INCH POLY ALONG COLCORD AVENUE AND ABANDON 2963 FEET OF 4 INCH CAST IRON, 280 FEET OF 1.25 INCH CAST IRON, 2034 FEET OF 4 INCH STEEL, AND 538 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
166 080.46900 (3)
RELOCATE FACILITIES. INSTALL 4206 FEET OF 8 INCH POLY AND ABANDON 4045 FEET OF 8 INCH POLY TO ACCOMMODATE THE CITY OF SAGINAW IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW
SYSTEM INTEGRITY DECEMBER
167 080.46948 619 INSTALL 893 FEET OF 4 INCH AND 4526 FEET OF 2 INCH POLY ALONG STREETS OF VIZCAYA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
168 080.47046 100,686
RELOCATE FACILITIES. INSTALL 248 FEET OF 2 INCH POLY AND 351 FEET OF 4 INCH POLY AND 5045 FEET OF 6 INCH POLY AND ABANDON 294 FEET OF 2 INCH POLY AND 3474 FEET OF 4 INCH STEEL AND 1847 FEET OF 4 INCH POLY ALONG WHITE CHAPEL BOULEVARD TO ACCOMMODATE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
SYSTEM INTEGRITY DECEMBER
169 080.47061 11,196
RELOCATE FACILITIES. INSTALL 2600 FEET OF 12 INCH STEEL, 75 FEET OF 6 INCH, 250 FEET OF 4 INCH, AND 100 FEET OF 2 INCH POLY ALONG MONTGOMERY STREET AND ABANDON 104 FEET OF 2 INCH AND 64 FEET OF 4 INCH POLY AND 2623 FEET OF 12 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
170 080.47064 (1)
RELOCATE FACILITIES. INSTALL 660 FEET OF 16 INCH STEEL AND 10 FEET OF 6 INCH POLY ALONG ROSEDALE AND ABANDON 650 FEET OF 16 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STORM DRAIN PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
171 080.47076 0
INSTALL 2050 FEET OF 2 INCH POLY AND (45) .75 INCH SERVICES ALONG BURLINGDELL AVENUE AND ABANDON 2050 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL
SYSTEM INTEGRITY DECEMBER
172 080.47077 200
INSTALL 2100 FEET OF 2 INCH POLY ALONG BURLINGDELL AVENUE AND ABANDON 2050 FEET OF 6 AND 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL
SYSTEM INTEGRITY DECEMBER
173 080.47079 241
INSTALL 1700 FEET OF 2 INCH POLY ALONG TARPLEY AVENUE AND ABANDON 1200 FEET OF 3 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL
SYSTEM INTEGRITY DECEMBER
174 080.47091 355
INSTALL 1770 FEET OF 2 INCH POLY ALONG GILPIN AVENUE AND ABANDON 650 FEET OF 8 INCH AND 1250 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL
SYSTEM INTEGRITY DECEMBER
175 080.47150 70
RELOCATE FACILITIES. INSTALL 1425 FEET OF 8 INCH ALONG LAMAR AND ABANDON 1640 FEET OF 8 INCH STEEL, 320 FEET OF 8 INCH POLY, 140 FEET OF 2 INCH POLY, AND 40 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
176 080.47220 (0)
RELOCATE FACILITIES. INSTALL 450 FEET OF 12 INCH AND 180 FEET OF 2 INCH POLY ALONG THE STREETS OF MCKENZIE STREET AND ABANDON 310 FEET OF 12 INCH STEEL AND 180 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
177 080.47231 4,330 INSTALL 3625 FEET OF 4 INCH AND 9790 FEET OF POLY ALONG STREETS OF ROCKHILL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH NOVEMBER
178 080.47303 450
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH AND 2230 FEET OF 2 INCH POLY ALONG SAN JACINTO AND ABANDON 470 FEET OF 6 INCH AND 2260 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
179 080.47311 1,360
RELOCATE FACILITIES. INSTALL 3630 FEET OF 2 INCH POLY ALONG ROYALTON AND ABANDON 3625 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
180 080.47398 178
INSTALL 3195 FEET OF 4 INCH POLY ALONG BONHAM STREET AND ABANDON 3085 FEET OF 4 INCH, 100 FEET OF 3 INCH CAST IRON, 190 FEET OF 4 INCH, 95 FEET OF 3 INCH, AND 10 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
181 080.47445 2,735
RELOCATE FACILITIES. INSTALL 220 FEET OF 4 INCH AND 1930 FEET OF 2 INCH POLY ALONG NECHES AND ABANDON 645 FEET OF 4 INCH POLY AND 1350 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
182 080.47446 25
RELOCATE FACILITIES. INSTALL 1985 FEET OF 4 INCH AND 1950 FEET OF 2 INCH POLY ALONG EWING AND ABANDON 1410 FEET OF 6 INCH STEEL, 420 FEET OF 8 INCH CAST IRON, 40 FEET OF 4 INCH CAST IRON, AND 155 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
183 080.47461 490
RELOCATE FACILITIES. INSTALL 14,537 FEET OF 30 INCH STEEL ALONG BERNAL STREET AND ABANDON 11,600 FEET OF 30 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
184 080.47512 2
RELOCATE FACILITIES. INSTALL 138 FEET OF 4 INCH AND 105 FEET OF 2 INCH POLY ALONG CLAYTON ROAD AND ABANDON 125 FEET OF 4 INCH AND 90 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
185 080.47597 676
INSTALL 750 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON 750 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
186 080.47598 768
INSTALL 1050 FEET OF 2 INCH POLY AND ABANDON 1050 FEET OF 4 INCH CAST IRON ALONG HENDERSON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
187 080.47600 1,434
INSTALL 1050 FEET OF 2 INCH POLY ALONG ASH AVENUE AND ABANDON 1050 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
188 080.47601 6,118
INSTALL 1900 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 4 INCH CAST IRON ALONG HENDERSON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
189 080.47603 24,018
INSTALL 1588 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON 1536 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
190 080.47605 19,004
INSTALL 1150 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON 1150 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 6 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
191 080.47606 9,075
INSTALL 800 FEET OF 2 INCH POLY ALONG HENDERSON AVENUE AND ABANDON 875 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
192 080.47607 8,792 ABANDON 3200 FEET OF 6 AND 8 INCH CAST IRON ALONG HENDERSON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
193 080.47617 119
RELOCATE FACILITIES. INSTALL 1750 FEET OF 2 INCH POLY ALONG BIRCH STREET AND ABANDON 2010 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
194 080.47681 13,964
INSTALL 1136 FEET OF 2 INCH POLY ALONG ASH AND ABANDON 1245 FEET OF 4 INCH AND 375 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
195 080.47682 28,262
INSTALL 2200 FEET OF 2 INCH POLY ALONG TERRY AND ABANDON 3550 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
196 080.47728 1,248
RELOCATE FACILITIES. INSTALL 2,835 FEET OF 6 INCH POLY ALONG RIVERSIDE DRIVE AND ABANDON 2830 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
197 080.47780 (465)
RELOCATE FACILITIES. INSTALL 1000 FEET OF 6 INCH POLY ALONG HAYMARKET AND ABANDON 980 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES MARCH
198 080.47836 52 INSTALL 3,480 FEET OF 2 INCH POLY ALONG STREETS OF ARTESIA PHASE 5A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH JANUARY
199 080.47848 1,079
INSTALL 1450 FEET OF 2 INCH POLY ALONG BROOKLYNDELL STREET AND ABANDON 1030 FEET OF 2 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
200 080.47849 1,297
INSTALL 1350 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 6 INCH CAST IRON AND 500 FEET OF 6 INCH AND 540 FEET OF 4 INCH CAST IRON ALONG RAYDELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
201 080.47850 1,674
INSTALL 1850 FEET OF 2 INCH POLY ALONG BARNETT AVENUE AND ABANDON 650 FEET OF 4 INCH AND 1200 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
202 080.47857 3,196
INSTALL 1500 FEET OF 2 INCH POLY ALONG MARSHALL DELL AVENUE AND ABANDON 1200 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
203 080.47882 6
RELOCATE FACILITIES. INSTALL 10,430 FEET OF 6 INCH AND 280 FEET OF 4 INCH POLY ALONG STACY ROAD AND ABANDON 10,300 FEET OF 6 INCH AND 160 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FAIRVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRVIEW
SYSTEM INTEGRITY DECEMBER
204 080.47884 107
RELOCATE FACILITIES. INSTALL 1465 FEET OF 2 INCH POLY ALONG BAXTERSHIRE AND ABANDON 1455 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
205 080.47894 (613)
INSTALL 5 GRADIENT CONTROL MATS, 2000 FEET OF ZINC RIBBON, 10 TEST STATIONS AND 2 DEEP GROUNDING POINTS TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY JUNE
206 080.47935 8
RELOCATE FACILITIES. INSTALL 3000 FEET OF 12 INCH STEEL ALONG VIRGINIA PARKWAY AND ABANDON 3000 FEET OF 12 INCH STEEL TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
207 080.47942 0
INSTALL 4500 FEET OF 10 INCH STEEL ALONG TRAVIS STREET AND ABANDON 4500 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
208 080.48000 18
INSTALL 1050 FEET OF 4 INCH POLY ALONG JUNIUS STREET AND ABANDON 1050 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
209 080.48010 71
INSTALL 450 FEET OF 2 INCH POLY ALONG JETER STREET AND ABANDON 50 FEET OF 2 INCH AND 380 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK
SYSTEM INTEGRITY DECEMBER
210 080.48110 462
INSTALL DISTRICT REGULATOR STATION AND 4800 FEET OF 12 INCH STEEL ALONG BALLARD DRIVE AND ABANDON DISTRICT REGULATOR STATION AND 4800 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE
SYSTEM INTEGRITY DECEMBER
211 080.48165 206 INSTALL 1560 FEET OF 4 INCH AND 485 FEET OF 6 INCH POLY ALONG STREETS OF VIZCAYA PHASE 2C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
212 080.48198 10
RELOCATE FACILITIES. INSTALL 1515 FEET OF 2 INCH POLY ALONG LANSHIRE SHOREVIEW AND ABANDON 1515 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
213 080.48282 9,742 INSTALL 5845 FEET OF 2 INCH, 2405 FEET OF 4 INCH POLY ALONG STREETS OF VIRGINIA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
214 080.48323 32,149 INSTALL FORT WORTH SERVICE CENTER. ALL CUSTOMERS FORT WORTH STRUCTURES DECEMBER
215 080.48388 65
RELOCATE FACILITIES. INSTALL 2000 FEET OF 20 INCH STEEL ALONG SCOTLAND AVENUE ON LINE CA(2ND)(WEST) AND ABANDON 2000 FEET OF 20 INCH STEEL TO ACCOMMODATE CITY OF AZLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE
SYSTEM INTEGRITY DECEMBER
216 080.48432 0
RELOCATE FACILITIES. INSTALL 40 FEET OF 8 INCH STEEL ALONG RANDOL MILL ROAD AND ABANDON 20 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
217 080.48464 10
INSTALL 1920 FEET OF 2 INCH POLY AND ABANDON 1163 FEET OF 4 INCH AND 461 FEET OF 6 INCH CAST IRON ALONG OVERTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
218 080.48474 5
INSTALL 900 FEET OF 12 INCH STEEL AND ABANDON 900 FEET ALONG ACROSS WILSON CREEK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
219 080.48519 803
RELOCATE FACILITIES. INSTALL 3080 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG MERIDA AND ABANDON 2915 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
220 080.48572 176
RELOCATE FACILITIES. INSTALL 1920 FEET OF 2 INCH POLY ALONG AIRLINE STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
221 080.48583 70
RELOCATE FACILITIES. INSTALL 200 FEET OF 8 INCH AND 250 FEET OF 2 INCH POLY ALONG LAURENCE DRIVE AND ABANDON 190 FEET OF 3 INCH STEEL TO ACCOMMODATE TXDOT ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEATH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 7 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
222 080.48651 80
INSTALL 1000 FEET OF 4 INCH POLY ALONG WASHINGTON AND ABANDON 900 FEET OF 4 INCH CAST IRON AND 20 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
223 080.48677 141
RELOCATE FACILITIES. INSTALL 1685 FEET OF 6 INCH 250 FEET OF 4 INCH 660 FEET OF 2 INCH POLY ALONG DEVITT STREET AND ABANDON 1430 FEET OF 6 INCH CAST IRON TO ACCOMMODATE FORT WORTH ROADWAY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
224 080.48683 2
INSTALL 124 FEET OF 4 INCH POLY ALONG LUCAS AND ABANDON 44 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
225 080.48694 57
RELOCATE FACILITIES. INSTALL 1830 FEET OF 4 INCH POLY ALONG PRINCETON AND ABANDON 1339 FEET OF 2 INCH STEEL AND 466 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF PRINCETON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
SYSTEM INTEGRITY DECEMBER
226 080.48741 32
RELOCATE FACILITIES. INSTALL 1600 FEET OF 4 INCH POLY ALONG UNIVERSITY AND ABANDON 2525 FEET OF 6 INCH CAST IRON AND 1250 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
227 080.48743 178
RELOCATE FACILITIES. INSTALL 340 FEET OF 4 INCH POLY ALONG BECKLEY AVENUE AND ABANDON 450 FEET OF 8 INCH AND 550 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS PAVING AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
228 080.48760 155,199
RELOCATE FACILITIES. INSTALL 10500 FEET OF 8 INCH STEEL AND ABANDON 6000 FEET OF 8 INCH STEEL ALONG EAGLE PARKWAY TO ACCOMMODATE TXDOT WIDENING PROJECT. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES SEPTEMBER
229 080.48782 51
RELOCATE FACILITIES. INSTALL 1960 FEET OF 6 INCH, 585 FEET OF 4 INCH, AND 980 FEET OF 2 INCH POLY ALONG COLLEGE AND ABANDON 1245 FEET OF 8 INCH, 580 FEET OF 6 INCH, AND 1050 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
230 080.48800 687
RELOCATE FACILITIES. INSTALL 4,160 FEET OF 8 INCH, 165 FEET OF 4 INCH, AND 1320 FEET OF 3 INCH POLY ALONG ABRAM STREET AND ABANDON 1,400 FEET OF 8 INCH, 1,760 FEET OF 4 INCH, 620 FEET OF 2 INCH STEEL, AND 1,830 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY TOACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
231 080.48844 284
RELOCATE FACILITIES. INSTALL 2375 FEET OF 2 INCH POLY ALONG COCHRAN AND ABANDON 2375 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
232 080.48845 351
INSTALL 3468 FEET OF 2 INCH POLY ALONG SEARCY DRIVE AND ABANDON 2765 FEET OF 4 INCH AND 703 FEET OF 6 CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
233 080.48846 2
INSTALL 300 FEET OF 4 INCH POLY ALONG 17TH NORTHEAST STREET AND ABANDON 300 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
234 080.48847 2,218
INSTALL 2865 FEET OF 2 AND 4 INCH POLY ALONG EUCLID AND ABANDON 3375 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
235 080.48921 9,081 INSTALL 17365 FEET OF 2 INCH AND 1745 FEET OF 4 INCH POLY ALONG THE STREETS OF HOLLYHOCK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH JANUARY
236 080.48922 121
INSTALL 1850 FEET OF 2 INCH POLY ALONG EASTWOOD DRIVE AND ABANDON 2051 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
237 080.48942 0
RELOCATE FACILITIES. INSTALL 4530 FEET OF 6 INCH, 70 FEET OF 4 INCH, 470 FEET OF 2 INCH POLY AND ABANDON 4590 FEET OF 4 INCH, 460 FEET OF 2 INCH POLY ALONG DANIELDALE TO ACCOMMODATE CITY OF LANCASTER PAVING AND DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER
SYSTEM INTEGRITY DECEMBER
238 080.48996 21,288 INSTALL 7380 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKS AT LEGACY PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH NOVEMBER
239 080.49008 571
RELOCATE FACILITIES. INSTALL 215 FEET OF 8 INCH, 110 FEET OF 6 INCH, 4925 FEET OF 4 INCH AND 875 FEET OF 2 INCH POLY ALONG C F HAWN AND ABANDON 800 FEET OF 8 INCH STEEL, 4735 FEET OF 8 INCH CAST IRON, 100 FEET OF 6 INCH POLY AND 480 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
240 080.49033 3
INSTALL 30 FEET OF 4 INCH POLY AND ABANDON 700 FEET OF 4 INCH CAST IRON ALONG BEVERLY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
241 080.49072 35
INSTALL 10 FEET OF 8 INCH AND 5 FEET OF 6 INCH STEEL ALONG SOUTHLAKE BOULEVARD AND ABANDON 10 FEET OF 8 INCH AND 6 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
SYSTEM INTEGRITY DECEMBER
242 080.49082 581
RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH POLY, 30 FEET OF 6 INCH STEEL, 275 FEET OF 4 INCH POLY, AND 250 FEET OF 2 INCH POLY ALONG SPRING VALLEY AND ABANDON 25 FEET OF 6 INCH, 1175 FEET OF 6 INCH AND 1130 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
243 080.49145 2,771,553
INSTALL 531 FEET OF 12 INCH STEEL AND 14467 FEET OF 24 INCH STEEL AND ABANDON 215 FEET OF 6 INCH STEEL AND 14800 FEET OF 24 INCH STEEL ALONG STREETS OF MOCKINGBIRD STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
244 080.49148 924,366
INSTALL 11,500 FEET OF 24 INCH STEEL ALONG DT3 AT MOCKINGBIRD AND ABANDON 8,895 FEET OF 24 INCH AND 3,900 FEET OF 20 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
245 080.49174 628
RELOCATE FACILITIES. INSTALL 755 FEET OF 4 INCH POLY ALONG ROSEDALE STREET AND ABANDON 638 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
246 080.49178 223,753 INSTALL ONE 30 INCH PIG TRAP ON LINE DT2 NEAR TURTLE CREEK STATION. ALL CUSTOMERS DALLASPIPELINE
INTEGRITY MARCH
247 080.49198 4
INSTALL 1171 FEET OF 2 INCH POLY AND ABANDON 1171 FEET OF 2 INCH, 773 FEET OF 3 INCH STEEL ALONG RIKE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE
SYSTEM INTEGRITY DECEMBER
248 080.49209 18
RELOCATE FACILITIES. INSTALL 1180 FEET OF 4 INCH AND 155 FEET OF 2 INCH POLY ALONG TERRELL ROAD AND ABANDON 1175 FEET OF 4 INCH AND 150 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF TERRELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 8 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
249 080.49232 (0)INSTALL 176 STEEL SERVICES AND ABANDON 176 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS
SYSTEM INTEGRITY DECEMBER
250 080.49242 0
INSTALL 221 STEEL SERVICES AND ABANDON 221 STEEL SERVICES WITHIN MAPSHEET #AG520020 GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
251 080.49245 (0)INSTALL 223 STEEL SERVICES AND ABANDON 223 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
252 080.49256 (3)
INSTALL 265 STEEL SERVICES IN CITY OF SAN ANGELO AND ABANDON 265 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY MARCH
253 080.49273 3,384
INSTALL 1025 FEET OF 6 INCH POLY AND ABANDON 205 FEET OF 4 INCH POLY AND 400 FEET OF 6 INCH CAST IRON ALONG HARVARD AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
254 080.49313 6,185
INSTALL 1815 FEET OF 6 INCH, 2113 FEET OF 4 INCH, AND 7753 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH PH 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
255 080.49407 (0)
RELOCATE FACILITIES. INSTALL 1670 FEET OF 4 INCH POLY ALONG CRESTBROOK AND ABANDON 1645 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
256 080.49410 87
INSTALL 1530 FEET OF 2 INCH POLY AND 35 1.25 IN POLY SERVICES. ABANDON 1050 FEET OF 4 INCH CAST IRON, 480 FEET OF 3 INCH CAST IRON ALONG ARMSTRONG IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
257 080.49414 270
INSTALL 2335 FEET OF 6 INCH AND 370 FEET OF 4 INCH POLY ALONG ABBOTT AVENUE AND ABANDON 2705 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
258 080.49423 (4,110)
RELOCATE FACILITIES. INSTALL 963 FEET OF 2 INCH, 2528 FEET OF 4 INCH, 2284 FEET OF 8 INCH, AND 660 FEET OF 12 INCH POLY ALONG VALLEY MILLS DRIVE AND 547 FEET OF 2 INCH STEEL AND 803 FEET OF 2 INCH POLY AND 619 FEET OF 3 INCH STEEL AND 1232 FEET OF 4 INCH STEEL AND 105 FEET OF 4 INCH POLY AND 560 FEET OF 6 INCH STEEL AND 385 FEET OF 8 INCH STEEL AND 948 FEET OF 12 INCH STEEL TO ACCOMMODATE TXDOT WIDENING PROJECT. ALL CUSTOMERS WACO
RELOCATION OF FACILITIES MARCH
259 080.49441 373
RELOCATE FACILITIES. INSTALL 3394 FEET OF 4 INCH POLY ALONG HARDEMAN STREET AND ABANDON 2100 FEET OF 4 INCH CAST IRON AND 1100 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
260 080.49454 35
RELOCATE FACILITIES. INSTALL 1150 FEET OF 4 INCH AND 475 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 1150 FEET OF 4 INCH AND 350 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS PAVING AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL
SYSTEM INTEGRITY DECEMBER
261 080.49455 23
RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH ALONG I-30 SERVICE ROAD AND ABANDON 390 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ROYSE CITY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY
SYSTEM INTEGRITY DECEMBER
262 080.49469 503
INSTALL 1735 FEET OF 2 INCH POLY ALONG ARMSTRONG AVENUE AND ABANDON 1735 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
263 080.49471 1,524
INSTALL 400 FEET OF 4 INCH AND 910 FEET OF 6 INCH POLY ALONG HIGHLAND PARK AND ABANDON 400 FEET OF 4 INCH AND 910 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
264 080.49473 25
RELOCATE FACILITIES. INSTALL 930 FEET OF 2 INCH POLY ALONG SHENANDOAH AND ABANDON 445 FEET OF 3 INCH, 130 FEET OF 2 INCH, AND 345 FEET OF 1.25 INCH STEEL TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
265 080.49476 541
INSTALL 3545 FEET OF 2 INCH AND 1025 FEET OF 4 INCH POLY ALONG THE STREETS OF HIGHLANDS AT WEST RIDGE PHASE 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
266 080.49480 133
RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG CLINTON AVENUE AND ABANDON 1040 FEET OF 6 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
267 080.49516 30
INSTALL 975 FEET OF 4 INCH AND 450 FEET OF 4 INCH POLY ALONG SIMPSON STREET AND ABANDON 970 FEET OF 4 INCH, 350 FEET OF 3 INCH STEEL AND 5 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
268 080.49527 206 INSTALL 1027 FEET OF 2 INCH POLY ALONG THE STREETS OF SORANO AVENUE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
269 080.49535 16
INSTALL 1150 FEET OF 4 INCH POLY ALONG BROADWAY STREET AND ABANDON 360 FEET OF 2 INCH, 295 FEET OF 2 INCH STEEL AND 350 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
270 080.49578 82
RELOCATE FACILITIES. INSTALL 1260 FEET OF 4 INCH POLY ALONG NOLAN STREET AND ABANDON 1260 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
271 080.49593 2,349
INSTALL 178 STEEL SERVICES AND ABANDON 178 STEEL SERVICES WITHIN MAPSHEET #04-03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
272 080.49647 359 ABANDON 600 FEET OF 1.25 INCH POLY ALONG HIGHWAY 36 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOMERVILLE
SYSTEM INTEGRITY DECEMBER
273 080.49649 152
INSTALL 1800 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG SAN SABA AND ABANDON 1600 FEET OF 2 INCH AND 600 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM
SYSTEM INTEGRITY DECEMBER
274 080.49678 87
INSTALL 380 FEET OF 4 INCH POLY ALONG BRAZOS AND ABANDON 380 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM
SYSTEM INTEGRITY DECEMBER
275 080.49679 869
RELOCATE FACILITIES. INSTALL (51) 0.75 POLY SERVICES ALONG EDGEWOOD TERRACE AND ABANDON (51) 0.75 STEEL SERVICES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
276 080.49680 0
INSTALL 3200 FEET OF 6 INCH POLY ALONG GREENVILLE AVENUE AND ABANDON 3200 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 9 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
277 080.49681 489
RELOCATE FACILITIES. INSTALL 4,685 FEET OF 2-INCH, 40 FEET OF 4-INCH, AND 5,640 FEET OF 6-INCH POLY ALONG EAST ROSEDALE STREET. ABANDON 1,758 FEET OF 4-INCH CAST IRON, 1,391 FEET OF 6-INCH CAST IRON, 97 FEET OF 2-INCH STEEL, 1,008 FEET OF 4-INCH STEEL , 400 FEET OF 4 INCH POLY AND 1431 FEET OF 6 INCH STEEL AND 303 FEET OF 6 INCH POLY AND 82 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
278 080.49705 7
INSTALL 1255 FEET OF 2 INCH POLY ALONG PINE MILL ROAD AND ABANDON 1003 FEET OF 2 INCH, 235 FEET OF 3 INCH, AND 17 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RENO
SYSTEM INTEGRITY DECEMBER
279 080.49732 86
INSTALL 1700 FEET OF 6 INCH STEEL ALONG LIONS CLUB AND ABANDON 1700 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
280 080.49752 3
INSTALL 500 FEET OF 4 INCH POLY ALONG KAUFMAN STREET AND ABANDON 500 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
281 080.49759 10,241
RELOCATE FACILITIES. INSTALL 1010 FEET OF 4 INCH POLY ALONG AVENUE E AND ABANDON 235 FEET OF 2 INCH AND 700 FEET OF 4 INCH STEEL, 125 FEET OF 2 INCH AND 220 FEET OF 4 INCH POLY TO ACCOMMODATE TXDOT IH30 IMPROVEMENTS PROJECT. ALL CUSTOMERS ARLINGTON
RELOCATION OF FACILITIES NOVEMBER
282 080.49762 73
INSTALL 250 FEET OF 2 INCH POLY AND 650 FEET OF 4 INCH POLY ALONG PRAIRIEVILLE AND ABANDON 250 FEET OF 2 INCH, 410 FEET OF 3 INCH, AND 225 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
283 080.49765 117
RELOCATE FACILITIES. INSTALL 1890 FEET OF 4 INCH POLY ALONG 36TH STREET AND ABANDON 1890 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
284 080.49832 1,198
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY AND 830 FEET OF 6 INCH POLY AND ABANDON 556 FEET OF 4 INCH AND 836 FEET OF 6 INCH STEEL ALONG COTTON STREET TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
285 080.49860 120
RELOCATE FACILITIES. INSTALL 960 FEET OF 2 INCH POLY ALONG BURSON AND ABANDON 600 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF LAKE WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
286 080.49865 0
INSTALL 337 FEET OF 8 INCH POLY ALONG SECOND AVENUE AND ABANDON 337 FEET OF 18 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
287 080.49903 38
RELOCATE FACILITIES. INSTALL 580 FEET OF 6 INCH POLY, 480 FEET OF 2 INCH POLY, AND ABANDON 1215 FEET OF 6 INCH POLY, 485 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF IRVING IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
288 080.49909 1
RELOCATE FACILITIES. INSTALL 30 FEET OF 8 INCH, 100 FEET OF 4 INCH, AND 30 FEET OF 2 INCH POLY ALONG CEDAR BEND ALLEY AND ABANDON 25 FEET OF 8 INCH, 50 FEET OF 4 INCH, 30 FEET OF 3 INCH, AND 25 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
289 080.49910 68
RELOCATE FACILITIES. INSTALL 2486 FEET OF 2 INCH AND 63 FEET OF 4 INCH POLY ALONG COLONIAL STREET AND ABANDON 1240 FEET OF 4 INCH STEEL, AND 1128 FEET OF CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
290 080.49916 (2)
RELOCATE FACILITIES. INSTALL 1215 FEET OF 2 INCH POLY ALONG BUXHILL AND ABANDON 1215 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
291 080.49950 1,435 INSTALL 6638 FEET OF 2 INCH AND 1090 FEET OF 4 INCH POLY ALONG THE STREETS OF AUBURN HILLS PHASE 5A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MAY
292 080.49970 112
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG KIRNWOOD AND ABANDON 700 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
293 080.49979 24
RELOCATE FACILITIES. INSTALL 1765 FEET OF 4 INCH POLY ALONG GRANDBURY STREET AND ABANDON 1150 FEET OF 4 INCH, 60 FEET OF 3 INCH, 340 FEET OF 2 INCH STEEL, 50 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
294 080.49984 310
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH, 1850 FEET OF 4 INCH, 210 FEET OF 6 INCH POLY ALONG MEADOW LANE AND ABANDON 65 FEET OF 2 INCH, 265 FEET OF 3 INCH, 1635 FEET OF 4 INCH, 85 FEET OF 6 INCH STEEL, 95 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
295 080.49985 348
INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1300 FEET OF 2 INCH STEEL ALONG GREENFIELD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
296 080.49987 81
RELOCATE FACILITIES. INSTALL 50 FEET OF 2 INCH, 120 FEET OF 4 INCH, AND 3,225 FEET OF 6 INCH POLY. ABANDON 45 FEET OF 2-INCH POLY, 2,845 FEET OF 4-INCH STEEL, AND 370 FEET OF 4-INCH POLY ALONG WEST BAILEY BOSWELL ROAD TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
297 080.49988 33
RELOCATE FACILITIES. INSTALL 650 FEET OF 2 INCH AND 30 FEET OF 4 INCH POLY ALONG CARIBOU ALLEY AND ABANDON 585 FEET OF 2 INCH AND 25 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
298 080.50032 0
RELOCATE FACILITIES. INSTALL 75 FEET OF 6 INCH AND 1425 FEET OF 2 INCH POLY ALONG ALDWICK AND ABANDON 65 FEET OF 6 INCH, 65 FEET OF 4 INCH STEEL, 1325 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
299 080.50036 12,732
INSTALL 3885 FEET OF 6 INCH, 730 FEET OF 4 INCH, 9620 FEET OF 2 INCH POLY ALONG STREETS OF SOUTHPOINTE PHASE 1A1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH NOVEMBER
300 080.50060 40
RELOCATE FACILITIES. INSTALL 450 FEET OF 4 INCH POLY ALONG AUSTIN STREET AND ABANDON 40 FEET OF 3 INCH CAST IRON AND 400 FT OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 10 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
301 080.50088 4
RELOCATE FACILITIES. INSTALL 285 FEET OF 4 INCH POLY ALONG SELLMEYER LANE AND ABANDON 285 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF HIGHLAND VILLAGE STREET IMPROVEMENT PROJECTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND VILLAGE
SYSTEM INTEGRITY DECEMBER
302 080.50109 45
RELOCATE FACILITIES. INSTALL 830 FEET OF 6 INCH, 221 FEET OF 4 INCH, 96 FEET OF 2 INCH POLY AND ABANDON 1070 FEET OF 6 INCH, 422 FEET OF 2 INCH, AND 188 FEET OF 4 INCH POLY,375 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
303 080.50110 15
INSTALL 620 FEET OF 2 INCH POLY ALONG JOSHUA STREET AND ABANDON 450 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CADDO MILLS
SYSTEM INTEGRITY DECEMBER
304 080.50115 49
RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 550 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 560 FEET OF 2 INCH POLY AND 2775 FEET OF 4 INCH CAST IRON AND 130 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
305 080.50116 833
INSTALL 930 FEET OF 4 INCH POLY ALONG THACKERY AND ABANDON 1075 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
306 080.50119 12
INSTALL 350 FEET OF 2 INCH POLY ALONG ROBIN LYNN DRIVE AND ABANDON 165 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
307 080.50136 522 INSTALL 2612 FEET OF 2 INCH POLY ALONG STREETS OF AUBURN HILLS PHASE 3A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH
308 080.50138 41
INSTALL 450 FEET OF 2 INCH POLY ALONG ROWAN AVENUE AND ABANDON 850 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
309 080.50149 1
INSTALL 2,800 FEET OF 20 INCH STEEL ALONG LINE CA(2ND)(WEST) AND ABANDON 2,800 FEET OF EXISTING 20 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RENO
SYSTEM INTEGRITY DECEMBER
310 080.50162 2
INSTALL 690 FEET OF 2 INCH POLY ALONG CEDAR STREET AND ABANDON 160 FEET OF 2 INCH POLY AND 430 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
311 080.50163 63
RELOCATE FACILITIES. INSTALL 1170 FEET OF 6 INCH, 385 FEET OF 4 INCH, 140 FEET OF 2 INCH POLY ALONG SYLVAN AVE AND ABANDON 1000 FEET OF 4 INCH,1150 FEET OF 3 INCH, 400 FEET OF 2 INCH STEEL, 200 FEET OF 3 INCH, 100 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
312 080.50167 1,174 INSTALL 3,755 FEET OF 2 INCH POLY ALONG THE STREETS OF AUBURN HILLS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH
313 080.50189 9
RELOCATE FACILITIES. INSTALL 2000 FEET OF 8 INCH POLY AND 40 FEET OF 4 INCH POLY ALONG KIEST AND ABANDON 1950 FEET OF 8 INCH STEEL AND 35 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECTIN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
314 080.50200 4
INSTALL 288 FEET OF 4 INCH POLY ALONG ASH STREET AND ABANDON 248 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA
SYSTEM INTEGRITY DECEMBER
315 080.50207 300
INSTALL 285 FEET OF 2 INCH POLY ALONG QUINET AND ABANDON 337 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE
SYSTEM INTEGRITY DECEMBER
316 080.50213 0
RELOCATE FACILITIES. INSTALL 1160 FEET OF 4 INCH AND 115 FEET OF 2 INCH POLY AND ABANDON 1070 FEET OF 3 INCH AND 155 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF LAKE DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE DALLAS
SYSTEM INTEGRITY DECEMBER
317 080.50214 64
RELOCATE FACILITIES. INSTALL 575 FEET OF 4 INCH POLY AND 320 FEET OF 2 INCH POLY AND ABANDON 580 FEET OF 4 INCH POLY, 135 FEET OF 2 INCH STEEL, 135 FEET OF 2 INCH POLY ALONG MAIN STREET TO ACCOMMODATE CITY OF LAKE DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE DALLAS
SYSTEM INTEGRITY DECEMBER
318 080.50215 154
RELOCATE FACILITIES. INSTALL (12) POLY SERVICES ALONG HICKORY HILLS BOULEVARD AND ABANDON (12) POLY SERVICES TO ACCOMMODATE CITY OF HICKORY CREEK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICKORY CREEK
SYSTEM INTEGRITY DECEMBER
319 080.50220 79
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH, 60 FEET OF 4 INCH POLY AND ABANDON 240 FEET OF 3 INCH POLY AND 150 FEET OF 3 INCH STEEL ALONG LA CABEZA TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
320 080.50270 175
INSTALL 2060 FEET OF 4 INCH POLY ALONG WANETA AND ABANDON 2160 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
321 080.50300 0
INSTALL 695 FEET OF 4 INCH POLY ALONG SEABEACH STREET AND ABANDON 695 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
322 080.50307 0
RELOCATE FACILITIES. INSTALL 1560 FEET OF 2 INCH POLY ALONG BEAUTY ALLEY AND ABANDON 1540 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
323 080.50315 4
RELOCATE FACILITIES. INSTALL 525 FEET OF 6 INCH POLY AND ABANDON 525 FEET OF 4 INCH POLY ALONG TEHAMA RIDGE PARKWAY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
324 080.50324 19
RELOCATE FACILITIES. INSTALL 500 FEET OF 1.25 INCH POLY ALONG HORIZON DRIVE AND ABANDON 400 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
SYSTEM INTEGRITY DECEMBER
325 080.50327 286
RELOCATE FACILITIES. INSTALL 1000 FEET OF 4 INCH AND 1600 FEET OF 2 INCH POLY ALONG LEWIS AND ABANDON 420 FEET OF 8 INCH AND 2600 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECTIN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
326 080.50331 675
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG SKYLINE DRIVE AND ABANDON 700 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW DRAINAGE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
327 080.50336 4
RELOCATE FACILITIES. INSTALL 415 FEET OF 6 INCH POLY ALONG VIRGINIA PARKWAY AND ABANDON 415 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 11 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
328 080.50352 313
INSTALL REGULATOR STATION ALONG RUTFORD AVENUE AND ABANDON REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
329 080.50368 0
INSTALL 310 FEET OF 2 INCH POLY ALONG JUNCTION HWY AND ABANDON 310 FEET OF 1.25 STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY SEPTEMBER
330 080.50373 77
RELOCATE FACILITIES. INSTALL 785 FEET OF 6 INCH, 915 FEET OF 4 INCH, AND 205 FEET OF 2 INCH POLY AND ABANDON 157 FEET OF 1.25 INCH, 373 FEET OF 2 INCH, 100 FEET OF 3 INCH, 661 FEET OF 6 INCH STEEL, AND 143 FEET OF 6 INCH POLY ALONG WEST COLE STREET TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
331 080.50400 2
RELOCATE FACILITIES. INSTALL 2,000 FEET OF 6 INCH AND 3,000 FEET OF 4 INCH POLY ALONG STACY ROAD AND ABANDON 5,000 FEET OF 6 INCH POLY TO ACCOMMODATE TXDOT ROAD WIDENING AND IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRVIEW
SYSTEM INTEGRITY DECEMBER
332 080.50409 148
RELOCATE FACILITIES. INSTALL 1845 FEET OF 2 INCH POLY ALONG KNOLLVIEW AND ABANDON 1835 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
333 080.50416 203
RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH POLY ALONG THOMAS PLACE AND ABANDON 1315 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
334 080.50420 456
INSTALL 1415 FEET OF 6 INCH, 255 FEET OF 4 INCH, AND 385 FEET OF 2 INCH POLY ALONG CARROLL AND ABANDON 1415 FEET OF 6 INCH, 255 FEET OF 4 INCH CAST IRON AND 385 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
335 080.50421 486
RELOCATE FACILITIES. INSTALL (77) 0.75 INCH SERVICES ALONG HILL STREET AND ABANDON (77) 0.75 INCH SERVICES TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
336 080.50422 830
RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG EWING AND ABANDON 1410 FEET OF 6 INCH STEEL, 420 FEET OF 8 INCH, 40 FEET OF 4 INCH CAST IRON, 155 FEET OF 6 INCH POLY, 105 FEET OF 6 INCH STEEL, 450 FEET OF 4 INCH STEEL, 775 FEET OF 6 INCH, 550 FEET OF 4 INCH AND 100 FEET OF 3 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
337 080.50423 0
RELOCATE FACILITIES. INSTALL (21) 0.75 INCH STEEL SERVICES ALONG CHESTERTON ALLEY AND ABANDON 1515 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
338 080.50424 339
RELOCATE FACILITIES. INSTALL (7) 0.75 INCH POLY SERVICES ALONG AIRLINE STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
339 080.50425 39
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG BELCLAIRE AVENUE AND ABANDON 2600 FEET OF 6 INCH AND 725 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
340 080.50426 70
RELOCATE FACILITIES. INSTALL 700 FEET OF 4 INCH POLY ALONG BISHOP AVENUE AND ABANDON 560 FEET OF 2 INCH AND 130 FEET OF 4 INCH POLY, AND 2775 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
341 080.50437 (2,138)INSTALL DEEP WELL GROUND BED AND RECTIFIER ALONG LINE KC11 IN TAYLOR COUNTY IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY JUNE
342 080.50454 146
INSTALL 550 FEET OF 2 INCH POLY ALONG ARDEN PLACE AND ABANDON 425 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
343 080.50497 56
INSTALL 400 FEET OF 2 INCH POLY HALL STREET AND ABANDON 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE
SYSTEM INTEGRITY DECEMBER
344 080.50504 281
RELOCATE FACILITIES. INSTALL (27) 0.75 INCH POLY SERVICES ALONG HARWEN TERRACE AND ABANDON (27) POLY SERVICES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
345 080.50512 (0)
RELOCATE FACILITIES. INSTALL 1660 FEET OF 2 INCH, 180 FEET OF 4 INCH POLY ALONG LA BOLSA AND ABANDON 125 FEET OF 4 INCH, 1530 FEET OF 3 INCH, 50 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
346 080.50514 0
RELOCATE FACILITIES. INSTALL 3635 FEET OF 2 INCH POLY AND ABANDON 1240 FEET OF 2 INCH, 2380 FEET OF 3 INCH STEEL ALONG MEANDERING WAY TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
347 080.50516 11
INSTALL 566 FEET OF 2 INCH POLY ALONG COLLEGE STREET AND ABANDON 566 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT
SYSTEM INTEGRITY DECEMBER
348 080.50517 0
INSTALL 1400 FEET OF 2 INCH POLY ALONG HAVERFORD ALLEY AND ABANDON 1380 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
349 080.50529 764
RELOCATE FACILITIES. INSTALL 98 POLY SERVICES AND ABANDON 98 STEEL SERVICES ALONG ROSEDALE STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
350 080.50531 34
RELOCATE FACILITIES. INSTALL 3000 FEET OF 4 INCH, 550 FEET OF 6 INCH POLY AND ABANDON 200 FEET OF 2 INCH, 1200 FEET OF 3 INCH, 570 FEET OF 4 INCH, 15 FEET OF 6 INCH POLY, 250 FEET OF 8 INCH, 825 FEET OF 6 INCH, 795 FEET OF 3 INCH, 380 FEET OF 2 INCH, 650 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
351 080.50532 66
RELOCATE FACILITIES. INSTALL 5080 FEET OF 4 INCH, 320 FEET OF 6 INCH, 100 FEET OF 2 INCH POLY AND ABANDON 2750 FEET OF 3 INCH, 500 FEET OF 6 INCH, 300 FEET OF 1.25 INCH POLY, 850 FEET OF 6 INCH, 100 FEET OF 6 INCH, 400 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
352 080.50533 (0)
RELOCATE FACILITIES. INSTALL 2550 FEET OF 4 INCH, 150 FEET OF 2 INCH POLY AND ABANDON 170 FEET OF 2 INCH, 2150 FEET OF 3 INCH POLY, 55 FEET OF 3 INCH, 5 FEET OF 2 INCH STEEL ALONG BILL BRADFORD ROAD TO ACCOMMODATE CITY OF SULPHUR SPRINGS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 12 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
353 080.50545 40
INSTALL 2250 FEET OF 2 INCH POLY ALONG 7TH STREET AND ABANDON 1150 FEET OF 4 INCH STEEL, 12 FEET OF 4 INCH, 570 FEET OF 2 INCH , 65 FEET OF 3 INCH POLY, AND 1010 FEET OF 3 INCH AND 380 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
354 080.50551 3
RELOCATE FACILITIES. INSTALL 285 FEET OF 4 INCH ALONG PRESTON AND ABANDON 285 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
355 080.50580 771
RELOCATE FACILITIES. INSTALL 4 FEET OF 4 INCH AND 960 FEET OF 6 INCH POLY AND ABANDON 440 FEET OF 4 INCH STEEL, 393 FEET OF 4 INCH , AND 127 FEET OF 6 INCH POLY ALONG MCREYNOLDS ROAD TO ACCOMMODATE CITY OF SANGER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER
SYSTEM INTEGRITY DECEMBER
356 080.50585 (0)
INSTALL DISTRICT REGULATOR STATION IN SAN ANGELO AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
357 080.50586 (0)
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION IN SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
358 080.50602 17,449
INSTALL 5866 FEET OF 2 INCH, 2273 FEET OF 4 INCH, 3219 FEET OF 6 INCH POLY ALONG THE STREETS OF MORNINGSTAR. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
359 080.50603 25,501
INSTALL 1820 FEET OF 6 INCH, 3390 FEET OF 4 INCH AND 7565 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
360 080.50622 313
INSTALL 3390 FEET OF 6 INCH AND 1750 FEET OF 4 INCH POLY ALONG STREETS OF GREENWAY PARK OF PHASE 1 OF FAWN MEADOW. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENISON GROWTH JANUARY
361 080.50635 453
INSTALL (20) 0.75 POLY SERVICES ALONG MINKS DRIVE AND ABANDON (20) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
SYSTEM INTEGRITY DECEMBER
362 080.50646 0
RELOCATE FACILITIES. INSTALL (28) STEEL SERVICES ALONG PIPELINE ROAD AND ABANDON (28) TO ACCOMMODATE CITY OF BEDFORD STREET IMPROVEMENT PROJECT STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD
SYSTEM INTEGRITY DECEMBER
363 080.50659 210
RELOCATE FACILITIES. INSTALL 960 FEET OF 2 INCH POLY ALONG BURSON AND ABANDON 600 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF LAKE WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
SYSTEM INTEGRITY DECEMBER
364 080.50662 28
INSTALL (36) 0.75 INCH POLY SERVICES ALONG EISENHOWER AND ABANDON (36) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
365 080.50667 80
INSTALL 3100 FEET OF 6 INCH POLY AND ABANDON 2087 FEET OF 6 INCH STEEL, 561 FEET OF 4 INCH STEEL, 203 FEET OF 2 INCH POLY, AND 219 FEET OF 4 INCH POLY ALONG NASHVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
366 080.50668 26
INSTALL 910 FEET OF 4 INCH POLY ALONG DRIESS STREET AND ABANDON 916 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
367 080.50669 22
INSTALL 212 FEET OF 2 INCH AND 130 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 650 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY
SYSTEM INTEGRITY DECEMBER
368 080.50676 (35)
INSTALL 1140 FEET OF 4 INCH POLY ALONG BLUEBONNET PARKWAY AND ABANDON 10400 FEET OF 10 INCH, 1112 FEET OF 4 INCH, 283 FEET OF 3 INCH AND 1065 FEET OF 2.5 INCH STEEL DUE TO AGING INFRASTRUCTURE IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
369 080.50681 193
RELOCATE FACILITIES. INSTALL 1633 FEET OF 4 INCH POLY ALONG 16TH STREET AND ABANDON 1308 FEET OF 4 INCH, 162 FEET OF 6 INCH, AND 72 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORTH WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
370 080.50692 (0)
RELOCATE FACILITIES. INSTALL 515 FEET OF 6 INCH POLY ALONG DEXTER AVENUE AND ABANDON 500 FEET ON 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION 0F TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
371 080.50705 71
INSTALL 1280 FEET OF 4 INCH POLY ALONG CADDO STREET AND ABANDON 1175 FEET OF 4 INCH STEEL, 455 FEET OF 3 INCH, AND 340 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
372 080.50716 21
INSTALL 1100 FEET OF 4 INCH POLY ALONG KING STREET AND ABANDON 50 FEET OF 4 INCH, 20 FEET OF 3 INCH POLY, 220 FEET OF 6 INCH, 105 FEET OF 2 INCH, AND 90 FEET OF 3 INCH, AND 2015 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
373 080.50717 13
RELOCATE FACILITIES. INSTALL 305 FEET OF 4 INCH, 15 FEET OF 2 INCH POLY ALONG MAY STREET AND ABANDON 837 FEET OF 4 INCH STEEL AND 150 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
374 080.50727 26
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG NW 15TH STREET AND ABANDON 90 FEET OF 4 INCH CAST IRON, 170 FEET OF 4 INCH, 111 FEET OF 2 INCH STEEL AND 111 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
375 080.50734 4
INSTALL 359 FT OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 359 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY
SYSTEM INTEGRITY DECEMBER
376 080.50741 26
INSTALL 85 FEET OF 2 INCH AND 1420 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 70 FEET OF 2 INCH, 75 FEET OF 4 INCH POLY AND 1471 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA
SYSTEM INTEGRITY DECEMBER
377 080.50745 1,397
RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH, 120 FEET OF 3 INCH, AND 60 FEET OF 4 INCH POLY ALONG FOREST HILL DRIVE AND ABANDON 220 FEET OF 2 INCH, 100 FEET OF 3 INCH, AND 50 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
378 080.50753 991
INSTALL 870 FEET OF 2 INCH POLY ALONG SMALL STREET AND ABANDON 870 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
379 080.50761 3
INSTALL 2600 FEET OF 2 AND 4 INCH POLY ALONG CARTER STREET AND ABANDON 1392 FEET OF 4 INCH, 1036 FEET OF 3 INCH, 43 FEET OF 2 INCH, 28 FEET OF 3 INCH STEEL, AND 54 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 13 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
380 080.50789 51
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG DULUTH STREET AND ABANDON 200 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
381 080.50796 133
RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH, 109 FEET OF 2 INCH POLY ALONG SPRINGDALE ROAD AND ABANDON 397 FEET OF 4 INCH, 95 FEET OF 2 INCH, 50 FEET OF 3 INCH STEEL, AND 161 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
382 080.50803 32
INSTALL 1820 FEET OF 2 INCH POLY ALONG BUCKNER AND ABANDON 1820 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
383 080.50815 1,340
INSTALL 750 FEET OF 4 INCH AND 5150 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTH POINTE PHASE 1A SECTION 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH NOVEMBER
384 080.50819 257
INSTALL 3230 FEET OF 8 INCH, 10 FEET OF 6 INCH, 725 FEET OF 4 INCH, 50 FEET OF 2 INCH POLY AND ABANDON 310 FEET OF 4 INCH, 1155 FEET OF 8 INCH, 1235 FEET OF 12 INCH, 1180 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
385 080.50830 510
RELOCATE FACILITIES. INSTALL (19) 0.75 INCH POLY SERVICES ALONG SURREY DRIVE AND ABANDON (19) 0.75 INCH SERVES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
386 080.50838 157
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG VAN NATTA LANE AND ABANDON 200 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
387 080.50840 2
RELOCATE FACILITIES. INSTALL 375 FEET OF 4 INCH POLY ALONG PECAN STREET AND ABANDON 346 FEET OF 4 INCH STEEL AND 50 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CLARKSVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE
SYSTEM INTEGRITY DECEMBER
388 080.50847 75
INSTALL 854 FEET OF 2 INCH POLY ALONG FORT WORTH AVENUE AND ABANDON 854 FEET 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
389 080.50850 2 INSTALL METER STATION AND 800 FEET OF 4 INCH STEEL ALONG HIGHWAY 377.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JANUARY
390 080.50862 65
RELOCATE FACILITIES. INSTALL 410 FEET OF 2 INCH AND 105 FEET OF 6 INCH POLY AND ABANDON 178 FEET OF 2 INCH POLY AND 130 FEET OF 6 INCH STEEL ALONG BELLAIRE CIRCLE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
391 080.50863 0
INSTALL 1990 FEET OF 8 INCH, 20 FEET OF 4 INCH, AND 40 FEET OF 2 INCH POLY ALONG LOLITA DRIVE AND ABANDON 1990 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
392 080.50867 1,480
INSTALL 2200 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY ALONG PACIFIC AND ABANDON 1800 FEET OF 4 INCH, 400 FEET OF 6 INCH AND 460 FEET OF 2 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
393 080.50903 197
INSTALL 1750 FEET OF 2 INCH AND 560 FEET OF 4 INCH POLY ALONG SOUTHWOOD AND ABANDON 1138 FEET OF 4 INCH AND 1172 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
394 080.50914 194
RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH AND 1100 FEET OF 4 INCH POLY ALONG MAIN STREET AND ABANDON 1290 FEET OF 2 INCH AND 25 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
SYSTEM INTEGRITY DECEMBER
395 080.50916 (0)
INSTALL 3480 FEET OF 4 INCH AND 3770 FEET OF 2 INCH POLY ALONG GORMAN AVENUE AND ABANDON 3606 FEET OF 4 INCH CAST IRON, 1217 FEET OF 2 INCH, 1577 FEET OF 4 INCH, 300 FEET OF 8 INCH STEEL, 451 FEET OF 8 INCH AND 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
396 080.50917 91
INSTALL 2050 FEET OF 4 INCH AND 510 FEET OF 2 INCH POLY ALONG TRAMMEL AND ABANDON 2030 FEET OF 6 INCH AND 440 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
397 080.50920 1
INSTALL 400 FEET OF 6 INCH POLY AND ABANDON 400 FEET OF 6 INCH POLY ALONG US 380 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE
SYSTEM INTEGRITY DECEMBER
398 080.50934 97
INSTALL 1490 FEET OF 2 INCH POLY AND ABANDON 1440 FEET OF 6 INCH CAST IRON ALONG ANN ARBOR AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
399 080.50939 230
RELOCATE FACILITIES. INSTALL 4200 FEET OF 2 INCH POLY ALONG FITZHUGH AVENUE AND ABANDON 3063 FEET OF 4 INCH CAST IRON AND 159 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
400 080.50944 10
RELOCATE FACILITIES. INSTALL 6650 FEET OF 8 INCH, 160 FEET OF 4 INCH AND 2415 FEET OF 2 INCH POLY ALONG COCKRELL HILL STREET AND ABANDON 6650 FEET OF 8 INCH, 160 FEET OF 4 INCH AND 2415 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
401 080.50953 217
INSTALL 2090 FEET OF 4 INCH POLY ALONG REIGER AVENUE AND ABANDON 2080 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
402 080.50956 4,174
RELOCATE FACILITIES. INSTALL 5325 FEET OF 6 INCH, 735 FEET OF 4 INCH, AND 170 FEET OF 2 INCH POLY AND ABANDON 4644 FEET OF 2 INCH STEEL AND 1592 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
403 080.50975 903
INSTALL 525 FEET OF 2 INCH, 1210 FEET OF 4 INCH POLY AND ABANDON 2940 FEET OF 4 INCH CAST IRON, 380 FEET OF 4 INCH POLY ALONG JEFFERSON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
404 080.50986 30
RELOCATE FACILITIES. INSTALL 176 FEET OF 2 INCH POLY ALONG KENLEY STREET AND ABANDON 176 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
405 080.51003 211
INSTALL 1200 FEET OF 4 INCH POLY ALONG MELBA STREET AND ABANDON 1100 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 14 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
406 080.51004 197
RELOCATE FACILITIES. INSTALL (8) 0.75 INCH POLY SERVICES ALONG WINIFRED DRIVE AND ABANDON (8) POLY SERVICES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
407 080.51005 72
RELOCATE FACILITIES. INSTALL 270 FEET OF 2 INCH POLY ALONG WONDER DRIVE AND ABANDON 270 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
408 080.51025 3,093 INSTALL 2923 FEET OF 2 INCH AND 1042 FEET OF 6 INCH POLY ALONG THE STREETS OF TIMBER CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
409 080.51030 679
RELOCATE FACILITIES. INSTALL 937 FEET OF 6 INCH, 567 FEET OF 4 INCH POLY AND ABANDON 920 FEET OF 6 INCH STEEL, 690 FEET OF 4 INCH CAST IRON ALONG SYLVANIA TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
410 080.51033 306
RELOCATE FACILITIES. INSTALL 1141 FEET OF 4 INCH POLY, 33 0.75 INCH POLY SERVICES ALONG LILLIAN STREET AND ABANDON 1098 FEET OF 4 INCH CAST IRON, 750 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
411 080.51034 299
RELOCATE FACILITIES. INSTALL 1182 FEET OF 4 INCH POLY AND ABANDON 1393 FEET OF 4 INCH CAST IRON, 257 FEET OF 4 INCH POLY AND 347 FEET OF 6 INCH POLY ALONG DELL STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
412 080.51041 458
INSTALL 2340 FEET OF 2 INCH POLY ALONG TREMONT AND ABANDON 580 FEET OF 6 INCH CAST IRON, 1610 FEET OF 4 INCH CAST IRON, 360 FEET OF 4 INCH CAST IRON, 380 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
413 080.51042 16
ABANDON 2 FEET OF 2 INCH STEEL, 2 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 14 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
414 080.51053 2,452
RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH AND 560 FEET OF 2 INCH POLY ALONG DAVIS STREET AND ABANDON 1635 FEET OF 8 INCH, 320 FEET OF 6 INCH AND 250 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
415 080.51054 1,303
RELOCATE FACILITIES. INSTALL 1050 FEET OF 4 INCH, 640 FEET OF 2 INCH AND 60 FEET OF 8 INCH POLY AND ABANDON 1330 FEET OF 8 INCH, 50 FEET OF 6 INCH, 895 FEET OF 4 INCH CAST IRON, AND 50 FEET OF 8 INCH STEEL ALONG DAVIS STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
416 080.51058 0
INSTALL 1600 FEET OF 8 INCH AND ABANDON 1600 FEET OF 8 INCH STEEL ALONG THE STREET EAST OF SANFORD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
417 080.51062 0
RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY ALONG DECATUR AVENUE AND ABANDON 931 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
418 080.51071 0
INSTALL 692 FEET OF 4 INCH POLY ALONG ROGERS AVENUE AND ABANDON 692 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
419 080.51075 913 INSTALL 4694 FEET OF 2 INCH AND 448 FEET OF 4 INCH POLY ALONG STREETS OF AUBURN HILLS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH MARCH
420 080.51083 177 INSTALL STEEL SERVICES IN CARROLLTON AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
SYSTEM INTEGRITY DECEMBER
421 080.51088 1 INSTALL 315 STEEL SERVICES AND ABANDON 315 STEEL SERVICES IN WICHITA FALLS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
422 080.51093 139 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
423 080.51094 385 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
424 080.51095 0 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
425 080.51096 2 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
426 080.51097 9 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
427 080.51101 0 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
428 080.51104 (0)INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN FAIRFIELD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD
SYSTEM INTEGRITY DECEMBER
429 080.51105 9 INSTALL STEEL SERVICES IN FAIRFIELD AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD
SYSTEM INTEGRITY DECEMBER
430 080.51108 0 INSTALL STEEL SERVICES IN GARLAND AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
431 080.51109 1 INSTALL STEEL SERVICES IN GARLAND AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
432 080.51110 10 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
433 080.51112 (0)INSTALL STEEL SERVICES IN MESQUITE AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
434 080.51131 1,010 INSTALL METERS AND ABANDON METERS FOR USE IN NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
435 080.51132 605 REPLACE AGING METERS WITHIN SOUTHWEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
436 080.51133 3,982
INSTALL METERS AND ABANDON METERS FOR USE IN THE SOUTHEAST DISTRICT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
437 080.51134 572 INSTALL METERS AND ABANDON METERS FOR USE IN SOUTHEAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
438 080.51135 2,521 INSTALL METERS AND ABANDON METERS FOR USE IN THE SOUTHEAST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
439 080.51136 3,473
INSTALL METERS AND ABANDON METERS FOR USE IN THE FORT WORTH DISTRICT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
440 080.51137 469 INSTALL METERS AND ABANDON METERS FOR USE IN SOUTHWEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
441 080.51138 947 INSTALL METERS AND ABANDON METERS FOR USE IN SOUTHWEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 15 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
442 080.51142 217,577
RELOCATE FACILITIES. INSTALL 293 FEET OF 4 INCH, 807 FEET OF 6 INCH, 10 FEET OF 8 INCH AND 10320 FEET OF 12 INCH POLY ALONG CROWLEY ROAD AND ABANDON 2940 FEET OF 4 INCH, 2695 FEET OF 6 INCH AND 195 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
443 080.51158 51
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY ALONG FATHOM DRIVE AND ABANDON 200 FEET OF 4 INCH , 100 FEET OF 2 INCH POLY AND 1 SERVICE LINE TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
444 080.51159 81
RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH ALONG CINDY LANE AND ABANDON 610 FEET OF 2 INCH POLY, 230 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
445 080.51162 128
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY ALONG DEXTER AND ABANDON 892 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
446 080.51171 116
RELOCATE FACILITIES. INSTALL 925 FEET OF 4 INCH, 150 FEET OF 2 INCH POLY ALONG CINDY LANE AND ABANDON 925 FEET OF 4 INCH, 150 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH FORTH WORTH ADDITIONS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
447 080.51176 722
RELOCATE FACILITIES. INSTALL 800 FEET OF 8 INCH ALONG OVERTON AND ABANDON 800 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
448 080.51193 (4)
INSTALL 2340 FEET OF 4 INCH,1035 FEET OF 2 INCH POLY ALONG BARCLAY DRIVE AND ABANDON 775 FEET OF 4 INCH, 1565 FEET OF 3 INCH AND 1035 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
449 080.51203 0
RELOCATE FACILITIES. INSTALL 200 FEET OF 6 INCH POLY AND ABANDON 200 FEET OF 6 INCH POLY ALONG MILRANY LANE TO ACCOMMODATE CITY OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
SYSTEM INTEGRITY SEPTEMBER
450 080.51207 251
INSTALL DEEP WELL GROUND BED AND RECTIFIER ALONG LINE RFB AND ABANDON DEEP WELL GROUND BED AND RECTIFIER IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TUSCOLA
SYSTEM INTEGRITY DECEMBER
451 080.51208 21
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG THE ALLEY OF RACINE DRIVE AND ABANDON 200 FEET OF 3 INCH AND 100 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
452 080.51221 207
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG IDAHO AND ABANDON 1080 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
453 080.51222 0
RELOCATE FACILITIES. INSTALL 1100 FEET OF 4 INCH POLY AND ABANDON 1080 FEET OF 4 INCH STEEL ALONG LONGOOD TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
454 080.51235 (546)
RELOCATE FACILITIES. INSTALL 10,636 FEET OF 6 INCH, 394 FEET OF 4 INCH POLY AND ABANDON 10,636 FEET OF 6 INCH, 394 FEET OF 4 INCH POLY ALONG OVILLA ROAD TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OVILLA
SYSTEM INTEGRITY DECEMBER
455 080.51243 71
INSTALL 422 FEET OF 2 INCH POLY AND ABANDON 507 FEET OF 4 INCH STEEL ALONG CAMPBELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
456 080.51244 52
RELOCATE FACILITIES. INSTALL 200 FEET OF 8 INCH POLY ALONG GILLON AND ABANDON 200 FEET OF 8 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
457 080.51250 329
RELOCATE FACILITIES. INSTALL 840 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY ALONG LAFAYETTE AVENUE AND ABANDON 840 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
458 080.51255 350
INSTALL 625 FEET OF 2 INCH POLY ALONG SHELBY AND ABANDON 260 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
459 080.51263 127
RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY AND ABANDON 1400 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
460 080.51268 16
INSTALL 1234 FEET OF 2 INCH POLY AND 1334 FEET OF 4 INCH POLY AND ABANDON 1789 FEET OF 2 INCH POLY AND 748 FEET OF 3 INCH POLY ALONG VALCOURT DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
461 080.51273 0
RELOCATE FACILITIES. INSTALL 6 LONG SERVICES AND ABANDON 6 LONG SERVICES ALONG TEXAS STREET TO ACCOMMODATE CITY OF GRAPEVINE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY SEPTEMBER
462 080.51279 2,334 INSTALL 13000 FEET OF 10 INCH STEEL ALONG LINE B17 AND ABANDON 10718 FEET OF 3 INCH STEEL IN TARRANT COUNTY. ALL CUSTOMERS FORT WORTH
SYSTEM IMPROVEMENT SEPTEMBER
463 080.51282 1
INSTALL 1550 FEET OF 4 INCH POLY AND ABANDON 2000 FEET OF 6 INCH STEEL AND 200 FEET OF 6 INCH CAST IRON ALONG LUCAS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
464 080.51283 27
INSTALL 1520 FEET OF 6 INCH STEEL. ABANDON 1520 FEET OF 4 INCH STEEL ALONG SOUTH INTERSTATE 30 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
465 080.51309 (3)
RELOCATE FACILITIES. INSTALL 3500 FEET OF 2 INCH POLY ALONG STREETS OF GIBBONS ROAD AND ABANDON 3,000 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF SOUTHMAYD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHMAYD
SYSTEM INTEGRITY DECEMBER
466 080.51313 81
RELOCATE FACILITIES. INSTALL 1385 FEET OF 2 INCH POLY ALONG SELMA STREET AND ABANDON 1385 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
467 080.51317 314
RELOCATE FACILITIES. INSTALL 1642 FEET OF 2 INCH POLY ALONG ELINOR STREET AND ABANDON 1642 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 16 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
468 080.51318 438
RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 1834 FEET OF 4 INCH POLY AND ABANDON 615 FEET OF 2 INCH, 1456 FEET OF 3 INCH STEEL ALONG HOLLIS STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
469 080.51329 (0)
RELOCATE FACILITIES. INSTALL 495 FEET OF 4 INCH POLY ALONG TORONTO STREET AND ABANDON 120 FEET OF 6 INCH, 250 FEET OF 4 INCH STEEL, AND 230 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
470 080.51332 93
INSTALL 965 FEET OF 2 INCH POLY AND (16) 0.75 INCH SERVICES ALONG BURTON AND ABANDON 739 FEET OF 4 INCH CAST IRON AND (16) 1.25 INCH SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
471 080.51346 104 INSTALL 3810 FEET OF 2 INCH POLY ALONG THE STREETS OF ARTESIA PHASE 5B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH JANUARY
472 080.51371 2,448
INSTALL 6000 FEET OF 2 INCH POLY ALONG WEST 13TH AND ABANDON 6000 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
473 080.51376 73
INSTALL 1875 FEET OF 4 INCH POLY, 15 POLY SERVICE LINES AND ABANDON 2990 FEET OF 3 INCH STEEL, 15 SERVICE LINES ALONG AVENUE E IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
474 080.51391 193
RELOCATE FACILITIES. INSTALL 756 FEET OF 2 INCH POLY ALONG BRITTAIN STREET AND ABANDON 760 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
475 080.51393 3
INSTALL 350 FEET OF 2 INCH POLY ALONG THE STREETS OF UNIVERSITY DRIVE AND ABANDON 400 FEET OF 4 INCH STEEL PIPE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
476 080.51395 273
RELOCATE FACILITIES. INSTALL 1560 FEET OF 4 INCH POLY ALONG WILKES STREET AND ABANDON 1500 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
477 080.51396 182
RELOCATE FACILITIES. INSTALL 305 FEET OF 2 INCH AND 105 FEET OF 6 INCH POLY ALONG ASHBURY DRIVE AND ABANDON 100 FEET OF 1-1/4 INCH, 80 FEET OF 2 INCH, AND 100 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
478 080.51397 3
RELOCATE FACILITIES. INSTALL 1212 FEET OF 4 INCH POLY ALONG MORROW AVENUE AND ABANDON 1496 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
479 080.51405 628
RELOCATE FACILITIES. INSTALL 945 FEET OF 2 INCH POLY ALONG SOUTH ROBERTS AND ABANDON 945 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
480 080.51407 (0)
INSTALL 2505 FEET OF 4 INCH AND 3340 FEET OF 2 INCH POLY ALONG ATHENS AVENUE AND ABANDON 4433 FEET OF 4 INCH STEEL AND 616 FEET OF 4 INCH AND 593 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
481 080.51411 9
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY ALONG LAMP POST LANE AND ABANDON 300 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
482 080.51413 44
RELOCATE FACILITIES. INSTALL (15) POLY SERVICE LINES AND ABANDON (15) POLY SERVICE LINES ALONG HOUGHTON AVENUE TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
483 080.51414 61
RELOCATE FACILITIES. INSTALL 1125 FEET OF 4 INCH POLY ALONG ALLEY OF BONNELL AVENUE AND ABANDON 1075 FEET OF 4 INCH CAST IRON AND 50 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
484 080.51420 292
INSTALL 1510 FEET OF 2 INCH ALONG SYLVESTER AND ABANDON 1510 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
485 080.51421 545
INSTALL 1455 FEET OF 4 INCH POLY ALONG AFTON AND ABANDON 1075 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
486 080.51427 8 ABANDON 350 FEET OF 6 INCH STEEL ALONG NORTH WEST HIGHWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
487 080.51430 66
RELOCATE FACILITIES. INSTALL 2365 FEET OF 4 INCH POLY AND ABANDON 2245 FEET OF 4 INCH, 120 FEET OF 2 INCH CAST IRON ALONG WELLESLEY AVENUE TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
488 080.51434 446
INSTALL 3700 FEET OF 2 INCH POLY ALONG BUCKNELL AND ABANDON 3700 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
489 080.51451 51
RELOCATE FACILITIES. INSTALL 150 FEET OF 8 INCH, 65 FEET OF 6 INCH POLY, 75 FEET STEEL, 130 FEET OF 4 POLY, 125 FEET OF 2 INCH POLY AND ABANDON 125 FEET OF 2 INCH POLY, 65 FEET OF 6 INCH STEEL, 65 FEET OF 6 INCH, 130 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
490 080.51459 177
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG DELEE STREET AND ABANDON 500 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
491 080.51460 0
INSTALL THREE ACTUATORS ALONG TEXAS INSTRUMENTS BOULEVARD AND ABANDON THREE OBSOLETE ACTUATORS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
492 080.51471 187
INSTALL 1000 FEET OF 2 INCH POLY ALONG RUTGER AND ABANDON 1000 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
493 080.51473 919
INSTALL 900 FEET OF 2 INCH AND 335 FEET OF 4 INCH POLY ALONG SOUTH VERSAILLES AND ABANDON 900 FEET OF CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
494 080.51474 901
INSTALL 865 FEET OF 2 INCH AND 505 FEET OF 4 INCH POLY ALONG BELCLAIRE AVENUE AND ABANDON 860 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
495 080.51479 7
RELOCATE FACILITIES. INSTALL 140 FEET OF 2 INCH POLY ALONG CENTER STREET AND ABANDON 140 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 17 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
496 080.51486 227
RELOCATE FACILITIES. INSTALL 1000 FEET OF 4 INCH POLY ALONG KILPATRICK AVENUE AND ABANDON 1022 FEET OF 4 INCH CAST IRON AND 40 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
497 080.51487 56
RELOCATE FACILITIES. INSTALL 1105 FEET OF 4 INCH POLY ALONG GOODMAN AVENUE AND ABANDON 1070 FEET OF 4 INCH CAST IRON AND 65 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
498 080.51488 41
RELOCATE FACILITIES. INSTALL 1630 FEET OF 4 INCH POLY ALONG BOURINE STREET AND ABANDON 1250 FEET OF 4 INCH CAST IRON, 380 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
499 080.51495 1
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY ALONG FM 460 AND ABANDON 290 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY
SYSTEM INTEGRITY DECEMBER
500 080.51503 67
RELOCATE FACILITIES. INSTALL 1130 FEET OF 4 INCH POLY AND ABANDON 340 FEET OF 8 INCH CAST IRON, 380 FEET OF 4 INCH POLY, 410 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
501 080.51504 0
INSTALL 1503 FEET OF 2 INCH AND 500 FEET OF 4 INCH ALONG BURTON AND ABANDON 1800 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
502 080.51506 61
RELOCATE FACILITIES. INSTALL 1225 FEET OF 4 INCH POLY ALONG HORNE STREET AND ABANDON 580 FEET OF 4 INCH CAST IRON, 630 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
503 080.51513 418
RELOCATE FACILITIES. INSTALL (89) 0.75 INCH POLY SERVICE LINES AND ABANDON 810 FEET OF 6 INCH CAST IRON, 585 FEET OF 6 INCH POLY AND 89 STEEL SERVICES ALONG THOMAS PLACE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
504 080.51516 95
RELOCATE FACILITIES. INSTALL 1790 FEET OF 4 INCH POLY AND ABANDON 1790 FEET OF 4 INCH CAST IRON ALONG CALMONT AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
505 080.51517 89
RELOCATE FACILITIES. INSTALL 695 FEET OF 4 INCH POLY, AND 155 FEET OF 2 INCH POLY ALONG CAMP BOWIE BOULEVARD AND ABANDON 701 FEET OF 6 INCH CAST IRON, AND 172 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
506 080.51529 28 INSTALL STEEL SERVICES IN GRAND PRAIRIE AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
507 080.51530 97 INSTALL STEEL SERVICES IN GRAND PRAIRIE AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
508 080.51537 39
RELOCATE FACILITIES. INSTALL 720 FEET OF 6 INCH POLY ALONG NORTH CAYLOR AND ABANDON 710 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
509 080.51543 145
INSTALL 1750 FEET OF 2 INCH POLY ALONG MUNDY DRIVE AND ABANDON 1750 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
510 080.51544 0
INSTALL 1580 FEET OF 4 INCH POLY ALONG MUNDY DRIVE AND ABANDON 1580 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
511 080.51551 14
RELOCATE FACILITIES. INSTALL 420 FEET OF 2 INCH POLY, 134 FEET OF 4 INCH, 332 FEET OF 6 INCH POLY AND ABANDON 639 FEET OF 2 INCH POLY, 179 FEET OF 4 INCH STEEL, 111 FEET OF 4 INCH, 56 FEET OF 3 INCH, 56 FEET OF 6 INCH POLY ALONG NORTH CUMMINGS DRIVE TO ACCOMMODATE CITY OF ALVARADO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO
SYSTEM INTEGRITY DECEMBER
512 080.51552 12
INSTALL 2 INCH DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG 28TH STREET IN SNYDER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
513 080.51557 (0)
INSTALL 2 INCH DISTRICT REGULATOR STATION ALONG HILL STREET AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
514 080.51573 0
INSTALL 3430 FEET OF 4 INCH POLY ALONG KENDALL LANE AND ABANDON 6839 FEET OF 16 INCH STEEL, 1122 FEET OF 2 INCH, AND 366 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
515 080.51575 22
INSTALL DISTRICT REGULATOR STATION AND ABANDON OBSOLETE RELIEF VALVE AND DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSCOE
SYSTEM INTEGRITY DECEMBER
516 080.51576 0
RELOCATE FACILITIES. ABANDON 80 FEET OF 6 INCH POLY ALONG WARREN PARKWAY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
517 080.51584 0
INSTALL 1655 FEET OF 2 INCH POLY ALONG CLAIRMONT STREET AND ABANDON 1500 OF 2 INCH BARE STEEL, 155 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
518 080.51585 (0)
INSTALL 2900 FEET OF 4 INCH POLY ALONG FM HIGHWAY 56 AND ABANDON 2900 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ECTOR
SYSTEM INTEGRITY DECEMBER
519 080.51617 626
INSTALL 1100 FEET OF 2 INCH POLY ALONG SOUTH BARRY AND ABANDON 1550 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
520 080.51620 147
INSTALL 2251 FEET OF 2 INCH POLY ALONG TALLMAN AND ABANDON 1901 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
521 080.51621 11
INSTALL 800 FEET OF 4 INCH POLY ALONG SOUTH MAIN STREET AND ABANDON 685 FEET OF 2 INCH STEEL, 25 FEET OF 2 INCH, AND 50 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN
SYSTEM INTEGRITY DECEMBER
522 080.51634 7
INSTALL 2800 FEET OF 2 INCH POLY AND ABANDON 2100 FEET OF 4 INCH STEEL, 400 FEET OF 4 INCH, 325 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION ALONG STARNES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 18 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
523 080.51640 0
INSTALL (2) 2 INCH DISTRICT REGULATOR STATIONS AND 2 INCH RELIEF VALVE ALONG CASA LINDA AND ABANDON DISTRICT REGULATOR STATION AND 2 INCH RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
524 080.51648 88
INSTALL 1200 FEET OF 6 INCH POLY ALONG VAUGHN AND ABANDON 1110 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
525 080.51653 988
INSTALL 1200 FEET OF 2 INCH POLY ALONG CARROL AND ABANDON 850 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
526 080.51655 66
INSTALL 868 FEET OF 2 INCH POLY ALONG DAGGETT AND ABANDON 740 FEET OF 6 INCH CAST IRON, 317 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
527 080.51656 (4)
RELOCATE FACILITIES. INSTALL 990 FEET OF 4 INCH AND 65 FEET OF 2 INCH POLY ALONG HILLCREST DRIVE AND ABANDON 980 FEET OF 4 INCH AND 60 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
528 080.51663 1,010
RELOCATE FACILITIES. INSTALL 76 FEET OF 2 INCH AND 675 FEET OF 6 INCH POLY AND ABANDON 76 FEET OF 2 INCH POLY AND 670 FEET OF 6 INCH STEEL ALONG WESTBROOK AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
529 080.51668 0
INSTALL 1255 FEET OF 4 INCH AND 2142 FEET OF 2 INCH POLY ALONG MCLENNAN STREET AND ABANDON 1351 FEET OF 3 INCH, 1225 FEET OF 4 INCH, 299 FEET OF 2 INCH STEEL AND 769 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART
SYSTEM INTEGRITY SEPTEMBER
530 080.51676 (212)
RELOCATE FACILITIES. INSTALL 1470 FEET OF 4 INCH POLY AND ABANDON 720 FEET OF 4 INCH CAST IRON ALONG CARNATION AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
531 080.51682 3 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
532 080.51684 21
RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH, 200 FEET OF 4 INC, AND 150 FEET OF 2 INCH POLY AND ABANDON 25 FEET OF 6 INCH, 75 FEET OF 2 INCH STEEL, 150 FEET OF 4 INCH STEEL, 100 FEET OF 4 INCH, AND 75 FEET OF 2 INCH POLY ALONG HANBEE STREET TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
533 080.51702 1,158
RELOCATE FACILITIES. INSTALL 2600 FEET OF 4-INCH AND 180 FEET OF 2-INCH POLY AND ABANDON 2200 FEET OF 4-INCH STEEL, 1,200 FEET OF 4-INCH POLY ALONG STATE HIGHWAY 21 TO ACCOMMODATE CITY OF BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
534 080.51708 5
RELOCATE FACILITIES. INSTALL 140 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 130 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ROYSE CITY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY
SYSTEM INTEGRITY DECEMBER
535 080.51728 2
RELOCATE FACILITIES. INSTALL 205 FEET OF 4 INCH POLY ALONG SOUTH COUNTRY CLUB DRIVE AND ABANDON 185 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
536 080.51740 (0)
INSTALL GROUNDBED ALONG LINE DALLAS DT5 AND ABANDON GROUNDBED TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
537 080.51743 223
RELOCATE FACILITIES. INSTALL 365 FEET OF 6 INCH AND 210 FEET OF 2 INCH POLY ALONG PERKINS AND ABANDON 320 FEET OF 6 INCH, 110 FEET OF 2 INCH POLY AND 40 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
538 080.51754 2,431
RELOCATE FACILITIES. INSTALL 380 FEET OF 6 INCH STEEL AND ABANDON 365 FEET OF 6 INCH STEEL ALONG 29TH STREET TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
539 080.51755 18
INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES AND ABANDON (40) COPPER SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
SYSTEM INTEGRITY DECEMBER
540 080.51760 0
INSTALL 950 FEET OF 2 INCH POLY ALONG STORY AND ABANDON 950 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
541 080.51761 4
RELOCATE FACILITIES. INSTALL 630 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY AND ABANDON 605 FEET OF 6 INCH, 22 FEET OF 4 INCH AND 12 FEET OF 2 INCH STEEL ALONG SOUTH MESQUITE ROAD TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
542 080.51764 1,237 INSTALL 2022 FEET OF 2 INCH AND 2677 FEET OF 4 INCH POLY ALONG STREETS OF BELLA CHARCA PHASE 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NOLANVILLE GROWTH OCTOBER
543 080.51783 152
RELOCATE FACILITIES. INSTALL 3920 FEET OF 6 INCH, 130 FEET OF 4 INCH POLY AND ABANDON 2384 FEET OF 6 INCH STEEL, 1145 FEET OF 8 INCH STEEL, 335 FEET OF 6 INCH POLY, AND 20 FEET OF 8 INCH POLY ALONG SOUTH TOWN EAST BOULEVARD TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
544 080.51786 5
INSTALL 2920 FEET OF 6 INCH, 345 FEET OF 4 INCH, AND 380 FEET OF 2 INCH POLY ALONG HIGHWAY 79 AND ABANDON 3297 FEET OF 2 INCH STEEL AND 161 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY DECEMBER
545 080.51794 (0)
INSTALL 1094 FEET OF 2 INCH POLY ALONG ANSON JONES AND ABANDON 25 FEET OF 6 INCH, 1069 FEET OF 4 INCH STEEL, AND DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON
SYSTEM INTEGRITY DECEMBER
546 080.51799 3,031
RELOCATE FACILITIES. INSTALL 2020 FEET OF 4 INCH POLY AND ABANDON 1768 FEET OF 4 INCH AND 1630 FEET OF 6 INCH CAST IRON ALONG LOTUS TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
547 080.51801 2,136
RELOCATE FACILITIES. INSTALL 1712 FEET OF 2 INCH POLY AND ABANDON 997 FEET OF 4 INCH STEEL AND 860 FEET OF 4 INCH CAST IRON ALONG SYLVANIA TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
548 080.51804 26
INSTALL 475 FEET OF 2 INCH AND 546 FEET OF 4 INCH POLY ALONG CALHOUN AND ABANDON 453 FEET OF 6 INCH CAST IRON, 185 FEET OF 4 INCH, 264 FEET OF 2 INCH POLY AND 130 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 19 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
549 080.51806 5,259
RELOCATE FACILITIES. INSTALL 3126 FEET OF 4 INCH POLY ALONG YUCCA AVENUE AND ABANDON 2736 FEET OF 4 INCH CAST IRON AND 540 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
550 080.51809 (0)
RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 1.25 INCH POLY ALONG ROSITA COURT TO ACCOMMODATE CITY OF PLANO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
551 080.51823 563
INSTALL 4320 FEET OF 4 INCH POLY AND ABANDON 925 FEET OF 6 INCH, 575 FEET OF 2 INCH, 3225 FEET OF 4 INCH CAST IRON ALONG FULTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
552 080.51824 91
INSTALL 670 FEET OF 2 INCH POLY ALONG BARTON STREET AND ABANDON 908 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
553 080.51825 71
INSTALL 2544 FEET OF 6 INCH POLY AND ABANDON 280 FEET OF 2 INCH, 1028 FEET OF 4 INCH, 1351 FEET OF 6 INCH, AND 2853 FEET OF 8 INCH CAST IRON ALONG KIRBY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
554 080.51829 27
RELOCATE FACILITIES. INSTALL 825 FEET OF 2 INCH AND 737 FEET OF 4 INCH POLY AND ABANDON 1320 FEET OF 4 INCH CAST IRON AND 159 FEET OF 4 INCH STEEL ALONG JENNINGS TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
555 080.51835 1
RELOCATE FACILITIES. INSTALL 2800 FEET OF 2 INCH AND 200 FEET OF 6 INCH POLY ALONG 15TH STREET AND ABANDON 2800 FEET OF 2 INCH AND 200 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
556 080.51840 448
INSTALL 1475 FEET OF 2 INCH AND 950 FEET OF 4 INCH POLY ALONG ALLEN STREET AND ABANDON 2112 FEET OF 4 INCH CAST IRON AND 264 FEET OF 4 INCH BARE STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
557 080.51843 13,005
RELOCATE FACILITIES. INSTALL 1715 FEET OF 4 INCH POLY AND ABANDON 678 FEET OF 4 INCH POLY AND 984 FEET OF 4 INCH CAST IRON ALONG DOROTHY LANE TO ACCOMODATE A CITY OF FORT WORTH DRAINAGE IMPROVEMENT PROJECT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
558 080.51844 8,091
RELOCATE FACILITIES. INSTALL 2097 FEET OF 12 INCH STEEL ALONG MONTGOMERY AND ABANDON 392 FEET OF 2 INCH , 2097 FEET OF 12 INCH STEEL, AND 5 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
559 080.51846 774
INSTALL 1300 FEET OF 4 INCH POLY AND ABANDON 480 FEET OF 6 INCH AND 1230 FEET OF 4 INCH CAST IRON ALONG MONTROSE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
560 080.51850 13
INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY ALONG NORTH CHURCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLUE RIDGE
SYSTEM INTEGRITY DECEMBER
561 080.51852 (3,908)
RELOCATE FACILITIES. INSTALL 1918 FEET OF 2 INCH POLY AND 10611 FEET OF 4 INCH POLY AND ABANDON 1148 FEET OF 2 INCH STEEL AND 62 FEET OF 2 INCH POLY AND 1417 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG VALLEY MILLS DRIVE TO ACCOMMODATE TXDOT ROAD WIDENING PROJECT. ALL CUSTOMERS WACO
RELOCATION OF FACILITIES MARCH
562 080.51853 7
INSTALL 2300 FEET OF 6 INCH POLY ALONG SPENCE ROAD AND ABANDON 2300 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALCH SPRINGS
SYSTEM INTEGRITY DECEMBER
563 080.51854 (2,538)
RELOCATE FACILITIES. INSTALL 1238 FEET OF 2 INCH AND 4704 FEET OF 4 INCH POLY AND ABANDON 867 FEET OF 2 INCH STEEL AND 391 FEET OF 2 INCH POLY AND 1377 FEET OF 3 INCH STEEL AND 412 FEET OF 3 INCH POLY AND 70 FEET OF 4 INCH POLY ALONG MLK BOULEVARD TO ACCOMMODATE TXDOT STREET PROJECT. ALL CUSTOMERS WACO
RELOCATION OF FACILITIES MARCH
564 080.51862 (0)
INSTALL 700 FEET OF 4 INCH POLY ALONG FIRST STREET AND ABANDON 600 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DAWSON
SYSTEM INTEGRITY DECEMBER
565 080.51870 47
INSTALL 850 FEET OF 6 INCH AND 1731 FEET OF 4 INCH POLY AND ABANDON 1825 FEET OF 6 INCH AND 790 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
566 080.51871 8
INSTALL 10 FEET OF 8 INCH AND 500 FEET OF 4 INCH POLY ALONG LAMAR AVENUE AND ABANDON 10 FEET OF 8 INCH, 10 FEET OF 4 INCH POLY AND 285 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
567 080.51873 5
RELOCATE FACILITIES. INSTALL 900 FEET OF 6 INCH POLY AND ABANDON 900 FEET OF 6 INCH POLY ALONG NORTH BEACH STREET TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
568 080.51886 313
INSTALL 325 FEET OF 6 INCH POLY ALONG BEDFORD ROAD AND ABANDON 320 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
569 080.51887 3
RELOCATE FACILITIES. INSTALL 35 FEET OF 2 INCH POLY ALONG SUMMERPLACE LANE AND ABANDON 30 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
SYSTEM INTEGRITY DECEMBER
570 080.51889 8,470
INSTALL 1300 FEET OF 8 INCH POLY AND ABANDON 1200 FEET OF 8 INCH POLY ALONG EULESS SOUTH MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
571 080.51899 2 ABANDON 325 FEET OF 2 INCH STEEL ALONG YOUNG STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
572 080.51920 (2,385)
RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH, 450 FEET OF 4 INCH, 485 FEET OF 6 INCH AND 950 FEET OF 8 INCH POLY ALONG IH35 AND ABANDON 425 FEET OF 4 INCH STEEL, 440 FEET OF 8 INCH, 690 FEET OF 6 INCH, 315 FEET OF 3 INCH, AND 470 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS DENTON
RELOCATION OF FACILITIES SEPTEMBER
573 080.51942 0
INSTALL 900 FEET OF 4 INCH AND 170 FEET OF 2 INCH POLY ALONG EAST OAK STREET AND ABANDON 955 FEET OF 2 INCH STEEL 410 FEET OF 2 INCH POLY 800 FEET OF 4 INCH STEEL AND 110 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
574 080.51944 267
INSTALL 1000 FEET OF 20 INCH STEEL AND ABANDON 1000 FEET OF 20 INCH STEEL ALONG BELT LINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
575 080.51958 9
RELOCATE FACILITIES. RELOCATE FACILITIES. INSTALL 266 FEET OF 4 INCH POLY AND ABANDON 157 FEET OF 3 INCH STEEL ALONG FARM TO MARKET 480 ROAD TO ACCOMMODATE CITY OF CENTER POINT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CENTER POINT
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 20 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
576 080.51962 (0)
INSTALL 906 FEET OF 4 INCH POLY ALONG SHERWOOD WAY AND ABANDON 933 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
577 080.51980 43
INSTALL 2390 FEET OF 2 INCH POLY ALONG SOUTH COLEMAN STREET AND ABANDON IN PLACE 421 FEET OF 2 INCH, 960 FEET OF 4 INCH STEEL, 321 FEET OF 3 INCH AND 1045 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER
SYSTEM INTEGRITY DECEMBER
578 080.51982 2,993
INSTALL 8775 FEET OF 6 INCH AND 5 FEET OF 4 INCH POLY ALONG COLEMAN STREET AND ABANDON 6250 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER
SYSTEM INTEGRITY DECEMBER
579 080.51992 (10)
INSTALL 3885 FEET OF 2 INCH POLY ALONG NORTHSIDE DRIVE AND ABANDON 3885 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILLEEN
SYSTEM INTEGRITY DECEMBER
580 080.51994 2,364
INSTALL 1955 FEET OF 4 INCH POLY ALONG VAUGHN STREET AND ABANDON 2060 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
581 080.52004 25
RELOCATE FACILITIES. INSTALL 2500 FEET OF 4 INCH POLY ALONG FREDDIE STREET AND ABANDON 2376 FEET OF 4 INCH CAST IRON, 106 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORTH WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
582 080.52012 7
ABANDON 312 FEET OF 4 INCH STEEL AND 348 FEET OF 2 INCH POLY ALONG NEDDERMAN DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
583 080.52014 77
RELOCATE FACILITIES. INSTALL 670 FEET OF 2 INCH POLY AND ABANDON 660 FEET OF 2 INCH STEEL ALONG MURSERY LANE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
584 080.52022 0
RELOCATE FACILITIES. INSTALL 3677 FEET OF 4 INCH, 554 FEET OF 2 INCH POLY ALONG BOSQUE BOULEVARD AND ABANDON 3978 FEET 4 INCH AND 2 INCH CAST IRON TO ACCOMMODATE CITY OF WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
585 080.52029 507
RELOCATE FACILITIES. INSTALL 398 FEET OF 2 INCH, 342 FEET OF 4 INCH POLY ALONG AVENUE U AND ABANDON 84 FEET OF 3 INCH, 73 FEET OF 2 INCH, 88 FEET OF 1 1/14 POLY, 12 FEET OF 3 INCH, 316 FEET OF 4 INCH, 93 FEET OF 3 STEEL TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
586 080.52033 13 INSTALL 2131 FEET OF 4 INCH POLY AND ABANDON 2218 FEET 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
587 080.52036 1,704
RELOCATE FACILITIES. INSTALL 1380 FEET OF 4 INCH POLY AND 400 FEET OF 6 INCH POLY ALONG GOLIAD STREET AND ABANDON 173 FEET OF 3 INCH POLY, 1010 FEET OF 4 INCH POLY AND 383 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
SYSTEM INTEGRITY DECEMBER
588 080.52039 139
INSTALL 450 FEET OF 2 INCH POLY ALONG WOODVILLE ROAD AND ABANDON 460 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
589 080.52044 46
INSTALL 1200 FEET OF 2 INCH POLY ALONG TANGLEWOOD DRIVE AND ABANDON 1200 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
590 080.52052 1,377
INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES ALONG FORT WORTH AND ABANDON (40) COPPER SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
591 080.52053 686
INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES AND ABANDON (40) COPPER SERVICE LINES ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
592 080.52055 1,208
INSTALL (34) 0.75 INCH AND (6) 2 INCH POLY SERVICES AND ABANDON (40) COPPER SERVICE LINES ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
593 080.52056 749
INSTALL (34) 0.75 INCH AND (6) 2.00 INCH POLY SERVICES AND ABANDON (40) COPPER SERVICES IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
594 080.52058 240
INSTALL 2045 FEET 2 INCH POLY, 215 FEET 6 INCH POLY, 54 0.75 INCH SERVICES AND ABANDON 354 FEET 6 INCH CAST IRON, 1935 FEET 4 INCH CAST IRON, 54 1.25 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
595 080.52062 226
INSTALL 350 FEET OF 2 INCH POLY, 750 FEET OF 4 INCH POLY ALONG GOOD LATIMER ABANDON 150 FEET OF 6 INCH CAST IRON AND 250 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
596 080.52067 1
RELOCATE FACILITIES. INSTALL 4022 FEET OF 2 INCH, 912 FEET OF 4 INCH POLY ALONG SOUTH HARRISON STREET AND ABANDON 5990 FEET OF 4 INCH AND 2 INCH STEEL TO ACCOMMODATE THE CITY OF WEST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY DECEMBER
597 080.52077 (0)
RELOCATE FACILITIES. INSTALL 250 FEET OF 6 IN POLY AND ABANDON 220 FEET OF 6 INCH STEEL AND 30 FEET OF 4 INCH STEEL ALONG WEST MASON STREET TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
598 080.52080 25
INSTALL AND ABANDON OBSOLETE COMPONENTS FROM RHINELAND MEASURING STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS MUNDAY
SYSTEM INTEGRITY DECEMBER
599 080.52094 0
REPLACE FACILITIES. INSTALL 905 FEET OF 4 INCH POLY ALONG COLCORD AVENUE AND ABANDON 646 FEET OF 4 INCH CAST IRON, 351 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
600 080.52098 489
INSTALL 2000 FEET OF 12 INCH STEEL ALONG LINE CA AND ABANDON 2000 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
601 080.52106 15
INSTALL 1437 FEET OF 2 INCH POLY ALONG 4TH STREET AND ABANDON 30 FEET OF 4 INCH, 1407 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
602 080.52112 0
INSTALL 2965 FEET OF 2 INCH POLY ALONG DRUMMOND AND ABANDON 125 FEET OF 2 INCH POLY, 2840 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS TYE
SYSTEM INTEGRITY DECEMBER
603 080.52121 10
INSTALL 650 FEET OF 4 INCH POLY ALONG LAMAR AVENUE AND ABANDON 21 FEET OF 4 INCH POLY, 630 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
604 080.52135 29
INSTALL 1480 FEET OF 4 INCH POLY AND 1750 FEET OF 2 INCH POLY ALONG ORCHARD STREET AND ABANDON 1543 FEET OF 4 INCH, 174 FEET OF 3 INCH, AND 1270 FEET OF 2 INCH STEEL, 215 FEET OF 2 INCH POLY, AND 28 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 21 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
605 080.52141 0
RELOCATE FACILITIES. ABANDON 360 FEET OF 4 INCH STEEL ALONG MEDICAL DISTRICT DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
606 080.52153 1
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY AND ABANDON 22 FEET OF 4 INCH POLY ALONG CROSSING CHAPEL CREEK BOULEVARD TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
607 080.52163 11
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG WEST HOLLEMAN DRIVE AND ABANDON 290 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
608 080.52167 0
INSTALL 558 FEET OF 4 INCH POLY AND ABANDON 488 FEET OF 6 INCH, 70 FEET OF 4 INCH STEEL ALONG HIGHLAND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUBLIN
SYSTEM INTEGRITY DECEMBER
609 080.52168 (0)
INSTALL 750 FEET OF 2 INCH POLY AND ABANDON 750 FEET OF 2 INCH STEEL ALONG MCCLAIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IREDELL
SYSTEM INTEGRITY DECEMBER
610 080.52170 6
INSTALL 330 FEET OF 6 INCH, 210 FEET OF 2 INCH POLY ALONG BARRON AVENUE AND ABANDON 905 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
611 080.52171 11
INSTALL 626 FEET OF 6 INCH AND 324 FEET OF 4 INCH POLY ALONG SANGER AVENUE AND ABANDON 664 FEET OF 8 INCH CAST IRON AND 327 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
612 080.52179 (0)
INSTALL 370 FEET OF 2 INCH POLY ALONG KESSLER AND ABANDON 370 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
613 080.52180 8
INSTALL 595 FEET OF 6 INCH, 1290 FEET OF 4 INCH, 705 FEET OF 2 INCH POLY ALONG MAGDALENE ROAD AND ABANDON 15 FEET OF 8 INCH, 437 FEET OF 6 INCH POLY, 417 FEET OF 4 INCH, 598 FEET OF 3 INCH, 192 FEET OF 2 INCH POLY, 53 FEET OF 8 INCH, 2537 FEET OF 6 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
614 080.52192 179
INSTALL 31 FEET OF 6 INCH AND 11015 FEET OF 12 INCH STEEL AND ABANDON 10800 FEET OF 6 INCH STEEL ON LINE L20 IN WILLIAMSON COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY DECEMBER
615 080.52193 47,938 INSTALL 2605 FEET OF 2 INCH POLY ALONG DESSAU ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS AUSTIN GROWTH JUNE
616 080.52201 0
RELOCATE FACILITIES. INSTALL 967 FEET OF 4 INCH AND 100 FEET OF 2 INCH POLY AND ABANDON 937 FEET OF 6 INCH, 60 FEET OF 4 INCH AND 100 FEET OF 2 INCH STEEL ALONG MESQUITE STREET TO ACCOMMODATE CITY OF HICO STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO
SYSTEM INTEGRITY SEPTEMBER
617 080.52203 104
INSTALL 1250 FEET OF 2 INCH POLY ALONG S BARRY AVENUE AND ABANDON 1370 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
618 080.52209 11
INSTALL 2 INCH DISTRICT REGULATOR STATION AND ABANDON 2 INCH DISTRICT REGULATOR STATION ALONG 30TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
619 080.52212 74
INSTALL 1893 FEET OF 4 INCH AND 570 FEET OF 2 INCH POLY AND ABANDON 1927 FEET OF 4 INCH CAST IRON AND 621 FEET OF 4 INCH POLY ALONG N 18TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
620 080.52230 391 INSTALL 1900 FEET OF 4 INCH POLY, 1130 FEET OF 2 INCH POLY ALONG STREETS OF LADERA SUB-DIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH JANUARY
621 080.52231 18
RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4 INCH STEEL ALONG HILLCREST STREET TO ACCOMMODATE THE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
622 080.52232 147 INSTALL (60) STEEL SERVICES AND ABANDON (60) STEEL SERVICES IN GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
623 080.52233 (0)INSTALL (60) STEEL SERVICES AND ABANDON (60) STEEL SERVICES IN GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
624 080.52245 203
INSTALL 990 FEET OF 4 INCH POLY AND 300 FEET OF 2 INCH POLY AND ABANDON 1290 FEET OF 4 INCH CAST IRON ALONG LELAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
625 080.52260 703
INSTALL 26 FEET OF 4 INCH, 292 FEET OF 6 INCH, AND 8549 FEET OF 8 INCH POLY AND ABANDON 3310 FEET OF 4 INCH STEEL, 350 FEET OF 8 INCH STEEL AND 165 FEET OF 6 INCH POLY ALONG BELT LINE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ADDISON
SYSTEM INTEGRITY DECEMBER
626 080.52262 0
RELOCATE FACILITIES. INSTALL 707 FEET OF 4 INCH POLY AND ABANDON 380 FEET OF 2 INCH STEEL ALONG NORTH HAMPTON DRIVE TO ACCOMMODATE CITY OF FORT WORTH PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
627 080.52277 1,702
RELOCATE FACILITIES. INSTALL 1881 FEET OF 2 INCH AND 330 FEET OF 4 INCH POLY AND ABANDON 1895 FEET OF 2 INCH STEEL AND 316 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
628 080.52287 3,525
INSTALL 3230 FEET OF 2 INCH, 990 FEET OF 4 INCH, 200 FEET OF 6 INCH POLY AND ABANDON 1150 FEET OF 6 INCH, 1295 FEET OF 4 INCH, 1650 FEET OF 3 INCH STEEL, 850 FEET OF 4 INCH AND 695 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
629 080.52296 (0)
INSTALL 317 FEET OF 4 INCH ALONG SOUTH 23RD ROAD AND ABANDON 291 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
630 080.52297 0
INSTALL 615 FEET OF 4 INCH POLY AND ABANDON 3 FEET OF 3 INCH AND 608 FEET OF 4 INCH STEEL ALONG MONTICELLO ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY SEPTEMBER
631 080.52327 327
INSTALL 1185 FEET OF 2 INCH POLY AND ABANDON 465 FEET OF 4 INCH CAST IRON ALONG CLEVELAND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
632 080.52338 165
RELOCATE FACILITIES. INSTALL 500 FEET OF 8 INCH POLY ALONG FARM TO MARKET ROAD 550 AND ABANDON 290 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HEATH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEATH
SYSTEM INTEGRITY DECEMBER
633 080.52340 0
INSTALL 2307 FEET OF 4 INCH ALONG TRAVIS AVENUE AND ABANDON 1776 FEET OF 2 INCH AND 3 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS MART
SYSTEM INTEGRITY SEPTEMBER
MTX AdditionsPage 22 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
634 080.52351 0
INSTALL 8 FEET OF 12 INCH STEEL, (1) 4 INCH BALL VALVE AND ABANDON (1) 12 INCH VALVE, (1) 4 INCH VALVE ALONG COUNTY ROAD 68 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY SEPTEMBER
635 080.52352 8
RELOCATE FACILITIES. INSTALL 2240 FEET OF 2 INCH POLY AND ABANDON 609 FEET OF 4 INCH CAST IRON, 1277 OF 4 INCH STEEL, 422 FEET OF 2 INCH, 10 FEET OF 4 INCH POLY ALONG 3RD STREET TO ACCOMMODATE THE CITY OF WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
636 080.52353 19
INSTALL 1336 FEET OF 2 INCH POLY AND ABANDON 912 FEET OF 2 INCH, 231 FEET OF 3 INCH POLY, 655 FEET OF 2 INCH, 51 FEET OF 3 INCH STEEL ALONG COLEMAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
637 080.52354 14
INSTALL 1200 FEET OF 6 INCH, 80 FEET OF 4 INCH POLY AND ABANDON 1015 FEET OF 6 INCH, 235 FEET OF 4 INCH, 47 FEET OF 3 INCH STEEL, 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
638 080.52356 21
INSTALL 3245 FEET OF 2 INCH POLY AND ABANDON 220 FEET OF 6 INCH, 3064 OF 4 INCH, 87 FEET OF 2 INCH STEEL, 192 FEET OF 4 INCH, 162 FEET OF 2 INCH POLY ALONG 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
639 080.52364 146
INSTALL REGULATOR STATION ALONG PARK BOULEVARD AND ABANDON REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
640 080.52367 526
INSTALL 1660 FEET OF 4 INCH POLY AND ABANDON 1060 FEET OF 6 INCH STEEL AND 1130 FEET OF 6 INCH CAST IRON ALONG CEDAR SPRINGS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
641 080.52375 (0)
INSTALL 1900 FEET OF 2 INCH POLY AND ABANDON (4) MAIN LINE REGULATOR STATIONS ALONG GIBBONS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHMAYD
SYSTEM INTEGRITY DECEMBER
642 080.52380 13
INSTALL 25 FEET OF 4 INCH, 10 FEET OF 6 INCH POLY AND A DISTRICT REGULATOR STATION ALONG AUSTIN STREET AND ABANDON 25 FEET OF 4 INCH, 10 FEET OF 6 INCH STEEL, DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
643 080.52392 0
RELOCATE FACILITIES. INSTALL 445 FEET OF 2 INCH POLY AND ABANDON 443 FEET OF 2 INCH STEEL ALONG KATHY STREET TO ACCOMMODATE CITY OF LONGVIEW IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY SEPTEMBER
644 080.52398 75
INSTALL 3494 FEET OF 2 INCH POLY AND ABANDON 343 FEET OF 2 INCH AND 2929 FEET OF 6 INCH CAST IRON ALONG ROWAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
645 080.52412 134
RELOCATE FACILITIES. INSTALL 1475 FEET OF 4 INCH POLY ALONG LEON STREET AND ABANDON 300 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
646 080.52420 (0)
RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY ALONG 17TH STREET AND ABANDON 280 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF BRIDGEPORT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRIDGEPORT
SYSTEM INTEGRITY DECEMBER
647 080.52442 13,295
RELOCATE FACILITIES. INSTALL 6700 FEET OF 8 INCH AND 116 FEET OF 4 INCH STEEL AND ABANDON 6672 FEET OF 4 INCH STEEL ALONG HIGHWAY 377 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
648 080.52451 1
RELOCATE FACILITIES. INSTALL 65 FEET OF 8 INCH POLY AND ABANDON 60 FEET OF 8 INCH STEEL ALONG WALNUT HILL TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
649 080.52452 1,524
RELOCATE FACILITIES. INSTALL 3120 FEET OF 4 INCH POLY ALONG PLEASANT RUN ROAD AND ABANDON 210 FEET OF 4 INCH, 475 FEET OF 2 INCH STEEL AND 2147 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF LANCASTER PAVING AND DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER
SYSTEM INTEGRITY DECEMBER
650 080.52463 2,145
INSTALL 1250 FEET OF 4 INCH AND 700 FEET OF 2 INCH POLY ALONG LLEWELLYN AVENUE AND ABANDON 985 FEET OF 6 INCH, 680 FEET OF 4 INCH CAST IRON, AND 215 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
651 080.52466 585
INSTALL 1830 FEET OF 2 INCH POLY ALONG W LOVERS STREET AND ABANDON 90 FEET OF 4 INCH POLY AND 1575 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
652 080.52467 3
INSTALL 1030 FEET OF 4 INCH POLY ALONG NORTH VERSAILLES AND ABANDON 325 FEET OF 6 INCH, 375 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
653 080.52468 1
INSTALL 1150 FEET OF 2 INCH POLY ALONG RALEIGH AND ABANDON 1145 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
654 080.52469 41
INSTALL 390 FEET OF 4 INCH POLY AND 240 FEET OF 2 INCH POLY AND ABANDON 630 FEET OF 4 INCH CAST IRON ALONG DARMOUTH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
655 080.52476 2,423
INSTALL 479 FEET OF 2 INCH AND 1896 FEET OF 4 INCH POLY ALONG EAST GREENWAY STREET AND ABANDON 1750 FEET OF 4 INCH, 550 FEET OF 6 INCH, AND 150 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
656 080.52477 10
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION IN DENTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
657 080.52491 (1)INSTALL (40) SERVICES AND ABANDON (40) SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
658 080.52494 (0)
INSTALL 20 FEET OF 2 INCH POLY AND ABANDON 48 FEET OF 2 INCH STEEL ALONG 25TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
659 080.52496 7
INSTALL 250 FEET OF 2 INCH POLY ALONG 30TH STREET AND ABANDON 35 FEET OF 2 INCH, 60 FEET OF 3 INCH STEEL AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
660 080.52497 12
RELOCATE FACILITIES. INSTALL 415 FEET OF 12 INCH POLY AND ABANDON 415 FEET OF 10 INCH STEEL ALONG ROSEDALE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
661 080.52508 237
RELOCATE FACILITIES. INSTALL 14520 FEET OF 4 INCH STEEL ALONG STEWART STREET AND ABANDON 14470 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF SCURRY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SCURRY
SYSTEM INTEGRITY DECEMBER
662 080.52516 (0)
INSTALL 1150 FEET OF 6 INCH POLY ALONG CHADBOURNE AND ABANDON 1150 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 23 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
663 080.52517 1
INSTALL 783 FEET OF 6 INCH POLY AND ABANDON 783 FEET OF 6 INCH STEEL ALONG COLORADO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
664 080.52519 6
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH AND ABANDON 840 FEET OF 3 INCH STEEL ALONG PALACIOS AVENUE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
665 080.52521 0
RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY AND ABANDON 55 FEET OF 4 INCH STEEL ALONG STEVENS STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
666 080.52537 155
INSTALL 2680 FEET OF 2 INCH POLY AND ABANDON 2300 FEET OF 2 INCH STEEL AND 380 FEET OF 2 INCH POLY ALONG WILSON ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
667 080.52538 413
RELOCATE FACILITIES. INSTALL 1350 FEET OF 2 INCH POLY AND ABANDON 1330 FEET OF 3 INCH STEEL ALONG LARGA TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
668 080.52539 101
RELOCATE FACILITIES. INSTALL 635 FEET OF 2 INCH POLY AND ABANDON 385 FEET OF 4 INCH STEEL AND 250 FEET OF 2 INCH STEEL ALONG WALNUT HILL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
669 080.52540 376
RELOCATE FACILITIES. INSTALL 400 FEET OF 8 INCH AND 150 FEET OF 4 INCH POLY ALONG LEMMON AVENUE AND ABANDON 154 FEET OF 6 INCH AND 437 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
670 080.52586 10 INSTALL 65 STEEL SERVICES ALONG MAPSHEET 207 IN MESQUITE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
671 080.52594 130 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
672 080.52599 1
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 2 INCH, 80 FEET OF 4 INCH POLY ALONG TICONDEROGA DRIVE TO ACCOMMODATE THE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
673 080.52601 24
INSTALL 2020 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 4 INCH CAST IRON ALONG MACON ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
674 080.52610 59
INSTALL 332 FEET OF 2 INCH, 6 FEET OF 4 INCH, 1030 FEET OF 6 INCH AND 754 FEET OF 8 INCH POLY AND ABANDON 327 FEET OF 2 INCH, 1772 FEET OF 8 INCH STEEL, 5 FEET OF 2 INCH POLY, AND 12 FEET OF 6 INCH POLY ALONG BRADFORD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
675 080.52611 0
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 120 FEET OF 4 INCH POLY ALONG FOREST VISTA DRIVE TO ACCOMMODATE THE CITY OF FLOWER MOUND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY SEPTEMBER
676 080.52635 0
INSTALL 375 FEET OF 2 INCH POLY AND ABANDON 635 FEET OF 2 INCH STEEL ALONG DELAWARE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY SEPTEMBER
677 080.52659 0
INSTALL 2170 FEET OF 4 INCH, 728 FEET OF 2 INCH POLY AND ABANDON 2170 FEET OF 4 INCH, 728 FEET OF 2 INCH STEEL ON JACKSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY SEPTEMBER
678 080.52685 (0)
RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY AND ABANDON 300 FEET OF 6 INCH STEEL ALONG SCOTT STREET TO ACCOMMODATE CITY OF GAINESVILLE UTILITY RENOVATIONS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
679 080.52691 2
INSTALL 275 FEET OF 2 INCH POLY AND ABANDON 275 FEET OF 2 INCH STEEL ALONG HAMPTON CIRCLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
680 080.52713 3,339
RELOCATE FACILITIES. INSTALL 2566 FEET OF 4 INCH AND 1062 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 4 INCH, 210 FEET OF 2 INCH STEEL, 565 FEET OF 4 INCH, AND 60 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
681 080.52714 23
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY AND ABANDON 25 FEET OF 4 INCH POLY ALONG WHISPERING LANE TO ACCOMMODATE CITY OF WATAUGA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA
SYSTEM INTEGRITY DECEMBER
682 080.52718 (0)
INSTALL (2) 6 INCH DISTRICT REGULATOR STATIONS AND ABANDON (2) 6 INCH DISTRICT REGULATOR STATIONS ALONG CUSTER ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
SYSTEM INTEGRITY DECEMBER
683 080.52731 84
INSTALL REGULATOR STATION ALONG AUSTIN STREET AND ABANDON REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
684 080.52732 518
INSTALL REGLUATOR AND RELIEF VALVE AND ABANDON REGLUATOR AND RELIEF VALVE ON LINE XT-25 IN TARRANT COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
685 080.52774 6 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
686 080.52775 29 INSTALL STEEL SERVICES AND ABANDON STEEL SERVICES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
687 080.52782 (0)
RELOCATE FACILITIES. INSTALL 260 FEET OF 2 INCH, 4 FEET OF 4 INCH AND ABANDON 82 FEET OF 2 INCH, 227 FEET OF 4 INCH POLY ALONG HORSEMAN ROAD TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
688 080.52787 41
RELOCATE FACILITIES. INSTALL 1580 FEET OF 4 INCH POLY AND ABANDON 1039 FEET OF 4 INCH POLY, 165 FEET OF 2 INCH POLY, 325 FEET OF 1.25 POLY, AND 248 FEET OF 2 INCH STEEL AND 115 FEET OF 4 INCH STEEL ALONG MONROE AVENUE TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
689 080.52802 (0)
RELOCATE FACILITIES. INSTALL (14) POLY SERVICES ALONG MEADOW LANE AND ABANDON (14) STEEL SERVICES TO ACCOMMODATE THE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
690 080.52803 207
INSTALL 1200 FEET OF 2 INCH POLY AND ABANDON 1130 FEET OF 4 INCH CAST IRON ALONG MELBA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
691 080.52815 15 INSTALL AC MITIGATION ALONG LINE DALLAS DT1 IN DALLAS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
692 080.52821 257
RELOCATE FACILITIES. INSTALL 39 STEEL SERVICES ALONG FORRESTAL DRIVE AND ABANDON 39 STEEL SERVICES TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 24 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
693 080.52827 3
INSTALL 360 FEET OF 2 INCH POLY AND ABANDON 120 FEET OF 2 INCH , 85 FEET OF 3 INCH STEEL, 90 FEET OF 3 INCH,AND 25 FEET OF 2 INCH POLY ALONG HOLLY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOSSOM
SYSTEM INTEGRITY DECEMBER
694 080.52838 11
INSTALL 1300 FEET OF 6 INCH POLY AND ABANDON 1300 FEET OF 10 INCH STEEL ALONG MILAM DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
695 080.52840 40
RELOCATE FACILITIES. INSTALL 1600 FEET OF 4 INCH POLY AND ABANDON 1513 FEET OF 4 INCH POLY AND 49 FEET OF 6 INCH STEEL ALONG LOY LAKE ROAD TO ACCOMMODATE CITY OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
696 080.52852 21
INSTALL 308 FEET OF 4 INCH POLY ALONG HUBBY AVENUE AND ABANDON 240 FEET OF 4 INCH CAST IRON AND 50 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
697 080.52853 11
INSTALL 180 FEET OF 4 INCH AND 40 FEET OF 6 INCH POLY ALONG JEFFERSON AVENUE AND ABANDON 113 FEET OF 4 INCH CAST IRON, 407 FEET OF 2 INCH STEEL AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
698 080.52875 127
INSTALL 3100 FEET OF 2 INCH POLY AND ABANDON 3110 FEET OF 3 INCH STEEL ALONG BENNINGTON DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
699 080.52882 1
RELOCATE FACILITIES. INSTALL (16) POLY SERVICES AND ABANDON (16) POLY SERVICES ALONG CAPETOWN DRIVE TO ACCOMMODATE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
700 080.52896 2,165 INSTALL 330 FEET OF 4 INCH AND 2800 FEET OF 2 INCH POLY ALONG STREETS OF THE CROSSING AT LICK CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JULY
701 080.52904 741
INSTALL 1750 FEET OF 2 INCH POLY AND ABANDON 1750 FEET OF 4 INCH CAST IRON ALONG LELAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
702 080.52906 (2,943)
INSTALL 19050 FEET OF 4 INCH STEEL AND 45 FEET OF 6 INCH POLY AND ABANDON 18930 FEET OF 4 INCH STEEL AND 3 FEET OF 6 INCH POLY ON LINE E10-5 IN GRAYSON COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOWE
SYSTEM INTEGRITY DECEMBER
703 080.52909 2,073
INSTALL 1250 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY AND ABANDON 1570 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
704 080.52910 289
INSTALL 1130 OF 8 INCH POLY AND ABANDON 1130 FEET OF 10 INCH STEEL IN DALLAS ALONG SYCAMORE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
705 080.52913 165
INSTALL 330 FEET OF 4 INCH POLY AND ABANDON 325 FEET OF 4 INCH STEEL ALONG FIFTH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
706 080.52914 90
RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH POLY AND THREE 0.75 INCH POLY SERVICES ALONG BOMAR AVENUE AND ABANDON 720 FEET OF 4 INCH STEEL AND 3 SERVICES TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
707 080.52917 6,329
INSTALL 3850 FEET OF 4 INCH AND 355 FEET OF 2 INCH POLY ALONG WESTLAKE AND ABANDON 835 FEET OF 6 INCH AND 3350 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
708 080.52933 24
INSTALL 1270 FEET OF 2 INCH POLY, 23 SERVICES AND ABANDON 870 FEET OF 4 INCH CAST IRON AND 545 FEET OF 2 INCH STEEL ALONG WAWEENOC AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
709 080.52936 287
INSTALL 1820 FEET OF 2 INCH POLY ALONG WAWEENOC AVENUE AND ABANDON 1310 FEET OF 4 INCH CAST IRON AND 740 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
710 080.52943 6
RELOCATE FACILITIES. ABANDON 40 FEET OF 4 INCH POLY ALONG HIDDEN LAKE CROSSING TO ACCOMMODATE CITY OF PFLUGERVILLE CITY ROAD PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE
SYSTEM INTEGRITY DECEMBER
711 080.52950 1
RELOCATE FACILITIES. INSTALL 360 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 3 INCH STEEL ALONG WEST AVENUE TO ACCOMMODATE CITY OF BELTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON
SYSTEM INTEGRITY DECEMBER
712 080.52954 4
INSTALL 260 FEET OF 2 INCH POLY AND ABANDON 260 FEET OF 2.5 INCH STEEL ALONG PECAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA
SYSTEM INTEGRITY DECEMBER
713 080.52955 46
RELOCATE FACILITIES. INSTALL 2400 FEET OF 6 INCH, 40 FEET OF 4 INCH, 20 FEET OF 2 INCH AND 40 FEET OF 3 INCH POLY ALONG THE STREETS OF DANIELDALE AND ABANDON 2020 FEET OF 4 INCH, 141 FEET OF 2 INCH, 322 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF LANCASTER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER
SYSTEM INTEGRITY DECEMBER
714 080.52958 96
INSTALL 1280 FEET OF 4 INCH POLY AND ABANDON 1820 FEET OF 6 INCH CAST IRON ALONG KINGS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
715 080.52960 81
INSTALL 1653 FEET 4 INCH POLY, 318 FEET OF 2 INCH POLY INCH ALONG NORTH 30TH STREET AND ABANDON 88 FEET OF 6 INCH STEEL, 924 FEET 4 INCH STEEL, 575 FEET OF 3 INCH STEEL,314 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
716 080.52961 16
INSTALL 1335 FEET OF 8 INCH POLY, AND 30 FEET OF 2 INCH POLY AND ABANDON 1257 FEET OF 8 INCH STEEL AND 75 FEET OF 8 INCH STEEL ALONG WASHINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
717 080.52962 11
INSTALL 1470 FEET OF 2 INCH POLY ALONG KINGS ROAD NORTH AND ABANDON 1470 OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
718 080.52966 4
INSTALL 1560 FEET OF 4 INCH POLY AND ABANDON 240 FEET OF 6 INCH STEEL, 1100 FEET OF 4 INCH STEEL, AND 460 FEET OF 2 INCH STEEL ALONG WEST OAK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA
SYSTEM INTEGRITY DECEMBER
719 080.52971 0
INSTALL STEEL SERVICES IN FARMERS BRANCH AND ABANDON STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY SEPTEMBER
720 080.52978 0
RELOCATE FACILITIES. INSTALL 210 FEET OF 2 INCH POLY, ABANDON 650 FEET OF 2 INCH POLY ALONG WASHINGTON STREET TO ACCOMMODATE CITY OF STEPHENVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
721 080.52982 129
INSTALL 2020 FEET 4 INCH POLY ALONG CONNOR ROAD AND ABANDON 3160 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 25 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
722 080.52989 2
INSTALL 660 FEET OF 4 INCH,200 FEET OF 2 INCH POLY AND ABANDON 1025 FEET OF 3 INCH, 45 FEET OF 4 INCH STEEL ALONG COMMERCE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BREMOND
SYSTEM INTEGRITY DECEMBER
723 080.52998 7
INSTALL 295 FEET OF 4 INCH POLY ALONG COLCORD AVENUE AND ABANDON 310 FEET OF 4 INCH CAST IRON AND 295 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
724 080.53002 5,979
INSTALL 2355 FEET OF 8 INCH, 10 FEET OF 6 INCH, 11110 FEET OF 4 INCH AND 4825 FEET OF 2 INCH POLY ALONG STREETS OF HILLS AT LEGACY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH AUGUST
725 080.53005 775
INSTALL 765 FEET OF 4 INCH POLY AND 905 FEET OF 2 INCH POLY ALONG WESTSIDE DRIVE AND ABANDON 760 FEET OF 6 INCH CAST IRON AND 945 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
726 080.53007 1,140
INSTALL 950 FEET OF 4 INCH POLY AND 150 FEET OF 2 INCH POLY ALONG WENONAH DRIVE AND ABANDON 930 FEET OF 4 INCH AND 800 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
727 080.53009 165
INSTALL 3100 FEET OF 4 INCH POLY AND 39 0.75 INCH SERVICES AND ABANDON 900 FEET OF 4 INCH STEEL, 1945 FEET OF 4 INCH CAST IRON ALONG FREDDIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
728 080.53019 149
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG GOODNIGHT LANE AND ABANDON 750 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
729 080.53024 (1)
INSTALL 2 INCH DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG BUTTERNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
730 080.53031 57
INSTALL DISTRICT REGULATOR STATION AND ABANDON 6 INCH METER AND DISTRICT REGULATOR STATION FEEDING PETERBILT ALONG PRECISION DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
731 080.53046 60
INSTALL 575 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 4 INCH CAST IRON ALONG WASHINGTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
732 080.53048 781
INSTALL 1150 FEET OF 4 INCH AND 690 FEET OF 2 INCH POLY ALONG COLLEGE STREET AND ABANDON 3615 FEET OF 4 INCH CAST IRON AND 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
733 080.53070 (0)
RELOCATE FACILITIES. INSTALL 430 FEET OF 2 INCH POLY ALONG STATE HIGHWAY 21 AND ABANDON 400 FEET OF 1.25 INCH STEEL TO ACCOMMODATE CITY OF AUSTONIO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUSTONIO
SYSTEM INTEGRITY DECEMBER
734 080.53075 134
INSTALL 2490 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 1366 FEET OF 4 INCH , 661 FEET OF 3 INCH , 386 FEET OF 2 INCH STEEL, 400 FEET OF 3 INCH, AND 259 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILFORD
SYSTEM INTEGRITY DECEMBER
735 080.53080 11
INSTALL 400 FEET OF 6 INCH POLY, TWO 3/4 INCH STEEL SERVICES WITH 3/4 INCH POLY. ABANDON 400 FEET OF 6 INCH STEEL AND TWO 3/4 INCH STEEL SERVICES ALONG SOUTH JIM MILLER DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
736 080.53081 46
INSTALL 1990 FEET OF 4 INCH POLY ALONG GLENMORE ROAD AND ABANDON 1990 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
737 080.53082 21
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH AND 120 FEET OF 6 INCH POLY ALONG CROCKETT AND ABANDON 285 FEET OF 3 INCH AND 110 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF PROSPER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER
SYSTEM INTEGRITY DECEMBER
738 080.53087 131
INSTALL 2341 FEET OF 4 INCH AND 416 FEET OF 2 INCH POLY ALONG ALAMEDA STREET AND ABANDON 657 FEET OF 2 INCH, 2172 FEET OF 4 INCH, 83 FEET OF 6 INCH STEEL AND 98 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK
SYSTEM INTEGRITY DECEMBER
739 080.53088 21
INSTALL 2024 FEET OF 4 INCH POLY ALONG KIRKWOOD STREET AND ABANDON 26 FEET OF 2 INCH, 532 FEET OF 3 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
740 080.53089 5
INSTALL 74 FEET OF 2 INCH AND 458 FEET OF 4 INCH POLY ALONG PLUM AND ABANDON 532 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
741 080.53092 0
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH STEEL ALONG SOUTH ALLEY STREET TO ACCOMMODATE CITY OF OLDEN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLDEN
SYSTEM INTEGRITY DECEMBER
742 080.53099 176
INSTALL 1000 FEET OF 4 INCH AND 595 FEET OF 2 INCH POLY ALONG CHERRY AND ABANDON 964 FEET OF 4 INCH, 419 FEET OF 2 INCH STEEL, 36 FEET OF 3 INCH AND 156 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
743 080.53104 464
INSTALL 1293 FEET OF 2 INCH AND 850 FEET OF 4 INCH POLY ALONG THE STREETS OF SANTA RITA NORTH SECTION 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
744 080.53105 15
INSTALL 1607 FEET OF 2 INCH POLY AND ABANDON 1398 FEET OF 2 INCH STEEL AND 279 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW
SYSTEM INTEGRITY DECEMBER
745 080.53106 4
INSTALL 435 FEET OF 2 INCH POLY ALONG SOUTH 4TH STREET AND ABANDON 405 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW
SYSTEM INTEGRITY DECEMBER
746 080.53117 13
INSTALL 540 FEET OF 2 INCH POLY AND ABANDON 540 FEET OF 2 INCH STEEL ALONG BETHEL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL
SYSTEM INTEGRITY DECEMBER
747 080.53127 12
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY AND ABANDON 190 FEET OF 3 INCH STEEL ON FARM TO MARKET ROAD 1836 EAST TO ACCOMMODATE CITY OF KAUFMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
748 080.53143 41
INSTALL 1275 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH POLY AND 900 FEET OF 4 INCH CAST IRON ALONG GRAINGER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
749 080.53153 1,038
INSTALL 2210 FEET OF 2 INCH POLY ALONG ROANOKE AND ABANDON 100 FEET OF 8 INCH AND 1500 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
750 080.53159 775
INSTALL 2345 FEET OF 2 INCH POLY ALONG LANGDON ALLEY AND ABANDON 110 FEET OF 4 INCH POLY, 1900 FEET OF 6 INCH, AND 430 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 26 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
751 080.53160 684
INSTALL 2835 FEET OF 2 INCH POLY ALONG GILFORD STREET AND ABANDON 130 FEET OF 4 INCH, 545 FEET OF 8 INCH POLY, 1880 FEET OF 4 INCH, 564 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
752 080.53162 (0)
RELOCATE FACILITIES. INSTALL 35 FEET OF 6 INCH POLY ALONG MELTON STREET AND ABANDON 35 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
753 080.53166 (0)
INSTALL 700 FEET OF 4 INCH POLY ALONG 3RD STREET AND ABANDON 640 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
754 080.53168 3,983
INSTALL 585 FEET OF 2 INCH POLY AND 2232 FEET OF 8 INCH POLY AND ABANDON 1575 FEET OF 6 INCH STEEL ALONG TRADE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS
SYSTEM INTEGRITY DECEMBER
755 080.53173 5
INSTALL 550 FEET OF 4 INCH POLY ALONG UNIVERSITY DRIVE AND ABANDON 40 FEET OF 4 INCH, 500 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
756 080.53174 458
INSTALL 4142 FEET OF 4 INCH STEEL ALONG LINE M4 AND ABANDON 4142 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW
SYSTEM INTEGRITY DECEMBER
757 080.53178 58
INSTALL 10363 FEET OF 4 INCH STEEL AND ABANDON 10343 FEET OF 4 INCH STEEL ALONG LINE G3 IN COOKE COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MYRA
SYSTEM INTEGRITY DECEMBER
758 080.53179 84
RELOCATE FACILITIES. INSTALL 1031 FEET OF 2 INCH POLY AND ABANDON 1021 FEET OF 2 INCH STEEL ALONG LLOYD AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
759 080.53186 4 INSTALL COMPOSITE WRAP ALONG LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
760 080.53189 2,236
INSTALL 2550 FEET OF 2 INCH POLY AND ABANDON 2100 FEET OF 4 INCH CAST IRON AND 275 FEET OF 4 INCH POLY ALONG SHELBY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
761 080.53190 3
INSTALL 7 COUPON TEST STATION AND REMOTE MONITORING UNITS ALONG KIEST DART IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
762 080.53191 47
RELOCATE FACILITIES.INSTALL 590 FEET OF 2 INCH, 850 FEET OF 4 INCH POLY,10 LONG AND 7 SHORT SERVICES. ABANDON 845 FEET OF 2 INCH STEEL AND 585 FEET OF 2 INCH POLY ALONG SOUTH 3RD STREET FROM EAST HAZELWOOD STREET TO ACCOMMODATE CITY OF PRINCETON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
SYSTEM INTEGRITY DECEMBER
763 080.53192 39
INSTALL 1370 FEET OF 2 INCH POLY, (7) 0.75 INCH SERVICES AND ABANDON 930 FEET OF 4 INCH, 60 FEET OF 6 INCH STEEL,240 FEET OF 4 INCH CAST IRON, 140 FEET OF 4 INCH POLY AND (7) SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
764 080.53193 2
INSTALL 400 FEET OF 2 INCH POLY ALONG KIRKWOOD AND ABANDON 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
765 080.53195 1,145
INSTALL 1830 FEET OF 2 INCH POLY ALONG PINE AND ABANDON 1830 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
766 080.53199 2,099
INSTALL 381 FEET OF 2 INCH AND 2349 FEET OF 4 INCH POLY ALONG 4TH STREET AND ABANDON 377 FEET OF 2 INCH AND 2345 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
767 080.53200 83
INSTALL 1350 FEET OF 2 INCH POLY, NINETEEN 0.75 INCH SERVICES ALONG FITZHUGH STREET AND ABANDON 900 FEET OF 4 INCH CAST IRON, 317 FEET OF 4 INCH STEEL AND 19 SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
768 080.53202 55 INSTALL 7000 FEET OF 8 INCH POLY ALONG STREETS OF ORCHARD RIDGE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH MARCH
769 080.53203 98
INSTALL 1880 FEET OF 2 INCH POLY ALONG RAMONA AND ABANDON 1790 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
770 080.53204 305
INSTALL 1630 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 8 INCH POLY, 1605 FEET OF 8 INCH AND 235 FEET OF 4 INCH CAST IRON ALONG DAVIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
771 080.53205 56
RELOCATE FACILITIES. INSTALL 245 FEET OF 2 INCH POLY, (2) 0.75 INCH POLY SERVICE LINES AND ABANDON 54 FEET OF 4 INCH , 171 FEET OF 2 INCH STEEL AND (2) 0.50 INCH SERVICE LINES ALONG HARDEMAN STREET TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
772 080.53207 1
INSTALL 548 FEET OF 2 INCH POLY ALONG THE STREETS OF PETIT AND SOUTH AND ABANDON 548 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THROCKMORTON
SYSTEM INTEGRITY DECEMBER
773 080.53214 3,568
INSTALL 4510 FEET OF 4 INCH AND 1870 FEET OF 2 INCH POLY ALONG 15TH STREET AND ABANDON 484 FEET OF 6 INCH, 1837 FEET OF 4 INCH AND 794 FEET OF 2 INCH CAST IRON, 200 FEET OF 4 INCH, 1692 FEET OF 2 INCH STEEL, 436 FEET OF 4 INCH AND 1218 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
774 080.53215 2,059
INSTALL 1800 FEET 4 INCH AND 475 FEET 2 INCH POLY ALONG REUTER STREET AND ABANDON 1201 FEET 4 INCH, 319 FEET 2 INCH CAST IRON, 390 FEET 4 INCH, 438 FEET 2 INCH, 647 FEET 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
775 080.53216 0
INSTALL 455 FEET OF 4 INCH POLY ALONG STREETS OF AVENUE J AND ABANDON 390 FEET OF 4 INCH, 24 FEET OF 2 INCH STEEL AND 41 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON
SYSTEM INTEGRITY DECEMBER
776 080.53217 3
INSTALL 120 FEET OF 4 INCH POLY AND 879 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 4 INCH, 1230 FEET OF 2 INCH STEEL, AND 15 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART
SYSTEM INTEGRITY DECEMBER
777 080.53219 82
INSTALL 1560 FEET OF 4 INCH POLY AND ABANDON 1410 FEET OF 3 INCH STEEL AND 150 FEET OF 3 INCH POLY ALONG BRIDGE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
778 080.53221 126,020
RELOCATE FACILITIES. INSTALL 324 FEET OF 2 INCH AND 7346 FEET OF 4 INCH POLY AND ABANDON 4530 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY AND 325 FEET OF 4 INCH POLY ALONG ABRAM STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
779 080.53238 388
INSTALL 1170 FEET OF 4 INCH POLY ALONG NAKONA DRIVE AND ABANDON 1590 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 27 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
780 080.53242 171
INSTALL 1540 FEET OF 2 INCH POLY ALONG BIDDISON STREET AND ABANDON 620 FEET OF 6 INCH, 430 FEET OF 4 INCH CAST IRON AND 180 FEET OF 2 INCH, AND 670 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
781 080.53254 878
INSTALL 2248 FEET OF 2 INCH POLY AND ABANDON 2675 FEET OF 4 INCH CAST IRON ALONG PARNELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
782 080.53261 0 INSTALL AC MITIGATION ALONG LINE J2 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
783 080.53265 19,739
RELOCATE FACILITIES. INSTALL 4350 FEET OF 4 INCH ALONG BALLPARK WAY AND ABANDON 3540 FEET OF 3 INCH STEEL TO ACCOMMODATE TXDOT SH 360 PROJECT IN ARLINGTON. ALL CUSTOMERS ARLINGTON
RELOCATION OF FACILITIES NOVEMBER
784 080.53268 212
INSTALL 2500 FEET OF 2 INCH POLY AND ABANDON 2500 FEET OF 2 INCH POLY ALONG KERR TRAIL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
785 080.53270 530
INSTALL 2188 FEET OF 2 INCH AND 388 FEET OF 4 INCH POLY ALONG CRENSHAW AVENUE AND ABANDON 2006 FEET OF 4 INCH CAST IRON AND 634 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
786 080.53271 12,886
INSTALL 935 FEET OF 6 INCH AND 1920 FEET OF 2 INCH POLY ALONG STREETS OF NEW LONE STAR HEIGHTS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH DECEMBER
787 080.53273 13,917 INSTALL 4300 FEET OF 2 INCH AND 2510 FEET OF 4 INCH POLY ALONG STREETS OF TANNERS MILL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH NOVEMBER
788 080.53274 (1)
INSTALL 780 FEET OF 4 INCH POLY AND ABANDON 780 FEET OF 4 INCH STEEL ALONG STREETS OF SOUTH OF FOXCROFT CIRCLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
789 080.53277 1,175
INSTALL 1200 FEET OF 2 INCH POLY, REPLACE 8 3/4 INCH SERVICES ALONG WEST CLARENDON DRIVE AND ABANDON 1575 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
790 080.53282 67
INSTALL 1274 FEET OF 2 INCH POLY AND 266 FEET OF 4 INCH POLY ALONG WEST 2ND STREET AND ABANDON IN PLACE 1388 FEET OF 3 INCH STEEL, 174 FEET OF 2 INCH STEEL AND 206 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
791 080.53297 108
INSTALL 2025 FEET OF 2 INCH POLY AND 26 3/4 INCH POLY SERVICES. ABANDON 600 FEET OF 6 INCH CAST IRON ALONG WALDRON ROAD, 460 FEET OF 4 INCH CAST IRON AND 460 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
792 080.53299 36,598
INSTALL 770 FEET OF 4 INCH AND 4860 FEET OF 2 INCH POLY ALONG THE STREETS OF DOVE CHASE PHASE 1 SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH DECEMBER
793 080.53302 635
INSTALL 1760 FEET OF 2 INCH POLY ALONG SOUTH BISHOP AVE AND ABANDON 525 FEET OF 4 INCH AND 1235 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
794 080.53322 127
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH, 250 FEET OF 2 INCH POLY ALONG BAMBOO AND ABANDON 225 FEET OF 2 INCH, 100 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
795 080.53323 84
INSTALL 540 FEET OF 8 INCH AND 700 FEET OF 2 INCH POLY ALONG SANTA FE STREET AND ABANDON 802 FEET OF 2 INCH AND 587 FEET OF 12 INCH STEEL, AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
796 080.53325 32
INSTALL 2756 FEET OF 2 INCH POLY AND ABANDON 10 FEET OF 3 INCH, 1096 FEET OF 4 INCH STEEL AND 1040 FEET OF 4 INCH CAST IRON ALONG GRAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
797 080.53333 17,965
RELOCATE FACILITIES. INSTALL 28 FEET OF 2 INCH STEEL AND 2658 FEET OF 4 INCH POLY AND ABANDON 485 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET PROJECT. ALL CUSTOMERS ARLINGTON
RELOCATION OF FACILITIES NOVEMBER
798 080.53343 0
RELOCATE FACILITIES. INSTALL 160 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY MAIN AND ABANDON 160 FEET OF 4 INCH, 100 FEET OF 2 INCH STEEL ALONG 11TH STREET TO ACCOMMODATE CITY OF BRIDGEPORT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRIDGEPORT
SYSTEM INTEGRITY DECEMBER
799 080.53351 11
INSTALL 450 FEET OF 2 INCH POLY, (6) 0.75 INCH POLY SERVICE LINES AND ABANDON 450 FEET OF 2 INCH POLY, (6) POLY SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CARROLLTON
SYSTEM INTEGRITY DECEMBER
800 080.53363 8,193
RELOCATE FACILITIES. INSTALL 1030 FEET OF 6 INCH POLY AND ABANDON 678 FEET OF 3 INCH AND 350 FEET OF 6 INCH STEEL ALONG STATE HIGHWAY 360 FROM AVENUE K TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT. ALL CUSTOMERS GRAND PRAIRI
RELOCATION OF FACILITIES NOVEMBER
801 080.53366 948 INSTALL 1340 FEET OF 6 INCH AND 9085 FEET OF 2 INCH POLY ALONG THE STREETS OF ARTESIA NORTH PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH NOVEMBER
802 080.53367 37,886
INSTALL 7045 FEET OF 2 INCH, 190 FEET OF 4 INCH AND 2410 FEET OF 6 INCH POLY ALONG THE STREETS OF HIGHLANDS AT WEST RIDGE PHASE 9. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
803 080.53368 11
RELOCATE FACILITIES. INSTALL 780 FEET OF 6 INCH, 130 FEET OF 4 INCH POLY ALONG ROCK PRAIRIE AND ABANDON 760 FEET OF 6 INCH, 120 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
804 080.53377 42
INSTALL 350 FEET OF 4 INCH AND 130 FEET OF 6 INCH POLY ALONG FALL CREEK DRIVE AND ABANDON 1261 FEET OF 3 INCH AND 126 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
805 080.53379 97
INSTALL 515 FEET OF 2 INCH POLY ALONG CREEKWOOD CIRCLE AND ABANDON 515 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
806 080.53380 0
INSTALL (2) 6 INCH REGULATORS AND ABANDON (2) 6 INCH REGULATORS AT PLANO SOUTH STATION ALONG STREETS OF AVENUE K IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
807 080.53384 79,490
RELOCATE FACILITIES. INSTALL 310 FEET OF 6 INCH AND 5927 FEET OF 8 INCH POLY ALONG SOUTHWEST PARKWAY AND ABANDON 37 FEET OF 4 INCH, 208 FEET OF 6 INCH, AND 5185 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRI
SYSTEM INTEGRITY DECEMBER
808 080.53385 15,085
INSTALL AC MITIGATION FACILITIES ALONG LINE D17 IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
809 080.53392 233
INSTALL 1100 FEET OF 4 INCH POLY AND 26 0.75 INCH SERVICES. ABANDON 1100 FEET OF 3 INCH STEEL ALONG ALCORN ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 28 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
810 080.53398 7
INSTALL REGULATOR AND RELIEF VALVE AND ABANDON REGULATOR AND RELIEF VALVE IN CITY OF GAINESVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
811 080.53400 (2)
INSTALL REGULATOR AND RELIEF VALVE AND ABANDON REGULATOR AND RELIEF VALVE IN THE CITY OF GAINESVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
812 080.53407 5
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 180 FEET OF 1.25 INCH STEEL ALONG FM 1280 TO ACCOMMODATE CITY OF AUSTONIO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUSTONIO
SYSTEM INTEGRITY DECEMBER
813 080.53409 63
RELOCATE FACILITIES. INSTALL 910 FEET OF 6 INCH POLY, 40 FEET OF 4 INCH POLY ALONG 24TH SOUTHEAST STREET AND ABANDON 860 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF PARIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
814 080.53419 2,583 INSTALL 5835 FEET OF 2 INCH POLY ALONG BRIDGE CREEK ESTATES SECTION 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH JANUARY
815 080.53422 21
INSTALL 920 FEET OF 16 INCH STEEL ALONG LINE C16 AND ABANDON 920 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD
SYSTEM INTEGRITY DECEMBER
816 080.53427 2,268
RELOCATE FACILITIES. INSTALL 301 FEET OF 2 INCH POLY, 235 FEET OF 4 INCH POLY, AND 2736 FEET OF 6 INCH POLY AND ABANDON 1175 FEET OF 2 INCH STEEL, 293 FEET OF 2 INCH POLY, 224 FEET OF 4 INCH, AND 1884 FEET OF 6 INCH STEEL ALONG ACOSTA STREET TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
817 080.53428 212
RELOCATE FACILITIES. INSTALL 75 FEET OF 2 INCH AND 305 FEET OF 4 INCH POLY AND ABANDON 127 FEET OF 2 INCH, 148 FEET OF 4 INCH POLY AND 115 FEET OF 4 INCH STEEL ALONG MAIN STREET TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
818 080.53444 (0)
INSTALL 20 FEET OF 8 INCH STEEL AND ABANDON 20 FEET OF 8 INCH STEEL ALONG SIMPSON STUART IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
819 080.53449 1
INSTALL 275 FEET OF 4 INCH POLY ALONG SAYLES AND ABANDON 25 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
820 080.53450 189
INSTALL 1300 FEET OF 4 INCH POLY AND 14 SERVICES ALONG SYCAMORE AND ABANDON 1300 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
821 080.53451 1,239
INSTALL 1170 FEET OF 2 INCH POLY ALONG DELAWARE AND ABANDON 1170 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
822 080.53467 77
INSTALL 1860 FEET OF 4 INCH AND 100 FEET OF 2 INCH POLY ALONG LAMBERTH ROAD AND ABANDON 1860 FEET OF 4 INCH STEL AND 100 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
823 080.53473 6,495
INSTALL 1104 FEET OF 6 INCH, 3522 FEET OF 4 INCH AND 4755 FEET OF 2 INCH POLY ALONG THE STREETS OF GLEN CROSSING PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH NOVEMBER
824 080.53479 7,958
RELOCATE FACILITIES. INSTALL 400 FEET OF 8 INCH AND 6900 FEET OF 6 INCH, 700 FEET OF 4 INCH AND 1200 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 8 INCH, 1150 FEET OF 4 INCH, AND 5900 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS
SYSTEM INTEGRITY DECEMBER
825 080.53481 1,241
RELOCATE FACILITIES. INSTALL 2000 FEET OF 2 INCH POLY ALONG HUDGINS STREET AND ABANDON 300 FEET OF 2 INCH, 590 FEET OF 3 INCH STEEL, 475 FEET OF 2 INCH, AND 60 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF GRAPEVINE RECONSTRUCTION PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
826 080.53495 1,967
INSTALL 2 FEET OF 2 INCH AND 2500 FEET OF 4 INCH POLY ALONG SOUTH HILLS AVENUE AND ABANDON 2000 FEET OF 6 INCH AND 700 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
827 080.53496 4
RELOCATE FACILITIES. INSTALL 750 FEET OF 4 INCH POLY ALONG BALL STREET AND ABANDON 610 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
828 080.53504 12,448
INSTALL 2860 FEET OF 2 INCH AND 2344 FEET OF 4 INCH POLY ALONG THE STREETS OF HIGHLANDS AT WEST RIDGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
829 080.53509 112
RELOCATE FACILITIES. INSTALL 2260 FEET OF 4 INCH POLY ALONG PECAN STREET AND ABANDON 2178 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BURNET STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET
SYSTEM INTEGRITY DECEMBER
830 080.53517 1 INSTALL (1) 12 INCH CLOCKSPRING ALONG LINE CA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANCTUARY
SYSTEM INTEGRITY DECEMBER
831 080.53523 2
INSTALL (50) STEEL SERVICES IN GRAND PRAIRIE AND ABANDON (50) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
832 080.53531 111
INSTALL 590 FEET OF 4 INCH POLY ALONG LITTLE JOHN AVENUE AND ABANDON 505 FEET OF 4 INCH CAST IRON AND 83 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
833 080.53533 294
RELOCATE FACILITIES. INSTALL (31) 1.25 INCH POLY SERVICE LINES AND ABANDON (31) 0.75 INCH POLY SERVICE LINES ALONG PINE BLUFF STREET TO ACCOMMODATE CITY OF PARIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
834 080.53535 2,201
RELOCATE FACILITIES. INSTALL 4560 FEET OF 6 INCH, 320 FEET OF 4 INCH, AND 760 FEET OF 2 INCH POLY ALONG PIPELINE ROAD AND ABANDON 4560 FEET OF 6 INCH, 320 FEET OF 4 INCH, AND 760 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF HURST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY DECEMBER
835 080.53555 815
INSTALL 1530 FEET OF 2 INCH POLY AND ABANDON 1920 FEET CAST IRON ALONG BECKLEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
836 080.53561 210
INSTALL 1285 FEET OF 2 INCH POLY ALONG MADISON AND ABANDON 85 FEET OF 2 INCH STEEL, 1720 FEET OF 4 INCH, AND 1325 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
837 080.53563 22 ABANDON 400 FEET OF 2 INCH STEEL ALONG EASTMAN ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
838 080.53564 12 INSTALL REGULATOR STATION AND ABANDON REGULATOR STATION IN PARIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 29 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
839 080.53568 87
RELOCATE FACILITIES. INSTALL 238 FEET OF 2 INCH, 910 FEET OF 4 INCH, AND 747 FEET OF 6 INCH POLY ALONG MLK AND ABANDON 200 FEET OF 2 INCH, 10 FEET OF 3 INCH STEEL, 131 FEET OF 4 INCH AND 246 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
840 080.53572 129
INSTALL 2100 FEET OF 4 INCH AND 480 FEET OF 2 INCH POLY ALONG POST OAK STREET AND ABANDON 1500 FEET OF 4 INCH, 780 FEET OF 3 INCH, AND 109 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
841 080.53582 43
INSTALL 400 FEET OF 4 INCH POLY ALONG 7TH AND ABANDON 400 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
842 080.53584 5
INSTALL 1066 FEET OF 4 INCH POLY ALONG CYPRESS ROAD AND ABANDON 1049 FEET OF 4 INCH STEEL, 21 FEET OF 4 INCH POLY AND 53 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
843 080.53589 137,892 INSTALL 3260 FEET OF 8 INCH POLY ALONG CRYSTAL BEND. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PFLUGERVILLE GROWTH NOVEMBER
844 080.53591 19,350
RELOCATE FACILITIES. INSTALL 6 FEET OF 2 INCH, 8 FEET OF 3 INCH, 231 FEET OF 4 INCH, AND 1091 FEET OF 6 INCH POLY ALONG NEW YORK AVENUE AND ABANDON 890 FEET OF 6 INCH, 160 FEET OF 3 INCH, AND 150 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
845 080.53592 80
INSTALL 302 FEET 6 INCH AND 696 FEET 4 INCH POLY ALONG AVENUE R AND ABANDON 675 FEET OF 4 INCH, 295 FEET OF 6 INCH STEEL, 4 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
846 080.53598 228
INSTALL 1835 FEET OF 2 INCH POLY ALONG BAILEY AND ABANDON 2095 FEET OF 3 INCH STEEL, 131 FEET OF 3 INCH AND 187 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
847 080.53599 0
RELOCATE FACILITIES. INSTALL 25 FEET OF 4 INCH POLY AND ABANDON 15 FEET OF 3 INCH POLY ALONG MOUNTAIN VIEW TO ACCOMMODATE CITY OF PFLUGERVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE
SYSTEM INTEGRITY SEPTEMBER
848 080.53608 12
RELOCATE FACILITIES. INSTALL 304 FEET OF 4 INCH POLY AND ABANDON 330 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF COPPELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL
SYSTEM INTEGRITY DECEMBER
849 080.53612 1,241
INSTALL 1175 FEET OF 4 INCH POLY AND ABANDON 1335 FEET OF 6 INCH CAST IRON ALONG NAKONA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
850 080.53614 300
INSTALL 370 FEET OF 4 INCH POLY ALONG EAST 26TH STREET AND ABANDON 360 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
851 080.53619 2,131
RELOCATE FACILITIES. INSTALL 4 FEET OF 3 INCH AND 3029 FEET OF 4 INCH POLY AND ABANDON 21 FEET OF 2 INCH, 2925 FEET OF 4 INCH CAST IRON, AND 67 FEET OF 4 INCH POLY ALONG BLUEBIRD AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
852 080.53623 360
INSTALL 1210 FEET OF 2 INCH POLY AND ABANDON 1160 FEET OF 4 INCH CAST IRON ALONG SOUTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
853 080.53624 1,163
INSTALL 1300 FEET OF 2 INCH POLY ALONG FITZHUGH AVENUE AND ABANDON 485 FEET OF 4 INCH AND 915 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
854 080.53625 30
INSTALL 480 FEET OF 2 INCH POLY ALONG SAN MARCOS AND ABANDON 470 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
855 080.53627 573
INSTALL 1320 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 4 INCH AND 1310 FEET OF 8 INCH CAST IRON ALONG HARDING STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
856 080.53631 (479)
RELOCATE FACILITIES. INSTALL 630 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH STEEL ALONG SH 175 TO ACCOMMODATE TXDOT ROAD PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES MARCH
857 080.53650 329 INSTALL AC MITIGATION ALONG LINE P7 AND P7-1 IN ROUND ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF 8209. ALL CUSTOMERS AUSTIN
SYSTEM INTEGRITY DECEMBER
858 080.53651 341
RELOCATE FACILITIES. INSTALL 217 FEET OF 4 INCH POLY ALONG RANCH ESTATES AND ABANDON 214 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
859 080.53652 1,107
RELOCATE FACILITIES. INSTALL 36 FEET OF 2 INCH AND 440 FEET OF 4 INCH POLY AND ABANDON 104 FEET OF 2 INCH POLY AND 440 FEET OF 4 INCH STEEL ALONG HOUSTON STREET TO ACCOMMODATE CITY OF GRANBURY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY
SYSTEM INTEGRITY DECEMBER
860 080.53654 2,905
RELOCATE FACILITIES. INSTALL 2706 FEET OF 2 INCH POLY AND ABANDON 2711 FEET OF 2 INCH STEEL AND 1566 FEET OF 3 INCH STEEL ALONG RIVERSIDE DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
861 080.53665 177
INSTALL 292 POLY SERVICES IN THE CITY OF FARMERS BRANCH AND ABANDON 292 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
862 080.53668 1,151
INSTALL 1235 FEET OF 2 INCH POLY ALONG NORTH ROSEMONT DRIVE AND ABANDON 170 FEET OF 2 INCH, 1187 FEET OF 6 INCH CAST IRON, AND 22 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
863 080.53669 232 ABANDON 1584 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
864 080.53670 859
INSTALL 364 POLY SERVICES IN THE CITY OF HURST AND ABANDON 364 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY DECEMBER
865 080.53671 5,216
INSTALL 3035 FEET OF 2 INCH POLY ALONG THACKERY AND ABANDON 2005 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
866 080.53674 4
INSTALL 485 FEET OF 4 INCH POLY AND ABANDON 485 FEET OF 2 INCH STEEL ALONG NEALTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD
SYSTEM INTEGRITY DECEMBER
867 080.53675 266
INSTALL 140 POLY SERVICES IN THE CITY OF CLEBURNE AND ABANDON 140 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 30 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
868 080.53676 12
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 1907 FEET OF 4 INCH STEEL ALONG LONGVIEW STREET TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
869 080.53677 100
RELOCATE FACILITIES. INSTALL 435 FEET OF 6 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON 425 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
870 080.53678 1,980
INSTALL 345 POLY SERVICES IN THE CITY OF GRAND PRAIRIE AND ABANDON 345 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
871 080.53679 182
INSTALL 228 POLY SERVICES ALONG CITY OF WAXAHACHIE AND ABANDON 228 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
872 080.53680 698
INSTALL 158 POLY SERVICES AND ABANDON 158 STEEL SERVICES IN THE CITY OF KERRVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN SABA
SYSTEM INTEGRITY DECEMBER
873 080.53681 258 INSTALL 338 POLY SERVICES AND ABANDON 338 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
874 080.53682 200
INSTALL 43 POLY SERVICES IN THE CITY OF GROESBECK AND ABANDON 43 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE
SYSTEM INTEGRITY DECEMBER
875 080.53684 24
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH AND 20 FEET OF 2 INCH POLY AND ABANDON 20 FEET OF 2 INCH AND 500 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF PALESTINE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
876 080.53685 1,034
INSTALL 488 POLY SERVICES IN THE CITY OF GARLAND AND ABANDON 488 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
877 080.53696 1,495
INSTALL 1600 FEET OF 6 INCH POLY ALONG MOCKINGBIRD LANE AND ABANDON 1645 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
878 080.53697 1,965
INSTALL 1200 FEET OF 2 INCH POLY ALONG MISTY WOOD STREET AND ABANDON 2202 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
879 080.53699 228
INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1328 FEET OF 2 INCH POLY ALONG STONEPORT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
880 080.53700 1,098
INSTALL 1330 FEET OF 2 INCH POLY ALONG ELAM ROAD AND ABANDON 980 FEET OF 2 INCH AND 530 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
881 080.53711 237 INSTALL (50) POLY SERVICES AND ABANDON (50) STEEL SERVICE LINES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
882 080.53712 284
INSTALL 1645 FEET OF 2 INCH POLY ALONG HOLMES STREET AND ABANDON 1645 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
883 080.53713 656
INSTALL 950 FEET OF 2 INCH POLY ALONG HICKMAN LANE AND ABANDON 941 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
884 080.53724 242
RELOCATE FACILITIES. INSTALL 2420 FEET OF 2 INCH AND 740 FEET OF 4 INCH POLY ALONG CYNISCA STREET AND ABANDON 2790 FEET OF 2 INCH AND 375 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
885 080.53730 73
RELOCATE FACILITIES. INSTALL 1945 FEET OF 2 INCH POLY ALONG WINDHAM STREET AND ABANDON 2788 FEET OF 4 INCH, 940 FEET OF 6 INCH CAST IRON, 447 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
886 080.53731 224
INSTALL 985 FEET OF 4 INCH, 840 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 4 INCH CAST IRON ALONG GARLAND ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
887 080.53739 13
INSTALL 540 FEET OF 2 INCH POLY AND ABANDON 553 FEET OF 2 INCH STEEL ALONG HOUSTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABBOTT
SYSTEM INTEGRITY DECEMBER
888 080.53740 15
INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 290 FEET OF 3 INCH STEEL AND 25 FEET OF 3 INCH POLY ALONG TEXAS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA
SYSTEM INTEGRITY DECEMBER
889 080.53742 (4)
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY ALONG BRIDGE CREEK DRIVE AND ABANDON 100 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
890 080.53743 4,741
RELOCATE FACILITIES. INSTALL 675 FEET OF 4 INCH STEEL AND ABANDON 504 FEET OF 4 INCH STEEL ALONG LINE M11 TO ACCOMMODATE TXDOT SH31 BYPASS IN HILL COUNTY. ALL CUSTOMERS HUBBARD
RELOCATION OF FACILITIES NOVEMBER
891 080.53748 17
INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 603 FEET OF 3 INCH STEEL ALONG MINTER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THROCKMORTON
SYSTEM INTEGRITY DECEMBER
892 080.53751 862
INSTALL 370 FEET OF 8 INCH POLY ALONG SALEM STREET AND ABANDON 370 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
893 080.53759 5,636 INSTALL 1724 FEET OF 2 INCH POLY ALONG THE STREETS OF ROLLING HILLS SECTION 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH JANUARY
894 080.53760 12,038
RELOCATE FACILITIES. INSTALL 485 FEET OF 2 INCH AND 1995 FEET OF 4 INCH POLY ALONG STATE HIGHWAY 360 AND ABANDON 490 FEET OF 2 INCH, 210 FEET OF 4 INCH POLY, 1815 FEET OF 4 INCH STEEL TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT. ALL CUSTOMERS ARLINGTON
RELOCATION OF FACILITIES NOVEMBER
895 080.53761 18,925
RELOCATE FACILITIES. INSTALL 31 FEET OF 4 INCH AND 1975 FEET OF 6 INCH AND 182 FEET OF 8 INCH POLY AND ABANDON 721 FEET OF 3 INCH POLY AND 2340 FEET OF 4 INCH STEEL AND 310 FEET OF 6 INCH POLY AND 497 FEET OF 8 INCH STEEL ALONG TXDOT SH360 TO ACCOMMODATE TXDOT STREET PROJECT. ALL CUSTOMERS ARLINGTON
RELOCATION OF FACILITIES NOVEMBER
896 080.53766 80
INSTALL 500 FEET OF 4 INCH POLY , 5 0.75 INCH SERVICES AND ABANDON 400 FEET OF 4 INCH CAST IRON, 1356 FEET OF 4 INCH STEEL ALONG BRYAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
897 080.53767 30
INSTALL 400 FEET OF 3 INCH STEEL ALONG MADISONVILLE AND ABANDON 400 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE
SYSTEM INTEGRITY DECEMBER
898 080.53778 270
INSTALL APPROXIMATELY 1677 FEET OF 4 INCH POLY ALONG BROADWAY AND ABANDON 1393 FEET OF 4 INCH AND 388 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 31 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
899 080.53779 376
INSTALL 1531 FEET OF 4 INCH POLY ALONG BRYAN STREET AND ABANDON 1531 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
900 080.53783 241
INSTALL 1130 FEET 4 INCH POLY AND ABANDON 1578 FEET OF 8 INCH CAST IRON AND 189 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
901 080.53785 295
INSTALL 1837 FEET OF 4 INCH POLY AND ABANDON 519 FEET OF 6 INCH, 1111 FEET OF 4 INCH CAST IRON, 167 FEET OF 2 INCH, AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
902 080.53797 30
INSTALL 850 FEET OF 2 INCH POLY ALONG PRIVATE ROAD AND ABANDON 1030 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MYRA
SYSTEM INTEGRITY DECEMBER
903 080.53807 1,421
INSTALL 90 FEET OF 2 INCH AND 1878 FEET OF 4 INCH POLY ALONG MAGNOLIA AVENUE AND ABANDON 285 FEET OF 4 INCH, 1570 FEET OF 6 INCH, AND 330 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
904 080.53809 220
INSTALL 1360 FEET OF 4 INCH POLY ALONG MISSOURI AVENUE AND ABANDON 878 FEET OF 4 INCH AND 1980 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
905 080.53810 1,758
INSTALL 688 FEET OF 2 INCH AND 2029 FEET OF 4 INCH POLY AND ABANDON 92 FEET OF 2 INCH, 403 FEET OF 4 INCH, 41 FEET OF 6 INCH AND 1692 FEET OF 8 INCH CAST IRON, 109 FEET OF 6 INCH, AND 35 FEET OF 8 INCH POLY ALONG TUCKER AT HEMPHILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
906 080.53811 1,233
INSTALL 1433 FEET OF 4 INCH POLY ALONG DAGGETT STREET AND ABANDON 1433 FEET OF 4 INCH CAST IRON AND 309 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
907 080.53812 27
INSTALL 750 FEET OF 2 INCH POLY ALONG OWENSVILLE STREET AND ABANDON 730 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN
SYSTEM INTEGRITY DECEMBER
908 080.53813 1,646
INSTALL 61 FEET OF 2 INCH AND 2210 FEET OF 4 INCH POLY AND ABANDON 1104 FEET OF 4 INCH CAST IRON ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
909 080.53822 1,575
INSTALL 1875 FEET OF 4 INCH POLY AND ABANDON 375 FEET OF 2 INCH STEEL AND 1200 FEET OF 4 INCH CAST IRON ALONG CANYON DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
910 080.53823 161
INSTALL 20 FEET OF 20 INCH STEEL AND ABANDON 20 FEET OF 20 INCH STEEL ALONG LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
911 080.53824 4,698
INSTALL 2340 FEET OF 4 INCH POLY ANF 35 FEET OF 8 INCH STEEL ALONG HIGHWAY 67 AND ABANDON 3900 FEET OF 20 INCH STEEL, 250 FEET OF 4 INCH AND 300 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
912 080.53826 41
RELOCATE FACILITIES. INSTALL 550 FEET OF 4 INCH AND 160 FEET OF 2 INCH POLY ALONG HILLSBORO STREET AND ABANDON 221 FEET OF 2 INCH, 696 FEET OF 3 INCH, AND 449 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF HILLSBORO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
913 080.53827 35
RELOCATE FACILITIES. INSTALL 500 FEET OF 4 INCH AND 60 FEET OF 2 INCH POLY ALONG 12TH STREET AND ABANDON 110 FEET OF 2 INCH, 17 FEET OF 3 INCH, 376 FEET OF 4 INCH STEEL, AND 74 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF BONHAM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM
SYSTEM INTEGRITY DECEMBER
914 080.53828 5 ABANDON 2150 FEET OF 2 INCH POLY ALONG STREETS OF LORAINE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LORAINE
SYSTEM INTEGRITY DECEMBER
915 080.53829 1,341
INSTALL 1330 FEET OF 2 INCH, 314 FEET OF 4 INCH AND 5 FEET OF 6 INCH POLY ALONG RAMEY STREET AND ABANDON 624 FEET OF 4 INCH AND 442 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
916 080.53830 17
RELOCATE FACILITIES. INSTALL 90 FEET OF 2 INCH POLY ALONG MELROSE DRIVE AND ABANDON 90 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
917 080.53831 1,870
INSTALL 1280 FEET OF 4 INCH POLY ALONG VIRGINIA STREET AND ABANDON 1210 FEET OF 4 INCH, 1170 FEET OF 6 INCH STEEL AND 94 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
918 080.53841 125
RELOCATE FACILITIES. INSTALL 1050 FEET OF 2 INCH POLY ALONG 27TH STREET AND ABANDON 982 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
919 080.53849 1,320
INSTALL 3645 FEET OF 2 INCH POLY ALONG VALLEY VIEW LANE AND ABANDON 3100 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
920 080.53856 3,497
INSTALL 2925 FEET OF 4 INCH AND 1250 FEET OF 2 INCH POLY AND ABANDON 1450 FEET OF 6 INCH AND 400 FEET OF 4 INCH CAST IRON ALONG EVANS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
921 080.53859 161
INSTALL 1700 FEET OF 2 INCH POLY ALONG WEBB CHAPEL AND ABANDON 1700 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
922 080.53874 5,815
INSTALL 6965 FEET OF 4 INCH POLY AND ABANDON 2827 FEET OF 6 INCH, 2400 FEET OF 4 INCH CAST IRON, 47 FEET OF 8 INCH, 616 FEET OF 4 INCH STEEL, 794 FEET OF 6 INCH, AND 281 FEET OF 4 INCH POLY ALONG MITCHELL BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
923 080.53878 12
INSTALL 25 FEET OF 8 INCH POLY AND ABANDON 25 FEET OF 8 INCH STEEL ALONG CASA VIEW STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
924 080.53881 11
INSTALL 255 FEET OF 4 INCH POLY ALONG STREETS OF TRENTMAN AND ABANDON 240 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
925 080.53885 341
INSTALL 1540 FEET OF 2 INCH POLY ALONG JEFFERSON AND ABANDON 1280 FEET OF 4 INCH, 580 FEET OF 6 INCH CAST IRON, AND 640 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
926 080.53891 319
RELOCATE FACILITIES. INSTALL 4 FEET OF 2 INCH, 3 FEET OF 3 INCH, 216 FEET OF 4 INCH POLY AND ABANDON 15 FEET OF 2 INCH, 2 FEET OF 3 INCH POLY, AND 200 FEET OF 3 INCH STEEL ALONG DUMONT TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
927 080.53892 9,278 INSTALL 3550 FEET OF 2 INCH AND 850 FEET OF 4 INCH POLY ALONG THE STREETS OF HOLLYHOCK PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH NOVEMBER
MTX AdditionsPage 32 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
928 080.53893 12,371 INSTALL 6375 FEET OF 2 INCH AND 3525 FEET OF 4 INCH POLY ALONG THE STREETS OF HOLLYHOCK PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH NOVEMBER
929 080.53894 12,990 INSTALL 5650 FEET OF 2 INCH POLY ALONG STREETS OF HOLLYHOCK PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH NOVEMBER
930 080.53895 361
INSTALL 200 FEET OF 12 INCH POLY ALONG MAURINE AND ABANDON 180 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
931 080.53909 25,329
RELOCATE FACILITIES. INSTALL 3900 FEET OF 24 INCH STEEL AND ABANDON 3175 FEET OF 24 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS WHEATLAND ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
932 080.53937 167
INSTALL 10 FEET OF 4 INCH POLY ALONG COLUMBUS AVENUE AND ABANDON REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
933 080.53956 10
INSTALL 430 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 314 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH ZULCH
SYSTEM INTEGRITY DECEMBER
934 080.53959 628
INSTALL 619 FEET OF 4 INCH POLY AND 126 FEET OF 2 INCH POLY AND ABANDON 570 FEET OF 3 INCH AND 116 FEET OF 2 INCH STEEL ALONG TERRELL STREETS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON
SYSTEM INTEGRITY DECEMBER
935 080.53968 129
INSTALL 980 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 850 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DAWSON
SYSTEM INTEGRITY DECEMBER
936 080.53974 26
INSTALL 650 FEET OF 2 INCH POLY ALONG PIERCE STREET AND ABANDON 155 FEET OF 2 INCH AND 660 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE
SYSTEM INTEGRITY DECEMBER
937 080.53981 593
RELOCATE FACILITIES. INSTALL 915 FEET OF 2 INCH POLY AND ABANDON 527 FEET OF 2 INCH AND 388 FEET OF 4 INCH STEEL ALONG HILL STREET TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
938 080.53992 1,842
RELOCATE FACILITIES. INSTALL 153 FEET OF 2 INCH AND 3030 FEET OF 4 INCH POLY AND ABANDON 524 FEET OF 2 INCH, 903 FEET OF 3 INCH, 888 FEET OF 4 INCH STEEL, 533 FEET OF 2 INCH, 36 FEET OF 4 INCH, AND 878 FEET OF 6 INCH POLY ALONG LOCUST STREET TO ACCOMMODATE CITY OF SULPHUR SPRINGS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
939 080.53994 78
INSTALL 470 FEET OF 4 INCH AND 755 FEET OF 2 INCH POLY ALONG FANCHER STREET AND ABANDON 684 FEET OF 4 INCH , 214 FEET OF 3 INCH, 449 FEET OF 2 INCH STEEL AND 103 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
940 080.53999 13
INSTALL 490 FEET OF 2 INCH POLY ALONG MAIN AVENUE AND ABANDON 417 FEET OF 2 INCH POLY AND 1395 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TALPA
SYSTEM INTEGRITY DECEMBER
941 080.54000 1,974
RELOCATE FACILITIES. INSTALL 807 FEET OF 2 INCH AND 1356 FEET OF 6 INCH POLY ALONG BELKNAP AND ABANDON 50 FEET OF 2 INCH, 55 FEET OF 6 INCH POLY AND 1356 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
942 080.54001 4,384 INSTALL 861 FEET OF 2 INCH POLY ALONG THE STREETS OF PATRIOT PLACE SECTION 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH JANUARY
943 080.54002 1,634
RELOCATE FACILITIES. INSTALL 957 FEET OF 4 INCH POLY ALONG MONTREAL CIRCLE AND ABANDON 875 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF HALTOM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
SYSTEM INTEGRITY DECEMBER
944 080.54003 62
INSTALL 535 FEET OF 2 INCH POLY ALONG GRAYSON AND ABANDON 535 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS POTTSBORO
SYSTEM INTEGRITY DECEMBER
945 080.54008 1,806
INSTALL 10 FEET OF 2 INCH, 24 FEET OF 8 INCH, 1295 FEET OF 12 INCH POLY AND ABANDON 70 FEET OF 2 INCH, 80 FEET OF 8 INCH, 65 FEET OF 12 INCH POLY, AND 820 FEET OF 18 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
946 080.54015 835
RELOCATE FACILITIES. INSTALL 312 FEET OF 2 INCH AND 139 FEET OF 4 INCH POLY AND ABANDON 118 FEET OF 2 INCH, 300 FEET OF 4 INCH, 7 FEET OF 6 INCH STEEL, AND 7 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
947 080.54017 11
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG SEETON ROAD AND ABANDON 100 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRI
SYSTEM INTEGRITY DECEMBER
948 080.54021 4,860
INSTALL 3625 FEET OF 4 INCH POLY ALONG BURCHILL ROAD AND ABANDON 1715 FEET OF 4 INCH CAST IRON, 1625 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
949 080.54037 6,056 INSTALL 4755 FEET OF 2 INCH POLY ALONG THE STREETS OF AUBURN HILLS PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
950 080.54040 (9)
INSTALL 768 FEET OF 2 INCH POLY ALONG BLUM STREET AND ABANDON 59 FEET OF 2 INCH, 656 FEET OF 6 INCH, AND 84 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
951 080.54043 6,458
RELOCATE FACILITIES. INSTALL 3706 FEET OF 4 INCH ALONG BOYD AVENUE AND ABANDON 81 FEET OF 2 INCH, 482 FEET OF 3 INCH , 1681 FEET OF 4 INCH CAST IRON , 2657 FEET OF 6 INCH CAST IRON , 220 FEET OF 4 INCH POLY, AND 50 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
952 080.54046 33,001
RELOCATE FACILITIES. INSTALL 1780 FEET OF 4 INCH POLY ALONG FIELDER ROAD AND ABANDON 1765 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON WATER AND SANITARY SEWER RENEWAL PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
953 080.54047 21
RELOCATE FACILITIES. INSTALL 385 FEET OF 2 INCH AND 118 FEET OF 4 INCH POLY IN MAGNOLIA STREET AND ABANDON 330 FEET OF 2 INCH, 92 FEET OF 4 INCH STEEL, 27 FEET OF 4 INCH AND 14 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF BROWNWOOD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
954 080.54050 2,389
INSTALL 4150 FEET OF 4 INCH POLY AND ABANDON 677 FEET OF 4 INCH CAST IRON , 600 FEET OF 4 INCH, 70 FEET OF 2 INCH POLY, 2358 FEET OF 4 INCH STEEL ALONG BURCHILL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
955 080.54051 6
INSTALL 260 FEET OF 4 INCH POLY ALONG AVENUE O AND ABANDON 260 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 33 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
956 080.54052 532
INSTALL 45 STEEL SERVICES ALONG CITY OF FORT WORTH AND ABANDON 45 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
957 080.54070 (1)
INSTALL 280 FEET OF 2 INCH POLY ALONG HOLLIDAY AND ABANDON 280 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
958 080.54081 259,756
INSTALL 4688 FEET OF 2 INCH, 1989 FEET OF 4 INCH AND 2050 FEET OF 6 INCH POLY ALONG THE STREETS OF VENTANA PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BENBROOK GROWTH MARCH
959 080.54086 1,614
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH AND 45 FEET OF 4 INCH POLY ALONG ARBOR LANE AND ABANDON 150 FEET OF 2 INCH POLY, 40 FEET OF 4 INCH POLY AND 5 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
960 080.54090 3,174
RELOCATE FACILITIES. INSTALL 280 FEET OF 6 INCH POLY ALONG OLD BURLESON ROAD AND ABANDON 270 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN TARRANT COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
961 080.54097 1,120
INSTALL 2000 FEET OF 4 INCH POLY ALONG REUNION STREET AND ABANDON 1100 FEET OF 2 INCH AND 900 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD
SYSTEM INTEGRITY DECEMBER
962 080.54112 12,186
RELOCATE FACILITIES. INSTALL 2300 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH, 265 FEET OF 2 INCH POLY, 180 FEET OF 4 INCH AND 550 FEET OF 2 INCH STEEL ALONG HICKORY STREET TO ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
963 080.54128 17
INSTALL 404 FEET OF 4 INCH POLY ALONG DUBOSE STREET AND ABANDON 404 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH
SYSTEM INTEGRITY DECEMBER
964 080.54131 12
INSTALL 200 FEET OF 2 INCH POLY ALONG WEST GROVE AND ABANDON 707 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY DECEMBER
965 080.54141 9,300
INSTALL 2165 FEET OF 2 INCH AND 1850 FEET OF 6 INCH POLY ALONG POTOMAC AVENUE AND ABANDON 2885 FEET OF 6 INCH AND 75 FEET OF 2 INCH CAST IRON, 575 FEET OF 4 INCH POLY, AND 190 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
966 080.54155 253
INSTALL 1755 FEET OF 2 INCH POLY ALONG HOLMES AND ABANDON 1335 FEET OF 4 INCH CAST IRON, 690 FEET OF 4 INCH, AND 145 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
967 080.54160 8,338
RELOCATE FACILITIES. INSTALL 2080 FEET OF 12 INCH STEEL ALONG SUBLETT ROAD AND ABANDON 51 FEET OF 2 INCH, 570 FEET OF 4 INCH POLY, AND 1720 FEET OF 12 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
968 080.54166 7,497
RELOCATE FACILITIES. INSTALL 2200 FEET OF 4 INCH AND 1400 FEET OF 2 INCH POLY ALONG SOUTH COLLEGE AVENUE AND ABANDON 1700 FEET OF 4 INCH, 110 FEET OF 3 INCH, 900 FEET OF 2 INCH STEEL, 320 FEET OF 2 INCH, AND 60 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
969 080.54183 680
INSTALL 350 FEET OF 2 INCH POLY AND 230 FEET OF 4 INCH POLY AND ABANDON 1016 FEET OF 8 INCH CAST IRON AND 1124 FEET OF 4 INCH CAST IRON AND 72 FEET OF 4 INCH POLY ALONG NORTH 32ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
970 080.54187 33,271 INSTALL 1250 FEET OF 4 INCH AND 3000 FEET OF 2 INCH POLY ALONG THE STREETS OF LADERA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH NOVEMBER
971 080.54195 2,855
RELOCATE FACILITIES. INSTALL 3387 FEET OF 4 INCH POLY ALONG COLONIAL PARKWAY AND ABANDON 1826 FEET OF 4 INCH STEEL, 959 FEET OF 6 INCH AND 506 FEET OF 4 INCH CAST IRON AND 610 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
972 080.54208 153
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG FRONT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITASCA
SYSTEM INTEGRITY DECEMBER
973 080.54210 901
INSTALL 1465 FEET OF 4 INCH POLY ALONG PINE STREET AND ABANDON 1565 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
974 080.54211 2,862
INSTALL 1950 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH, 385 FEET OF 6 INCH, AND 485 FEET OF 8 INCH CAST IRON ALONG CROZIER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
975 080.54213 880
INSTALL 1210 FEET OF 2 INCH POLY AND ABANDON 1210 FEET OF 4 INCH CAST IRON ALONG GARDEN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
976 080.54217 1,665
INSTALL 975 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY AND ABANDON 940 FEET OF 4 INCH CAST IRON ALONG LAWRENCE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
977 080.54236 1,186
RELOCATE FACILITIES. INSTALL 2218 FEET OF 2 INCH POLY AND ABANDON 301 FEET OF 2 INCH AND 1267 FEET OF 4 INCH STEEL AND 713 FEET OF 4 INCH POLY ALONG TRINITY STREET TO ACCOMMODATE CITY OF FORNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY
SYSTEM INTEGRITY DECEMBER
978 080.54253 7,991
RELOCATE FACILITIES. INSTALL 3961 FEET OF 4 INCH POLY ALONG NORTHWEST PARKWAY AND ABANDON 2930 FEET OF 4 INCH STEEL, 1005 FEET OF 4 INCH, 392 FEET OF 3 INCH, AND 86 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
979 080.54264 7,881
RELOCATE FACILITIES. INSTALL 1023 FEET OF 4 INCH, 210 FEET OF 2 INCH POLY AND ABANDON 1023 FEET OF 4 INCH STEEL ALONG ANGLE AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
980 080.54265 1,924
RELOCATE FACILITIES. INSTALL 770 FEET OF 4 INCH AND 1050 FEET OF 6 INCH POLY AND ABANDON 760 FEET OF 4 INCH AND 1040 FEET OF 6 INCH STEEL ALONG BUNTING TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 34 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
981 080.54270 15,608
RELOCATE FACILITIES. INSTALL 2715 FEET OF 4 INCH POLY AND ABANDON 2666 FEET OF 4 INCH CAST IRON ALONG ROBINSON STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
982 080.54273 4,211
RELOCATE FACILITIES. INSTALL 3458 FEET OF 6 INCH AND 140 FEET OF 2 INCH POLY ALONG OLD RANDOL MILL ROAD AND ABANDON 3236 FEET OF 6 INCH, 210 FEET OF 2 INCH STEEL AND 334 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
983 080.54284 770
INSTALL 300 FEET OF 2 INCH POLY ALONG WATER OAK STREET AND ABANDON 231 FEET OF 2 INCH AND 1061 FEET OF 4 INCH STEEL AND 495 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
984 080.54286 279
INSTALL 29 FEET OF 2 INCH, 5 FEET OF 3 INCH, AND 350 FEET OF 4 INCH POLY AND ABANDON 29 FEET OF 2 INCH, 5 FEET OF 3 INCH POLY AND 350 FEET OF 3 INCH STEEL ALONG WRIGHT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS
SYSTEM INTEGRITY DECEMBER
985 080.54287 1,183
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY AND ABANDON 840 FEET OF 3 INCH STEEL ALONG CLARENDON TO ACCOMMODATE CITY OF COCKRELL HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COCKRELL HILL
SYSTEM INTEGRITY DECEMBER
986 080.54291 4,369
RELOCATE FACILITIES. INSTALL 273 FEET OF 2 INCH , 244 FEET OF 4 INCH, 2040 FEET OF 6 INCH POLY AND ABANDON 224 FEET OF 2 INCH, 236 FEET OF 4 INCH, 1986 FEET OF 6 INCH POLY ALONG COLONY STREET TO ACCOMMODATE CITY OF CARROLLTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY
SYSTEM INTEGRITY DECEMBER
987 080.54299 1,002
RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH POLY AND 500 FEET OF 6 INCH POLY AND ABANDON 70 FEET OF 2 INCH POLY AND 380 FEET OF 10 INCH STEEL ALONG CESAR CHAVEZ TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
988 080.54302 652
RELOCATE FACILITIES. INSTALL 240 FEET OF 6 INCH POLY AND ABANDON 240 FEET OF 6 INCH POLY ALONG FLOWER MOUND ROAD TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
989 080.54306 194
RELOCATE FACILITIES. INSTALL 1655 FEET OF 4 INCH POLY AND ABANDON 1750 FEET OF 4 INCH POLY ALONG US 287 TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
990 080.54313 5,405
INSTALL (247) POLY SERVICES IN THE CITY OF FARMERS BRANCH AND ABANDON (247) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
991 080.54315 7,998
INSTALL (370) POLY SERVICES AND ABANDON (370) STEEL SERVICES IN THE CITIES OF HURST AND BEDFORD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY DECEMBER
992 080.54318 2,696
INSTALL (257) POLY SERVICES IN THE CITY OF EDGECLIFF VILLAGE AND ABANDON (257) STEEL SERVICES ALONG IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
993 080.54320 4,837
INSTALL (291) POLY SERVICES IN THE CITY OF ARLINGTON AND ABANDON (291) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
994 080.54321 24
RELOCATE FACILITIES. INSTALL (14) 0.75 INCH POLY SERVICES ALONG CATAMORE AND ABANDON (14) 0.75 INCH STEEL SERVICES TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
995 080.54322 1,070
INSTALL (140) POLY SERVICES IN THE CITY OF WAXAHACHIE AND ABANDON (140) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
996 080.54325 844 INSTALL 158 POLY SERVICES AND ABANDON 158 STEEL SERVICES IN BURNET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET
SYSTEM INTEGRITY DECEMBER
997 080.54327 1,610
INSTALL (194) STEEL SERVICES IN THE CITY OF BURNETT AND ABANDON (194) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET
SYSTEM INTEGRITY DECEMBER
998 080.54328 1,235
INSTALL (80) POLY SERVICES IN THE CITY OF ROUNDROCK AND ABANDON (80) STEEL SERVICES ALONG IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
999 080.54330 229 INSTALL 172 STEEL SERVICES IN MEXIA AND ABANDON 172 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
1000 080.54331 8,357
INSTALL (343) POLY SERVICES IN THE CITY OF GARLAND AND ABANDON (343) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1001 080.54333 62
INSTALL 720 FEET OF 2 INCH POLY ALONG BEAN STREET AND ABANDON 181 FEET OF 3 INCH CAST IRON AND 527 FEET OF 2 INCH STEEL IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOWE
SYSTEM INTEGRITY DECEMBER
1002 080.54340 1,245
INSTALL 1050 FEET OF 2 INCH POLY ALONG WINDOMERE AND ABANDON 1025 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1003 080.54341 2,170
INSTALL 2755 FEET OF 2 INCH POLY ALONG MONTCLAIR AND ABANDON 2233 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1004 080.54344 0
RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY AND ABANDON 60 FEET OF 2 INCH POLY ALONG CLARK STREET TO ACCOMMODATE CITY OF LITTLE ELM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM
SYSTEM INTEGRITY DECEMBER
1005 080.54345 165
RELOCATE FACILITIES. INSTALL 193 FEET OF 2 INCH POLY AND ABANDON 85 FEET OF 2 INCH STEEL AND 135 FEET OF 2 INCH POLY ALONG OLIVE STREET TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
1006 080.54346 2,883
RELOCATE FACILITIES. INSTALL 2405 FEET OF 6 INCH, 1000 FEET OF 4 INCH, AND 60 FEET OF 2 INCH POLY AND ABANDON 8 FEET OF 2 INCH, 70 FEET OF 3 INCH, 990 FEET OF 4 INCH, 2250 FEET OF 6 INCH STEEL, 63 FEET OF 2 INCH, 25 FEET OF 4 INCH, AND 150 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1007 080.54349 3,920
ABANDON 45 FEET OF 6 INCH STEEL AND 1395 FEET OF 12 INCH STEEL ALONG 26TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1008 080.54354 279
INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 485 FEET OF 4 INCH STEEL ALONG AVENUE G IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 35 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1009 080.54356 2,231
RELOCATE FACILITIES. ABANDON 4646 FEET OF 6 INCH CAST IRON AND 776 FEET OF 6 INCH POLY ALONG ELDRIDGE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1010 080.54357 527
INSTALL 26 POLY SERVICES AND ABANDON 18 FEET OF 2 INCH STEEL AND 26 STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1011 080.54359 3,382
INSTALL (55) POLY SERVICES IN THE CITY OF DALLAS AND ABANDON (55) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1012 080.54360 1,598 ABANDON 31 FEET OF 2 INCH STEEL IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1013 080.54365 (2)
INSTALL REGULATOR STATION, 20 FEET OF 2 INCH, AND 20 FEET OF 4 INCH POLY AND ABANDON REGULATOR STATION, 15 FEET OF 2 INCH, AND 15 FEET OF 4 INCH STEEL ALONG EDGEFIELD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1014 080.54366 1,691
INSTALL 825 FEET OF 4 INCH AND 125 FEET OF 2 INCH POLY AND ABANDON 815 FEET OF 4 INCH CAST IRON AND 125 FEET OF 2 INCH STEEL ALONG BRYAN PARKWAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1015 080.54370 1,457
INSTALL (45) POLY SERVICES AND ABANDON (45) COPPER SERVICES IN THE TOWN OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1016 080.54371 1,620
INSTALL 170 FEET OF 2 INCH AND 2336 FEET OF 4 INCH POLY AND ABANDON 77 FEET OF 2 INCH, 2246 FEET OF 4 INCH STEEL, AND 70 FEET OF 4 INCH POLY ALONG 14TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1017 080.54383 1,397
INSTALL 3237 FEET OF 2 INCH POLY ALONG CUMBERLAND AVENUE AND ABANDON 2300 FEET OF 4 INCH CAST IRON, 306 FEET OF 4 INCH STEEL, AND 523 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1018 080.54386 94
INSTALL 160 FEET OF 8 INCH POLY ALONG BELT LINE AND ABANDON 160 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ADDISON
SYSTEM INTEGRITY DECEMBER
1019 080.54394 1,444
INSTALL 2650 FEET OF 2 INCH POLY ALONG CULBERSON AND ABANDON 1944 FEET OF 4 INCH, 638 FEET OF 3 INCH, AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1020 080.54399 100
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY AND ABANDON 33 FEET OF 4 INCH POLY ALONG 5TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1021 080.54402 320
INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 4 INCH STEEL ALONG WALNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1022 080.54413 44
INSTALL REGULATOR STATION ALONG 25TH STREET AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1023 080.54416 (4)INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE ALONG VINE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1024 080.54417 332
RELOCATE FACILITIES. INSTALL 309 FEET OF 4 INCH POLY AND ABANDON 279 FEET OF 4 INCH STEEL AND 30 FEET OF 4 INCH POLY ALONG 7TH STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1025 080.54427 3,731
RELOCATE FACILITIES. INSTALL 1932 FEET OF 4 INCH POLY ALONG STADIUM DRIVE AND ABANDON 2054 FEET OF 4 INCH STEEL, 721 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1026 080.54428 12,659
RELOCATE FACILITIES. INSTALL 2285 FEET OF 4 INCH POLY ALONG WABASH AVENUE AND ABANDON 4124 FEET OF 4 INCH, 125 FEET OF 6 INCH STEEL, 125 FEET OF 6 INCH, AND 120 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1027 080.54431 391
INSTALL 560 FEET OF 4 INCH POLY ALONG FRONT STREET AND ABANDON 560 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST
SYSTEM INTEGRITY DECEMBER
1028 080.54432 26
RELOCATE FACILITIES. INSTALL (3) POLY SERVICES AND ABANDON (3) STEEL SERVICES ALONG LAKESIDE TO ACCOMMODATE CITY OF AZLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE
SYSTEM INTEGRITY DECEMBER
1029 080.54443 4,720
INSTALL 3745 FEET OF 4 INCH POLY ALONG BELLAIRE STREET AND ABANDON 1008 FEET OF 4 INCH, 2487 FEET OF 6 INCH, 235 FEET OF 8 INCH CAST IRON, 623 FEET OF 4 INCH, AND 122 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1030 080.54446 1,602
INSTALL 1975 FEET OF 4 INCH POLY ALONG VICKERY BOULEVARD AND ABANDON 775 FEET OF 4 INCH POLY AND 425 FEET OF 4 INCH CAST IRON AND 1370 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1031 080.54447 6,568
INSTALL 4920 FEET OF 4 INCH POLY ALONG BELLAIRE AND ABANDON 2158 FEET OF 4 INCH, 2289 FEET OF 6 INCH AND 157 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1032 080.54448 4,845 INSTALL 3235 FEET OF 2 INCH POLY ALONG THE STREETS OF CREEKS OF LEGACY PHASE 2B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH AUGUST
1033 080.54449 69
INSTALL RELIEVE VALVE AT DISTRICT REGULATOR STATION 10 IN GATESVILLE AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
1034 080.54450 387 INSTALL 4070 FEET OF 2 INCH POLY ALONG THE STREETS OF AUBURN HILLS PHASE 5B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
1035 080.54456 1,277
INSTALL 1700 FEET OF 4 INCH POLY AND ABANDON 1700 FEET OF 4 INCH CAST IRON ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1036 080.54468 3,765
INSTALL 1835 FEET OF 2 INCH POLY ALONG MENTOR AVENUE AND ABANDON 1800 FEET OF 4 INCH CAST IRON AND 40 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1037 080.54472 1,958
INSTALL 1743 FEET OF 2 INCH POLY AND ABANDON 1820 FEET OF 4 INCH CAST IRON AND 120 FEET OF 2 INCH STEEL ALONG MENTOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1038 080.54478 1,505
INSTALL 2875 FEET OF 4 INCH POLY ALONG GARLAND ROAD AND ABANDON 1950 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1039 080.54484 52
INSTALL METER AND ABANDON METER AT LANE ASPHALT PLANT IN CITY OF DENTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1040 080.54486 313 INSTALL 3275 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH FEBRUARY
MTX AdditionsPage 36 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1041 080.54492 272
INSTALL 490 FEET OF 2 INCH AND 122 FEET OF 4 INCH POLY ALONG MULLER STREET AND ABANDON 255 FEET OF 2 INCH, 609 FEET OF 3 INCH STEEL AND 94 FEET OF 4 INCH STEEL AND 65 FEET OF 3 INCH AND 11 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
1042 080.54494 791
INSTALL 100 FEET OF 6 INCH STEEL ALONG DOMINIK DRIVE AND ABANDON 60 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
1043 080.54498 260
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION IN THE TOWN OF GAINESVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
1044 080.54510 528
RELOCATE FACILITIES. INSTALL 19 FEET OF 2 INCH POLY AND 185 FEET OF 6 INCH POLY AND ABANDON 16 FEET OF 2 INCH POLY, 173 FEET OF 6 INCH, AND 184 FEET OF 10 INCH STEEL ALONG AVE A TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
1045 080.54517 82 INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE ALONG HOOD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
1046 080.54524 4,262
INSTALL 3180 FEET OF 2 INCH AND 1971 FEET OF 6 INCH POLY AND ABANDON 878 FEET OF 2 INCH, 1330 FEET OF 3 INCH, 1249 FEET OF 4 INCH, 2138 FEET OF 6 INCH STEEL, AND 10 FEET OF 6 INCH POLY ALONG AVENUE J IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1047 080.54528 775
RELOCATE FACILITIES. INSTALL 28 FEET OF 2 INCH AND 3 FEET OF 3 INCH, 1222 FEET OF 4 INCH POLY AND ABANDON 179 FEET OF 2 INCH, 611 FEET OF 3 INCH, 611 FEET OF 4 INCH, 352 FEET OF 6 INCH STEEL, 10 FEET OF 2 INCH, 37 FEET OF 3 INCH, AND 3 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF WHITESBORO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITESBORO
SYSTEM INTEGRITY DECEMBER
1048 080.54529 448
RELOCATE FACILITIES. INSTALL 650 FEET OF 2 INCH POLY ALONG MANSFIELD AND ABANDON 650 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
SYSTEM INTEGRITY DECEMBER
1049 080.54538 2,973
RELOCATE FACILITIES. INSTALL 3705 FEET OF 2 INCH POLY ALONG SCHADT STREET AND ABANDON 325 FEET OF 6 INCH, 3565 FEET OF 4 INCH CAST IRON, 575 FEET OF 4 INCH, 230 FEET OF 2 INCH STEEL AND 55 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1050 080.54546 777
INSTALL 936 FEET OF 4 INCH POLY ALONG WESTSIDE DRIVE AND ABANDON 800 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
1051 080.54548 167
RELOCATE FACILITIES. INSTALL 190 FEET OF 6 INCH POLY AND ABANDON 180 FEET OF 6 INCH POLY ALONG RABBIT RIDGE ROAD TO ACCOMMODATE CITY OF HEATH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEATH
SYSTEM INTEGRITY DECEMBER
1052 080.54550 1,287
INSTALL 1408 FEET OF 6 INCH AND 107 FEET OF 2 INCH POLY AND ABANDON 1778 FEET OF 8 INCH CAST IRON ALONG ABBOT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
1053 080.54551 4,482
INSTALL 2825 FEET OF 8 INCH, 75 FEET OF 2 INCH AND 25 FEET OF 4 INCH ALONG WALNUT HILL LANE AND ABANDON 23 FEET OF 3 INCH, 22 FEET OF 6 INCH AND 2830 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1054 080.54553 96
INSTALL 20 FEET OF 16 INCH STEEL ALONG LINE C16 AND ABANDON 17 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
SYSTEM INTEGRITY DECEMBER
1055 080.54565 237
RELOCATE FACILITIES. INSTALL 345 FEET OF 2 INCH POLY ABANDON 302 FEET OF 2 INCH STEEL ALONG BARNETT STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1056 080.54568 824
RELOCATE FACILITIES. INSTALL 526 FEET OF 4 INCH POLY ALONG BRENTWOOD STAIR ROAD AND ABANDON 239 FEET OF 4 INCH POLY AND 283 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1057 080.54570 4,321
INSTALL 250 FEET OF 6 INCH POLY, 1742 FEET OF 4 INCH POLY, 365 FEET OF 2 INCH POLY ALONG RUFUS ROAD AND ABANDON 1724 FEET OF 4 INCH CAST IRON , 415 FEET OF 6 INCH CAST IRON, 119 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1058 080.54574 15
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG FORT WORTH STREET AND ABANDON 42 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF PALESTINE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
1059 080.54579 602
RELOCATE FACILITIES. INSTALL (16) 0.75 INCH POLY SERVICES AND ABANDON (16) STEEL SERVICES ON TAHOE DR TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1060 080.54589 457
RELOCATE FACILITIES. INSTALL 1125 FEET OF 4 INCH POLY AND ABANDON 1121 FEET OF 2 INCH STEEL ALONG TEXAS STREET TO ACCOMMODATE CITY OF EMORY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EMORY
SYSTEM INTEGRITY DECEMBER
1061 080.54590 1,623
INSTALL 1100 FEET OF 2 INCH POLY ALONG GOLDSPIER AND ABANDON 1100 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1062 080.54591 882
INSTALL 960 FEET OF 2 INCH POLY ALONG BRANDSHAW AND ABANDON 1950 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1063 080.54592 4,006
INSTALL 3871 FEET OF 4 INCH AND 136 FEET OF 2 INCH POLY ALONG REED AND ABANDON 343 FEET OF 2 INCH, 65 FEET OF 4 INCH POLY, 738 FEET OF 4 INCH AND 1266 FEET OF 6 INCH CAST IRON, AND 2420 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1064 080.54593 1,507
INSTALL 2980 FEET OF 6 INCH AND 230 FEET OF 4 INCH POLY ALONG HIGHWAT 79 AND ABANDON 2699 FEET OF 2 INCH AND 223 FEET OF 3 INCH STEEL AND 253 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY DECEMBER
1065 080.54600 716
INSTALL 1735 FEET OF 4 INCH POLY AND ABANDON 1802 FEET OF 2 INCH STEEL AND 23 FEET OF 2 INCH POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GUNTER
SYSTEM INTEGRITY DECEMBER
1066 080.54608 8
ABANDON 650 FEET OF 2 INCH STEEL AND 744 FEET OF 2 INCH POLY ALONG CEDAR STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN
SYSTEM INTEGRITY DECEMBER
1067 080.54610 1,189 INSTALL 1282 FEET OF 2 INCH POLY AND ABANDON 940 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 37 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1068 080.54611 1,140
INSTALL 1520 FEET OF 2 INCH POLY ALONG WRIGHT AND ABANDON 680 FEET OF 6 INCH AND 340 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1069 080.54612 1,501
RELOCATE FACILITIES. INSTALL 1000 FEET OF 6 INCH, 825 FEET OF 4 INCH, AND 60 FEET OF 2 INCH POLY ALONG COTTONWOOD CREEK AND ABANDON 100 FEET OF 6 INCH, 825 FEET OF 4 INCH, AND 5 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1070 080.54622 290
RELOCATE FACILITIES. INSTALL 414 FEET OF 2 INCH POLY AND ABANDON 396 FEET OF 2 INCH POLY ALONG GATTIS SCHOOL ROAD TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
1071 080.54624 1,170
INSTALL 1125 FEET OF 2 INCH POLY ALONG HOLMES AND ABANDON 1125 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1072 080.54625 2,167
INSTALL 650 FEET OF 2 INCH AND 765 FEET OF 8 INCH POLY AND ABANDON 1340 FEET OF 4 INCH CAST IRON ALONG PENNSYLVANIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1073 080.54635 203
RELOCATE FACILITIES. INSTALL 94 FEET OF 4 INCH AND 6 FEET OF 6 INCH POLY AND ABANDON 3 FEET OF 4 INCH POLY AND 64 FEET OF 6 INCH STEEL ALONG LACY STREET TO ACCOMMODATE CITY OF PALESTINE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
1074 080.54640 516
INSTALL 1450 FEET OF 4 INCH POLY ALONG WALNUT AND ABANDON 18 FEET OF 2 INCH, 1412 FEET OF 4 INCH STEEL, AND 4 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA
SYSTEM INTEGRITY DECEMBER
1075 080.54655 411
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG FARM TO MARKET 1392 AND ABANDON 790 FEET OF 2 INCH STEEL TO ACCOMMODATE TXDOT PAVING AND DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
1076 080.54658 477
INSTALL 537 FEET OF 4 INCH POLY AND ABANDON 537 FEET OF 4 INCH STEEL ALONG DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MUNDAY
SYSTEM INTEGRITY DECEMBER
1077 080.54661 670,421
INSTALL 16 FEET OF 4 INCH STEEL AND 56 FEET OF 6 INCH POLY AND 2 FEET OF 8 INCH STEEL AND 11978 FEET OF 12 INCH STEEL AND ABANDON 14 FEET OF 2 INCH POLY AND 13769 FEET OF 3 INCH STEEL AND 2 FEET OF 6 INCH POLY ALONG CHIESA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
SYSTEM INTEGRITY DECEMBER
1078 080.54665 376
RELOCATE FACILITIES. INSTALL 319 FEET OF 2 INCH AND 64 FEET OF 4 INCH POLY AND ABANDON 364 FEET OF 2 INCH AND 424 FEET OF 4 INCH STEEL ALONG ESTES STREET TO ACCOMMODATE CITY OF BENBROOK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK
SYSTEM INTEGRITY DECEMBER
1079 080.54666 3,917 INSTALL 1387 FEET OF 6 INCH AND 2878 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA 3B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
1080 080.54681 985
RELOCATE FACILITIES. INSTALL (40) POLY SERVICES ALONG BELVEDERE DRIVE AND ABANDON (40) STEEL SERVICES TO ACCOMMODATE PHASE 1 OF THE CITY OF ARLINGTON 2016 RESIDENTIAL STREET REBUILD PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1081 080.54685 25,987
RELOCATE FACILITIES. INSTALL 1808 FEET OF 8 INCH AND 100 FEET OF 2 INCH POLY ALONG NEW HOPE DRIVE AND ABANDON 1808 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF CEDAR PARK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK
SYSTEM INTEGRITY DECEMBER
1082 080.54703 552
INSTALL 980 FEET OF 2 INCH POLY ALONG LIVE OAK AND ABANDON 775 FEET OF 6 INCH CAST IRON AND 205 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1083 080.54704 2,038
INSTALL 840 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY ALONG LIVE OAK AND ABANDON 875 FEET OF 6 INCH CAST IRON AND 200 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1084 080.54705 1,066
INSTALL 1440 FEET OF 4 INCH POLY ALONG CANYON DRIVE AND ABANDON 370 FEET OF 2 INCH STEEL AND 1070 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1085 080.54706 928
INSTALL 1050 FEET OF 2 INCH POLY ALONG MENTOR AND ABANDON 940 FEET OF 2 INCH AND 1063 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1086 080.54707 878
INSTALL 950 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG WENONAH DRIVE AND ABANDON 930 FEET OF 4 INCH AND 800 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1087 080.54709 958
INSTALL 1010 FEET OF 4 INCH POLY ALONG WENONAH AND ABANDON 1015 FEET OF 6 INCH AND 430 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1088 080.54710 3,364
INSTALL (225) POLY SERVICES AND ABANDON (225) COPPER SERVICES IN THE CITY OF FORT WORTH IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1089 080.54711 2,609
INSTALL 1096 FEET OF 2 INCH POLY ALONG POINSETTIA AND ABANDON 1096 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1090 080.54716 1,442
INSTALL 770 FEET OF 4 INCH AND 708 FEET OF 2 INCH POLY AND ABANDON 682 FEET OF 4 INCH, 633 FEET OF 6 INCH CAST IRON, AND 69 FEET OF 6 INCH STEEL ALONG RAMEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1091 080.54717 930
INSTALL 1330 FEET OF 2 INCH POLY ALONG LAWHORN STREET AND ABANDON 1135 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1092 080.54718 607
INSTALL 575 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 2 INCH, 28 FEET OF 3 INCH STEEL, AND 483 FEET OF 4 POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
1093 080.54723 1,604
RELOCATE FACILITIES. INSTALL 2205 FEET OF 4 INCH AND 900 FEET OF 2 INCH POLY ALONG GOLIAD AND ABANDON 136 FEET OF 2 INCH, 946 FEET OF 4 INCH POLY, 855 FEET OF 4 INCH, AND 300 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
SYSTEM INTEGRITY DECEMBER
1094 080.54727 257
RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH POLY AND ABANDON 158 FEET OF 2 INCH STEEL AND 63 FEET OF 2 INCH POLY ALONG CEDAR STREET TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 38 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1095 080.54733 123,241
INSTALL 17150 FEET OF 6 INCH AND 8350 FEET OF 4 INCH STEEL AT THE VAN ALSTYNE MEASURING STATION AND ABANDON 25476 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE
SYSTEM INTEGRITY DECEMBER
1096 080.54748 4,594
RELOCATE FACILITIES. INSTALL 115 FEET OF 16 INCH STEEL ALONG HI LINE ROAD AND ABANDON 100 FEET OF 16 INCH STEEL TO ACCOMODATE TXDOT LOWEST STEMMONS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES AUGUST
1097 080.54759 297
RELOCATE FACILITIES. INSTALL 5 FEET OF 4 INCH AND 64 FEET OF 6 INCH POLY AND ABANDON 40 FEET OF 6 INCH STEEL ALONG BUCKNER TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1098 080.54761 715
RELOCATE FACILITIES. INSTALL 695 FEET OF 4 INCH POLY AND ABANDON 553 FEET OF 4 INCH CAST IRON AND 77 FEET OF 4 INCH POLY ALONG MCLEMORE AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1099 080.54794 1,605
INSTALL 1640 FEET OF 2 INCH POLY ALONG CLARENDON DRIVE AND ABANDON 2435 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1100 080.54795 1,237 INSTALL 856 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA 3D. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
1101 080.54797 2,193
INSTALL 1740 FEET OF 2 INCH POLY AND ABANDON 1690 FEET OF 4 INCH CAST IRON 1460 FEET OF 8 INCH STEEL ALONG SOUTH FLEMING AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1102 080.54799 12 ABANDON 775 FEET OF 2 INCH STEEL ALONG WEATHERFORD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
1103 080.54817 1,141
INSTALL 1550 FEET OF 2 INCH POLY ALONG RUEA STREET AND ABANDON 1550 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1104 080.54818 553
INSTALL 980 FEET OF 2 INCH POLY ALONG TOPEKA AND ABANDON 1020 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1105 080.54835 2,720
INSTALL 237 POLY SERVIES AND ABDANDON 237 STEEL SERVICES IN THE CITY OF FARMERS BRANCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
1106 080.54837 4,637
INSTALL 359 POLY SERVICES AND ABANDON 359 STEEL SERVICES IN THE CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1107 080.54838 2,534
INSTALL (171) STEEL SERVICES AND ABANDON (171) STEEL SERVICES ALONG STREETS OF DESOTO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE
SYSTEM INTEGRITY DECEMBER
1108 080.54839 3,262
INSTALL (396) POLY SERVICES ALONG STREETS OF ROUND ROCK AND ABANDON (396) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
1109 080.54842 4,964
INSTALL 207 POLY SERVICES AND ABANDON 270 STEEL SERVICES IN CITY OF SAGINAW IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW
SYSTEM INTEGRITY DECEMBER
1110 080.54853 227
RELOCATE FACILITIES. INSTALL (13) 0.75 INCH POLY SERVICES AND ABANDON (13) 0.75 INCH POLY SERVICES ALONG ROCKWOOD STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1111 080.54854 3,853
RELOCATE FACILITIES. INSTALL 3093 FEET OF 6 INCH AND 1276 FEET OF 2 INCH POLY ALONG US 377 AND ABANDON 3000 FEET OF 2 INCH STEEL AND 160 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1112 080.54858 30,111
RELOCATE FACILITIES. INSTALL 2386 FEET OF 6 INCH, 350 FEET OF 4 INCH AND 1636 FEET OF 2 INCH POLY AND ABANDON 1520 FEET OF 2 INCH, 300 FEET OF 3 INCH STEEL AND 610 FEET OF 2 INCH POLY ALONG US 377 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1113 080.54859 2,949
RELOCATE FACILITIES. INSTALL 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY AND ABANDON 650 FEET OF 6 INCH AND 200 FEET OF 4 INCH POLY ALONG EAST BROAD STREET TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
SYSTEM INTEGRITY DECEMBER
1114 080.54860 256
INSTALL DEEPWELL GROUND BED AND ABANDON DEEPWELL GROUNDBED ON LINE O2(2ND)-1 IN DALLAS COUNTY IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
1115 080.54863 2,307
INSTALL 725 FEET OF 6 INCH POLY ALONG HARVARD AND ABANDON 220 FEET OF 4 INCH CAST IRON AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1116 080.54874 179
RELOCATE FACILITIES. INSTALL (8) POLY SERVICES AND ABANDON (8) POLY SERVICES ALONG JORDAN DRIVE TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET PAVING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1117 080.54875 3,531
INSTALL 2914 FEET OF 4 INCH POLY ALONG PARK PLACE AND ABANDON 1285 FEET OF 4 INCH AND , 42 FEET OF 1.25 FEET OF STEEL, 68 FEET OF 2 INCH, AND 33 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1118 080.54876 141
ABANDON 6854 FEET OF 2 INCH POLY AND 3370 FEET OF 4 INCH POLY ALONG SUBLETT ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1119 080.54882 212
INSTALL 472 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH, 419 FEET OF 3 INCH STEEL, AND 60 FEET OF 2 INCH POLY AND ALONG COLLEGE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROXTON
SYSTEM INTEGRITY DECEMBER
1120 080.54886 183
RELOCATE FACILITIES. INSTALL 337 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH POLY, 1 FOOT OF 3 INCH STEEL AND 266 FEET OF 4 INCH POLY ALONG NORTH ELM STREET TO ACCOMMODATE CITY OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1121 080.54894 34,703
RELOCATE FACILITIES. INSTALL 6 FEET OF 3 INCH, 107 FEET OF 4 INCH AND 3216 FEET OF 6 INCH POLY ALONG FM3549 AND ABANDON 8 FEET OF 3 INCH AND 3310 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
SYSTEM INTEGRITY DECEMBER
1122 080.54895 907
INSTALL 1866 FEET OF 4 INCH POLY ALONG AVENUE J AND ABANDON 1325 FEET OF 4 INCH CAST IRON AND 540 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1123 080.54909 1,479
INSTALL 1385 FEET OF 4 INCH AND 1590 FEET OF 2 INCH POLY ALONG AVENUE D AND ABANDON 1429 FEET OF 4 INCH, 430 FEET OF 3 INCH, 987 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VALLEY MILLS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 39 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1124 080.54910 894
INSTALL 1260 FEET OF 4 INCH POLY ALONG PATRICIA STREET AND ABANDON 1250 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LACY LAKEVIEW
SYSTEM INTEGRITY DECEMBER
1125 080.54912 511
RELOCATE FACILITIES. INSTALL (19) POLY SERVICES ALONG KELLER AVENUE AND ABANDON (19) STEEL SERVICES TO ACCOMMODATE CITY OF BENBROOK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK
SYSTEM INTEGRITY DECEMBER
1126 080.54926 520
RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 625 FEET OF 2 INCH AND 500 FEET OF 4 INCH STEEL AND 11 FEET OF 2 INCH AND 5 FEET OF 4 INCH POLY ALONG 1ST STREET TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1127 080.54927 370
INSTALL 22 FEET OF 3 INCH AND 540 FEET OF 4 INCH POLY AND ABANDON 133 FEET OF 2 INCH, 407 FEET OF 3 INCH STEEL, AND 16 FEET OF 3 INCH POLY ALONG CENTRAL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
1128 080.54931 856
INSTALL 563 FEET OF 2 INCH POLY AND 78 FEET OF 4 INCH POLY AND ABANDON 646 FEET OF 4 INCH POLY ALONG SANGER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1129 080.54934 7,171
INSTALL 685 FEET OF 2 INCH AND 2865 FEET OF 4 INCH POLY ALONG VAUGHN AND ABANDON 3550 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1130 080.54942 3,737
INSTALL POLY SERVICES AND ABANDONG POLY SERVICES ALONG STREETS OF GROESBECK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
1131 080.54943 2,320 INSTALL 1830 FEET OF 2 INCH POLY ALONG STREETS OF AUBURN HILLS. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MCKINNEY GROWTH NOVEMBER
1132 080.54955 1,914
RELOCATE FACILITIES. INSTALL 1495 FEET OF 4 INCH POLY ALONG CONNALLY TERRACE AND ABANDON 1485 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1133 080.54961 15
INSTALL DISTRICT REGULATOR STATION ALONG FOREST LANE AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1134 080.54964 773 INSTALL 510 FEET OF 4 INCH AND 2730 FEET OF 2 INCH POLY ALONG THE STREETS OF AUBURN HILLS PHASE 3B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
1135 080.54965 283
INSTALL 275 FEET OF 6 INCH POLY AND ABANDON 275 FEET OF 6 INCH CAST IRON ALONG DURHAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1136 080.54967 594
INSTALL 420 FEET OF 8 INCH POLY ALONG MOUNTAIN VIEW AND ABANDON 200 FEET OF 4 INCH, 122 FEET OF 8 INCH, AND 118 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1137 080.54969 790
RELOCATE FACILITIES. INSTALL 800 FEET OF 6 INCH POLY ALONG GLADE ROAD AND ABANDON 833 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF COLLEYVILLE CONSTRUCTION IMPROVEMENTS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
1138 080.54984 1,917
RELOCATE FACILITIES.INSTALL 200 FEET OF 2 INCH POLY ALONG OAK PARK DRIVE AND ABANDON 200 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DENTON DENTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1139 080.54988 2,032
INSTALL SERVICES ALONG STREETS OF CARROLTON AND ABANDON SERVICES DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
SYSTEM INTEGRITY DECEMBER
1140 080.54993 494
INSTALL 950 FEET OF 4 INCH POLY AND ABANDON 600 FEET OF 3 INCH BARE STEEL AND 350 FEET OF 4 INCH BARE STEEL ALONG WACO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILTON
SYSTEM INTEGRITY DECEMBER
1141 080.55009 5
RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH POLY AND ABANDON 70 FEET OF 2 INCH STEEL ALONG NORTHSHORE DRIVE TO ACCOMMODATE CITY OF CARROLLTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
SYSTEM INTEGRITY DECEMBER
1142 080.55018 159
RELOCATE FACILITIES. INSTALL 222 FEET OF 2 INCH POLY AND ABANDON 212 FEET OF 2 INCH STEEL ALONG HARDEE STREET TO ACCOMMODATE CITY OF CHANDLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHANDLER
SYSTEM INTEGRITY DECEMBER
1143 080.55022 1,066
INSTALL 1300 FEET OF 4 INCH POLY ALONG MORPHY STREET AND ABANDON 275 FEET OF 2 INCH, 260 FEET OF 4 INCH STEEL, 265 FEET OF 4 INCH, 505 FEET OF 8 INCH POLY, 1250 FEET OF 4 INCH AND 275 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1144 080.55026 2,139
INSTALL 850 FEET OF 6 INCH AND 1230 FEET OF 4 INCH POLY ALONG GARRISON STREET AND ABANDON 836 FEET OF 8 INCH AND 1022 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1145 080.55033 532
RELOCATE FACILITIES. INSTALL 374 FEET OF 2 INCH POLY AND ABANDON 337 FEET OF 2 INCH POLY ALONG THROCKMORTON TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
SYSTEM INTEGRITY DECEMBER
1146 080.55041 1,039
INSTALL 1217 FEET OF 2 INCH POLY AND ABANDON 1176 FEET OF 2 INCH POLY AND 32 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
1147 080.55042 541
INSTALL 30 FEET OF 8 INCH STEEL AND ABANDON 20 FEET OF 8 INCH AND 2 FEET OF 2 INCH STEEL ALONG SYNERGY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
1148 080.55043 1,743
INSTALL 3067 FEET OF 2 INCH AND 60 FEET OF 4 INCH POLY AND ABANDON 238 FEET OF 2 INCH, 1286 FEET OF 3 INCH , 1224 FEET OF 4 INCH STEEL, AND 50 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DAWSON
SYSTEM INTEGRITY DECEMBER
1149 080.55045 2,520
INSTALL 2200 FEET OF 2 INCH POLY ALONG GLENWOOD AVENUE AND ABANDON 2200 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1150 080.55047 990
INSTALL 1753 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 1723 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
1151 080.55049 859
INSTALL 5 FEET OF 18 INCH STEEL ALONG FLAMINGO DRIVE AND ABANDON 5 FEET OF 18 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
1152 080.55054 1,881
INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 970 FEET OF 6 INCH CAST IRON ALONG HUDSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1153 080.55055 1,325
INSTALL 1230 FEET OF 2 INCH POLY ALONG HUDSON STREET AND ABANDON 1015 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 40 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1154 080.55059 732
INSTALL 1152 FEET OF 2 INCH POLY ALONG JACKSON STREET AND ABANDON 1152 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
1155 080.55060 53,819
RELOCATE FACILITIES. INSTALL 5175 FEET OF 2 INCH POLY AND ABANDON 3324 FEET OF 4 INCH STEEL, 350 FEET OF 4 INCH POLY AND 70 FEET OF 4 INCH CAST IRON ALONG BERKLEY PLACE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1156 080.55064 2,546
RELOCATE FACILITIES. INSTALL 1810 FEET OF 4 INCH AND 1010 FEET OF 2 INCH POLY AND ABANDON 680 FEET OF 2 INCH STEEL ALONG CHURCH STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1157 080.55065 856,167
INSTALL 9360 FEET OF 12 INCH STEEL AND ABANDON 9360 FEET OF 12 INCH STEEL ALONG LINE J2 EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1158 080.55067 920
INSTALL 926 FEET OF 2 INCH POLY ALONG PATTERSON AND ABANDON 4 FEET OF 2 INCH, 254 FEET OF 4 INCH POLY, 210 FEET OF 3 INCH, AND 1637 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
SYSTEM INTEGRITY DECEMBER
1159 080.55070 975
INSTALL 902 FEET OF 2 INCH AND 650 FEET OF 6 INCH POLY ALONG NORTH CREEWOOD CIRCLE AND ABANDON 115 FEET OF 1.25 AND 787 FEET OF 3 INCH POLY AND 650 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
1160 080.55073 625
INSTALL 740 FEET OF 2 INCH POLY ALONG 38TH STREET AND ABANDON 853 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
1161 080.55074 162 INSTALL 338 FEET OF 2 INCH POLY AND ABANDON 338 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD
SYSTEM INTEGRITY DECEMBER
1162 080.55079 1,854
INSTALL 1460 FEET OF 2 INCH POLY AND ABANDON 7 FEET OF 4 INCH POLY, 1100 FEET OF 6 INCH CAST IRON, AND 1050 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
1163 080.55083 3,864
INSTALL 4150 FEET OF 6 INCH, 601 FEET OF 2 INCH AND 10 FEET OF 4 INCH POLY ALONG AMBLER STREET AND ABANDON 4000 FEET OF 4 INCH STEEL AND 400 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1164 080.55091 2,788
RELOCATE FACILITIES. INSTALL 320 FEET OF 4 INCH POLY ALONG FM1938 AND ABANDON 400 FEET OF 4 INCH POLY AND 100 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
SYSTEM INTEGRITY DECEMBER
1165 080.55097 1,114
INSTALL 950 FEET OF 2 INCH POLY AND ABANDON 950 FEET OF 4 INCH CAST IRON ALONG DELAWARE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1166 080.55100 1,061
RELOCATE FACILITIES. INSTALL 885 FEET OF 8 INCH POLY AND ABANDON 900 FEET OF 18 INCH STEEL ALONG STREETS OF DALLAS TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1167 080.55111 14 ABANDON 288 FEET OF 2 INCH AND 12 FEET OF 3 INCH STEEL ALONG HASKELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1168 080.55132 82
ABANDON 78 FEET OF 2 INCH, 74 FEET OF 3 INCH STEEL, 3970 FEET OF 3 INCH, AND 83 FEET OF 2 INCH POLY ALONG TYE TAYLOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYE
SYSTEM INTEGRITY DECEMBER
1169 080.55144 1,292
RELOCATE FACILITIES. INSTALL 2659 FEET OF 4 INCH POLY ALONG LIVE OAK STREET AND ABANDON 100 FEET OF 2 INCH, 845 FEET OF 3 INCH, AND 30 FEET OF 4 INCH POLY AND 1110 FEET OF 3 INCH AND 180 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GATESVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
1170 080.55156 940
INSTALL 1500 FEET OF 8 INCH POLY ALONG LINCOLN PARK ROAD ABANDON 1412 FEET OF 4 INCH STEEL AND 4 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE
SYSTEM INTEGRITY DECEMBER
1171 080.55157 333
INSTALL 160 FEET OF 8 INCH POLY ALONG AIRLINE AND ABANDON 100 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1172 080.55166 309 INSTALL 1644 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 1D. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
1173 080.55170 27,250
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG AUSTIN STREET AND ABANDON 380 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1174 080.55172 2,246
INSTALL 1550 FEET OF 2 INCH POLY ALONG 22ND STREET AND ABANDON 1100 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1175 080.55178 2,388
INSTALL 1240 FEET OF 4 INCH, 891 FEET OF 6 INCH AND 335 FEET OF 2 INCH POLY AND ABANDON 825 FEET OF 2 INCH STEEL, 43 FEET OF 3 INCH STEEL, 135 FEET OF 2 INCH POLY, 1833 FEET OF 4 INCH AND 1227 FEET OF 6 INCH CAST IRON ALONG DUTTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1176 080.55180 3,049
INSTALL 4468 FEET OF 2 INCH AND 360 FEET OF 4 INCH POLY ALONG CLAY AVENUE AND ABANDON 2416 FEET OF 4 INCH AND 6 INCH CAST IRON, 1934 FEET OF 4 INCH STEEL, AND 650 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1177 080.55192 1,966
INSTALL 1750 FEET OF 2 INCH POLY ALONG LAWRENCE AND ABANDON 1780 FEET OF 4 INCH AND 500 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1178 080.55195 2,570
INSTALL 1025 FEET OF 2 INCH POLY AND 330 FEET OF 4 INCH POLY AND ABANDON 1025 FEET OF 6 INCH AND 330 FEET OF 8 INCH CAST IRON ALONG LELAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1179 080.55196 2,930
INSTALL 2760 FEET OF 6 INCH POLY AND ABANDON 1382 FEET OF 4 INCH, 838 FEET OF 6 INCH STEEL, 304 FEET OF 4 INCH, 70 FEET OF 6 INCH CAST IRON, 95 FEET OF 6 INCH , 71 FEET OF 2 INCH POLY ALONG TRAVIS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1180 080.55203 1,237
INSTALL 1260 FEET OF 2 INCH POLY AND ABANDON 930 FEET OF 4 INCH CAST IRON AND 150 FEET OF 2 INCH STEEL ALONG CARL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1181 080.55204 39,539
INSTALL 7900 FEET OF 4 INCH POLY ALONG BERKLEY PLACE AND ABANDON 1608 FEET OF 4 INCH CAST IRON AND 8320 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1182 080.55205 651
INSTALL 1040 FEET OF 2 INCH POLY ALONG CARL STREET AND ABANDON 1040 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 41 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1183 080.55206 792
INSTALL 653 FEET OF 4 INCH AND 654 FEET OF 2 INCH POLY AND ABANDON 234 FEET OF 3 INCH AND 1186 FEET OF 4 INCH STEEL ALONG DAVIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON
SYSTEM INTEGRITY DECEMBER
1184 080.55210 16,833
INSTALL 5441 FEET OF 4 INCH POLY ALONG ODESSA AVENUE AND ABANDON 561 FEET OF 8 INCH AND 770 FEET OF 4 INCH CAST IRON AND 1721 FEET OF 4 INCH AND 625 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1185 080.55211 460
RELOCATE FACILITIES. INSTALL 559 FEET OF 6 INCH POLY AND ABANDON 228 FEET OF 6 INCH STEEL AND 209 FEET OF 6 INCH POLY ALONG FM2818 TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
1186 080.55219 49
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY ALONG FM 1810 AND ABANDON 41 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF PETROLIA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PETROLIA
SYSTEM INTEGRITY DECEMBER
1187 080.55221 1,994
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY ALONG STAFFORD DRIVE AND ABANDON 50 FEET OF 1.25 INCH, 265 FEET OF 2 INCH AND 170 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1188 080.55230 690
INSTALL 1075 FEET OF 2 INCH POLY ALONG AVENUE I AND ABANDON 863 FEET OF 2 INCH STEEL AND 49 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LACY LAKEVIEW
SYSTEM INTEGRITY DECEMBER
1189 080.55232 377
INSTALL 32 FEET OF 4 INCH POLY AND ABANDON 18 FEET OF 4 INCH CAST IRON ALONG STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1190 080.55233 41
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY AND ABANDON 32 FEET OF 4 INCH POLY ALONG BARTLETT DRIVE TO ACCOMMODATE CITY OF THE COLONY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY
SYSTEM INTEGRITY DECEMBER
1191 080.55234 1,025
RELOCATE FACILITIES. INSTALL 195 FEET OF 4 INCH AND 31 FEET OF 6 INCH POLY ALONG WHITLEY ROAD AND ABANDON 131 FEET OF 4 INCH AND 20 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF WATAUGA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA
SYSTEM INTEGRITY DECEMBER
1192 080.55239 1,237
INSTALL 1750 FEET OF 4 INCH POLY AND ABANDON 1630 FEET OF 4 INCH CAST IRON AND 10 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1193 080.55241 1,630
INSTALL 1400 FEET OF 4 INCH POLY, 35 SERVICES AND ABANDON 1235 FEET OF 4 INCH CAST IRON, 35 SERVICES ALONG MCCART STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1194 080.55244 521
INSTALL 160 FEET OF 2 INCH POLY AND DRS06 ALONG REYNOSA ROAD AND ABANDON DRS06, 68 FEET OF 3 INCH POLY, 333 FEET OF 4 INCH, AND 30 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DE LEON
SYSTEM INTEGRITY DECEMBER
1195 080.55251 1,165
INSTALL 1976 FEET OF 2 INCH POLY AND ABANDON 1851 FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY ALONG 42ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1196 080.55257 3,186
INSTALL 1063 FEET OF 6 INCH POLY ALONG VICKERY AND ABANDON 1063 FEET OF 6 INCH CAST IRON AND 250 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1197 080.55259 220
INSTALL 470 FEET OF 6 INCH POLY ALONG NORTH WOODS STREET AND ABANDON 435 FEET OF 6 INCH STEEL AND 30 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1198 080.55260 1,686
INSTALL 1300 FEET OF 2 INCH POLY ALONG LAKE FOREST DRIVE AND ABANDON 1300 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ADDISON
SYSTEM INTEGRITY DECEMBER
1199 080.55267 628
INSTALL 1150 FEET OF 2 INCH POLY ALONG VAUGHN AND ABANDON 930 FEET OF 4 INCH AND 230 FEET OF 3 INCH STEEL AND 154 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
1200 080.55279 3,280
INSTALL 1420 FEET OF 2 INCH AND 775 OF 4 INCH POLY AND ABANDON 345 FEET OF 6 INCH AND 1500 FEET OF 4 INCH CAST IRON ALONG GLENWICK LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
1201 080.55280 4,678
INSTALL 2710 FEET OF 2 INCH POLY AND ABANDON 565 FEET OF 1.25 INCH POLY, 2145 FEET OF 4 INCH, 720 FEET OF 6 INCH, AND 660 FEET OF 8 INCH CAST IRON ALONG NORTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1202 080.55288 1,593
RELOCATE FACILITIES. INSTALL 2650 FEET OF 4 INCH POLY AND ABANDON 1540 FEET OF 3 INCH, 400 FEET OF 4 INCH POLY, AND 550 FEET OF 3 INCH STEEL ALONG MOORE STREET TO ACCOMMODATE CITY OF SULPHUR SPRINGS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
1203 080.55294 168
INSTALL DEEP WELL GROUND BED AND RECTIFIER ON LINE U IN JONES COUNTY AND ABANDON DEEP WELL GROUND BED AND RECTIFIER IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD
SYSTEM INTEGRITY DECEMBER
1204 080.55299 108,031
INSTALL 650 FEET OF 6 INCH POLY, 3000 FEET 4 INCH POLY AND 9300 FEET OF 2 INCH POLY ALONG THE STREETS OF WATERSCAPE PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH MARCH
1205 080.55300 7
RELOCATE FACILITIES. ABANDON 320 FEET OF 2 INCH POLY ALONG HOGAN COURT TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
1206 080.55301 38
INSTALL REGULATOR AND RELIEF VALVE ALONG HIGHWAY 277 AND ABANDON REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1207 080.55304 37,396
RELOCATE FACILITIES. INSTALL 2725 FEET OF 4 INCH POLY ALONG SIX FLAGS ROAD AND ABANDON 50 FEET OF 2 INCH, 86 FEET OF 4 INCH POLY AND 53 FEET OF 3 INCH, AND 2537 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1208 080.55305 5,251 INSTALL 2600 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR PHASE 2 SECTION 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
1209 080.55320 50,907
RELOCATE FACILITIES. INSTALL 3000 FEET OF 4 INCH POLY AND ABANDON 117 FEET OF 2 INCH, 1888 FEET OF 4 INCH STEEL AND 125 FEET OF 2 INCH, 25 FEET OF 4 INCH AND 20 FEET OF 6 INCH POLY ALONG FOREST STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1210 080.55321 2,220
INSTALL 3300 FEET OF 2 INCH POLY AND ABANDON 1905 FEET OF 4 INCH, 1110 FEET OF 6 INCH CAST IRON, AND 175 FEET OF 6 INCH POLY ALONG REAGAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 42 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1211 080.55322 4,281
INSTALL 1830 FEET OF 2 INCH POLY ALONG THROCKMORTON AND ABANDON 3515 FEET OF 4 INCH, 330 FEET OF 6 INCH CAST IRON, 150 FEET OF 4 INCH, 190 FEET OF 3 INCH POLY, 475 FEET OF 6 INCH AND 45 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1212 080.55335 1,309
RELOCATE FACILITIES. INSTALL 915 FEET OF 4 INCH AND 1495 FEET OF 2 INCH POLY ALONG 14TH STREET AND ABANDON 1250 FEET OF 2 INCH, 26 FEET OF 3 INCH STEEL, 45 FEET OF 4 INCH, AND 566 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1213 080.55337 51,092
INSTALL 6400 FEET OF 10 INCH STEEL AND ABANDON 6400 FEET OF 8 INCH STEEL ALONG KC WEST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1214 080.55343 44
RELOCATE FACILITIES. INSTALL 106 FEET OF 6 INCH POLY AND ABANDON 108 FEET OF 6 INCH POLY ALONG KIEST BOULEVARD TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1215 080.55346 2,992 INSTALL 380 FEET OF 4 INCH AND 1270 FEET OF 2 INCH POLY ALONG STREETS OF MORNINGSTAR PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
1216 080.55350 266
INSTALL 96 FEET OF 4 INCH POLY ALONG HICKORY AND ABANDON 27 FEET OF STEEL AND 85 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1217 080.55351 3,123
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH AND 3045 FEET OF 4 INCH POLY AND ABANDON 2487 FEET OF 2 INCH STEEL, 437 FEET OF 2 INCH, AND 180 FEET OF 4 INCH POLY ALONG PECAN STREET TO ACCOMMODATE THE CITY OF ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
SYSTEM INTEGRITY DECEMBER
1218 080.55352 156
INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH POLY ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
1219 080.55379 1,666
INSTALL 1230 FEET OF 2 INCH POLY ALONG ELECTRA AND ABANDON 820 FEET OF 4 INCH AND 410 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1220 080.55380 2,427
INSTALL 1030 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 4 INCH CAST IRON ALONG BERTRAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1221 080.55383 149
INSTALL 525 FEET OF 2 INCH POLY ALONG FAIRVIEW STREET AND ABANDON 520 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE
SYSTEM INTEGRITY DECEMBER
1222 080.55386 1,101
INSTALL 1335 FEET OF 2 INCH POLY AND ABANDON 1335 FEET OF 4 INCH CAST IRON ALONG GRIFFITH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1223 080.55387 529
RELOCATE FACILITIES. INSTALL 570 FEET OF 2 INCH AND 250 FEET OF 4 INCH POLY ALONG CEDAR AND ABANDON 697 FEET OF 3 INCH AND 542 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF HICO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO
SYSTEM INTEGRITY DECEMBER
1224 080.55397 1,400
RELOCATE FACILITIES. INSTALL 1215 FEET OF 4 INCH AND 1285 FEET OF 2 INCH POLY ALONG KINGSBRIDGE AND ABANDON 680 FEET OF 4 INCH, 535 FEET OF 3 INCH AND 1385 FEET OF 2 INCH POLY TO ACCOMMODATE ALLEYS REHAB PROJECTS BY THE CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1225 080.55405 194,175
INSTALL 12557 FEET OF 6 INCH STEEL ALONG LINE M3 AND ABANDON 20695 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
1226 080.55415 1,139
INSTALL 3800 FEET OF 2 INCH POLY ALONG SH 294 AND ABANDON 3800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
1227 080.55417 300
INSTALL RECTIFIER AND GROUND BED ALONG LINE M6(2ND) IN CORSICANA IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1228 080.55419 4,684
INSTALL 2890 FEET OF 4 INCH POLY ALONG ROGERS AVENUE AND ABANDON 406 FEET OF 8 INCH, 1375 FEET OF 4 INCH CAST IRON, 1315 FEET OF 4 INCH, AND 317 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1229 080.55422 1,885
RELOCATE FACILITIES. INSTALL 1360 FEET OF 2 INCH POLY ALONG ROSEHILL ROAD AND ABANDON 1360 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1230 080.55423 1,265
RELOCATE FACILITIES. INSTALL 840 FEET OF 4 INCH POLY ALONG LYONS ROAD AND ABANDON 810 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1231 080.55424 1,862
RELOCATE FACILITIES. INSTALL 680 FEET OF 4 INCH POLY ALONG FALLBROOK DRIVE AND ABANDON 675 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1232 080.55425 554
RELOCATE FACILITIES. INSTALL 480 FEET OF 2 INCH POLY ALONG GUTHRIE ROAD AND ABANDON 500 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1233 080.55427 (93,826)
RELOCATE FACILITIES. INSTALL 1880 FEET OF 4 INCH POLY ALONG HIGHWAY 66 AND ABANDON 1800 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT FM1570 IMPROVEMENT PROJECT IN HUNT COUNTY. ALL CUSTOMERS GREENVILLE
RELOCATION OF FACILITIES OCTOBER
1234 080.55432 482
INSTALL 540 FEET OF 4 INCH AND 70 FEET OF 2 INCH POLY AND ABANDON 440 FEET OF 4 INCH CAST IRON, 100 FEET OF 4 INCH STEEL, AND 70 FEET OF 2 INCH STEEL ALONG 14TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
1235 080.55437 159
RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH POLY ALONG ROSSER ROAD AND ABANDON 50 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1236 080.55441 588 INSTALL (1) 220 SLEEVE ALONG LINE C16(WEST) IN TARRANT COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1237 080.55445 552
RELOCATE FACILITIES. INSTALL 580 FEET OF 4 INCH POLY ALONG BOWIE STREET AND ABANDON 335 FEET OF 4 INCH CAST IRON, 225 FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 43 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1238 080.55469 1,605
RELOCATE FACILITIES. INSTALL 1537 FEET OF 4 INCH AND 1318 FEET OF 2 INCH POLY ALONG ROBERTS STREET AND ABANDON 848 FEET OF 2 INCH AND 1802 FEET OF 3 INCH STEEL AND 273 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WEST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY DECEMBER
1239 080.55470 3,159
INSTALL (342) POLY SERVICES AND ABANDON (342) STEEL SERVICES ALONG STREETS OF BEDFORD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD
SYSTEM INTEGRITY DECEMBER
1240 080.55471 632 ABANDON 32 FEET OF 2 INCH AND 65 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILFORD
SYSTEM INTEGRITY DECEMBER
1241 080.55474 616
RELOCATE FACILITIES. INSTALL 360 FEET OF 6 INCH POLY ALONG MCPHERSON AVENUE AND ABANDON 475 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1242 080.55484 1,006
INSTALL 1080 FEET OF 2 INCH POLY ALONG SUPERIOR AND ABANDON 1005 FEET OF 4 INCH CAST IRON AND 75 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1243 080.55485 1,070
INSTALL 1100 FEET OF 2 INCH POLY ALONG PIERCE STREET AND ABANDON 960 FEET OF 6 INCH CAST IRON AND 140 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1244 080.55487 1,923
INSTALL 2055 FEET OF 2 INCH POLY ALONG EXLINE STREET AND ABANDON 210 FEET OF 4 INCH AND 1845 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1245 080.55488 3,573
INSTALL 1900 FEET OF 2 INCH POLY ALONG CARPENTER AVENUE AND ABANDON 1850 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1246 080.55491 166
INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 289 FEET OF 3 INCH CAST IRON AND 28 FEET OF 4 INCH STEEL ALONG 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
1247 080.55495 23,251
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH AND 465 FEET OF 6 INCH POLY ALONG PATTON DRIVE AND ABANDON 18 FEET OF 2 INCH AND 460 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1248 080.55512 2,990
INSTALL (225) POLY SERVICES AND ABANDON (225) STEEL SERVICES ALONG STREETS OF KERRVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
1249 080.55513 5,949
INSTALL (372) POLY SERVICES ALONG STREETS OF ARLINGTON AND ABANDON (372) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1250 080.55520 244
INSTALL 300 FEET OF 4 INCH POLY ALONG BOMBER DRIVE AND ABANDON 285 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1251 080.55526 132
INSTALL 200 FEET OF 2 INCH AND 320 FEET OF 4 INCH POLY ALONG POLK AND ABANDON 194 FEET OF 2 INCH AND 200 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CENTERVILLE
SYSTEM INTEGRITY DECEMBER
1252 080.55530 81
INSTALL 5 FEET OF 10 INCH AND 5 FEET OF 12 INCH POLY ALONG AVENUE L AND ABANDON 5 FEET OF 10 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1253 080.55539 206
INSTALL 300 FEET OF 4 INCH AND ABANDON 300 FEET OF 4 INCH STEEL ALONG SHERMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
1254 080.55543 540
RELOCATE FACILITIES. INSTALL 1050 FEET OF 2 INCH POLY AND ABANDON 1664 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1255 080.55546 39
RELOCATE FACILITIES. ABANDON 25 FEET OF 4 INCH STEEL ALONG ELM TO ACCOMMODATE CITY OF FORNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY
SYSTEM INTEGRITY DECEMBER
1256 080.55548 21
RELOCATE FACILITIES. ABANDON 225 FEET OF 2 INCH STEEL ALONG PROFIT TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1257 080.55564 439
INSTALL 575 FEET OF 2 INCH POLY ALONG CHANDLER AND ABANDON 622 FEET OF 2 INCH STEEL AND 61 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHANDLER
SYSTEM INTEGRITY DECEMBER
1258 080.55565 2,119
RELOCATE FACILITIES. INSTALL 2425 FEET OF 2 INCH POLY ALONG GARDENVIEW AND ABANDON 2486 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1259 080.55568 2,983
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH, 1750 FEET OF 4 INCH, AND 100 FEET OF 8 INCH POLY ALONG HIGHLAND AND ABANDON 100 FEET OF 2 INCH, 2032 FEET OF 6 INCH, AND 294 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1260 080.55602 5 ABANDON 980 FEET OF 2 INCH POLY ALONG HEADS AND TAIL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
1261 080.55614 172
RELOCATE FACILITIES. INSTALL 185 FEET OF 4 INCH POLY ALONG WOODSIDE DRIVE AND ABANDON 155 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1262 080.55621 44
RELOCATE FACILITIES. INSTALL 98 FEET OF 4 INCH POLY AND ABANDON 95 FEET OF 4 INCH STEEL ALONG VALLEY VIEW LANE TO ACCOMMODATE CITY OF FARMERS BRANCH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
1263 080.55623 1,446
INSTALL 200 FEET OF 10 INCH STEEL AND ABANDON 200 FEET OF 10 INCH STEEL ALONG HIGHWAY 77 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORRESTON
SYSTEM INTEGRITY DECEMBER
1264 080.55625 933
INSTALL 950 FEET OF 2 INCH POLY ALONG GUARANTY STREET AND ABANDON 525 FEET OF 4 INCH AND 350 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1265 080.55627 322
INSTALL DEEP WELL GROUND BED AND RECTIFIER ALONG LINE L14 AND ABANDON DEEP WELL GROUND BED AND RECTIFIER IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROGERS
SYSTEM INTEGRITY DECEMBER
1266 080.55630 237
RELOCATE FACILITIES. INSTALL 240 FEET OF 8 INCH POLY ALONG KEMP BOULEVARD AND ABANDON 240 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
1267 080.55639 2,680 INSTALL 2375 FEET OF 2 INCH POLY ALONG STREETS OF CREEKS OF LEGACY. DEVELOPER INSTALLED FACILTIES. RESIDENTIAL CELINA GROWTH AUGUST
1268 080.55640 7,577 INSTALL 6150 FEET OF 2 INCH AND 650 FEET OF 6 INCH POLY ALONG THE STREETS OF WILLOW WOOD PHASE 2B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
MTX AdditionsPage 44 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1269 080.55641 1,252
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND 1600 FEET OF 2 INCH POLY AND ABANDON 1600 FEET OF 4 INCH STEEL AND 400 FEET OF 3 INCH STEEL ALONG CHURCH STREET TO ACCOMMODATE CITY OF ROYSE CITY WATER AND PAVING AND SEWER PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY
SYSTEM INTEGRITY DECEMBER
1270 080.55642 27,058
RELOCATE FACILITIES. INSTALL 5745 FEET OF 4 INCH POLY ALONG LOTUS AVENUE AND ABANDON 1800 FEET OF 6 INCH CAST IRON, 540 FEET OF 6 INCH, 580 FEET OF 3 INCH, AND 465 FEET OF 2 INCH STEEL, AND 185 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1271 080.55648 470
INSTALL DISTRICT REGULATOR STATION ALONG STREETS OF RICHLAND AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND
SYSTEM INTEGRITY DECEMBER
1272 080.55650 954 INSTALL 1660 FEET OF 2 INCH POLY AND ABANDON 1660 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
1273 080.55656 384
RELOCATE FACILITIES. INSTALL 10 POLY SERVICE LINES AND ABANDON 10 STEEL SERVICES ALONG BROADWAY TO ACCOMMODATE THE CITY OF MARBLE FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS
SYSTEM INTEGRITY DECEMBER
1274 080.55667 280
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG SW 1ST STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS
SYSTEM INTEGRITY DECEMBER
1275 080.55670 3,333
RELOCATE FACILITIES. INSTALL 2550 FEET OF 6 INCH, 1650 FEET OF 4 INCH, AND 400 FEET OF 2 INCH POLY ALONG ROCKMOOR DRIVE AND ABANDON 120 FEET OF 1.25 INCH, 2100 FEET OF 2 INCH, 1650 FEET OF 3 INCH AND 2550 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF EDGECLIFF VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EDGECLIFF VILLAGE
SYSTEM INTEGRITY DECEMBER
1276 080.55673 29,032
RELOCATE FACILITIES. INSTALL 2869 FEET OF 8 INCH POLY ALONG I20 AND ABANDON 210 FEET OF 6 INCH, 1388 FEET OF 8 INCH POLY AND 1210 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF TXDOT INTERSTATE 20 STREET IMPROVEMENT PROJECT IN DALLAS COUNTY. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF FACILITIES DECEMBER
1277 080.55674 3,986
INSTALL 1215 FEET OF 6 INCH POLY, 4196 FEET OF 4 INCH POLY ALONG CUSTER ROAD AND ABANDON 1215 FEET OF 6 INCH STEEL, 2831 FEET OF 4 INCH POLY, 1365 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1278 080.55675 311
RELOCATE FACILITIES. INSTALL 360 FEET OF 4 INCH POLY ALONG MURPHY AND ABANDON 360 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BEDFORD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD
SYSTEM INTEGRITY DECEMBER
1279 080.55682 7,393
INSTALL 6033 FEET OF 2 INCH POLY ALONG KELSEY DRIVE AND ABANDON 5683 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1280 080.55683 22,630
INSTALL 4200 FEET OF 2 INCH POLY AND ABANDON 4200 FEET OF 2 INCH POLY ALONG WESTLAKE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1281 080.55690 75
RELOCATE FACILITIES. INSTALL 75 FEET OF 6 INCH POLY AND ABANDON 75 FEET OF 6 INCH POLY ALONG AVENUE K TO ACCOMMODATE THE CITY OF PLANO NEW ROADWAY ELEVATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1282 080.55692 1,723
INSTALL 2290 FEET OF 2 INCH AND 430 FEET OF 6 INCH POLY ALONG FAIRFAX AND ABANDON 100 FEET OF 6 INCH POLY, 2190 FEET OF 6 INCH AND 440 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
1283 080.55697 1,335
RELOCATE FACILITIES. INSTALL 450 FEET OF 6 INCH POLY ALONG PRESTON ROAD AND ABANDON 350 FEET OF 6 INCH POLY AND 100 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
1284 080.55702 1,415
INSTALL 1600 FEET OF 8 INCH POLY, 192 FEET OF 2 INCH POLY AND 40 FEET OF 4 INCH POLY ALONG HALL STREET AND ABANDON 1600 FEET OF 8 INCH, 192 FEET OF 2 INCH, AND 30 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE
SYSTEM INTEGRITY DECEMBER
1285 080.55710 1,397
INSTALL 1310 FEET OF 2 INCH POLY AND ABANDON 1310 FEET OF 6 INCH CAST IRON ALONG SOUTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1286 080.55711 829
INSTALL 1575 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 6 INCH CAST IRON AND 545 FEET OF 6 INCH POLY ALONG SOUTH FITZHUGH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1287 080.55714 1,249
INSTALL 1950 FEET OF 2 INCH POLY ALONG PARK ROW AND ABANDON 1020 FEET OF 4 INCH AND 485 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1288 080.55715 353
INSTALL 389 FEET OF 4 INCH POLY ALONG PANDOLPH AND ABANDON 384 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1289 080.55719 670
RELOCATE FACILITIES. INSTALL 42 POLY SERVICES AND ABANDON 42 STEEL AND POLY SERVICES ALONG REEVER STREET TO ACCOMMODATE THE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1290 080.55723 619
INSTALL 1282 FEET OF 2 INCH, 1650 FEET OF 4 INCH AND 563 FEET OF 6 INCH POLY ALONG THE STREETS OF SANTA RITA SOUTH SECTION 4B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
1291 080.55728 29,225
INSTALL 3000 FEET OF 24 INCH STEEL ALONG DT3 IN DALLAS COUNTY AND ABANDON 3000 FEET OF 24 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
1292 080.55752 950
RELOCATE FACILITIES. INSTALL 1531 FEET OF 6 INCH POLY AND ABANDON 1515 FEET OF 6 INCH POLY ALONG MCREYNOLDS ROAD TO ACCOMMODATE CITY OF SANGER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER
SYSTEM INTEGRITY DECEMBER
1293 080.55758 785
RELOCATE FACILITIES. INSTALL 365 FEET OF 2 INCH AND 474 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 365 FEET OF 2 INCH, 624 FEET OF 3 INCH STEEL, AND 280 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF MALONE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALONE
SYSTEM INTEGRITY DECEMBER
1294 080.55759 257
RELOCATE FACILITIES. INSTALL 235 FEET OF 4 INCH POLY AND ABANDON 235 FEET OF 4 INCH STEEL ALONG ED COADY ROAD TO ACCOMMODATE CITY OF EDGECLIFF VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EDGECLIFF VILLAGE
SYSTEM INTEGRITY DECEMBER
1295 080.55761 1,047
INSTALL 3765 FEET OF 2 INCH POLY ALONG FARM TO MARKET 1161 NORTH AND ABANDON 3572 FEET OF 2 INCH STEEL AND 438 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 45 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1296 080.55765 344
INSTALL RECTIFIER AND DEEPWELL GROUND BED AND ABANDON DEEPWELL GROUND BED ON LINE W22-20 IN DENTON COUNTY IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
SYSTEM INTEGRITY DECEMBER
1297 080.55772 345
INSTALL 217 FEET OF 2 INCH AND 315 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 2 INCH, 217 FEET OF 3 INCH, 208 FEET OF 4 INCH STEEL, AND 105 FEET OF 4 INCH POLY ALONG LAMAR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
SYSTEM INTEGRITY DECEMBER
1298 080.55775 18,264
INSTALL 1395 FEET OF 2 INCH POLY ALONG VAN BUREN STREET AND ABANDON 25 FEET OF 4 INCH STEEL AND 1370 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1299 080.55784 288
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY AND 80 FEET OF 6 INCH POLY ALONG COLONIAL AVENUE AND ABANDON 30 FEET OF 4 INCH POLY AND 70 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1300 080.55785 148
RELOCATE FACILITIES. INSTALL 150 FEET OF 4 INCH POLY ALONG CENTER STREET AND ABANDON 150 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
1301 080.55797 2,877
INSTALL (163) POLY SERVICES ALONG STREETS OF FORT WORTH AND ABANDON (163) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1302 080.55799 283
INSTALL 750 FEET OF 2 INCH POLY AND ABANDON 750 FEET OF 2 INCH STEEL ALONG RAMSEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OGLESBY
SYSTEM INTEGRITY DECEMBER
1303 080.55818 772
INSTALL 4550 FEET OF 2 INCH POLY, THIRTY TWO (32) SHORT SIDE SERVICE STUBS, AND TWENTY THREE (23) LONG SIDE SERVICE STUBS ALONG THE STREETS OF NEW LA JOLLA PHASE 3 SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRI GROWTH JUNE
1304 080.55822 825 INSTALL 912 FEET OF 4 INCH AND 2390 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA 3E. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
1305 080.55823 500
RELOCATE FACILITIES. INSTALL 610 FEET OF 4 INCH POLY AND ABANDON 530 FEET OF 4 INCH POLY ALONG SHERMAN DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1306 080.55839 2,863
INSTALL (353) POLY SERVICES AND ABANDON (353) STEEL SERVICES ALONG STREETS OF FARMERS BRANCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
1307 080.55840 2,970
INSTALL (204) POLY SERVICES AND ABANDON (204) STEEL SERVICES ALONG STREETS OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1308 080.55841 4,117
INSTALL (389) POLY SERVICES AND ABANDON (389) COPPER SERVICES IN THE CITY OF ARLINGTON IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1309 080.55842 2,807
INSTALL (189) POLY SERVICES AND ABANDON (189) STEEL SERVICES ALONG STREETS OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1310 080.55857 234
INSTALL 320 FEET OF 4 INCH POLY ALONG AMBLER STREET AND ABANDON 320 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1311 080.55858 518
INSTALL 152 FEET OF 4 INCH POLY AND ABANDON 1100 FEET OF 8 INCH STEEL ALONG MARSHALL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARLSBAD
SYSTEM INTEGRITY DECEMBER
1312 080.55867 1,423
INSTALL 1750 FEET OF 2 INCH POLY ALONG BRYAN PARKWAY AND ABANDON 1615 FEET OF 4 INCH CAST IRON AND 135 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1313 080.55868 926
INSTALL 1220 FEET OF 4 INCH POLY ALONG NORTH BEACON STREET AND ABANDON 740 FEET OF 8 INCH, 360 FEET OF 6 INCH CAST IRON, 50 FEET OF 8 INCH STEEL, AND 70 FEET OF 8 INCH POLY INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1314 080.55871 24,161 INSTALL 3200 FEET OF 2 INCH POLY ALONG THE STREETS OF MOCKINGBIRD PLACE PHASE I ADDITION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WHITEHOUSE GROWTH JULY
1315 080.55872 12
RELOCATE FACILITIES. ABANDON 540 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
1316 080.55879 64
INSTALL DISTRICT REGULATOR STATION IN PARIS AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
1317 080.55889 216 INSTALL 335 FEET OF 2 INCH POLY AND ABANDON 335 FEET OF 2 INCH STEEL ALONG HACKBERRY IN ACCORDANCE WITH TEXAS RULE 8209. ALL CUSTOMERS ANNA
SYSTEM INTEGRITY DECEMBER
1318 080.55897 1,711
INSTALL 1860 FEET OF 2 INCH POLY ALONG BROOKS AVENUE AND ABANDON 1655 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1319 080.55898 174
INSTALL 10 FEET OF 8 INCH POLY AND ABANDON 10 FEET OF 8 INCH STEEL ALONG AUDELIA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1320 080.55899 279
INSTALL 10 FEET OF 8 INCH POLY ALONG WALKER AND ABANDON 4 FEET OF 6 INCH AND 28 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1321 080.55910 833
INSTALL 1850 FEET OF 2 INCH POLY ALONG DONNA AND ABANDON 1850 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
SYSTEM INTEGRITY DECEMBER
1322 080.55920 2,914
INSTALL 1535 FEET OF 2 INCH POLY ALONG CEDAR SPRINGS ROAD AND ABANDON 1035 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1323 080.55922 1,207
INSTALL 220 FEET OF 6 INCH AND 660 FEET OF 2 INCH POLY ALONG DARTMOUTH AVENUE AND ABANDON 420 FEET OF 4 INCH CAST IRON AND 240 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1324 080.55923 3,180
RELOCATE FACILITIES. INSTALL 2186 FEET OF 2 INCH POLY AND (29) POLY SERVICES ALONG SYLVANIA AVENUE AND ABANDON (29) STEEL SERVICES AND 30 FEET OF 2 INCH CAST IRON TO ACCOMMODATE THE CITY OF FORT WORTH CITY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1325 080.55925 249
INSTALL GROUNDBED AND RECTIFIER AND ABANDON INSTALL GROUNDBED AND RECTIFIER ON LINE D IN DALLAS COUNTY TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1326 080.55926 10,041
RELOCATE FACILITIES. INSTALL 3114 FEET OF 4 INCH POLY AND ABANDON 3100 FEET OF 4 INCH STEEL ALONG JACQELINE ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 46 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1327 080.55943 393
RELOCATE FACILITIES. INSTALL 80 FEET OF 6 INCH AND 130 FEET OF 2 INCH POLY ALONG POTOMAC DRIVE AND ABANDON 177 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1328 080.55944 10,644
INSTALL 11825 FEET OF 2 INCH POLY ALONG THE STREETS OF THE FIRST PHASE OF THE HOMESTEAD AT OWNSBY FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH NOVEMBER
1329 080.55949 7,925 INSTALL 3130 FEET OF 2 INCH AND 725 FEET OF 4 INCH POLY ALONG THE STREETS OF WILLIAMS CREEK PHASE 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
1330 080.55950 2,536
INSTALL 1883 FEET OF 2 INCH AND 1216 FEET OF 4 INCH POLY ALONG SOUTH AVENUE G AND ABANDON 2784 FEET OF 4 INCH, 2045 FEET OF 3 INCH, 230 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
1331 080.55951 914
INSTALL 1340 FEET OF 4 INCH POLY ALONG LAMAR STREET AND ABANDON 816 FEET OF 4 INCH STEEL AND 513 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
1332 080.55952 8,045,720 INSTALL 31,000 FEET OF 10 INCH STEEL ALONG HARMON ROAD AND US287 IN FORT WORTH. ALL CUSTOMERS FORT WORTH
SYSTEM IMPROVEMENT DECEMBER
1333 080.55957 38
RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH POLY AND ABANDON 75 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1334 080.55961 1,531
INSTALL 930 FEET OF 2 INCH POLY ALONG MYRTLE DRIVE AND ABANDON 930 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1335 080.55963 2,937
INSTALL 1275 FEET OF 2 INCH POLY ALONG MYRTLE AND ABANDON 1275 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1336 080.55964 996
RELOCATE FACILITIES. INSTALL 1450 FEET OF 2 INCH POLY ALONG MCGEE STREET AND ABANDON 760 FEET OF 2 INCH POLY AND 670 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1337 080.55966 988
RELOCATE FACILITIES. INSTALL 900 FEET OF 6 INCH POLY ALONG RALPH HALL PARKWAY AND ABANDON 817 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
SYSTEM INTEGRITY DECEMBER
1338 080.55975 38,518
INSTALL 2140 FEET OF 4 INCH POLY AND ABANDON 2140 FEET OF 8 INCH CAST IRON ALONG LAKESHORE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1339 080.55976 42,064
INSTALL 975 FEET OF 4 INCH POLY AND 585 FEET OF 2 INCH POLY AND ABANDON 1100 FEET OF 8 INCH CAST IRON AND 460 FEET OF 4 INCH CAST IRON ALONG LAKESHORE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1340 080.55978 9,536 INSTALL 1300 FEET OF 4 INCH AND 2570 FEET OF 2 INCH POLY ALONG STREETS OF GRAMERCY PARK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH OCTOBER
1341 080.55979 39,269 INSTALL 750 FEET OF 4 INCH POLY ALONG HOLFORD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GARLAND GROWTH DECEMBER
1342 080.55980 1,733
INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON 2323 FEET 2 INCH, 35 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1343 080.55984 576
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG ENNIS AVENUE AND ABANDON 800 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
1344 080.55986 1,546
INSTALL 2475 FEET OF 2 INCH, 544 FEET OF 4 INCH AND 1111 FEET OF 6 INCH POLY ALONG TIERRA ROSA BOULEVARD TO SERVE SANTA RITA NORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
1345 080.55989 739
INSTALL 45 FEET OF 16 INCH STEEL ALONG LINE C16 AND ABANDON 65 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD
SYSTEM INTEGRITY DECEMBER
1346 080.55990 811
RELOCATE FACILITIES. INSTALL 1200 FEET OF 4 INCH POLY AND ABANDON 1167 FEET OF 4 INCH CAST IRON AND 60 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1347 080.55992 1,095
INSTALL 750 FEET OF 4 INCH POLY ALONG URSALINE AVENUE AND ABANDON 526 FEET OF 4 INCH AND 215 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1348 080.56006 297
RELOCATE FACILITIES. INSTALL 440 FEET OF 4 INCH POLY ALONG SHERMAN STREET AND ABANDON 425 FEET OF 2 INCH STEEL AND 10 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF NOCONA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA
SYSTEM INTEGRITY DECEMBER
1349 080.56012 618
RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY ALONG 23RD STREET AND ABANDON 127 FEET OF 3 INCH AND 464 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1350 080.56016 667
RELOCATE FACILITIES. INSTALL 1014 FEET OF 2 INCH POLY ALONG HARRISON STREET AND ABANDON 947 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF MCGREGOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
1351 080.56023 10 ABANDON 397 FEET OF 2 INCH STEEL ALONG MOODY CIRCLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
1352 080.56030 2,504
RELOCATE FACILITIES. INSTALL 1860 FEET OF 8 INCH AND 350 FEET OF 2 INCH POLY ALONG LANCASTER AND ABANDON 50 FEET OF 6 INCH, 360 FEET OF 4 INCH, 900 FEET OF 3 INCH, AND 1835 FEET OF 8 INCH STEEL, 50 FEET OF 6 INCH, 640 FEET OF 4 INCH, AND 90 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1353 080.56033 1,734
RELOCATE FACILITIES. INSTALL 150 FEET OF 4 INCH AND 600 FEET OF 2 INCH POLY ALONG ALEXANDER DRIVE AND ABANDON 30 FEET OF 2 INCH, 635 FEET OF 3 INCH, 15 FEET OF 4 INCH STEEL, 106 FEET OF 2 INCH, AND 70 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
1354 080.56034 1,760
INSTALL 1390 FEET OF 2 INCH POLY ALONG WOODLAWN AND ABANDON 1240 FEET OF 4 INCH AND 290 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1355 080.56037 430
RELOCATE FACILITIES. INSTALL 780 FEET OF 2 INCH POLY ALONG HILL LANE AND ABANDON 770 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 47 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1356 080.56044 2,384
RELOCATE FACILITIES. INSTALL 720 FEET OF 6 INCH POLY ALONG FM 1171 AND ABANDON 120 FEET OF 6 INCH STEEL AND 580 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
1357 080.56064 312
INSTALL 600 FEET OF 2 INCH POLY ALONG KENTUCKY AND ABANDON 500 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
1358 080.56065 4,182
INSTALL 975 FEET OF 2 INCH POLY ALONG PEMBROKE AND ABANDON 975 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1359 080.56067 904
INSTALL 1480 FEET OF 2 INCH POLY AND ABANDON 1385 FEET OF 6 INCH AND 315 FEET OF 4 INCH CAST IRON ALONG OAK LAWN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1360 080.56068 904
INSTALL 1460 FEET OF 2 INCH POLY ALONG PARK ROW AVENUE AND ABANDON 1045 FEET OF 4 INCH AND 310 FEET OF 6 INCH CAST IRON AND 135 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1361 080.56070 340 ABANDON 20 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAVON
SYSTEM INTEGRITY DECEMBER
1362 080.56076 410
RELOCATE FACILITIES. INSTALL 860 FEET OF 8 INCH POLY ALONG HODDE LANE AND ABANDON 786 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF PFLUGERVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE
SYSTEM INTEGRITY DECEMBER
1363 080.56097 1,472
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY ALONG LONGNECK ROAD AND ABANDON 218 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF PRINCETON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
SYSTEM INTEGRITY DECEMBER
1364 080.56107 5,638
INSTALL 2600 FEET OF 4 INCH POLY ALONG HARWIN STREET AND ABANDON 1238 FEET OF 4 INCH, 1160 FEET OF 6 INCH, AND 360 FEET OF 8 INCH CAST IRON, AND 225 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1365 080.56110 5,868
INSTALL DEEP WELL GROUND BED AND RECTIFIER AT STATION ALONG LINE L21 IN WILLIAMSON COUNTY IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
1366 080.56131 313
RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH POLY ALONG NORTH COLONY BOULEVARD AND ABANDON 400 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF THE COLONY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY
SYSTEM INTEGRITY DECEMBER
1367 080.56144 1,250
INSTALL 2760 FEET OF 2 INCH POLY ALONG COLLEGE STREET AND ABANDON 1100 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY
SYSTEM INTEGRITY DECEMBER
1368 080.56147 592
INSTALL 1525 FEET OF 2 INCH POLY ALONG ELM AND ABANDON 915 FEET OF 2 INCH STEEL AND 610 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY
SYSTEM INTEGRITY DECEMBER
1369 080.56148 4,160 INSTALL 6460 FEET OF 2 INCH AND 595 FEET OF 4 INCH POLY ALONG STREETS OF PHASE 1B OF THE DONIHOO FARMS. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PARKER GROWTH NOVEMBER
1370 080.56150 1,152
INSTALL 2418 FEET OF 2 INCH POLY AND ABANDON 2516 FEET OF 2 INCH STEEL AND 237 FEET OF 2 INCH POLY ALONG THE STREETS OF CHADBOURNE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINGATE
SYSTEM INTEGRITY DECEMBER
1371 080.56153 3,467
INSTALL (249) STEEL SERVICES AND (49) METERS ALONG STREETS OF TEMPLE AND ABANDON (249) STEEL SERVICES AND (49) METERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILLEEN
SYSTEM INTEGRITY DECEMBER
1372 080.56154 1,887
INSTALL (160) POLY SERVICES AND ABANDON (160) STEEL SERVICES ALONG STREETS OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1373 080.56155 2,447
INSTALL (238) POLY SERVICES ALONG STREETS OF GARLAND AND ABANDON (238) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1374 080.56158 2,596
INSTALL (269) POLY SERVICES AND ABANDON (269) STEEL SERVICES ALONG STREETS OF ROUND ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
1375 080.56159 1,836
INSTALL (267) POLY SERVICES AND ABANDON (267) STEEL SERVICES ALONG STREETS OF TEMPLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
1376 080.56160 2,733
INSTALL 163 FEET OF 2 INCH AND 2087 FEET OF 6 INCH POLY ALONG 11TH STREET AND ABANDON 163 FEET OF 2 INCH, 1490 FEET OF 6 INCH, 24 FEET OF 4 INCH, 467 FEET OF 8 INCH, 7 FEET OF 12 INCH STEEL, AND 98 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1377 080.56162 8,160
INSTALL (249) POLY SERVICES AND ABANDON (249) STEEL SERVICES ALONG STREETS IN CITY OF TEMPLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
1378 080.56164 1,274
INSTALL 1720 FEET OF 2 INCH AND 182 FEET OF 4 INCH POLY ALONG 10TH STREET AND ABANDON 648 FEET OF 3 INCH AND 1407 FEET OF 2 INCH STEEL AND 45 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1379 080.56165 204
RELOCATE FACILITIES. INSTALL 237 FEET OF 2 INCH POLY ALONG HANDLEY DRIVE AND ABANDON 202 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1380 080.56171 489
INSTALL 700 FEET OF 4 INCH POLY ALONG HENDERSON AND ABANDON 100 FEET OF 2 INCH POLY AND 517 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRIDGEPORT
SYSTEM INTEGRITY DECEMBER
1381 080.56173 3,518
INSTALL 3860 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 3686 FEET OF 3 INCH, 58 FEET OF 4 INCH, 106 FEET OF 2 INCH STEEL AND 400 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
1382 080.56174 1,762 INSTALL 1140 FEET OF 2 INCH POLY AND ABANDON 1070 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1383 080.56175 1,836
INSTALL 960 FEET OF 6 INCH, 1145 FEET OF 2 INCH POLY ALONG TYLER STREET AND ABANDON 2192 FEET OF 2 INCH STEEL DUE TO AGING INFRASTRUCTURE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
1384 080.56180 1,817
INSTALL 1469 FEET OF 2 INCH AND 1221 FEET OF 4 INCH POLY ALONG DAVID DAVIS DRIVE AND ABANDON 1469 FEET OF 2 INCH AND 1221 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
1385 080.56185 190
INSTALL 320 FEET OF 4 INCH POLY ALONG MCGEE STREET AND ABANDON 320 FEET OF 4 INCH, 42 FEET OF 2 INCH STEEL AND 119 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 48 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1386 080.56186 1,166
INSTALL 249 FEET OF 6 INCH AND 2141 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 538 FEET OF 2 INCH, 1149 FEET OF 3 INCH, 210 FEET OF 4 INCH AND 249 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1387 080.56187 1,216
INSTALL 1000 FEET OF 2 INCH AND 670 FEET OF 4 INCH POLY ALONG US 175 AND ABANDON 1000 FEET OF 6 INCH AND 670 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1388 080.56188 987
INSTALL 480 FEET OF 2 INCH POLY AND ABANDON 318 FEET OF 4 INCH AND 1317 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1389 080.56194 1,804
INSTALL 3211 FEET OF 4 INCH POLY ALONG FM153 AND ABANDON 3051 FEET OF 3 INCH STEEL AND 160 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINGATE
SYSTEM INTEGRITY DECEMBER
1390 080.56195 246
INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 3 INCH STEEL ALONG BALLARD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE
SYSTEM INTEGRITY DECEMBER
1391 080.56199 1,606
INSTALL 1770 FEET OF 2 INCH POLY AND ABANDON 1779 FEET OF 6 INCH CAST IRON ALONG YORK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1392 080.56200 5,207
INSTALL 1970 FEET OF 2 INCH POLY ALONG YORK AND ABANDON 1470 FEET OF 4 INCH AND 500 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1393 080.56205 1,450
INSTALL 1824 FEET OF 2 INCH POLY ALONG 18TH AND ABANDON 1385 FEET OF 2 INCH STEEL AND 342 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1394 080.56206 673 INSTALL 2970 FEET OF 4 INCH AND 1010 FEET OF 2 INCH POLY ALONG THE STREETS OF BREWSTER POINT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JULY
1395 080.56208 5,876
INSTALL 1250 FEET OF 8 INCH, 4150 FEET OF 4 INCH AND 7200 FEET OF 2 INCH POLY ALONG THE STREETS OF SOMERSET PARK PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH OCTOBER
1396 080.56209 1,974
INSTALL 1601 FEET OF 2 INCH POLY ALONG 18TH STREET AND ABANDON 1479 FEET OF 2 INCH STEEL AND 122 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1397 080.56210 1,665
INSTALL 2026 FEET OF 2 INCH POLY ALONG PARK AND ABANDON 2001 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1398 080.56214 358
RELOCATE FACILITIES. INSTALL 310 FEET OF 6 INCH POLY AND ABANDON 310 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1399 080.56222 1,293
INSTALL 1210 FEET OF 4 INCH AND 340 FEET OF 2 INCH POLY AND ABANDON 289 FEET OF 6 INCH AND 1100 FEET OF 8 INCH CAST IRON ALONG MALCOLM X BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1400 080.56225 2,160
INSTALL (200) POLY SERVICES AND ABANDON (200) COPPER SERVICES ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1401 080.56226 723
INSTALL 857 FEET OF 4 INCH POLY ALONG GILBERT AVENUE AND ABANDON 857 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
1402 080.56228 6,608
INSTALL 810 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG MCDERMOTT AND ABANDON 1110 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1403 080.56229 1,141
INSTALL 1300 FEET OF 6 INCH POLY ALONG WINDTHORST ROAD AND ABANDON 1300 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
1404 080.56230 88
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG OAK GROVE ROAD AND ABANDON 100 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
1405 080.56232 2,810
INSTALL 1875 FEET OF 2 INCH AND 355 FEET OF 4 INCH POLY AND ABANDON 1392 FEET OF 3 INCH AND 93 FEET OF 4 INCH CAST IRON ALONG LOMO ALTO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
1406 080.56234 1,027
INSTALL 625 FEET OF 4 INCH POLY ALONG EAST 30TH STREET AND ABANDON 610 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1407 080.56236 609
INSTALL 913 FEET OF 4 INCH POLY ALONG STRONG AVENUE AND ABANDON 913 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER
SYSTEM INTEGRITY DECEMBER
1408 080.56237 686
RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY ALONG SUNNYBROOK AND ABANDON 620 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1409 080.56240 573
INSTALL 620 FEET OF 4 INCH POLY AND ABANDON 553 FEET OF 4 INCH AND 306 FEET OF 6 INCH STEEL ALONG STRONG AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER
SYSTEM INTEGRITY DECEMBER
1410 080.56244 897
INSTALL 1670 FEET OF 2 INCH POLY ALONG BRYAN STREET AND ABANDON 1260 FEET OF 8 INCH, 140 FEET OF CAST IRON, 210 FEET OF 4 INCH POLY AND 600 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1411 080.56245 98,660
INSTALL 1200 FEET OF 8 INCH POLY AND ABANDON 1200 FEET OF 8 INCH STEEL ALONG HIGHWAY 161 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
1412 080.56246 740
INSTALL 852 FEET OF 2 INCH POLY ALONG HUTCHINS STREET AND ABANDON 488 FEET OF 3 INCH, 107 FEET OF 2 INCH, 817 FEET OF 4 INCH POLY, 253 FEET OF 3 INCH, AND 170 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER
SYSTEM INTEGRITY DECEMBER
1413 080.56249 451
INSTALL 332 FEET OF 2 INCH AND 410 FEET OF 4 INCH POLY ALONG 13TH STREET AND ABANDON 273 FEET OF 6 INCH, 307 FEET OF 3 INCH, AND 183 FEET OF 4 INCH STEEL, AND 25 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER
SYSTEM INTEGRITY DECEMBER
1414 080.56251 5,379
RELOCATE FACILITIES. INSTALL 453 FEET OF 6 INCH POLY ALONG JIM CRYSTAL ROAD AND ABANDON 453 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1415 080.56315 5,220,180 NORTH REGION EAST AREA OPERATIONS BLANKET FOR NEW SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER1416 080.56316 4,460,267 INSTALL NEW SERVICES IN NORTH WEST REGION. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1417 080.56317 3,833,041 SOUTHEAST REGION DALLAS AREA OPERATIONS BLANKET FOR NEW SERVICE LINES.. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1418 080.56318 3,136,099 SOUTHEAST REGION EAST AREA OPERATIONS BLANKET FOR NEW SERVICE LINES.. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1419 080.56319 1,810,923 SOUTHEAST REGION SOUTH AREA OPERATIONS BLANKET FOR NEW SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
MTX AdditionsPage 49 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1420 080.56320 10,389,355 SOUTHWEST REGION FORT WORTH AREA OPERATIONS BLANKET FOR NEW SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1421 080.56321 7,125,672 SOUTHWEST REGION SOUTH AREA OPERATIONS BLANKET FOR NEW SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1422 080.56322 1,087,019 SOUTHWEST REGION WEST AREA OPERATIONS BLANKET FOR NEW SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1423 080.56323 1,715,886 NORTH REGION EAST AREA OPERATIONS BLANKET FOR NEW METERS. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER1424 080.56324 1,534,858 NORTH REGION WEST AREA OPERATIONS BLANKET FOR NEW METERS. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1425 080.56325 1,065,461 SOUTHEAST REGION DALLAS AREA OPERATIONS BLANKET FOR NEW METERS. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1426 080.56326 1,433,741 SOUTHEAST REGION EAST AREA OPERATIONS BLANKET FOR NEW METERS. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1427 080.56327 549,697 SOUTHEAST REGION SOUTH AREA OPERATIONS BLANKET FOR NEW METERS. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1428 080.56328 2,680,657 SOUTHWEST REGION FORT WORTH AREA OPERATIONS BLANKET FOR NEW METERS. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1429 080.56329 2,659,483 SOUTHWEST REGION SOUTH AREA OPERATIONS BLANKET FOR NEW METERS. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1430 080.56330 243,191 SOUTHWEST REGION SOUTH AREA OPERATIONS BLANKET FOR NEW METERS. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1431 080.56331 550,495 INSTALL SERVICES AND ABANDON SERVICES IN NORTH EAST REGION. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1432 080.56332 407,191 INSTALL SERVICE LINES IN NORTH WEST REGION. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1433 080.56333 4,652 SOUTHEAST REGION DALLAS AREA BLANKET FOR REPLACEMENT OF SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1434 080.56334 358,942 SOUTHEAST REGION EAST AREA BLANKET FOR REPLACEMENT OF SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1435 080.56335 220,165 SOUTHEAST REGION SOUTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1436 080.56336 268,618 SOUTHWEST REGION FORT WORTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1437 080.56337 137,978 SOUTHWEST REGION SOUTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1438 080.56338 167,229 SOUTHWEST REGION SOUTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF SERVICE LINES. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1439 080.56339 42,501 INSTALL BLANKET FOR CLAMPS IN NORTH EAST REGION. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1440 080.56340 282,750 INSTALL MAINS AND LEAK CLAMPS IN THE NORTHWEST REGION. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1441 080.56341 (155,017)SOUTHEAST REGION DALLAS AREA OPERATIONS BLANKET FOR REPLACEMENT OF MAINS AND LEAK CLAMPS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1442 080.56342 269,032 SOUTHEAST REGION EAST AREA OPERATIONS BLANKET FOR REPLACEMENT OF MAINS AND LEAK CLAMPS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1443 080.56343 (22,505)SOUTHEAST REGION SOUTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF MAINS AND LEAK CLAMPS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1444 080.56344 441,279 SOUTHWEST REGION FORT WORTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF MAINS AND LEAK CLAMPS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1445 080.56345 44,013 SOUTHWEST REGION SOUTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF MAINS AND LEAK CLAMPS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1446 080.56346 237,214 SOUTHWEST REGION WEST AREA OPERATIONS BLANKET FOR REPLACEMENT OF MAINS AND LEAK CLAMPS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1447 080.56347 665,086 INSTALL BLANKET FOR NEW METERS AND REGULATORS. ALL CUSTOMERS SYSTEM WIDE GROWTH DECEMBER
1448 080.56348 837,793 INSTALL METERS AND ABANDON METERS IN THE NORTHWEST REGION. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1449 080.56349 1,092,393 SOUHTEAST REGION DALLAS AREA OPERATIONS BLANKET FOR REPLACEMENT OF METERS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1450 080.56350 640,163 INSTALL METERS AND ABANDON METERS IN THE SOUTHEAST REGION. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1451 080.56351 569,720 SOUTHEAST REGION SOUTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF METERS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1452 080.56352 1,209,326 SOUTHWEST REGION FORT WORTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF METERS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1453 080.56353 347,661 SOUTHWEST REGION SOUTH AREA OPERATIONS BLANKET FOR REPLACEMENT OF METERS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1454 080.56354 566,541 SOUTHWEST REGION WEST AREA OPERATIONS BLANKET FOR REPLACEMENT OF METERS. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1455 080.56355 181,561 NORTH REGION, EAST AREA OPERATIONS BLANKET FOR ANODES. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1456 080.56356 1,280,403 NORTH REGION WEST AREA OPERATIONS BLANKET FOR REPLACEMENT OF ANODES. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1457 080.56357 660,019 SOUTHEAST REGION, SOUTHEAST DALLAS AREA OPERATIONS BLANKET FOR ANODES. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1458 080.56358 583,698 SOUTHEAST REGION, EAST AREA OPERATIONS BLANKET FOR ANODES. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1459 080.56359 433,324 SOUTHEAST REGION, SOUTH AREA OPERATIONS BLANKET FOR ANODES. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1460 080.56360 760,209 SOUTHWEST REGION, FT WORTH AREA OPERATIONS BLANKET FOR ANODES. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1461 080.56361 268,892 SOUTHWEST REGION, SOUTH AREA OPERATIONS BLANKET FOR ANODES. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1462 080.56362 847,177 SOUTHWEST REGION, WEST AREA OPERATIONS BLANKET FOR ANODES. ALL CUSTOMERS SYSTEM WIDESYSTEM
INTEGRITY DECEMBER
1463 080.56363 3,562,795 INSTALL SERVICES AND ABANDON SERVICES IN NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1464 080.56364 8,334,558
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1465 080.56365 30,940,549 INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1466 080.56366 5,350,403
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHEAST EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1467 080.56367 6,299,568
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHEAST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1468 080.56368 10,996,828
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHWEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1469 080.56369 3,272,155
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHWEST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1470 080.56370 5,526,398
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES IN THE SOUTHWEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1471 080.56371 3,873,501 INSTALL METERS AND ABANDON METERS IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 50 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1472 080.56372 3,975,352 INSTALL METERS AND ABANDON METERS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1473 080.56373 6,204,395 INSTALL METERS AND ABANDON METERS IN THE DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1474 080.56374 2,904,754 INSTALL METERS AND ABANDON METERS IN THE SOUTHEAST EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1475 080.56375 2,027,694 INSTALL METERS AND ABANDON METERS IN THE SOUTHEAST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1476 080.56376 5,048,640 INSTALL METERS AND ABANDON METERS IN THE SOUTHWEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1477 080.56377 1,984,367 INSTALL METERS AND ABANDON METERS IN THE SOUTHWEST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1478 080.56378 1,549,195 INSTALL METERS AND ABANDON METERS IN THE SOUTHWEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1479 080.56387 2,535,652 INSTALL MAIN ALONG STREETS OF NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1480 080.56388 10,411,435 REPLACE MAINS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1481 080.56389 1,502,405 REPLACE MAINS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1482 080.56390 3,226,643
INSTALL 14 FEET OF 2 INCH POLY AND ABANDON 544 FEET OF 2 INCH STEEL IN THE SOUTHEAST EAST REGION ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1483 080.56391 6,363,516 REPLACE MAINS IN THE SOUTHEAST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1484 080.56392 5,653,554 REPLACE MAINS IN THE SOUTHWEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1485 080.56393 1,936,085 REPLACE MAINS IN SOUTHWEST SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1486 080.56394 11,749,041 REPLACE MAINS IN THE SOUTHWEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
1487 080.56403 456
INSTALL 700 FEET OF 2 INCH POLY AND ABANDON 700 FEET OF 2 INCH STEEL ALONG WREN DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1488 080.56405 1,056
RELOCATE FACILITIES. ABANDON 990 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
1489 080.56408 1,412
INSTALL 1015 FEET OF 6 INCH AND 600 FEET OF 2 INCH POLY AND ABANDON 577 FEET OF 2 INCH, 117 FEET OF 3 INCH, 171 FEET OF 4 INCH AND 560 FEET OF 6 INCH STEEL ALONG WEST FRANKLIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
1490 080.56409 1,317
RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH POLY AND ABANDON 1809 FEET OF 2 INCH STEEL ALONG BONHAM STREET TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1491 080.56410 1,377
RELOCATE FACILITIES. INSTALL 604 FEET OF 2 INCH POLY ALONG MOTLEY DRIVE AND ABANDON 604 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
1492 080.56415 652
INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH STEEL ALONG CHRISTOPHER PLACE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1493 080.56416 1,984
INSTALL 2125 FEET OF 2 INCH POLY ALONG TYLER STREET AND ABANDON 1830 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1494 080.56419 1,528
INSTALL 1500 FEET OF 2 INCH POLY ALONG WINDMORE AND ABANDON 1405 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1495 080.56420 992
INSTALL 1550 FEET OF 2 INCH POLY ALONG TEMPLE AND ABANDON 780 FEET OF 4 INCH AND 340 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1496 080.56421 4,028
INSTALL 1800 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 6 INCH STEEL AND 405 FEET 6 INCH AND 565 FEET OF 4 INCH CAST IRON ALONG COLORADO IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1497 080.56422 3,311
INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 580 FEET OF 4 INCH CAST IRON ALONG MAYFLOWER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1498 080.56423 84
RELOCATE FACILITIES. ABANDON 238 FEET OF 2 INCH STEEL ALONG MCNAIRN ROAD TO ACCOMMODATE CITY OF BURLESON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
1499 080.56430 1,506
INSTALL 1185 FEET OF 2 INCH POLY ALONG CLINTON AVENUE AND ABANDON 275 FEET OF 6 INCH POLY, 590 FEET OF 4 INCH CAST IRON AND 320 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1500 080.56431 3,444
INSTALL 120 FEET OF 6 INCH STEEL ALONG GREAT SOUTH PARKWAY AND ABANDON 120 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1501 080.56433 4,159
RELOCATE FACILITIES. INSTALL 945 FEET OF 4 INCH AND 163 FEET OF 2 INCH POLY ALONG BRENNAN AVENUE AND ABANDON 730 FEET OF 4 INCH, 25 FEET OF 2 INCH STEEL AND 206 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1502 080.56435 582
RELOCATE FACILITIES. INSTALL 576 FEET OF 4 INCH POLY ALONG PARK STREET AND ABANDON 6 FEET OF 2 INCH AND 360 FEET OF 4 INCH AND 150 FEET OF 6 INCH AND 18 FEET OF 8 INCH STEEL AND 6 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1503 080.56436 1,264
RELOCATE FACILITIES. INSTALL 960 FEET OF 4 INCH AND 310 FEET OF 6 INCH POLY ALONG HUBBY AVENUE AND ABANDON 86 FEET OF 2 INCH, 526 FEET OF 3 INCH, 460 FEET OF 4 INCH AND 296 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1504 080.56441 138
ABANDON 295 FEET OF 2 INCH STEEL AND 21 FEET OF 2 INCH POLY ALONG GRANADA WEST AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
1505 080.56442 1,707
INSTALL 443 FEET OF 2 INCH AND 2895 FEET OF 4 INCH POLY ALONG POE AND ABANDON 443 FEET OF 2 INCH AND 2895 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 51 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1506 080.56445 825
INSTALL 1330 FEET OF 4 INCH POLY ALONG MALONE AND ABANDON 1389 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1507 080.56448 751
INSTALL 804 FEET OF 4 INCH AND 55 FEET OF 2 INCH POLY AND ABANDON 55 FEET OF 2 INCH AND 673 FEET OF 4 INCH STEEL AND 131 FEET OF 4 INCH POLY ALONG LUCAS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
1508 080.56456 492
INSTALL 675 FEET OF 4 INCH POLY ALONG HAWES AND ABANDON 675 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
1509 080.56475 13
ABANDON 60 FEET OF 2 INCH , 15 FEET OF 4 INCH STEEL, AND 3 FEET OF 4 INCH POLY AND DRS03 ON SCRIPTURE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1510 080.56477 4 ABANDON 801 FEET OF 2 INCH POLY ALONG MAIN STEET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALMA
SYSTEM INTEGRITY DECEMBER
1511 080.56483 590
INSTALL 650 FEET OF 4 INCH POLY ALONG HUTCHINS AND ABANDON 95 FEET OF 6 INCH, 416 FEET OF 3 INCH, AND 139 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER
SYSTEM INTEGRITY DECEMBER
1512 080.56492 15
RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH POLY ALONG JONES STREET AND ABANDON 241 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF LEWISVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
SYSTEM INTEGRITY DECEMBER
1513 080.56493 191
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG PARKHAVEN DRIVE AND ABANDON 490 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF SEGOVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE
SYSTEM INTEGRITY DECEMBER
1514 080.56497 2,978
RELOCATE FACILITIES. INSTALL 680 FEET OF 8 INCH POLY ALONG CRESTVIEW DRIVE AND ABANDON 680 FEET OF 8 INCH STEEL AND 400 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1515 080.56502 261
INSTALL 300 FEET OF 4 INCH POLY ALONG WALTON DRIVE AND ABANDON 500 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
1516 080.56510 27,706
INSTALL 2785 FEET OF 2 INCH POLY ALONG DARMOUTH AVENUE AND ABANDON 1363 FEET OF 6 INCH AND 1800 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1517 080.56514 1,080
RELOCATE FACILITIES. INSTALL 880 FEET OF 6 INCH AND 200 FEET OF 2 INCH POLY ALONG WEST MARVIN AVENUE AND ABANDON 134 FEET OF 2 INCH AND 890 FEET OF 6 INCH STEEL AND 255 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
1518 080.56519 100
RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY ALONG ARUNDEL AVENUE AND ABANDON 34 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1519 080.56522 88
RELOCATE FACILITIES. INSTALL 191 FEET OF 2 INCH POLY ALONG BELLEVUE DRIVE AND ABANDON 330 FEET OF 2 INCH AND 80 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
1520 080.56523 130
INSTALL 210 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH POLY ALONG STATE HIGHWAY 31 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF
SYSTEM INTEGRITY DECEMBER
1521 080.56534 119
RELOCATE FACILITIES. INSTALL 177 FEET OF 4 INCH POLY ALONG AVENUE U AND ABANDON 158 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
1522 080.56538 585
INSTALL 1311 FEET OF 2 INCH POLY ALONG 12TH STREET AND ABANDON 1311 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1523 080.56543 6,559
INSTALL 2850 FEET OF 4 INCH POLY ALONG ADA AVENUE AND ABANDON 1450 FEET OF 4 INCH AND 1850 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1524 080.56544 2,148
INSTALL 1600 FEET OF 4 INCH POLY ALONG WILDWOOD ROAD AND ABANDON 1600 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1525 080.56545 7,289
INSTALL 1895 FEET OF 4 INCH POLY AND ABANDON 1625 FEET OF 4 INCH CAST IRON AND 270 FEET OF 2 INCH STEEL ALONG WATAUGA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1526 080.56546 728
RELOCATE FACILITIES. INSTALL 880 FEET OF 2 INCH POLY ALONG STREETS OF WESTWORTH VILLAGE AND ABANDON 898 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
1527 080.56548 764
RELOCATE FACILITIES. INSTALL 260 FEET OF 4 INCH POLY AND 1090 FEET OF 4 INCH STEEL ALONG COLEMAN STREET AND ABANDON 1320 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
1528 080.56556 2,612
INSTALL 3725 FEET OF 2 INCH POLY ALONG COLLEGE HILLS AND ABANDON 2373 FEET OF 2 INCH, 1323 FEET OF 3 INCH STEEL, 13 FEET OF 2 INCH AND 16 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1529 080.56558 1,259
INSTALL 2264 FEET OF 2 INCH POLY ALONG COLLEGE HILLS AND ABANDON 2252 FEET OF 2 INCH STEEL AND 12 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1530 080.56567 1,007
INSTALL ACTUATED VALVE, RELIEF VALVE, AND INSULATING FLANGE KITS AND ABANDON MANUAL VALVE, AND ACTUATED VALVE FOR OWENS CORNING PLANT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
1531 080.56568 696
INSTALL 850 FEET OF 4 INCH POLY ALONG EXCHANGE BOULEVARD AND ABANDON 836 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1532 080.56571 57,425
RELOCATE FACILITIES. INSTALL 1500 FEET OF 6 INCH STEEL AND ABANDON 740 FEET OF 3 INCH STEEL AND 498 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF ALVARADO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVARADO
SYSTEM INTEGRITY DECEMBER
1533 080.56572 66,774
INSTALL 970 FEET OF 10 INCH STEEL ALONG AVENUE J AND ABANDON 940 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1534 080.56577 50
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY ALONG SOUTHERN AVENUE AND ABANDON 11 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF HIGHLAND PARK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 52 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1535 080.56583 1,201
RELOCATE FACILITIES. INSTALL 1756 FEET OF 6 INCH POLY ALONG MEADOW BROOK DRIVE AND ABANDON 1756 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1536 080.56586 6,961
RELOCATE FACILITIES. INSTALL 2006 FEET OF 4 INCH POLY ALONG ROCKHILL ROAD AND ABANDON 1990 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1537 080.56588 450
RELOCATE FACILITIES. INSTALL (18) POLY SERVICES ALONG WISTERIA STREET AND ABANDON (18) STEEL SERVIVES TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
SYSTEM INTEGRITY DECEMBER
1538 080.56593 5,567
INSTALL 2025 FEET OF 2 INCH POLY AND ABANDON 1050 FEET OF 4 INCH AND 975 FEET OF 6 INCH CAST IRON ALONG COLORADO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1539 080.56598 376
INSTALL 340 FEET OF 4 INCH POLY ALONG HOPKINS AND ABANDON 338 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
1540 080.56605 206
INSTALL DISTRICT REGULATOR STATION IN ABILENE AND ABANDON DISTRICT REGULATOR STATION 67 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1541 080.56606 127
INSTALL DISTRICT REGULATOR STATION AT CLYDE AND ABANDON DISTRICT REGULATOR STATION 3 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE
SYSTEM INTEGRITY DECEMBER
1542 080.56607 458
INSTALL DISTRICT REGULATOR STATION AT TUSCOLA AND ABANDON DISTRICT REGULATOR STATION 1 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TUSCOLA
SYSTEM INTEGRITY DECEMBER
1543 080.56608 174
INSTALL DISTRICT REGULATOR STATION IN ABILENE AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAWN
SYSTEM INTEGRITY DECEMBER
1544 080.56610 169
INSTALL (1) 1.25 INCH POLY SERVICE ALONG BIVAR AND ABANDON 360 FEET OF 3 INCH CAST IRON, 10 FEET OF 4 INCH STEEL AND 160 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DE LEON
SYSTEM INTEGRITY DECEMBER
1545 080.56611 3,803
INSTALL 1460 FEET OF 2 INCH POLY AND ABANDON 460 FEET OF 6 INCH AND 1200 FEET OF 4 INCH CAST IRON ALONG BATES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1546 080.56612 5,242
INSTALL 1835 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 6 INCH CAST IRON AND 350 FEET OF 6 INCH AND 60 FEET OF 2 INCH STEEL ALONG MILLERDALE IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1547 080.56613 855
INSTALL 1250 FEET OF 4 INCH POLY ALONG URBAN AND ABANDON 2460 FEET OF 4 INCH STEEL AND 115 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1548 080.56614 3,610
INSTALL 1135 FEET OF 2 INCH POLY ALONG FAIRDALE AND ABANDON 1135 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1549 080.56618 5,040
RELOCATE FACILITIES. INSTALL 1360 FEET OF 2 INCH, 9800 FEET OF 4 INCH,40 FEET OF 6 INCH POLY ALONG PULLIAM STREET AND ABANDON 19 FEET OF 1.25 INCH, 700 FEET OF 2 INCH, 106 FEET OF 6 INCH, 3208 FEET OF 4 INCH, 2257 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1550 080.56627 33
INSTALL DISTRICT REGULATOR STATION IN ABILENE AND ABANDON DISTRICT REGULATOR STATION 39 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1551 080.56633 98
INSTALL 280 FEET OF 2 INCH POLY AND ABANDON 280 FEET OF 2 INCH STEEL ALONG BENJAMIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENJAMIN
SYSTEM INTEGRITY DECEMBER
1552 080.56651 126,659
INSTALL TEST STATION ALONG LINE P7 IN ORDER TO PROVIDE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
1553 080.56652 6,029
INSTALL 4007 FEET OF 4 INCH POLY AND ABANDON 1206 FEET OF 2 INCH POLY AND 965 FEET OF 3 INCH STEEL IN TAYLOR COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1554 080.56662 32,157
RELOCATE FACILITIES. INSTALL 1785 FEET OF 6 INCH POLY AND ABANDON 1785 FEET OF 6 INCH STEEL IN HAYNES AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1555 080.56670 38,567
INSTALL DISTRICT REGULATOR STATION AT TURTLE CREEK IN DALLAS COUNTY AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1556 080.56672 859
INSTALL 1050 FEET OF 2 INCH POLY ALONG BELMONT STREET AND ABANDON 1040 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
1557 080.56679 1,174
INSTALL 2500 FEET OF 2 INCH POLY ALONG COLLEGE AVENUE AND ABANDON 2618 FEET OF 2 INCH STEEL AND 18 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1558 080.56680 3,804
INSTALL 1745 FEET OF 2 INCH POLY AND ABANDON 1050 FEET OF 4 INCH, 150 FEET OF 6 INCH CAST IRON, AND 450 FEET OF 4 INCH POLY ALONG OWENSONS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1559 080.56681 6,612
INSTALL 1710 FEET OF 2 INCH POLY ALONG NOLTE DRIVE AND ABANDON 1710 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1560 080.56685 1,599
RELOCATE FACILITIES. INSTALL 2280 FEET OF 4 INCH POLY AND ABANDON 2250 FEET OF 4 INCH STEEL ALONG VEGA STREET TO ACCOMMODATE THE CITY OF GRAND PRAIRIE DRAINAGE IMPROVEMENTS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1561 080.56686 2,215
INSTALL 3200 FEET OF 4 INCH POLY AND ABANDON 2050 FEET OF 4 INCH CAST IRON, 1100 FEET OF 4 INCH STEEL ALONG CRENSHAW ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1562 080.56694 210 INSTALL STEEL SLEEVE ALONG LINE KP1 IN ERATH COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
1563 080.56717 2,697
INSTAL (243) POLY SERVICES AND ABANDON (243) STEEL SERVICES ALONG STREETS OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1564 080.56719 4,287
INSTALL (285) POLY SERVICES AND ABANDON (285) STEEL SERVIES ALONG STREETS OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1565 080.56720 9,503
INSTALL (253) POLY SERVICES AND ABANDON (253) STEEL SERVICES ALONG STREETS IN CITY OF ROUND ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
1566 080.56721 115
INSTALL 160 FEET OF 4 INCH POLY ALONG GATES STREET AND ABANDON 354 FEET OF 4 INCH, 167 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 53 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1567 080.56722 4,274
INSTALL 565 FEET OF 4 INCH AND 955 FEET OF 2 INCH POLY ALONG SAN FERNANDO STREET AND ABANDON 565 FEET OF 8 INCH AND 770 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1568 080.56723 2,502
INSTALL 1865 FEET OF 4 INCH POLY ALONG SAN FERNANDO WAY AND ABANDON 1865 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1569 080.56724 6,856
INSTALL 2065 FEET OF 4 INCH POLY AND ABANDON 1345 FEET OF 4 INCH CAST IRON, 270 FEET OF 4 INCH, 10 FEET OF 6 INCH, AND 15 FEET OF 8 INCH POLY ALONG SAN FERNANDO WAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1570 080.56726 10,075
INSTALL (253) POLY SERVICES AND ABANDON (253) STEEL SERVICES ALONG STREETS IN CITY OF DESOTO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE
SYSTEM INTEGRITY DECEMBER
1571 080.56727 22 ABANDON 704 FEET OF 2 INCH STEEL ALONG CUMMINGS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
1572 080.56731 2,648
RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG MONTCLAIR PLACE AND ABANDON 4 FEET OF 2 INCH STEEL AND 66 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1573 080.56735 2,569
INSTALL 1485 FEET OF 2 INCH POLY ALONG NEWMORE AVENUE AND ABANDON 1840 FEET OF 4 INCH AND 436 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1574 080.56737 205
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY ALONG GREENVILLE AVENUE AND ABANDON 197 FEET OF 3 INCH STEEL AND 25 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
1575 080.56738 285
INSTALL 500 FEET OF 4 INCH POLY ALONG PECAN STREET AND ABANDON 463 FEET OF 3 INCH STEEL AND 21 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MUENSTER
SYSTEM INTEGRITY DECEMBER
1576 080.56739 2,449
INSTALL 1445 FEET OF 2 INCH POLY ALONG MALCOLM X AND ABANDON 1000 FEET OF 4 INCH AND 445 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1577 080.56743 9,664
RELOCATE FACILITIES. INSTALL 2995 FEET OF 4 INCH POLY AND ABANDON 2074 FEET OF 4 INCH CAST IRON AND 694 FEET OF 4 INCH AND 200 FEET OF 2 INCH STEEL ALONG COVELLO AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1578 080.56746 2,559
RELOCATE FACILITIES. INSTALL 620 FEET OF 6 INCH, 3390 FEET OF 4 INCH, 820 FEET OF 2 INCH POLY ALONG 4TH STREET AND ABANDON 4758 FEET OF 6, 4, 3, 2, AND 1.25 INCH STEEL TO ACCOMMODATE CITY OF TAYLOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
1579 080.56747 962
INSTALL 1340 FEET OF 2 INCH POLY ALONG CANTERBURY AND ABANDON 1340 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1580 080.56756 839
INSTALL 300 FEET OF 2 INCH POLY AND 80 FEET OF 4 INCH POLY ALONG NORTH BEATON STREET AND ABANDON 300 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1581 080.56762 407
RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY AND 275 FEET OF 2 INCH POLY ALONG 13TH STREET AND ABANDON 600 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1582 080.56782 10,856
INSTALL 5450 FEET OF 2 INCH AND 2725 FEET OF 6 INCH POLY ALONG STREETS OF SECOND PHASE OF ERWIN FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
1583 080.56789 292
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG EDMOND STREET AND ABANDON 637 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF TAYLOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
1584 080.56800 (1,093)
INSTALL 1000 FEET OF 8 INCH POLY ALONG KIEST ROAD AND ABANDON 1000 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1585 080.56806 495
RELOCATE FACILITIES. INSTALL 760 FEET OF 6 INCH POLY AND ABANDON 660 FEET OF 6 INCH POLY AND ALONG CANTRELL SANSOM ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1586 080.56809 1,845
INSTALL 1550 FEET OF 4 INCH POLY AND ABANDON 1490 FEET OF 6 INCH CAST IRON ALONG TAOS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1587 080.56810 2,065
INSTALL 1215 FEET OF 4 INCH AND 135 FEET OF 2 INCH POLY ALONG EASTERN AVENUE AND ABANDON 1146 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1588 080.56817 5,868
INSTALL DISTRICT REGULATOR STATION 10, 78 FEET OF 4 INCH STEEL AND 80 FEET OF 6 INCH POLY IN ARLINGTON AND ABANDON DISTRICT REGULATOR STATION, 15 FEET OF 2 INCH STEEL AND 75 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
1589 080.56826 134
RELOCATE FACILITIES. ABANDON 1800 FEET OF 3 INCH POLY ON WEBB FERRELL ROAD NORTH OF RED DEER WAY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1590 080.56828 1,260
RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY ALONG FARM TO MARKET 709 AND ABANDON 1400 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1591 080.56838 366
INSTALL 535 FEET OF 2 INCH POLY ALONG COX STREET AND ABANDON 535 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LUEDERS
SYSTEM INTEGRITY DECEMBER
1592 080.56850 2,314 ABANDON 5 FEET OF 10 INCH AND 163 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1593 080.56853 143
INSTALL DISTRICT REGULATOR STATION ALONG 2ND STREET AND ABANDON DISTRICT REGULATOR STATION 3 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA
SYSTEM INTEGRITY DECEMBER
1594 080.56855 225,060
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY BURKBURNETT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT
SYSTEM INTEGRITY DECEMBER
1595 080.56856 139,850
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY HOLLIDAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY
SYSTEM INTEGRITY DECEMBER
1596 080.56857 909
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY ELECTRA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 54 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1597 080.56858 2,627,674
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY WICHITA FALLS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
1598 080.56860 2,303,174
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY MCCGREGOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGOR
SYSTEM INTEGRITY DECEMBER
1599 080.56861 8,428
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY OSCEOLA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OSCEOLA
SYSTEM INTEGRITY DECEMBER
1600 080.56862 1,737,257
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY MARLIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
1601 080.56863 3,403,227
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1602 080.56864 1,346,185 WEST AREA REPLACEMENTS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY DECEMBER
1603 080.56865 406,940
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY HILLSBORO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
1604 080.56866 274,980
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY BALLINGER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER
SYSTEM INTEGRITY DECEMBER
1605 080.56867 2,756,199
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1606 080.56869 38
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY WINTERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINTERS
SYSTEM INTEGRITY DECEMBER
1607 080.56870 41,077
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY COLEMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN
SYSTEM INTEGRITY DECEMBER
1608 080.56871 223,937
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY COMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE
SYSTEM INTEGRITY DECEMBER
1609 080.56872 50 BLANKET AREA REPLACEMENT AS PART OF THE TEXAS RULE 8.209. ALL CUSTOMERS BLANKETSYSTEM
INTEGRITY JUNE
1610 080.56873 103,575
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY BROWNWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
1611 080.56874 398,262
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
1612 080.56875 27 BAIRD AREA REPLACEMENTS AS PART OF THE TEXAS RULE 8.209. ALL CUSTOMERS BAIRDSYSTEM
INTEGRITY DECEMBER
1613 080.56876 2,241,509
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1614 080.56882 3,557
INSTALL 1620 FEET OF 2 INCH POLY ALONG WOODCREST AND ABANDON 1551 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1615 080.56884 1,858
INSTALL 1045 FEET OF 2 INCH AND 325 FEET OF 4 INCH POLY ALONG WOODCREST STREET AND ABANDON 1045 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1616 080.56891 1,707
INSTALL 1080 FEET OF 4 INCH, 2100 FEET OF 2 INCH POLY ALONG LITTLE JOHN STREET AND ABANDON 1080 FEET OF 6 INCH, 2150 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1617 080.56894 216
INSTALL 560 FEET OF 2 INCH STEEL ALONG THARP ROAD AND ABANDON 560 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THROCKMORTON
SYSTEM INTEGRITY DECEMBER
1618 080.56897 124
INSTALL 550 FEET OF 4 INCH POLY ALONG COPELAND ROAD AND ABANDON 550 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1619 080.56904 1,319
INSTALL 700 FEET OF 2 INCH AND 515 FEET OF 4 INCH POLY ALONG SAN CRISTOBAL AND ABANDON 642 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1620 080.56912 4,330 INSTALL 1200 FEET OF 2 INCH POLY ALONG THE STREETS OF CORDOVA RIDGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH NOVEMBER
1621 080.56917 996
INSTALL 1900 FEET OF 2 INCH POLY ALONG MALCOLM X STREET AND ABANDON 1850 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1622 080.56918 2,571
INSTALL 1980 FEET OF 2 INCH POLY ALONG BRIGHAM AND ABANDON 260 FEET OF 4 INCH AND 1585 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1623 080.56919 31,818
INSTALL 1781 FEET OF 2 INCH POLY ALONG SUPERIOR AND ABANDON 1367 FEET OF 4 INCH AND 310 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1624 080.56920 11,605
INSTALL 2170 FEET OF 2 INCH POLY AND ABANDON 2100 FEET OF 4 INCH AND 2220 FEET OF 6 INCH CAST IRON ALONG SOUTHLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1625 080.56921 3,198
INSTALL 1070 FEET OF 2 INCH POLY AND ABANDON 690 FEET OF 4 INCH AND 380 FEET OF 6 INCH CAST IRON ALONG YORK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1626 080.56922 1,180
INSTALL 1280 FEET OF 2 INCH POLY ALONG KENNISON ROAD AND ABANDON 1210 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1627 080.56925 31 INSTALL 4 INCH BALL VALVE AND ABANDON 4 INCH BALL VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK
SYSTEM INTEGRITY DECEMBER
1628 080.56928 481
RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY ALONG BAYLOR STREET AND ABANDON 52 FEET OF 2 INCH AND 351 FEET OF 4 INCH STEEL AND 148 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
1629 080.56938 8,858
INSTALL 1870 FEET OF 2 INCH AND 675 FEET OF 4 INCH POLY AND ABANDON 1165 FEET OF 4 INCH AND 1040 FEET OF 6 INCH CAST IRON ALONG E GREENWAY BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1630 080.56947 1,154
INSTALL 1969 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY ALONG 8TH STREET AND ABANDON 2411 FEET OF 4 INCH, AND 404 FEET OF 2 INCH STEEL, AND 337 FEET OF 2 AND 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
1631 080.56949 604
RELOCATE FACILITIES. INSTALL 600 FEET OF 8 INCH POLY ALONG PURINGTON AVENUE AND ABANDON 600 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 55 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1632 080.56955 10,309 INSTALL 4000 FEET OF 4 INCH AND 11500 FEET OF 2 INCH POLY ALONG THE STREETS OF THE LAKES OF ARGYLE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARGYLE GROWTH NOVEMBER
1633 080.56965 5,754
INSTALL 2560 FEET OF 2 INCH AND 970 FEET OF 4 INCH POLY AND ABANDON 1935 FEET OF 6 INCH AND 590 FEET OF 4 INCH CAST IRON AND 1180 FEET OF 8 INCH STEEL ALONG EDMONDSON AVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
1634 080.56971 587
RELOCATE FACILITIES. INSTALL 481 FEET OF 2 INCH AND 930 FEET OF 4 INCH POLY AND ABANDON 485 FEET OF 1.25 INCH POLY AND 166 FEET OF 2 INCH AND 882 FEET OF 4 INCH AND 371 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
1635 080.56974 817
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY ALONG GREENBRIER ROAD AND ABANDON 764 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
1636 080.56975 914
INSTALL 1665 FEET OF 2 INCH POLY ALONG WASHINGTON AND ABANDON 1570 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1637 080.56978 2,474 INSTALL 1620 FEET OF 2 INCH POLY ALONG STREETS OF VIZCAYA 6 A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
1638 080.56980 26
RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY ALONG HAYS STREET AND ABANDON 60 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
1639 080.56981 9,303 INSTALL METER ALONG CEMENTARY CALLOWAY ROAD AND ABANDON METER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
SYSTEM INTEGRITY DECEMBER
1640 080.56988 1,270
RELOCATE FACILITIES. INSTALL 1325 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY ALONG OAK STREET AND ABANDON 1442 FEET OF 2 INCH AND 118 FEET OF 4 INCH STEEL AND 275 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDACE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
1641 080.56989 3,246
INSTALL 1620 FEET OF 2 INCH POLY ALONG NEWPORT ROAD AND ABANDON 1335 FEET OF 4 INCH CAST IRON AND 235 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1642 080.56991 3,231
RELOCATE FACILITIES. INSTALL 1,500 FEET OF 2 INCH POLY ALONG ROE STREET AND ABANDON 1,500 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF WHITE SETTLEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
SYSTEM INTEGRITY DECEMBER
1643 080.56995 1,069
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG VIRGINIA STREET AND ABANDON 885 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1644 080.57008 26,660 INSTALL 7,000 FEET OF 8 INCH POLY AND DISTRICT REGULATOR STATION ALONG HIGHWAY FM 157. ALL CUSTOMERS FORT WORTH
SYSTEM IMPROVEMENT MARCH
1645 080.57011 1,574
RELOCATE FACILITIES. INSTALL 424 FEET OF 2 INCH POLY AND ABANDON 321 FEET OF 2 INCH POLY ALONG BURSEY ROAD TO ACCOMMODATE CITY OF WATAUGA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA
SYSTEM INTEGRITY DECEMBER
1646 080.57013 2,825
INSTALL 1510 FEET OF 2 INCH POLY AND ABANDON 975 FEET OF 4 INCH AND 470 FEET OF 3 INCH CAST IRON ALONG SOUTH EDGEFIELD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1647 080.57045 34,958
RELOCATE FACILITIES. INSTALL 46 FEET OF 16 INCH STEEL AND ABANDON 40 FEET OF 16 INCH STEEL TO ACCOMMODATE DALLAS COUNTY RIVERFRONT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1648 080.57053 5,744
INSTALL 1410 FEET OF 2 INCH POLY AND ABANDON 785 FEET OF 4 INCH, 585 FEET OF 6 INCH CAST IRON, 270 FEET OF 2 INCH, AND 220 FEET OF 6 INCH STEEL ALONG ALLISON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1649 080.57058 5,320
RELOCATE FACILITIES. INSTALL 1689 FEET OF 4 INCH POLY ALONG 4TH STREET AND ABANDON 1316 FEET OF 4 INCH CAST IRON AND 373 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1650 080.57061 (11)
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY MEXIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
1651 080.57063 941,615
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY WORTHAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM
SYSTEM INTEGRITY DECEMBER
1652 080.57069 3,820
RELOCATE FACILITIES. INSTALL 1800 FEET OF 4 INCH AND 2065 FEET OF 2 INCH POLY ALONG MOUNT VERNON AVENUE AND ABANDON 1050 FEET OF 6 INCH, 1330 FEET OF 2 INCH STEEL, 50 FEET OF 6 INCH, 630 FEET OF 4 INCH, 60 FEET OF 2 INCH POLY, 635 FEET OF 4 INCH, AND 750 OF 3 INCH CAST IRON, 1330 FEET OF 2 INCH STEEL AND 60 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1653 080.57070 1,188
RELOCATE FACILITIES. INSTALL 1480 FEET OF 4 INCH POLY ALONG MILLETT ROAD,315 FEET OF 2 INCH POLY AND ABANDON 1480 FEET OF 4 INCH AND 315 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1654 080.57071 6,201
INSTALL 615 FEET OF 2 INCH AND 1300 FEET OF 4 INCH POLY AND ABANDON 365 FEET OF 4 INCH AND 1305 FEET OF 6 INCH CAST IRON ALONG ROSS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1655 080.57072 10,252
INSTALL 2615 FEET OF 2 INCH AND 900 FEET OF 4 INCH POLY AND ABANDON 1405 FEET OF 6 INCH AND 1460 FEET OF 4 INCH CAST IRON AND 45 FEET OF 1.25 INCH AND 95 FEET OF 4 INCH STEEL ALONG GRASSMERE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
1656 080.57076 4,771
INSTALL 620 FEET OF 2 INCH AND 775 FEET OF 4 INCH POLY AND ABANDON 1395 FEET OF 4 INCH AND 390 FEET OF 6 INCH CAST IRON ALONG KENWELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1657 080.57090 853
INSTALL 1260 FEET OF 2 INCH POLY AND ABANDON 40 FEET OF 3 INCH AND 1375 FEET OF 6 INCH CAST IRON ALONG THE STREETS OF SAN CRISTOBAL AND WHITE ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 56 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1658 080.57096 67
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY ALONG BILL MOSES PARKWAY AND ABANDON 243 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FARMERS BRANCH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
1659 080.57104 632
INSTALL 340 FEET OF 8 INCH AND 10 FEET OF 2 INCH POLY ALONG BOSQUE BOULEVARD AND ABANDON 350 FEET OF 8 INCH, AND 10 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1660 080.57117 26
INSTALL 663 FEET OF 2 INCH POLY ALONG SALT CREEK ROAD AND ABANDON 481 FEET OF 1 INCH STEEL AND 509 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EARLY
SYSTEM INTEGRITY DECEMBER
1661 080.57123 4,814
RELOCATE FACILITIES. INSTALL 1610 FEET OF 6 INCH POLY AND ABANDON 1200 FEET OF 4 INCH STEEL AND 400 FEET OF 4 INCH POLY ALONG COLEMAN STREET TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
1662 080.57131 671
INSTALL DISTRICT REGULATOR STATIONS AND ABANDON DISTRICT REGULATOR STATIONS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1663 080.57133 18 ABANDON 14 FEET OF 2 INCH AND 11 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LUEDERS
SYSTEM INTEGRITY DECEMBER
1664 080.57134 3,308
INSTALL 2500 FEET OF 2 INCH POLY ALONG 13TH STREET AND ABANDON 2500 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1665 080.57138 5,899 RELOCATE FACILITIES. INSTALL 345 FEET OF 6 INCH POLY AND ABANDON 240 FEET OF 6 INCH POLY TO ACCOMMODATE POPEYES PROJECT. ALL CUSTOMERS AUSTIN
RELOCATION OF FACILITIES DECEMBER
1666 080.57152 235
RELOCATE FACILITIES. INSTALL 480 FEET OF 2 INCH POLY ALONG WILLIE STREET AND ABANDON 474 FEET OF 2 INCH STEEL AND 12 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1667 080.57168 308
INSTALL 920 FEET OF 2 INCH POLY ALONG WEST PARK STREET AND ABANDON 537 FEET OF 2 INCH AND 511 FEET OF 3 INCH STEEL AND 2 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1668 080.57170 689
INSTALL 980 FEET OF 4 INCH POLY ALONG BLUEBIRD ROAD AND ABANDON 693 FEET OF 4 INCH STEEL AND 287 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD
SYSTEM INTEGRITY DECEMBER
1669 080.57171 65,306
RELOCATE FACILITIES. INSTALL 2518 FEET OF 2 INCH, 569 FEET OF 4 INCH, 10 FEET OF 6 INCH AND 1255 FEET OF 8 INCH POLY ALONG MOUNT VERNON AVENUE AND ABANDON 370 FEET OF 2 INCH, 951 FEET OF 3 INCH, 500 FEET OF 4 INCH, 1613 FEET OF 6 INCH, 1050 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1670 080.57174 417
INSTALL 660 FEET OF 4 INCH POLY ALONG ELMWOOD STREET AND ABANDON 548 FEET OF 4 INCH STEEL AND 103 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
1671 080.57176 230
INSTALL 500 FEET OF 4 INCH POLY ALONG HAMILTON STREET AND ABANDON 500 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER
SYSTEM INTEGRITY DECEMBER
1672 080.57179 43 ABANDON 271 FEET OF 2 INCH STEEL ALONG LAMAR STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1673 080.57193 3,037
RELOCATE FACILITIES. INSTALL 1260 FEET OF 2 INCH POLY AND ABANDON 1190 FEET OF 2 INCH STEEL AND 110 FEET OF 2 INCH POLY ALONG CEDAR STREET TO ACCOMMODATE CITY OF CELBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
1674 080.57196 22,165 INSTALL 3280 FEET OF 2 INCH AND 200 FEET OF 4 INCH POLY ALONG STREETS OF RESIDENCES AT JEANS CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
1675 080.57200 51,546
INSTALL 698 FEET OF 2 INCH AND 3118 FEET OF 4 INCH POLY ALONG WIND FLOWER LANE WITHIN THE ORCHARD RIDGE DEVELOPMENT SECTION 2A AND 2B IN THE CITY OF LIBERTY HILL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
1676 080.57202 1,346
INSTALL 825 FEET OF 2 INCH AND 4 INCH POLY ALONG VICTORIA AND ABANDON 1600 FEET OF 6, 4, 3 AND 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK
SYSTEM INTEGRITY DECEMBER
1677 080.57208 15
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY ALONG JOPLIN DRIVE AND ABANDON 275 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
1678 080.57214 384
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 189 FEET OF 2 INCH STEEL AND 61 FEET OF 2 INCH POLY ALONG HOLLIS STREET TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
1679 080.57217 78
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY AND ABANDON 260 FEET OF 4 INCH POLY ALONG PROGRESS DRIVE TO ACCOMMODATE CITY OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1680 080.57225 595 INSTALL (6) VALVES AND ABANDON DISTRICT REGULATOR STATION ALONG XT25 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
1681 080.57240 13,247
INSTALL 3000 FEET OF 2 INCH POLY AND ABANDON 1575 FEET OF 4 INCH CAST IRON AND 1475 FEET STEEL ALONG LOWDEN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1682 080.57242 107
INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 307 FEET OF 2 INCH STEEL ALONG GRANT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN
SYSTEM INTEGRITY DECEMBER
1683 080.57247 304
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 175 FEET OF 4 INCH POLY ALONG KINGSFORT PARKWAY TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
1684 080.57248 (364)
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY ALONG SHILOH ROAD AND ABANDON 350 FEET OF 4 INCH POLY TO ACCOMMODATE PLANO ROAD PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1685 080.57259 964
INSTALL 700 FEET OF 4 INCH POLY ALONG AIRPORT ROAD AND ABANDON 690 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
1686 080.57261 105,978
RELOCATE FACILITIES. INSTALL 5000 FEET OF 4 INCH AND 7500 FEET OF 2 INCH POLY ALONG FOURTH STREET AND ABANDON 4900 FEET OF 4 INCH, 6000 FEET OF 2 INCH AND 1500 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF KAUFMAN ROAD AND DRAINAGE IMPROVEMENTS PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 57 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1687 080.57262 418
RELOCATE FACILITIES. INSTALL 580 FEET OF 4 INCH POLY ALONG BOB JONES ROAD AND ABANDON 575 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
SYSTEM INTEGRITY DECEMBER
1688 080.57268 582
RELOCATE FACILITIES. INSTALL 510 FEET OF 4 INCH POLY ALONG COWAN STREET AND ABANDON 388 FEET OF 2 INCH STEEL, 80 FEET OF 2 INCH, AND 21 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1689 080.57269 11,219
INSTALL 1253 FEET OF 2 INCH, 2695 FEET OF 4 INCH AND 15 FEET OF 6 INCH POLY AND ABANDON 456 FEET OF 6 INCH STEEL, 800 FEET OF 4 INCH, 1753 FEET OF 6 INCH CAST IRON ALONG COLVIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1690 080.57278 5,227
INSTALL 1560 FEET OF 6 INCH, 780 FEET OF 4 INCH AND 880 FEET OF 2 INCH POLY ALONG HINTON STREET AND ABANDON 1735 FEET OF 1.25 INCH AND 3 INCH STEEL AND 331 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSON OF TEXAS RULE 8209. ALL CUSTOMERS TIOGA
SYSTEM INTEGRITY DECEMBER
1691 080.57282 30,145
RELOCATE FACILITIES. INSTALL 13 FEET OF 2 INCH, 6 FEET OF 4 INCH, AND 2347 FEET OF 6 INCH POLY ALONG FISH CREEK ROAD AND ABANDON 61 FEET OF 2 INCH, 55 FEET OF 4 INCH, AND 5280 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1692 080.57283 1,477
INSTALL 3750 FEET OF 2 INCH POLY ALONG LONGBOTHAM AND ABANDON 2510 FEET OF 2 INCH, 605 FEET OF 4 INCH STEEL AND 615 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM
SYSTEM INTEGRITY DECEMBER
1693 080.57285 5,789
RELOCATE FACILITIES. INSTALL 635 FEET OF 2 INCH POLY AND ABANDON 618 FEET OF 2 INCH STEEL AND 49 FEET OF 2 INCH POLY ALONG ANDREW AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1694 080.57287 268
INSTALL 280 FEET OF 6 INCH POLY ALONG DENTON STREET AND ABANDON 23 FEET OF 4 INCH AND 250 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
1695 080.57293 10,377
INSTALL 27 FEET OF 2 INCH, 12 FEET OF 3 INCH, 6 FEET OF 4 INCH, 7 FEET OF 6 INCH AND 2680 FEET OF 8 INCH POLY AND ABANDON 10 FEET OF 2 INCH, 10 FEET OF 3 INCH, 9 FEET OF 6 INCH, 2657 FEET OF 12 INCH AND 10 FEET OF 2 INCH STEEL AND 2 FEET OF 3 INCH POLY AND 10 FEET OF 4 INCH STEEL AND 9 FEET OF 6 INCH STEEL AND 2657 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1696 080.57294 13,065
INSTALL 3409 FEET OF 2 INCH POLY AND ABANDON 1485 FEET OF 2 INCH AND 417 FEET OF 4 INCH STEEL AND 802 FEET OF 2 INCH AND 126 FEET OF 4 INCH POLY ALONG 20TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1697 080.57296 925
INSTALL DISTRICT REGULATOR STATION, 13 FEET OF 2 INCH STEEL AND 19 FEET OF 4 INCH STEEL AND ABANDON DISTRICT REGULATOR STATION ALONG RED RIVER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
1698 080.57297 174
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY ALONG DOVE LOOP AND ABANDON 150 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GRAPEVINE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
1699 080.57309 180
RELOCATE FACILITIES. INSTALL 80 FEET OF 2 INCH POLY ALONG 14TH STREET AND ABANDON 70 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1700 080.57312 55,268
INSTALL 752 FEET OF 2 INCH AND 2938 FEET OF 4 INCH POLY ALONG ROCKRIDGE AND ABANDON 700 FEET OF 4 INCH CAST IRON AND 3125 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1701 080.57314 1,153
INSTALL 1049 FEET OF 2 INCH POLY AND ABANDON 101 FEET OF 2 INCH AND 409 FEET OF 3 INCH STEEL AND 2 FEET OF 2 INCH AND 107 FEET OF 3 INCH POLY ALONG TRAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD
SYSTEM INTEGRITY DECEMBER
1702 080.57332 93
RELOCATE FACILITIES. INSTALL 240 FEET OF 4 INCH POLY ALONG CHESTNUT AVENUE AND ABANDON 230 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
1703 080.57344 2,505
INSTALL 2700 FEET OF 6 INCH, 2200 FEET OF 4 INCH, AND 6400 FEET OF 2 INCH POLY ALONG STREETS OF LIVELY PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
1704 080.57348 6,066
RELOCATE FACILITIES. INSTALL 29 FEET OF 4 INCH POLY AND 1116 FEET OF 8 INCH POLY AND ABANDON 4 FEET OF 4 INCH, 132 FEET OF 8 INCH POLY AND 8 FEET OF 3 INCH AND 366 FEET OF 12 INCH STEEL ALONG LAMAR STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1705 080.57351 6
INSTALL DISTRICT REGULATOR STATION ALONG STREETS OF SNYDER AND ABANDON DISTRICT REGULATOR STATION 16 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
1706 080.57362 29
RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH POLY ALONG NORTH FOREST AND ABANDON 80 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEEMNT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
1707 080.57370 410
INSTALL 400 FEET OF 6 INCH POLY ALONG WATERCROSS DRIVE AND ABANDON 400 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1708 080.57371 2,880
RELOCATE FACILITIES. INSTALL 1070 FEET OF 2 INCH POLY ALONG EVANS AVENUE AND ABANDON 330 FEET OF 6 INCH, 420 FEET OF 4 INCH CAST IRON, 50 FEET OF 6 INCH, AND 205 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1709 080.57374 906
INSTALL 1525 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 872 FEET OF 2 INCH, 298 FEET OF 4 INCH STEEL AND 398 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM
SYSTEM INTEGRITY DECEMBER
1710 080.57388 670
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 383 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1711 080.57391 7,188
INSTALL 2260 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 6 INCH AND 1301 FEET OF 8 INCH CAST IRON ALONG LAKEWOOD BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 58 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1712 080.57392 13,670
RELOCATE FACILITIES. INSTALL 1075 FEET OF 2 INCH POLY ALONG TRIGG STREET AND ABANDON 1071 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
1713 080.57393 17,678
RELOCATE FACILITIES. INSTALL 1078 FEET OF 2 INCH POLY ALONG STRALEY AVENUE AND ABANDON1081 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
1714 080.57394 233 INSTALL GOUGE ALONG LINE B IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1715 080.57395 56
RELOCATE FACILITIES. ABANDON 190 FEET OF 4 INCH POLY ALONG MAIN STREET TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
1716 080.57396 19,189
RELOCATE FACILITIES. INSTALL 1235 FEET OF 2 INCH POLY ALONG LYLE STREET AND ABANDON 1238 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
1717 080.57397 25,283
RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG COLEMAN STREET AND ABANDON 1100 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
1718 080.57398 68
RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH POLY ALONG SUNRISE DRIVE AND ABANDON 16 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
1719 080.57399 17,538
RELOCATE FACILITIES. INSTALL 1279 FEET OF 2 INCH POLY ALONG ATON AVENUE AND ABANDON 1213 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
1720 080.57400 6,421
INSTALL 1460 FEET OF 4 INCH POLY AND ABANDON 1455 FEET OF 4 INCH CAST IRON ALONG POMONA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1721 080.57402 41,233
INSTALL 1865 FEET OF 4 INCH POLY AND ABANDON 1865 FEET OF 4 INCH CAST IRON ALONG TAOS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1722 080.57405 6,867
INSTALL 1934 FEET OF 2 INCH POLY AND ABANDON 780 FEET OF 4 INCH AND 735 FEET OF 6 INCH CAST IRON ALONG SOUTH CATERBURY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1723 080.57406 21,501
INSTALL 885 FEET OF 2 INCH AND 540 FEET OF 4 INCH POLY ALONG KESSLER CANYON AND ABANDON 1225 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1724 080.57419 710
RELOCATE FACILITIES. INSTALL 86 FEET OF 4 INCH POLY AND ABANDON 170 FEET OF 2 INCH, 132 FEET OF 3 INCH STEEL AND 80 FEET OF 2 INCH POLY AND ALONG PECAN STREET TO ACCOMMODATE CITY OF HUTTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTTO
SYSTEM INTEGRITY DECEMBER
1725 080.57431 653
RELOCATE FACILITIES. INSTALL 800 FEET OF 4 INCH POLY ALONG OAKWOOD AND ABANDON 790 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BALCH SPRINGS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALCH SPRINGS
SYSTEM INTEGRITY DECEMBER
1726 080.57435 (1,728)
INSTALL 13 FEET OF 2 INCH AND 1424 FEET OF 6 INCH POLY AND ABANDON 13 FEET OF 2 INCH POLY AND 1419 FEET OF 4 INCH STEEL ALONG HORSESHOE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN
SYSTEM INTEGRITY DECEMBER
1727 080.57437 50,647
INSTALL 1565 FEET OF 6 INCH STEEL ALONG AVENUE J ON LINE U AND ABANDON 1548 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCCAULLEY
SYSTEM INTEGRITY DECEMBER
1728 080.57446 662 INSTALL (1) 120 WELD SLEEVE ON LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
1729 080.57449 352
INSTALL 320 FEET OF 6 INCH AND 240 FEET OF 4 INCH POLY ALONG HASWELL AND ABANDON 310 FEET OF 6 INCH AND 230 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1730 080.57469 389
INSTALL 300 FEET OF 2 INCH POLY ALON MERIDIAN AVENUE AND ABANDON 300 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1731 080.57470 105
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG ROSEBROOK CIRCLE AND ABANDON 100 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF WHITEHOUSE NEW STORM DRAIN PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEHOUSE
SYSTEM INTEGRITY DECEMBER
1732 080.57475 262
INSTALL 30 FEET OF 8 INCH POLY AND 15 FEET OF 6 INCH POLY ALONG INWOOD AND ABANDON 20 FEET OF 8 INCH AND 10 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1733 080.57478 2,969
INSTALL 20 FEET OF 8 INCH STEEL ALONG ARAPAHO ROAD AND ABANDON 20 FEET OF 8 INCH OF STEEL AND (ONE) 3 INCH VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
1734 080.57492 492
INSTALL 2 INCH DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION IN CITY OF ITALY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITALY
SYSTEM INTEGRITY DECEMBER
1735 080.57493 1,124
INSTALL 268 FEET OF 4 INCH POLY AND ABANDON 145 FEET OF 3 INCH STEEL ALONG OAK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1736 080.57497 3,316
INSTALL 1747 FEET OF 4 INCH POLY AND ABANDON 1755 FEET OF 4 INCH STEEL ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1737 080.57498 861
INSTALL 3100 FEET OF 2 INCH POLY ALONG STADIUM DRIVE ABANDON 1647 FEET OF 2 INCH, AND 432 FEET OF 4 INCH STEEL, 613 FEET OF 2 INCH AND 132 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALVORD
SYSTEM INTEGRITY DECEMBER
1738 080.57499 16,802
INSTALL 4066 FEET OF 2 INCH POLY AND ABANDON 2281 FEET OF 4 INCH CAST IRON AND 1051 FEET OF 4 INCH STEEL ALONG ARLINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1739 080.57502 5,358
INSTALL 1620 FEET OF 2 INCH POLY AND ABANDON 970 FEET OF 4 INCH AND 340 FEET OF 8 INCH CAST IRON ALONG MARNE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1740 080.57503 7,432
INSTALL 1563 FEET OF 2 INCH POLY AND ABANDON 1890 FEET OF 4 INCH CAST IRON ALONG STEPHENSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 59 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1741 080.57506 161
INSTALL 525 FEET OF 4 INCH POLY ALONG WELBORN ROAD AND ABANDON 120 FEET OF 3 INCH CAST IRON, 4 INCH OF 225 FEET AND 385 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1742 080.57508 19,704
INSTALL 1566 FEET OF 4 INCH POLY AND ABANDON 1425 FEET OF 6 INCH, 1350 FEET OF 4 INCH CAST IRON AND 400 FEET OF 4 INCH STEEL ALONG SOUTH HILLS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1743 080.57509 1,233
INSTALL 1940 FEET OF 2 INCH POLY ALONG SAN CRISTOBAL ROAD AND ABANDON 2155 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1744 080.57510 3,747
INSTALL 1185 FEET OF 2 INCH POLY AND 355 FEET OF 4 INCH AND ABANDON 1531 FEET OF 6 INCH CAST IRON ALONG SAN LEANDRO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1745 080.57518 23,742 INSTALL 1502 FEET OF 4 INCH, 2508 FEET OF 2 INCH POLY ALONG THE STREETS OF BALLANTYNE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUSTIN GROWTH OCTOBER
1746 080.57520 3
RELOCATE FACILITIES. ABANDON 370 FEET OF 2 INCH POLY ALONG UNIVERSITY OF TEXAS ARLINGTON BOULEVARD CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1747 080.57525 43,173
INSTALL 1268 FEET OF 4 INCH POLY ALONG ASBURY ALLEY AND ABANDON 240 FEET OF 6 INCH STEEL AND 1490 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1748 080.57528 54,388
INSTALL 2671 FEET OF 4 INCH POLY ALONG MISSION AVENUE AND ABANDON 2000 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1749 080.57529 857
RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY AND ABANDON 645 FEET OF 4 INCH STEEL ALONG LOCUST ROAD TO ACCOMMODATE THE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1750 080.57540 16,041
INSTALL 330 FEET OF 2 INCH AND 1760 FEET OF 6 INCH POLY AND ABANDON 785 FEET OF 4 INCH, 330 FEET OF 6 INCH, AND 960 FEET OF 8 INCH CAST IRON ALONG ERVAY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1751 080.57544 39
RELOCATE FACILITIES. ABANDON 1950 FEET OF 4 INCH STEEL AND 385 FEET OF 2 INCH POLY TO ACCOMMODATE THE DEMOLISHMENT OF CLOSED MALL IN ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1752 080.57545 166
INSTALL 320 FEET OF 2 INCH POLY ALONG AVENUE H AND ABANDON 320 FEET OF STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON
SYSTEM INTEGRITY DECEMBER
1753 080.57549 4,556
INSTALL 1675 FEET OF 2 INCH POLY AND ABANDON 1655 FEET OF 8 INCH CAST IRON ALONG HOLLIS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1754 080.57551 12,498
INSTALL 1464 FEET OF 2 INCH POLY ALONG LINCOLN AND ABANDON 1495 FEET OF 4 INCH CAST IRON, 80 FEET OF 4 INCH POLY, 30 FEET OF 4 INCH AND 65 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1755 080.57552 5,551
INSTALL 1550 FEET OF 2 INCH POLY AND ABANDON 1270 FEET OF 4 INCH CAST IRON ALONG TIMOTHY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1756 080.57556 222 ABANDON 350 FEET OF 4 INCH STEEL ALONG HAYNIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
1757 080.57568 55,400
RELOCATE FACILITIES. INSTALL 2898 FEET OF 4 INCH POLY ALONG GALVEZ AND ABANDON 1607 FEET OF 4 INCH CAST IRON AND 1000 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1758 080.57570 192
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG US 80 AND ABANDON 265 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
1759 080.57579 2,065
INSTALL 1100 FEET OF 6 INCH AND 150 FEET OF 2 INCH POLY ALONG 22ND STREET AND ABANDON 1100 FEET OF 8 INCH AND 150 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1760 080.57580 2,543
RELOCATE FACILITIES. INSTALL 1124 FEET OF 2 INCH POLY AND ABANDON 464 FEET OF 2 INCH STEEL AND 646 FEET OF 2 INCH POLY ALONG ROBIN LANE TO ACCOMMODATE CITY OF BERTRAM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BERTRAM
SYSTEM INTEGRITY DECEMBER
1761 080.57585 9
RELOCATE FACILITIES. ABANDON 166 FEET OF 6 INCH POLY ALONG DEER CREEK LANE TO ACCOMMODATE CITY OF LEANDER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEANDER
SYSTEM INTEGRITY DECEMBER
1762 080.57599 2,657
INSTALL 6 INCH FLANGE VALVE AND ABANDON STOPPLE AND CLOCKSPRING ALONG LINE CA(3RD) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN
SYSTEM INTEGRITY DECEMBER
1763 080.57607 220
RELOCATE FACILITIES. INSTALL 265 FEET OF 2 INCH POLY AND ABANDON 370 FEET OF 3 INCH STEEL ALONG RANDOLPH STREET TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1764 080.57613 195
INSTALL 460 FEET OF 4 INCH POLY ALONG LAKE STREET AND ABANDON 400 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1765 080.57615 10,751
RELOCATE FACILITIES. INSTALL (99) POLY SERVICES AND ABANDON (99) STEEL SERVICES ALONG CAPITAL STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1766 080.57627 372
INSTALL 700 FEET OF 4 INCH AND 290 FEET OF 2 INCH POLY ALONG MLK STREET AND ABANDON 690 FEET OF 4 INCH AND 280 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT
SYSTEM INTEGRITY DECEMBER
1767 080.57629 6,358 INSTALL (25) MOTORIZED REGULATORS AND ABANDON (25) REGULATORS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1768 080.57630 1,334
INSTALL 15 FEET OF 2 INCH, 3 FEET OF 3 INCH AND 1441 FEET OF 4 INCH POLY AND ABANDON 12 FEET OF 2 INCH, 2732 FEET OF 3 INCH AND 16 FEET OF 4 INCH POLY ALONG KNOLLWOOD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1769 080.57631 744
INSTALL 470 FEET OF 6 INCH POLY AND ABANDON 293 FEET OF 6 INCH STEEL ALONG UNIVERSITY PARKS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 60 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1770 080.57632 2,282
INSTALL 107 FEET OF 2 INCH AND 377 FEET OF 4 INCH POLY AND ABANDON 282 FEET OF 2 INCH AND 191 FEET OF 4 INCH STEEL AND 47 FEET OF 2 INCH AND 11 FEET OF 4 INCH POLY ALONG JACKSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE
SYSTEM INTEGRITY DECEMBER
1771 080.57634 116
RELOCATE FACILITIES. INSTALL 50 FEET OF 8 INCH AND 30 FEET OF 4 INCH POLY ALONG BISHOP AND ABANDON 45 FEET OF 8 INCH AND 25 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1772 080.57641 1,461 INSTALL 2600 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKE WELLINGTON ESTATES PHASE 12. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH JANUARY
1773 080.57658 7,612
INSTALL 974 FEET OF 2 INCH AND 1451 FEET OF 4 INCH POLY AND ABANDON 1054 FEET OF 3 INCH AND 1600 FEET OF 6 INCH CAST IRON ALONG HILLCREST AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
1774 080.57661 295
INSTALL 400 FEET OF 4 INCH POLY ALONG BILL OWENS PARKWAY AND ABANDON 400 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
1775 080.57665 77,330
INSTALL 8 FEET OF 4 INCH AND 64 FEET OF 12 INCH STEEL ALONG MIDWAY ROAD AND ABANDON 7 FEET OF 4 INCH AND 70 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1776 080.57669 426
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY ALONG BROADWAY AND ABANDON 400 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF CARROLLTON STORM DRAIN PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
SYSTEM INTEGRITY DECEMBER
1777 080.57672 8,936
INSTALL 2691 FEET OF 2 INCH POLY AND ABANDON 1595 FEET OF 6 INCH, 1405 FEET OF 4 INCH CAST IRON, AND 40 FEET OF 6 INCH POLY ALONG GRASSMERE LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
1778 080.57675 421
INSTALL 1000 FEET OF 2 INCH POLY ALONG FORT STREET AND ABANDON 1000 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
1779 080.57679 61,272
INSTALL 2830 FEET OF 4 INCH POLY ALONG HARVARD AVENUE AND ABANDON 2090 FEET OF 4 INCH, 500 FEET OF 8 INCH, AND 380 FEET OF 6 INCH CAST IRON, AND 360 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
1780 080.57689 943
INSTALL 795 FEET OF 2 INCH POLY AND ABANDON 2 FEET OF 2 INCH AND 8 FEET OF 3 INCH POLY AND 614 FEET OF 3 INCH STEEL ALONG GANDY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
1781 080.57693 16,641
INSTALL 2373 FEET OF 8 INCH STEEL AND ABANDON 2373 FEET OF 8 INCH STEEL ALONG COUNTY ROAD 230 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEINERT
SYSTEM INTEGRITY DECEMBER
1782 080.57697 1,098
INSTALL 660 FEET OF 2 INCH POLY AND ABANDON 660 FEET OF 2 INCH STEEL ALONG GOSSETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
1783 080.57703 12,981
INSTALL 12983 FEET OF 4 INCH STEEL AND ABANDON 12988 FEET OF 4 INCH STEEL ALONG LINE L26 IN COUNTY FALLS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LOTT
SYSTEM INTEGRITY DECEMBER
1784 080.57711 1,823
RELOCATE FACILITIES. INSTALL 2500 FEET OF 4 INCH POLY ALONG NATIONAL DRIVE AND ABANDON 2500 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
1785 080.57713 688
INSTALL 500 FEET OF 6 INCH POLY ALONG KEARNEY AVENUE AND ABANDON 250 FEET OF 6 INCH CAST IRON AND 250 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1786 080.57716 120
INSTALL 300 FEET OF 2 INCH POLY ALONG CADDO STREET AND ABANDON 300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN
SYSTEM INTEGRITY DECEMBER
1787 080.57719 226
INSTALL 200 FEET OF 2 INCH POLY ALONG EASTMAN ROAD AND ABANDON 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
1788 080.57725 14,666
INSTALL 785 FEET OF 4 INCH AND 595 FEET OF 2 INCH POLY ALONG HUDNALL AND ABANDON 660 FEET OF 8 INCH, 360 FEET OF 4 INCH AND 235 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1789 080.57729 2,073
RELOCATE FACILITIES. INSTALL 17 FEET OF 3 INCH AND 504 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 4 INCH POLY ALONG AUSTIN STREET TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
1790 080.57730 16 ABANDON 473 FEET OF 2 INCH STEEL ALONG LIVE OAK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE
SYSTEM INTEGRITY DECEMBER
1791 080.57747 7,240
INSTALL 1099 FEET OF 4 INCH POLY AND ABANDON 1005 FEET OF 4 INCH CAST IRON ALONG HOPKINS ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1792 080.57748 104
INSTALL 75 FEET OF 2 INCH POLY ALONG OHIO STREET AND ABANDON STEEL SERVICE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA
SYSTEM INTEGRITY DECEMBER
1793 080.57751 199
RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY ALONG GARZA ROAD AND ABANDON 60 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SHADY SHORES STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHADY SHORES
SYSTEM INTEGRITY DECEMBER
1794 080.57753 4,149
INSTALL 1469 FEET OF 2 INCH POLY AND ABANDON 720 FEET OF 6 INCH CAST IRON ALONG MAYFLOWER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1795 080.57754 26,492
INSTALL 2150 FEET OF 2 INCH POLY ALONG WEST COLORADO ROAD AND ABANDON 1130 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1796 080.57755 1,516
RELOCATE FACILITIES. INSTALL 212 FEET OF 6 INCH POLY AND ABANDON 204 FEET OF 6 INCH CAST IRON ALONG WEST HAMMOND STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1797 080.57756 13,001
INSTALL DISTRICT REGULATOR STATION AND VALVE AND ABANDON DISTRICT REGULATOR STATION 58 ALONG BELT LINE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1798 080.57757 1,666
RELOCATE FACILITIES. INSTALL 216 FEET OF 6 INCH POLY AND ABANDON 204 FEET OF 6 INCH STEEL ALONG HEMPHILL STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1799 080.57758 1,587
INSTALL 765 FEET OF 4 INCH POLY AND ABANDON 120 FEET OF 4 INCH AND 610 FEET OF 8 INCH STEEL ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 61 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1800 080.57763 2,458
RELOCATE FACILITIES. INSTALL 897 FEET OF 4 INCH AND 2 FEET OF 6 INCH POLY AND ABANDON 564 FEET OF 4 INCH CAST IRON ALONG CARTWRIGHT AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1801 080.57767 5,100
INSTALL 1268 FEET OF 2 INCH POLY AND ABANDON 1362 FEET OF 2 INCH POLY ALONG RONIN LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BERTRAM
SYSTEM INTEGRITY DECEMBER
1802 080.57795 14,824
RELOCATE FACILITIES. INSTALL 585 FEET OF 2 INCH POLY ALONG PEARSON AVENUE AND ABANDON 200 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
1803 080.57796 8,787
RELOCATE FACILITIES. INSTALL 6 POLY SERVICES ALONG TUCKER STREET AND ABANDON (6) STEEL SERVICES TO ACCOMMODATE THE CITY OF MCKINNEY CAPITAL IMPROVEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
1804 080.57800 15,758
INSTALL 800 FEET OF 4 INCH POLY AND 200 FEET OF 8 INCH STEEL ALONG KATY STREET AND ABANDON 800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMO
SYSTEM INTEGRITY DECEMBER
1805 080.57809 847
INSTALL 13 FEET OF 2 INCH AND 737 FEET OF 4 INCH POLY AND ABANDON 725 FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY ALONG BEZNER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LINDSAY
SYSTEM INTEGRITY DECEMBER
1806 080.57818 552
INSTALL 430 FEET OF 2 INCH POLY ALONG ECHOLS STREET AND ABANDON 465 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1807 080.57820 947
INSTALL 671 FEET OF 2 INCH POLY AND ABANDON 200 FEET OF 2 INCH STEEL AND 322 FEET OF 2 INCH POLY ALONG PLUM STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL
SYSTEM INTEGRITY DECEMBER
1808 080.57823 32,479
INSTALL 1810 FEET OF 2 INCH POLY ALONG INWOOD ROAD AND ABANDON 1425 FEET OF 4 INCH CAST IRON AND 385 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1809 080.57824 71,081
RELOCATE FACILITIES. INSTALL 2064 FEET OF 24 INCH STEEL ALONG WHEATLAND ROAD AND ABANDON 1263 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1810 080.57836 51 ABANDON 282 FEET OF 3 INCH STEEL ALONG ROBINSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
1811 080.57848 351
RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH POLY ALONG CADDO STREET AND ABANDON 105 FEET OF 2 INCH POLY AND 439 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LIPAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LIPAN
SYSTEM INTEGRITY DECEMBER
1812 080.57850 730
INSTALL 430 FEET OF 2 INCH POLY ALONG AVENUE D AND ABANDON 426 FEET OF 2 INCH STEEL AND 4 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KNOX CITY
SYSTEM INTEGRITY DECEMBER
1813 080.57852 22,400
RELOCATE FACILITIES. INSTALL 2456 FEET OF 2 INCH AND 3212 FEET OF 4 INCH POLY ALONG CHIMNEY HILL DRIVE AND ABANDON 903 FEET OF 2 INCH AND 2080 FEET OF 3 INCH STEEL AND 1371 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1814 080.57856 35,625
INSTALL 1768 FEET OF 2 INCH AND 374 FEET OF 4 INCH POLY ALONG GREENWAY BOULEVARD AND ABANDON 1370 FEET OF 4 INCH AND 385 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1815 080.57859 36,689
INSTALL 1595 FEET OF 4 INCH AND 355 FEET OF 2 INCH POLY ALONG NEWMORE STREET AND ABANDON 1595 FEET OF 6 FEET CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1816 080.57861 16,107
INSTALL 1120 FEET OF 2 INCH POLY AND 545 FEET OF 4 INCH POLY ALONG MUNGER AVENUE. ABANDON 1105 FEET OF 4 INCH CAST IRON AND 1200 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1817 080.57866 28,448
INSTALL 1634 FEET OF 2 INCH AND 710 FEET OF 4 INCH POLY ALONG NICHOLS STREET AND ABANDON 114 FEET OF 2 INCH POLY, 3150 FEET OF 4 INCH CAST IRON, 925 FEET OF 4 INCH STEEL, AND 326 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1818 080.57874 15,046
INSTALL 1440 FEET OF 4 INCH POLY ALONG ROSS AVENUE AND ABANDON 10 FEET OF 4 INCH CAST IRON AND 1440 FEET OF 6 INCH CAST IRON AND 175 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1819 080.57877 38,416
INSTALL 600 FEET OF 4 INCH AND ABANDON 600 FEET OF STEEL ALONG LINE W12-1 IN WISE COUNTY IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS DECATUR
SYSTEM INTEGRITY DECEMBER
1820 080.57879 15,191
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 01 IN CITY OF TERRELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
1821 080.57902 504
RELOCATE FACILITIES. INSTALL 56 FEET OF 6 INCH POLY ALONG PECAN LANE AND ABANDON 56 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
SYSTEM INTEGRITY DECEMBER
1822 080.57904 5,211
INSTALL 1615 FEET OF 2 INCH POLY ALONG SUDBURY DRIVE AND ABANDON 1591 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1823 080.57908 3,343
INSTALL 1035 FEET OF 2 INCH POLY ALONG EDGEFIELD STREET AND ABANDON 862 FEET OF 4 INCH AND 102 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1824 080.57909 137
RELOCATE FACILITIES. INSTALL 116 FEET OF 4 INCH POLY ALONG FAIRWAY STREET AND ABANDON 113 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
1825 080.57912 14 ABANDON 800 FEET OF 2 INCH STEEL ALONG LUDELLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1826 080.57914 15,798
INSTALL 925 FEET OF 2 INCH AND 344 FEET OF 4 INCH POLY ALONG RAVENDALE LANE AND ABANDON 915 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1827 080.57915 39,209
INSTALL 1730 FEET OF 2 INCH POLY AND ABANDON 1095 FEET OF 4 INCH AND 630 FEET OF 6 INCH CAST IRON ALONG AVALON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1828 080.57916 2,299
RELOCATE FACILITIES. INSTALL 1876 FEET OF 2 INCH POLY ALONG THE STREET OF ROBINSON AND ABANDON 723 FEET OF 2 INCH AND 6 FEET OF 3 INCH STEEL AND 989 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 62 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1829 080.57924 4,444
INSTALL 1732 FEET OF 2 INCH POLY ALONG MLK BOULEVARD AND ABANDON 8 FEET OF 2 INCH AND 499 FEET OF 4 INCH POLY AND 993 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1830 080.57926 14,570
INSTALL 1820 FEET OF 2 INCH POLY ALONG MYRTLE STREET AND ABANDON 1240 FEET OF 8 INCH, 330 FEET OF 6 INCH, 120 FEET OF 4 INCH CAST IRON AND 130 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1831 080.57929 5,463
INSTALL 10 FEET OF 3 INCH AND 1908 FEET OF 4 INCH POLY ALONG DAVIS STREET AND ABANDON 829 FEET OF 3 INCH AND 646 FEET OF 4 INCH STEEL AND 283 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
1832 080.57930 4 ABANDON 2 INCH DISTRICT REGULATOR STATION 01 IN TAYLOR COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENT
SYSTEM INTEGRITY DECEMBER
1833 080.57932 3,431
INSTALL 208 FEET OF 2 INCH, 8 FEET OF 3 INCH AND 1579 FEET OF 4 INCH POLY ALONG DANIELS DRIVE AND ABANDON 208 FEET OF 2 INCH AND 1733 FEET OF 4 INCH STEEL AND 61 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS
SYSTEM INTEGRITY DECEMBER
1834 080.57938 68,464
INSTALL 2125 FEET OF 2 INCH AND 3010 FEET OF 4 INCH POLY ALONG ELM STREET AND ABANDON 1738 FEET OF 4 INCH CAST IRON, 2636 FEET OF 4 INCH, 1040 FEET OF 6 INCH STEEL, AND 678 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1835 080.57940 5,521
INSTALL 500 FEET OF 4 INCH AND 225 FEET OF 2 INCH POLY ALONG ELM STREET AND ABANDON 482 FEET OF 4 INCH AND 200 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1836 080.57941 6,435
INSTALL 400 FEET OF 4 INCH AND 220 FEET OF 2 INCH POLY ALONG BRAZOS AND ABANDON 400 FEET OF 4 INCH AND 380 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1837 080.57944 10,286
INSTALL 350 FEET OF 2 INCH AND 1800 FEET OF 4 INCH POLY AND ABANDON 2482 FEET OF 4 INCH AND 571 FEET OF 6 INCH CAST IRON AND 2209 FEET OF 4 INCH STEEL ALONG NOBLE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1838 080.57954 11,041
INSTALL 2 FEET OF 2 INCH AND 3296 FEET OF 4 INCH POLY ALONG RACE STREET AND ABANDON 12 FEET OF 2 INCH AND 3323 FEET OF 4 INCH CAST IRON AND 5 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1839 080.57959 10,054
RELOCATE FACILITIES. INSTALL 1283 FEET OF 2 INCH, 3 FEET OF 3 INCH AND 2688 FEET OF 4 INCH POLY ALONG LINDA LANE AND ABANDON 8 FEET OF 1.25 INCH, 1027 FEET OF 2 INCH, 2499 FEET OF 3 INCH AND 252 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1840 080.57960 11,805
INSTALL 1470 FEET OF 2 INCH POLY ALONG POLK STREET AND ABANDON 1380 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1841 080.57963 10,387
INSTALL 2825 FEET OF 2 INCH AND 359 FEET OF 4 INCH POLY ALONG JUDD STREET AND ABANDON 2616 FEET OF 4 INCH CAST IRON AND 207 FEET OF 4 INCH AND 349 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1842 080.57964 53,465
RELOCATE FACILITIES. INSTALL 40 FEET OF 8 INCH STEEL AND 40 FEET OF 6 INCH STEEL ALONG FM195 AND ABANDON 10 FEET OF 8 INCH STEEL AND 10 INCH POLY TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
1843 080.57971 17,619
INSTALL 930 FEET OF 2 INCH AND 2065 FEET OF 4 INCH POLY ALONG MARSAILIS STREET AND ABANDON 514 FEET OF 2 INCH AND 203 FEET OF 3 INCH AND 1926 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1844 080.57983 2,030,182
REPLACE REGULATOR STATIONS AT THE END OF LINE C22 ON THE SOUTHEAST SIDE OF DFW AIRPORT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
1845 080.57985 497,680
INSTALL 22 FEET OF 8 INCH STEEL AND 4926 FEET OF 10 INCH STEEL AND DISTRICT REGULATOR STATION AT DFW AIRPORT AND ABANDON 1213 FEET OF 8 INCH STEEL AND 1690 FEET OF 10 INCH STEEL AND DISTRICT REGULATOR STATION ALONG DFW AIRPORT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
1846 080.57986 244,931
REPLACE MAINLINE VALVE AND STRADDLE ASSEMBLY AND DRS02 AT DFW AIRPORT DUE TO NON-WORKING VALVES AND AGING INFRASTRUCTURE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
1847 080.57990 10,444
INSTALL DISTRICT REGULATOR STATION ALONG HOLLY AND ABANDON DISTRICT REGULATOR STATION 01 IN CRANDALL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CRANDALL
SYSTEM INTEGRITY DECEMBER
1848 080.57991 7,570
INSTALL 3302 FEET OF 2 INCH POLY ALONG FERGUSON STREET AND ABANDON 3032 FEET OF 2 INCH STEEL AND 87 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
1849 080.57992 8,917
INSTALL 1944 FEET OF 2 INCH POLY ALONG SAN LEANDRO STREET AND ABANDON 2012 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1850 080.57993 24,051
INSTALL 325 FEET OF 2 INCH AND 1350 FEET OF 4 INCH POLY AND ABANDON 1280 FEET OF 6 INCH CAST IRON AND 325 FEET OF 3 INCH POLY ALONG SAN BENITO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1851 080.57996 825 INSTALL 396 FEET OF 6 INCH AND 296 FEET OF 2 INCH POLY ALONG STREETS OF VIZCAYA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
1852 080.57997 55,629
INSTALL 2450 FEET OF 4 INCH AND 360 FEET OF 6 INCH POLY ALONG BEVERLY AVENUE AND ABANDON 2810 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
1853 080.58003 2,570
INSTALL 845 FEET OF 2 INCH POLY ALONG WILDWOOD ROAD AND ABANDON 937 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1854 080.58008 349
RELOCATE FACILITIES. INSTALL 318 FEET OF 4 INCH POLY ALONG MLK DRIVE AND ABANDON 305 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1855 080.58009 11,093
INSTALL 1354 FEET OF 2 INCH POLY ALONG HARWOOD AND ABANDON 345 FEET OF 4 INCH AND 940 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1856 080.58012 11,635
INSTALL 1101 FEET OF 2 INCH POLY ALONG GANO AND ABANDON 1300 FEET OF 8 INCH STEEL, 530 FEET OF 4 INCH, 785 FEET OF 6 INCH AND 380 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 63 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1857 080.58013 (1,914)
INSTALL 105 FEET OF 2 INCH, 32 FEET OF 4 INCH AND 2346 FEET OF 6 INCH POLY ALONG WASHINGTON STREET AND ABANDON 233 FEET OF 2 INCH AND 5 FEET OF 4 INCH POLY AND 5 FEET OF 4 INCH, 6 FEET OF 3 INCH AND 2187 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
1858 080.58020 41,937
INSTALL 2250 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 4 INCH, 305 FEET OF 6 INCH CAST IRON AND 170 FEET OF 4 INCH STEEL ALONG EDGEFIELD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1859 080.58023 20,964
INSTALL 1507 FEET OF 2 INCH POLY ALONG SIDNEY STREET AND ABANDON 1375 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1860 080.58024 35,231
INSTALL 1760 FEET OF 2 INCH POLY ALONG TODD STREET AND ABANDON 1520 FEET OF 4 INCH CAST IRON AND 290 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1861 080.58026 12,000
INSTALL 150 FEET OF 4 INCH POLY AND ABANDON (1) DISTRICT REGULATOR STATION AND 8026 FEET OF 4 INCH STEEL ALONG PLANO ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
1862 080.58027 27,409
INSTALL 1580 FEET OF 2 INCH POLY ALONG TEXAS DRIVE AND ABANDON 1580 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1863 080.58029 8,900
INSTALL 925 FEET OF 2 INCH POLY AND ABANDON 885 FEET OF 4 INCH CAST IRON ALONG OLD ORCHARD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1864 080.58034 5,784
INSTALL 6 FEET OF 3 INCH AND 1749 FEET OF 4 INCH POLY AND ABANDON 1639 FEET OF 3 INCH, 206 FEET OF 4 INCH, 6 FEET OF 6 INCH STEEL AND 2 FEET OF 4 INCH POLY ALONG SYCAMORE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE
SYSTEM INTEGRITY DECEMBER
1865 080.58036 17,990
INSTALL 1520 FEET OF 2 INCH POLY ALONG ROLINDA DRIVE AND ABANDON 1520 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1866 080.58037 28,235
INSTALL 1805 FEET OF 2 INCH POLY ALONG CUMBERLAND AND ABANDON 1290 FEET OF 4 INCH AND 515 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1867 080.58038 36,289
INSTALL 1745 FEET OF 2 INCH POLY ALONG STOREY STREET AND ABANDON 1230 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1868 080.58040 17,124
INSTALL 920 FEET OF 2 INCH AND 667 FEET OF 4 INCH POLY ALONG FOREST HILLS AND ABANDON 525 FEET OF 8 INCH, 695 FEET OF 4 INCH CAST IRON AND 165 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1869 080.58042 18,423
INSTALL 1365 FEET OF 4 INCH POLY ALONG SANTA CLARA AND ABANDON 475 FEET OF 8 INCH AND 775 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1870 080.58051 6,619
INSTALL (259) POLY SERVICES AND ABANDON (259) STEEL SERVICES ALONG STREETS IN CITY OF TEMPLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
1871 080.58052 5,605
RELOCATE FACILITIES. INSTALL 27 FEET OF 2 INCH POLY ALONG LONE STAR DRIVE AND ABANDON 546 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR PARK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK
SYSTEM INTEGRITY DECEMBER
1872 080.58054 16,793
INSTALL 5079 FEET OF 4 INCH POLY ALONG HIGHWAY 271 AND ABANDON 7 FEET OF 4 INCH POLY AND 5064 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
1873 080.58055 3,743
INSTALL (124) POLY SERVICES AND ABANDON (124) STEEL SERVICES ALONG STREETS IN CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1874 080.58056 4,321
INSTALL (160) POLY SERVICES AND ABANDON (160) STEEL SERVICES ALONG STREETS IN CITY OF DESOTO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE
SYSTEM INTEGRITY DECEMBER
1875 080.58060 58,663
INSTALL 3300 FEET OF 4 INCH POLY ALONG BEWICK AND ABANDON 380 FEET OF 6 INCH STEEL, 820 FEET OF 6 INCH, AND 1031 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1876 080.58061 42,539
RELOCATE FACILITIES. INSTALL 2204 FEET OF 4 INCH POLY AND ABANDON 1950 FEET OF 4 INCH CAST IRON, 692 FEET OF 4 INCH STEEL, 163 FEET OF POLY ALONG COVELO TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1877 080.58068 392 INSTALL (3) CLOCKSPRINGS ALONG LINE CA(2ND) EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1878 080.58083 118
RELOCATE FACILITIES. INSTALL (2) .25 INCH POLY SERVICES ALONG 51ST STREET AND ABANDON 31 FEET OF 4 INCH STEEL TO ACCOMMODATE TXDOT HIGHWAY 35 PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
1879 080.58084 163
RELOCATE FACILITIES. INSTALL (1) .25 INCH POLY SERVICE ALONG 47TH STREET AND ABANDON 32 FEET OF 4 INCH POLY II TO ACCOMMODATE CITY OF TEMPLE TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
1880 080.58085 30,062
INSTALL 1635 FEET OF 4 INCH POLY ALONG CHEROKEE TRAIL AND ABANDON 1635 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1881 080.58086 32,084
INSTALL 1875 FEET OF 4 INCH POLY ALONG BLUFFVIEW ROAD AND ABANDON 490 FEET OF 4 INCH CAST IRON, 290 FEET OF 2 INCH STEEL, 660 FEET OF 8 INCH CAST IRON, 85 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1882 080.58087 12,007
INSTALL (343) POLY SERVICES AND ABANDON (343) STEEL SERVICES ALONG STREETS IN CITY OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1883 080.58088 66,093
INSTALL (393) POLY SERVICES ALONG STREETS OF ARLINGTON AND ABANDON (393) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1884 080.58099 2,140
INSTALL 2207 FEET OF 2 INCH POLY ALONG GAY STREET AND ABANDON 12 FEET OF 1.25 INCH POLY AND 2215 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN
SYSTEM INTEGRITY DECEMBER
1885 080.58100 17,507
INSTALL 2744 FEET OF 2 INCH POLY AND ABANDON 2921 FEET OF 2 INCH STEEL AND 50 FEET OF 4 INCH POLY ALONG SOUTH COLLEGE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
1886 080.58101 17,716
INSTALL 1890 FEET OF 2 INCH POLY ALONG LAWRENCE AND ABANDON 1890 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1887 080.58103 16,164
INSTALL 1750 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY ALONG LAWRENCE AND ABANDON 950 FEET OF 4 INCH AND 680 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 64 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1888 080.58104 6,862
INSTALL 60 FEET OF 2 INCH, 906 FEET OF 4 INCH AND 1907 FEET OF 6 INCH POLY AND ABANDON 1018 FEET OF 2 INCH AND 1160 FEET OF 3 INCH STEEL AND 1025 FEET OF 3 INCH POLY ALONG PORCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA
SYSTEM INTEGRITY DECEMBER
1889 080.58105 82,438
INSTALL 13999 FEET OF 4 INCH POLY ALONG LINE M6 AND ABANDON 13878 FEET OF 3 INCH STEEL AND 11 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST
SYSTEM INTEGRITY DECEMBER
1890 080.58107 10,369
INSTALL 361 FEET OF 2 INCH AND 936 FEET OF 4 INCH POLY ALONG 4TH STREET AND ABANDON 330 FEET OF 2 INCH AND 1000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1891 080.58109 116
INSTALL 92 FEET OF 4 INCH POLY ALONG 11TH STREET AND ABANDON 24 FEET OF 2 INCH AND 68 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
1892 080.58110 3,909
INSTALL 60 FEET OF 4 INCH POLY AND DISTRICT REGULATOR STATION ALONG CYPRESS AND ABANDON 196 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
1893 080.58112 (467)
INSTALL 26 FEET OF 8 INCH POLY ALONG SYCAMORE STREET AND ABANDON 24 FEET OF 8 INCH AND 2 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1894 080.58113 1,623
RELOCATE FACILITIES. INSTALL 861 FEET OF 2 INCH POLY ALONG FOCH STREET AND ABANDON 970 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1895 080.58115 9,255
INSTALL (50) POLY SERVICE LINES AND ABANDON (50) COPPER SERVICE LINES ALONG STREETS IN CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1896 080.58117 4,830
INSTALL 3375 FEET OF 2 INCH POLY ALONG DONALDSON STREET AND ABANDON 27 FEET OF 1.25 INCH, 797 FEET OF 2 INCH, 326 FEET OF 3 INCH AND 470 FEET OF 4 INCH POLY AND 1096 FEET OF 3 INCH, 550 FEET OF 4 INCH AND 363 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS
SYSTEM INTEGRITY DECEMBER
1897 080.58119 4,425
INSTALL 3146 FEET OF 2 INCH POLY ALONG DONALDSON STREET AND ABANDON 150 FEET OF 2 INCH, 1760 FEET OF 4 INCH, 740 FEET OF 3 INCH STEEL, 150 FEET OF 3 INCH AND 500 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS
SYSTEM INTEGRITY DECEMBER
1898 080.58126 579,993 INSTALL 6500 FEET OF 8 INCH POLY ALONG RANDOL MILL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH SEPTEMBER
1899 080.58131 1,915
RELOCATE FACILITIES. INSTALL 87 FEET OF 2 INCH AND 3 FEET OF 4 INCH POLY ALONG JOMAR LANE AND ABANDON 81 FEET OF 2 INCH AND 9 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1900 080.58147 224
RELOCATE FACILITIES. INSTALL (5) POLY SERVICE LINES AND ABANDON (5) POLY SERVICES ALONG MCGREGOR STREET TO ACCOMMODATE CITY OF MCGREGOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
1901 080.58149 5,445
INSTALL 1200 FEET OF 2 INCH POLY ALONG COUNTY ROAD 1020 AND ABANDON 720 FEET OF STEEL AND 480 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1902 080.58153 17,089
INSTALL 1800 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY ALONG MOCKINGBIRD LANE AND ABANDON 20 FEET OF 4 INCH POLY, 85 FEET OF 2 INCH POLY, 1715 FEET OF 2 INCH STEEL AND 55 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
1903 080.58154 42,675
INSTALL 3600 FEET OF 2 INCH POLY AND ABANDON 3400 FEET OF 4 INCH STEEL ALONG ADELAIDE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
1904 080.58158 27,846
INSTALL 45 FEET OF 8 INCH STEEL ALONG WILLIAMS DRIVE AND ABANDON (2) 8 INCH STEEL VALVES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY DECEMBER
1905 080.58159 59,487
INSTALL 2885 FEET OF 4 INCH POLY AND ABANDON 884 FEET OF 4 INCH, 997 FEET OF 6 INCH CAST IRON, 345 FEET OF 2 INCH STEEL ALONG RETTA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1906 080.58161 29,840
INSTALL 2226 FEET OF 2 INCH, 11 FEET OF 3 INCH, AND 66 FEET OF 4 INCH POLY AND ABANDON 151 FEET OF 3 INCH, 2458 FEET OF 4 INCH STEEL, 7 FEET OF 3 INCH AND 65 FEET OF 4 INCH POLY ALONG JAMES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
1907 080.58162 14,437
RELOCATE FACILITIES. INSTALL (52) POLY SERVICES ALONG SOUTHMOOR ROAD AND ABANDON (52) POLY SERVICES TO ACCOMMODATE CITY OF ARLINGTON PAVING AND DRAINAGE PLAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1908 080.58167 25,686
INSTALL 1900 FEET OF 6 INCH AND 320 FEET OF 2 INCH POLY ALONG HACKBERRY AND ABANDON 411 FEET OF 2 INCH, 1595 FEET PF 8 INCH STEEL AND 997 FEET OF 2 INCH AND 30 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1909 080.58169 10,608 ABANDON 57 FEET OF 24 INCH STEEL ALONG LINE CA (3RD) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE
SYSTEM INTEGRITY DECEMBER
1910 080.58172 5,968
RELOCATE FACILITIES. INSTALL (16) POLY SERVICES ALONG BRIAR HILL ROAD AND ABANDON (16) POLY SERVICES TO ACCOMMODATE CITY OF GRAND PRAIRIE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1911 080.58174 7,539
INSTALL 430 FEET OF 4 INCH POLY AND ABANDON 440 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY ALONG WEST PIONEER PARKWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1912 080.58189 664
ABANDON 1785 FEET OF 2 INCH AND 528 FEET OF 4 INCH STEEL AND 381 FEET OF 4 INCH POLY ALONG CHAMBERS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EMHOUSE
SYSTEM INTEGRITY DECEMBER
1913 080.58192 50
INSTALL 3 INCH VALVE AND ABANDON 3 INCH VALVE ON DISTRICT REGULATOR STATION ALONG BEAVER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
1914 080.58195 1,869
RELOCATE FACILITIES. INSTALL 296 FEET OF 6 INCH POLY ALONG MCDERMOTT ROAD AND ABANDON 264 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
1915 080.58204 4,205
INSTALL 1401 FEET OF 2 INCH POLY ALONG AVENUE F AND ABANDON 1141 FEET OF 4 INCH STEEL AND 264 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1916 080.58212 10,208
INSTALL 1465 FEET OF 4 INCH POLY ALONG HILLCREST DRIVE AND ABANDON 1460 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 65 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1917 080.58217 33,646
INSTALL 1821 FEET OF 2 INCH POLY AND 157 FEET OF 4 INCH POLY AND 2241 FEET OF 6 INCH POLY AND ABANDON 1055 FEET OF 2 INCH STEEL AND 140 FEET OF 2 INCH POLY AND 144 FEET OF 4 INCH STEEL AND 2611 FEET OF 6 INCH STEEL ALONG PRESTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1918 080.58218 15,391
INSTALL 2105 FEET OF 2 INCH POLY ALONG MAPLE DRIVE AND ABANDON 2100 FEET OF 2 INCH STEEL ALONG LAKESIDE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1919 080.58225 21,652
INSTALL 264 FEET OF 2 INCH POLY AND 1590 FEET OF 4 INCH POLY AND ABANDON 45 FEET OF 2 INCH, 1574 FEET OF 3 INCH AND 225 FEET OF 6 INCH STEEL ALONG TRAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1920 080.58229 1,095
INSTALL 427 FEET OF 2 INCH POLY ALONG MEADOW LAKE AVENUE AND ABANDON 408 FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1921 080.58233 1,613
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY ALONG CLIFF VIEW AND ABANDON 90 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1922 080.58234 4,081
INSTALL 17 FEET OF 2 INCH AND 2 FEET OF 3 INCH STEEL AND ABANDON 6 FEET OF 2 INCH AND 2 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1923 080.58242 3,037
INSTALL 670 FEET OF 2 INCH POLY ALONG CROCKETT STREET AND ABANDON 887 FEET OF 2 INCH AND 43 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1924 080.58252 2,610
INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 8 INCH, 119 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY ALONG RANDOLPH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
1925 080.58254 3,047
INSTALL 400 FEET OF 4 INCH POLY AND ABANDON 5 FEET OF 3 INCH POLY AND 385 FEET OF 4 INCH STEEL ALONG SCHOPMEYER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
1926 080.58258 5,413
RELOCATE FACILITIES. INSTALL 263 FEET OF 2 INCH POLY ALONG CHESTNUT STREET AND ABANDON 263 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
1927 080.58265 27,795
INSTALL 1242 FEET OF 2 INCH AND 3508 FEET OF 4 INCH POLY ALONG OLD ORCHARD STREET AND ABANDON 1213 FEET OF 2 INCH AND 3425 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
1928 080.58267 51,327
INSTALL 220 FEET OF 2 INCH, 2940 FEET OF 4 INCH AND 270 FEET OF 6 INCH ALONG 1ST STREET AND ABANDON 4000 FEET OF 2 INCH, 3 INCH, AND 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY
SYSTEM INTEGRITY DECEMBER
1929 080.58276 26,460
INSTALL 1950 FEET OF 2 INCH POLY ALONG CANTEY AND ABANDON 1629 FEET OF 4 INCH CAST IRON AND 65 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1930 080.58286 184
ABANDON 4396 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 02 AT KIRKLAND CITY GATE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KIRKLAND
SYSTEM INTEGRITY DECEMBER
1931 080.58306 15,358
INSTALL 1375 FEET OF 2 INCH POLY ALONG GLEN GARDEN AND ABANDON 301 FEET OF 4 INCH AND 886 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1932 080.58307 393 INSTALL METALIC SLEEVE ALONG LINE D9-2-1 IN COLLIN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
1933 080.58308 357 INSTALL 925 FEET OF 4 INCH POLY ALONG FORT WORTH AVENUE. RESIDENTIAL DALLAS GROWTH OCTOBER
1934 080.58320 5,431
RELOCATE FACILITIES. INSTALL 1173 FEET OF 2 INCH AND 212 FEET OF 4 INCH POLY ALONG ANNA DRIVE AND ABANDON 944 FEET OF 3 INCH STEEL AND 364 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
SYSTEM INTEGRITY DECEMBER
1935 080.58327 16,646
RELOCATE FACILITIES. INSTALL 1525 FEET OF 4 INCH POLY ALONG VINSON AND ABANDON 1525 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1936 080.58329 9,740
INSTALL 3 FEET OF 3 INCH POLY AND 803 FEET OF 4 INCH POLY AND ABANDON 652 FEET OF 3 INCH STEEL, 100 FEET OF 3 INCH POLY, AND 6 FEET OF 4 INCH POLY ALONG SHAWNEE TRACE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
1937 080.58330 16,225
INSTALL 2609 FEET OF 2 INCH AND 3210 FEET OF 4 INCH POLY ALONG MCKENZIE AVENUE AND ABANDON 2460 FEET OF 2 INCH, 2660 FEET OF 3 INCH AND 354 FEET OF 6 INCH STEEL AND 237 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
1938 080.58340 529
RELOCATE FACILITIES. INSTALL 130 FEET OF 6 INCH POLY ALONG RANDOL MILL ROAD AND ABANDON 130 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1939 080.58359 16,099
RELOCATE FACILITIES. INSTALL 470 FEET OF 2 INCH AND 339 FEET OF 4 INCH POLY AND ABANDON 472 FEET OF 2 INCH POLY AND 347 FEET OF 4 INCH STEEL ALONG WINDSOR TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1940 080.58361 43,427
INSTALL 2000 FEET OF 2 INCH AND 50 FEET OF 6 INCH POLY ALONG BOOKER AND ABANDON 221 FEET OF 4 INCH CAST IRON, 1500 FEET OF 2 INCH, AND 500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1941 080.58372 825 INSTALL 1300 FEET OF 2 INCH POLY ALONG THE STREETS OF COUNTRY WAY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH OCTOBER
1942 080.58373 57,088
INSTALL 25 FEET OF 3 INCH, 34 FEET OF 6 INCH, 42 FEET OF 8 INCH STEEL AND 5 FEET OF 8 INCH POLY AND DISTRICT REGULATOR STATION AT RED OAKS AND ABANDON DISTRICT REGULATOR STATION AND 59 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK
SYSTEM INTEGRITY DECEMBER
1943 080.58384 8,667
RELOCATE FACILITIES. INSTALL 43 FEET OF 2 INCH AND 268 FEET OF 4 INCH AND 4417 FEET OF 6 INCH POLY ALONG FM 664 AND ABANDON 80 FEET OF 2 INCH, 208 FEET OF 4 INCH AND 4390 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF OVILLA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OVILLA
SYSTEM INTEGRITY DECEMBER
1944 080.58387 3,360
INSTALL 360 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 297 FEET OF 2 INCH AND 3 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1945 080.58389 54 ABANDON DISTRICT REGULATOR STATION ALONG CITY OF SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
1946 080.58390 120 ABANDON DISTRICT REGULATOR STATION IN THE CITY OF ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
1947 080.58398 120 ABANDON DISTRICT REGULATOR STATION IN CITY OF ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 66 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1948 080.58402 30 ABANDON DISTRICT REGULATOR STATION 09 IN SHACKELFORD COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
1949 080.58413 10,928
INSTALL 8638 FEET OF 2 INCH AND 2142 FEET OF 4 INCH POLY ALONG STREETS OF THE COLLINSBROOK FARMS PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH NOVEMBER
1950 080.58418 117 ABANDON DISTRICT REGULATOR STATION 07 IN ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
1951 080.58429 658
INSTALL 492 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 482 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLANKET
SYSTEM INTEGRITY DECEMBER
1952 080.58444 14,113
INSTALL 450 FEET OF 6 INCH AND 280 FEET OF 4 INCH POLY ALONG HINTON AND ABANDON 161 FEET OF 3 INCH, 231 FEET OF 2 INCH, 196 FEET OF 2 INCH STEEL AND 219 FEET OF POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA
SYSTEM INTEGRITY DECEMBER
1953 080.58451 52,323
RELOCATE FACILITIES. INSTALL 473 FEET OF 2 INCH POLY AND 8 FEET OF 3 INCH POLY AND 3874 FEET OF 4 INCH POLY AND ABANDON 1780 FEET OF 2 INCH STEEL AND 1676 FEET OF 3 INCH STEEL ALONG LENNOX DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1954 080.58452 5,389
RELOCATE FACILITIES. INSTALL (22) POLY SERVICES AND ABANDON (22) STEEL SERVICES ALONG LANGLEY AVENUE TO ACCOMMODATE CITY OF EVERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN
SYSTEM INTEGRITY DECEMBER
1955 080.58454 636
RELOCATE FACILITIES. ABANDON 58 FET OF 3 INCH STEEL ALONG EAGLE TO ACCOMMODATE CITY OF BRUCEVILLE EDDY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRUCEVILLE EDDY
SYSTEM INTEGRITY DECEMBER
1956 080.58460 2,334
INSTALL 1667 FEET OF 2 INCH POLY AND ABANDON 1402 FEET OF 2 INCH POLY ALONG HEMPHILL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON
SYSTEM INTEGRITY DECEMBER
1957 080.58462 11,345
INSTALL 1620 FEET OF 2 INCH POLY AND ABANDON 1384 FEET OF 2 INCH POLY ALONG KIRBY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON
SYSTEM INTEGRITY DECEMBER
1958 080.58464 21
ABANDON 700 FEET OF 2 INCH STEEL AND 294 FEET OF 2 INCH POLY ALONG MEMORY LANE IN PALESTINE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
1959 080.58469 949
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY ALONG 2ND STREET AND ABANDON 4021 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1960 080.58480 4,572
INSTALL 2180 FEET OF 4 INCH POLY AND ABANDON 1480 FEET OF 2 INCH POLY ALONG ZMOLEK ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALMA
SYSTEM INTEGRITY DECEMBER
1961 080.58484 29,283
RELOCATE FACILITIES. INSTALL 1362 FEET OF 2 INCH AND 328 FEET OF 4 INCH POLY ALONG MCKINNEY AVENUE AND ABANDON 30 FEET OF 2 INCH STEEL AND 1136 FEET OF 2 INCH AND 328 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1962 080.58485 14,054
RELOCATE FACILITIES. INSTALL (58) POLY SERVICES ALONG BIGGS TERRACE AND ABANDON (58) STEEL SERVICES TO ACCOMMODATE CITY OF ARLINGTON PAVING AND STORM DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1963 080.58490 17,860
RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH POLY AND ABANDON 497 FEET OF 2 INCH STEEL AND 158 FEET OF 2 INCH POLY ALONG BUMPAS STREET TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
1964 080.58494 755
RELOCATE FACILITIES. INSTALL 227 FEET OF 4 INCH POLY ALONG DOMINIK DRIVE AND ABANDON 227 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
1965 080.58499 8,360
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG CLARK ROAD AND ABANDON 287 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CEDAR HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL
SYSTEM INTEGRITY DECEMBER
1966 080.58509 3,360
INSTALL 860 FEET OF 4 INCH POLY ALONG ROCKWOOD LANE AND ABANDON 853 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1967 080.58514 24,943
RELOCATE FACILITIES. INSTALL 1832 FEET OF 4 INCH POLY ALONG UNIVERSITY AVENUE AND ABANDON 1834 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
1968 080.58515 1,636
INSTALL 10 FEET OF 8 INCH AND 20 FEET OF 4 INCH POLY ALONG GOODNIGHT LANE AND ABANDON 10 FEET OF 8 INCH AND 20 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1969 080.58544 9,704 INSTALL 1605 FEET OF 2 INCH POLY ALONG THE STREETS OF STONEY CREEK PHASE 5 SECTION 3. RESIDENTIAL SUNNYVALE GROWTH NOVEMBER
1970 080.58545 26,840
RELOCATE FACILITIES. INSTALL 1055 FEET OF 4 INCH AND 340 FEET OF 6 INCH POLY ALONG TRAIL LAKE AND ABANDON 1060 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1971 080.58551 527
RELOCATE FACILITIES. INSTALL 31 FEET OF 4 INCH POLY ALONG CONCHO ROAD AND ABANDON 25 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1972 080.58556 19,355 INSTALL 1080 FEET OF 8 INCH AND 2400 FEET OF 4 INCH POLY ALONG INNOVATION BUSINESS PARK. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS HUTTO GROWTH JUNE
1973 080.58559 9,242 INSTALL 1600 FEET OF 8 INCH POLY ALONG INNOVATION BUSINESS PARK PHASE 1. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL HUTTO GROWTH JUNE
1974 080.58564 1,583
RELOCATE FACILITIES. INSTALL 344 FEET OF 4 INCH POLY ALONG VICKERY STREET AND ABANDON 326 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1975 080.58577 34,084
RELOCATE FACILITIES. INSTALL 975 FEET OF 6 INCH POLY AND 600 FEET OF 10 INCH STEEL AND ABANDON 600 FEET OF 6 INCH STEEL, 375 FEET OF 6 INCH POLY AND 600 FEET OF 10 INCH STEEL ALONG MCDERMOTT DRIVE TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
SYSTEM INTEGRITY DECEMBER
1976 080.58583 3,812 INSTALL WELD-OVER SLEEVE ALONG LINE XT25 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 67 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
1977 080.58587 848
RELOCATE FACILITIES. INSTALL 321 FEET OF 4 INCH POLY ALONG NORTHWOOD STREET AND ABANDON 321 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
1978 080.58590 296,066
RELOCATE FACILITIES. INSTALL 4089 FEET OF 16 INCH STEEL AND ABANDON 20 FEET OF 12 INCH AND 3965 FEET OF 18 INCH STEEL ALONG PIPELINE ROAD TO ACCOMMODATE CITY OF HURST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY DECEMBER
1979 080.58593 21,599
INSTALL 1930 FEET OF 2 INCH POLY AND ABANDON 1930 FEET OF 4 INCH CAST IRON ALONG LATTA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1980 080.58594 5,946
INSTALL 1540 FEET OF 2 INCH POLY ALONG LATTA AND ABANDON 1250 FEET OF 4 INCH AND 210 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1981 080.58598 77,942
INSTALL DISTRICT REGULATOR STATION, 10 FEET OF 3 INCH AND 297 FEET OF 8 INCH STEEL AND ABANDON 6321 FEET OF 3 INCH STEEL ALONG LINE L21 AT LIMMER LOOP IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTTO
SYSTEM INTEGRITY DECEMBER
1982 080.58604 64 ABANDON 118 FEET OF 2 INCH STEEL AND 122 FEET OF 2 INCH POLY ALONG FM2964 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER
SYSTEM INTEGRITY DECEMBER
1983 080.58608 1,942
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY ALONG TWIGHLIGHT AND ABANDON 450 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
1984 080.58610 3,361
INSTALL 548 FEET OF 2 INCH POLY ALONG YOUNG DRIVE AND ABANDON 540 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILLEEN
SYSTEM INTEGRITY DECEMBER
1985 080.58618 15,670
INSTALL 1375 FEET OF 2 INCH POLY AND ABANDON 855 FEET OF 4 INCH AND 464 FEET OF 8 INCH CAST IRON ALONG HERALD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1986 080.58619 19,029
INSTALL 1394 FEET OF 2 INCH POLY AND ABANDON 538 FEET OF 4 INCH AND 141 FEET OF 6 INCH AND 424 FEET OF 8 INCH CAST IRON ALONG ELSIE FAYE HEGGINS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1987 080.58620 25,665
INSTALL 25 FEET OF 2 INCH AND 1300 FEET OF 4 INCH POLY ALONG ALONG EAST 12TH AND ABANDON 1530 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1988 080.58621 2,698
INSTALL 1130 FEET OF 2 INCH POLY ALONG CUMBERLAND AVENUE AND ABANDON 795 FEET OF 4 INCH AND 330 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1989 080.58622 7,958
INSTALL 1146 FEET OF 2 INCH POLY AND ABANDON 504 FEET OF 2 INCH POLY AND 712 FEET OF 4 INCH STEEL AND DRS20 ALONG 11TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM
SYSTEM INTEGRITY DECEMBER
1990 080.58630 11,145
RELOCATE FACILITIES. INSTALL 310 FEET OF 6 INCH POLY MAIN AND ABANDON 300 FEET OF 6 INCH POLY ALONG THROCKMORTON ROAD TO ACCOMMODATE CITY OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
SYSTEM INTEGRITY DECEMBER
1991 080.58634 20,087
RELOCATE FACILITIES. INSTALL 1100 FEET OF 4 INCH POLY AND ABANDON 1040 FEET STEEL ALONG SOUTH DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
1992 080.58635 3,487
INSTALL 578 FEET OF 2 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON 365 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1993 080.58639 28,400
INSTALL 2360 FEET OF 2 INCH POLY AND ABANDON 2360 FEET OF 4 INCH STEEL ALONG CAMBRIDGE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
1994 080.58640 41,165
INSTALL 2174 FEET OF 4 INCH POLY AND ABANDON 1937 FEET OF 6 INCH CAST IRON ALONG NORTH PLYMOUTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
1995 080.58646 3,945
RELOCATE FACILITIES. INSTALL 603 FEET OF 4 INCH POLY AND ABANDON 586 FEET OF 3 INCH STEEL AND 1221 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF EASTLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
SYSTEM INTEGRITY DECEMBER
1996 080.58658 25,833
RELOCATE FACILITIES. INSTALL 1859 FEET OF 2 INCH POLY AND 1321 FEET OF 4 INCH POLY ALONG FM51 AND ABANDON 1235 FEET OF 2 INCH STEEL AND 225 FEET OF 2 INCH POLY AND 120 FEET OF 4 INCH STEEL AND 150 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SPRINGTOWN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN
SYSTEM INTEGRITY DECEMBER
1997 080.58669 2,240
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY AND ABANDON 113 FEET OF 2 INCH POLY ALONG BRANDYWINE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
1998 080.58670 5,897
RELOCATE FACILITIES. INSTALL 130 FEET OF 6 INCH AND 20 FEET OF 4 INCH POLY AND ABANDON 110 FEET OF 6 INCH AND 15 FEET OF 3 INCH STEEL ALONG NEW YORK AVENUE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
1999 080.58684 131
RELOCATE FACILITIES. INSTALL 14 FEET OF 4 INCH POLY ALONG CANONGATE AND ABANDON 10 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
2000 080.58691 41,699
INSTALL 269 FEET OF 2 INCH AND 415 FEET OF 6 INCH POLY ALONG 1ST STREET AND ABANDON 269 FEET OF 2 INCH AND 414 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
2001 080.58692 102,238
INSTALL 25 FEET OF 2 INCH POLY AND 10 FEET OF 3 INCH POLY AND 26 FEET OF 4 INCH POLY AND 40 FEET OF 6 INCH POLY AND 4003 FEET OF 8 INCH POLY ALONG NORTHWOOD DRIVE AND ABANDON 30 FEET OF 2 INCH POLY AND 25 FEET OF 3 INCH POLY AND 15 FEET OF 4 INCH POLY AND 60 FEET OF 6 INCH STEEL AND 3970 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS
SYSTEM INTEGRITY DECEMBER
2002 080.58693 1,683
INSTALL 487 FEET OF 6 INCH POLY ALONG VIRGINIA STREET AND ABANDON 425 FEET OF 6 INCH STEEL AND 25 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
2003 080.58694 1,831
RELOCATE FACILITIES. INSTALL 110 FEET OF 4 INCH POLY ALONG TEXAS AVENUE AND ABANDON 110 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
2004 080.58708 46,320
INSTALL 3061 FEET OF 4 INCH POLY AND ABANDON 920 FEET OF 4 INCH CAST IRON, 200 FEET OF 4 INCH POLY AND 1466 FEET OF 4 INCH STEEL ALONG WAITS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 68 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2005 080.58712 19,638
INSTALL 2010 FEET OF 2 INCH POLY AND ABANDON 981 FEET OF 4 INCH CAST IRON, 384 FEET OF 4 INCH POLY, 1825 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2006 080.58713 131
RELOCATE FACILITIES. INSTALL 50 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2007 080.58714 2,147
INSTALL 469 FEET OF 4 INCH POLY AND ABANDON 462 FEET OF 4 INCH STEEL ALONG GILMER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
2008 080.58723 2,065
RELOCATE FACILITIES. INSTALL 125 FEET OF 2 INCH POLY ALONG SAGEWOOD STREET AND ABANDON 120 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2009 080.58726 11,454
RELOCATE FACILITIES. INSTALL 60 FEET OF 6 INCH POLY AND ABANDON 60 FEET OF 6 INCH STEEL ALONG CONGRESS STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2010 080.58733 1,818
RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH POLY AND (1) POLY SERVICE AND ABANDON (1) POLY SERVICE ALONG WHITNEY COURT TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2011 080.58734 46,651
RELOCATE FACILITIES. INSTALL 630 FEET OF 2 INCH AND 2803 FEET OF 4 INCH POLY AND ABANDON 2272 FEET OF 2 INCH AND 768 FEET OF 3 INCH STEEL ALONG ANITA AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2012 080.58735 11,396
INSTALL 1750 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 8 INCH CAST IRON AND 1750 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2013 080.58736 6,437
RELOCATE FACILITIES. INSTALL 216 FEET OF 2 INCH AND 1,422 FEET OF 4 INCH POLY AND ABANDON 250 FEET OF 2 INCH POLY AND 73 FEET OF 3 INCH STEEL AND 156 FEET OF 3 INCH POLY AND 214 FEET OF 4 INCH STEEL AND 561 FEET OF 4 INCH POLY ALONG ADAMS AVENUE TO ACCOMMODATE TXDOT WIDENING PROJECT. ALL CUSTOMERS TEMPLE
RELOCATION OF FACILITIES SEPTEMBER
2014 080.58737 8,934
INSTALL 27 FEET OF 20 INCH STEEL AND ABANDON 27 FEET OF 24 INCH STEEL ALONG LINE CA (2ND)(WEST) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN
SYSTEM INTEGRITY DECEMBER
2015 080.58738 7,565
RELOCATE FACILITIES. INSTALL 410 FEET OF 4 INCH POLY ALONG PECAN STREET AND ABANDON 410 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CELINA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA
SYSTEM INTEGRITY DECEMBER
2016 080.58740 17,319 INSTALL 4000 FEET OF 4 INCH AND 4100 FEET OF 2 INCH POLY ALONG STREETS OF BAYSIDE WEST PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH OCTOBER
2017 080.58748 30,404
INSTALL (160) POLY SERVICES AND ABANDON (160) STEEL SERVICES ALONG STREETS OF ROSEBUD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD
SYSTEM INTEGRITY DECEMBER
2018 080.58750 36,620
INSTALL 3326 FEET OF 4 INCH POLY ALONG LAWNWOOD AND ABANDON 1205 FEET OF 4 INCH, 1498 FEET OF 6 INCH CAST IRON, 462 FEET OF 2 INCH, AND 560 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2019 080.58751 38,503
RELOCATE FACILITIES. INSTALL 61 FEET OF 2 INCH, 10 FEET OF 4 INCH AND 1099 FEET OF 6 INCH POLY AND ABANDON 62 FEET OF 2 INCH AND 977 FEET OF 4 INCH STEEL AND 15 FEET OF 2 INCH POLY ALONG US377 TO ACCOMMODATE CITY OF ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
SYSTEM INTEGRITY DECEMBER
2020 080.58753 59,182
RELOCATE FACILITIES. INSTALL 396 FEET OF 2 INCH, 306 FEET OF 6 INCH, AND 248 FEET OF 8 INCH POLY AND ABANDON 36 FEET OF 2 INCH POLY, 240 FEET OF 2 INCH, 289 FEET OF 6 INCH AND 204 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
2021 080.58755 25,705
RELOCATE FACILITIES. INSTALL 4400 FEET OF 2 INCH POLY ALONG COTTON STREET AND ABANDON 4743 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
2022 080.58756 52,617
INSTALL 4 FEET OF 2 INCH POLY AND 4084 FEET OF 4 INCH POLY ALONG GALVEZ AND ABANDON 840 FEET OF 2 INCH AND 561 FEET OF 4 INCH POLY AND 2092 FEET OF 4 INCH AND 1072 FEET OF 6 INCH AND 167 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2023 080.58768 928
INSTALL 1,175 FEET OF 2 INCH POLY, 936 FEET OF 4 INCH POLY AND 1,024 FEET OF 6 INCH POLY ALONG TERRA DEL SOL PARKWAY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2024 080.58788 6,135
RELOCATE FACILITIES. INSTALL 125 OF 2 INCH POLY ALONG ARCHER AND ABANDON 440 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2025 080.58791 1,869
RELOCATE FACILITIES. INSTALL 110 FEET OF 6 INCH POLY AND ABANDON 5 FEET OF 6 INCH STEEL AND 105 FEET OF 6 INCH POLY ALONG WOODBROOK ST AND SOUTHRIDGE DR TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2026 080.58792 81,769
RELOCATE FACILITIES. INSTALL 75 FEET OF 2 INCH POLY AND 2400 FEET OF 4 INCH POLY AND ABANDON 25 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY AND 1825 FEET OF 4 INCH STEEL AND 585 FEET OF 4 INCH POLY ALONG CHESTNUT STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2027 080.58796 6,236
RELOCATE FACILITIES. INSTALL 6 POLY SERVICES AND ABANDON 6 STEEL SERVICES ALONG TIMBERIDGE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2028 080.58797 16,634
RELOCATE FACILITIES. INSTALL 315 FEET OF 2 INCH POLY ALONG SHERATON STREET AND ABANDON 315 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2029 080.58798 9,301
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY AND ABANDON 250 FEET OF 2 INCH POLY ALONG PLUM HOLLOW STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2030 080.58800 253,373
RELOCATE FACILITIES. INSTALL 1154 FEET OF 2 INCH POLY AND ABANDON 248 FEET OF 2 INCH STEEL AND 38 FEET OF 2 INCH POLY AND 804 FEET OF 4 INCH STEEL ALONG SOUTH AVENUE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 69 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2031 080.58801 12,038
RELOCATE FACILITIES. INSTALL 748 FEET OF 2 INCH POLY AND ABANDON 746 FEET OF 2 INCH STEEL ALONG PANHANDLE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2032 080.58806 2,179
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY AND ABANDON 74 FEET OF 2 INCH POLY ALONG HENDERSON DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2033 080.58807 5,117
RELOCATE FACILITIES. INSTALL 11 POLY SERVICES AND ABANDON 11 STEEL SERVICES ALONG PAISLEY STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2034 080.58810 2,268 INSTALL 1030 OF 2 INCH AND POLY ALONG THE STREETS OF VIZCAYA 3F. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2035 080.58815 9,588 INSTALL 6354 FEET OF 2 INCH AND 4147 FEET OF 6 INCH POLY ALONG STREETS OF WOLF RANCH PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2036 080.58816 309
INSTALL 792 FEET OF 2 INCH AND 372 FEET OF 4 INCH AND 1395 FEET OF 6 INCH POLY ALONG STREETS OF SADDLE CREED. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2037 080.58817 515 INSTALL 810 FEET OF 2 INCH AND 1230 FEET OF 4 INCH POLY ALONG STREETS OF SADDLE CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2038 080.58824 9,920
RELOCATE FACILITIES. INSTALL 716 FEET OF 2 INCH POLY AND ABANDON 681 FEET OF 2 INCH POLY ALONG CHERRY DRIVE TO ACCOMMODATE CITY OF PRINCETON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
SYSTEM INTEGRITY DECEMBER
2039 080.58830 68,572
RELOCATE FACILITIES. INSTALL 700 FEET OF 2 INCH POLY AND 900 FEET OF 6 INCH STEEL AND ABANDON 700 FEET OF 2 INCH POLY AND 800 FEET OF 6 INCH STEEL ALONG 24TH ROAD TO ACCOMMODATE CITY OF EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
SYSTEM INTEGRITY DECEMBER
2040 080.58831 19,763
RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND ABANDON 160 FEET OF 2 INCH POLY ALONG HILL ALLEY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2041 080.58834 42,963
RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH AND 545 FEET OF 4 INCH POLY AND ABANDON 226 FEET OF 2 INCH STEEL AND 908 FEET OF 4 INCH STEEL ALONG MAIN STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2042 080.58837 77,314
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY ALONG FORREST RIDGE DRIVE AND ABANDON 90 FEET OF 1.25 INCH, 20 FEET OF 2 INCH , AND 60 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2043 080.58849 396
RELOCATE FACILITIES. INSTALL 16 FEET OF 2 INCH, 2 FEET OF 3 INCH AND 142 FEET OF 4 INCH POLY ALONG CHURCH STREET AND ABANDON 45 FEET OF 2 INCH AND 116 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF GAINESVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
2044 080.58860 6,725
INSTALL 298 FEET OF 4 INCH POLY AND ABANDON 264 FEET OF 8 INCH CAST IRON ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2045 080.58863 35,004
RELOCATE FACILITIES. INSTALL 1873 FEET OF 2 INCH POLY ALONG ECTOR AND ABANDON 1120 FEET OF 2 INCH STEEL AND 631 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2046 080.58866 60,172
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH AND 60 FEET OF 4 INCH POLY ALONG LAGUNA STREET AND ABANDON 120 FEET OF 2 INCH POLY AND 60 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2047 080.58867 28,417
RELOCATE FACILITIES. INSTALL 870 FEET OF 6 INCH POLY AND ABANDON 870 FEET OF 6 INCH STEEL ALONG ALONG CAMDEN COURT TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2048 080.58871 39,729
RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY AND 2200 FEET OF 4 INCH POLY ALONG PAISLEY AND ABANDON 365 FEET OF 2 INCH STEEL AND 450 FEET OF 2 INCH POLY AND 715 FEET OF 3 INCH STEEL AND 630 FEET OF 3 INCH POLY AND 260 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2049 080.58872 52,216
RELOCATE FACILITIES. INSTALL 233 FEET OF 2 INCH POLY AND 71 FEET OF 4 INCH POLY AND 182 FEET OF 6 INCH POLY AND ABANDON 200 FEET OF 2 INCH STEEL AND 71 FEET OF 4 INCH POLY AND 195 FEET OF 6 INCH STEEL ALONG HILLCREST STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2050 080.58878 15,878
INSTALL 1692 FEET OF 2 INCH AND 256 FEET OF 4 INCH POLY ALONG BALDWIN STREET AND ABANDON 2505 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2051 080.58879 74,795
INSTALL 387 FEET OF 8 INCH STEEL AND ABANDON 330 FEET OF 8 INCH STEEL ALONG PLANO ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
2052 080.58880 17,128
INSTALL 1 FEET OF 2 INCH AND 1534 FEET OF 4 INCH POLY AND ABANDON 1555 FEET OF 4 INCH CAST IRON AND 75 FEET OF 4 INCH POLY ALONG BOWLING AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2053 080.58881 56,069
INSTALL 542 FEET OF 2 INCH POLY AND 1816 FEET OF 6 INCH POLY ALONG COLORADO STREET AND ABANDON 2270 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2054 080.58882 28,996
INSTALL 1418 FEET OF 2 INCH AND 635 FEET OF 4 INCH POLY ALONG AVALON DRIVE AND ABANDON 915 FEET OF 6 INCH AND 1350 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2055 080.58883 25,973
INSTALL 796 FEET OF 2 INCH POLY AND 12 FEET OF 3 INCH POLY AND 1941 FEET OF 4 INCH POLY AND ABANDON 2224 FEET OF 3 INCH STEEL ALONG RIDGEWOOD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
2056 080.58888 19,560
INSTALL 1250 FEET OF 2 INCH POLY AND ABANDON 990 FEET OF 4 INCH CAST IRON ALONG LORNA LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 70 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2057 080.58890 49,294
INSTALL 448 FEET OF 2 INCH POLY AND 4498 FEET OF 4 INCH POLY AND ABANDON 68 FEET OF 2 INCH STEEL AND 3639 FEET OF 2 INCH POLY ALONG STATE HIGHWAY 34 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON
SYSTEM INTEGRITY DECEMBER
2058 080.58891 17,828
RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH POLY ALONG FOARD STREET AND ABANDON 800 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2059 080.58895 949
INSTALL 504 FEET OF 2 INCH POLY ALONG CHERRY STREET AND ABANDON 801 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE
SYSTEM INTEGRITY DECEMBER
2060 080.58896 5,947
INSTALL 45 FEET OF 12 INCH STEEL AND ABANDON 45 FEET OF 12 INCH STEEL ALONG LINE CA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2061 080.58899 14,826
INSTALL 2200 FEET OF 2 INCH POLY ALONG OLD BLOOMING GROVE AND ABANDON 2200 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON
SYSTEM INTEGRITY DECEMBER
2062 080.58900 26,224
INSTALL 2281 FEET OF 2 INCH POLY AND ABANDON 931 FEET OF 4 INCH AND 1124 FEET OF 6 INCH CAST IRON ALONG SUDBURY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2063 080.58901 13,319
INSTALL 869 FEET OF 2 INCH AND 342 FEET OF 4 INCH POLY AND ABANDON 935 FEET OF 8 INCH CAST IRON ALONG SAINT MORITZ IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2064 080.58903 33,420
INSTALL 470 FEET OF 2 INCH POLY AND 1035 FEET OF 4 INCH POLY AND ABANDON 1105 FEET OF 2 INCH POLY AND 56 FEET OF 4 INCH STEEL ALONG SISSOM STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON
SYSTEM INTEGRITY DECEMBER
2065 080.58907 36,910
INSTALL 1700 FEET OF 4 INCH, 1500 FEET OF 2 INCH, 800 FEET OF 4 INCH POLY ALONG WALNUT STREET AND ABANDON 4000 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE
SYSTEM INTEGRITY DECEMBER
2066 080.58911 2,887
INSTALL REGULATOR AND ABANDON 4 INCH EMCO REGULATOR AT PARIS DISTRICT REGULATOR 16 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
2067 080.58921 13,559
RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH AND 60 FEET OF 2 INCH POLY ALONG DYSON AND ABANDON 100 FEET OF 6 INCH, 30 FEET OF 2 INCH POLY, AND 65 FEET OF 1.25 INCH STEEL TO ACCOMMODATE CITY OF DALLAS TXDOT RELOCATION PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2068 080.58928 35,280
RELOCATE FACILITIES. INSTALL 2225 FEET OF 4 INCH POLY AND ABANDON 572 FEET OF 2 INCH POLY AND 335 FEET OF 4 INCH POLY AND 1540 FEET OF 4 INCH STEEL ALONG HICKORY STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2069 080.58929 49,889
RELOCATE FACILITIES. INSTALL 1285 FEET OF 4 INCH, 558 FEET OF 2 INCH, 216 FEET OF 2 INCH POLY ALONG HICKORY STREET AND ABANDON 1284 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2070 080.58931 118 ABANDON DISTRICT REGULATOR 9 ON CHERRY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY
SYSTEM INTEGRITY DECEMBER
2071 080.58942 43,738
INSTALL 267 FEET OF 2 INCH POLY AND 1981 FEET OF 4 INCH POLY ALONG UNIVERSITY AND ABANDON 1507 FEET OF 4 INCH AND 1797 FEET OF 6 INCH AND 2286 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2072 080.58945 22,751
INSTALL 162 FEET OF 2 INCH AND 906 FEET OF 4 INCH POLY ALONG RUGGED AND ABANDON 1050 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2073 080.58946 22,510
INSTALL 1137 FEET OF 2 INCH AND 3 FEET OF 4 INCH POLY ALONG ELMWOOD AND ABANDON 1555 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2074 080.58951 100,547
INSTALL 670 FEET OF 2 INCH AND 3398 FEET OF 4 INCH POLY AND ABANDON 2498 FEET OF 4 INCH AND 1499 FEET OF 6 INCH CAST IRON ALONG WINTON TERRACE WEST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2075 080.58952 2,936
INSTALL 142 FEET OF 8 INCH POLY ALONG LUNA ROAD AND ABANDON 142 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2076 080.58961 1,539
INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 116 FEET OF 1.25 INCH POLY AND 465 FEET OF 2 INCH POLY ALONG PIN OAK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
2077 080.58965 24,863
INSTALL 1080 FEET OF 2 INCH AND 540 FEET OF 4 INCH POLY ALONG LOVERS AND ABANDON 1080 FEET OF 4 INCH AND 540 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
2078 080.58969 74,988
INSTALL 325 FEET OF 2 INCH POLY AND 3015 FEET OF 4 INCH POLY ALONG MEDFORD COURT AND ABANDON 2851 FEET OF 4 INCH, 2718 FEET OF 6 INCH STEEL, 768 FEET OF 6 INCH AND 222 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2079 080.58970 47,756
INSTALL 1318 FEET OF 2 INCH POLY ALONG ASBURY STREET AND ABANDON 10 FEET OF 2 INCH POLY AND 1300 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
2080 080.58974 46,186
INSTALL (364) POLY SERVICES ALONG STREETS OF DUNCANVILLE AND ABANDON (364) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
2081 080.58976 23,992
INSTALL 1975 FEET OF 2 INCH AND 1185 FEET OF 4 INCH POLY ALONG EVANS AND ABANDON 570 FEET OF 2 INCH, 346 FEET OF 3 INCH, 665 FEET OF 4 INCH STEEL, 120 FEET OF 2 INCH, 250 FEET OF 3 INCH AND 475 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM
SYSTEM INTEGRITY DECEMBER
2082 080.58978 4,714
INSTALL 315 FEET OF 2 INCH POLY AND ABANDON 470 FEET OF 2 INCH STEEL ALONG EAST IRVING STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2083 080.58980 50,122
INSTALL 22 FEET OF 2 INCH AND 2135 FEET OF 4 INCH POLY ALONG ASBURY STREET AND ABANDON 5 FEET OF 4 INCH AND 1500 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
2084 080.58982 6,645
INSTALL 622 FEET OF 4 INCH POLY ALONG AVENUE J AND ABANDON 595 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
2085 080.58985 619 INSTALL 1952 FEET OF 2 INCH POLY ALONG THE STREET OF MERIDIAN PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL KERRVILLE GROWTH OCTOBER
2086 080.58991 2,309 ABANDON 297 FEET OF 3 INCH STEEL ALONG SPRUCE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 71 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2087 080.58999 125,365
INSTALL 460 FEET OF 2 INCH POLY AND 4551 FEET OF 4 INCH POLY ALONG GREENE AVENUE AND ABANDON 2208 FEET OF 4 INCH STEEL, 785 FEET OF 4 INCH, 658 FEET OF 6 INCH CAST IRON AND 72 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2088 080.59001 101 ABANDON 387 FEET OF 2 INCH POLY ALONG JACKSBORO HIGHWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2089 080.59003 1,049
INSTALL 258 FEET OF 4 INCH POLY AND ABANDON 52 FEET OF 4 INCH STEEL AND 260 FEET OF 4 INCH POLY ALONG CLAY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA
SYSTEM INTEGRITY DECEMBER
2090 080.59007 20,814
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG ANITA AVENUE AND ABANDON 800 FEET OF 2 INCH AND 432 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2091 080.59008 22,574
RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG ANNA DRIVE AND ABANDON 100 FEET OF 2 INCH POLY, 200 FEET OF 2 INCH, AND 900 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
SYSTEM INTEGRITY DECEMBER
2092 080.59014 17,954
INSTALL 1320 FEET OF 2 INCH POLY ALONG DAY AND ABANDON 1040 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2093 080.59016 21,258
INSTALL 1450 FEET OF 2 INCH POLY ALONG DAY STREET AND ABANDON 1450 FEET OF 4 INCH CAST IRON ALONG DAY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2094 080.59020 70,997
INSTALL 419 FEET OF 2 INCH POLY AND 4165 FEET OF 4 INCH POLY AND ABANDON 75 FEET OF 2 INCH POLY AND 1249 FEET OF 3 INCH POLY AND 1447 FEET OF 4 INCH POLY AND 4423 FEET OF 6 INCH CAST IRON AND 305 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2095 080.59021 53,905
INSTALL (450) POLY SERVICES ALONG SCEYENE AND ABANDON (450) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2096 080.59031 51,973
INSTALL 3061 FEET OF 4 INCH POLY ALONG MINDEN STREET AND ABANDON 1131 FEET OF 4 INCH STEEL AND 767 FEET OF 6 INCH CAST IRON AND 182 FEET OF 6 INCH POLY AND 320 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2097 080.59039 1,265
INSTALL DISTRICT REGULATOR STATION ALONG FM 455 AND ABANDON DISTRICT REGULATOR STATION 07 IN ANNA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA
SYSTEM INTEGRITY DECEMBER
2098 080.59045 17,849 INSTALL 3000 FEET OF 4 INCH AND 1125 FEET OF 2 INCH POLY ALONG STREETS OF FAWN MEADOWS PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENISON GROWTH JANUARY
2099 080.59050 9,071
INSTALL 1723 FEET OF 2 INCH POLY ALONG MAGNOLIA AND ABANDON 1680 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHANDLER
SYSTEM INTEGRITY DECEMBER
2100 080.59051 38,203
INSTALL 2545 FEET OF 2 INCH POLY AND 555 FEET OF 4 INCH POLYAND ABANDON 2545 FEET OF 4 INCH CAST IRON, 30 FEET OF 6 INCH CAST IRON, AND 525 FEET OF 4 INCH POLY ALONG SAN BENITO WAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2101 080.59052 5,381
INSTALL 1010 FEET 2 INCH AND 110 FEET OF 4 INCH POLY ALONG RHONES QUARTER AND ABANDON 600 FEET OF 2 INCH AND 400 FEET OF 2 INCH AND 300 FEET OF 1.25 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER
SYSTEM INTEGRITY DECEMBER
2102 080.59054 3,781
INSTALL 336 FEET OF 2 INCH POLY ALONG MURCHISON AND ABANDON 334 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKSTON
SYSTEM INTEGRITY DECEMBER
2103 080.59055 6,771
INSTALL 413 FEET OF 4 INCH POLY ALONG PRAIRIEVILLE STREET AND ABANDON 115 FEET OF 3 INCH STEEL AND 201 FEET OF 4 INCH STEEL AND 133 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
2104 080.59060 36,342
INSTALL 469 FEET OF 2 INCH POLY AND 2036 FEET OF 4 INCH POLY AND ABANDON 1840 FEET OF 6 INCH CAST IRON ALONG SANTA CLARA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2105 080.59062 157,100
RELOCATE FACILITIES. INSTALL 535 FEET OF 2 INCH POLY AND 5751 FEET OF 4 INCH POLY AND ABANDON 4105 FEET OF 2 INCH STEEL AND 937 FEET OF 4 INCH STEEL AND 4087 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
2106 080.59064 59,414
INSTALL 169 FEET OF 2 INCH AND 3460 FEET OF 4 INCH POLY ALONG BIDDISON AND ABANDON 788 FEET OF 6 INCH, 475 FEET OF 4 INCH CAST IRON AND 2525 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2107 080.59068 22,296
INSTALL 1815 FEET OF 4 INCH POLY AND ABANDON 1690 FEET OF 6 INCH CAST IRON ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2108 080.59069 38,163
INSTALL 1940 FEET OF 2 INCH POLY AND ABANDON 1590 FEET OF 4 INCH CAST IRON AND 395 FEET OF 6 INCH CAST IRON ALONG MORTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2109 080.59070 2,218
INSTALL 285 FEET OF 4 INCH POLY ALONG PECAN STREET AND ABANDON 110 FEET OF 2 INCH AND 128 FEET OF 3 INCH AND 47 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY DECEMBER
2110 080.59074 15,021
INSTALL 1092 FEET OF 2 INCH AND 426 FEET OF 4 INCH POLY ALONG SAN PEDRO AND ABANDON 790 FEET OF 8 INCH AND 420 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2111 080.59075 22,557
INSTALL 445 FEET OF 4 INCH AND 1030 FEET OF 2 INCH POLY ALONG SAN BENITO AND ABANDON 790 FEET OF 4 INCH, 445 FEET OF 8 INCH CAST IRON AND 240 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2112 080.59078 46,611
INSTALL 3115 FEET OF 4 INCH POLY ALONG GREENE AND ABANDON 2104 FEET OF 4 INCH, 360 FEET OF 6 INCH STEEL, 434 FEET OF 4 INCH CAST IRON AND 195 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2113 080.59090 7,857
RELOCATE FACILITIES. INSTALL 560 FEET OF 4 INCH POLY ALONG BROADWAY STREET AND ABANDON 315 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF PROSPER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER
SYSTEM INTEGRITY DECEMBER
2114 080.59093 837
RELOCATE FACILITIES. INSTALL 20 FEET OF 4 INCH POLY ALONG PROCTOR AVENUE AND ABANDON 12 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2115 080.59100 3,679
INSTALL 485 FEET OF 2 INCH POLY ALONG SEQUOIA DRIVE AND ABANDON MAIN LINE REGULATOR 29 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 72 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2116 080.59112 0 INSTALL 416 FEET OF 6 INCH POLY ALONG FM 720. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LITTLE ELM GROWTH JANUARY
2117 080.59117 109,598
RELOCATE FACILITIES. INSTALL 5 FEET OF 2 INCH POLY AND 611 FEET OF 4 INCH POLY AND 7055 FEET OF 8 INCH POLY ALONG MARTOP ROAD AND ABANDON 100 FEET OF 2 INCH POLY AND 7673 FEET OF 4 INCH POLY AND 5 FEET OF 6 INCH POLY AND 142 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF AUBREY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUBREY
SYSTEM INTEGRITY DECEMBER
2118 080.59124 29,690
INSTALL 3921 FEET OF 2 INCH AND 1394 FEET OF 4 INCH POLY ALONG THE STREETS OF THE WESTON RIDGE SUBDIVISION PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
2119 080.59125 (10)
INSTALL 5400 FEET OF 2 INCH AND 1880 FEET OF 6 INCH POLY ALONG THE STREETS OF THE SECOND PHASE OF THE BROOKSIDE ADDITION SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH MARCH
2120 080.59132 53,275
INSTALL (169) POLY SERVICES ALONG STREETS OF FREDERICKSBURG AND ABANDON (169) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG
SYSTEM INTEGRITY DECEMBER
2121 080.59135 114,876
INSTALL 800 FEET OF 20 INCH STEEL AND ABANDON 800 FEET OF 20 INCH ON LINE D ALONG WEBB CHAPEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2122 080.59140 994
INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE AT DISTRICT REGULATOR STATION 01 IN CLYDE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE
SYSTEM INTEGRITY DECEMBER
2123 080.59142 2,961,103
INSTALL 4800 FEET OF 20 INCH STEEL ALONG 645 NORTH TOWN EAST BOULEVARD AND ABANDON 4780 FEET OF 20 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
2124 080.59144 2,962
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG SH 10 AND ABANDON 83 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
SYSTEM INTEGRITY DECEMBER
2125 080.59153 21,499
INSTALL 500 FEET OF 2 INCH AND 935 FEET OF 4 INCH POLY ALONG FOREST PARK AND ABANDON 1823 FEET OF 4 INCH CAST IRON AND 131 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2126 080.59157 21,852
RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH POLY AND ABANDON 1600 FEET OF 2 INCH STEEL IN FORT WORTH ON CHEROKEE TRAIL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2127 080.59162 2,061
RELOCATE FACILITIES. INSTALL 85 FEET OF 2 INCH STEEL ALONG FM 1174 AND ABANDON 121 FEET OF .75 INCH POLY SERVICES TO ACCOMMODATE TXDOT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BERTRAM
SYSTEM INTEGRITY DECEMBER
2128 080.59165 157,484
RELOCATE FACILITIES. INSTALL 800 FEET OF 24 INCH STEEL ALOND PARKDALE BOULEVARD AND ABANDON 903 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2129 080.59167 9,472
RELOCATE FACILITIES. INSTALL 40 FEET OF 2 INCH AND 690 FEET OF 4 INCH POLY ALONG CENTER AND ABANDON 71 FEET OF 2 INCH AND 653 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
2130 080.59172 11,226
RELOCATE FACILITIES. INSTALL 905 FEET OF 2 INCH POLY AND ABANDON 1632 FEET OF 2 INCH STEEL ALONG CONRAD HILTON TO ACCOMMODATE CITY OF CISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
2131 080.59173 12,838
INSTALL 680 FEET OF 2 INCH AND 98 FEET OF 4 INCH POLY AND ABANDON 840 FEET OF 3 INCH STEEL AND 1077 FEET OF 4 INCH POLY ALONG STREETS OF DAWSON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DAWSON
SYSTEM INTEGRITY DECEMBER
2132 080.59175 12,493
RELOCATE FACILITIES. INSTALL 1637 FEET OF 2 INCH POLY AND 132 FEET OF 4 INCH POLY AND ABANDON 1380 FEET OF 2 INCH STEEL AND 1398 FEET OF 2 INCH POLY AND 140 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2133 080.59176 8,174
RELOCATE FACILITIES. INSTALL 15 FEET OF 6 INCH POLY ALONG ABRAMS ROAD AND ABANDON 6 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
2134 080.59185 659
ABANDON DISTRICT REGULATOR STATION 50 IN SAN ANGELO IN TOM GREEN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
2135 080.59199 33,700
INSTALL (70) POLY SERVICES ALONG STREETS OF FORT WORTH AND ABANDON (70) COPPER SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2136 080.59202 38,368
INSTALL 3225 FEET OF 4 INCH POLY ALONG MASON AND ABANDON 1316 FEET OF 4 INCH CAST IRON, 710 FEET OF 6 INCH, 120 FEET OF 4 INCH STEEL, AND 290 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2137 080.59214 13,196
INSTALL 297 FEET OF 2 INCH POLY AND 1021 FEET OF 4 INCH POLY AND ABANDON 633 FEET OF 4 INCH AND 1246 FEET OF 8 INCH CAST IRON ALONG HOLMES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2138 080.59215 1,866
RELOCATE FACILITIES. INSTALL 139 FEET OF 4 INCH POLY ALONG CARTER STREET AND ABANDON 55 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2139 080.59216 44,288
INSTALL 1874 FEET OF 2 INCH POLY AND 1580 FEET OF 4 INCH POLY ALONG SANGER AVENUE AND ABANDON 515 FEET OF 4 INCH, 290 FEET OF 6 INCH, AND 715 FEET OF 8 INCH CAST IRON, 1280 FEET OF 4 INCH AND 10 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2140 080.59218 162 ABANDON DISTRICT REGULATOR STATION 68 IN TAYLOR COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2141 080.59221 21,993
RELOCATE FACILITIES. INSTALL 760 FEET OF 4 INCH POLY ALONG WACO DRIVE AND ABANDON 766 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2142 080.59261 25,516
INSTALL 1025 FEET OF 2 INCH POLY AND 545 FEET OF 4 INCH POLY ALONG NOB HILL ROAD AND ABANDON 1025 FEET OF 4 INCH AND 545 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2143 080.59268 19,585
INSTALL 742 FEET OF 2 INCH POLY AND 494 FEET OF 4 INCH POLY ALONG KNOTT PLACE AND ABANDON 1267 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 73 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2144 080.59269 15,472 INSTALL AC MITIGATION ALONG LINE DT1 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2145 080.59272 58,659
INSTALL 979 FEET OF 2 INCH POLY AND 4115 FEET OF 4 INCH POLY ALONG LANCASTER STREET AND ABANDON 1931 FEET OF 4 INCH, 779 FEET OF 6 INCH STEEL, 1923 FEET OF 6 INCH, 915 FEET OF 4 INCH CAST IRON AND 546 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2146 080.59274 931
RELOCATE FACILITIES. ABANDON 38 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
2147 080.59277 8,067
INSTALL 950 FEET OF 4 INCH POLY ALONG 19TH STREET AND ABANDON 645 FEET OF 8 INCH, 76 FEET OF 6 INCH, 230 FEET OF 4 INCH, 21 FEET OF 3 INCH STEEL AND 13 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
2148 080.59288 58,261
INSTALL 2435 FEET OF 2 INCH POLY AND 5387 FEET OF 6 INCH POLY AND ABANDON 6674 FEET OF 2 INCH STEEL ALONG SWANA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA
SYSTEM INTEGRITY DECEMBER
2149 080.59292 23,766
RELOCATE FACILITIES. INSTALL 579 FEET OF 2 INCH AND 650 FEET OF 4 INCH POLY ALONG WOODY LANE AND ABANDON 472 FEET OF 2 INCH AND 573 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
2150 080.59293 59,372
INSTALL 4598 FEET OF 4 INCH POLY ALONG WILSON ROAD AND ABANDON 1624 FEET OF 3 INCH STEEL AND 2314 FEET OF 3 INCH POLY AND 399 FEET OF 4 INCH STEEL AND 514 FEET OF 4 INCH POLY AND 613 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2151 080.59307 4,165
INSTALL 13 FEET OF 2 INCH AND 280 FEET OF 4 INCH POLY AND ABANDON 228 FEET OF 2 INCH POLY AND 275 FEET OF 4 INCH STEEL ALONG NAVASOTA ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK
SYSTEM INTEGRITY DECEMBER
2152 080.59309 64,479
INSTALL (313) POLY SERVICES AND ABANDON (313) STEEL SERVICES ALONG STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON
SYSTEM INTEGRITY DECEMBER
2153 080.59330 23,044
RELOCATE FACILITIES. INSTALL 827 FEET OF 2 INCH POLY AND 4121 FEET OF 4 INCH POLY AND ABANDON 90 FEET OF 2 INCH STEEL AND 827 FEET OF 2 INCH POLY AND 145 FEET OF 4 INCH STEEL AND 3976 FEET OF 4 INCH POLY ALONG CHATTEY ROAD TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
SYSTEM INTEGRITY DECEMBER
2154 080.59331 13,611
RELOCATE FACILITIES. INSTALL 1385 FEET OF 6 INCH POLY AND ABANDON 1208 FEET OF 6 INCH POLY ALONG MAIN STREET TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
SYSTEM INTEGRITY DECEMBER
2155 080.59332 750
ABANDON 363 FEET OF 3 INCH STEEL, 176 FEET OF 3 INCH POLY AND 59 FEET OF 4 INCH POLY ALONG 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
2156 080.59335 376
RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG BASTROP STREET AND ABANDON 60 INCH OF 2 INCH STEEL TO ACCOMMODATE CITY OF MANOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANOR
SYSTEM INTEGRITY DECEMBER
2157 080.59337 9,820
INSTALL 790 FEET OF 2 INCH POLY ALONG LINDA LANE AND ABANDON 790 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2158 080.59339 10,558
INSTALL 945 FEET OF 2 INCH POLY ALONG INWOOD ROAD AND ABANDON 1000 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2159 080.59340 23,168
INSTALL 358 FEET OF 2 INCH POLY AND 1699 FEET OF 4 INCH POLY ALONG KENWELL STREET AND ABANDON 181 FEET OF 3 INCH AND 1664 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2160 080.59342 37,308
INSTALL 1965 FEET OF 2 INCH AND 350 FEET OF 4 INCH POLY ALONG LOMO ALTO AND ABANDON 1420 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
2161 080.59344 1,959 INSTALL 667 FEET OF 2 INCH AND 911 FEET OF 4 INCH POLY ALONG THE STREETS OF SADDLE CREEK 2E. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2162 080.59345 27,627
INSTALL 1225 FEET OF 2 INCH POLY ALONG ROSEDALE AVENUE AND ABANDON 1065 FEET OF 4 INCH AND 360 FEET OF 6 INCH CAST IRON AND 210 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
2163 080.59346 44,870
INSTALL 52 FEET OF 2 INCH POLY AND 1823 FEET OF 4 INCH POLY ALONG ABBOT AVENUE AND ABANDON 1200 FEET OF 4 INCH AND 325 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
2164 080.59347 20,034
INSTALL 1023 FEET OF 2 INCH POLY ALONG GILLON AVENUE AND ABANDON 100 FEET OF 3 INCH, 900 FEET OF 4 INCH, 550 FEET OF 8 INCH CAST IRON AND 27 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
2165 080.59348 52,489
INSTALL 2062 FEET OF 2 INCH POLY AND 546 FEET OF 4 INCH POLY AND ABANDON 770 FEET OF 4 INCH CAST IRON MAIN AND 1050 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2166 080.59350 72,401
INSTALL 4740 FEET OF 4 INCH POLY ALONG GRANDE AND ABANDON 2127 FEET OF 4 INCH CAST IRON, 1765 FEET OF 4 INCH, 402 FEET OF 3 INCH, 335 FEET OF 6 INCH STEEL, 280 FEET OF 2 INCH POLY AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2167 080.59360 2,918
RELOCATE FACILITIES. INSTALL 340 FEET OF 4 INCH POLY AND ABANDON 365 FEET OF 4 INCH POLY ALONG WALNUT CREEK DRIVE TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
SYSTEM INTEGRITY DECEMBER
2168 080.59362 309
INSTALL 2024 FEET OF 2 INCH AND 78 FEET OF 4 INCH AND 1837 FEET OF 6 INCH POLY ALONG THE STREETS OF SADDLE CREEK 2B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2169 080.59365 18,367
INSTALL 2618 FEET OF 2 INCH POLY ALONG HARROLD AND ABANDON 252 FEET OF 2 INCH, 970 FEET OF 4 INCH STEEL, 310 FEET OF 2 INCH POLY AND 1839 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HARROLD
SYSTEM INTEGRITY DECEMBER
2170 080.59369 34,878
INSTALL 1450 FEET OF 4 INCH AND 315 FEET OF 2 INCH POLY ALONG ROSEDAL AVENUE AND ABANDON 1925 FEET OF 4 INCH AND 130 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
2171 080.59372 29,974
INSTALL 1277 FEET OF 2 INCH POLY AND 1539 FEET OF 4 INCH POLY ALONG MARSHALL STREET AND ABANDON 1179 FEET OF 2 INCH STEEL AND 1557 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 74 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2172 080.59377 11,190
INSTALL 2515 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG BONHAM STREET AND ABANDON 2110 FEET OF 3 INCH, 275 FEET OF 2 INCH STEEL, AND 650 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
2173 080.59378 31,509
RELOCATE FACILITIES. INSTALL 374 FEET OF 6 INCH STEEL ALONG BARRON ROAD AND ABANDON 355 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
2174 080.59381 11,940
RELOCATE FACILITIES. INSTALL 556 FEET OF 2 INCH POLY ALONG BIDDISON AND ABANDON 563 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2175 080.59387 2,075
INSTALL 360 FEET OF 2 INCH POLY ALONG LOMBARDY LANE AND ABANDON 51 FEET OF 1.25 INCH POLY AND 307 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2176 080.59402 19,959
RELOCATE FACILITIES. INSTALL 289 FEET OF 2 INCH POLY AND 690 FEET OF 4 INCH POLY AND 165 FEET OF 8 INCH POLY ALONG ABBOTT DRIVE AND ABANDON 605 FEET OF 3 INCH STEEL AND 343 FEET OF 4 INCH STEEL AND 130 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
SYSTEM INTEGRITY DECEMBER
2177 080.59408 13,769
RELOCATE FACILITIES. INSTALL 1030 FEET OF 2 INCH POLY ALONG GEORGE STREET AND ABANDON 1025 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
SYSTEM INTEGRITY DECEMBER
2178 080.59409 19,656
RELOCATE FACILITIES. INSTALL 692 FEET OF 2 INCH POLY AND ABANDON 702 FEET OF 2 INCH STEEL ALONG GLENN DRIVE TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
SYSTEM INTEGRITY DECEMBER
2179 080.59411 497
INSTALL 50 FEET OF 2 INCH POLY ALONG MCCRACKEN STREET AND ABANDON 673 FEET OF 3 INCH STEEL AND 8 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO
SYSTEM INTEGRITY DECEMBER
2180 080.59414 22,511
INSTALL 30 FEET OF 3 INCH AND 1225 FEET OF 4 INCH POLY ALONG AVENUE Y AND ABANDON 209 FEET OF 2 INCH, 889 FEET OF 3 INCH STEEL AND 10 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
2181 080.59416 35,316
INSTALL 444 FEET OF 2 INCH AND 3252 FEET OF 4 INCH POLY AND ABANDON 2280 FEET OF 2 INCH STEEL AND 356 FEET OF 2 INCH POLY AND 921 FEET OF 3 INCH STEEL AND 25 FEET OF 4 INCH POLY ALONG MARVIN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
2182 080.59427 27,118
INSTALL 2038 FEET OF 2 INCH POLY ALONG MAPLE AND ABANDON 2031 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2183 080.59430 3,125
INSTALL (1) FLOWSIC METER AND ABANDON (1) FLOWSIC METER ALONG NORTH SERVICE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
2184 080.59432 38,042
INSTALL 1350 FEET OF 4 INCH, 1050 FEET OF 6 INCH AND 150 FEET OF 2 INCH POLY ALONG RAY SIMON AND ABANDON 2151 FEET OF 4 INCH CAST IRON AND 516 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2185 080.59445 17,577
RELOCATE FACILITIES. INSTALL 22 FEET OF 2 INCH AND 821 FEET OF 4 INCH POLY ALONG FM1183 AND ABANDON 155 FEET OF 4 INCH AND 225 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
2186 080.59454 16,471
INSTALL 1550 FEET OF 2 INCH POLY ALONG BRIGHAM AND ABANDON 1220 FEET OF 4 INCH AND 300 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2187 080.59456 117 ABANDON DISTRICT REGULATOR STATION 08 ON CEDAR IN ARCHER COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY
SYSTEM INTEGRITY DECEMBER
2188 080.59457 1 INSTALL 435 FEET OF 2 INCH POLY ALONG STREET OF 24 HOUR FITNESS. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FAIRVIEW GROWTH JANUARY
2189 080.59463 20,193
INSTALL 903 FEET OF 2 INCH POLY AND 396 FEET OF 4 INCH POLY ALONG MALCOM X BOULEVARD AND ABANDON 1296 FEET OF 4 INCH AND 442 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2190 080.59468 29,396
INSTALL 2606 FEET OF 4 INCH POLY ALONG DEVITT STREET AND ABANDON 1073 FEET OF 4 INCH CAST IRON AND 180 FEET OF 4 INCH POLY AND 1603 FEET OF 6 INCH STEEL AND 658 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2191 080.59469 12,780
INSTALL 1700 FEET OF 2 INCH POLY ALONG HICKORY AND ABANDON 1320 FEET OF 4 INCH CAST IRON AND 480 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2192 080.59470 22,867
INSTALL 2230 FEET OF 2 INCH POLY AND 320 FEET OF 4 INCH POLY ALONG HICKORY STREET AND ABANDON 1375 FEET OF 4 INCH, 570 FEET OF 6 INCH CAST IRON AND 295 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2193 080.59473 118 ABANDON DISTRICT REGULATOR STATION 05 IN ARCHER COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HOLLIDAY
SYSTEM INTEGRITY DECEMBER
2194 080.59477 4,318
INSTALL 680 FEET OF 2 INCH POLY ALONG DAVIS AND ABANDON 680 FEET OF 1.25 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2195 080.59482 3,505
INSTALL 440 FEET OF 2 INCH POLY ALONG STROUD AND ABANDON 139 FEET OF 2 INCH, 2 FEET OF 3 INCH POLY AND 304 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST
SYSTEM INTEGRITY DECEMBER
2196 080.59484 685
INSTALL DISTRICT REGULATOR STATION ALONG MAIN STREET AND ABANDON DISTRICT REGULATOR STATION 12 AND 727 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
2197 080.59488 3,156
RELOCATE FACILITIES. INSTALL 285 FEET OF 2 INCH POLY ALONG DONALEE STREET AND ABANDON 290 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2198 080.59495 5,799 INSTALL 2290 FEET OF 2 INCH POLY ALONG THE STREETS OF AUBURN HILLS PHASE 5C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH NOVEMBER
2199 080.59496 35,074
INSTALL 1350 FEET OF 4 INCH AND 625 FEET FO 6 INCH POLY ALONG MARYDALE DRIVE AND ABANDON 1400 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 75 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2200 080.59497 10,174
RELOCATE FACILITIES. INSTALL 165 FEET OF 2 INCH AND 460 FEET OF 4 INCH POLY ALONG BISHOP STREET AND ABANDON 221 FEET OF 3 INCH AND 411 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CLIFTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
2201 080.59510 396,134
RELOCATE FACILITIES. INSTALL 13 FEET OF 2 INCH, 4 FEET OF 6 INCH AND 2936 FEET OF 8 INCH POLY AND ABANDON 1011 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT SOUTHERN GATEWAY. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES OCTOBER
2202 080.59511 350,090
RELOCATE FACILITIES. INSTALL 3750 FEET OF 8 INCH, 275 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY AND ABANDON 106 FEET OF 2 INCH, 8 FEET OF 4 INCH, 3614 FEET OF 8 INCH POLY AND 491 FEET OF 6 INCH, 454 FEET OF 8 INCH AND 145 FEET OF 4 INCH STEEL AND 70 FEET OF 4 INCH CAST IRON ALONG SOUTHERN GATEWAY TO ACCOMMODATE TXDOT PAVING AND DRAINAGE IMPROVEMENT PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES OCTOBER
2203 080.59512 210,385
RELOCATE FACILITIES. INSTALL 196 FEET OF 4 INCH POLY AND 520 FEET OF 8 INCH POLY AND ABANDON 110 FEET OF 3 INCH STEEL AND 467 FEET OF 8 INCH STEEL ALONG SANER AVENUE TO ACCOMMODATE TXDOT ROAD PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES OCTOBER
2204 080.59513 (29,387)
RELOCATE FACILITIES. INSTALL 310 FEET OF 8 INCH POLY ALONG BECKLEYWOOD BOULEVARD AND ABANDON 490 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT ROAD PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES OCTOBER
2205 080.59518 212
ABANDON 2020 FEET OF 2 INCH AND 247 FEET OF 4 INCH STEEL ALONG SEYMOUR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
2206 080.59530 25,851
INSTALL 1700 FEET OF 2 INCH POLY ALONG TODD STREET AND ABANDON 782 FEET OF 4 INCH AND 956 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2207 080.59533 17,493
INSTALL 1490 FEET OF 2 INCH POLY AND ABANDON 1577 FEET OF 6 INCH AND 433 FEET OF 8 INCH CAST IRON ALONG KENILWORTH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2208 080.59534 13,261
INSTALL 1205 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 4 INCH AND 974 FEET OF 6 INCH AND 328 FEET OF 8 INCH CAST IRON ALONG ALTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2209 080.59535 8,775
INSTALL 810 FEET OF 2 INCH POLY ALONG COLUMBIA AVENUE AND ABANDON 725 FEET OF 4 INCH AND 219 FEET OF 6 INCH AND 195 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2210 080.59539 26,712
RELOCATE FACILITIES. INSTALL 1450 FEET OF 4 INCH POLY AND ABANDON 1500 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2211 080.59541 27,781
RELOCATE FACILITIES. INSTALL 745 FEET OF 2 INCH AND 166 FEET OF 4 INCH POLY AND ABANDON 718 FEET OF 2 INCH AND 155 FEET OF 3 INCH STEEL ALONG SACHSE ROAD TO ACCOMMODATE CITY OF SACHSE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE
SYSTEM INTEGRITY DECEMBER
2212 080.59546 52,413
INSTALL 350 FEET OF 10 INCH STEEL ALONG BROOKHOLLOW DRIVE AND ABANDON 354 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2213 080.59548 6,203
RELOCATE FACILITIES. INSTALL 524 FEET OF 2 INCH POLY AND ABANDON 277 FEET OF 2 INCH STEEL AND 220 FEET OF 2 INCH POLY ALONG GANTT STREET TO ACCOMMODATE CITY OF PRINCETON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
SYSTEM INTEGRITY DECEMBER
2214 080.59553 26,283
INSTALL 1854 FEET OF 2 INCH POLY AND ABANDON 1635 FEET OF 3 INCH STEEL ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
2215 080.59559 33,919
RELOCATE FACILITIES. INSTALL 6 FEET OF 2 INCH POLY AND 3093 FEET OF 4 INCH POLY ALONG TRAILWOOD DRIVE AND ABANDON 6 FEET OF 2 INCH STEEL, 2 FEET OF 2 INCH POLY, 2592 FEET OF 4 INCH STEEL AND 440 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
2216 080.59571 338 ABANDON DISTRICT REGULATOR STATION 10 ON ELM STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
2217 080.59578 (24)INSTALL 2953 FEET OF 4 INCH POLY ALONG STREETS OF WINDERMERE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FARMERS BRANCH GROWTH JANUARY
2218 080.59580 19,668
RELOCATE FACILITIES. INSTALL 1677 FEET OF 4 INCH POLY ALONG COYLE STREET AND ABANDON 1572 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ROWLETT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
SYSTEM INTEGRITY DECEMBER
2219 080.59590 15,591
INSTALL 575 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 2 INCH STEEL ALONG 13TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRIDGEPORT
SYSTEM INTEGRITY DECEMBER
2220 080.59600 18,200
RELOCATE FACILITIES. INSTALL 1047 FEET OF 2 INCH POLY AND 139 FEET OF 4 INCH POLY ALONG UNIVERSITY AVENUE AND ABANDON 496 FEET OF 2 INCH STEEL, 599 FEET OF 2 INCH POLY AND 155 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
2221 080.59601 27,039
INSTALL 1951 FEET OF 4 INCH POLY AND ABANDON 1939 FEET OF 4 INCH STEEL ALONG ROYAL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
2222 080.59603 45,135
INSTALL 3358 FEET OF 4 INCH POLY ALONG HARRINGTON AND ABANDON 1335 FEET OF 4 INCH CAST IRON, 1142 FEET OF 4 INCH, 200 FEET OF 3 INCH, 100 FEET OF 6 INCH STEEL, 404 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2223 080.59606 5,795
INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 295 FEET OF 2 INCH STEEL ALONG WEST BROADWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY DECEMBER
2224 080.59611 12,900
INSTALL REGULATOR AND RELIEF VALVE AND ABANDON REGULATOR AND RELIEF VALVE AT DISTRICT REGULATOR STATION 17 IN SOUTHLAKE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
SYSTEM INTEGRITY DECEMBER
2225 080.59612 83,647
RELOCATE FACILITIES. INSTALL 3435 FEET OF 2 INCH POLY AND 780 FEET OF 4 INCH POLY AND 122 FEET OF 6 INCH POLY AND ABANDON 92 FEET OF 2 INCH STEEL AND 304 FEET OF 3 INCH STEEL AND 1233 FEET OF 3 INCH POLY AND 822 FEET OF 4 INCH POLY AND 237 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
SYSTEM INTEGRITY DECEMBER
2226 080.59620 27,807
INSTALL 92 FEET OF 2 INCH POLY AND 510 FEET OF 4 INCH POLY AND 1823 FEET OF 6 INCH POLY ALONG STREETS OF TIOGA AND ABANDON 77 FEET OF 2 INCH STEEL AND 243 FEET OF 2 INCH POLY AND 692 FEET OF 3 INCH STEEL AND 208 FEET OF 3 INCH POLY AND 1267 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TIOGA
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 76 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2227 080.59625 18,199
INSTALL 187 FEET OF 2 INCH POLY AND 711 FEET OF 4 INCH POLY ALONG RETTA STREET AND ABANDON 462 FEET OF 3 INCH POLY AND 1346 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2228 080.59637 24,063
INSTALL 788 FEET OF 2 INCH POLY AND 1398 FEET OF 4 INCH POLY ALONG MANNETT STREET AND ABANDON 20 FEET OF 6 INCH POLY AND 1113 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2229 080.59639 36,034
INSTALL 3300 FEET OF 4 INCH POLY ALONG STIRLING AND ABANDON 2194 FEET OF 4 INCH, 299 FEET OF 6 INCH CAST IRON AND 176 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2230 080.59640 38,129
INSTALL 2070 FEET OF 2 INCH POLY ALONG MANNETT STREET AND ABANDON 1310 FEET OF 4 INCH, 400 FEET OF 6 INCH AND 40 FEET OF 8 INCH CAST IRON AND 290 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2231 080.59642 3,652
INSTALL 601 FEET OF 2 INCH POLY ALONG LYTLE STREET AND ABANDON 820 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
2232 080.59643 42,098
RELOCATE FACILITIES. INSTALL 1458 FEET OF 2 INCH POLY AND 703 FEET OF 4 INCH POLY ALONG LESLIE STREET AND ABANDON 2232 FEET OF 3 INCH STEEL AND 42 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HAMILTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON
SYSTEM INTEGRITY DECEMBER
2233 080.59644 16,616
RELOCATE FACILITIES. INSTALL 11 FEET OF 2 INCH AND 502 FEET OF 4 INCH POLY ALONG HIGHWAY 281 AND ABANDON 2 FEET OF 2 INCH AND 491 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF HAMILTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HAMILTON
SYSTEM INTEGRITY DECEMBER
2234 080.59645 4,966
INSTALL 275 FEET OF 4 INCH POLY ALONG HICKORY STREET AND ABANDON 275 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2235 080.59649 964,175
RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH AND 1200 FEET OF 8 INCH POLY ALONG FM 2478 AND ABANDON 1380 FEET OF 2 INCH STEEL AND 175 FEET OF 2 INCH AND 2180 FEET OF 8 INCH POLY TO ACCOMMODATE TXDOT STORM DRAINAGE IMPROVEMENTS IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
2236 080.59660 45,248
INSTALL 2336 FEET OF 2 INCH POLY ALONG BENNETT AVENUE AND ABANDON 2135 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2237 080.59666 30,532
RELOCATE FACILITIES. INSTALL 6 FEET OF 3 INCH POLY AND 1895 FEET OF 8 INCH POLY ALONG HUBBARD STREET AND ABANDON 1758 FEET OF 3 INCH STEEL AND 102 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HEATH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEATH
SYSTEM INTEGRITY DECEMBER
2238 080.59672 3,283
RELOCATE FACILITIES. INSTALL 401 FEET OF 2 INCH POLY ALONG 14TH STREET AND ABANDON 393 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
2239 080.59675 22,365
INSTALL 20 FEET OF 6 INCH AND 35 FEET OF 12 INCH POLY AND ABANDON 462 FEET OF 6 INCH AND 23 FEET OF 12 INCH AND 12 FEET OF 16 INCH STEEL ALONG RANIER ST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2240 080.59678 12,032
RELOCATE FACILITIES. INSTALL 105 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY AND ABANDON 256 FEET OF 2 INCH STEEL ALONG THOMAS STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2241 080.59679 3,440
INSTALL 300 FEET OF 2 INCH AND 160 FEET OF 4 INCH POLY ALONG BRECKENRIDGE ROAD AND ABANDON 300 FEET OF 2 INCH AND 160 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
2242 080.59681 7,718
RELOCATE FACILITIES. INSTALL 115 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH POLY ALONG THUNDERBIRD DRIVE AND ABANDON 115 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2243 080.59683 3,176
RELOCATE FACILITIES. INSTALL (12) POLY SERVICES AND ABANDON (12) STEEL SERVICES ALONG HETTIE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2244 080.59688 43,057
INSTALL 1558 FEET OF 2 INCH AND 1769 FEET OF 4 INCH POLY ALONG NORMA STREET AND ABANDON 2000 FEET OF 4 INCH AND 1000 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2245 080.59691 8,772
INSTALL 535 FEET OF 4 INCH POLY ALONG OVERHILL ROAD AND ABANDON 140 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2246 080.59697 13,822
RELOCATE FACILITIES. INSTALL 1275 FEET OF 4 INCH POLY ALONG BEDFORD COURT AND ABANDON 1270 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BEDFORD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD
SYSTEM INTEGRITY DECEMBER
2247 080.59700 16,835
RELOCATE FACILITIES. INSTALL (32) POLY SERVICES AND ABANDON (32) STEEL SERVICES ALONG OVERTON PARK EAST TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2248 080.59702 74,088
INSTALL 210 FEET OF 2 INCH POLY AND 3161 FEET OF 4 INCH POLY ALONG GOLDENROD AVENUE AND ABANDON 1910 FEET OF 4 INCH AND 840 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2249 080.59705 2,819
RELOCATE FACILITIES. INSTALL 406 FEET OF 4 INCH POLY ALONG MAIN STREET AND ABANDON 108 FEET OF 2 INCH POLY AND 227 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WOLFE CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WOLFE CITY
SYSTEM INTEGRITY DECEMBER
2250 080.59713 1,456
INSTALL (4) REGULATORS AND ABANDON (4) REGULATORS AT INTERNATIONAL GRAIN ALONG CITY OF GREENVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
2251 080.59724 1,753 INSTALL 2030 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK 2A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2252 080.59726 33,606
INSTALL 54 FEET OF 2 INCH AND 1263 FEET OF 8 INCH POLY ALONG 7TH STREET AND ABANDON 38 FEET OF 2 INCH, 1199 FEET OF 6 INCH STEEL, AND 3 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 77 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2253 080.59728 4,664
RELOCATE FACILITIES. INSTALL 346 FEET OF 6 INCH POLY AND ABANDON 332 FEET OF 6 INCH POLY ALONG SH360 TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2254 080.59729 30,192
INSTALL 15 FEET OF 2 INCH AND 1535 FEET OF 6 INCH POLY ALONG MINTCLAIR AND ABANDON 1460 FEET OF 6 INCH AND 15 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2255 080.59733 2,910
RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH POLY ALONG RICE STREET AND ABANDON 200 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BEVERLY HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEVERLY HILLS
SYSTEM INTEGRITY DECEMBER
2256 080.59738 17,297
INSTALL 36 FEET OF 2 INCH AND 2544 FEET OF 4 INCH POLY ALONG OLD BURK ROAD AND ABANDON MLR05 AND MLR22 AND 15 FEET OF 2 INCH, 50 FEET OF 3 INCH, 15 FEET OF 4 INCH, 320 FEET OF 6 INCH STEEL AND 81 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2257 080.59741 26,659
INSTALL 1106 FEET OF 2 INCH AND 812 FEET OF 4 INCH POLY AND ABANDON 419 FEET OF 6 INCH AND 691 FEET OF 8 INCH CAST IRON ALONG GREENWAY BOLUVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2258 080.59745 27,192
INSTALL 800 FEET OF 2 INCH AND 1567 FEET OF 4 INCH POLY AND ABANDON 2160 FEET OF 6 INCH CAST IRON ALONG AVALON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2259 080.59746 54,889
INSTALL 2145 FEET OF 4 INCH POLY ALONG GASTON AVENUE AND ABANDON 530 FEET OF 6 INCH AND 2305 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2260 080.59747 43,821
INSTALL 1750 FEET OF 4 INCH POLY ALONG INWOOD ROAD AND ABANDON 1775 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2261 080.59753 35,764
INSTALL 271 FEET OF 2 INCH AND 1724 FEET OF 4 INCH POLY AND ABANDON 98 FEET OF 2 INCH AND 1376 FEET OF 4 INCH STEEL AND 167 FEET OF 4 INCH AND 172 FEET OF 6 INCH POLY AND 695 FEET OF 6 INCH CAST IRON ALONG ASTER AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2262 080.59775 34,011
INSTALL 1972 FEET OF 4 INCH POLY AND ABANDON 1318 FEET OF 4 INCH STEEL AND 812 FEET OF 6 INCH, 536 FEET OF 4 INCH POLY AND 746 FEET OF 6 INCH CAST IRON ALONG DAISY LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2263 080.59784 19,312
INSTALL (2) 8 INCH MOONEY REGULATORS AND ABANDON (2) 6 INCH GROVE REGULATORS ALONG GARLAND DISTRICT REGULATOR 60 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2264 080.59792 9,132 INSTALL 423 FEET OF 2 INCH POLY ALONG THE STREETS OF OAK PARK 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH JULY
2265 080.59803 19,843 INSTALL 3275 FEET OF 2 INCH POLY AND 1475 FEET OF 4 INCH POLY ALONG EAGLE GLEN ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH DECEMBER
2266 080.59818 2,121
RELOCATE FACILITIES. INSTALL 150 FEET OF 1.25 INCH POLY ALONG WOODBINE ROAD AND ABANDON 150 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
2267 080.59823 7,530
INSTALL (25) REGULATORS AND ABANDON (25) REGULATORS IN DALLAS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2268 080.59824 20,451
INSTALL 1280 FEET OF 2 INCH AND 590 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH CAST IRON ALONG CHRISTENSEN DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2269 080.59825 24,946
INSTALL 1635 FEET OF 2 INCH AND 355 FEET OF 4 INCH POLY AND ABANDON 1630 FEET OF 4 INCH AND 345 FEET OF 6 INCH CAST IRON ALONG LATTA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2270 080.59827 38,993
INSTALL 29 FEET OF 2 INCH AND 17 FEET OF 4 INCH AND 2237 FEET OF 6 INCH AND 3 FEET OF 8 INCH POLY AND ABANDON 60 FEET OF 4 INCH AND 1130 FEET OF 8 INCH CAST IRON ALONG WINSTED IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2271 080.59830 38,053
INSTALL 1555 FEET OF 2 INCH POLY AND 422 FEET OF 4 INCH POLY AND 1069 FEET OF 6 INCH POLY AND ABANDON 450 FEET OF 8 INCH, 840 FEET OF 4 INCH CAST IRON AND 1000 FEET OF 4 INCH POLY ALONG DELROSE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2272 080.59831 31,340
INSTALL 2,275 FEET OF 8 INCH, 600 FEET OF 4 INCH AND 6,850 FEET OF 2 INCH POLY ALONG THE STREETS OF OAKMONT PHASE 1B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH DECEMBER
2273 080.59836 2,853
INSTALL 400 FEET OF 4 INCH POLY ALONG TEXAS STREET AND ABANDON 380 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT
SYSTEM INTEGRITY DECEMBER
2274 080.59845 40,640
INSTALL 1251 FEET OF 2 INCH POLY AND 2143 FEET OF 4 INCH POLY AND ABANDON 1969 FEET OF 4 INCH, 1266 FEET OF 6 INCH CAST IRON, 994 FEET OF 6 INCH AND 538 FEET OF 4 INCH STEEL ALONG RIVERSIDE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2275 080.59854 29,137
RELOCATE FACILITIES. INSTALL 814 FEET OF 2 INCH POLY AND 1106 FEET OF 4 INCH POLY AND ABANDON 2000 FEET OF 4 INCH CAST IRON ALONG MARIGOLD AVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2276 080.59857 284
INSTALL GROUND BED ALONG LINE L8C AND ABANDON GROUND BED IN BRAZOS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
2277 080.59866 9 INSTALL 475 FEET OF 2 INCH POLY ALONG 4TH STREET ALONG STREETS OF RELLIS ACADEMIC BUILDING. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BRYAN GROWTH JANUARY
2278 080.59879 20,016
INSTALL 1833 FEET OF 2 INCH POLY AND 148 FEET OF 4 INCH POLY AND ABANDON 1070 FEET OF 8 INCH CAST IRON AND 1030 FEET OF 8 INCH POLY ALONG EAST MOCKINGBIRD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2279 080.59880 217,027
INSTALL 2,878 FEET OF 2 INCH, 4464 FEET OF 4 INCH AND 1,582 FEET OF 6 INCH POLY ALONG STREETS OF VENTANA PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH MARCH
2280 080.59881 11,580
RELOCATE FACILITIES. INSTALL 1290 FEET OF 2 INCH POLY ALONG ROUSE STREET AND ABANDON 980 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 78 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2281 080.59882 51,372
RELOCATE FACILITIES. INSTALL 720 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH POLY AND 2650 FEET OF 4 INCH POLY AND ABANDON 234 FEET OF 3 INCH POLY AND 1884 FEET OF 4 INCH POLY ALONG FREEPORT ROAD TO ACCOMMODATE CITY OF COPPELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL
SYSTEM INTEGRITY DECEMBER
2282 080.59886 27,417
RELOCATE FACILITIES. INSTALL 2 FEET OF 4 INCH POLY AND 850 FEET OF 6 INCH POLY AND 1970 FEET OF 8 INCH POLY AND ABANDON 2188 FEET OF 2 INCH STEEL AND 518 FEET OF 2 INCH POLY ALONG COLLINS ROAD TO ACCOMMODATE CITY OF SUNNYVALE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SUNNYVALE
SYSTEM INTEGRITY DECEMBER
2283 080.59889 3,227,179
INSTALL 90,561 FEET OF 2 INCH, 27,748 FEET OF 4 INCH, 6,954 FEET OF 6 INCH AND 3 FEET OF 8 INCH POLY ALONG FONTANA, ESPANOLA, DURANGO, CORTEZ, AND LARGO STREETS AND ABANDON 27,293 FEET OF 2 INCH, 61,861 FEET OF 3 INCH, 19,081 FEET OF 4 INCH AND 15,296 FEET OF 6 INCH STEEL $$$$ IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2284 080.59893 66,589
RELOCATE FACILITIES. INSTALL 385 FEET OF 2 INCH POLY AND 5 FEET OF 3 INCH POLY AND 5232 FEET OF 4 INCH POLY ALONG KIMBO ROAD AND ABANDON 432 FEET OF 2 INCH STEEL AND 48 FEET OF 2 INCH POLY AND 3561 FEET OF 3 INCH STEEL AND 55 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2285 080.59894 4,473
RELOCATE FACILITIES. INSTALL 270 FEET OF 2 INCH POLY ALONG WILLOW STREET AND ABANDON 266 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF BURNET STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET
SYSTEM INTEGRITY DECEMBER
2286 080.59905 41,750
RELOCATE FACILITIES. INSTALL 184 FEET OF 2 INCH POLY AND 658 FEET OF 8 INCH POLY AND ABANDON 115 FEET OF 2 INCH POLY AND 147 FEET OF 6 INCH STEEL AND 301 FEET OF 8 INCH STEEL AND 101 FEET OF 8 INCH POLY AND 96 FEET OF 10 INCH STEEL ALONG EAGLE DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2287 080.59907 19,457
INSTALL 1480 FEET OF 2 INCH POLY ALONG COLGATE AND ABANDON 1460 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2288 080.59909 6,932
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY ALONG SUGAR CANE LANE AND ABANDON 316 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2289 080.59912 5,760
RELOCATE FACILITIES. INSTALL 406 FEET OF 4 INCH POLY ALONG DUCK CREEK ROAD AND ABANDON 407 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SANGER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER
SYSTEM INTEGRITY DECEMBER
2290 080.59916 -
RELOCATE FACILITIES. INSTALL 284 FEET OF 8 INCH POLY AND ABANDON 23 FEET OF 3 INCH POLY AND 255 FEET OF 8 INCH STEEL ALONG SAND STREET TO ACCOMMODATE TXDOT WIDENING PROJECT IN FORT WORTH. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES MAY
2291 080.59925 1 INSTALL 680 FEET OF 2 INCH POLY ALONG AN ALLEY FOR THE NEW TOWNHOMES AT WADE AND RIVENDELL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH JANUARY
2292 080.59939 46,147
RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY AND 3468 FEET OF 4 INCH POLY AND ABANDON 1069 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY AND 2060 FEET OF 4 INCH STEEL AND 330 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2293 080.59943 755,277
INSTALL 30,000 FEET OF 6 INCH STEEL AND 5000 FEET OF 8 INCH POLY ALONG LINE L15 AND ABANDON 32,000 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
2294 080.59946 61,565
RELOCATE FACILITIES. INSTALL 2075 FEET OF 2 INCH POLY AND 2200 FEET OF 4 INCH POLY AND ABANDON 6 FEET OF 2 INCH POLY AND 17 FEET OF 3 INCH POLY AND 3817 FEET OF 4 INCH POLY ALONG MAYHILL ROAD TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2295 080.59947 45,204
RELOCATE FACILITIES. INSTALL 2425 FEET OF 2 INCH POLY ALONG HAWTHORNE STREET , AND ABANDON 775 FEET OF 3 INCH STEEL, 1125 FEET OF 2 INCH STEEL AND 525 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF IRVING STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2296 080.59948 45,636
INSTALL 2204 FEET OF 2 INCH AND 1223 FEET OF 4 INCH POLY ALONG SNOW WHITE DRIVE AND ABANDON 1490 FEET OF 2 INCH, 700 FEET OF 3 INCH AND 1213 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2297 080.59956 3,967
INSTALL 5 FEET OF 3 INCH POLY AND 371 FEET OF 4 INCH POLY AND ABANDON 370 FEET OF 3 INCH POLY ALONG BELT LINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COPPELL
SYSTEM INTEGRITY DECEMBER
2298 080.59970 6,380
INSTALL 380 FEET OF 4 INCH POLY ALONG 39TH AND ABANDON 380 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2299 080.59971 121,642
INSTALL 4977 FEET OF 2 INCH POLY AND 1347 FEET OF 4 INCH POLY AND ABANDON 4801 FEET OF 3 INCH STEEL ALONG SHADY HILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2300 080.59980 162,326
INSTALL 2680 FEET OF 2 INCH POLY AND 3750 FEET OF 4 INCH POLY AND 140 FEET OF 8 INCH POLY ALONG THE STREETS OF MEADOW RUN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH DECEMBER
2301 080.59983 141,221 INSTALL 6400 FEET OF 2 INCH POLY AND 135 FEET OF 4 INCH POLY ALONG THE STREETS OF MEADOW RUN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH DECEMBER
2302 080.59984 12 INSTALL 3510 FEET OF 2 INCH POLY ALONG THE STREETS OF PHASE 4B OF THE TRINITY FALLS PLANNING UNIT 3 SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH JANUARY
2303 080.59994 2,561
INSTALL 450 FEET OF 2 INCH POLY ALONG NORTH BRECKENRIDGE AND ABANDON 450 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
2304 080.60000 8,505 INSTALL 1106 FEET OF 2 INCH POLY ALONG CROCKETT STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROANOKE GROWTH NOVEMBER
2305 080.60006 1,227
RELOCATE FACILITIES. INSTALL 234 FEET OF 4 INCH POLY ALONG FM709 AND ABANDON 209 FEET OF 3 INCH AND 34 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF RETREAT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RETREAT
SYSTEM INTEGRITY DECEMBER
2306 080.60022 9,077
INSTALL 600 FEET OF 2 INCH POLY AND ABANDON 600 FEET OF 2 INCH STEEL ALONG WALDROP ALLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 79 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2307 080.60041 107,576
INSTALL 2500 FEET OF 2 INCH POLY AND 2000 FEET OF 4 INCH POLY ALONG THE STREETS OF WOODCREEK PHASE 9C-1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH MARCH
2308 080.60047 84,483
INSTALL 3520 FEET OF 2 INCH AND 1475 FEET OF 4 INCH POLY ALONG MELISSA LANE AND ABANDON 5103 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2309 080.60048 31,898
INSTALL 1605 FEET OF 2 INCH POLY ALONG NORTHVIEW LANE AND ABANDON 1520 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2310 080.60050 107,258
INSTALL 4720 FEET OF 2 INCH AND 1420 FEET OF 4 INCH POLY ALONG PORT ROYAL DRIVE AND ABANDON 4720 FEET OF 2 INCH AND 1420 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2311 080.60063 27,949
INSTALL 2325 FEET OF 4 INCH POLY ALONG PARMER AND ABANDON 632 FEET OF 4 INCH AND 1938 FEET OF 2 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2312 080.60064 6,185 INSTALL 3385 FEET OF 2 INCH AND 1950 FEET OF 6 INCH POLY ALONG THE STREETS OF MISSION RANCH PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH NOVEMBER
2313 080.60077 20,284
RELOCATE FACILITIES. INSTALL 1442 FEET OF 2 INCH POLY AND ABANDON 1394 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG CALIFORNIA LANE TO ACCOMMODATE CITY OF DALWORTHINGTON GARDENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS
DALWORTHINGTON GARDENS
SYSTEM INTEGRITY DECEMBER
2314 080.60079 27,020
RELOCATE FACILITIES. INSTALL 15 FEET OF 3 INCH AND 673 FEET OF 6 INCH AND 597 FEET OF 8 INCH POLY AND ABANDON 22 FEET OF 3 INCH AND 683 FEET OF 6 INCH AND 585 FEET OF 8 INCH STEEL AND 6 FEET OF 6 INCH AND 10 FEET OF 8 INCH POLY ALONG 36TH STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2315 080.60080 9,141 INSTALL 2 MILES OF 12 INCH STEEL ALONG MEADOW RUN. ALL CUSTOMERS MELISSASYSTEM
IMPROVEMENT APRIL
2316 080.60083 224
INSTALL RECTIFIER AND POLE AND ABANDON RECTIFIER AND POLE ALONG GILMER RD IN LONGVIEW IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
2317 080.60087 31,290
INSTALL 1350 FEET OF 4 INCH POLY AND ABANDON 1350 FEET OF 3 INCH STEEL ALONG MELETIO LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2318 080.60088 3,639
RELOCATE FACILITIES. INSTALL 140 FEET OF 4 INCH AND 224 FEET OF 6 INCH POLY ALONG STERILITE DRIVE AND ABANDON 178 FEET OF 4 INCH AND 182 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
2319 080.60091 10,917
INSTALL 1431 FEET OF 4 INCH POLY ALONG WEBB AVENUE AND ABANDON 170 FEET OF 2 INCH, 800 FEET OF 3 INCH STEEL AND 247 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE
SYSTEM INTEGRITY DECEMBER
2320 080.60092 479 INSTALL 995 FEET OF 4 INCH AND 750 FEET OF 6 INCH POLY ALONG STREETS OF RAYZOR RANCH PHASE 3. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DENTON GROWTH JUNE
2321 080.60094 60,885
INSTALL 8428 FEET OF 2 INCH POLY AND 2 FEET OF 3 INCH POLY AND ABANDON 5502 FEET OF 2 INCH STEEL, 1761 FEET OF 2 INCH POLY, 229 FEET OF 3 INCH STEEL, 97 FEET OF 3 INCH POLY AND 350 FEET OF 4 INCH STEEL ALONG WEST 34TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
2322 080.60097 8,714
INSTALL 930 FEET OF 2 INCH POLY, 4068 FEET OF 4 INCH POLY AND 7291 FEET OF 6 INCH POLY ALONG STREETS OF SANFORD PARK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL VAN ALSTYNE GROWTH SEPTEMBER
2323 080.60100 74,324
RELOCATE FACILITIES. INSTALL 279 FEET OF 2 INCH POLY AND 5 FEET OF 3 INCH POLY AND 2631 FEET OF 4 INCH POLY AND 1240 FEET OF 6 INCH POLY MARIE STREET AND ABANDON 651 FEET OF 2 INCH STEEL AND 68 FEET OF 2 INCH POLY AND 3821 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209.. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
2324 080.60103 85,338
INSTALL 1407 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND 1428 FEET OF 4 INCH POLY ALONG CLOUD CIRCLE AND ABANDON 958 FEET OF 2 INCH STEEL AND 1022 FEET OF 3 INCH STEEL AND 1773 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2325 080.60104 92,088
INSTALL 2457 FEET OF 2 INCH POLY AND ABANDON 2020 FEET OF 2 INCH AND 520 FEET OF 3 INCH STEEL ALONG CROXIA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2326 080.60105 174,720
INSTALL 2745 FEET OF 2 INCH AND 350 FEET OF 8 INCH POLY AND ABANDON 2745 FEET OF 3 INCH STEEL AND 350 FEET OF 8 INCH STEEL ALONG FLAIR DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2327 080.60106 57,071
INSTALL 32 FEET OF 4 INCH POLY AND 1931 FEET OF 6 INCH POLY ALONG WALDORF AND ABANDON 17 FEET OF 4 INCH STEEL AND 1876 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2328 080.60107 44,758
INSTALL 1622 FEET OF 2 INCH AND 1670 FEET OF 4 INCH POLY AND ABANDON 3629 FEET OF 3 INCH STEEL ALONG WEBB CHAPEL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2329 080.60108 83,884
INSTALL 8530 FEET OF 2 INCH POLY, 2480 FEET OF 4 INCH POLY, AND 2340 FEET OF 6 INCH POLY ALONG WALNUT HILL LANE. ABANDON 675 FEET OF 2 INCH STEEL, 8120 FEET OF 3 INCH STEEL, 1935 FEET OF 4 INCH STEEL, 1960 FEET OF 6 INCH STEEL, AND 355 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2330 080.60110 97,532
INSTALL 3449 FEET OF 2 INCH POLY AND 14 FEET OF 4 INCH POLY ALONG KILLION STREET AND ABANDON 887 FEET OF 2 INCH STEEL AND 47 FEET OF 2 INCH POLY AND 2154 FEET OF 3 INCH STEEL AND 11 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2331 080.60111 278,176
INSTALL 5910 FEET OF 2 INCH, 195 FEET OF 4 INCH, 3070 FEET OF 6 INCH POLY ALONG WELCH ROAD AND ABANDON 7760 FEET OF 3 INCH, 190 FEET OF 4 INCH STEEL, 440 FEET OF 3 INCH AND 590 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2332 080.60112 182,468
INSTALL 5964 FEET OF 2 INCH AND 1188 FEET OF 12 INCH POLY AND ABANDON 5710 FEET OF 2 INCH AND 20 FEET OF 3 INCH STEEL ALONG MIDWAY ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 80 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2333 080.60113 432,154
INSTALL 28,030 FEET OF 2 INCH, 7,805 FEET OF 4 INCH, 6,065 FEET OF 6 INCH, 170 FEET OF 8 INCH, AND 6010 FEET OF 12 INCH POLY ALONG WALNUT HILL AND ABANDON 5045 FEET OF 2 INCH, 12085 FEET OF 3 INCH, 10,310 FEET OF 4 INCH, 7,925 FEET OF 6 INCH, 495 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2334 080.60114 8,299
INSTALL 3205 FEET OF 2 INCH, 3160 FEET OF 4 INCH AND 1900 FEET OF 6 INCH POLY ALONG THE STREETS OF THE LAKES AT LEGACY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH NOVEMBER
2335 080.60117 18,814
INSTALL 450 FEET OF 2 INCH POLY AND ABANDON 345 FEET OF 4 INCH CAST IRON ALONG SUMMITT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2336 080.60125 8,688
INSTALL DISTRICT REGULATOR STATION ALONG HACKBERRY STREET AND ABANDON DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
2337 080.60126 9,859
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 05 ALONG WEST 15TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
2338 080.60142 10,390
INSTALL 940 FEET OF 2 INCH POLY ALONG REVERE AND ABANDON 930 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2339 080.60143 13,431
INSTALL 770 FEET OF 2 INCH POLY ALONG MISTLETOE DRIVE AND ABANDON 5 FEET OF 2 INCH STEEL AND 674 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2340 080.60145 52,989
INSTALL DISTRICT REGULATOR STATION IN EVERMAN AND ABANDON DISTRICT REGULATOR STATION DRS2541 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN
SYSTEM INTEGRITY DECEMBER
2341 080.60146 41,437
RELOCATE FACILITIES. INSTALL 2575 FEET OF 2 INCH POLY ALONG OSCEOLE AVENUE AND 384 FEET OF 4 INCH POLY AND ABANDON 2210 FEET OF 2 INCH STEEL AND 32 FEET OF 2 INCH POLY AND 354 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.2009. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2342 080.60150 10,381
RELOCATE FACILITIES. INSTALL 477 FEET OF 2 INCH POLY ALONG EVA STREET AND ABANDON 467 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2343 080.60151 34,639 INSTALL 1081 FEET OF 2 INCH, 4775 FEET OF 4 INCH AND 2264 FEET OF 6 INCH POLY ALONG LARKSPUR PARK BOULEVARD. RESIDENTIAL LARKSPUR GROWTH NOVEMBER
2344 080.60157 10,641
RELOCATE FACILITIES. INSTALL 1350 FEET OF 4 INCH AND 800 FEET OF 2 INCH POLY ALONG GLENDALE STREET AND ABANDON 1350 FEET OF 4 INCH AND 700 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KILGORE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILGORE
SYSTEM INTEGRITY DECEMBER
2345 080.60158 17,871
INSTALL 1260 FEET OF 2 INCH AND 162 FEET OF 4 INCH POLY ALONG PINE AVENUE AND ABANDON 1088 FEET OF 2 INCH, 108 FEET OF 3 INCH STEEL, 165 FEET OF 2 INCH AND 96 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2346 080.60163 19,777
INSTALL 650 FEET OF 8 INCH POLY AND ABANDON 650 FEET OF 8 INCH STEEL POLY ALONG LOMBARDY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2347 080.60167 45,912
RELOCATE FACILITIES. INSTALL 3000 FEET OF 2 INCH AND 310 FEET OF 4 INCH POLY AND ABANDON 3000 FEET OF 2 INCH AND 45 FEET OF 3 INCH AND 380 FEET OF 4 INCH STEEL AND 15 FEET OF 4 INCH POLY ALONG FALCON DRIVE TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
2348 080.60170 6,720
INSTALL 590 FEET OF 2 INCH POLY ALONG LYNCH STREET AND ABANDON 1170 FEET OF 2 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
2349 080.60171 25,937
RELOCATE FACILITIES. INSTALL 57 FEET OF 2 INCH AND 1833 FEET OF 4 INCH POLY AND ABANDON 47 FEET OF 2 INCH AND 771 FEET OF 3 INCH POLY AND 990 FEET OF 4 INCH STEEL ALONG GRADY STREET TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
2350 080.60172 23,718
RELOCATE FACILITIES. INSTALL 2000 FEET OF 2 INCH POLY AND ABANDON 1400 FEET OF 2 INCH STEEL AND 550 FEET OF 2 INCH POLY ALONG TRUETT STREET TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
2351 080.60173 11,803
RELOCATE FACILITIES. INSTALL 540 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY AND ABANDON 1064 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL AND 1500 FEET OF 2 INCH POLY ALONG FALMOUTH DRIVE TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
2352 080.60178 2,539
INSTALL 4 FEET OF 3 INCH AND 94 FEET OF 4 INCH POLY ALONG WOODS AND ABANDON 68 FEET OF 2 INCH, 66 FEET OF 3 INCH STEEL AND 24 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
2353 080.60182 4,768
INSTALL REGULATOR AND ABANDON REGULATOR ON DISTRICT REGULATOR STATION 8 ON LINE J2 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
2354 080.60188 10,547
INSTALL 270 FEET OF 4 INCH AND 50 FEET OF 2 INCH POLY ALONG NORTH 38TH STREET AND ABANDON 50 FEET OF 4 INCH POLY, 204 FEET OF 4 INCH AND 43 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2355 080.60191 13,566
RELOCATE FACILITIES. INSTALL 212 FEET OF 2 INCH, 590 FEET OF 4 INCH, AND 150 FEET OF 6 INCH POLY ALONG GRANT STREET AND ABANDON 209 FEET OF 2 INCH, 266 FEET OF 4 INCH AND 145 FEET OF 6 INCH POLY AND 325 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2356 080.60200 177,263
INSTALL 884 FEET OF 2 INCH AND 113 FEET OF 4 INCH AND 219 FEET OF 6 INCH AND 4810 FEET OF 8 INCH POLY AND ABANDON 857 FEET OF 3 INCH AND 113 FEET OF 4 INCH AND 30 FEET OF 6 INCH AND 4786 FEET OF 8 INCH STEEL ALONG THE STREETS OF WALNUT HILL LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2357 080.60201 119,685
INSTALL 52 FEET OF 2 INCH AND 3182 FEET OF 4 INCH POLY AND ABANDON 850 FEET OF 3 INCH AND 2510 FEET OF 6 INCH STEEL ALONG LAKEMONT DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2358 080.60202 163,549
INSTALL 2110 FEET OF 6 INCH AND 7480 FEET OF 2 INCH POLY ALONG WEBB CHAPEL ROAD AND ABANDON 310 FEET OF 2 INCH, 3405 FEET OF 3 INCH AND 2753 FEET OF 6 INCH STEEL, 75 FEET OF 6 INCH AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 81 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2359 080.60204 109,632
INSTALL 1073 FEET OF 2 INCH AND 2830 FEET OF 8 INCH POLY AND ABANDON 975 FEET OF 2 INCH AND 1598 FEET OF 6 INCH AND 2830 FEET OF 8 INCH STEEL ALONG THE STREETS OF WEBB CHAPEL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2360 080.60217 3,239
RELOCATE FACILITIES. INSTALL 257 FEET OF 6 INCH POLY AND ABANDON 245 FEET OF 6 INCH POLY ALONG MAGNOLIA RIDGE DRIVE TO ACCOMMODATE CITY OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
SYSTEM INTEGRITY DECEMBER
2361 080.60225 22,226
INSTALL 120 FEET OF8 INCH POLY AND ABANDON 147 FEET OF 8 INCH STEEL ALONG SOUTH HAMPTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2362 080.60248 16,658
INSTALL 2 FEET OF 16 INCH STEEL AND ABANDON 2 FEET OF 16 INCH STEEL ALONG WEST DAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2363 080.60250 31,958
RELOCATE FACILITIES. INSTALL 16 FEET OF 2 INCH AND 2417 FEET OF 6 INCH POLY AND ABANDON 2100 FEET OF 6 INCH POLY ALONG ASHMORE LANE TO ACCOMMODATE CITY OF NORTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTHLAKE
SYSTEM INTEGRITY DECEMBER
2364 080.60254 50,594
RELOCATE FACILITIES. INSTALL 3667 FEET OF 2 INCH AND 1429 FEET OF 4 INCH POLY AND ABANDON 1672 FEET OF 2 INCH, 67 FEET OF 3 INCH AND 1463 FEET OF 4 INCH STEEL AND 1711 FEET OF 2 INCH AND 40 FEET OF 4 INCH POLY ALONG BAYLOR STREET TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
2365 080.60259 13,455
INSTALL 110 FEET OF 12 INCH POLY AND 100 FEET OF 6 INCH POLY AND ABANDON 80 FEET OF 6 INCH STEEL AND 6 FEET OF 12 INCH POLY AND 38 FEET OF 16 INCH STEEL ALONG CHALK HILL ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2366 080.60279 4,662
RELOCATE FACILITIES. INSTALL 236 FEET OF 2 INCH POLY AND 123 FEET OF 4 INCH POLY ALONG HUNTING DRIVE AND ABANDON 25 FEET OF 2 INCH STEEL AND 160 FEET OF 4 INCH STEEL AND 123 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2367 080.60285 36,204
RELOCATE FACILITIES. INSTALL 1950 FEET OF 4 INCH POLY AND ABANDON 328 FEET OF 2 INCH AND 1875 FEET OF 3 INCH AND 8 FEET OF 4 INCH POLY ALONG INDIAN CREEK DRIVE TO ACCOMMODATE CITY OF TROPHY CLUB STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TROPHY CLUB
SYSTEM INTEGRITY DECEMBER
2368 080.60287 33,801
RELOCATE FACILITIES. INSTALL 4588 FEET OF 2 INCH POLY AND ABANDON 4676 FEET OF 2 INCH STEEL ALONG GLENBROOK TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2369 080.60288 6,456
INSTALL 8 FEET OF 4 INCH AND 33 FEET OF 8 INCH POLY ALONG WESTMORELAND ROAD AND ABANDON 12 FEET OF 4 INCH AND 17 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2370 080.60294 28,901
INSTALL 871 FEET OF 12 INCH POLY ALONG 25TH STREET AND ABANDON 854 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2371 080.60295 16,783
INSTALL 7 FEET OF 12 INCH STEEL ALONG LINE P7 AND ABANDON 9 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
2372 080.60297 5,979 INSTALL 472 FEET OF 4 INCH AND 2278 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2373 080.60298 3,505 INSTALL 1265 FEET OF 4 INCH AND 823 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2374 080.60299 18,437
INSTALL 7 FEET OF 8 INCH STEEL ALONG LINE L(2ND) AND ABANDON 7 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
2375 080.60302 840
INSTALL 3 INCH FLOWSAFE RELIEF VALVES AT DISTRICT REGULATOR STATION 12 AND ABANDON 2 INCH FISHER RELIEF VALVE IN TRAVIS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WELLS BRANCH
SYSTEM INTEGRITY DECEMBER
2376 080.60313 112,756
RELOCATE FACILITIES. INSTALL 1,974 FEET OF 4 IN POLY AND ABANDON 1996 FEET OF 4 INCH POLY ALONG SH121 TO ACCOMMODATE TXDOT STREET PROJECT. ALL CUSTOMERS GRAPEVINE
RELOCATION OF FACILITIES MAY
2377 080.60328 7,962
INSTALL 25 FEET OF 12 INCH POLY AND ABANDON 25 FEET OF 12 INCH STEEL ALONG SINGLETON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2378 080.60337 125,481
RELOCATE FACILITIES. INSTALL 1052 FEET OF 8 INCH POLY AND ABANDON 824 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
2379 080.60345 5,994
INSTALL 45 FEET OF 8 INCH POLY AND ABANDON 20 FEET OF 10 INCH STEEL ALONG MCKINNEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2380 080.60359 9,990
INSTALL 1000 FEET OF 6 INCH POLY MAIN AND ABANDON 450 FEET OF 4 INCH STEEL ALONG PRESTON STREET IN ACCORDANCE WITH RAILROAD COMMISSON OF TEXAS RULE 8.209. ALL CUSTOMERS VAN ALSTYNE
SYSTEM INTEGRITY DECEMBER
2381 080.60361 288,232
INSTALL 346 POLY SERVICES AND ABANDON 346 STEEL SERVICES ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2382 080.60364 18,476
INSTALL 444 FEET OF 2 INCH AND 331 FEET OF 8 INCH POLY ALONG FOREST ABENUE AND ABANDON 400 FEET OF 2 INCH AND 332 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2383 080.60371 3,917 INSTALL 1457 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2384 080.60378 8,472 INSTALL 1724 FEET OF 2 INCH POLY ALONG THE STREETS OF MISSION RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH NOVEMBER
2385 080.60379 984
INSTALL RELIEF VALVE AT DISTRICT REGULATOR STATION 14 IN GARLAND AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2386 080.60381 12,227
RELOCATE FACILITIES. INSTALL 1254 FEET OF 2 INCH POLY ALONG CHEROKEE TRAIL AND ABANDON 1232 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2387 080.60382 1,055
INSTALL RELIEF VALVE AT DISTRICT REGULATOR STATION 5 IN MESQUITE AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
2388 080.60383 1,152
INSTALL RELIEF VALVE AT KAUFMAN DISTRICT REGULATORS STATION 06 AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 82 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2389 080.60390 5,378
RELOCATE FACILITIES. INSTALL 240 FEET OF 2 INCH AND 55 FEET OF 4 INCH POLY ALONG AVENUE A AND ABANDON 504 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2390 080.60391 1,885
RELOCATE FACILITIES. INSTALL 60 FEET OF 2 INCH POLY AND 50 FEET OF 4 INCH POLY ALONG AVENUE H AND ABANDON 110 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2391 080.60396 58,922
RELOCATE FACILITIES. INSTALL 108 FEET OF 24 INCH STEEL ALONG SCYENE ROAD AND ABANDON 100 FEET OF 24 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
2392 080.60397 36,676
INSTALL 2986 FEET OF 4 INCH POLY ALONG MARTIN LYDON AVENUE AND ABANDON 1375 FEET OF 3 INCH AND 60 FEET OF 4 INCH AND 17 FEET OF 6 INCH POLY AND 1529 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2393 080.60399 65,158
RELOCATE FACILITIES. INSTALL 5357 FEET OF 2 INCH AND 482 FEET OF 4 INCH POLY ALONG NAVARRO AVENUE AND ABANDON 2219 FEET OF 2 INCH, 475 FEET OF 1.25 INCH, 263 FEET OF 2 INCH STEEL, 1504 FEET OF 2 INCH, AND 457 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF DE LEON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DE LEON
SYSTEM INTEGRITY DECEMBER
2394 080.60402 630
RELOCATE FACILITIES. INSTALL 51 FEET OF 2 INCH POLY AND ABANDON 55 FEET OF 2 INCH STEEL ALONG 3RD STREET TO ACCOMMODATE CITY OF LAMPASAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAMPASAS
SYSTEM INTEGRITY DECEMBER
2395 080.60411 1 INSTALL 630 FEET OF 6 INCH AND 1595 FEET OF 2 INCH POLY ALONG THE STREETS OF CANTARRA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH JANUARY
2396 080.60413 17,916
RELOCATE FACILITIES. INSTALL 712 FEET OF 6 INCH POLY AND ABANDON 720 FEET OF 6 INCH POLY ALONG MILITARY PARKWAY TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
2397 080.60419 22,800
RELOCATE FACILITIES. INSTALL 1358 FEET OF 2 INCH POLY AND 58 FEET OF 4 INCH POLY ALONG SMOKEY MOUNTAIN DRIVE AND ABANDON 1154 FEET OF 2 INCH STEEL AND 204 FEET OF 2 INCH AND 58 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
2398 080.60430 4,552
RELOCATE FACILITIES. INSTALL 338 FEET OF 2 INCH POLY AND ABANDON 338 FEET OF 2 INCH POLY ALONG DAVIS BOULVARD TO ACCOMMODATE CITY OF NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
SYSTEM INTEGRITY DECEMBER
2399 080.60439 37,593
INSTALL 804 FEET OF 2 INCH POLY AND 1193 FEET OF 6 INCH POLY AND ABANDON 279 FEET OF 2 INCH POLY AND 2168 FEET OF 4 INCH CAST IRON AND 1208 FEET OF 6 INCH STEEL AND 1180 FEET OF 8 INCH CAST IRON ALONG SPRING AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2400 080.60441 30,405
INSTALL 1640 FEET OF 4 INCH AND 810 FEET OF 2 INCH POLY ALONG MARSHALL AND ABANDON 55 FEET OF 4 INCH POLY, 95 FEET OF 6 INCH STEEL AND 2300 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2401 080.60442 10,660
RELOCATE FACILITIES. INSTALL 251 FEET OF 6 INCH POLY AND ABANDON 25 FEET OF 4 INCH STEEL AND 70 FEET OF 6 INCH POLY ALONG LAFAYETTE AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2402 080.60446 13,181
RELOCATE FACILITIES. INSTALL 1585 FEET OF 2 INCH POLY ALONG ATON STREET AND ABANDON 615 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF WESTWORTH VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTWORTH VILLAGE
SYSTEM INTEGRITY DECEMBER
2403 080.60449 21,170
INSTALL 1526 FEET OF 2 INCH, 539 FEET OF 4 INCH AND 875 FEET OF 6 INCH POLY ALONG SPRING AVENUE AND ABANDON 305 FEET OF 2 INCH STEEL AND 26 FEET OF 6 INCH AND 4 FEET OF 2 INCH POLY AND 1898 FEET OF 4 INCH AND 745 FEET OF 6 INCH AND 632 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2404 080.60452 27,785
INSTALL 1560 FEET OF 2 INCH AND 774 FEET OF 4 INCH POLY ALONG FRANK STREET AND ABANDON 1022 FEET OF 4 INCH POLY AND 1005 FEET OF 4 INCH AND 273 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2405 080.60453 21 INSTALL 744 FEET OF 2 INCH POLY ALONG GREENS PRAIRIE ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH JANUARY
2406 080.60454 7,106
INSTALL 497 FEET OF 2 INCH POLY AND ABANDON 687 FEET OF 2 INCH STEEL AND 103 FEET OF 2 INCH POLY ALONG JONES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
2407 080.60455 31,642
INSTALL 2100 FEET OF 2 INCH AND 298 FEET OF 4 INCH POLY ALONG LAGOW STREET AND ABANDON 880 FEET OF 4 INCH AND 1654 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2408 080.60473 24,019
INSTALL 10 INCH MAINLINE VALVE AND (2) 4 INCH STRADDLE VALVES AT DFW NORTH REMOTE PARKING AND ABANDON 10 INCH MAINLINE VALVE AND (2) 4 INCH MAINLINE VALVES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
2409 080.60474 5,535
INSTALL 803 FEET OF 4 INCH POLY ALONG JUNIUS STREET AND ABANDON 698 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
2410 080.60478 9,999
INSTALL 427 FEET OF 2 INCH POLY AND ABANDON 410 FEET OF 1.25 INCH STEEL ALONG NORTHWEST HIGHWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2411 080.60486 36,089
INSTALL 2612 FEET OF 4 INCH POLY AND ABANDON 1611 FEET OF 4 INCH, 600 FEET OF 6 INCH CAST IRON, 477 FEET OF 4 INCH STEEL AND 543 FEET OF 4 INCH POLY ALONG GROVER AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2412 080.60495 8,189
INSTALL 510 FEET OF 2 INCH POLY ALONG ALGERITA STREET AND ABANDON 454 FEET OF 3 INCH STEEL AND 124 FEET OF 3 INCH POLY AND 80 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
2413 080.60507 17,357
INSTALL 100 FEET OF 2 INCH POLY AND 1410 FEET OF 4 INCH POLY AND ABANDON805 FEET OF 4 INCH POLY, 422 FEET OF 4 INCH CAST IRON AND 27 FEET OF 4 INCH STEEL ALONG GORDON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 83 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2414 080.60516 14,886
RELOCATE FACILITIES. INSTALL 978 FEET OF 2 INCH POLY AND 1088 FEET OF 4 INCH POLY AND ABANDON 572 FEET OF 2 INCH STEEL AND 927 FEET OF 2 INCH POLY AND 342 FEET OF 4 INCH POLY ALONG OATES ROAD TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2415 080.60517 35,606
INSTALL DISTRICT REGULATOR STATION AND METER AT JAGOE-PUBLIC CO ASPHALT PLANT AND ABANDON DISTRICT REGULATOR STATION AND METER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2416 080.60518 9,118
RELOCATE FACILITIES. INSTALL 910 FEET OF 4 INCH POLY ALONG WHITLEY ROAD AND ABANDON 930 FEET OF 4 INCH STEEL AND 8 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF KELLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
SYSTEM INTEGRITY DECEMBER
2417 080.60521 14,691 INSTALL 3478 FEET OF 2 INCH POLY ALONG LIMBURG DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HIGHLAND VILLAGE GROWTH NOVEMBER
2418 080.60524 916 INSTALL 2921 FEET OF 4 INCH POLY ALONG THE STREETS OF SUMMER CREEK RANCH PHASE 12 C. RESIDENTIAL FORT WORTH GROWTH JUNE
2419 080.60542 2,071
INSTALL 3 FEET OF 2 INCH POLY AND 275 FEET OF 4 INCH POLY ALONG TRADERS ROAD AND ABANDON 15 FEET OF 2 INCH POLY AND 350 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
2420 080.60546 10,008
RELOCATE FACILITIES. INSTALL 626 FEET OF 2 INCH POLY AND 19 FEET OF 4 INCH POLY AND ABANDON 581 FEET OF 2 INCH STEEL AND 15 FEET OF 4 INCH STEEL ALONG PECAN STREET TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
2421 080.60547 655
RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH POLY ALONG HIGHWAY 79 AND ABANDON 58 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF OAKWOOD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OAKWOOD
SYSTEM INTEGRITY DECEMBER
2422 080.60548 23,523
INSTALL 1232 FEET OF 2 INCH POLY ALONG CLINTON AND ABANDON 1277 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
2423 080.60559 30,030
RELOCATE FACILITIES. INSTALL 2257 FEET OF 2 INCH POLY AND ABANDON 65 FEET OF 2 INCH STEEL AND 1286 FEET OF 2 INCH POLY ALONG WABASH AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2424 080.60560 12,639
RELOCATE FACILITIES. INSTALL 291 FEET OF 6 INCH POLY ALONG SH198 AND ABANDON 215 FEET OF 4 INCH AND 25 FEET OF 6 INCH STEEL AND 3 FEET OF 4 INCH AND 20 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF CANTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON
SYSTEM INTEGRITY DECEMBER
2425 080.60561 12,275
RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 510 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG ELLIS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2426 080.60572 1,351
RELOCATE FACILITIES. INSTALL 265 FEET OF 2 INCH POLY AND ABANDON 403 FEET OF 2 INCH STEEL ALONG ENNIS AVENUE TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
2427 080.60575 9,484 INSTALL 4286 FEET OF 2 INCH POLY ALONG STREETS OF ARTESIA NORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH NOVEMBER
2428 080.60580 158,820
RELOCATE FACILITIES. INSTALL 600 FEET OF 10 INCH STEEL ALONG TXDOT FRONTAGE ROAD AND ABANDON 1100 FEET OF 10 INCH STEEL TO ACCOMMODATE CITY OF ARLINGTON TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2429 080.60584 1,426
INSTALL 551 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH POLY AND ABANDON 100 FEET OF 3 INCH STEEL AND 570 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY ALONG CHESTNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE
SYSTEM INTEGRITY DECEMBER
2430 080.60585 33,490
INSTALL 1920 FEET OF 4 INCH POLY AND ABANDON 1920 FEET OF 6 INCH CAST IRON ALONG THE STREETS OF CHEROKEE TRAIL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2431 080.60586 43,452
INSTALL 2040 FEET OF 4 INCH POLY AND ABANDON 1950 FEET OF 6 INCH CAST IRON ALONG BLUE BONNET ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2432 080.60596 82,206
INSTALL 291 POLY SERVICES AND ABANDON 291 STEEL SERVICES ALONG THE STREETS OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2433 080.60598 47,055
INSTALL (164) POLY SERVICES ALONG STREETS OF WAXAHACHIE AND ABANDON (164) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
2434 080.60599 53,594
INSTALL (80) POLY SERVICES ALONG STREETS OF FREDERICKSBURG AND ABANDON (80) STEEL SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG
SYSTEM INTEGRITY DECEMBER
2435 080.60604 6,545
INSTALL 455 FEET OF 2 INCH POLY ALONG PURNELL ROAD AND ABANDON 284 FEET OF 2 INCH AND 140 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
SYSTEM INTEGRITY DECEMBER
2436 080.60608 7,247
RELOCATE FACILITIES. INSTALL 1060 FEET OF 4 INCH POLY AND ABANDON 812 FEET OF 2 INCH AND 347 FEET OF 3 INCH STEEL AND 45 FEET OF 2 INCH POLY ALONG THE STREETS OF ROCKHILL ROAD TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
2437 080.60611 62,663
RELOCATE FACILITIES. INSTALL 1240 FEET OF 4 INCH POLY ALONG PERKINS STREET AND ABANDON 537 FEET OF 2 INCH STEEL AND 1542 FEET OF 4 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2438 080.60612 5,464
INSTALL 7890 FEET OF 2 INCH, 2390 FEET OF 4 INCH AND 770 FEET OF 8 INCH POLY ALONG THE STREETS OF THE CREEKS OF LEGACY WEST. DEVELOPER INSTALLED FACILTIES. RESIDENTIAL CELINA GROWTH AUGUST
2439 080.60615 84,749
RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH AND 2100 FEET OF 4 INCH POLY ALONG GARDNER DRIVE AND ABANDON 1900 FEET OF 3 INCH STEEL TO ACCOMMODATE TXDOT HIGHWAY WIDENING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PALESTINE
SYSTEM INTEGRITY DECEMBER
2440 080.60616 17,768
INSTALL 910 FEET OF 6 INCH POLY ALONG 24TH STREET AND ABANDON 10 FEET OF 6 INCH STEEL AND 910 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
2441 080.60619 16,397
RELOCATE FACILITIES. INSTALL 1414 FEET OF 2 INCH POLY ALONG AND ABANDON 302 FEET OF 2 INCH STEEL AND 1067 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 84 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2442 080.60628 7,251
RELOCATE FACILITIES. INSTALL 188 FEET OF 4 INCH POLY ALONG ROGSBEE DRIVE AND ABANDON 188 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
2443 080.60629 4,135
INSTALL 875 FEET OF 2 INCH AND 400 FEET OF 4 INCH POLY ALONG COMMERCE STREET AND ABANDON 1275 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2444 080.60634 8,017
RELOCATE FACILITIES. INSTALL 460 FEET OF 6 INCH POLY ALONG STREETS OF GRANDPRAIRIE AND ABANDON 440 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
2445 080.60636 13,186
RELOCATE FACILITIES. INSTALL 33 FEET OF 4 INCH AND 458 FEET OF 8 INCH POLY ALONG BRIAR HILL ROAD AND ABANDON 28 FEET OF 3 INCH, 6 FEET OF 4 INCH, AND 430 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
2446 080.60644 867
INSTALL FLOWSAFE RELIEF VALVE AT DISTRICT REGULATOR STATION 2 AND ABANDON ROCKWELL RELIEF VALVE IN WILLIAMSON COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
2447 080.60646 7,244
INSTALL 831 FEET OF 2 INCH POLY ALONG GARLINGTON AND ABANDON 970 FEET OF 2 INCH, 32 FEET OF 3 INCH STEEL AND 38 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE
SYSTEM INTEGRITY DECEMBER
2448 080.60647 19,911 INSTALL 1600 FEET OF 4 INCH POLY ALONG MANANA DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH JUNE
2449 080.60655 64,847
INSTALL 2723 FEET OF 2 INCH POLY AND ABANDON 2422 FEET OF 3 INCH STEEL ALONG BEAVER BROOK LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2450 080.60661 30,629
RELOCATE FACILITIES. INSTALL 1700 FEET OF 2 INCH AND 125 FEET OF 4 INCH POLY ALONG BRANCHVIEW DRIVE ABANDON 2570 FEET OF 2 INCH STEEL AND 320 FEET OF 2 INCH POLY AND 500 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2451 080.60662 34,878
RELOCATE FACILITIES. INSTALL 459 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH POLY AND 1780 FEET OF 4 INCH POLY AND ABANDON 180 FEET OF 2 INCH STEEL AND 95 FEET OF 2 INCH POLY AND 28 FEET OF 3 INCH POLY AND 1050 FEET OF 4 INCH POLY ALONG E.SANFORD TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2452 080.60663 6,979
RELOCATE FACILITIES. INSTALL 260 FEET OF 4 INCH POLY ALONG PACIFIC STREET AND ABANDON 260 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY
SYSTEM INTEGRITY DECEMBER
2453 080.60664 35,330
INSTALL 3158 FEET OF 2 INCH POLY AND ABANDON 435 FEET OF 4 INCH POLY AND 2725 FEET OF 6 INCH CAST IRON ALONG THE STREETS OF PENELOPE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2454 080.60670 6,365,515
INSTALL 40 FEET OF 8 INCH STEEL AND 2459 FEET OF 8 INCH POLY AND 34 FEET OF 12 INCH STEEL AND 3918 FEET OF 16 INCH STEEL AND ABANDON 5 FEET OF 4 INCH POLY AND 2723 FEET OF 18 INCH STEEL ALONG PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
SYSTEM INTEGRITY DECEMBER
2455 080.60673 2,474 INSTALL 2710 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2456 080.60679 27,497
RELOCATE FACILITIES. INSTALL 1126 FEET OF 4 INCH POLY AND ABANDON 2885 FEET OF 4 INCH STEEL AND 20 FEET OF 6 INCH POLY ALONG THE STREETS OF BISHOP STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2457 080.60681 16,147
RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH POLY ALONG GAMBRELL AND ABANDON 878 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2458 080.60683 32,328
RELOCATE FACILITIES. INSTALL 1385 FEET OF 4 INCH POLY AND 10 FEET OF 6 INCH POLY AND ABANDON 1002 FEET OF 4 INCH STEEL AND 90 FEET OF 4 INCH POLY ALONG THE STREETS OF ROSEDALE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2459 080.60684 10,314
RELOCATE FACILITIES. INSTALL 3000 FEET OF 6 INCH POLY ALONG SHAHAN PRAIRIE AND ABANDON 3000 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF LITTLE ELM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM
SYSTEM INTEGRITY DECEMBER
2460 080.60685 6,690
INSTALL 950 FEET OF 2 INCH POLY ALONG NORTH ONEAL STREET AND ABANDON 1110 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL
SYSTEM INTEGRITY DECEMBER
2461 080.60688 17,373
INSTALL 1527 FEET OF 2 INCH AND 529 FEET OF 4 INCH POLY ALONG CANAL STREET AND ABANDON 1440 FEET OF 4 INCH CAST IRON AND 100 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2462 080.60690 (22,563) INSTALL 2400 FEET OF 6 INCH STEEL ALONG FM 156. ALL CUSTOMERS FORT WORTH GROWTH OCTOBER
2463 080.60691 42,041
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH AND 800 FEET OF 6 INCH POLY ALONG MILLER AND ABANDON 440 FEET OF 2 INCH AND 770 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2464 080.60693 38,061
RELOCATE FACILITIES. INSTALL 27 FEET OF 4 INCH POLY AND 4503 FEET OF 6 INCH POLY AND ABANDON 122 FEET OF 2 INCH POLY AND 3963 FEET OF 6 INCH POLY ALONG FM2181 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2465 080.60694 52,413
RELOCATE FACILITIES. INSTALL 2268 FEET OF 4 INCH POLY ALONG CLAIREMONT AVENUE AND ABANDON 758 FEET OF 4 INCH, 894 FEET OF 6 INCH CAST IRON AND 1145 FEET OF 4 INCH AND 64 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2466 080.60699 3,239
INSTALL 354 FEET OF 2 INCH POLY ALONG SOUTH MARKET STREET AND ABANDON 354 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR
SYSTEM INTEGRITY DECEMBER
2467 080.60704 31,691
INSTALL 233 FEET OF 2 INCH AND 2320 FEET OF 4 INCH POLY AND ABANDON 1974 FEET OF 4 INCH CAST IRON, 814 FEET OF 4 INCH AND 557 FEET OF 6 INCH POLY ALONG LIVINGSTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2468 080.60705 22,520
INSTALL 1841 FEET OF 4 INCH AND 5 FEET OF 6 INCH POLY ALONG LIVINGSTON AVENUE AND ABANDON 1828 FEET OF 4 INCH CAST IRON AND 3 FEET OF 4 INCH AND 20 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 85 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2469 080.60706 58,850
INSTALL 2665 FEET OF 4 INCH POLY ALONG STANDIFER STREET AND ABANDON 1794 FEET OF 4 INCH STEEL, 658 FEET OF 4 INCH CAST IRON AND 640 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2470 080.60707 43,403
INSTALL 220 FEET OF 2 INCH AND 3 FEET OF 3 INCH AND 3463 FEET OF 4 INCH POLY AND ABANDON 224 FEET OF 2 INCH AND 1339 FEET OF 6 INCH CAST IRON AND 2712 FEET OF 4 INCH STEEL AND 384 FEET OF 4 INCH POLY ALONG 22ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2471 080.60714 42,419
INSTALL 150 FEET OF 4 INCH AND 450 FEET OF 8 INCH POLY AND ABANDON 10 FEET OF 3 INCH AND 50 FEET OF 4 INCH AND 1003 FEET OF 8 INCH STEEL ALONG ROGERS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2472 080.60718 15,431
INSTALL 1544 FEET OF 2 INCH POLY AND ABANDON 110 FEET OF 3 INCH AND 297 FEET OF 4 INCH AND 1398 FEET OF 6 CAST IRON ALONG THE STREETS OF HARWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2473 080.60719 38,476
INSTALL 2085 FEET OF 2 INCH AND 279 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH AND 647 FEET OF 6 INCH CAST IRON ALONG ROBERT L PARRISH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2474 080.60720 18,088
INSTALL 1237 FEET OF 2 INCH POLY AND 271 FEET OF 4 INCH POLY AND ABANDON 1508 FEET OF 6 INCH CAST IRON ALONG WOFFORD AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2475 080.60721 15,451
INSTALL 1307 FEET OF 2 INCH POLY AND ABANDON 8 FEET OF 2 INCH AND 871 FEET OF 6 INCH AND 352 FEET OF 8 INCH CAST IRON ALONG ELSIE FAYE HEGGINS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2476 080.60722 18,224
INSTALL 1135 FEET OF 2 INCH POLY AND ABANDON 1131 FEET OF 6 INCH CAST IRON ALONG EVERGREEN HILLS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2477 080.60723 11,255
INSTALL 910 FEET OF 2 INCH AND 160 FEET OF 4 INCH POLY AND ABANDON 555 FEET OF 2 INCH STEEL AND 790 FEET OF 4 INCH CAST IRON ALONG COLLINS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2478 080.60724 34,299
INSTALL 1514 FEET OF 2 INCH AND 527 FEET OF 4 INCH POLY AND ABANDON 1951 FEET OF 6 INCH CAST IRON ALONG YORK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2479 080.60725 27,129
INSTALL 1519 FEET OF 2 INCH AND 449 FEET OF 4 INCH POLY AND ABANDON 173 FEET OF 3 INCH POLY AND 1320 FEET OF 4 INCH AND 272 FEET OF 8 INCH CAST IRON ALONG THE STREETS OF OAKDALE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2480 080.60727 22,800
INSTALL 1200 FEET OF 2 INCH AND 8 FEET OF 4 INCH POLY AND ABANDON 1194 FEET OF 8 INCH CAST IRON ALONG LATTA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2481 080.60728 24,932
INSTALL 2530 FEET OF 2 INCH POLY ALONG FOREST HILLS AND ABANDON 1850 FEET OF 8 INCH AND 255 FEET OF 6 INCH CAST IRON AND 180 FEET OF 8 INCH AND 245 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2482 080.60729 16,078
INSTALL 1248 FEET OF 2 INCH POLY AND ABANDON 630 FEET OF 6 INCH AND 910 FEET OF 8 INCH CAST IRON AND 462 FEET OF 8 INCH POLY ALONG MARBURG STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2483 080.60730 20,572
INSTALL 925 FEET OF 2 INCH POLY AND ABANDON 447 FEET OF 4 INCH POLY AND 1110 FEET OF 6 INCH CAST IRON ALONG STOREY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2484 080.60732 35,225
INSTALL 1250 FEET OF 2 INCH AND 420 FEET OF 4 INCH POLY ALONG WODDORD AVENUE AND ABANDON 1375 FEET OF 4 INCH AND 425 FEET OF 6 ICH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2485 080.60733 14,133
INSTALL 967 FEET OF 2 INCH POLY AND 670 FEET OF 4 INCH POLY AND ABANDON 596 FEET OF 6 INCH CAST IRON ALONG CARTER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2486 080.60734 19,425
INSTALL 672 FEET OF 2 INCH POLY AND 1279 FEET OF 4 INCH POLY AND ABANDON 69 FEET OF 3 INCH AND 2350 FEET OF 4 INCH CAST IRON AND 402 FEET OF 4 INCH POLY ALONG THE STREETS OF PARK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2487 080.60735 23,228
INSTALL 1994 FEET OF 2 INCH POLY ALONG COLUMBIA AVENUE AND ABANDON 1030 FEET OF 4 INCH CAST IRON AND 1030 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2488 080.60736 61,456
INSTALL 1785 FEET OF 2 INCH AND 640 FEET OF 4 INCH POLY ALONG LAGOW AND ABANDON 1655 FEET OF 4 INCH, 265 FEET OF 6 INCH CAST IRON, AND 460 FEET OF 2 INCH AND 370 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2489 080.60737 14,177
INSTALL 1350 FEET OF 2 INCH POLY ALONG TURNER AVENUE AND ABANDON 250 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2490 080.60738 12,920
INSTALL 1190 FEET OF 2 INCH POLY ALONG CHRISTENSEN DRIVE AND ABANDON 1190 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2491 080.60740 15,906
INSTALL 1390 FEET OF 2 INCH POLY ALONG ROLINDA DRIVE AND ABANDON 1860 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2492 080.60741 24,411
RELOCATE FACILITIES. INSTALL 1836 FEET OF 2 INCH AND 670 FEET OF 4 INCH POLY AND ABANDON 615 FEET OF 2 INCH STEEL AND 1074 FEET OF 4 INCH STEEL AND 599 FEET OF 2 INCH POLY AND 349 FEET OF 4 INCH POLY ALONG AVENUE L TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2493 080.60743 15,265
INSTALL 1460 FEET OF 2 INCH POLY AND ABANDON 1280 FEET OF CAST IRON ALONG MYRTLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2494 080.60744 32,862
INSTALL 2396 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 4 INCH POLY AND 12 FEET OF 6 INCH POLY AND 2610 FEET OF 6 INCH CAST IRON ALONG JAMAICA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2495 080.60745 14,980
INSTALL 1525 FEET OF 2 INCH POLY ALONG FROEMAN STREET AND ABANDON 1365 FEET OF 4 INCH AND 90 FEET OF 8 INCH CAST IRON AND 340 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2496 080.60747 49,415
INSTALL 2040 FEET OF 4 INCH POLY ALONG AVALON AVENUE AND ABANDON 180 FEET OF 4 INCH AND 1860 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 86 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2497 080.60750 12,491
RELOCATE FACILITIES. INSTALL 480 FEET OF 6 INCH POLY ALONG WESTERN CENTER BOULEVARD AND ABANDON 480 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2498 080.60754 933,152
INSTALL 200 FEET OF 6 INCH POLY AND 419 FEET OF 16 INCH STEEL AND ABANDON 480 FEET OF 16 INCH STEEL ALONG BAKER BLVD AND CRITES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS
SYSTEM INTEGRITY DECEMBER
2499 080.60760 8,705
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY AND ABANDON 730 FEET OF 2 INCH STEEL AND 70 FEET OF 2 INCH POLY ALONG LAVISTA STREET TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
2500 080.60762 1,443 INSTALL 2442 FEET OF 4 INCH AND 382 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2501 080.60763 2,062 INSTALL 1835 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2502 080.60769 209,655
RELOCATE FACILITIES. INSTALL 7132 FEET OF 2 INCH POLY AND 8 FEET OF 3 INCH POLY AND 1373 FEET OF 4 INCH POLY AND 7491 FEET OF 6 INCH POLY AND ABANDON 332 FEET OF 2 INCH POLY AND 6132 FEET OF 4 INCH STEEL AND 2612 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF TERRELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
2503 080.60770 5,515
RELOCATE FACILITIES. INSTALL 527 FEET OF 2 INCH POLY ALONG PINE STREET AND ABANDON 408 FEET OF 2 INCH AND 128 FEET OF 3 INCH STEEL AND 80 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HILLSBORO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
2504 080.60781 12,236
INSTALL 1380 FEET OF 2 INCH POLY AND ABANDON 1360 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG BARRETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
2505 080.60797 42,459
INSTALL 1925 FEET OF 2 INCH POLY ALONG STONEBRIDGE AND ABANDON 325 FEET OF 2 INCH, 645 FEET OF 4 INCH, 1010 FEET OF 6 INCH AND 280 FEET OF 8 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2506 080.60806 13,344
RELOCATE FACILITIES. INSTALL 6 FEET OF 4 INCH POLY AND 1405 FEET OF 6 INCH POLY ALONG TURBEVILLE AND ABANDON 787 FEET OF 4 INCH POLY AND 692 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF HICKORY CREEK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICKORY CREEK
SYSTEM INTEGRITY DECEMBER
2507 080.60808 57,396
RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 686 FEET OF 2 INCH POLY ALONG COIT ROAD TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
2508 080.60809 17,704
RELOCATE FACILITIES. INSTALL 1077 FEET OF 2 INCH POLY ALONG BINGHAM STREET AND ABANDON 1013 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
2509 080.60817 2,169
RELOCATE FACILITIES. INSTALL 46 FEET OF 6 INCH POLY ALONG LAKE FOREST AND ABANDON 54 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF WOODWAY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WOODWAY
SYSTEM INTEGRITY DECEMBER
2510 080.60819 1,317 INSTALL 3875 FEET OF 4 INCH POLY AND 2800 FEET OF 2 INCH POLY ALONG VERANDAH WAY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL IRVING GROWTH APRIL
2511 080.60822 19,910
RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH POLY ALONG NORTH TRAIL AND ABANDON 795 FEET OF 2 INCH STEEL AND 9 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CROWLEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
SYSTEM INTEGRITY DECEMBER
2512 080.60823 13,111
RELOCATE FACILITIES. INSTALL 1010 FEET OF 12 INCH POLY AND ABANDON 918 FEET OF 12 INCH POLY ALONG TRINITY FALLS PARKWAY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
2513 080.60826 50,496
RELOCATE FACILITIES. INSTALL 2700 FEET OF 2 INCH POLY AND ABANDON 2000 FEET OF 2 INCH STEEL ALONG ARAPAHO ROAD TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
2514 080.60841 37,335 INSTALL 1775 FEET OF 2 INCH AND 1481 FEET OF 4 INCH POLY ALONG STREETS OF MORNINGSTAR PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
2515 080.60844 6,974
RELOCATE FACILITIES. INSTALL 550 FEET OF 2 INCH POLY ALONG THANNISCH AVENUE AND ABANDON 482 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2516 080.60847 16,759
INSTALL 880 FEET OF 4 INCH POLY AND ABANDON 842 FEET OF 4 INCH STEEL AND 32 FEET OF 4 INCH POLY ALONG BAILEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
2517 080.60852 6,036
INSTALL 487 FEET OF 4 INCH POLY AND ABANDON 476 FEET OF 6 INCH STEEL ALONG BILL OWENS PARKWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
2518 080.60857 30,568
RELOCATE FACILITIES. INSTALL 1135 FEET OF 4 INCH POLY AND ABANDON 22 FEET OF 2 INCH STEEL AND 63 FEET OF 2 INCH POLY AND 108 FEET OF 3 INCH STEEL AND 1068 FEET OF 4 INCH STEEL AND 315 FEET OF 4 INCH POLY ALONG HANDLEY DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2519 080.60859 20,379
RELOCATE FACILITIES. INSTALL 1030 FEET OF 8 INCH POLY AND ABANDON 1148 FEET OF 4 INCH STEEL ALONG GRAYSON STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2520 080.60865 22,114
RELOCATE FACILITIES. INSTALL 1052 FEET OF 2 INCH POLY AND ABANDON 278 FEET OF 2 INCH STEEL AND 685 FEET OF 2 INCH POLY ALONG ROGERS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2521 080.60866 12,643
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH AND 1748 FEET OF 4 INCH POLY ALONG FRANCIS STREET AND ABANDON 253 FEET OF 2 INCH STEEL AND 1465 FEET OF 4 INCH STEEL AND 362 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 87 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2522 080.60868 36,883
RELOCATE FACILITIES. INSTALL 549 FEET OF 2 INCH POLY AND 1743 FEET OF 4 INCH POLY AND ABANDON 549 FEET OF 2 INCH STEEL AND 12 FEET OF 2 INCH POLY ALONG ANDREW AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2523 080.60871 25,780
INSTALL 1055 FEET OF 2 INCH POLY AND 75 FEET OF 4 INCH POLY AND 1525 FEET OF 6 INCH POLY AND ABANDON 220 FEET OF 2 INCH STEEL AND 130 FEET OF 2 INCH POLY AND 126 FEET OF 3 INCH STEEL AND 384 FEET OF 4 INCH STEEL AND 1017 FEET OF 6 INCH STEEL AND 788 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
2524 080.60872 16,466
RELOCATE FACILITIES. INSTALL 251 FEET OF 2 INCH AND 693 FEET OF 4 INCH POLY ALONG KINSALE COURT AND ABANDON 212 FEET OF 2 INCH AND 480 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2525 080.60878 38,300
INSTALL 1500 FEET OF 4 INCH AND 390 FEET OF 2 INCH POLY ALONG PARKLAND AVENUE AND ABANDON 1500 FEET OF 4 INCH AND 390 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2526 080.60879 1,250
INSTALL DISTRICT REGULATOR STATION ALONG INTERSTATE 35 AND ABANDON DISTRICT REGULATOR STATION IN ELLIS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
2527 080.60880 354,176 INSTALL 3100 FEET OF 6 INCH STEEL ALONG BARDIN ROAD. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER
2528 080.60894 14,296
RELOCATE FACILITIES. INSTALL 849 FEET OF 2 INCH POLY AND ABANDON 1030 FEET OF 2 INCH STEEL ALONG MILL CREEK TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2529 080.60897 46,505
RELOCATE FACILITIES. INSTALL 3280 FEET OF 4 INCH AND 600 FEET OF 6 INCH POLY ALONG CHURCH STREET AND ABANDON 2635 FEET OF 2 INCH, 405 FEET OF 2 INCH, AND 575 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
2530 080.60899 72,037
INSTALL 1082 FEET OF 10 INCH STEEL ALONG LINE M AND ABANDON 1074 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARDWELL
SYSTEM INTEGRITY DECEMBER
2531 080.60911 3,540
RELOCATE FACILITIES. INSTALL 210 FEET OF 2 INCH POLY ALONG HERNDON STREET AND ABANDON 199 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
2532 080.60914 18,690
INSTALL 8 FEET OF 8 INCH POLY AND 504 FEET OF 12 INCH POLY AND ABANDON 272 FEET OF 2 INCH POLY AND 33 FEET OF 8 INCH POLY AND 623 FEET OF 12 INCH STEEL ALONG JAMES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2533 080.60917 65,785 INSTALL AC MITIGATION ALONG LINE D17-4 IN COLLIN COUNTY. ALL CUSTOMERS PLANOSYSTEM
INTEGRITY DECEMBER
2534 080.60921 2,474
INSTALL 1382 FEET OF 6 INCH AND 1939 FEET OF 4 INCH POLY ALONG STREETS OF SANTA RITA RANCH NORTH 7A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2535 080.60922 24,815
RELOCATE FACILITIES. INSTALL 1430 FEET OF 2 INCH POLY AND 360 FEET OF 4 INCH POLY AND ABANDON 1370 FEET OF 2 INCH STEEL AND 400 FEET OF 4 INCH STEEL AND 60 FEET OF 6 INCH POLY ALONG TRENCHARD TO ACCOMMODATE CITY OF DECATUR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR
SYSTEM INTEGRITY DECEMBER
2536 080.60930 23,653
INSTALL 1585 FEET OF 2 INCH POLY ALONG NORTHVIEW LANE AND ABANDON 1565 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2537 080.60931 8,509
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY AND 94 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND 88 FEET OF 4 INCH STEEL ALONG DAVIS TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT CITY ARLINGTON OF STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2538 080.60933 21,813
INSTALL 1493 FEET OF 2 INCH POLY AND ABANDON 52 FEET OF 3 INCH POLY AND 1442 FEET OF 4 INCH STEEL ALONG VANCOUVER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2539 080.60934 28,504
INSTALL 2351 FEET OF 2 INCH POLY ALONG CREST COVE AND ABANDON 2365 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2540 080.60936 2,320
INSTALL 1282 FEET OF 6 INCH, 2095 FEET OF 4 INCH AND 1642 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH NORTH SECTION 11. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2541 080.60941 28 INSTALL 130 FEET OF 4 INCH POLY ALONG GOLDEN TRIANGLE BOULEVARD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
2542 080.60942 27,581
RELOCATE FACILITIES. INSTALL 652 FEET OF 4 INCH POLY ALONG PARKER HENDERSON ROAD AND ABANDON 169 FEET OF 2 INCH AND 7 FEET OF 3 INCH AND 566 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2543 080.60943 46,238,223
AREA REPLACEMENT IN NORTHWEST DALLAS WITHIN THE BOUNDARIES OF DENTON DRIVE, I635, INWOOD AND NORTHWEST HIGHWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2544 080.60944 256,509
AREA REPLACEMENT IN SOUTHWEST DALLAS WITHIN THE BOUNDARIES OF TRINITY RIVER, I35E, WRIGHT AVENUE, AND LOOP 12 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2545 080.60946 99,526 FUNCTIONAL COCKRELL HILL ZONE 3 AREA REPLACEMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2546 080.60960 11,187
RELOCATE FACILITIES. INSTALL 1577 FEET OF 2 INCH POLY AND ABANDON 1260 FEET OF 2 INCH STEEL ALONG NURSERY ROAD TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2547 080.60967 13,688
RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH AND 562 FEET OF 4 INCH POLY ALONG GOSHEN STREET AND ABANDON 404 FEET OF 2 INCH AND 464 FEET OF 3 INCH STEEL AND 84 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF CANTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON
SYSTEM INTEGRITY DECEMBER
2548 080.60984 48,443 INSTALL 4265 FEET OF 2 INCH AND 833 FEET OF 4 INCH POLY ALONG STREETS OF MORNINGSTAR PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
2549 080.60988 85,885
INSTALL 200 FEET OF 6 INCH POLY AND 2600 FEET OF 4 INCH POLY AND 1800 FEET OF 2 INCH POLY ALONG CALISTOGA LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH OCTOBER
2550 080.60995 2,010 INSTALL 960 FEET OF 6 INCH AND 2085 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA NORTH 6B. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2551 080.60997 2,629 INSTALL 1209 FEET OF 4 INCH AND 1251 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA NORTH SECTION 21. RESIDENTIAL LEANDER GROWTH OCTOBER
MTX AdditionsPage 88 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2552 080.61000 29,691
RELOCATE FACILITIES. INSTALL 1840 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 4 INCH POLY AND 1740 FEET OF 4 INCH STEEL ALONG NORTH STREET TO ACCOMMODATE CITY OF MANSFIELD STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
SYSTEM INTEGRITY DECEMBER
2553 080.61007 15,470
INSTALL 1379 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 2 INCH POLY ALONG SHARON LEE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2554 080.61016 12,886 INSTALL 230 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG ROSELAND AVENUE TO SERVE THE SKYLINE TERRACES MULTIFAMILY DEVELOPMENT. RESIDENTIAL DALLAS GROWTH NOVEMBER
2555 080.61042 5,939
ABANDON DRS12 AND 81 FEET OF 3 INCH STEEL AND INSTALL 81 FEET OF 6 INCH POLY ALONG AVENUE M IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
2556 080.61057 3,866
INSTALL 1689 FEET OF 4 INCH AND 1543 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SOUTH SECTION 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2557 080.61058 3,299 INSTALL 2427 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2558 080.61069 6,636
INSTALL 708 FEET OF 2 INCH POLY ALONG COMMERCIAL AVENUE AND ABANDON 687 FEET OF 2 INCH STEEL AND 13 FEET OF 2 INCH AND 3 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANSON
SYSTEM INTEGRITY DECEMBER
2559 080.61071 34,493
RELOCATE FACILITIES. INSTALL 4 FEET OF 3 INCH AND 1096 FEET OF 4 INCH AND 1041 FEET OF 6 INCH POLY AND ABANDON 1090 FEET OF 3 INCH POLY AND 318 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
2560 080.61072 9,056
INSTALL 498 FEET OF 4 INCH POLY ALONG COLUMBUS STREET AND ABANDON 419 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY DECEMBER
2561 080.61075 70,360
INSTALL 9334 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH AND 500 FEET OF 8 INCH POLY AND 8700 FEET OF 6 INCH STEEL ALONG LINE E16 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
2562 080.61082 13,721
INSTALL APPROXIMATELY 2000 FEET OF 4 INCH POLY AND 600 FEET OF 2 INCH POLY ALONG THE STREETS OF EPIC TOWNE CROSSING. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GRAND PRAIRIE GROWTH OCTOBER
2563 080.61085 (1,116)
RELOCATE FACILITIES. INSTALL 850 FEET OF 8 INCH POLY AND ABANDON 60 FEET OF 2 INCH STEEL, 600 FEET OF 8 INCH STEEL, AND 225 FEET OF 4 INCH POLY ALONG BECKLEY STREET TO ACCOMMODATE NEW DEVELOPMENT. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES MARCH
2564 080.61087 13,348
INSTALL 318 FEET OF 2 INCH AND 325 FEET OF 6 INCH AND 304 FEET OF 12 INCH POLY ALONG MILL STREET AND ABANDON 437 FEET OF 2 INCH STEEL AND 624 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2565 080.61088 625
INSTALL DISTRICT REGULATOR STATION 71 AND ABANDON DISTRICT REGULATOR STATION IN ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2566 080.61091 158 ABANDON DISTRICT REGULATOR STATION 76 IN ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2567 080.61101 12,123
RELOCATE FACILITIES. INSTALL 134 FEET OF 2 INCH POLY AND 443 FEET OF 4 INCH POLY AND ABANDON 95 FEET OF 2 INCH STEEL AND 375 FEET OF 3 INCH STEEL AND 479 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CHICO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO
SYSTEM INTEGRITY DECEMBER
2568 080.61116 2,305
INSTALL 333 FEET OF 2 INCH POLY ALONG CEDAR AND ABANDON 262 FEET OF 2 INCH STEEL AND 65 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2569 080.61119 8,315
RELOCATE FACILITIES. INSTALL 267 FEET OF 4 INCH POLY AND 170 FEET OF 6 INCH POLY AND ABANDON 263 FEET OF 3 INCH STEEL AND 167 FEET OF 6 INCH STEEL ALONG SPRING GROVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2570 080.61121 55,890
RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY AND 1409 FEET OF 6 INCH POLY AND ABANDON 1469 FEET OF 6 INCH STEEL AND 445 FEET OF 8 INCH STEEL ALONG US 67 TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2571 080.61133 8,466
PURCHASE (25) MOTORIZED REGULATORS AND ABANDON (25) MOTORIZED REGULATORS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2572 080.61144 6,409
INSTALL 16 FEET OF 2 INCH AND 17 FEET OF 8 INCH POLY ALONG DONALD AND ABANDON 3 INCH FLANGE VALVE AND 23 FEET OF 3 INCH AND 9 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2573 080.61146 21,229
RELOCATE FACILITIES. INSTALL (40) POLY SERVICES AND ABANDON (40) STEEL SERVICES ALONG EAST MITCHELL STREET TO ACCOMMODATE THE CITY OF ARLINGTON PAVING AND DRAINAGE PLAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2574 080.61162 5,670
RELOCATE FACILITIES. INSTALL 339 FEET OF 2 INCH POLY ALONG BEVERLY DRIVE AND ABANDON 334 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF BEVERLY HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEVERLY HILLS
SYSTEM INTEGRITY DECEMBER
2575 080.61165 782
ABANDON 2835 FEET OF 2 INCH, 1577 FEET OF 3 INCH AND 1580 FEET OF 8 INCH STEEL ALONG HOMEVIEW AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2576 080.61182 11,116
INSTALL 1275 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 4 INCH AND 300 FEET OF 8 INCH CAST IRON ALONG SCURRY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2577 080.61183 11,413
INSTALL 1455 FEET OF 2 INCH POLY ALONG SAN JACINTO STREET AND ABANDON 200 FEET OF 4 INCH, 1000 FEET OF 8 INCH CAST IRON AND 335 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2578 080.61187 4,021
INSTALL 1260 FEET OF 2 INCH AND 900 FEET OF 4 INCH POLY ALONG THE STREETS OF CROSSING AT LICK CREEK PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JUNE
2579 080.61193 15,633
RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH AND 171 FEET OF 4 INCH POLY ALONG NANCY DRIVE AND ABANDON 40 FEET OF 2 INCH POLY AND 37 FEET OF 3 INCH AND 106 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF GLEN ROSE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE
SYSTEM INTEGRITY DECEMBER
2580 080.61196 96,728
INSTALL (2) DISTRICT REGULATOR STATIONS AND 200 FEET OF 6 INCH STEEL ALONG COMANCHE STREET AND ABANDON (2) DISTRICT REGULLATOR STATIONS AND 200 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 89 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2581 080.61204 1,653
INSTALL 380 FEET OF 2 INCH POLY AND ABANDON 377 FEET OF 2 INCH STEEL ALONG MLK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE
SYSTEM INTEGRITY DECEMBER
2582 080.61216 14,298
INSTALL 59 FEET OF 2 INCH AND 8 FEET OF 4 INCH AND 6 FEET OF 8 INCH STEELK ALONG KC30 AND ABANDON 60 FEET OF 2 INCH, 4 FEET OF 4 INCH AND 5 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE
SYSTEM INTEGRITY DECEMBER
2583 080.61227 19,135
INSTALL 1420 FEET OF 4 INCH POLY ALONG MAURICE AVENUE AND ABANDON 474 FEET OF 6 INCH STEEL, 428 FEET OF 4 INCH, 166 FEET OF 6 INCH CAST IRON AND 86 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2584 080.61228 106,233 INSTALL 2750 FEET OF 2 INCH POLY AND 860 FEET OF 4 INCH POLY ALONG THE STREETS OF BROOKSIDE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH SEPTEMBER
2585 080.61233 192 INSTALL 280 FEET OF 2 INCH AND 670 FEET OF 4 INCH POLY ALONG STREETS OF AUSTIN'S ESTATES PHASE 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH APRIL
2586 080.61253 59,827 INSTALL 3850 FEET OF 2 INCH AND 660 FEET OF 6 INCH POLY ALONG THE STREETS OF ANNA CROSSING PHASE 5. RESIDENTIAL ANNA GROWTH JUNE
2587 080.61259 13,815
RELOCATE FACILITIES. INSTALL 1900 FEET OF 4 INCH POLY AND ABANDON 940 FEET OF 3 INCH POLY ALONG AIRPORT ROAD TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2588 080.61272 3,700
INSTALL 520 FEET OF 2 INCH POLY ALONG EAST MORRIS STREET AND ABANDON 510 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE
SYSTEM INTEGRITY DECEMBER
2589 080.61273 5,667
INSTALL 535 FEET OF 2 INCH POLY ALONG MAGNOLIA STREET AND ABANDON 108 FEET OF 2 INCH POLY AND 163 FEET OF 3 INCH AND 688 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
2590 080.61278 8,006
INSTALL 177 FEET OF 2 INCH POLY AND 473 FEET OF 4 INCH POLY ALONG GRAYSON STREET. ABANDON 546 FEET OF 2 INCH STEEL AND 6 FEET OF 2 INCH POLY AND 8 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS POTTSBORO
SYSTEM INTEGRITY DECEMBER
2591 080.61300 6,185 INSTALL 1,420 FEET OF 2 INCH AND 3,800 FEET OF 4 INCH POLY ALONG BOX CANYON DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NOLANVILLE GROWTH OCTOBER
2592 080.61305 4,418
RELOCATE FACILITIES. INSTALL 116 FEET OF 4 INCH POLY ALONG HARDIN STREET AND ABANDON 116 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
2593 080.61307 30,199
RELOCATE FACILITIES. INSTALL 1584 FEET OF 4 INCH POLY AND ABANDON 414 FEET OF 2 INCH STEEL AND 1338 FEET OF 4 INCH POLY ALONG CULLUM DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2594 080.61310 83,204
INSTALL 15 FEET OF 2 INCH POLY AND 22 FEET OF 3 INCH POLY AND 1538 FEET OF 8 INCH POLY ALONG COIT ROAD AND ABANDON 23 FEET OF 2 INCH STEEL AND 28 FEET OF 3 INCH STEEL AND 1491 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
2595 080.61312 22,259
INSTALL 1829 FEET OF 2 INCH POLY AND ABANDON 1795 FEET OF 3 INCH STEEL AND 670 FEET OF 4 INCH STEEL AND 62 FEET OF 4 INCH POLY ALONG OLD BETSY ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE
SYSTEM INTEGRITY DECEMBER
2596 080.61319 814
INSTALL RELIEF VALVE AT DISTRICT REGULATOR STATION 01 ALONG ORIENT AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ODELL
SYSTEM INTEGRITY DECEMBER
2597 080.61325 903
RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY ALONG DUTTON AVENUE AND ABANDON 385 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2598 080.61326 45,621
INSTALL 2000 FEET OF 4 INCH AND 370 FEET OF 2 INCH POLY ALONG KIEST BOULEVARD AND ABANDON 2000 FEET OF 8 INCH AND 370 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2599 080.61327 87,782
INSTALL 3668 FEET OF 4 INCH POLY AND ABANDON 1415 FEET OF 4 INCH AND 303 FEET OF 6 INCH CAST IRON ALONG BIGHAM BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2600 080.61338 41,875
INSTALL 52 FEET OF 2 INCH POLY ALONG HAYNIE AVENUE AND 1556 FEET OF 4 INCH POLY AND ABANDON 1553 FEET OF 6 INCH CAST IRON AND 3 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
2601 080.61343 47,686
INSTALL 2300 FEET OF 4 INCH POLY ALONG LOCKE AVENUE AND ABANDON 1229 FEET OF 8 INCH, 821 FEET OF 4 INCH CAST IRON, 305 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2602 080.61347 19,022
INSTALL 3,250 FEET OF 4 INCH POLY AND 4,850 FEET OF 2 INCH POLY ALONG THE STREETS OF CREEKSIDE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH APRIL
2603 080.61348 20,141
RELOCATE FACILITIES. ABANDON 242 FEET OF 1.25 INCH POLY AND 1973 FEET OF 2 INCH POLY ALONG LAKESHORE DRIVE TO ACCOMMODATE CITY OF LITTLE ELM STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LITTLE ELM
SYSTEM INTEGRITY DECEMBER
2604 080.61362 109,427
INSTALL 610 FEET OF 4 INCH POLY AND 1936 FEET OF 12 INCH POLY ALONG MALVEY ROAD AND ABANDON 1108 FEET OF 4 INCH POLY AND 1926 FEET OF 12 INCH STEEL AND 25 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2605 080.61371 38,872
RELOCATE FACILITIES. INSTALL 1587 FEET OF 4 INCH POLY ALONG EDGEHILL ROAD AND ABANDON 620 FEET OF 6 INCH AND 235 FEET OF 8 INCH CAST IRON TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2606 080.61373 13,987
INSTALL 3458 FEET OF 2 INCH POLY AND 761 FEET OF 4 INCH POLY AND 696 FEET OF 6 INCH POLY ALONG PORTER FARM ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2607 080.61375 9,851
RELOCATE FACILITIES. INSTALL 353 FEET OF 4 INCH POLY AND ABANDON 1225 FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY ALONG HILLDALE ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2608 080.61392 165,242
INSTALL 3895 FEET OF 10 INCH STEEL AND ABANDON 3751 FEET OF 12 INCH STEEL ALONG LINE M IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE
SYSTEM INTEGRITY DECEMBER
2609 080.61398 24,269 INSTALL 1175 FEET OF 4 INCH POLY AND ABANDON 1143 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 90 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2610 080.61404 1,728
INSTALL 127 FEET OF 4 INCH POLY ALONG SENLAC DRIVE AND ABANDON 111 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
2611 080.61408 3,478
INSTALL 315 FEET OF 2 INCH POLY ALONG ORCHARD STREET AND ABANDON 297 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG
SYSTEM INTEGRITY DECEMBER
2612 080.61409 7,628 INSTALL 2900 FEET OF 4 INCH POLY AND INSTALL 4400 FEET OF 2 INCH POLY ALONG E. BELT LINE RD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL IRVING GROWTH OCTOBER
2613 080.61410 21,804
INSTALL 1900 FEET OF 4 INCH ALONG MACARTHUR BOULEVARD AND ABANDON 1200 FEET OF 4 INCH AND 1260 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2614 080.61414 7,847
RELOCATE FACILITIES. INSTALL 1104 FEET OF 2 INCH POLY AND 1877 FEET OF 8 INCH POLY AND 555 FEET OF 12 INCH STEEL AND ABANDON 350 FEET OF 2 INCH STEEL AND 890 FEET OF 2 INCH POLY AND 185 FEET OF 6 INCH STEEL AND 3385 FEET OF 8 INCH STEEL AND 95 FEET OF 8 INCH POLY AND 375 FEET OF 12 INCH STEEL ALONG DALLAS STREETS TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2615 080.61417 263 INSTALL 4100 FEET OF 4 INCH POLY ALONG SHERMAR LANE TO SERVE THE HARPER SPRINGS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PRINCETON GROWTH JUNE
2616 080.61418 2,132
INSTALL 4200 FEET OF 2 INCH POLY ALONG THE STREETS OF THE FIRST PHASE OF THE HARPER SPRINGS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH
2617 080.61436 28,542
RELOCATE FACILITIES. INSTALL 1047 FEET OF 2 INCH POLY ALONG CAIRN CIRCLE AND ABANDON 1040 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2618 080.61438 9,838
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG MORRISON STREET AND ABANDON 500 FEET OF 1.25 INCH STEEL TO ACCOMMODATE CITY OF ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
2619 080.61442 353 INSTALL 1775 FEET OF 2 INCH POLY ALONG STREETS OF MISSION RANCH PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JULY
2620 080.61444 53,196
RELOCATE FACILITIES. INSTALL 1076 FEET OF 6 INCH AND 958 FEET OF 2 INCH POLY ALONG WAYSIDE AVENUE AND ABANDON 1062 FEET OF 6 INCH, 963 FEET OF 2 INCH STEEL, 73 FEET OF 6 INCH AND 187 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2621 080.61448 7,306
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG UPLAND AND ABANDON 380 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
2622 080.61453 40,860
RELOCATE FACILITIES. INSTALL 3100 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG HOUSTON STREET AND ABANDON 3080 FEET OF 4 INCH, 90 FEET OF 2 INCH STEEL AND 90 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
2623 080.61459 3,311
INSTALL 4,800 FEET OF 2 INCH AND 2,900 FEET OF 4 INCH POLY ALONG THE STREETS OF THE COVE PHASE 3 SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WAXAHACHIE GROWTH JUNE
2624 080.61461 5,259
RELOCATE FACILITIES. INSTALL 340 FEET OF 4 INCH POLY ALONG DEER PARK ROAD AND ABANDON 830 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DECATUR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR
SYSTEM INTEGRITY DECEMBER
2625 080.61462 29,649
RELOCATE FACILITIES. INSTALL 21 FEET OF 2 INCH POLY AND 223 FEET OF 4 INCH POLY AND ABANDON 25 FEET OF 2 INCH STEEL AND 216 FEET OF 4 INCH STEEL ALONG KING ROW TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2626 080.61475 31,594
RELOCATE FACILITIES. INSTALL 185 FEET OF 2 INCH, 1060 FEET OF 4 INCH AND 2940 FEET OF 6 INCH POLY ALONG 5TH STREET AND ABANDON 2495 FEET OF 3 INCH STEEL, 175 FEET OF 2 INCH AND 1050 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF SACHSE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE
SYSTEM INTEGRITY DECEMBER
2627 080.61482 21,723
INSTALL 1455 FEET OF 2 INCH POLY ALONG KENWELL AND ABANDON 1455 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2628 080.61484 28,343
INSTALL 1020 FEET OF 4 INCH POLY AND 1640 FEET OF 2 INCH POLY ALONG STREETS OF MORNINGSTAR SECTION 6 PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
2629 080.61487 7,403 INSTALL FLAG POLE FOR USE AT BRYAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
2630 080.61488 24,174
RELOCATE FACILITIES. INSTALL 1000 FEET OF 2 INCH POLY ALONG LA SALLE DRIVE AND ABANDON 1000 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
2631 080.61493 2,383
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY ALONG LATTIMORE DRIVE AND ABANDON 220 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2632 080.61502 1,413
INSTALL 300 FEET OF 4 INCH POLY ALONG COGGIN AND ABANDON 300 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
2633 080.61533 10,005
INSTALL 583 FEET OF 2 INCH POLY AND ABANDON 563 FEET OF 2 INCH STEEL AND 10 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
2634 080.61537 8,660 INSTALL 2055 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA 6D. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2635 080.61538 558 ABANDON DISTRICT REGULATOR STATION 28 ALONG RANDOLPH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
2636 080.61540 48,220
INSTALL 2260 FEET OF 6 INCH POLY ALONG COBER DRIVE AND ABANDON 2260 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
2637 080.61544 59,482
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY AND 720 FEET OF 4 INCH POLY AND 1210 FEET OF 6 INCH POLY ALONG VALERA COURT AND ABANDON 114 FEET OF 2 INCH STEEL AND 42 FEET OF 4 INCH POLY AND 765 FEET OF 6 INCH STEEL AND 46 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2638 080.61545 709
RELOCATE FACILITIES. INSTALL 30 FEET OF 4 INCH POLY ALONG AUGUSTA STREET AND ABANDON 20 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF THE COLONY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 91 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2639 080.61552 34,285
INSTALL 2790 FEET OF 4 INCH POLY AND ABANDON 1475 FEET OF 8 INCH STEEL AND 390 FEET OF 8 INCH POLY ALONG NORTH FIELDER ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2640 080.61554 4,112 INSTALL 20 FEET OF 4 INCH, 2088 FEET OF 6 INCH AND 4892 FEET OF 8 INCH POLY ALONG MOORE STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROUND ROCK GROWTH DECEMBER
2641 080.61558 1,153
INSTALL FLOW SAFE RELIEF VALVE AND ABANDON ROKWELL RELIEF VALVE AT CLARKSVILLE DISTRICT REGULATOR STATION 7 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE
SYSTEM INTEGRITY DECEMBER
2642 080.61566 9,897
RELOCATE FACILITIES. INSTALL 503 FEET OF 2 INCH POLY AND 235 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 2 INCH STEEL AND 480 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND 2 FEET OF 4 INCH STEEL AND 32 FEET OF 4 INCH POLY ALONG JOHNSON STREET TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
2643 080.61573 13,918
INSTALL 1428 FEET OF 2 INCH POLY ALONG BROOKHOLLOW AND ABANDON 1403 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TYLER
SYSTEM INTEGRITY DECEMBER
2644 080.61594 121,623,057 DALLAS CAST IRON REPLACEMENT FUNCTIONAL PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2645 080.61595 43,472,054 FUNCTIONAL FORT WORTH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2646 080.61597 9,249,207 FUNCTIONAL DALLAS UNIVERSITY PARK CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2647 080.61600 11,306
RELOCATE FACILITIES. INSTALL 781 FEET OF 2 INCH POLY AND ABANDON 768 FEET OF 2 INCH STEEL ALONG OVERLAKE STREET TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
2648 080.61610 190,702 INSTALL 1600 FEET OF 4 INCH AND 1595 OF 2 INCH POLY FOR 80 NEW RESIDENTIAL CUSTOMERS IN THE URBAN COMMONS. RESIDENTIAL DALLAS GROWTH DECEMBER
2649 080.61630 3,039
INSTALL GROUNDBED AND POLE ALONG 2ND STREET IN ORDER TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
2650 080.61634 25,258
INSTALL 1110 FEET OF 2 INCH AND 380 FEET OF 4 INCH POLY AND ABANDON 740 FEET OF 4 INCH, 370 FEET OF 6 INCH AND 360 FEET OF 8 INCH CAST IRON ALONG PEMBROKE AVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2651 080.61641 10,866 INSTALL WELD SLEEVE ALONG LINE D DIG IN DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
2652 080.61643 238,240
RELOCATE FACILITIES. INSTALL 3469 FEET OF 12 INCH STEEL AND ABANDON 2500 FEET OF 6 INCH STEEL ALONG THE STREETS OF PRIME POINTE TO ACCOMODATE PRIME POINTE DEVELOPMENT IN DALLAS COUNTY. ALL CUSTOMERS WILMER
RELOCATION OF FACILITIES OCTOBER
2653 080.61650 19,255 INSTALL 316 FEET OF 4 INCH POLY ALONG CHALK HILL STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER
2654 080.61651 7,216
RELOCATE FACILITIES. INSTALL 345 FEET OF 2 INCH POLY AND ABANDON 365 FEET OF 2 INCH STEEL ALONG RIDGEWOOD DRIVE TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
2655 080.61652 2,067,569
RELOCATE FACILITIES. INSTALL 950 FEET OF 2 INCH, 7500 FEET OF 4 INCH AND 5750 FEET OF 6 INCH POLY ALONG CRANBROOK DRIVE AND ABANDON 1010 FEET OF 2 INCH, 325 FEET OF 3 INCH AND 1250 FEET OF 4 INCH POLY AND 420 FEET OF 2 INCH AND 5150 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEYVILLE ROADWAY IMPROVEMENTS IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
2656 080.61669 208,966
INSTALL 2025 FEET OF 2 INCH POLY AND 2581 FEET OF 4 INCH POLY ALONG THE STREETS OF PRESTON HILLS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH DECEMBER
2657 080.61671 5,285
INSTALL 250 FEET OF 4 INCH AND 30 FEET OF 6 INCH POLY ALONG PARADISE AND ABANDON 250 FEET OF 4 INCH STEEL AND 30 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
2658 080.61672 26,582
RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG LONSDALE AVENUE AND ABANDON 1300 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2659 080.61677 6,000
RELOCATE FACILITIES. INSTALL 542 FEET OF 2 INCH POLY ALONG WIND RIVER LANE AND ABANDON 420 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2660 080.61684 5,677 INSTALL 5 FEET OF 12 INCH HALF SOLE ALONG CA(2ND) EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2661 080.61686 29,488
INSTALL 2166 FEET OF 6 INCH POLY AND ABANDON 2160 FEET OF 6 INCH STEEL AND 171 FEET OF 6 INCH POLY ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2662 080.61688 (10,456)
RELOCATE FACILITIES. INSTALL 632 FEET OF 6 INCH POLY AND ABANDON 564 FEET OF 6 INCH POLY ALONG BERKSHIRE LAKE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2663 080.61691 1,673
INSTALL 2505 FEET OF 6 INCH, 1104 FEET OF 4 INCH AND 4344 FEET OF 2 INCH POLY ALONG THE STREETS OF SHADOWGLEN PHASE 2 SECTION 21A AND 21B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JUNE
2664 080.61692 23,753 INSTALL 387 FEET OF 3 INCH STEEL AND ABANDON 370 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILFORD
SYSTEM INTEGRITY DECEMBER
2665 080.61696 261 ABANDON 290 FEET OF 3 INCH POLY ALONG SANDERS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST
SYSTEM INTEGRITY DECEMBER
2666 080.61699 14,954
INSTALL 1313 FEET OF 2 INCH POLY AND ABANDON 1308 FEET OF 2 INCH STEEL ALONG DAKOTA DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2667 080.61702 21,403
INSTALL 1380 FEET OF 4 INCH POLY ALONG WEST CELESTE DRIVE AND ABANDON 1370 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2668 080.61715 869
INSTALL 16 FEET OF 8 INCH POLY AND ABANDON 30 FEET OF 3 INCH STEEL AND 25 FEET OF 8 INCH STEEL ALONG HAMPTON ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2669 080.61716 5,399
RELOCATE FACILITIES. INSTALL 624 FEET OF 2 INCH POLY ALONG EAST ELLIS STREET AND ABANDON 624 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF LLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LLANO
SYSTEM INTEGRITY DECEMBER
2670 080.61718 168,517
INSTALL 1470 FEET OF 2 INCH POLY AND 2217 FEET OF 4 INCH POLY ALONG PARK LANE AND ABANDON 1320 FEET OF 2 INCH STEEL AND 665 FEET OF 2 INCH POLY AND 2210 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 92 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2671 080.61721 11,325
RELOCATE FACILITIES. INSTALL 370 FEET OF 6 INCH POLY AND ABANDON 370 FEET OF 6 INCH POLY ALONG STEINBECK BEND ROAD TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2672 080.61724 10,288
INSTALL 510 FEET OF 4 INCH POLY AND ABANDON 408 FEET OF 3 INCH POLY ALONG BEADY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2673 080.61729 8 INSTALL 3800 FEET OF 2 INCH, 70 FEET OF 4 INCH POLY ALONG THE STREETS OF HIGHLANDS PHASE 10 SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH JANUARY
2674 080.61750 14,352
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH AND 80 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL ALONG HAWKINS STREET TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
2675 080.61774 5,376
INSTALL 24 FEET OF 2 INCH AND 14 FEET OF 4 INCH POLY AND ABANDON 12 FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY AND REPLACE DRS01 ALONG SHERMAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
2676 080.61776 0 INSTALL 1400 FEET OF 2 INCH POLY ALONG THE STREETS OF CROSSPOINTE RESIDENTIAL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CORINTH GROWTH JANUARY
2677 080.61787 7,284
RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH POLY AND ABANDON 400 FEET OF 6 POLY ALONG INDUSTRIAL BOULEVARD TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
2678 080.61788 1,316
INSTALL 4680 2 INCH 3840 FEET 4 INCH POLY FOR NEW BELLA TERRA SUBDIVISION PHASE 1 ALONG SOUTH 31 STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL TEMPLE GROWTH SEPTEMBER
2679 080.61794 11,776
INSTALL 1 FEET OF 3 INCH POLY AND 32 FEET OF 4 INCH POLY AND 35 FEET OF 6 INCH POLY ALONG WEST PARK STREET, ABANDON 30 FEET OF 2 INCH POLY AND 24 FEET OF 6 INCH STEEL AND 4 FEET OF 6 INCH POLY, AND REPLACE DRS24 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
2680 080.61795 19,084
RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 830 FEET OF 2 INCH STEEL ALONG BRIARMEADOW DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2681 080.61799 25,557
INSTALL 700 FEET OF 4 INCH POLY ALONG 26TH STREET AND ABANDON 413 FEET OF 3 INCH, 141 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
2682 080.61807 21,180 INSTALL (5) 220 STYLE WELD SLEEVES ALONG LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2683 080.61812 2,474
INSTALL 487 FEET OF 6 INCH AND 941 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH NORTH SECTION 20A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH OCTOBER
2684 080.61840 5,743 INSTALL 175 FEET OF 4 INCH POLY MAIN ALONG US 380. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PRINCETON GROWTH DECEMBER
2685 080.61842 25,887 INSTALL 640 FEET OF 4 INCH POLY ALONG EXCHANGE PKWY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ALLEN GROWTH JUNE
2686 080.61845 745 ABANDON 9 FEET OF 2 INCH AND 294 FEET OF 3 INCH STEEL ALONG SH22 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST
SYSTEM INTEGRITY DECEMBER
2687 080.61850 537 INSTALL 3019 FEET OF 4 INCH AND 3543 FEET OF 2 INCH POLY ALONG STREETS OF STILLWATER PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JUNE
2688 080.61855 3,967
INSTALL 516 FEET OF 2 INCH POLY AND ABANDON 312 FEET OF 2 INCH STEEL AND 155 FEET OF 4 INCH STEEL AND 64 FEET OF 2 INCH POLY ALONG FILLMORE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2689 080.61873 399,462 INSTALL 8817 FEET OF 2 INCH, 2493 FEET OF 6 INCH AND 770 FEET OF 12 INCH POLY ALONG THE STREETS OF HOMESTEAD AT THE COLLUMS. RESIDENTIAL CELINA GROWTH SEPTEMBER
2690 080.61884 38,812
RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH AND 1135 FEET OF 4 INCH AND 660 FEET OF 6 INCH POLY ALONG CRAWFORD AND ABANDON 1990 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FATE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FATE
SYSTEM INTEGRITY DECEMBER
2691 080.61891 10,244
INSTALL 665 FEET OF 2 INCH POLY ALONG MILLER AND ABANDON 665 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR
SYSTEM INTEGRITY DECEMBER
2692 080.61892 8,948
INSTALL 300 FEET OF 2 INCH POLY ALONG HIGHWAY 380 AND ABANDON 300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THROCKMORTON
SYSTEM INTEGRITY DECEMBER
2693 080.61893 7,151
INSTALL 335 FEE OF 2 INCH POLY ALONG IDAHO AND ABANDON 335 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR
SYSTEM INTEGRITY DECEMBER
2694 080.61899 6,099
RELOCATE FACILITIES. INSTALL 70 FEET OF 2 INCH AND 930 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 2 INCH AND 900 FEET OF 4 INCH POLY ALONG FIREWHEEL DRIVE TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
2695 080.61903 5,889
INSTALL 100 FEET OF 2 INCH AND 20 FEET OF 4 INCH AND 250 FEET OF 8 INCH POLY ALONG UNIVERSITY HILLS BOULEVARD AND ABANDON 98 FEET OF 2 INCH AND 18 FEET OF 3 INCH AND 245 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2696 080.61906 0
INSTALL 2,375 FEET OF 2 INCH AND 4,600 FEET OF 4 INCH POLY ALONG THE STREETS OF SANDBROCK RANCH PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUBREY GROWTH JANUARY
2697 080.61912 10,445
INSTALL 400 FEET OF 4 INCH POLY ALONG EAST WALKER AND ABANDON 400 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
2698 080.61916 10,052
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG GOSHEN AND ABANDON 280 FEET OF 2 INCH POLY AND 620 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF CANTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CANTON
SYSTEM INTEGRITY DECEMBER
2699 080.61918 241,640
RELOCATE FACILITIES. INSTALL 375 FEET OF 4 INCH AND 60 FEET OF 6 INCH POLY ALONG WENTWORTH STREET AND ABANDON 375 FEET OF 4 INCH AND 60 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY APRIL
2700 080.61919 354
ABANDON DISTRICT REGULATOR STATION 3 IN MCGREGOR IN MCLENNAN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
2701 080.61928 7,202
RELOCATE FACILITIES. INSTALL 2880 FEET OF 4 INCH POLY ALONG STUART ROAD AND ABANDON 59 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 93 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2702 080.61930 13,145
RELOCATE FACILITIES. INSTALL 1297 FEET OF 2 INCH POLY AND ABANDON 816 FEET OF 2 INCH POLY ALONG COUNTRY CLUB ROAD TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
2703 080.61931 22,392
RELOCATE FACILITIES. INSTALL 1710 FEET OF 2 INCH POLY ALONG 4TH STREET AND ABANDON 1480 FEET OF 2 INCH AND 270 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF KENNEDALE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KENNEDALE
SYSTEM INTEGRITY DECEMBER
2704 080.61932 3,492
RELOCATE FACILITIES. INSTALL 70 FEET OF 4 INCH POLY ALONG 28TH STREET AND ABANDON 50 FEET OF 4 INCH STEEL TO ACCOMMODATE TEXRAIL STORM DRAIN PROJECT. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES MARCH
2705 080.61937 36,712
RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH AND 400 FEET OF 2 INCH POLY ALONG FM148 AND ABANDON 1310 FEET OF 4 INCH STEEL AND 290 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF SCURRY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SCURRY
SYSTEM INTEGRITY DECEMBER
2706 080.61944 1,246
RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY ALONG 1ST AVENUE AND ABANDON 72 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2707 080.61946 534
RELOCATE FACILITIES. ABANDON 346 FEET OF 4 INCH POLY ALONG SIMONDALE DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2708 080.61947 10,151
INSTALL DISTRICT REGULATOR STATION AND RELIEF VALVE AT CORSICANA DISTRICT REGULATOR STATION 20 AND ABANDON DISTRICT REGULATOR STATION AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
2709 080.61964 36,554
INSTALL 1300 FEET OF 4 INCH POLY ALONG SHERWOOD DRIVE AND ABANDON 1050 FEET OF 3 INCH STEEL AND 50 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
2710 080.61965 399,982
INSTALL 17,000 FEET OF 6 INCH STEEL AND ABANDON 17,000 FEET OF 3 INCH STEEL ON LINE S6 IN ELLIS COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK
SYSTEM INTEGRITY DECEMBER
2711 080.61975 37,018
INSTALL 1785 FEET OF 4 INCH AND 2315 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR SECTION 5 PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
2712 080.61985 8,597
INSTALL 430 FEET OF 6 INCH AND 85 FEET OF 2 INCH POLY ALONG 7TH STREET AND ABANDON 428 FEET OF 8 INCH AND 346 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2713 080.61989 30,373
RELOCATE FACILITIES. INSTALL 2357 FEET OF 4 INCH POLY ALONG SOMERVILLE PLACE AND ABANDON 2620 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2714 080.61991 12,832
RELOCATE FACILITIES. INSTALL 520 FEET OF 4 INCH AND 40 FEET OF 2 INCH POLY ALONG ELLA YOUNG DRIVE AND ABANDON 520 FEET OF 4 INCH AND 40 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2715 080.61992 46,281 INSTALL 2387 FEET OF 4 INCH POLY ALONG HIDDEN VISTA BOULEVARD TO SERVE HIGH COUNTRY PH 1. ALL CUSTOMERS BURLESON GROWTH DECEMBER
2716 080.61994 17,616
RELOCATE FACILITIES. INSTALL 380 FEET OF 6 INCH AND 180 FEET OF 2 INCH POLY ALONG 23RD STREET AND ABANDON 380 FEET OF 6 INCH AND 180 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
2717 080.61995 761,181
RELOCATE FACILITIES. ABANDON 96 FEET OF 2 INCH POLY AND 1046 FEET OF 10 INCH STEEL ALONG SMITH TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2718 080.61997 (41)
INSTALL 350 FEET OF 2 INCH AND 1,975 FEET OF 4 INCH POLY ALONG THE STREETS OF WILDRIDGE RESIDENTIAL PHASES 4A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH MARCH
2719 080.61998 744
INSTALL 3,350 FEET OF 2 INCH AND 275 FEET OF 4 INCH POLY ALONG THE STREETS OF WILDRIDGE RESIDENTIAL PHASES 4B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH JUNE
2720 080.61999 18,523 INSTALL 146 FEET OF 6 INCH AND 2106 FEET OF 2 INCH POLY ALONG THE STREETS OF HIDDEN VISTA PHASE 9. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BURLESON GROWTH DECEMBER
2721 080.62004 23,169
INSTALL 2200 FEET OF 2 INCH ALONG TAYLOR STREET AND ABANDON 1492 FEET OF 4 INCH STEEL, 756 FEET OF 3 INCH, 105 FEET OF 4 INCH POLY AND 160 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
2722 080.62014 20,526
RELOCATE FACILITIES. INSTALL 3138 FEET OF 4 INCH POLY ALONG TEX BOULEVARD AND ABANDON 2621 FEET OF 4 INCH CAST IRON AND 40 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2723 080.62018 (418)
RELOCATE FACILITIES. INSTALL 296 FEET OF 2 INCH POLY ALONG BERRY AND ABANDON 4 INCH STEEL TO ACCOMMODATE NEW DEVELOPMENT IN FORT WORTH. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES MARCH
2724 080.62019 80,950
RELOCATE FACILITIES. INSTALL 2500 FEET OF 8 INCH POLY ALONG TIERNEY ROAD AND ABANDON 2353 FEET OF 16 INCH, 69 FEET OF 4 INCH, 39 FEET OF 2 INCH STEEL AND 2239 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2725 080.62025 4,592 INSTALL 4617 FEET OF 8 INCH POLY ALONG THE STREETS OF PECAN SQUARE. ALL CUSTOMERS NORTHLAKE GROWTH JULY
2726 080.62028 1,086 INSTALL 920 FEET OF 4 INCH AND 3412 FEET OF 2 INCH POLY ALONG THE STREETS OF VISTA POINTE PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2727 080.62034 38,870
RELOCATE FACILITIES. INSTALL 2000 FEET OF 6 INCH POLY ALONG MIDWAY ROAD AND ABANDON 2000 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF LEWISVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
SYSTEM INTEGRITY DECEMBER
2728 080.62036 94,664
INSTALL 9460 FEET OF 4 INCH POLY ALONG DALLAS STREET AND ABANDON 7500 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICE
SYSTEM INTEGRITY DECEMBER
2729 080.62037 2,007
INSTALL 7160 FEET OF 2 INCH AND 1800 FEET OF 4 INCH POLY ALONG THE STREETS OF THE SECOND PHASE OF THE WINCHESTER SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH MARCH
2730 080.62044 20,211
INSTALL 3800 FEET OF 2 INCH POLY ALONG HIGHWAY 80 AND ABANDON 3800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 94 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2731 080.62049 6,821
RELOCATE FACILITIES. INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 680 FEET OF 2 INCH POLY ALONG FLORES DRIVE TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2732 080.62052 9,460
INSTALL MEASURING STATION AND 400 FEET OF 6 INCH POLY AND ABANDON 1400 FEET OF 6 INCH STEEL ALONG STREETS OF DALLAS GLOBAL DEVELOPMENT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2733 080.62053 51,437
INSTALL 2955 FEET OF 4 INCH AND 1623 FEET OF 2 INCH POLY ALONG AVENUE J AND ABANDON 3967 FEET OF 3 INCH STEEL AND 20 FEET OF 2 INCH STEEL AND 132 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
2734 080.62055 3,958
INSTALL 455 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 560 FEET OF 4 INCH, 92 FEET OF 3 INCH AND 25 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO
SYSTEM INTEGRITY DECEMBER
2735 080.62065 4,901
INSTALL 495 FEET OF 2 INCH POLY ALONG SHADY OAKS STREET AND ABANDON 395 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET
SYSTEM INTEGRITY DECEMBER
2736 080.62070 10,037
RELOCATE FACILITIES. INSTALL 150 FEET OF 4 INCH POLY ALONG WOODARD AVENUE AND ABANDON 1074 FEET OF 4 INCH STEEL, 10 FEET OF 3 INCH AND 37 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
2737 080.62072 5,256 REPLACE DISTRICT REGULATOR STATION 1 ALONG OKLAHOMA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
2738 080.62075 24 INSTALL 6598 FEET OF 2 INCH POLY AND 3424 FEET OF 4 INCH POLY ALONG STREETS OF PECAN SQUARE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTHLAKE GROWTH MARCH
2739 080.62079 34,932
INSTALL 770 FEET OF 6 INCH, 985 FEET OF 4 INCH AND 1460 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR SECTION 6 PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
2740 080.62084 1,802
RELOCATE FACILITIES. INSTALL 44 FEET OF 2 INCH POLY ALONG HAYS STREET AND ABANDON 44 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
2741 080.62089 617 ABANDON 180 FEET OF 6 INCH STEEL ALONG GLENBROOK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2742 080.62090 39,621
RELOCATE FACILITIES. INSTALL 400 FEET OF 8 INCH POLY, 380 FEET OF 8 INCH AND 440 FEET OF 4 INCH STEEL ALONG COUNTY ROAD 110 AND ABANDON 250 FEET OF 8 INCH POLY, 270 FEET OF 8 INCH AND 240 FEET OF 4 INCH STEEL TO ACCOMMODATE COUNTY ROAD RELOCATION PROJECT. ALL CUSTOMERS GEORGETOWN
RELOCATION OF FACILITIES MAY
2743 080.62099 2,131
INSTALL 125 FEET OF 4 INCH AND 225 FEET OF 2 INCH POLY ALONG WEST 26TH STREET AND ABANDON 125 FEET OF 3 INCH AND 225 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
2744 080.62102 21,595
RELOCATE FACILITIES. INSTALL 1546 FEET OF POLY ALONG SHANNON AND ABANDON 205 FEET OF 2 INCH STEEL AND 1580 FEET OF 3 INCH AND 6 INCH POLY TO ACCOMMODATE CITY OF GEORGETOWN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY DECEMBER
2745 080.62121 48,731 INSTALL 2415 FEET OF 8 INCH POLY AND 860 FEET OF 4 INCH POLY ALONG STATE HIGHWAY 81. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH SEPTEMBER
2746 080.62122 100,294 INSTALL 8285 FEET OF 8 INCH POLY ALONG US HWY 81. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORT WORTH GROWTH OCTOBER
2747 080.62123 116,736
RELOCATE FACILITIES. INSTALL 597 FEET OF 4 INCH POLY AND ABANDON 514 FEET OF 4 INCH POLY ALONG FEDERAL AIRPORT AUTHORITY BOULEVARD TO ACCOMMODATE CONSTRUCTION OF UNDERROUND WALKWAY TUNNEL. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES SEPTEMBER
2748 080.62130 1,437 INSTALL 2085 FEET OF 2 INCH POLY AND 4160 FEET OF 4 INCH POLY ALONG THE STREETS OF HARBOR LAKES 14. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRANBURY GROWTH SEPTEMBER
2749 080.62139 3,746
RELOCATE FACILITIES. INSTALL 324 FEET OF 2 INCH ALONG PALOMA DRIVE AND ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE COUNTY ROAD WIDENING PROJECT. ALL CUSTOMERS ROUND ROCK
RELOCATION OF FACILITIES MARCH
2750 080.62146 7,330
INSTALL 430 FEET OF 2 INCH POLY ALONG EMERSON LANE AND ABANDON 290 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2751 080.62151 12,652
INSTALL 1525 FEET OF 4 INCH POLY ALONG CALHOUN STREET AND ABANDON 493 FEET OF 12 INCH STEEL AND 507 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2752 080.62157 66,323
INSTALL 100 FEET OF 4 INCH STEEL AND REGULATOR STATION NEAR THE INTERSECTION OF SH 114 AND TROPHY LAKE DRIVE TO SERVE CHARLES SCHWAB SCHOOL CAMPUS. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WESTLAKE GROWTH JUNE
2753 080.62160 35,045
RELOCATE FACILITIES. INSTALL 1460 FEET OF 4 INCH AND 1140 FEET OF 2 INCH POLY ALONG FM 984 AND ABANDON 2600 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF BARDWELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARDWELL
SYSTEM INTEGRITY DECEMBER
2754 080.62174 865
RELOCATE FACILITIES. INSTALL 170 FEET OF 2 INCH POLY ALONG FOXT STREET AND ABANDON 213 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CALDWELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALDWELL
SYSTEM INTEGRITY DECEMBER
2755 080.62177 5,646
INSTALL 5900 FEET OF 2 INCH, 1300 FEET OF 4 INCH AND 1350 FEET OF 6 INCH POLY ALONG THE STREETS OF WOODLAND CREEK PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH JUNE
2756 080.62178 182,770 INSTALL 1350 FEET OF 6 INCH POLY ALONG FM 35. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROYSE CITY GROWTH JUNE
2757 080.62184 200 ABANDON DISTRICT REGULATOR STATION 11 IN MARLIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
2758 080.62185 318
ABANDON DISTRICT REGULATOR STATION 02 AND 80 FEET OF 4 INCH STEEL AND 13 FEET OF 4 INCH POLY ALONG JEFFERSON SOUTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
2759 080.62192 9,815
RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH AND 25 FEET OF 2 INCH POLY ALONG ALMENA ROAD AND ABANDON 150 FEET OF 6 INCH AND 20 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF RIVER OAKS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RIVER OAKS
SYSTEM INTEGRITY DECEMBER
2760 080.62202 5,190
RELOCATE FACILITIES. INSTALL 531 FEET OF 2 INCH POLY AND ABANDON 448 FEET OF 2 INCH STEEL ALONG ELIZABETH STEET TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
SYSTEM INTEGRITY DECEMBER
2761 080.62203 11,125
INSTALL 800 FEET OF 8 INCH POLY ALONG BRENTWOOD STAIR ROAD AND ABANDON 800 FEET OF 16 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 95 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2762 080.62204 28,491
RELOCATE FACILITIES. INSTALL 2850 FEET OF 4 INCH AND 250 FEET OF 2 INCH POLY ALONG DENISON STREET AND ABANDON 1863 FEET OF 3 INCH STEEL, 624 FEET OF 3 INCH, 44 FEET OF 2 INCH POLY, AND 100 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
SYSTEM INTEGRITY DECEMBER
2763 080.62206 37,359
RELOCATE FACILITIES. INSTALL 1512 FEET OF 2 INCH, 1323 FEET OF 4 INCH POLY AND ABANDON 2467 FEET OF 3 INCH STEEL AND 66 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
SYSTEM INTEGRITY DECEMBER
2764 080.62210 7,971
RELOCATE FACILITIES. INSTALL 492 FEET OF 2 INCH, 114 FEET OF 4 INCH POLY AND ABANDON 492 FEET OF 2 INCH AND 92 FEET OF 4 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG PEGGY DRIVE TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
SYSTEM INTEGRITY DECEMBER
2765 080.62211 36,417
RELOCATE FACILITIES. INSTALL 1760 FEET OF 2 INCH POLY AND ABANDON 1744 FEET OF 2 INCH, 26 FEET OF 4 INCH STEEL ALONG LARRY STREET TO ACCOMMODATE CITY OF HALTOM CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
SYSTEM INTEGRITY DECEMBER
2766 080.62212 30,989
RELOCATE FACILITIES. INSTALL 333 FEET OF 2 INCH, 1012 FEET OF 4 INCH POLY AND ABANDON 417 FEET OF 2 INCH AND 992 FEET OF 3 INCH STEEL AND 4 FEET OF 2 INCH POLY ALONG MONNA STREET TO ACCOMMODATE CITY OF HALTOM CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
SYSTEM INTEGRITY DECEMBER
2767 080.62213 503,203
RELOCATE FACILITIES. INSTALL 2157 FEET OF 6 INCH POLY AND ABANDON 2157 FEET OF 2 INCH STEEL ALONG KERLEY AND DUNCAN STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY OCTOBER
2768 080.62214 14 INSTALL 230 FEET OF 2 INCH POLY ALONG HIGHWAY 121. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL EULESS GROWTH JUNE
2769 080.62215 49,587 INSTALL 4300 FEET OF 2 INCH AND 3430 FEET OF 4 INCH POLY ALONG HIGH BLUFF DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH NOVEMBER
2770 080.62216 (109)
RELOCATE FACILITIES. INSTALL 48 FEET OF 2 INCH POLY ALONG DICKASON AVENUE AND ABANDON 35 FEET OF 2 INCH POLY TO ACCOMMODATE DEVELOPER VAULT INSTALLATION. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES MARCH
2771 080.62218 28,528
RELOCATE FACILITIES. INSTALL 1654 FEET OF 4 INCH AND 806 FEET OF 2 INCH POLY ALONG BREWSTER STREET AND ABANDON 2460 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF ROBINSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROBINSON
SYSTEM INTEGRITY DECEMBER
2772 080.62219 9,786
INSTALL 540 FEET OF 2 INCH POLY AND ABANDON 734 FEET OF 2 INCH STEEL ALONG AVENUE A TO ACCOMMODATE THE CITY OF CLIFTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
2773 080.62221 5,033
INSTALL DEEP WELL GROUND BED AND RECTIFIER AND ABANDON DEEP WELL GROUND BED AND RECTIFIER ON LINE M IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL
SYSTEM INTEGRITY DECEMBER
2774 080.62227 861 INSTALL 3000 FEET OF 4 INCH AND 3900 FEET OF 2 INCH POLY ALONG THE STREETS OF LAVON FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH APRIL
2775 080.62229 9,071
RELOCATE FACILITIES. INSTALL 223 FEET OF 6 INCH POLY ALONG OAK MILL CREEK ROAD AND ABANDON 286 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2776 080.62230 16,794 INSTALL 2650 FEET OF 2 INCH AND 1450 FEET OF 4 INCH POLY ALONG FRIEDRICH DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH NOVEMBER
2777 080.62236 16,466,216
FUNCTIONAL PROJECT TO REPLACE 5 FEET TO 250 FEET SECTIONS OF MAIN IN SOUTHEAST DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2778 080.62237 41,029
INSTALL 5800 FEET OF 2 INCH POLY, 4950 FEET OF 4 INCH POLY, AND 1800 FEET OF 6 INCH POLY ALONG STREETS OF SOUTHPOINTE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH NOVEMBER
2779 080.62261 9,089 INSTALL 410 FEET OF 2 INCH POLY ALONG AKARS AND GANO IN DALLAS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH OCTOBER
2780 080.62272 10,255 INSTALL 543 FEET OF 4 INCH AND 3579 FEET OF 2 INCH POLY ALONG THE STREETS OF PALMERA BLUFF SECTION 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL
2781 080.62276 6,091
INSTALL 800 FEET OF 2 INCH POLY AND ABANDON 618 FEET OF 2 INCH STEEL AND 88 FEET OF 2 INCH POLY ALONG CONGER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN
SYSTEM INTEGRITY DECEMBER
2782 080.62278 361,770
INSTALL 4058 FEET OF 2 INCH, 1926 FEET OF 4 INCH, 39 FEET OF 6 INCH, 746 FEET OF 12 INCH POLY AND ABANDON 706 FEET OF 3 INCH POLY, 2916 FEET OF 3 INCH AND 2062 FEET OF 6 INCH AND 1889 FEET OF 12 INCH STEEL ALONG BONHAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2783 080.62279 27,411
INSTALL 60 FEET OF 12 INCH STEEL ALONG ABRAMS ROAD AND ABANDON 60 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2784 080.62280 22,865
INSTALL 1054 FEET OF 4 INCH POLY AND ABANDON 39 FEET OF 3 INCH AND 999 FEET OF 6 INCH STEEL ALONG MAPLELEAF IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2785 080.62282 (16,744)INSTALL 320 FEET OF 2 INCH POLY ALONG ECTOR STREET AND ABANDON 320 FEET OF 2 INCH POLY. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2786 080.62283 4,186
INSTALL 175 FEET OF 4 INCH POLY ALONG CARL STREET AND ABANDON 175 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2787 080.62295 17,062
RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH POLY ALONG SUNSET STREET AND ABANDON 525 FEET OF 2 INCH AND 8355 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF SULPHUR SPRINGS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
2788 080.62296 3,010 INSTALL 7618 FEET OF 2 INCH POLY AND 7629 FEET OF 4 INCH POLY ALONG SPOTTED FAWN DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH JULY
2789 080.62297 37,314
RELOCATE FACILITIES. INSTALL 1568 FEET OF 4 INCH AND 4 FEET OF 6 INCH POLY AND ABANDON 30 FEET OF 6 INCH POLY AND 53 FEET OF 3 INCH AND 102 FEET OF 6 INCH AND 1917 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2790 080.62303 6,569
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG THE STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2791 080.62309 35,031
INSTALL 11 FEET OF 2 INCH AND 1426 FEET OF 4 INCH POLY AND ABANDON 11 FEET OF 2 INCH POLY AND 1426 FEET OF 4 INCH STEEL ALONG FAIRBROOK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 96 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2792 080.62310 43,850
INSTALL 225 FEET OF 4 INCH POLY, 2200 FEET OF 6 INCH IP POLY AND 550 FEET OF 8 INCH IP POLY ALONG LEON STREET, LEVITA, AND HIGHLAND. ABANDON 116 FEET OF 2 INCH POLY, 1450 FEET OF 3 INCH STEEL AND 380 FEET OF 2 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
2793 080.62311 2,466
INSTALL 1769 FEET OF 8 INCH, 1217 FEET OF 4 INCH AND 5557 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH WEST SECTION 4A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
2794 080.62312 45,584
INSTALL 4010 FEET OF 4 INCH, 300 FEET OF 6 INCH POLY AND ABANDON 1042 FEET OF 2 INCH AND 1066 FEET OF 3 INCH AND 150 FEET OF 4 INCH STEEL AND 395 FEET OF 2 INCH AND 1948 FEET OF 3 INCH POLY ALONG MILL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CUMBY
SYSTEM INTEGRITY DECEMBER
2795 080.62313 241,676
RELOCATE FACILITIES. INSTALL 1120 FEET OF 4 INCH POLY AND ABANDON 670 FEET OF 4 INCH STEEL AND 280 FEET OF 4 INCH POLY ALONG MAIN STREET AND AVENUE A IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY OCTOBER
2796 080.62315 14,222
RELOCATE FACILITIES. INSTALL 840 FEET OF 2 INCH POLY AND 174 FEET OF 4 INCH POLY AND ABANDON 700 FEET OF 2 INCH STEEL AND 54 FEET OF 2 INCH POLY AND 148 FEET OF 4 INCH POLY ALONG DOROTHY TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
2797 080.62328 9,561
INSTALL 425 FEET 2 INCH POLY ON PINE STREET AND ABANDON 672 FEET 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
2798 080.62332 (273)INSTALL 2720 FEET OF 4 INCH AND 632 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF CROSSING. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH MARCH
2799 080.62333 48 ABANDON 489 FEET OF 2 INCH STEEL ALONG OFFUTT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2800 080.62336 8 ABANDON DISTRICT REGULATOR STATION 8 IN TAYLOR COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2801 080.62338 3,946
INSTALL 508 FEET OF 4 INCH POLY ALONG 1ST STREET AND ABANDON 508 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE
SYSTEM INTEGRITY DECEMBER
2802 080.62339 151 ABANDON DISTRICT REGULATOR STATION 7 IN TOM GREEN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
2803 080.62341 150 ABANDON DISTRICT REGLUATOR STATION 49 IN TOM GREEN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
2804 080.62345 149
RELOCATE FACILITIES. INSTALL 240 FEET OF 6 INCH POLY ALONG SOUTH INTERSTATE 35 AND ABANDON 426 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT STORM DRAINAGE PROJECT. ALL CUSTOMERS DENTON
RELOCATION OF FACILITIES SEPTEMBER
2805 080.62357 113,506
RELOCATE FACILITIES. INSTALL 422 FEET OF 2 INCH POLY AND 1141 FEET OF 4 INCH POLY AND 14 FEET OF 6 INCH POLY AND 2279 FEET OF 8 INCH POLY AND 175 FEET OF 12 INCH POLY AND ABANDON 147 FEET OF 2 INCH POLY AND 769 FEET OF 4 INCH STEEL AND 1234 FEET OF 4 INCH POLY AND 2193 FEET OF 6 INCH STEEL AND 753 FEET OF 6 INCH POLY AND 156 FEET OF 12 INCH STEEL ALONG CAMP BOWIE BOULEVARD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2806 080.62358 46,808
RELOCATE FACILITIES. ABANDON 150 FEET OF 2 INCH STEEL AND 301 FEET OF 2 INCH POLY AND 941 FEET OF 3 INCH STEEL AND 1364 FEET OF 3 INCH POLY AND 46 FEET OF 4 INCH POLY AND 2867 FEET OF 6 INCH POLY ALONG RM 620 TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
2807 080.62359 8,592
INSTALL 257 FEET OF 2 INCH POLY AND ABANDON 416 FEET OF 2 INCH STEEL AND 69 FEET OF 2 INCH POLY ALONG 16TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP
SYSTEM INTEGRITY DECEMBER
2808 080.62365 32,577 INSTALL 2304 FEET OF 6 INCH, 2452 FEET OF 4 INCH AND 4634 OF 2 INCH POLY ALONG THE STREETS OF LARKSPUR. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
2809 080.62366 9,961
INSTALL 1062 FEET OF 2 INCH POLY AND 3 FEET OF 3 INCH POLY AND ABANDON 74 FEET OF 2 INCH POLY AND 860 FEET OF 3 INCH STEEL AND 93 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALAKOFF
SYSTEM INTEGRITY DECEMBER
2810 080.62370 3,093 INSTALL 961 FEET OF 4 INCH AND 252 FEET OF 6 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER
2811 080.62376 7,271
INSTALL 1300 FEET OF 2 INCH POLY ALONG 21ST STREET AND ABANDON 800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
2812 080.62380 29,796
RELOCATE FACILITIES. INSTALL 568 FEET OF 2 INCH AND 556 FEET OF 4 INCH POLY AND ABANDON 375 FEET OF 2 INCH AND 1227 FEET OF 4 INCH AND 36 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF WATAUGA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WATAUGA
SYSTEM INTEGRITY DECEMBER
2813 080.62382 16,292
INSTALL 95 FEET OF 2 INCH 902 FEET OF 4 INCH AND 1305 FEET OF 6 INCH POLY ALONG ENTERPRISE AND ABANDON 15 FEET OF 4 INCH POLY AND 2123 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
2814 080.62383 20,136
INSTALL 2440 FEET OF 2 INCH AND 534 FEET OF 4 INCH POLY AND ABANDON 75 FEET OF 2 INCH AND 583 FEET OF 3 INCH AND 822 FEET OF 4 INCH STEEL AND 868 FEET OF 3 INCH AND 169 FEET OF 2 INCH AND 150 FEET OF 4 INCH POLY ALONG 7TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM
SYSTEM INTEGRITY DECEMBER
2815 080.62386 6,970
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH AND 740 FEET OF 4 INCH POLY ALONG 8TH STREET AND ABANDON 915 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF VENUS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS
SYSTEM INTEGRITY DECEMBER
2816 080.62387 4,450
INSTALL 625 FEET OF 2 INCH POLY ALONG 5TH STREET AND ABANDON 2520 FEET OF 3 INCH STEEL AND 140 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VENUS
SYSTEM INTEGRITY DECEMBER
2817 080.62391 65,047
INSTALL 110 FEET OF 16 INCH, 110FEET OF 12 INCH STEEL AND 90 FEET OF 8 INCH POLY AND ABANDON 73 FEET OF 8 INCH POLY AND 93 FEET OF 12 INCH AND 60 FEET OF 16 INCH AND 34 FEET OF 18 INCH STEEL ALONG PETERSMITH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2818 080.62397 1,502
INSTALL 6 FEET OF 4 INCH POLY ALONG ROSEWOOD AND ABANDON DISTRICT REGULATOR STATION 3, 32 FEET OF 2 INCH AND 10 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2819 080.62398 1,052,496
RELOCATE FACILITIES. INSTALL 3005 FEET OF 6 INCH POLY, 200 FEET OF 4 INCH POLY AND 167 FEET OF 2 INCH POLY ALONG UNIVERSITY BOULEVARD AND ABANDON 3025 FEET OF 6 INCH POLY, 117 FEET OF 4 INCH POLY AND 115 FEET OF 2 INCH POLY TO ACCOMMODATE CITY ROAD WIDENING PROJECT. ALL CUSTOMERS ROUND ROCK
RELOCATION OF FACILITIES DECEMBER
MTX AdditionsPage 97 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2820 080.62399 462,413
RELOCATE FACILITIES. INSTALL 792 FEET OF 4 INCH POLY AND ABANDON 275 FEET OF 2 INCH STEEL AND 533 FEET OF 2 INCH POLY AND 401 FEET OF 4 INCH POLY ALONG SOUTH LOCUST DRIVE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2821 080.62404 7,479
RELOCATE FACILITIES. INSTALL 425 FEET OF 4 INCH POLY ALONG SOUTH PALESTINE AND ABANDON 425 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
2822 080.62408 1,284 ABANDON DISTRICT REGULATOR STATION 01 IN HARDEMAN COUNTY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CHILLICOTHE
SYSTEM INTEGRITY DECEMBER
2823 080.62409 131
RELOCATE FACILITIES. ABANDON 55 FEET OF 6 INCH POLY ALONG 1700 SOUTH JENNINGS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2824 080.62419 41,618
INSTALL 5286 FEET OF 2 INCH POLY ALONG 3RD STREET AND ABANDON 2947 FEET OF 4 INCH, 967 FEET OF 3 INCH STEEL, 1042 FEET OF 3 INCH, 335 FEET OF 2 INCH AND 615 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD
SYSTEM INTEGRITY DECEMBER
2825 080.62420 70,644
INSTALL 7982 FEET OF 2 INCH POLY AND ABANDON 66 FEET OF 1.25 INCH, 197 FEET OF 2 INCH, 3148 FEET OF 3 INCH POLY, 155 FEET OF 2 INCH, 4132 FEET OF 3 INCH, AND 27 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSEBUD
SYSTEM INTEGRITY DECEMBER
2826 080.62422 274,213
RELOCATE FACILITIES. INSTALL 611 FEET OF 2 INCH POLY AND 364 FEET OF 4 INCH POLY AND 146 FEET OF 6 INCH POLY AND ABANDON 611 FEET OF 2 INCH POLY AND 364 FEET OF 4 INCH POLY AND 146 FEET OF 6 INCH POLY ALONG CALENDER ROAD TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY OCTOBER
2827 080.62423 462,276
INSTALL 25500 FEET OF 10 INCH STEEL ALONG LINE KP1 AND ABANDON 19300 FEET OF 10 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
2828 080.62424 44,726 INSTALL 6,530 FEET OF 2 INCH POLY AND 250 FEET OF 4 INCH POLY ALONG HARRIS ROAD AND SILO. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH DECEMBER
2829 080.62425 35,653
INSTALL 2455 FEET OF 2 INCH POLY ALONG WEST AVENUE EAST AND ABANDON 2580 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2830 080.62426 64,956 INSTALL 1614 FEET OF 4 INCH POLY ALONG EAST US HIGHWAY 290 IN THE CITY OF MANOR. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH DECEMBER
2831 080.62427 11,497 INSTALL 1619 FEET OF 4 INCH POLY ALONG RING ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MANOR GROWTH DECEMBER
2832 080.62435 17,947 INSTALL 1900 FEET OF 2 INCH POLY ALONG STREETS OF CEDAR RIDGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRI GROWTH DECEMBER
2833 080.62439 18,711
INSTALL 1015 FEET OF 2 INCH POLY ALONG ALLEY OF COMANCHE TRAIL AND ABANDON 1005 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2834 080.62441 18,382
INSTALL 1190 FEET OF 2 INCH POLY AND 942 FEET OF 4 INCH POLY ALONG SOUTH 3RD STREET AND ABANDON 1140 FEET OF 2 INCH STEEL AND 1272 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2835 080.62447 118,812
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES ALONG THE NORTHWEST DALLAS ZONE AREA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2836 080.62448 2,518
RELOCATE FACILITIES. INSTALL 170 FEET OF 4 INCH POLY ALONG 3RD STREET AND ABANDON 175 FEET OF 4 INCH POLY, 4 INCH, AND 3 INCH STEEL TO ACCOMMODATE THE CITY OF TAYLOR STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
2837 080.62451 40,202 INSTALL 700 FEET OF 2 INCH POLY ALONG BROWDER AND BELLVIEW IN DALLAS, TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH DECEMBER
2838 080.62457 3,950
INSTALL DISTRICT REGULATOR STATION IN ABILENE AND ABANDON DISTRICT REGULATOR STATION 22 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2839 080.62465 108,489
INSTALL 1759 FEET OF 2 INCH POLY AND 1406 FEET OF 4 INCH POLY ALONG THE STREETS OF WOODCREEK PHASE 9C3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH MARCH
2840 080.62466 268 INSTALL 703 FEET OF 4 INCH POLY ALONG DB WOOD ROAD.COMMERCIAL OR
INDUSTRIAL GEORGETOWN GROWTH JUNE
2841 080.62467 94,526 INSTALL 1400 FEET OF 2 INCH AND 1500 FEET OF 4 INCH POLY ALONG THE STREETS OF WOODCREEK PHASE 9C2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH MARCH
2842 080.62471 266,677
INSTALL 2000 FEET OF 4 INCH POLY AND 5700 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODCREEK PHASE 9D1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH MARCH
2843 080.62472 13,402 INSTALL 2100 FEET OF 4 INCH POLY ALONG LEGACY.COMMERCIAL OR
INDUSTRIAL FRISCO GROWTH DECEMBER
2844 080.62492 38,094
INSTALL 1501 FEET OF 2 INCH POLY AND ABANDON 226 FEET OF 8 INCH STEEL AND 1236 FEET OF 16 INCH STEEL ALONG EAST 6TH STREET AND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2845 080.62513 21,878
RELOCATE FACILITIES. INSTALL 11 FEET OF 2 INCH POLY AND 4 FEET OF 3 INCH POLY AND 1452 FEET OF 4 INCH POLY AND ABANDON 1096 FEET OF 2 INCH STEEL AND 227 FEET OF 2 INCH POLY AND 110 FEET OF 3 INCH POLY ALONG YUCCA DRIVE TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
2846 080.62514 4,560 INSTALL 1900 FEET OF 2 INCH POLY ALONG STREETS OF ANNA CROSSING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH DECEMBER
2847 080.62517 2,788
INSTALL 340 FEET OF 2 INCH, 6 FEET OF 3 INCH AND 47 FEET OF 4 INCH POLY AND ABANDON 335 FEET OF 2 INCH, 40 FEET OF 4 INCH AND 6 FEET OF 3 INCH STEEL ALONG THE STREETS OF WEST WHITE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PILOT POINT
SYSTEM INTEGRITY DECEMBER
2848 080.62523 7,219
INSTALL 800 FEET OF 2 INCH POLY ALONG WEST POINT AND ABANDON 800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY
SYSTEM INTEGRITY DECEMBER
2849 080.62524 9,022 INSTALL 897 FEET OF 4 INCH POLY ALONG VOLTA DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL CEDAR PARK GROWTH DECEMBER
2850 080.62527 3,701
INSTALL GROUNDBED AND RECTIFIER ALONG LINE L8AE1 AND ABANDON GROUNDBED AND RECTIFIER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK
SYSTEM INTEGRITY DECEMBER
2851 080.62547 3,887 INSTALL 6,010 FEET OF 2 INCH AND 4,525 FEET OF 6 INCH POLY ALONG THE STREETS OF FOWLER FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL KRUM GROWTH JUNE
2852 080.62550 4,530
PURCHASE (1) DESKTOP, (11) LAPTOPS, (9) THIN CLIENTS, (29) TABLETS, (29) MODEMS, (4) MONITORS, AND (40) KEYBOARDS FOR USE IN THE NORTH REGION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
2853 080.62553 9,586
INSTALL 1180 FEET OF 2 INCH POLY ALONG AUSTIN STREET AND ABANDON 932 FEET OF 4 INCH AND 432 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 98 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2854 080.62554 1,533
INSTALL 50 FEET OF 2 INCH POLY ALONG HEARD STREET AND ABANDON 90 FEET OF 2 INCH STEEL AND 48 FEET OF 2 INCH POLY TO ACCOMMODATE EXISTING MAIN ON PRIVATE PROPERTY IN COLLIN COUNTY. ALL CUSTOMERS MCKINNEY
RELOCATION OF FACILITIES JULY
2855 080.62555 30,292
INSTALL 1170 FEET OF 6 INCH AND 130 FEET OF 2 INCH POLY ALONG CAMP BOWIE AND ABANDON 1170 FEET OF 6 INCH AND 130 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2856 080.62571 21,896
INSTALL 7 FEET OF 2 INCH, 139 FEET OF 3 INCH AND 490 FEET OF 4 INCH STEEL AND ABANDON 19 FEET OF 2 INCH, 104 FEET OF 3 INCH AND 482 FEET OF 4 INCH STEEL ALONG CNG-56-T IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EARLY
SYSTEM INTEGRITY DECEMBER
2857 080.62579 32 INSTALL 132 FEET OF 2 INCH POLY ALONG THE STREETS OF MANSIONS AT GEORGETOWN II DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JUNE
2858 080.62584 1,281 INSTALL 298 FEET OF 4 INCH POLY ALONG MILTON STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH JUNE
2859 080.62588 691
INSTALL 1201 FEET OF 6 INCH POLY AND 2723 FEET OF 2 INCH POLY ALONG THE STREETS OF DEERBROOKE PHASE 2 SECTION 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL
2860 080.62590 825
INSTALL REGULATOR AND RELIEF VALVE AT KWIKSET REGULATOR STATION AND ABANDON REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
2861 080.62606 4,616
INSTALL 1549 FEET OF 2 INCH AND 733 FEET OF 6 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH NORTH SECTION 20C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER
2862 080.62609 57,022
INSTALL 2966 FEET OF 2 INCH POLY AND ABANDON 2960 FEET OF 2 INCH POLY AND 60 FEET OF 4 INCH STEEL ALONG ROUGH CREEK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY
SYSTEM INTEGRITY DECEMBER
2863 080.62612 8,642
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG HIGHWAY 283 AND ABANDON 99 FEET OF 3 INCH STEEL AND 99 FEET OF 3 INCH POLY TO ACCOMMODATE TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
2864 080.62613 1,497
RELOCATE FACILITIES. ABANDON 490 FEET OF 3 INCH POLY ALONG HIGHWAY 283 TO ACCOMMODATE CITY OF ALBANY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
2865 080.62630 16,233
RELOCATE FACILITIES. INSTALL 535 FEET OF 4 INCH POLY AND 210 FEET OF 6 INCH POLY AND ABANDON 132 FEET OF 6 INCH STEEL ALONG MARSHALL DRIVE TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
2866 080.62635 3,424
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY ALONG WICHITA STREET AND ABANDON 200 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FOREST HILL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
2867 080.62637 3,760
INSTALL DISTRICT REGULATOR STATION ALONG MAIN STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR
SYSTEM INTEGRITY DECEMBER
2868 080.62639 2,172
INSTALL 400 FEET OF 4 INCH POLY ALONG FM1644 AND ABANDON 375 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT
SYSTEM INTEGRITY DECEMBER
2869 080.62641 7,658
INSTALL 900 FEET OF 2 INCH POLY ALONG HENSEL DRIVE AND ABANDON 880 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
2870 080.62648 10,816 INSTALL REGULATOR STATION AND MEASURING STATION ALONG E10-5 IN VAN ALSTYNE. ALL CUSTOMERS VAN ALSTYNE
SYSTEM IMPROVEMENT SEPTEMBER
2871 080.62650 766 INSTALL 3,476 FEET OF 6 INCH AND 2885 FEET OF 2 INCH POLY ALONG STREETS OF PANCHARASARP FARMS ADDITION. RESIDENTIAL BURLESON GROWTH APRIL
2872 080.62656 324 INSTALL 350 FEET OF 6 INCH POLY ALONG LOOP 288. ALL CUSTOMERS DENTONSYSTEM
IMPROVEMENT SEPTEMBER
2873 080.62657 30,569
INSTALL 1500 FEET OF 4 INCH AND 500 FEET OF 2 INCH POLY AND ABANDON 2000 FEET OF 1.25 INCH POLY ALONG SH 34 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AVALON
SYSTEM INTEGRITY DECEMBER
2874 080.62674 46,599 INSTALL 7613 FEET OF 2 INCH AND 470 FEET OF 4 INCH POLY ALONG THE STREETS OF MERIDIAN AT SOUTHGATE. RESIDENTIAL MCKINNEY GROWTH OCTOBER
2875 080.62685 7,043 INSTALL 1980 FEET OF 8 INCH POLY ALONG THE STREETS OF BAR W RANCH. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH JUNE
2876 080.62688 475 ABANDON 320 FEET OF 2 INCH STEEL ALONG BRENTS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2877 080.62689 5,279
RELOCATE FACILITIES. INSTALL 460 FEET OF 8 INCH AND 660 FEET OF 10 INCH STEEL ALONG US HIGHWAY 75 AND ABANDON 460 FEET OF 8 INCH AND 660 FEET OF 10 INCH STEEL TO ACCOMMODATE THE CITY OF SHERMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
2878 080.62690 905
ABANDON 1247 FEET OF 2 INCH AND 476 FEET OF 1.25 INCH STEEL ALONG JAMES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH
SYSTEM INTEGRITY DECEMBER
2879 080.62691 23,343
RELOCATE FACILITIES. INSTALL 1242 FEET OF 4 INCH POLY ALONG GRANDE AVENUE AND ABANDON 904 FEET OF 2 INCH AND 338 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
2880 080.62692 60,802
INSTALL 1625 FEET OF 2 INCH POLY AND 1310 FEET OF 4 INCH POLY ALONG THE STREETS OF MELISSA VILLAGE SUBDIVISION IN MCKINNEY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL MELISSA GROWTH DECEMBER
2881 080.62693 1,154,698
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY CLIFTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
2882 080.62700 14,556
INSTALL 5605 FEET OF 2 INCH AND 909 FEET OF 6 INCH POLY ALONG THE STREETS OF BAR W RANCH PHASE 1 SECTION 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
2883 080.62714 489,725
RELOCATE FACILITIES. INSTALL 1011 FEET OF 4 INCH AND 989 FEET OF 6 INCH POLY ALONG FM 2818 AND ABANDON 238 FEET OF 4 INCH AND 500 FEET OF 6 INCH POLY AND 219 FEET OF 4 INCH AND 728 FEET OF 6 INCH STEEL TO ACCOMMODATE TXDOT HIGHWAY IMPROVEMENT PROJECT IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
2884 080.62716 38,117
RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY AND 160 FEET OF 4 INCH POLY ALONG WOODVILLE ROAD AND ABANDON 220 FEET OF 2 INCH AND 110 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY OCTOBER
2885 080.62723 9,319
RELOCATE FACILITIES. INSTALL 345 FEET OF 2 INCH POLY AND ABANDON 30 FEET OF 2 INCH POLY ALONG LLANO STREET TO ACCOMMODATE CITY OF FREDERICKSBURG STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 99 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2886 080.62724 30,085
RELOCATE FACILITIES. INSTALL 1934 FEET OF 4 INCH POLY ALONG GRANDE AVENUE AND ABANDON 1148 FEET OF 4 INCH AND 337 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF CLEBURNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
2887 080.62726 52,795
RELOCATE FACILITIES. INSTALL 1875 FEET OF 2 INCH AND 1750 FEET OF 4 INCH POLY AND ABANDON 1820 FEET OF 2 INCH, 490 FEET OF 4 INCH STEEL AND 55 FEET OF 2 INCH AND 1260 FEET OF 4 INCH POLY ALONG THOMASSON TO ACCOMMODATE CITY OF MESQUITE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
2888 080.62735 2,377,535
RELOCATE FACILITIES. INSTALL 478 FEET OF 2 INCH POLY AND 1810 FEET OF 4 INCH POLY ALONG SOUTH LOCUST STREET AND ABANDON 182 FEET OF 2 INCH POLY AND 717 FEET OF 2 INCH STEEL AND 1158 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2889 080.62736 37,865
RELOCATE FACILITIES. INSTALL 1917 FEET OF 2 INCH POLY AND ABANDON 2211 FEET OF 2 INCH POLY AND 162 FEET OF 4 INCH POLY ALONG WAINWRIGHT STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2890 080.62737 41,091
INSTALL 6 RELIEF VALVES AND RETIRE 6 RELIEF VALVES IN THE SOUTHWEST SOUTH DISTRICT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
2891 080.62742 54,422
RELOCATE FACILITIES. INSTALL 823 FEET OF 2 INCH AND 3755 FEET OF 4 INCH POLY AND ABANDON 495 FEET OF 2 INCH, 4269 FEET OF 4 INCH STEEL AND 119 FEET OF 4 INCH AND 260 FEET OF 2 INCH POLY ALONG THE STREETS OF HANDLEY DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2892 080.62744 2,075
RELOCATE FACILITIES. INSTALL 267 FEET OF 2 INCH AND 5 FEET OF 3 INCH POLY ALONG WHIPPOORWILL LANE AND ABANDON 226 FEET OF 3 INCH STEEL AND 8 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
2893 080.62752 16,316
INSTALL 150 FEET OF 8 INCH POLY ALONG HALL STREET AND ABANDON 150 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2894 080.62753 102,591
INSTALL 36 FEET OF 4 INCH STEEL AND 7618 FEET OF 6 INCH STEEL AND ABANDON 7353 FEET OF 4 INCH STEEL ALONG STREETS OF BROWNWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
2895 080.62754 1
RELOCATE FACILITIES. INSTALL 163 FEET OF 6 INCH POLY AND ABANDON 205 FEET OF 6 INCH STEEL ALONG CURRIE STREET TO ACCOMMODATE DEVELOPER PROJECT. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES JANUARY
2896 080.62756 154 ABANDON DISTRICT REGULATOR STATION 26 IN ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2897 080.62759 16,973 INSTALL (50) PAX1 MOTORIZED REGULATORS AND ABANDON (50) PAX1 MOTORIZED REGULATORS. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2898 080.62760 1,326
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG SKYLINE STREET AND ABANDON 90 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF ROWLETT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
SYSTEM INTEGRITY DECEMBER
2899 080.62763 2,434
INSTALL 329 FEET OF 2 INCH POLY ALONG AVENUE E AND ABANDON 329 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILDRESS
SYSTEM INTEGRITY DECEMBER
2900 080.62765 295,554
RELOCATE FACILITIES. INSTALL 3100 FEET OF 6 INCH POLY ALONG CHEEK SPARGER ROAD AND ABANDON 960 FEET OF 4 INCH POLY AND 1900 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEYVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
2901 080.62768 158 INSTALL 5,335 FEET OF 2 INCH POLY ALONG THE STREETS OF FIRESIDE VILLAGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH APRIL
2902 080.62774 114,114 INSTALL 735 FEET OF 4 INCH POLY MAIN ALONG NORTH CENTRAL EXPRESSWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER
2903 080.62778 16,393
INSTALL 850 FEET OF 6 INCH POLY ALONG HUFFINES AND ABANDON 650 FEET OF 6 INCH POLY AND 152 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
SYSTEM INTEGRITY DECEMBER
2904 080.62780 15
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH POLY ALONG BAGBY AVE TO ACCOMMODATE POWER POLE PROJECT FOR THE BRAZOS ELECTRIC POWER COOPERATIVE. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES MARCH
2905 080.62786 28,460 INSTALL 3270 FEET OF 2 INCH POLY AND 1017 FEET OF 4 INCH POLY ALONG THE STREETS OF THE HILLS AT LEGACY SUBDIVISION. RESIDENTIAL PROSPER GROWTH SEPTEMBER
2906 080.62787 1,991
INSTALL 5510 FEET OF 2 INCH, 900 FEET OF 4 INCH AND 1250 FEET OF 6 INCH POLY ALONG THE STREETS OF DEVONSHIRE VILLAGE PHASE 9. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH APRIL
2907 080.62791 4,494
RELOCATE FACILITIES. INSTALL 140 FEET OF 2 INCH POLY AND ABANDON 125 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF EDGECLIFF VILLAGE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EDGECLIFF VILLAGE
SYSTEM INTEGRITY DECEMBER
2908 080.62796 (185) INSTALL DELL PC'S AND C DOCKS FOR MONITORS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
2909 080.62802 10,051
INSTALL 4196 FEET OF 2 INCH POLY AND 3947 FEET OF 4 INCH POLY ALONG ALONG THE STREETS OF GREENWAY PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH NOVEMBER
2910 080.62805 36,900
INSTALL 1340 FEET OF 4 INCH AND 75 FEET OF 2 INCH POLY ALONG WEST HEMPHILL STREET AND ABANDON 1100 FEET OF 6 INCH STEEL 260 FEET OF 6 INCH AND 60 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2911 080.62806 39,387
RELOCATE FACILITIES. INSTALL 1500 FEET OF 2 INCH AND 1200 FEET OF 4 INCH POLY AND ABANDON 1500 FEET OF 2INCH AND 1200 FEET OF 4 INCH STEEL ALONG HAWTHORNE TO ACCOMMODATE THE CITY OF PLANO ALLEY RECONDITIONING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
2912 080.62807 3,144 INSTALL 3000 FEET OF 6 INCH POLY ALONG SHELBY STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GREENVILLE GROWTH SEPTEMBER
2913 080.62808 230,171 INSTALL 1110 FEET OF 6 INCH POLY AND 10 FEET OF 4 INCH POLY AND 60 FEET OF 10 INCH STEEL CASING ALONG SH 121. ALL CUSTOMERS MELISSA GROWTH DECEMBER
2914 080.62812 12,267
INSTALL 720 FEET OF 8 INCH AND 45 FEET OF 2 INCH POLY ALONG ROOSEVELT AND ABANDON 720 FEET OF 8 INCH AND 45 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 100 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2915 080.62819 24,279
RELOCATE FACILITIES. INSTALL 1087 FEET OF 2 INCH POLY AND ABANDON 203 FEET OF 2 INCH STEEL AND 73 FEET OF 2 INCH POLY AND 351 FEET OF 3 INCH STEEL AND 738 FEET OF 3 INCH POLY ALONG NORTHWEST 2ND STREET TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
2916 080.62824 535
RELOCATE FACILITIES. ABANDON 35 FEET OF 4 INCH STEEL ALONG MILLER AVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2917 080.62829 62,789
INSTALL 1750 FEET OF 8 INCH POLY AND ABANDON 1750 FEET OF 8 INCH STEEL ALONG LEDBETTER DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2918 080.62831 2,474 INSTALL 2229 FEET OF 2 INCH POLY ALONG THE STREETS OF THE CREEKS OF LEGACY PH2A SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH AUGUST
2919 080.62833 56,508
INSTALL 240 FEET OF 12 INCH AND 75 FEET OF 4 INCH POLY ALONG E CLARENDON DR AND ABANDON 210 FEET OF 12 INCH AND 25 FEET OF 10 INCH STEEL AND 50 FEET OF 4 INCH POLY AND 650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2920 080.62834 9,161
RELOCATE FACILITIES. INSTALL 308 FEET OF 4 INCH POLY ALONG SOUTHWEST PARKWAY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2921 080.62838 24,316
INSTALL 2501 FEET OF 2 INCH POLY AND ABANDON 2485 FEET OF 2 INCH STEEL ALONG SATURN SPRINGS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2922 080.62842 29,731
INSTALL 28 FEET OF 2 INCH, 71 FEET OF 4 INCH AND 1597 FEET OF 6 INCH POLY AND ABANDON 1650 FEET OF 6 INCH STEEL AND 125 FEET OF 6 INCH POLY ALONG CHERRY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
2923 080.62845 39,179
INSTALL 275 FEET OF 4 INCH POLY AND 1622 FEET OF 6 INCH POLY AND ABANDON 100 FEET OF 3 INCH STEEL AND 1829 FEET OF 6 INCH STEEL ALONG BRUTON ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
2924 080.62850 96,181
RELOCATE FACILITIES. INSTALL 750 FEET OF 4 INCH POLY AND ABANDON 650 FEET OF 3 INCH POLY AND 100 FEET OF 4 INCH STEEL ALONG KROGER DRIVE TO ACCOMODATECITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY SEPTEMBER
2925 080.62860 28 INSTALL 6300 FEET OF 4 INCH AND 6900 FEET OF 2 INCH POLY ALONG THE STREETS OF SONOMA VERDE PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH JANUARY
2926 080.62866 2,897
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 100 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2927 080.62870 17,032
INSTALL 1530 FEET OF 4 INCH AND 220 FEET OF 4 INCH POLY AND ABANDON 730 FEET OF 4 INCH, 471 FEET OF 3 INCH, 160 FEET OF 2 INCH STEEL AND 60 FEET OF 2 INCH POLY ALONG WOODLAWN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
2928 080.62878 237,760
INSTALL 1020 FEET OF 2 INCH POLY ALONG LAKESIDE DRIVE AND ABANDON 1010 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2929 080.62883 763,985 PURCHASE USS SYSTEM AND LICENSES FOR USE IN DALLAS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
2930 080.62890 7,217
INSTALL 398 FEET OF 2 INCH POLY AND 700 FEET OF 4 INCH POLY AND ABANDON 496 FEET OF 2 INCH STEEL AND 28 FEET OF 2 INCH POLY AND 672 FEET OF 4 INCH STEEL ALONG LOOP 286 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
2931 080.62893 4,907
RELOCATE FACILITIES. INSTALL 325 FEET FEET OF 4 INCH POLY ALONG HIGH SCHOOL DRIVE STREET AND ABANDON 325 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
2932 080.62904 7,635
INSTALL 382 FEET OF 4 INCH POLY ALONG AVENUE B AND ABANDON 382 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
2933 080.62905 254,937
INSTALL 2200 FEET OF 2 INCH POLY, 2500 FEET OF 4 INCH POLY AND 3000 FEET OF 6 INCH POLY ALONG THE STREETS OF TRAVIS RANCH PHASE 3C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEATH GROWTH JUNE
2934 080.62910 1,057 INSTALL 3400 FEET OF 6 INCH AND 1700 FEET OF 4 INCH POLY ALONG STREETS OF VERANDAH PHASE 3D. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROYSE CITY GROWTH APRIL
2935 080.62917 15,165
RELOCATE FACILITIES. INSTALL 1376 FEET OF 2 INCH POLY AND 3 FEET OF 3 INCH POLY AND ABANDON 111 FEET OF 2 INCH POLY AND 1194 FEET OF 3 INCH STEELALONG 17TH STREET TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
2936 080.62924 17,917
INSTALL 2,392 FEET OF 4 INCH POLY AND 2,448 FEET OF 2 INCH POLY ALONG THE STREETS OF CHISHOLM TRAIL SUBDIVISION IN FORT WORTH, TEXAS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
2937 080.62930 186 ABANDON 348 FEET OF 2 INCH POLY ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2938 080.62936 92,261 INSTALL 3700 FEET OF 2 INCH POLY ALONG THE STREETS OF VERANDAH PHASE 3B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH NOVEMBER
2939 080.62937 69,203 INSTALL 2630 FEET OF 4 INCH POLY ALONG AMBASSADOR WAY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BALCH SPRINGS GROWTH APRIL
2940 080.62941 6,370 INSTALL (1) RADIO TOWER FOR USE AT BEDFORD SERVICE CENTER. ALL CUSTOMERS BEDFORDSYSTEM
INTEGRITY MARCH
2941 080.62949 4,484 INSTALL 1591 FEET OF 4 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SOUTH SECTION 5B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER
2942 080.62950 115,439
INSTALL 200 FEET OF 20 INCH STEEL ALONG BELTLINE AND ABANDON 190 FEET OF 20 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SUNNYVALE
SYSTEM INTEGRITY DECEMBER
2943 080.62952 18,566
RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG WEST FRONT AND ABANDON 1090 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
2944 080.62956 360,366
INSTALL 2600 FEET OF 12 INCH AND 6250 FEET OF 2 INCH POLY ALONG NORTHWEST HIGHWAY AND ABANDON 260 FEET OF 12 INCH, 5540 FEET OF 6 INCH, 3335 FEET OF 2 INCH, 105 FEET OF 3 INCH STEEL, 525 FEET OF 6 INCH, 1050 FEET OF 1.25 INCH, 2655 FEET OF 2 INCH, 875 FEET OF 3 INCH AND 295 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 101 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2945 080.62957 7,911
INSTALL 802 FEET OF 2 INCH POLY AND ABANDON 791 FEET OF 2 INCH STEEL ALONG BLANTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHICO
SYSTEM INTEGRITY DECEMBER
2946 080.62961 585 INSTALL 889 FEET OF 4 INCH AND 1972 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYSON PHASE 2 SECTION 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
2947 080.62962 4,758
INSTALL 548 FEET OF 2 INCH POLY AND ABANDON 313 FEET OF 2 INCH STEEL AND 461 FEET OF 3 INCH STEEL ALONG BUTLER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON
SYSTEM INTEGRITY DECEMBER
2948 080.62967 8,545
INSTALL 1024 FEET OF 4 INCH AND 2573 FEET OF 2 INCH POLY ALONG THE STREETS OF SHADOWGLEN PHASE 2 SECTION 17. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JUNE
2949 080.62969 5,152 INSTALL 2112 FEET OF 4 INCH POLY ALONG GABRIELS HORN ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH DECEMBER
2950 080.62970 15,801 INSTALL 3746 FEET OF 4 INCH AND 11,628 FEET OF 2 INCH POLY ALONG THE STREETS OF BLUFFVIEW SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
2951 080.62973 550 INSTALL 1803 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVISSO PHASE 3 SECTION 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL
2952 080.62979 (1,334) INSTALL (40) MODEMS FOR USE IN MID TEX DIVISION. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
2953 080.62980 34,096
INSTALL DISTRICT REGULATOR STATION AND 158 FEET OF 6 INCH POLY, 15 FEET OF 6 INCH AND 41 FEET OF 8 INCH STEEL AND ABANDON 3 DISTRICT REGULATOR STATION AND 36 FEET OF 2 INCH AND 142 FEET OF 4 INCH STEEL ALONG THE STREETS OF BURLESON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
2954 080.62990 200,918
INSTALL 10,112 FEET OF 2 INCH POLY AND 3145 FEET OF 4 INCH POLY ALONG THE STREETS OF THE STAR TRAIL SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PROSPER GROWTH OCTOBER
2955 080.62991 6,374
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY ALONG CHERRYWOOD COURT AND ABANDON 350 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
2956 080.63002 7,619
RELOCATE FACILITIES. INSTALL 480 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY ALONG SHADY OAK ROAD AND ABANDON 480 FEET OF 4 INCH STEEL AND 10 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KEENE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEENE
SYSTEM INTEGRITY DECEMBER
2957 080.63010 2,330
RELOCATE FACILITIES. INSTALL 25 FEET OF 2 INCH POLY AND 14 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 9 FEET OF 6 INCH POLY ALONG YALE BOULEVARD TO ACCOMMODATE CITY OF RICHARDSON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
2958 080.63011 3,161
INSTALL DISTRICT REGULATOR STATION ALONG HARRISON STREET AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD
SYSTEM INTEGRITY DECEMBER
2959 080.63013 (17,779)
INSTALL 1100 FEET OF 6 INCH, 1400 FEET OF 4 INCH AND 3900 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODCREEK PHASE 8B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH APRIL
2960 080.63015 1,726
INSTALL 340 FEET OF 2 INCH POLY ALONG EMMETT STREET AND ABANDON 335 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
2961 080.63016 44,196
INSTALL 4634 FEET OF 2 INCH AND 595 FEET OF 4 INCH POLY AND ABANDON 1993 FEET OF 4 INCH STEEL AND 160 FEET OF 3 INCH AND 1830 FEET OF 4 INCH POLY ALONG HUBBARD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
2962 080.63022 (5,104) PURCHASE (6) TABLETS FOR USE IN MID TEX DIVISION. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
2963 080.63028 14,942
RELOCATE FACILITIES. INSTALL 795 FEET OF 2 INCH POLY ALONG TRIUMPH AND ABANDON 795 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL WATER LINE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
2964 080.63030 1
RELOCATE FACILITIES. INSTALL 365 FEET OF 4 INCH POLY ALONG MARSHALL STREET AND ABANDON 460 FEET OF 4 INCH POLY TO ACCOMMODATE NEW DEVELOPMENT. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES JANUARY
2965 080.63033 9,320
RELOCATE FACILITIES. INSTALL 761 FEET OF 4 INCH POLY ALONG OAKMONT AND ABANDON 620 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF ROUND ROCK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
2966 080.63043 21,294
RELOCATE FACILITIES. INSTALL 2000 FEET OF 2 INCH POLY ALONG BLOSSOM AND ABANDON 1980 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
2967 080.63045 3,346
INSTALL 360 FEET OF 4 INCH POLY ALONG N AVENUE AND ABANDON 360 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY DECEMBER
2968 080.63048 5,458
INSTALL 672 FEET OF 2 INCH POLY AND ABANDON 739 FEET OF 4 INCH STEEL AND 674 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA
SYSTEM INTEGRITY DECEMBER
2969 080.63049 2,193
INSTALL 4 FEET OF 4 INCH POLY AND 416 FEET OF 6 INCH POLY AND ABANDON 396 FEET OF 3 INCH STEEL AND 4 FEET OF 4 INCH POLY ALONG FM HWY 121 AND 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GUNTER
SYSTEM INTEGRITY DECEMBER
2970 080.63053 1,495
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG HILLSDALE DRIVE AND ABANDON 80 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF FLOWERMOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
2971 080.63063 371,304
INSTALL 16,820 FEET OF 2 INCH, 2111 FEET OF 4 INCH AND 2836 FEET OF 6 INCH POLY ALONG THE STREETS OF CAMBRIDGE CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH OCTOBER
2972 080.63065 7,588
RELOCATE FACILITIES. INSTALL 567 FEET OF 2 INCH POLY AND ABANDON 642 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF HALTOM CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
SYSTEM INTEGRITY DECEMBER
2973 080.63069 40,986
RELOCATE FACILITIES. INSTALL 616 FEET OF 2 INCH POLY AND 258 FEET OF 4 INCH POLY AND 698 FEET OF 6 INCH POLY AND ABANDON 888 FEET OF 2 INCH STEEL AND 90 FEET OF 2 INCH POLY AND 61 FEET OF 3 INCH STEEL AND 525 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
2974 080.63080 65,856
INSTALL 1035 FEET OF 8 INCH STEEL ALONG CHRISTOVAL ROAD AND ABANDON 1035 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
2975 080.63081 (113)INSTALL 500 FEET OF 2 INCH POLY ALONG SOUTH OF AMERICAN DRIVE TO SERVE MEDICAL CITY PLANO.
COMMERCIAL OR INDUSTRIAL PLANO GROWTH MARCH
MTX AdditionsPage 102 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
2976 080.63090 2,025
RELOCATE FACILITIES. INSTALL 270 FEET OF 2 INCH POLY ALONG 823 FLAMINGO AND ABANDON 260 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DUNCANVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE
SYSTEM INTEGRITY DECEMBER
2977 080.63091 15,847
INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 999 FEET OF 3 INCH STEEL ALONG AUSTIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEONARD
SYSTEM INTEGRITY DECEMBER
2978 080.63092 2,516
INSTALL 359 FEET OF 2 INCH POLY AND ABANDON 479 FEET OF 2 INCH STEEL ALONG WEST WILLIAM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
2979 080.63096 1,827,894 INSTALL 10,405 FEET OF 12 INCH POLY AND 10 FEET OF 6 INCH POLY AND 530 FEET OF 4 INCH POLY ALONG THE STREETS OF CAMBRIDGE SUBDIVISION. ALL CUSTOMERS CELINA GROWTH OCTOBER
2980 080.63100 176 ABANDON DISTRICT REGULATOR 1 IN ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
2981 080.63109 1,373 ABANDON 387 FEET OF 4 INCH CAST IRON ALONG 7TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
2982 080.63112 2,392
RELOCATE FACILITIES. INSTALL 24 FEET OF 6 INCH POLY ALONG JOHN W. ELLIOTT STREET AND ABANDON 24 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF FRISCO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
2983 080.63113 26,794
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND 1430 FEET OF 6 INCH POLY AND ABANDON 18 FEET OF 2 INCH POLY AND 1405 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
2984 080.63135 1,123,912
RELOCATE FACILITIES. INSTALL 4109 FEET OF 2 INCH POLY AND 31 FEET OF 3 INCH POLY AND 182 FEET OF 4 INCH POLY AND 3695 FEET OF 6 INCH POLY AND ABANDON 522 FEET OF 1.25 INCH POLY AND 368 FEET OF 2 INCH STEEL AND 1610 FEET OF 2 INCH POLY AND 1649 FEET OF 3 INCH STEEL AND 1934 FEET OF 3 INCH POLY AND 70 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY ALONG MAIN AND CIRCLE TO ACCOMMODATE CITY OF KAUFMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
2985 080.63140 (381)INSTALL 1150 FEET OF 2 INCH POLY ALONG THE STREETS OF JASMINE HILL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL RICHARDSON GROWTH APRIL
2986 080.63142 56,875
INSTALL 5961 FEET OF 2 INCH POLY AND 527 FEET OF 4 INCH POLY AND 850 FEET OF 6 INCH POLY ALONG THE STREETS OF THE TIMBER CREEK SUBDIVISION.DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER
2987 080.63145 42,546 INSTALL 3,200 FEET OF 4 INCH POLY ALONG THE STREETS OF MILLENNIUM PLACE COMMERCIAL AREA. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL CORINTH GROWTH OCTOBER
2988 080.63147 114,358 INSTALL 1695 FEET OF 2 INCH POLY ALONG WEST 6TH STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL IRVING GROWTH OCTOBER
2989 080.63149 (141)
RELOCATE FACILITIES. INSTALL 65 FEET OF 6 INCH POLY AND ABANDON 65 FEET OF 6 INCH POLY ALONG OZONA BOULEVARD TO ACCOMMODATE T CITY OF FORT WORTH CITY PROJECT. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES SEPTEMBER
2990 080.63150 1,486,619
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY VERNON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
2991 080.63154 1,053,833 INSTALL 3564 FEET OF 8 INCH POLY ALONG STATE HIGHWAY 114. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
2992 080.63155 295,571 IOWA PARK AREA REPLACEMENTS AS PART OF THE TEXAS RULE 8.209 PROGRAM. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
2993 080.63156 5,910
RELOCATE FACILITIES. INSTALL 440 FEET OF 6 INCH POLY ALONG WEST BELTLINE ROAD AND ABANDON 440 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF DESOTO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
SYSTEM INTEGRITY DECEMBER
2994 080.63159 4,568
INSTALL 40 FEET OF 12 INCH STEEL ALONG SH 199 AND ABANDON 40 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AZLE
SYSTEM INTEGRITY DECEMBER
2995 080.63160 (976) PURCHASE (3) MDTS FOR USE IN THE SHERMAN DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
2996 080.63162 4,977
RELOCATE FACILITIES. INSTALL 1320 FEET OF 4 INCH POLY AND ABANDON 639 FEET OF 4 INCH STEEL AND 46 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
2997 080.63163 11,196
RELOCATE FACILITIES. INSTALL 408 FEET OF 4 INCH POLY AND ABANDON 351 FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
2998 080.63164 14,046
RELOCATE FACILITIES. INSTALL 321 FEET OF 2 INCH POLY AND 350 FEET OF 4 INCH POLY AND ABANDON 110 FEET OF 2 INCH STEEL AND 79 FEET OF 2 INCH POLY AND 316 FEET OF 3 INCH STEEL AND 17 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WACO HERRING AVE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
2999 080.63170 33
RELOCATE FACILITIES. ABANDON 123 FEET OF 3 INCH POLY ALONG GRAND AVENUE PARKWAY TO ACCOMMODATE THE CITY OF AUSTIN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS AUSTIN
SYSTEM INTEGRITY DECEMBER
3000 080.63172 13,626
INSTALL DISTRICT REGULATOR STATION 01 ALONG PINE STREET AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABBOTT
SYSTEM INTEGRITY DECEMBER
3001 080.63177 8,403
RELOCATE FACILITIES. INSTALL 320 FEET OF 2 INCH POLY ALOG MESQUITE DRIVE AND ABANDON 127 FEET OF 2 INCH STEEL AND 188 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
3002 080.63180 23,030
INSTALL 1788 FEET OF 4 INCH POLY AND ABANDON 1749 FEET OF 3 INCH STEEL AND 36 FEET OF 2 INCH POLY ALONG AVENUE B IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS LAWN
SYSTEM INTEGRITY DECEMBER
3003 080.63191 59,550
INSTALL 25 FEET OF 10 INCH AND 10 FEET OF 8 INCH STEEL ALONG TEASLEY DRIVE AND ABANDON 25 FEET OF 10 INCH AND 10 FEET OF 8 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3004 080.63196 503
RELOCATE FACILITIES. INSTALL 55 FEET OF 2 INCH POLY AND ABANDON 36 FEET OF 2 INCH POLY ALONG WESTVIEW TO ACCOMMODATE CITY OF ROWLETT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
SYSTEM INTEGRITY DECEMBER
3005 080.63198 8,094
INSTALL 21 FEET OF 2 INCH POLY AND 328 FEET OF 4 INCH POLY AND ABANDON 2 FEET OF 2 INCH STEEL AND 289 FEET OF 4 INCH STEEL AND 34 FEET OF 4 INCH POLY ALONG TRINTIY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR
SYSTEM INTEGRITY DECEMBER
3006 080.63199 (3)INSTALL 3,575 FEET OF 2 INCH POLY ALONG THE STREETS OF HICKORY CREEK CROSSING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HICKORY CREEK GROWTH JANUARY
MTX AdditionsPage 103 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3007 080.63206 9,069
INSTALL 625 FEET OF 2 INCH POLY AND ABANDON 1967 FEET OF 2 INCH STEEL AND 128 FEET OF 2 INCH POLY ALONG PINE STREET IN CLYDE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS CLYDE
SYSTEM INTEGRITY DECEMBER
3008 080.63212 22,029
INSTALL 5 FEET OF 12 INCH STEEL AND 14 FEET OF 16 INCH STEEL AND ABANDON 19 FEET OF 12 INCH STEEL AND 18 FEET OF 16 INCH STEEL ALONG DAGGETT AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3009 080.63213 86,124
INSTALL 5 FEET OF 4 INCH POLY AND 7 FEET OF 6 INCH POLY AND 25 FEET OF 8 INCH POLY AND 983 FEET OF 12 INCH POLY ALONG LANCASTER ROAD AND ABANDON 440 FEET OF 6 INCH STEEL AND 7 FEET OF 6 INCH POLY AND 1127 FEET OF 12 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3010 080.63216 1,062,763
RELOCATE FACILITIES. INSTALL 455 FEET OF 2 INCH POLY AND 2292 FEET OF 4 INCH POLY AND ABANDON 465 FEET OF 2 INCH STEEL, 257 FEET OF 4 INCH STEEL AND 619 FEET OF 4 INCH POLY TO ACCOMMODATE TXDOT RELOCATION PROJECT IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN
SYSTEM INTEGRITY DECEMBER
3011 080.63217 7,640
INSTALL 797 FEET OF 2 INCH POLY AND ABANDON 388 FEET OF 2 INCH STEEL AND 182 FEET OF 2 INCH POLY ALONG AVENUE P IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
3012 080.63222 26,750
RELOCATE FACILITIES. INSTALL 1337 FEET OF 2 INCH POLY AND 245 FEET OF 4 INCH POLY AND ABANDON 1575 FEET OF 2 INCH STEEL ALONG SCRIPTURE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3013 080.63225 (9,873)PURCHASE (30) LAPTOPS, (15) VDI BIRCKS, AND (30) MONITORS FOR USE IN MID TEX. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
3014 080.63232 12,979
INSTALL 104 FEET OF 2 INCH POLY AND 354 FEET OF 4 INCH POLY AND 1500 FEET OF 6 INCH POLY ALONG SPRUCE AVENUE AND ABANDON 1958 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE
SYSTEM INTEGRITY DECEMBER
3015 080.63236 14,958
RELOCATE FACILITIES. INSTALL 672 FEET F 4 INCH POLY ALONG BELL AND ABANDON 8 FEET OF 2 INCH POLY AND 592 FEET OF 4 INCH POLY AND 75 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
3016 080.63240 1,155
RELOCATE FACILITIES. INSTALL 10 FEET OF 3 INCH POLY AND ABANDON 5 FEET OF 3 INCH POLY ALONG MCDANIEL TO ACCOMMODATE CITY OF CARROLLTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARROLLTON
SYSTEM INTEGRITY DECEMBER
3017 080.63241 9,992
INSTALL 2760 FEET OF 4 INCH POLY AND ABANDON 1958 FEET OF 4 INCH STEEL ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE
SYSTEM INTEGRITY DECEMBER
3018 080.63242 14,190
RELOCATE FACILITIES. INSTALL 940 FEET OF 4 INCH POLY ALONG WYNNEWOOD DRIVE AND ABANDON 335 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3019 080.63247 33,034 INSTALL 2122 FEET OF 8 INCH AND 87 FEET OF 4 INCH POLY ALONG COUNTY ROAD 279 ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH JUNE
3020 080.63249 38,938 INSTALL 2581 FEET OF 4 INCH AND 2366 FEET OF 2 INCH POLY ALONG THE STREETS OF LEANDER 61 PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
3021 080.63251 113,580
RELOCATE FACILITIES. INSTALL 495 FEET OF 2 INCH POLY AND 172 FEET OF 4 INCH POLY AND 1079 FEET OF 6 INCH POLY AND ABANDON 679 FEET OF 2 INCH STEEL AND 875 FEET OF 4 INCH STEEL AND 136 FEET OF 6 INCH POLY ALONG MAIN STREET TO ACCOMMODATE CITY OF CROWLEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
SYSTEM INTEGRITY DECEMBER
3022 080.63255 225 ABANDON DISTRICT REGULATOR STATION 132 ALONG WEST COLORADO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3023 080.63256 15,556
RELOCATE FACILITIES. INSTALL (33) POLY SERVICES AND ABANDON (33) STEEL SERVICES ALONG MILDRED LANE TO ACCOMMODATE CITY OF BENBROOK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BENBROOK
SYSTEM INTEGRITY DECEMBER
3024 080.63257 190 ABANDON DISTRICT REGULATOR STATION 10 IN COMANCHE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE
SYSTEM INTEGRITY DECEMBER
3025 080.63263 1,502 INSTALL 505 FEET OF 4 INCH POLY ALONG WYNNEWOOD DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH JUNE
3026 080.63265 49,797
INSTALL 6471 FEET OF 2 INCH POLY AND 5134 FEET OF 4 INCH POLY ALONG THE STREETS OF THE GLEN CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH OCTOBER
3027 080.63271 14,362
INSTALL 3 FEET OF 2 INCH POLY AND 1426 FEET OF 4 INCH POLY AND ABANDON 426 FEET OF 2 INCH POLY AND 1581 FEET OF 4 INCH STEEL AND 382 FEET OF 4 INCH POLY ALONG BOWIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANTA ANNA
SYSTEM INTEGRITY DECEMBER
3028 080.63274 6,181 INSTALL 1689 FEET OF 2 INCH POLY ALONG THE STREETS OF CRYSTAL SPRINGS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
3029 080.63278 23,156 INSTALL 1000 FEET OF 4 INCH POLY ALONG BROAD STREET AND ABANDON 1000 FEET OF 4 INCH POLY. ALL CUSTOMERS MANSFIELD
SYSTEM INTEGRITY OCTOBER
3030 080.63279 28,199
INSTALL 544 FEET OF 2 INCH POLY AND 9 FEET OF 3 INCH POLY AND 30 FEET OF 4 INCH POLY AND 1451 FEET OF 6 INCH POLY ALONG BROADWAY STREET AND ABANDON 1376 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH STEEL AND 779 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
3031 080.63283 0 INSTALL 3530 FEET OF 2 INCH POLY ALONG THE STREETS OF SABLE HILLS ESTATES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SACHSE GROWTH JANUARY
3032 080.63284 41,761
INSTALL 2930 FEET OF 4 INCH POLY ALONG EAST TEXAS AVENUE AND ABANDON 800 FEET OF 3 INCH AND 1950 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
3033 080.63292 12,367 INSTALL 2400 FEET OF 2 INCH POLY ALONG THE STREETS OF BIRMINGHAM BLUFFS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH SEPTEMBER
3034 080.63298 36,450
RELOCATE FACILITIES. INSTALL 420 FEET OF 8 INCH POLY ALONG LAMAR AND ABANDON 415 FEET OF 8 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3035 080.63300 6,982
INSTALL 880 FEET OF 4 INCH POLY ALONG NORTH BECKLEY AND ABANDON 878 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LANCASTER
SYSTEM INTEGRITY DECEMBER
3036 080.63301 1,035 REPLACE 30 OBSOLETE MID-TEX RTU UNITS. ALL CUSTOMERS DALLASGENERAL PLANT -
EQUIPMENT MARCH
3037 080.63302 949
INSTALL 1345 FEET OF 4 INCH POLY AND 2120 FEET OF 2 INCH POLY ALONG THE STREETS OF LASATER RANCH PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JULY
3038 080.63309 7,644
INSTALL 791 FEET OF 8 INCH, 1632 FEET OF 6 INCH, 314 FEET OF 4 INCH AND 3492 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR W RANCH PHASE 1 SECTION 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JULY
MTX AdditionsPage 104 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3039 080.63312 135,362
INSTALL POLY SERVICES AND ABANDON STEEL SERVICES ALONG STREETS IN CITY OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3040 080.63313 183
INSTALL 3306 FEET OF 2 INCH POLY AND 1319 FEET OF 4 INCH POLY AND 2012 FEET OF 6 INCH POLY ALONG THE STREETS OF QUAIL VALLEY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JUNE
3041 080.63317 46,953
INSTALL 1405 FEET OF 4 INCH POLY AND 4420 FEET OF 2 INCH POLY ALONG THE STREETS OF DOVE CHASE SUBDIVISION IN MANSFIELD TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH DECEMBER
3042 080.63318 591
INSTALL 3362 FEET OF 2 INCH, 454 FEET OF 4 INCH AND 511 FEET OF 6 INCH POLY ALONG THE STREETS OF MORNINGSTAR PHASE 2 SECTIONS 4 AND 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JUNE
3043 080.63321 11,985
RELOCATE FACILITIES. INSTALL 1120 FEET OF 4 INCH POLY ALONG ROYAL STREET ABANDON 1000 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF WAXAHACHIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
3044 080.63326 81,584
RELOCATE FACILITIES. INSTALL 93 FEET OF 2 INCH POLY AND 260 FEET OF 4 INCH POLY AND 4967 FEET OF 8 INCH POLY AND ABANDON 93 FEET OF 2 INCH POLY AND 146 FEET OF 4 INCH POLY AND 4734 FEET OF 8 INCH POLY ALONG SKYLINE AND SH80 TO ACCOMMODATE CITY OF MESQUITE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
SYSTEM INTEGRITY DECEMBER
3045 080.63331 72,574
INSTALL 4500 FEET OF 4 INCH AND 2100 FEET OF 2 INCH POLY ALONG MARKET STREET AND ABANDON 2 FEET OF 2 INCH STEEL AND 249 FEET OF 2 INCH POLY AND 3210 FEET OF 3 INCH STEEL AND 188 FEET OF 3 INCH POLY AND 2289 FEET OF 4 INCH STEEL AND 572 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MABANK
SYSTEM INTEGRITY DECEMBER
3046 080.63332 573 INSTALL 1675 FEET OF 2 INCH POLY ALONG THE STREETS OF WATERS EDGE. DEVELOPER INSTALLED FACILITY. RESIDENTIAL DENTON GROWTH JUNE
3047 080.63336 18,541
RELOCATE FACILITIES. INSTALL 600 FEET OF 4 INCH POLY ALONG HUNT AND PECAN AND ABANDON 540 FEET OF 6 INCH STEEL AND 60 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF RANGER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER
SYSTEM INTEGRITY DECEMBER
3048 080.63337 36,921
INSTALL 291 FEET OF 2 INCH POLY AND 2331 FEET OF 4 INCH POLY AND 738 FEET OF 6 INCH POLY AND 8 FEET OF 12 INCH STEEL AND ABANDON 384 FEET OF 2 INCH STEEL AND 181 FEET OF 2 INCH POLY AND 587 FEET OF 4 INCH STEEL AND 2569 FEET OF 6 INCH STEEL AND 17 FEET OF 6 INCH POLY AND 370 FEET OF 8 INCH STEEL AND 8 FEET OF 12 INCH STEEL ALONG BRIDWELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3049 080.63339 66,415
INSTALL 3,145 FEET OF 2 INCH POLY, 1,675 FEET OF 4 INCH POLY AND 1,785 FEET OF 6 INCH POLY ALONG THE STREETS OF STARK FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER
3050 080.63340 353,191 INSTALL 3,375 FEET OF 8 INCH AND 6,080 FEET OF 2 INCH POLY ALONG THE STREETS OF TIMBERBROOK PHASE 2. RESIDENTIAL JUSTIN GROWTH DECEMBER
3051 080.63351 4,639 INSTALL 1838 FEET OF 4 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
3052 080.63352 515 INSTALL 1057 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
3053 080.63363 4,815
RELOCATE FACILITIES. INSTALL 510 FEET OF 4 INCH POLY ALONG OLD AUSTIN PFLUGERVILLE ROAD AND ABANDON 517 FEET OF 3 INCH AND 59 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF PFLUGERVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PFLUGERVILLE
SYSTEM INTEGRITY DECEMBER
3054 080.63367 (40)
RELOCATE FACILITIES. INSTALL 25 FEET OF 2 INCH POLY ALONG 21ST STREET AND ABANDON 25 FEET OF 2 INCH POLY TO ACCOMMODATE NEW COMMERCIAL DEVELOPMENT. ALL CUSTOMERS WICHITA FALLS
RELOCATION OF FACILITIES MARCH
3055 080.63368 374
RELOCATE FACILITIES. INSTALL 68 FEET OF 2 INCH POLY ALONG VALLEY DRIVE AND ABANDON 62 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF KERRVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
3056 080.63376 3,249 INSTALL 1584 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH NORTH SECTION 9. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JULY
3057 080.63379 153,044
RELOCATE FACILITIES. INSTALL 796 FEET OF 6 INCH POLY AND ABANDON 677 FEET OF 4 INCH POLY AND 257 FEET OF 6 INCH POLY ALONG MCDONWELL SCHOOL ROAD TO ACCOMMODATE CITY OF COLLEYVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
3058 080.63381 15,074
INSTALL 2000 FEET OF 2 INCH AND 324 FEET OF 4 INCH POLY ALONG GARTH AND ABANDON 1757 FEET OF 2 INCH STEEL AND 303 FEET OF 3 INCH STEEL AND 324 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILLEEN
SYSTEM INTEGRITY DECEMBER
3059 080.63389 14,016
INSTALL 740 FEET OF 2 INCH POLY ALONG CLARE STREET AND ABANDON 1500 FEET OF 2 INCH OTHER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
3060 080.63391 24,337 INSTALL 4810 FEET OF 2 INCH POLY ALONG THE STREETS OF THE NINTH PHASE OF THE WEST CROSSING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH JUNE
3061 080.63393 117,902
INSTALL 3010 FEET OF 2 INCH AND 540 FEET OF 6 INCH POLY ALONG THE STREETS OF WEST CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH DECEMBER
3062 080.63394 7,667
RELOCATE FACILITIES. INSTALL 975 FEET OF 2 INCH POLY ALONG SHORECREST DRIVE AND ABANDON 965 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF ROWLETT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
SYSTEM INTEGRITY DECEMBER
3063 080.63397 3 INSTALL 5360 FEET OF 4 INCH POLY ALONG HOLFORD ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GARLAND GROWTH JANUARY
3064 080.63398 3,958
INSTALL 920 FEET OF 2 INCH POLY ALONG EAST ELLISON STREET AND ABANDON 650 FEET OF 4 INCH STEEL AND 275 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
3065 080.63404 3,049
INSTALL DISTRICT REGULATOR STATION IN BROOKSTON AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROOKSTON
SYSTEM INTEGRITY DECEMBER
3066 080.63405 (18,757)PURCHASE 8 COMPUTERS AND ABANDON 8 COMPUTERS FOR USE IN DALLAS DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
3067 080.63408 3,655
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH AND 250 FEET OF 2 INCH POLY ALONG BUFFORD STREET ABANDON 250 FEET OF 2 INCH POLY AND 175 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF BURLESON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
3068 080.63414 48,748
RELOCATE FACILITIES. INSTALL 645 FEET OF 2 INCH POLY ALONG MICHIGAN AVENUE AND ABANDON 1000 FEET OF 6 INCH CAST IRON TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3069 080.63416 35,960 INSTALL 105 FEET OF 6 INCH POLY AND 905 FEET OF 4 INCH POLY ALONG THE VICINITY OF ENGLAND PARKWAY. ALL CUSTOMERS GRAND PRAIRIE GROWTH SEPTEMBER
MTX AdditionsPage 105 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3070 080.63421 (49)
RELOCATE FACILITIES. INSTALL 200 FEET OF 4 INCH POLY AND ABANDON 145 FEET OF 3 INCH STEEL TO ACCOMMODATE PRIVATE DEVELOPER IMPROVEMENT PROJECT. ALL CUSTOMERS TAYLOR
RELOCATION OF FACILITIES MARCH
3071 080.63425 770
INSTALL 2405 FEET OF 2 INCH, 1380 FEET OF 6 INCH AND 890 FEET OF 8 INCH POLY ALONG THE STREETS OF HARVEST PHASE 4B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTHLAKE GROWTH JUNE
3072 080.63428 18,272
RELOCATE FACILITIES. INSTALL 1540 FEET OF 2 INCH POLY ALONG WESTWOOD DRIVE AND ABANDON 1540 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3073 080.63433 1,000 INSTALL 20 FEET OF STEEL ALONG COIT ROAD TO RAISE STATION ON LINE D9-2-1-6. ALL CUSTOMERS MCKINNEY
SYSTEM IMPROVEMENT APRIL
3074 080.63437 416,179 INSTALL 4738 FEET OF 2 INCH AND 1800 FEET OF 4 INCH POLY ALONG STREETS OF HAVEN PHASE 1. RESIDENTIAL WAXAHACHIE GROWTH JUNE
3075 080.63443 1,251,062
RELOCATE FACILITIES. INSTALL 114 FEET OF 2 INCH, 905 FEET OF 4 INCH AND 4619 FEET OF 6 INCH POLY AND ABANDON 48 FEET OF 2 INCH STEEL AND 38 FEET OF 3 INCH STEEL AND 5346 FEET OF 4 INCH STEEL AND 244 FEET OF 4 INCH POLY ALONG SOUTH COLLINS STREET AND PIONEER PARKWAY.TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3076 080.63448 3,343 INSTALL 900 FEET OF 4 INCH POLY ALONG MIRA LAGO AND LAGO VISTA. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FARMERS BRANCH GROWTH JUNE
3077 080.63456 (134,696) INSTALL 260 FEET OF 2 INCH POLY ALONG 9TH STREET. ALL CUSTOMERS GEORGETOWNSYSTEM
IMPROVEMENT JUNE
3078 080.63457 7,432
RELOCATE FACILITIES. INSTALL 193 FEET OF 6 INCH POLY ALONG WEST DIVISION AND ABANDON 156 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3079 080.63465 0
INSTALL 160 FEET OF 8 INCH POLY, 1675 FEET OF 4 INCH POLY AND 1250 FEET OF 2 INCH POLY ALONG THE STREETS OF CARMEL WEST PHASE 2 SECTION 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH JANUARY
3080 080.63466 1,243
INSTALL 2010 FEET OF 4 INCH AND 4290 FEET OF 2 INCH POLY ALONG THE STREETS OF CARMEL WEST PHASE 2 SECTION 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH JUNE
3081 080.63468 (437)INSTALL 4062 FEET OF 2 INCH POLY AND 2837 FEET OF 4 INCH POLY ALONG BELCLAIRE PHASE 1 SUBDIVISON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CLEBURNE GROWTH SEPTEMBER
3082 080.63471 260 INSTALL 557 FEET OF 4 INCH POLY ALONG HWY 190 IN KILLEEN TEXAS. ALL CUSTOMERS KILLEEN GROWTH MARCH
3083 080.63472 4,052
RELOCATE FACILITIES. INSTALL 440 FEET OF 2 INCH POLY ALONG JARVIS WAY AND ABANDON 440 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3084 080.63476 33 ABANDON DISTRICT REGULATOR STATION 08 ALONG DAVIS STREET IN WEST, TEXAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY DECEMBER
3085 080.63477 10 ABANDON DISTRICT REGULATOR STATION 10 IN ALBANY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
3086 080.63478 67
INSTALL 1798 FEET OF 6 INCH AND 2436 FEET OF 4 INCH POLY ALONG THE STREETS OF DEER BROOKE PHASE 2 SECTION 2 PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL
3087 080.63484 (1,498)INSTALL 683 FEET OF 4 INCH AND 1,874 FEET OF 2 INCH POLY ALONG STREETS OF BELCLAIRE PH2 SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CLEBURNE GROWTH SEPTEMBER
3088 080.63486 500
INSTALL 3320 FEET OF 2 INCH AND 2104 FEET OF 4 INCH POLY ALONG THE STREETS OF VILLAGES AT CHARLESTON PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH SEPTEMBER
3089 080.63487 65,133 INSTALL 96 FEET OF 18 INCH STEEL AND ABANDON 96 FEET OF 18 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3090 080.63490 4,597
INSTALL 400 FEET OF 4 INCH POLY AND 2200 FEET OF 2 INCH POLY ALONG THE STREETS OF ARBOR ENCLAVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEATH GROWTH SEPTEMBER
3091 080.63492 6,189
RELOCATE FACILITIES. INSTALL 411 FEET OF 4 INCH POLY AND ABANDON 20 FEET OF 4 INCH POLY AND 395 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3092 080.63493 2,962
ABANDON 176 FEET OF 2 INCH POLY AND 244 FEET OF 4 INCH POLY ALONG OVILLA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK
SYSTEM INTEGRITY DECEMBER
3093 080.63495 32,501
RELOCATE FACILITIES. INSTALL 2786 FEET OF 2 INCH POLY AND ABANDON 1460 FEET OF 2 INCH STEEL AND 5 FEET OF 3 INCH STEEL ALONG OLIVE PLACE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3094 080.63496 5,400
INSTALL 627 FEET OF 2 INCH POLY AND ABANDON 620 FEET OF 2 INCH STEEL ALONG HILLTOP DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
3095 080.63497 57 INSTALL 3325 FEET OF 6 INCH POLY ALONG ARRINGTON ROAD TO SERVE GREENS PRAIRIE RESERVE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS COLLEGE STATION GROWTH JULY
3096 080.63500 10 INSTALL 2790 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENBRIER PHASE 16. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JANUARY
3097 080.63502 158,693 INSTALL 7,510 FEET OF 8 INCH POLY ALONG STATE HIGHWAY 6. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS COLLEGE STATION GROWTH DECEMBER
3098 080.63503 12,747
INSTALL 53 FEET OF 2 INCH POLY AND 2400 FEET OF 4 INCH POLY AND 315 FEET OF 6 INCH POLY AND ABANDON 54 FEET OF 2 INCH POLY AND 2398 FEET OF 4 INCH POLY AND 310 FEET OF 6 INCH STEEL ALONG JAMESTOWN LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3099 080.63505 (25,467)PURCHASE 120 LAPTOPS, TABLETS AND MONITORS FOR USE OF THE DALLAS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
3100 080.63507 320 ABANDON DISTRICT REGULATOR STATION 262 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3101 080.63509 424 INSTALL 3,595 FEET OF 4 INCH POLY ALONG CHISHOLM TRAIL RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JULY
3102 080.63510 3,791 INSTALL 1235 FEET OF 2 INCH POLY ALONG THE STREETS OF WINDING STREAM TRAIL AND TURTLE BAY LOOP. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
3103 080.63511 19 INSTALL 408 FEET OF 4 INCH POLY AND 2165 FEET OF 2 INCH POLY ALONG THE STREETS OF CRYSTAL SPRINGS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JANUARY
3104 080.63512 35,056
INSTALL 2041 FEET OF 2 INCH POLY AND 880 FEET OF 4 INCH POLY AND 1287 FEET OF 6 INCH POLY AND ABANDON 2354 FEET OF 3 INCH STEEL AND 677 FEET OF 4 INCH STEEL AND 432 FEET OF 6 INCH STEEL ALONG WEST 28TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 106 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3105 080.63514 17,356
INSTALL 1600 FEET OF 2 INCH POLY ALONG TRAVIS AVENUE AND ABANDON 1570 FEET OF 4 INCH STEEL AND 380 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3106 080.63516 4,180 INSTALL 1625 FEET OF 4 INCH POLY ALONG SILKEN CROSSING. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL MIDLOTHIAN GROWTH SEPTEMBER
3107 080.63517 767
INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE ALONG DISTRICT REGULATOR 1 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY
SYSTEM INTEGRITY DECEMBER
3108 080.63519 8,629
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY ALONG HOLLAND STREET TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
3109 080.63525 106 ABANDON DISTRICT REGULATOR STATION 274 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3110 080.63531 8,769
INSTALL 301 FEET OF 4 INCH POLY AND 80 FEET OF 8 INCH STEEL AND 60 FEET OF 2 INCH POLY ALONG HOUSTON AND ABANDON 290 FEET OF 4 INCH AND 50 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY
SYSTEM INTEGRITY DECEMBER
3111 080.63533 41,115
RELOCATE FACILITIES. INSTALL 57 FEET OF 2 INCH POLY AND 2811 FEET OF 4 INCH POLY AND ABANDON 1695 FEET OF 2 INCH STEEL AND 46 FEET OF 2 INCH POLY AND 1120 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY ALONG TEXT BOULEVARD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3112 080.63544 30,762
RELOCATE FACILITIES. INSTALL 11 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND 937 FEET OF 4 INCH POLY AND 420 FEET OF 8 INCH POLY AND ABANDON 11 FEET OF 2 INCH POLY AND 300 FEET OF 3 INCH STEEL AND 3 FEET OF 3 INCH POLY AND 470 FEET OF 6 INCH STEEL AND 398 FEET OF 8 INCH STEEL ALONG VICKI STREET TO ACCOMMODATE CITY OF HALTOM CITY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HALTOM CITY
SYSTEM INTEGRITY DECEMBER
3113 080.63546 32,960
RELOCATE FACILITIES. INSTALL 598 FEET OF 6 INCH POLY AND ABANDON 598 FEET OF 6 INCH STEEL ALONG PLANO PARKWAY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
3114 080.63547 274
RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY ALONG METHVIN STREET AND ABANDON 253 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF LONGVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
3115 080.63548 18,606
RELOCATE FACILITIES. INSTALL 10 FEET OF 2 INCH POLY AND 935 FEET OF 4 INCH POLY AND ABANDON 8 FEET OF 2 INCH POLY AND 9 FEET OF 4 INCH POLY ALONG MARYS LANE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3116 080.63553 210 ABANDON DISTRICT REGULATOR STATION 9 IN BALLINGER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER
SYSTEM INTEGRITY DECEMBER
3117 080.63557 2,366 ABANDON 445 FEET OF 3 INCH STEEL ALONG SYCAMORE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE
SYSTEM INTEGRITY DECEMBER
3118 080.63561 241 INSTALL 3007 FEET OF 2 INCH POLY AND 162 FEET OF 6 INCH POLY ALONG SIENA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JUNE
3119 080.63563 1,495,630 INSTALL 36 INCH PIG TRAP ALONG DALLAS DT 1 IN DALLAS COUNTY. ALL CUSTOMERS DALLASPIPELINE
INTEGRITY DECEMBER
3120 080.63570 17
ABANDON DISTRICT REGULATOR STATION(S) 131 ALONG KINGS HIGHWAY AND EDGEFIELD AVENUE IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3121 080.63574 20,263
INSTALL 2786 FEET OF 2 INCH POLY AND 1009 FEET OF 4 INCH POLY AND ABANDON 103 FEET OF 2 INCH POLY AND 353 FEET OF 3 INCH POLY AND 2505 FEET OF 4 INCH STEEL ALONG COLBERT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
3122 080.63576 13,193
INSTALL 4150 FEET OF 2 INCH AND 230 FEET OF 6 INCH POLY ALONG THE STREETS OF THE THIRD PHASE OF THE ARCADIA FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH JULY
3123 080.63577 9,315
NSTALL 3265 FEET OF 2 INCH AND 965 FEET OF 6 INCH POLY ALONG THE STREETS OF THE FOURTH PHASE OF THE ARCADIA FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH JULY
3124 080.63581 14,699
RELOCATE FACILITIES. INSTALL 1020 FEET 4 INCH POLY ALONG ARMSTRONG AND ABANDON 907 FEET OF 4 INCH STEEL AND 110 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3125 080.63586 21,498
RELOCATE FACILITIES. INSTALL 2535 FEET OF 2 INCH POLY AND 125 FEET OF 4 INCH POLY AND ABANDON 2411 FEET OF 2 INCH STEEL AND 24 FEET OF 2 INCH POLY AND 83 FEET OF 4 INCH STEEL ALONG NORTH 25TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3126 080.63588 3,488
RELOCATE FACILITIES. INSTALL 78 FEET OF 4 INCH POLY AND ABANDON 83 FEET OF 4 INCH STEEL ALONG NORTH 25TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3127 080.63589 29,376
INSTALL 1360 FEET OF 2 INCH POLY AND 365 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 6 INCH STEEL AND 1520 FEET OF 4 INCH STEEL AND 111 FEET OF 3 INCH STEEL ALONG WEST 4TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
3128 080.63590 7,972
RELOCATE FACILITIES. INSTALL 150 FEET OF 6 INCH POLY AND ABANDON 150 FEET OF 6 INCH STEEL ALONG BOSQUE AT WOODED ACRES TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3129 080.63594 66 ABANDON DISTRICT REGULATOR STATION 04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT
SYSTEM INTEGRITY DECEMBER
3130 080.63603 17,469
INSTALL 1112 FEET OF 4 INCH POLY AND ABANDON 961 FEET OF 4 INCH STEEL AND 146 FEET OF 4 INCH POLY AND 21 FEET OF 6 INCH STEEL ALONG MOSS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
SYSTEM INTEGRITY DECEMBER
3131 080.63606 19,046
ABANDON 20 FEET OF 6 INCH STEEL AND 66 FEET OF 12 INCH STEEL ALONG NEWMORE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3132 080.63607 39,041
RELOCATE FACILITIES. INSTALL 840 FEET OF 4 INCH POLY AND ABANDON 246 FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY AND 130 FEET OF 3 INCH POLY AND 34 FEET OF 4 INCH STEEL AND 305 FEET OF 4 INCH POLY ALONG LEE STREET TO ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
3133 080.63608 7,156
INSTALL 588 FEET OF 2 INCH POLY AND ABANDON 586 FEET OF 2 INCH STEEL ALONG SAN CARLOS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 107 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3134 080.63609 3,910
INSTALL GROUNDBED AND RECTIFIER AND ABANDON GROUNDBED AND RECTIFIER ON LINE O1 IN DALLAS COUNTY TO PROVIDE ADEQUATE CATHODIC PROTECTION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
3135 080.63610 4,990
INSTALL RECTIFIER AND GROUND BED AND ABANDON RECTIFIER AND GROUND BED IN GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3136 080.63615 9,438
RELOCATE FACILITIES. INSTALL 928 FEET OF 2 INCH POLY AND 3 FEET OF 3 INCH POLY AND ABANDON 803 FEET OF 3 INCH STEEL ALONG GARLAND AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3137 080.63616 19,141
INSTALL 1288 FEET OF 2 INCH POLY AND ABANDON 8 FEET OF 4 INCH POLY ALONG LIPSCOMB STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3138 080.63624 274
INSTALL 2150 FEET OF 2 INCH AND 50 FEET OF 4 INCH POLY ALONG THE STREETS OF WILDRIDGE RESIDENTIAL PHASES 4C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH JUNE
3139 080.63625 2,927
RELOCATE FACILITIES. INSTALL 215 FEET OF 4 INCH POLY AND ABANDON 215 FEET OF 3 INCH POLY ALONG WEST 6TH STREET TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
3140 080.63626 481
RELOCATE FACILITIES. INSTALL 295 FEET OF 12 INCH POLY AND ABANDON 460 FEET OF 12 INCH STEEL ALONG KINGS HWY AND SH 121 TO ACCOMMODATE TREES ON PROPERTY. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES MARCH
3141 080.63627 480 INSTALL 354 FEET OF 4 INCH POLY ALONG MAIN STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH JUNE
3142 080.63632 26,680
RELOCATE FACILITIES. INSTALL 643 FEET OF 2 INCH AND 2 FEET OF 3 INCH AND 3808 FEET OF 4 INCH POLY AND ABANDON 334 FEET OF 2 INCH STEEL AND 572 FEET OF 2 INCH POLY AND 367 FEET OF 3 INCH STEEL AND 2521 FEET OF 4 INCH STEEL AND 265 FEET OF 4 INCH POLY AND 1195 FEET OF 6 INCH STEEL AND 73 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF SULPHUR SPRINGS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
3143 080.63637 (191)
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG GALLOWAY AVENUE AND ABANDON 250 FEET OF 4 INCH POLY TO ACCOMMODATE TXDOT STREET PROJECT. ALL CUSTOMERS MESQUITE
RELOCATION OF FACILITIES MARCH
3144 080.63646 996
INSTALL 2,400 FEET OF 4 INCH POLY AND 4,800 FEET OF 2 INCH POLY ALONG THE STREETS IN THE NEW CRESCENT HEIGHTS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH OCTOBER
3145 080.63647 6,457
INSTALL 594 FEET OF 2 INCH POLY AND ABANDON 460 FEET OF 2 INCH STEEL AND 65 FEET OF 2 INCH POLY ALONG REED STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HONEY GROVE
SYSTEM INTEGRITY DECEMBER
3146 080.63653 13,543
INSTALL 1325 FEET OF 2 INCH POLY ALONG HEARON STREET AND ABANDON 781 FEET OF 2 INCH STEEL AND 106 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
3147 080.63655 321
ABANDON DISTRICT REGULATOR STATION 01 ALONG WILBARGER AND 12TH IN VERNON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
3148 080.63656 246,964
INSTALL 7,027 FEET OF 6 INCH POLY AND 7,300 FEET OF 8 INCH POLY ALONG THE STREETS OF SOUTH OAK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LITTLE ELM GROWTH SEPTEMBER
3149 080.63659 468 INSTALL 2,283 FEET OF 6 INCH POLY AND 590 FEET OF 4 INCH POLY ALONG INNER LOOP. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GEORGETOWN GROWTH SEPTEMBER
3150 080.63660 2,582 INSTALL 753 FEET OF 4 INCH AND 4879 FEET OF 2 INCH POLY ALONG THE STREETS OF BABRIELS BLUFF. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JUNE
3151 080.63663 4,911 INSTAL 2,191 FEET OF 4 INCH POLY AND 6,705 FEET OF 2 INCH POLY ALONG HOMESTEAD AND DANIEL FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DESOTO GROWTH MARCH
3152 080.63664 163,432
INSTALL 2,775 FEET OF 2 INCH POLY AND 2,475 FEET OF 4 INCH POLY ALONG THE STREETS OF SOUTH OAK RESIDENTIAL IN LITTLE ELM, DENTON COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LITTLE ELM GROWTH OCTOBER
3153 080.63671 57,060 INSTALL 6,125 FEET OF 2 INCH IP POLY ALONG STREETS OF TREES FARM PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DESOTO GROWTH DECEMBER
3154 080.63674 5,686
INSTALL 464 FEET OF 2 INCH POLY ALONG LOOP 561 AND ABANDON 598 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
SYSTEM INTEGRITY DECEMBER
3155 080.63677 6,407
RELOCATE FACILITIES. INSTALL 1062 FEET OF 2 INCH POLY AND ABANDON 187 FEET OF 2 INCH STEEL AND 546 FEET OF 3 INCH STEEL AND 20 FEET OF 4 INCH STEEL ALONG CULBERSON STREET TO ACCOMMODATE CITY OF GAINESVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
3156 080.63678 4,534 INSTALL 2220 FEET OF 2 INCH POLY ALONG THE STREETS OF PARADISO VALLE IN MCKINNEY TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH DECEMBER
3157 080.63679 8,945
RELOCATE FACILITIES. INSTALL 1435 FEET OF 2 INCH POLY ALONG WOODBRIDGE ROAD AND ABANDON 493 FEET OF 2 INCH STEEL AND 2167 FEET OF 2 INCH POLY AND 175 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
3158 080.63680 4,788
RELOCATE FACILITIES. INSTALL 74 FEET OF 2 INCH POLY AND 51 FEET OF 4 INCH POLY AND ABANDON 58 FEET OF 2 INCH POLY AND 7 FEET OF 4 INCH POLY ALONG WACO STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3159 080.63688 1,332 INSTALL 2,500 FEET OF 2 INCH POLY AND 3,750 OF 4 INCH POLY ALONG THE SREETS OF SANDBROCK RANCH SUBDIVISION. RESIDENTIAL AUBREY GROWTH JUNE
3160 080.63695 (86)
RELOCATE FACILITIES. INSTALL 170 FEET OF 2 INCH POLY ALONG GRAND CENTRAL CROSSING COMMERCIAL SUBDIVISION AND ABANDON 115 FEET OF 2 INCH POLY TO ACCOMMODATE GRAND CENTRAL CROSSING COMMERCIAL SUBDIVISION. ALL CUSTOMERS GRAND PRAIRIE
RELOCATION OF FACILITIES MARCH
3161 080.63698 292
ABANDON DISTRICT REGULATOR STATION 163 AT BOWIE AND GORDON IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3162 080.63700 12,436
RELOCATE FACILITIES. INSTALL 1249 FEET OF 2 INCH POLY ALONG CRIPPLE CREEK AND ABANDON 1249 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3163 080.63701 16,996
RELOCATE FACILITIES. INSTALL 2626 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY AND 1600 FEET OF 3 INCH POLY AND 260 FEET OF 4 INCH STEEL ALONG SUNNYBROOK TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 108 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3164 080.63702 63,183
RELOCATE FACILITIES. INSTALL 3404 FEET OF 2 INCH POLY AND ABANDON 3304 FEET OF 2 INCH STEEL AND 100 FEET OF 2 INCH POLY ALONG GREENOAKS TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3165 080.63703 202,920
RELOCATE FACILITIES. INSTALL 1620 FEET OF 2 INCH POLY ALONG OAK MEADOW AND ABANDON 1620 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY SEPTEMBER
3166 080.63704 54,244
RELOCATE FACILITIES. INSTALL 49 FEET OF 2 INCH POLY AND 10 FEET OF 3 INCH POLY AND 1152 FEET OF 4 INCH POLY ALONG WILLIAM BREWSTER AND ABANDON 49 FEET OF 2 INCH STEEL AND 10 FEET OF 3 INCH STEEL AND 1152 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3167 080.63705 2,077
RELOCATE FACILITIES. INSTALL 553 FEET OF 4 INCH POLY AND ABANDON 315 FEET OF 3 INCH POLY ALONG PURITAN DRIVE TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3168 080.63711 2 INSTALL 315 FEET OF 2 INCH POLY ALONG COIT ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FRISCO GROWTH JANUARY
3169 080.63712 4,445
RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY AND ABANDON 75 FEET OF 2 INCH POLY ALONG PEACHTREE TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
3170 080.63715 16,876
INSTALL 2404 FEET OF 2 INCH POLY ALONG FARM TO MARKET ROAD 308 AND ABANDON 650 FEET OF 2 INCH STEEL AND 454 FEET OF 2 INCH POLY AND 755 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PENELOPE
SYSTEM INTEGRITY DECEMBER
3171 080.63717 7,591
INSTALL 1300 FEET OF 2 INCH POLY ALONG EASTERN STAR AND ABANDON 1290 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3172 080.63745 (265)PURCHASE PROJECTOR AND WIRELESS PRESENTATION SYSTEM FOR USE AT FORT WORTH SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT DECEMBER
3173 080.63747 1,070,538 INSTALL LAUNCHER FACILITIES ON LINE CA IN PARKER COUNTY. ALL CUSTOMERS SANCTUARYPIPELINE
INTEGRITY DECEMBER
3174 080.63750 5,356
INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 480 FEET OF 4 INCH STEEL 10 FEET OF 4 INCH POLY ALONG CADDO STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE
SYSTEM INTEGRITY DECEMBER
3175 080.63751 28,219
INSTALL 1376 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH STEEL AND 426 FEET OF 4 INCH POLY ALONG TAYLOR STREET AND WASHINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE
SYSTEM INTEGRITY DECEMBER
3176 080.63752 940
INSTALL RELIEF VALVE AND AND ABANDON RELIEF VALVE AT AUSTIN COLLEGE IN SHERMAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
3177 080.63753 33 ABANDON 270 FEET OF 2 INCH STEEL ALONG MARTIN LUTHER KING ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
3178 080.63754 1,458 ABANDON 675 FEET OF 2 INCH STEEL ALONG GOODE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUITMAN
SYSTEM INTEGRITY DECEMBER
3179 080.63760 227
INSTALL 1,095 FEET OF 2 INCH POLY AND 4,570 FEET OF 6 INCH POLY ALONG THE STREETS OF CHARLES SCHWAB CAMPUS. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DENTON GROWTH JUNE
3180 080.63762 9,210
INSTALL 875 FEET OF 4 INCH POLY AND 6,135 FEET OF 2 INCH POLY ALONG THE STREETS OF CREEKSIDE CONDOS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CEDAR PARK GROWTH DECEMBER
3181 080.63763 5,131 INSTALL 1226 FEET OF 4 INCH POLY ALONG STREETS OF CROSSCREEK RANCH PHASE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CEDAR PARK GROWTH DECEMBER
3182 080.63765 (11,072)PURCHASE (5) LAPTOPS, (4) VDI, (45) TABLETS, (15) MONITORS AND OTHER PERIPHERALS THAT ARE OUT OF WARRANTY. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
3183 080.63768 126 ABANDON DISTRICT REGULATOR STATION 02 ALONG COMANCHE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE
SYSTEM INTEGRITY DECEMBER
3184 080.63769 19,893
INSTALL 704 FEET OF 4 INCH STEEL AND ABANDON 683 FEET OF 4 INCH STEEL ALONG US HIGHWAY 84 EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GOLDTHWAITE
SYSTEM INTEGRITY DECEMBER
3185 080.63770 41,715
RELOCATE FACILITIES. INSTALL 475 FEET OF 2 INCH POLY AND 15 FEET OF 3 INCH POLY AND 3168 FEET OF 4 INCH POLY AND ABANDON 297 FEET OF 2 INCH STEEL AND 6 FEET OF 2 INCH POLY AND 1120 FEET OF 3 INCH STEEL AND 152 FEET OF 3 INCH POLY AND 1798 FEET OF 4 INCH STEEL AND 935 FEET OF 4 INCH POLY ALONG SOUTH KERR STREET TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE
SYSTEM INTEGRITY DECEMBER
3186 080.63771 27 INSTALL 1210 FEET OF 4 INCH AND 1450 FEET OF 2 INCH POLY ALONG STREETS OF ESSEX PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CARROLLTON GROWTH MARCH
3187 080.63772 21 ABANDON DISTRICT REGULATOR STATION #108 IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3188 080.63775 249 INSTALL 165 FEET OF 2 INCH POLY AND 495 FEET OF 6 INCH POLY ALONG STREET OF LDS CHURCH. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PROSPER GROWTH APRIL
3189 080.63779 572 INSTALL 2,600 FEET OF 2 INCH POLY ALONG THE STREETS OF HEATH GOLF AND YACHT CLUB. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEATH GROWTH JUNE
3190 080.63780 281 ABANDON DISTRICT REGULATOR STATION 406 ALONG WEILER BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3191 080.63782 3,584
RELOCATE FACILITIES. INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 140 FEET OF 2 INCH POLY ALONG HIGHWAY 377 AND INTERSTATE 35 TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3192 080.63783 3,909
RELOCATE FACILITIES. INSTALL 270 FEET OF 4 INCH POLY ALONG PINEWOOD AND ABANDON 170 FEET OF 3 INCH AND 100 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3193 080.63785 9,037
RELOCATE FACILITIES. INSTALL 190 FEET OF 2 INCH POLY ALONG SOUTHEAST LINGLEVILLE ROAD AND MCCART STREET AND ABANDON 140 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
3194 080.63788 9,266
RELOCATE FACILITIES. ABANDON 887 FEET OF 2 INCH STEEL AND 35 FEET OF 2 INCH POLY AND 420 FEET OF 3 INCH STEEL ALONG FM2862 TO ACCOMMODATE CITY OF WESTMINSTER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTMINSTER
SYSTEM INTEGRITY DECEMBER
3195 080.63790 15,345
INSTALL 620 FEET OF 4 INCH POLY ALONG BRYAN AVENUE AND ABANDON 98 FEET OF 6 INCH STEEL AND 193 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 109 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3196 080.63804 0 INSTALL 800 FEET OF 2 INCH POLY ALONG THE STREETS OF WATERBROOK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARGYLE GROWTH JANUARY
3197 080.63811 29,272
INSTALL 4095 FEET OF 4 INCH POLY AND 360 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAMMELL CROW DEVELOPMENT. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL IRVING GROWTH DECEMBER
3198 080.63815 (27)INSTALL 190 FEET OF 4 INCH POLY ALONG ELM STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH JANUARY
3199 080.63822 53,045 INSTALL 800 FEET OF 4 INCH POLY ALONG TEXAS STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH JUNE
3200 080.63824 1,321
INSTALL 2,570 FEET OF 6 INCH POLY, 4,458 FEET OF 4 INCH POLY, 2,610 FEET OF 2 INCH POLY ALONG THE STREETS OF FRIEDEN LAKES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH MARCH
3201 080.63831 795,841
INSTALL 14 FEET OF 2 INCH POLY AND 6375 FEET OF 4 INCH POLY AND ABANDON 147 FEET OF 2 INCH STEEL AND 800 FEET OF 2 INCH POLY AND 3422 FEET OF 3 INCH STEEL AND 774 FEET OF 6 INCH STEEL ALONG KINKAID DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
3202 080.63850 8,980
INSTALL 650 FEET OF 2 INCH POLY AND 83 FEET OF 4 INCH POLY ALONG BLOSSOM LANE AND ABANDON 785 FEET OF 2 INCH STEEL AND 63 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3203 080.63851 (280) REMOTE CONTROL VALVES ALONG LINE CA, HCA CA-32 IN TARRANT COUNTY. ALL CUSTOMERS FORT WORTHSYSTEM
INTEGRITY MARCH
3204 080.63852 27,683
INSTALL 2561 FEET OF 2 INCH POLY ALONG BURNSIDE AVENUE AND ABANDON 2240 FEET OF 2 INCH STEEL AND 103 FEET OF 2 INCH POLY AND 130 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3205 080.63856 (177) REMOTE CONTROL VALVES ALONG LINE CA 2ND EAST IN TARRANT COUNTY. ALL CUSTOMERS FORT WORTHSYSTEM
INTEGRITY MARCH
3206 080.63857 6
INSTALL 485 FEET OF 4 INCH AND 1875 FEET OF 2 INCH POLY ALONG THE STREETS OF HIGHLANDS AT MAYFIELD RANCH SECTION 13. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JANUARY
3207 080.63861 8,429 INSTALL 503 FEET OF 4 INCH POLY AND 2899 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYSON SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER
3208 080.63863 13,184
RELOCATE FACILITIES. INSTALL 399 FEET OF 2 INCH POLY AND ABANDON 398 FEET OF 2 INCH STEEL ALONG EGAN STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3209 080.63874 21 INSTALL 240 FEET OF 4 INCH POLY ALONG STREETS OF TORQUE GRILL AND CANTINA. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BURLESON GROWTH APRIL
3210 080.63877 69,457
INSTALL 2500 FEET OF 2 INCH POLY AND ABANDON 2450 FEET OF 2 INCH STEEL ALONG NORTH 3RD STREET IN CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
3211 080.63878 37,847
INSTALL 81 FEET OF 2 INCH POLY AND 477 FEET OF 4 INCH POLY AND ABANDON 481 FEET OF 2 INCH POLY AND 318 FEET OF 3 INCH STEEL AND 82 FEET OF 3 INCH POLY ALONG HEARNE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
3212 080.63881 25,974 INSTALL 1650 FEET OF 4 INCH POLY ALONG CHALK HILL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER
3213 080.63884 523 INSTALL 1300 FEET OF 6 INCH, 1400 FEET OF 4 INCH AND 3200 FEET OF 2 INCH POLY ALONG STREETS OF LAKES AT RIVER TRAILS PHASE 16. RESIDENTIAL FORT WORTH GROWTH JUNE
3214 080.63885 6,311
RELOCATE FACILITIES. INSTALL 268 FEET OF 4 INCH POLY AND ABANDON 200 FEET OF 4 INCH STEEL ALONG CEDAR STREET TO ACCOMMODATE CITY OF HEARNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
3215 080.63889 169
RELOCATE FACILITIES. INSTALL 21 FEET OF 2 INCH POLY ALONG PARK AVENUE AND ABANDON 11 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3216 080.63901 63,259
RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG ROLLING RIDGE AND ABANDON 1190 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3217 080.63902 15,032
INSTALL 1673 FEET OF 2 INCH POLY ALONG OLD COLONY ROAD AND ABANDON 1237 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3218 080.63904 13,438
RELOCATE FACILITIES. INSTALL 905 FEET OF 4 INCH POLY ALONG CAMPBELL ROAD AND ABANDON 10 FEET OF 4 INCH POLY AND 932 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3219 080.63906 2,585
RELOCATE FACILITIES. INSTALL 201 FEET OF 2 INCH POLY AND ABANDON 60 FEET OF 1.25 INCH POLY ALONG BRADLEY STREET TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
3220 080.63907 502,134
RELOCATE FACILITIES. INSTALL 307 FEET OF 4 INCH POLY AND 3938 FEET OF 6 INCH POLY AND ABANDON 275 FEET OF 4 INCH POLY AND 3880 FEET OF 6 INCH POLY ALONG HICKORY CREEK WEST TO ACCOMMODATE THE CITY OF DENTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3221 080.63911 572,563
INSTALL 908 FEET OF 2 INCH POLY AND 1161 FEET OF 4 INCH POLY ALONG RIVER BEND DRIVE AND ABANDON 700 FEET OF 2 INCH POLY AND 800 FEET OF 3 INCH POLY AND 340 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY DECEMBER
3222 080.63914 17,342
RELOCATE FACILITIES. INSTALL 1868 FEET OF 4 INCH POLY ALONG LONGHORN TRAIL AND ABANDON 1880 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3223 080.63917 9,604
INSTALL 602 FEET OF 4 INCH POLY ALONG 3RD STREET AND ABANDON 110 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WALNUT SPRINGS
SYSTEM INTEGRITY DECEMBER
3224 080.63919 5,964
INSTALL 450 FEET OF 2 INCH AND 4INCH POLY AND ABANDON 250 FEET OF 2 INCH AND 100 FEET OF 3 INCH STEEL ALONG BRIGGS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3225 080.63922 968 INSTALL 2715 FEET OF 4 INCH AND 2545 FEET OF 2 INCH POLY ALONG THE STREETS OF REVELSTOKE 1B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
3226 080.63924 4 INSTALL 1795 FEET OF 2 INCH POLY ALONG THE STREETS OF THREE POINTS PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CEDAR PARK GROWTH JANUARY
3227 080.63937 2,105
RELOCATE FACILITIES. INSTALL 70 FEET OF 6 INCH POLY ALONG KELLER PARKWAY AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF KELLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
SYSTEM INTEGRITY DECEMBER
3228 080.63938 9,906
RELOCATE FACILITIES. INSTALL (9) POLY SERVICES AND ABANDON (9) POLY SERVICES ALONG STEEPLECHASE DRIVE TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 110 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3229 080.63942 8,263
INSTALL 389 FEET OF 4 INCH POLYALONG LAMAR STREET AND ABANDON 96 FEET OF 4 INCH STEEL AND 307 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY
SYSTEM INTEGRITY DECEMBER
3230 080.63946 24,013
INSTALL 3826 FEET OF 2 INCH POLY ALONG CROXTON ROAD AND ABANDON 945 FEET OF 2 INCH STEEL AND 2251 FEET OF 2 INCH POLY AND 70 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA
SYSTEM INTEGRITY DECEMBER
3231 080.63955 2,990
INSTALL 38 FEET OF 2 INCH POLY ALONG 9TH STREET AND ABANDON 23 FEET OF 2 INCH STEEL AND 25 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
3232 080.63966 15,469 INSTALL 6600 FEET OF 8 POLY ALONG THE STREETS OF OAKS PRESERVES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MANSFIELD GROWTH APRIL
3233 080.63970 51 ABANDON DISTRICT REGULATOR STATION 93 ALONG SHEFIELD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3234 080.63977 30,454
INSTALL 254 FEET OF 6 INCH AND 11 FEET OF 4 INCH POLY AND ABANDON 212 FEET OF 6 INCH STEEL AND 23 FEET OF 6 INCH AND 3 FEET OF 4 INCH POLY ALONG LOCUST STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3235 080.63978 7,786
INSTALL 1023 FEET OF 2 INCH POLY ALONG PECAN STREET AND 395 FEET OF 4 INCH POLY AND ABANDON 1580 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
3236 080.63979 7,037
RELOCATE FACILITIES. INSTALL 927 FEET OF 2 INCH POLY AND ABANDON 42 FEET OF 2 INCH POLY ALONG HAWTHORNE STREET TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3237 080.63980 446,470 INSTALL DISTRICT REGULATOR STATION AND 65 FEET OF 4 INCH STEEL. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CRANDALL
SYSTEM IMPROVEMENT SEPTEMBER
3238 080.63981 1,581 INSTALL 3000 FEET OF 4 INCH POLY ALONG RAVENHILL STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORNEY GROWTH APRIL
3239 080.63993 1,701
RELOCATE FACILITIES. INSTALL 122 FEET OF 16 INCH STEEL AND ABANDON 114 FEET OF 16 INCH STEEL ALONG NORTH SUMMIT AVENUE TO ACCOMMODATE LEWISVILLE STORM DRAIN PROJECT. ALL CUSTOMERS LEWISVILLE
RELOCATION OF FACILITIES OCTOBER
3240 080.63995 5,018
RELOCATE FACILITIES. INSTALL 154 FEET OF 2 INCH POLY AND ABANDON 184 FEET OF 2 INCH STEEL ALONG PRAIRIE STREET TO ACCOMMODATE CITY OF EVERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN
SYSTEM INTEGRITY DECEMBER
3241 080.63996 25,898 INSTALL 2430 FEET OF 2 INCH POLY ALONG THE STREETS OF CANTERBURY COVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH OCTOBER
3242 080.64001 1,465
RELOCATE FACILITIES. INSTALL 46 FEET OF 2 INCH POLY AND ABANDON 27 FEET OF 2 INCH POLY ALONG PEARSON AVENUE TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
3243 080.64003 2,070
INSTALL 150 FEET OF 2 INCH POLY ALONG ROCKWALL AND ABANDON 265 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
3244 080.64005 5,262
RELOCATE FACILITIES. INSTALL 155 FEET OF 8 INCH POLY ALONG GREENS PRAIRIE TRAIL AND ABANDON 135 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
3245 080.64008 3,116 INSTALL 1400 FEET OF 2 INCH POLY ALONG THE STREETS OF THE HIGHLANDS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER
3246 080.64016 15,769
INSTALL 1030 FEET OF 2 INCH POLY ALONG RANCH ROAD AND MESQUITE LANE AND ABANDON 5 FEET OF 6 INCH AND 7 FEET OF 4 INCH POLY AND 581 FEET OF 2 INCH STEEL AND 475 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY DECEMBER
3247 080.64020 19,865
PROJECT IS TO INSTALL REMOTE CONTROL ON A VALVE ON LINE D AT STATION D7 BETWEEN I-35 AND HWY-75 IN THE CITY OF DALLAS, DALLAS COUNTY. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
3248 080.64025 1,034,284
FUNCTIONAL PROJECT COVERING REPLACEMENT OF MAINS AND SERVICE LINES IN THE CITY SWEETWATER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
3249 080.64026 24,494
INSTALL 6 FEET OF 2 INCH POLY AND 4 FEET OF 4 INCH POLY AND 608 FEET OF 6 INCH POLY AND ABANDON 537 FEET OF 2 INCH STEEL ALONG WILLIAMS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY DECEMBER
3250 080.64029 (280)INSTALL 753 FEET OF 2 INCH POLY ALONG THE STREETS OF PRESTON PARK SECTION 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUSTIN GROWTH MARCH
3251 080.64035 219
ABANDON DISTRICT REGULATOR 157 IN FORT WORTH ALONG GLEN GARDEN DRIVE AND SOUTH RIVERSIDE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3252 080.64044 1,812
INSTALL 1578 FEET OF 4 INCH AND 1178 FEET OF 2 INCH POLY ALONG THE STREETS OF SANSOM BLUFF APARTMENTS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SANSOM PARK GROWTH MARCH
3253 080.64049 1,371,062
INSTALL 120 FEET OF 2 INCH POLY AND 180 FEET OF 4 INCH POLY AND 780 FEET OF 6 INCH POLY AND 800 FEET OF 12 INCH POLY AND ABANDON 15 FEET OF 2 INCH STEEL AND 20 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY AND 70 FEET OF 6 INCH STEEL AND 1187 FEET OF 12 INCH STEEL ALONG JONES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3254 080.64050 243 INSTALL 2401 FEET OF 2 INCH POLY ALONG THE STREETS OF PRESTON PARK SECTION 2B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUSTIN GROWTH APRIL
3255 080.64051 13,206
INSTALL 301 FEET OF 2 INCH POLY AND 258 FEET OF 4 INCH POLY AND ABANDON 333 FEET OF 2 INCH POLY AND 263 FEET OF 3 INCH STEEL ALONG SMALL HILL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
3256 080.64053 17,158
INSTALL 1245 FEET OF 4 INCH POLY AND ABANDON 1015 FEET OF 4 INCH STEEL AND 400 FEET OF 4 INCH POLY ALONG NEW YORK AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3257 080.64057 161,958
INSTALL 3,757 OF 2 INCH POLY AND 2,230 FEET OF 4 INCH POLY AND 2,425 FEET OF 6 INCH POLY ALONG THE STREETS OF OAKMONT PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL RED OAK GROWTH OCTOBER
3258 080.64059 376,312
INSTALL 9000 FEET OF 2 INCH POLY AND 2295 FEET OF 6 INCH POLY ALONG THE STREETS OF SHAW CREEK RANCH SUBDIVISION IN FERRIS TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FERRIS GROWTH DECEMBER
3259 080.64063 1,218 INSTALL 2510 FEET OF 2 INCH AND 800 FEET OF 4 INCH POLY ALONG THE STREETS OF CREEK CROSSING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH JUNE
3260 080.64064 257,723 INSTALL 500 FEET OF 4 INCH POLY AND 6,660 FEET OF 2 INCH POLY ALONG WESTERN RIDGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JULY
3261 080.64069 15,812 INSTALL 900 FEET OF 4 INCH POLY AND 800 OF 2 INCH POLY ALONG THE STREETS OF CLEAR LAKE ESTATES SUBDIVISION IN GRAND PRAIRIE,TEXAS. RESIDENTIAL GRAND PRAIRI GROWTH DECEMBER
3262 080.64070 367
RELOCATE FACILITIES. INSTALL 21 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 4 INCH POLY ALONG CROSSLAKE PARKWAY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 111 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3263 080.64077 6 INSTALL 183 FEET OF 4 INCH AND 2,167 FEET OF 2 INCH POLY ALONG THE STREETS OF MADSEN RANCH PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JANUARY
3264 080.64090 1,081,477
RELOCATE FACILITIES. ABANDON 55 FEET OF 2 INCH STEEL AND 1934 FEET OF 2 INCH POLY AND 149 FEET OF 3 INCH STEEL AND 700 FEET OF 3 INCH POLY AND 356 FEET OF 4 INCH STEEL ALONG MELISSA ROAD TO ACCOMMODATE CITY OF MELISSA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MELISSA
SYSTEM INTEGRITY DECEMBER
3265 080.64100 515 INSTALL 3388 FEET OF 6 INCH POLY ALONG INTERSTATE 35. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL NORTHLAKE GROWTH OCTOBER
3266 080.64103 40
RELOCATE FACILITIES. ABANDON 287 FEET OF 6 INCH POLY ALONG DALLAS PARKWAY TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
3267 080.64115 1,394
INSTALL (1) SERVICE LINE AND ABANDON DALLAS DRS249 ALONG PRESTON ROAD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
3268 080.64118 2,098
INSTALL RTU AT DISTRICT REGULATOR 02 ALONG LINE L8C AND ABANDON RTU AND VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
3269 080.64122 21,223
RELOCATE FACILITIES. INSTALL 776 FEET OF 2 INCH POLY AND ABANDON 969 FEET OF 2 INCH POLY ALONG DENLEY TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3270 080.64128 12,284
RELOCATE FACILITIES. INSTALL 1223 FEET OF 2 INCH POLY AND 17 FEET OF 3 INCH POLY AND 13 FEET OF 4 INCH POLY AND ABANDON 1148 FEET OF 3 INCH STEEL ALONG CRENSHAW DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3271 080.64130 1,481,102
RELOCATE FACILITIES. INSTALL 277 FEET OF 2 INCH POLY AND 16 FEET OF 3 INCH POLY AND 13 FEET OF 4 INCH POLY AND 2493 FEET OF 8 INCH POLY AND ABANDON 16 FEET OF 3 INCH POLY AND 13 FEET OF 6 INCH STEEL AND 2200 FEET OF 8 INCH STEEL ALONG HAMPTON ROAD TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
3272 080.64131 1,275,510
RELOCATE FACILITIES. INSTALL 1011 FEET OF 12 INCH AND 1190 FEET OF 2 INCH POLY AND ABANDON 930 FEET OF 16 INCH STEEL AND 208 FEET OF 2 INCH POLY ALONG GASTON AVENUE TO ACCOMMODATE CITY OF DALLAS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3273 080.64132 7,785
RELOCATE FACILITIES. INSTALL 2850 FEET OF 4 INCH POLY AND ABANDON 2850 FEET OF 4 INCH POLY ALONG US HIGHWAY 175 TO ACCOMMODATE TXDOT STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
3274 080.64138 1,167
INSTALL 282 FEET OF 2 INCH POLY ALONG WEST CEDAR AND ABANDON 278 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN
SYSTEM INTEGRITY DECEMBER
3275 080.64139 411,777
RELOCATE FACILITIES. INSTALL 625 FEET OF 4 INCH POLY AND ABANDON 400 FEET OF 4 INCH STEEL AND 88 FEET OF 4 INCH POLY ALONG FM 407 TO ACCOMMODATE CITY OF JUSTIN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JUSTIN
SYSTEM INTEGRITY OCTOBER
3276 080.64141 30,770
INSTALL 2200 FEET OF 12 INCH, 275 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY ABANDON 198 FEET OF 2 INCH STEEL AND 360 FEET OF 6 INCH STEEL AND 2128 FEET OF 18 INCH STEEL ALONG SCYENE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3277 080.64144 1,967
RELOCATE FACILITIES. INSTALL 90 FEET OF 4 INCH POLY ALONG WEST FELIX AND ABANDON 70 FEET OF 4 INCH CAST IRON TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES DECEMBER
3278 080.64146 9,085
RELOCATE FACILITIES. INSTALL 255 FEET OF 4 INCH POLY AND 230 FEET OF 6 INCH POLY AND ABANDON 50 FEET OF 4 INCH STEEL AND 210 FEET OF 4 INCH POLY AND 220 FEET OF 6 INCH POLY ALONG HEMPHILL DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3279 080.64150 200,762
INSTALL 1049 FEET OF 4 INCH POLY AND ABANDON 139 FEET OF 2 INCH STEEL AND 935 FEET OF 3 INCH STEEL ALONG CHURCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY DECEMBER
3280 080.64151 20,111 INSTALL 260 FEET OF 4 INCH POLY ALONG STREETS OF DYLAN DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
3281 080.64152 244 ABANDON DISTRICT REGULATOR 130 IN FORT WORTH AT THE EVANS AVENUE AND EAST JESSAMINE STREET. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3282 080.64154 72,955
RELOCATE FACILITIES. INSTALL 177 FEET OF 6 INCH POLY ALONG HERITAGE TRACE ALONG FARM TO MARKET ROAD 156 AND ABANDON 150 FEET OF 6 INCH POLY TO ACCOMMODATE TEXAS DEPARTMENT OF TRANSPORTATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3283 080.64155 13,830
RELOCATE FACILITIES. INSTALL 809 FEET OF 6 INCH POLY AND ABANDON 809 FEET OF 6 INCH POLY ALONG FM 156 TO ACCOMMODATE TXDOT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3284 080.64157 340,177
RELOCATE FACILITIES. INSTALL 7 FEET OF 2 INCH POLY AND 232 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY ALONG VICTORIA DRIVE AND FM 156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES DECEMBER
3285 080.64158 377,135
RELOCATE FACILITIES. INSTALL 16 FEET OF 2 INCH POLY AND 166 FEET OF 6 INCH POLY AND ABANDON 12 FEET OF 2 INCH POLY ALONG HIGHLAND DRIVE AND FM 156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3286 080.64159 475,464
RELOCATE FACILITIES. INSTALL 1000 FEET OF 6 INCH POLY AND ABANDON 525 FEET OF 6 INCH STEEL ALONG WESTERN CENTER TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3287 080.64163 28,533
INSTALL 2594 FEET OF 4 INCH POLY AND ABANDON 2255 FEET OF 3 INCH STEEL AND 346 FEET OF 3 INCH POLY ALONG BRYANT AND ARCHER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE
SYSTEM INTEGRITY DECEMBER
3288 080.64167 7,824 INSTALL 1,636 FEET OF 4 INCH AND 621 FEET OF 2 INCH POLY ALONG THE STREETS OF HEATHER MEADOWS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
3289 080.64168 3
ABANDON DISTRICT REGULATOR STATION #048 IN DALLAS AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1627.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 112 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3290 080.64173 777
INSTALL 151 FEET OF 2 INCH POLY AND ABANDON 765 FEET OF 2 INCH STEEL AND 210 FEET OF 2 INCH POLY AND 483 FEET OF 3 INCH STEEL AND 39 FEET OF 3 INCH POLY AND 400 FEET OF 4 INCH STEEL AND 40 FEET OF 4 INCH POLY ALONG MCLELLAND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH
SYSTEM INTEGRITY DECEMBER
3291 080.64175 53,598
INSTALL 951 FEET OF 2 INCH POLY AND 2423 FEET OF 4 INCH POLY AND ABANDON 2359 FEET OF 2 INCH STEEL AND 481 FEET OF 2 INCH POLY AND 173 FEET OF 4 INCH STEEL ALONG ARKANSAS AND MORRIS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR
SYSTEM INTEGRITY DECEMBER
3292 080.64185 11,720
RELOCATE FACILITIES. INSTALL 394 FEET OF 6 INCH POLY AND ABANDON 295 FEET OF 6 INCH POLY ALONG COPPER CROSSING DRIVE ACROSS F.M. 156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3293 080.64186 7,659
RELOCATE FACILITIES. INSTALL 4 FEET OF 4 INCH POLY AND 224 FEET OF 6 INCH POLY AND ABANDON 210 FEET OF 4 INCH POLY AND 8 FEET OF 6 INCH POLY ALONG GRAND CENTRAL PARKWAY ACROSS F.M. 156 TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3294 080.64192 3,926 INSTALL 325 FEET OF 4 INCH POLY ALONG SNOW GOOSE TRAIL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH JUNE
3295 080.64193 218
ABANDON DISTRICT REGULATOR STATION 158 IN FORT WORTH AT THE TENNESSEE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3296 080.64198 8,952
INSTALL 1095 FEET OF 2 INCH POLY AND ABANDON 127 FEET OF 2 INCH POLY AND 423 FEET OF 4 INCH STEEL ALONG RINGLING LAKE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
SYSTEM INTEGRITY DECEMBER
3297 080.64199 5 INSTALL 2125 FEET OF 2 INCH POLY ALONG THE STREETS OF CANTARRA 1 SECTION 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH JANUARY
3298 080.64202 60,560
RELOCATE FACILITIES. INSTALL 381 FEET OF 2 INCH POLY AND ABANDON 390 FEET OF 2 INCH STEEL ALONGWEST THIRD STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3299 080.64214 17 INSTALL 3425 FEET OF 2 INCH POLY MAIN ALONG THE STREETS OF BAR C RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JANUARY
3300 080.64215 279 INSTALL 2950 FEET OF 2 INCH POLY ALONG THE STREETS OF CARDINAL CROSSING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH APRIL
3301 080.64216 115,131
INSTALL 2021 FEET OF 2 INCH POLY AND 2 FEET OF 3 INCH POLY AND 2344 FEET OF 4 INCH POLY AND ABANDON 3224 FEET OF 3 INCH STEEL AND 326 FEET OF 3 INCH POLY AND 495 FEET OF 4 INCH STEEL AND 345 FEET OF 4 INCH POLY AND 1055 FEET OF 6 INCH STEEL AND 80 FEET OF 6 INCH POLY ALONG 27TH AND AVE O IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
3302 080.64217 25,679 INSTALL 1200 FEET OF 2 INCH POLY ALONG SKILLMAN STREET AND SEGWICK DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH DECEMBER
3303 080.64218 365 INSTALL 1100 FEET OF 6 INCH POLY ALONG BLACK LOCUST. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PFLUGERVILLE GROWTH APRIL
3304 080.64219 3,439 INSTALL 950 FEET OF 2 INCH POLY ALONG HIGHLAND AND FERGUSON ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH JUNE
3305 080.64220 34,900 INSTALL 4220 FEET OF 6 INCH POLY ALONG S INTERSTATE HIGHWAY 45. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WILMER GROWTH DECEMBER
3306 080.64234 8,239 INSTALL 4600 FEET OF 2 INCH POLY ALONG THE STREETS OF GIDEON GROVE NORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH OCTOBER
3307 080.64245 6,371 INSTALL 3100 FEET OF 6 INCH POLY ALONG JOHN KING BOULEVARD TO GIDEON GROVE NORTH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROCKWALL GROWTH APRIL
3308 080.64247 10,530
INSTALL 2410 FEET OF 2 INCH POLY AND 412 FEET OF 4 INCH POLY AND ABANDON 142 FEET OF 2 INCH STEEL AND 643 FEET OF 2 INCH POLY AND 2324 FEET OF 3 INCH STEEL AND 18 FEET OF 3 INCH POLY ALONG ORCHARD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON
SYSTEM INTEGRITY DECEMBER
3309 080.64248 40,766 INSTALL 510 FEET OF 4 INCH POLY AND INSTALL ALONG HICKORY STREET AND PRESTON ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FRISCO GROWTH DECEMBER
3310 080.64249 3,515
INSTALL 347 FEET OF 2 INCH POLY AND ABANDON 395 FEET OF 2 INCH STEEL AND 139 FEET OF 2 INCH POLY AND 366 FEET OF 3 INCH STEEL AND 127 FEET OF 3 INCH POLY AND 475 FEET OF 4 INCH STEEL ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAINT JO
SYSTEM INTEGRITY DECEMBER
3311 080.64250 308,941 INSTALL 7854 FEET OF 2 INCH AND 3067 FEET OF 4 INCH POLY ALONG THE STREETS OF TRINITY FALLS PHASE 3-5B. RESIDENTIAL MCKINNEY GROWTH SEPTEMBER
3312 080.64252 14,861 INSTALL 560 FEET OF 2 INCH POLY ALONG STREETS OF POND SPRINGS APARTMENTS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUSTIN GROWTH JULY
3313 080.64253 12,870 INSTALL 1335 FEET OF 8 INCH POLY ALONG BIRD POND ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH JUNE
3314 080.64254 7,455
RELOCATE FACILITIES. INSTALL (15) 0.75 INCH SERVICE LINES ALONG MOLLIMAR AND ABANDON (15) 0.75 INCH SERVICES TO ACCOMMODATE THE CITY OF PLANO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
3315 080.64273 (357)INSTALL 3705 FEET OF 2 INCH POLY ALONG THE STREETS OF DEER BROOKE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH APRIL
3316 080.64274 1,516
RELOCATE FACILITIES. INSTALL 28 FEET OF 3 INCH POLY AND ABANDON 28 FEET OF 3 INCH POLY ALONG MUNICIPAL TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
3317 080.64279 4,514 INSTALL 1505 FEET OF 4 INCH POLY AND 450 FEET OF 2 INCH POLY ALONG BONNIEVIEW. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH JUNE
3318 080.64280 161,079 INSTALL 3475 FEET OF 6 INCH POLY ALONG INDUSTRIAL PARK DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FAIRFIELD GROWTH SEPTEMBER
3319 080.64281 224,774
INSTALL 2255 FEET OF 4 INCH AND 5266 FEET OF 2 INCH POLY ALONG THE STREETS OF THE TRAILS OF ELIZABETH CREEK PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
3320 080.64288 3,608
INSTALL 965 FOOT OF 2 INCH POLY AND 2481 FOOT OF 4 INCH POLY AND 7 FOOT OF 8 INCH POLY ALONG THE STREETS IN THE NEW CONCORDIA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL KELLER GROWTH NOVEMBER
3321 080.64289 69,203 INSTALL 140 FEET OF 2 INCH POLY AND 2559 FEET OF 4 INCH POLY ALONG BELTLINE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BALCH SPRINGS GROWTH APRIL
3322 080.64294 84 INSTALL 5667 FEET OF 2 INCH POLY AND 6388 FEET OF 4 INCH POLY ALONG THE STREETS OF HARBOR PARK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AZLE GROWTH JANUARY
3323 080.64295 9,282
INSTALL DISTRICT REGULATOR STATION ALONG WILCOX AND ABANDON DISTRICT REGULATOR STATION 01 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE
SYSTEM INTEGRITY DECEMBER
3324 080.64302 21
ABANDON DISTRICT REGULATOR STATION 081 IN UNIVERSITY PARK, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 113 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3325 080.64303 6,981
INSTALL 1790 FEET OF 2 INCH POLY AND ABANDON 3283 FEET OF 2 INCH POLY ALONG FM498 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
3326 080.64309 23 ABANDON DISTRICT REGULATOR STATION 033 ALONG BISBEE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3327 080.64312 3,967
RELOCATE FACILITIES. INSTALL 420 FEET OF 6 INCH POLY AND ABANDON 410 FEET OF 6 INCH POLY ALONG KELLER HASLET ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3328 080.64313 21,642 INSTALL 1350 FEET OF 2 INCH POLY ALONG THE STREETS OF PHASE 5 OF THE TIMBER CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH OCTOBER
3329 080.64317 33
RELOCATE FACILITIES. INSTALL 353 FEET OF 4 INCH POLY AND ABANDON 340 FEET OF 4 INCH POLY MAIN ALONG SH 360 TO ACCOMMODATE CONSTRUCTION OF COMMERCIAL DRIVEWAY FOR AMERICAN AIRLINES FACILITY. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES APRIL
3330 080.64319 7,977
INSTALL 312 FEET OF 2 INCH POLY AND ABANDON 301 FEET OF 2 INCH STEEL ALONG CARDINAL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MURCHISON
SYSTEM INTEGRITY DECEMBER
3331 080.64322 1,817
RELOCATE FACILITIES. INSTALL 15 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 4 INCH POLY ALONG CLEVELAND AVENUE TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3332 080.64323 71 ABANDON 10 FEET OF 2 INCH STEEL AND 137 FEET OF 2 INCH POLY ALONG IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
3333 080.64326 300,552
RELOCATE FACILITIES. INSTALL 1053 FEET OF 2 INCH POLY AND 609 FEET OF 6 INCH POLY AND ABANDON 1367 FEET OF 2 INCH STEEL ALONG WATERCRESS DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY SEPTEMBER
3334 080.64328 7,868
INSTALL 117 FEET OF 2 INCH POLY AND 781 FEET OF 4 INCH POLY AND ABANDON 65 FEET OF 2 INCH STEEL AND 772 FEET OF 3 INCH STEEL ALONG EAST MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MADISONVILLE
SYSTEM INTEGRITY DECEMBER
3335 080.64330 129,375 INSTALL 143 SERVICE LINES AND ABANDON 143 SERVICE LINES IN DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3336 080.64335 (18,413) INSTALL 776 FEET OF 4 INCH POLY ALONG THE STREETS OF CHURCH STREET. ALL CUSTOMERS GEORGETOWNSYSTEM
IMPROVEMENT DECEMBER
3337 080.64339 2,981
RELOCATE FACILITIES. INSTALL 10 FEET OF 2 INCH POLY AND 13 FEET OF 4 INCH POLY AND 114 FEET OF 6 INCH POLY AND ABANDON 7 FEET OF 2 INCH POLY AND 105 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3338 080.64341 6,974
INSTALL 462 FEET OF 2 INCH POLY AND ABANDON 195 FEET OF 2 INCH STEEL AND 165 FEET OF 2 INCH POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
3339 080.64342 6,223
INSTALL 305 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH STEEL ALONG AL LIPSCOM WAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3340 080.64344 50,663 INSTALL 1000 FEET OF 4 INCH POLY ALONG NORTH SONOMA TRAIL.COMMERCIAL OR
INDUSTRIAL ENNIS GROWTH DECEMBER
3341 080.64346 558,910
FUNCTIONAL PROJECT COVERING THE REPLACEMENT OF MAINS AND SERVICE LINES IN GEORGETOWN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY DECEMBER
3342 080.64360 130 INSTALL 285 FEET OF 2 INCH POLY ALONG INTERSTATE HIGHWAY 35. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DENTON GROWTH JUNE
3343 080.64365 35,137 INSTALL 900 FEET OF 6 INCH POLY ALONG THE STREETS OF TWU.COMMERCIAL OR
INDUSTRIAL DENTON GROWTH OCTOBER
3344 080.64369 929
INSTALL 1715 FEET OF 4 INCH AND 2540 FEET OF 2 INCH POLY ALONG THE STREETS OF HERITAGE CREEKSIDE HOMES PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH OCTOBER
3345 080.64376 6,517
RELOCATE FACILITIES. INSTALL (14) POLY SERVICES ALONG NORTH TRAIL STREET AND ABANDON (4) POLY SERVICES AND (10) STEEL SERVICES TO ACCOMMODATE CITY OF CROWLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
SYSTEM INTEGRITY DECEMBER
3346 080.64378 109
ABANDON 544 FEET OF 2 INCH POLY ALONG VAUGHN DRIVE TO ACCOMMODATE THE CITY OF BURLESON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
3347 080.64380 2,449
RELOCATE FACILITIES. INSTALL 38 FEET OF 6 INCH POLY AND ABANDON 30 FEET OF 6 INCH STEEL ALONG SPRAGUE DRIVE TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT. IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3348 080.64385 273,873 INSTALL 1684 FEET OF 4 INCH POLY AND ABANDON 1622 FEET OF 4 INCH POLY ALONG TEXAN TRAIL. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY SEPTEMBER
3349 080.64387 1,135 INSTALL 5147 FEET OF 2 INCH AND 1545 FEET OF 4 INCH POLY MAIN ALONG THE STREETS OF MAGNOLIA FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GLENN HEIGHTS GROWTH JUNE
3350 080.64393 12,300
RELOCATE FACILITIES. INSTALL 1816 FEET OF 2 INCH POLY AND ABANDON 1791 FEET OF 2 INCH POLY ALONG FOLKSTONE DRIVE TO ACCOMMODATE CITY OF FOREST HILL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FOREST HILL
SYSTEM INTEGRITY DECEMBER
3351 080.64395 10,209
INSTALL 181 FEET OF 2 INCH POLY AND 397 FEET OF 4 INCH POLY AND 1287 FEET OF 8 INCH POLY AND ABANDON 75 FEET OF 2 INCH STEEL AND 56 FEET OF 2 INCH POLY AND 376 FEET OF 4 INCH STEEL AND 1125 FEET OF 8 INCH STEEL ALONG FAIRBANKS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
3352 080.64398 142,622
RELOCATE FACILITIES. INSTALL 980 FEET OF 2 INCH, 625 FEET OF 4 INCH, 5980 FEET OF 6 INCH AND 225 FEET OF 8 INCH POLY ALONG SH 352 AND ABANDON 975 FEET OF 2 INCH, 125 FEET OF 3 INCH AND 6470 FEET OF 4 INCH POLY THE ACCOMMODATE TXDOT DRAINAGE PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MESQUITE
RELOCATION OF FACILITIES DECEMBER
3353 080.64400 25,548
INSTALL 1060 FEET OF 2 INCH POLY AND 3412 FEET OF 4 INCH POLY AND ABANDON 185 FEET OF 2 INCH STEEL AND 3894 FEET OF 4 INCH STEEL AND 30 FEET OF 4 INCH POLY AND 738 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY
SYSTEM INTEGRITY DECEMBER
3354 080.64401 1,277 INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 240 FEET OF 2 INCH POLY ALONG MARBLE ARCH LANE. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY MARCH
3355 080.64407 4,566
INSTALL DISTRICT REGULATOR STATION ALONG VICTORIA AND ABANDON DISTRICT REGULATOR STATION 26 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
3356 080.64410 1,259
RELOCATE FACILITIES. INSTALL 15 FEET OF 4 INCH STEEL AND ABANDON 10 FEET OF 4 INCH STEEL ALONG HARRISON LANE TO ACCOMMODATE CITY OF HURST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 114 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3357 080.64411 4,175
INSTALL 2700 FEET OF 4 INCH POLY AND 1500 FEET OF 2 INCH POLY ALONG THE STREETS OF OAKS PRESERVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH JUNE
3358 080.64412 6,212 INSTALL 1295 FEET OF 2 INCH POLY ALONG THE STREETS OF CARLSON PLACE PHASE D. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JUNE
3359 080.64414 7,812
RELOCATE FACILITIES. INSTALL 46 FEET OF 2 INCH STEEL AND 12 FEET OF 8 INCH STEEL AND ABANDON 4 FEET OF 6 INCH STEEL AND 8 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
SYSTEM INTEGRITY DECEMBER
3360 080.64416 5,358
INSTALL DISTRICT REGULATOR STATION ALONG SAUNDERS STREET AND ABANDON DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
3361 080.64417 541 INSTALL 1850 FEET OF 4 INCH POLY AND 8950 FEET OF 2 INCH POLY ALONG THE STREETS OF RIVERSET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH JUNE
3362 080.64418 3 INSTALL 2000 FEET OF 2 INCH POLY ALONG THE STREETS OF STONELEIGH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEATH GROWTH JANUARY
3363 080.64420 8,110
RELOCATE FACILITIES. INSTALL 420 FEET OF 6 INCH POLY AND ABANDON 400 FEET OF 6 INCH STEEL ALONG CARROLL STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3364 080.64422 217 ABANDON DISTRICT REGULATOR STATION ALONG ROBINWOOD DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3365 080.64423 217 ABANDON DISTRICT REGULATOR STATION ALONG MICKI LYNN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3366 080.64424 7,337
RELOCATE FACILITIES. INSTALL 10 FEET OF 4 INCH POLY AND 330 FEET OF 8 INCH POLY AND ABANDON 10 FEET OF 4 INCH POLY AND 330 FEET OF 8 INCH POLY ALONG BUSINESS 114 TO ACCOMMODATE CITY OF ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
SYSTEM INTEGRITY DECEMBER
3367 080.64426 531 INSTALL 2150 FEET OF 2 INCH POLY ALONG THE STREETS OF WHISPER ROCK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH JUNE
3368 080.64427 (471)
PURCHASE (3) 3000 WATT INVERTER GENERATORS AND (2) TRUCK DOCKS, MODEMS, POWER SUPPLY, AND DELL LAPTOPS FOR USE IN ROUND ROCK SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT DECEMBER
3369 080.64431 3,608 INSTALL 1900 FEET OF 4 INCH POLY AND 2900 FEET OF 2 INCH POLY ALONG PARK PLACE BOULEVARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH OCTOBER
3370 080.64434 10,868
RELOCATE FACILITIES. INSTALL 49 POLY SERVICES AND ABANDON 49 POLY AND STEEL SERVICES ALONG COLLINS STREET TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3371 080.64438 351,203
RELOCATE FACILITIES. INSTALL 1027 FEET OF 2 INCH POLY AND 1569 FEET OF 6 INCH POLY AND 3 FEET OF 8 INCH POLY AND ABANDON 1162 FEET OF 2 INCH STEEL AND 80 FEET OF 2 INCH POLY AND 48 FEET OF 6 INCH STEEL ALONG LAKE DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
3372 080.64440 1,970
INSTALL 311 FEET OF 2 INCH POLY AND ABANDON 213 FEET OF 2 INCH STEEL AND 70 FEET OF 2 INCH POLY AND 14 FEET OF 3 INCH STEEL ALONG CAROLINA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3373 080.64442 52,753
RELOCATE FACILITIES. INSTALL 185 FEET OF 8 INCH, 2750 FEET OF 6 INCH AND 2750 FEET OF 4 INCH POLY ALONG BETSY LANE AND ABANDON 2800 FEET OF 8 INCH STEEL TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3374 080.64451 77,665
INSTALL 534 FEET OF 2 INCH POLY AND ABANDON 498 FEET OF 2 INCH STEEL ALONG MASSEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY SEPTEMBER
3375 080.64466 44,158
INSTALL 625 FEET OF 2 INCH AND 1,338 FEET OF 4 INCH AND 727 FEET OF 6 INCH POLY ALONG THE STREETS OF VENTANA 3A-1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
3376 080.64467 22,434
INSTALL 990 FEET OF 2 INCH POLY AND 65 FEET OF 4 INCH POLY AND 940 FEET OF 6 INCH POLY AND ABANDON 740 FEET OF 2 INCH STEEL AND 52 FEET OF 4 INCH STEEL AND 68 FEET OF 4 INCH POLY AND 820 FEET OF 6 INCH STEEL AND 118 FEET OF 6 INCH POLY ALONG PENROSE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3377 080.64471 27,276
RELOCATE FACILITIES. INSTALL 10 FEET OF 3 INCH POLY AND 2248 FEET OF 4 INCH POLY AND ABANDON 991 FEET OF 3 INCH STEEL AND 815 FEET OF 3 INCH POLY AND 486 FEET OF 4 INCH STEEL ALONG HILLCREST TO ACCOMMODATE CITY OF HICO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO
SYSTEM INTEGRITY DECEMBER
3378 080.64472 218
ABANDON DISTRICT REGULATOR STATION #201 IN DALLAS AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1738.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3379 080.64473 78,113 INSTALL 1828 FEET OF 2 INCH AND 1054 FEET OF 4 INCH POLY ALONG THE VARIOUS STREETS WITHIN PHASE 3-3B OF THE TRINITY FALLS SUBDIVISION. RESIDENTIAL MCKINNEY GROWTH OCTOBER
3380 080.64474 33
ABANDON DISTRICT REGULATOR STATION 031 ALONG SPRING AVENUE IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3381 080.64483 (31)INSTALL 1297 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA 4D. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH APRIL
3382 080.64484 69,687 INSTALL 2631 FEET OF 2 INCH POLY ALONG THE VARIOUS STREETS WITHIN PHASE 3-3C OF THE TRINITY FALLS SUBDIVISION. RESIDENTIAL CELINA GROWTH OCTOBER
3383 080.64487 24,430
INSTALL 25 FEET OF 4 INCH POLY AND 1800 FEET OF 6 INCH POLY AND ABANDON 50 FEET OF 2 INCH POLY AND 850 FEET OF 4 INCH STEEL AND 675 FEET OF 6 INCH STEEL ALONG VICKERY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3384 080.64491 11 ABANDON DISTRICT REGULATOR STATION 027 ALONG GASTON IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3385 080.64493 2,532
RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY AND ABANDON 214 FEET OF 2 INCH POLY ALONG GUENTHER AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3386 080.64494 43,736 INSTALL 3000 FEET OF 4 INCH POLY AND 4850 FEET OF 2 INCH POLY ALONG THE STREETS OF TRIPLE DIAMOND RANCH SUBDIVISION IN MANSFIELD, TX. RESIDENTIAL MANSFIELD GROWTH OCTOBER
3387 080.64495 10,922
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 275 FEET OF 4 INCH STEEL ALONG KIMBERLY DRIVE TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3388 080.64498 7,287 INSTALL 2,268 FEET OF 2 INCH POLY ALONG ARROW POINT DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL CEDAR PARK GROWTH DECEMBER
MTX AdditionsPage 115 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3389 080.64500 34,285,630
INSTALL 6.5 MILES OF 12 INCH STEEL AND 1.5 MILES OF 12 INCH, 0.65 MILES OF 8 INCH AND 1.65 MILES OF 6 INCH POLY AND ABANDON 5.1 MILES OF 12 INCH STEEL AND 4.05 MILES OF 16 INCH STEEL ALONG GARDEN RIDGE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
SYSTEM INTEGRITY DECEMBER
3390 080.64506 478
INSTALL 148 FEET OF 2 INCH POLY AND ABANDON 437 FEET OF 2 INCH STEEL AND 568 FEET OF 2 INCH POLY ALONG 4TH AND ELM IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEGARGEL
SYSTEM INTEGRITY DECEMBER
3391 080.64517 16,084
INSTALL 343 FEET OF 2 INCH POLY AND ABANDON 330 FEET OF 2 INCH POLY ALONG SW 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3392 080.64518 186
ABANDON (1) DISTRICT REGULATOR STATION ALONG WILDER AVENUE STREET IN THE TOWN OF BELLMEAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLMEAD
SYSTEM INTEGRITY DECEMBER
3393 080.64519 6,367
INSTALL 431 FEET OF 2 INCH POLY AND ABANDON 383 FEET OF 2 INCH STEEL AND 48 FEET OF 2 INCH POLY ALONG DAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3394 080.64522 359,022
RELOCATE FACILITIES. INSTALL 980 FEET OF 2 INCH POLY AND 1425 FEET OF 8 INCH POLY AND ABANDON 390 FEET OF 2 INCH STEEL AND 583 FEET OF 2 INCH POLY AND 284 FEET OF 6 INCH STEEL ALONG WATERCRESS DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
3395 080.64527 3,358
RELOCATE FACILITIES. INSTALL 6 FEET OF 4 INCH POLY AND 130 FEET OF 6 INCH POLY AND ABANDON 6 FEET OF 4 INCH POLY AND 140 FEET OF 6 INCH POLY ALONG MORRISS ROAD TO ACCOMMODATE CITY OF FLOWER MOUND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
3396 080.64535 33,633 INSTALL 4493 FEET OF 2 INCH POLY AND 1387 FEET OF 4 INCH POLY ALONG THE STREETS OF THE TANNERS MILL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH JULY
3397 080.64540 264,459
INSTALL 3 VALVES, 28 FEET OF 10 INCH STEEL, AND 135 FEET OF 16 INCH STEEL AND ABANDON 2 VALVES, 47 FEET OF 10 INCH STEEL, 105 FEET OF 12 INCH STEEL, AND 116 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
SYSTEM INTEGRITY DECEMBER
3398 080.64541 440,774
INSTALL 120 FEET OF 16 INCH STEEL AND ABANDON 120 FEET OF 12 INCH STEEL ALONG PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY DECEMBER
3399 080.64543 (4)INSTALL 1073 FEET OF 2 INCH POLY ALONG JUDGE ELY DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ABILENE GROWTH JANUARY
3400 080.64544 267,502 INSTALL 2840 FEET OF 4 INCH POLY AND 4,340 FEET OF 2 INCH POLY ALONG THE STREETS OF EAGLE GLEN IN THE CITY OF ALVARADO. RESIDENTIAL ALVARADO GROWTH JULY
3401 080.64545 28,099 INSTALL 400 FEET OF 2 INCH POLY ALONG HILLCREST AND STATE HIGHWAY 121. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FRISCO GROWTH SEPTEMBER
3402 080.64546 44,523
INSTALL 2550 FEET OF 12 INCH, 60 FEET OF 8 INCH, 425 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG SOUTH LANCASTER ROAD AND ABANDON 2550 FEET OF 12 INCH, 80 FEET OF 8 INCH AND 30 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3403 080.64548 9,861 INSTALL 2870 FEET OF 2 INCH POLY ALONG THE STREETS OF SHADOWGLEN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANOR GROWTH JULY
3404 080.64551 20,296
INSTALL (2) REGLUATORS AND (1) RELIEF VALVE, ABANDON (2) REGLUATORS AND (1) RELIEF VALVE ALONG LINE L15-5 IN THE TOWN OF GATESVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
3405 080.64553 7,914
INSTALL CLOCK SPRINGS ALONG LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3406 080.64556 8,996
RELOCATE FACILITIES. INSTALL 1350 FEET OF 2 INCH POLY AND ABANDON 1285 FEET OF 2 INCH POLY ALONG BRENNAN DRIVE TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
3407 080.64557 2,552
RELOCATE FACILITIES. INSTALL 41 FEET OF 4 INCH POLY AND ABANDON 40 FEET OF 3 INCH STEEL ALONG HIGHWAY 377 TO ACCOMMODATE CITY OF ARGYLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARGYLE
SYSTEM INTEGRITY DECEMBER
3408 080.64558 20,562
RELOCATE FACILITIES. INSTALL 1950 FEET OF 2 INCH POLY ALONG MONTICELLO AND ABANDON 1900 FEET OF 1.25 INCH POLY TO ACCOMMODATE THE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
3409 080.64559 3,840
INSTALL 375 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 2 INCH STEEL AND 187 FEET OF 4 INCH STEEL ALONG NANTUCKET DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
3410 080.64565 10,612 INSTALL 220 FEET OF 2 INCH POLY ALONG BAUMGARTNER WAY. ALL CUSTOMERS ALLEN GROWTH DECEMBER
3411 080.64567 8,466 INSTALL 6904 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVISSO PHASE 4 SECTIONS 1,2 AND 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CEDAR PARK GROWTH JUNE
3412 080.64568 36,191 INSTALL 1,606 FEET OF 4 INCH POLY AND 540 FEET OF 2 INCH POLY ALONG THE STREETS OF VENTANA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
3413 080.64569 379,892
RELOCATE FACILITIES. INSTALL 2586 FEET OF 4 INCH AND 70 FEET OF 8 INCH POLY ALONG PENINSULA CLUB CIRCLE AND ABANDON 2163 FEET OF 2 INCH STEEL, 507 FEET OF 1.25 INCH, 90 FEET OF 2 INCH AND 60 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY SEPTEMBER
3414 080.64571 11,276
INSTALL 370 FEET OF 2 INCH POLY AND 400 FEET OF 4 INCH POLY AND ABANDON 712 FEET OF 2 INCH POLY AND 510 FEET OF 4 INCH STEEL AND 5 FEET OF 4 INCH POLY AND 72 FEET OF 6 INCH STEEL ALONG PATRICK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUBLIN
SYSTEM INTEGRITY DECEMBER
3415 080.64572 280,159
RELOCATE FACILITIES. NSTALL 1352 FEET OF 4 INCH AND 493 FEET OF 8 INCH POLY ALONG PENINSULA CLUB CIR WESTAND ABANDON 1352 FEET OF 2 INCH STEEL AND 483 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF LAKE WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY SEPTEMBER
3416 080.64576 1,767
RELOCATE FACILITIES. INSTALL 94 FEET OF 8 INCH POLY AND ABANDON 82 FEET OF 8 INCH POLY ALONG IH 30 AND AIRPORT ROAD TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT.IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
SYSTEM INTEGRITY DECEMBER
3417 080.64579 25,166
ABANDON 2217 FEET OF 2 INCH STEEL, 6 FEET OF 3 INCH STEEL, 720 FEET OF 4 INCH STEEL, AND 1311 FEET OF 6 INCH STEEL ALONG RANGER ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER
SYSTEM INTEGRITY DECEMBER
3418 080.64582 4,809 INSTALL 4300 FEET OF 2 INCH POLY ALONG THE STREETS OF DEVONSHIRE VILLAGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER
MTX AdditionsPage 116 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3419 080.64583 35,085
INSTALL 66 FEET OF 12 INCH STEEL AND ABANDON 70 FEET OF 12 INCH STEEL ALONG LINE CA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3420 080.64584 502,402
RELOCATE FACILITIES. INSTALL 417 FEET OF 2 INCH AND 2503 FEET OF 6 INCH POLY AND ABANDON 2066 FEET OF 4 INCH, 291 FEET OF 2 INCH POLY ALONG MCKINNEY STREET TO ACCOMMODATE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3421 080.64589 375,967
RELOCATE FACILITIES. INSTALL 2643 FEET OF 2 INCH, 30 FEET OF 4 INCH AND 2916 FEET OF 6 INCH POLY ALONG GLADE ROAD AND ABANDON 148 FEET OF 2 INCH, 30 FEET OF 3 INCH, 409 FEET OF 4 INCH AND 292 FEET OF 6 INCH POLY AND 2274 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF COLLEYVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
3422 080.64593 63,789
RELOCATE FACILITIES. INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 1390 FEET OF 2 INCH POLY ALONG HOLLAND DRIVE TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3423 080.64594 34,546
RELOCATE FACILITIES. INSTALL 1100 FEET OF 2 INCH POLY ALONG GREEN OAKS DRIVE AND ABANDON 1090 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3424 080.64599 347,241
RELOCATE FACILITIES. INSTALL 1384 DEET OF 8 INCH POLY AND ABANDON 635 FEET OF 8 INCH POLY ALONG TEEL PARKWAT TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
3425 080.64601 7,333
RELOCATE FACILITIES. INSTALL 1868 FEET OF 8 INCH AND 45 FEET OF 4 INCH POLY ALONG WATERCRESS DRIVE AND ABANDON 1739 FEET OF 8 INCH AND 89 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF LAKE WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
SYSTEM INTEGRITY DECEMBER
3426 080.64603 125
ABANDON (1) DISTRICT REGULATOR STATION 11 ALONG IDLEWILD DRIVE IN THE TOWN OF BROWNWOOD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
3427 080.64604 37,074
INSTALL 200 FEET OF STEEL AND ABANDON 200 FEET OF STEEL IN WISE COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3428 080.64606 80 ABANDON DISTRICT REGLUATOR STATION 12 IN SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
3429 080.64607 861 INSTALL 959 FEET OF 4 INCH AND 6065 FEET OF 2 INCH POLY ALONG THE STREETS OF SIENA 31. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JUNE
3430 080.64608 5 INSTALL 3651 FEET OF 4 INCH AND 1218 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA 6E, 6F AND 7C. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JANUARY
3431 080.64612 1,166 ABANDON 1500 FEET OF 2 INCH STEEL ALONG CARLSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3432 080.64614 1,329
RELOCATE FACILITIES. INSTALL 27 FEET OF 6 INCH POLY AND ABANDON 19 FEET OF 6 INCH POLY ALONG CUSTER DRIVE AND LOOKOUT DRIVE TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
3433 080.64622 11,117 INSTALL 2150 FEET OF 6 INCH POLY ALONG BUNKER HILL ROAD AND BEN DAVIS ROAD. ALL CUSTOMERS GARLAND GROWTH JUNE
3434 080.64629 (301,383)
RELOCATE FACILITIES. INSTALL 1042 FEET OF 4 INCH POLY AND ABANDON 1037 FEET OF 4 INCH POLY ALONG US 87TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT. ALL CUSTOMERS COMFORT
RELOCATION OF FACILITIES MARCH
3435 080.64630 2,059
RELOCATE FACILITIES. INSTALL 313 FEET OF 2 INCH POLY AND 80 FEET OF 4 INCH POLY AND ABANDON 4 FEET OF 2 INCH STEEL AND 303 FEET OF 2 INCH POLY AND 71 FEET OF 4 INCH STEEL ALONG KAZMEIER TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
3436 080.64632 4,057
RELOCATE FACILITIES. INSTALL 374 FEET OF 2 INCH POLY AND ABANDON 199 FEET OF 3 INCH STEEL ALONG COLLEGE MAIN STREET TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
3437 080.64633 6,339
INSTALL 984 FEET OF 2 INCH POLY AND ABANDON 1007 FEET OF 2 INCH STEEL ALONG HOLLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN
SYSTEM INTEGRITY DECEMBER
3438 080.64634 162,677 INSTALL 6030 FEET OF 2 INCH POLY ALONG THE STREETS OF RIVERPLACE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH APRIL
3439 080.64640 58
RELOCATE FACILITIES. ABANDON 25 FEET OF 4 INCH POLY ALONG COUNTY ROAD 110 TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
3440 080.64647 2,091 ABANDON 873 FEET OF 3 INCH STEEL ALONG LEHIGH DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3441 080.64648 (3,561)
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 260 FEET OF 2 INCH POLY TO ACCOMMODATE NEW BUILDING IN CONSTRUCTION IN TARRANT COUNTY. ALL CUSTOMERS MANSFIELD
RELOCATION OF FACILITIES SEPTEMBER
3442 080.64650 5,750
INSTALL 1057 FEET OF 2 INCH POLY AND 6 FEET OF 3 INCH POLY AND ABANDON 3 FEET OF 2 INCH POLY AND 1054 FEET OF 3 INCH STEEL ALONG OAK DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY DECEMBER
3443 080.64651 601 INSTALL 750 FEET OF 2 INCH POLY ALONG WASHINGTON AVENUE IN DALLAS COUNTY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH JUNE
3444 080.64654 3,771
INSTALL 500 FEET OF 4 INCH AND 250 FEET OF 2 INCH POLY ALONG WEST 3RD AVENUE AND ABANDON 500 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
3445 080.64660 150 ABANDON 355 FEET OF 4 INCH STEEL ALONG MCKINNEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
3446 080.64661 4,959
RELOCATE FACILITIES. INSTALL 1675 FEET OF 8 INCH POLY ALONG WATERCRESS DRIVE AND ABANDON 1677 FEET OF 6 INCH STEEL AND 480 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF LAKE WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
SYSTEM INTEGRITY DECEMBER
3447 080.64662 4,204
RELOCATE FACILITIES. INSTALL 520 FEET OF 2 INCH POLY AND ABANDON 520 FEET OF 2 INCH POLY ALONG BUENA VISTA DRIVE TO ACCOMMODATE CITY OF MARBLE FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS
SYSTEM INTEGRITY DECEMBER
3448 080.64667 313 INSTALL 10 FEET OF 4 INCH STEEL AND ABANDON 10 FEET OF 4 INCH STEEL ON LINE W12-1 ALONG HWY 380. ALL CUSTOMERS DECATUR
SYSTEM INTEGRITY APRIL
3449 080.64669 5,647
RELOCATE FACILITIES. INSTALL 686 FEET OF 2 INCH POLY AND ABANDON 342 FEET OF 2 INCH STEEL AND 341 FEET OF 2 INCH POLY ALONG RHOMBURG STREET TO ACCOMMODATE CITY OF BURNET STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURNET
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 117 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3450 080.64680 6,006
INSTALL 401 FEET OF 4 INCH POLY AND ABANDON 396 FEET OF 3 INCH STEEL ALONG CYPRESS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUBBARD
SYSTEM INTEGRITY DECEMBER
3451 080.64685 7,243
INSTALL 512 FEET OF 6 INCH POLY AND ABANDON 350 FEET OF 3 INCH STEEL ALONG SLOAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
3452 080.64688 12,169
RELOCATE FACILITIES. INSTALL 1604 FEET OF 8 INCH POLY AND ABANDON 1602 FEET OF 6 INCH STEEL ALONG WATERCRESS DRIVE TO ACCOMMODATE CITY OF LAKE WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
SYSTEM INTEGRITY DECEMBER
3453 080.64689 3,182
RELOCATE FACILITIES. INSTALL 199 FEET OF 4 INCH POLY AND ABANDON 107 FEET OF 2 INCH STEEL AND 25 FEET OF 3 INCH STEEL ALONG BULWER AVENUE TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
3454 080.64690 3,577 INSTALL 3025 FEET OF 4 INCH AND 8785 FEET OF 2 INCH POLY ALONG THE STREETS OF CROSSCREEK PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH JUNE
3455 080.64691 4,114
RELOCATE FACILITIES. INSTALL 539 FEET OF 2 INCH POLY AND ABANDON 509 FEET OF 2 INCH STEEL ALONG HAMILTON STREET TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
3456 080.64692 6,791
INSTALL 633 FEET OF 2 INCH POLY AND ABANDON 771 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 7 ALONG STREETS OF MIDLOTHIAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MIDLOTHIAN
SYSTEM INTEGRITY DECEMBER
3457 080.64694 (4,292)PURCHASE 18 RUGGED TABLETS, DOCKS, MODEMS, AND POWER SUPPLIES, 6 LAPTOPS, 2 DOCKS, AND A FULL CONSOLE FOR NEW HIRE EMPLOYEES. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
3458 080.64698 10,020 INSTALL 1350 FEET OF 4 INCH POLY AND 1650 FEET OF 2 INCH POLY ALONG THE STREETS OF URBAN TRAILS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTH RICHLAND HILLS GROWTH OCTOBER
3459 080.64699 2,664
INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 527 FEET OF 2 INCH STEEL, 126 FEET OF 2 INCH POLY, AND 327 FEET OF 6 INCH STEELAND DISTRICT REGULATOR STATION 03 ALONG MILL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE
SYSTEM INTEGRITY DECEMBER
3460 080.64700 568 INSTALL 2,600 FEET OF 2 INCH POLY ALONG THE STREETS OF FOX RUN SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROBINSON GROWTH MARCH
3461 080.64703 723,830
RELOCATE FACILITIES. INSTALL 2120 FEET OF 6 INCH, 120 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY ALONG RANCH VIEW RD. AND ABANDON 2120 FEET OF 6 INCH, 120 FEET OF 4 INCH AND 90 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY JULY
3462 080.64705 1 INSTALL 400 FEET OF 2 INCH POLY ALONG THE STREETS OF VERANDAH PHASE 1E. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH JANUARY
3463 080.64708 1,050 INSTALL 2373 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SECTION 16. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH APRIL
3464 080.64712 866
INSTALL RELIEF VALVE AT REGULATOR STATION IN DENTON AND ABANDON TWO RELIEF VALVES AT DISTRICT REGULATOR STATION 34 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3465 080.64713 4 ABANDON DISTRICT REGULATOR STATION #138 IN DALLAS, DALLAS COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3466 080.64714 15,122 INSTALL 2115 FEET OF 4 INCH AND 5350 FEET OF 2 INCH POLY ALONG THE STREETS OF KASPER SECTION 8 AND 9. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JUNE
3467 080.64719 14,023
RELOCATE FACILITIES. ABANDON 2000 FEET OF 6 INCH STEEL ALONG WATERCRESS DRIVE TO ACCOMMODATE CITY OF LAKE WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LAKE WORTH
SYSTEM INTEGRITY DECEMBER
3468 080.64721 4,570 INSTALL 275 FEET OF 2 INCH POLY ALONG RAISING CANES. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GRAND PRAIRIE GROWTH JUNE
3469 080.64722 20,533
RELOCATE FACILITIES. INSTALL 677 FEET OF 3 INCH STEEL AND ABANDON 651 FEET OF 3 INCH STEEL ALONG AGAPE DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3470 080.64730 7,288
RELOCATE FACILITIES. INSTALL 633 FEET OF 4 INCH POLY AND ABANDON 633 FEET OF 4 INCH STEEL AND 15 FEET OF 4 INCH POLY ALONG SANDERSON AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3471 080.64733 408,659 INSTALL 8200 FEET OF 4 INCH POLY AND 500 FEET OF 2 INCH POLY ALONG THE STREETS OF BLUE TOPAZ TRAIL DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH DECEMBER
3472 080.64735 5,961
INSTALL 716 FEET OF 2 INCH POLY AND ABANDON 95 FEET OF 2 INCH STEEL AND 92 FEET OF 2 INCH POLY AND 573 FEET OF 3 INCH STEEL ALONG NORTH COVINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
3473 080.64738 7 INSTALL 5000 FEET OF 8 INCH POLY AND ABANDON 5000 FEET OF 6 INCH POLY ALONG A.W. GRIMES. ALL CUSTOMERS ROUND ROCK GROWTH JUNE
3474 080.64739 26,437
INSTALL DISTRICT REGULATOR STATION AND ABANDON MEDICIAL MOUND DISTRICT REGULATOR STATION 01 ALONG FM 1167 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE
SYSTEM INTEGRITY DECEMBER
3475 080.64740 69,803
INSTALL 1700 FEET OF 2 INCH POLY AND 1570 FEET OF 4 INCH POLY AND ABANDON 132 FEET OF 2 INCH POLY, 906 FEET OF 4 INCH POLY, AND 766 FEET OF 6 INCH POLY ALONG SYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3476 080.64741 5,343
RELOCATE FACILITIES. INSTALL 499 FEET OF 2 INCH POLY AND 47 FEET OF 6 INCH POLY AND ABANDON 500 FEET OF 2 INCH STEEL AND 43 FEET OF 6 INCH STEEL ALONG CHUCK DRIVE TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3477 080.64750 164,946
INSTALL 900 FEET OF 2 INCH POLY ALONG FIELDSIDE AND ABANDON 890 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY SEPTEMBER
3478 080.64752 (301)
INSTALL 2370 FEET OF 4 INCH AND 1851 FEET OF 2 INCH POLY ALONG THE STREETS OF HUTTO CROSSING PHASE 4 SECTION 9A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH JUNE
3479 080.64769 1,699
RELOCATE FACILITIES. INSTALL 225 FEET OF 2 INCH POLY AND ABANDON 180 FEET OF 2 INCH POLY ALONG VERANDA LANE TO ACCOMMODATE CITY OF COLLEYVILLE IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
3480 080.64770 6,214
INSTALL 1166 FEET OF 2 INCH POLY AND ABANDON 1152 FEET OF 2 INCH STEEL AND 6 FEET OF 2 INCH POLY ALONG MESQUITE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NOCONA
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 118 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3481 080.64774 (116)INSTALL 820 FEET OF 4 INCH POLY TO SERVE RIVERBEND BUSINESS PARK. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH MARCH
3482 080.64775 6,016
INSTALL 478 FEET OF 2 INCH POLY AND 157 FEET OF 4 INCH POLY AND ABANDON 515 FEET OF 2 INCH STEEL, 408 FEET OF 2 INCH POLY AND 1 DISTRICT REGLUATOR STATION ALONG WILLOW STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MALONE
SYSTEM INTEGRITY DECEMBER
3483 080.64776 5,074
INSTALL 690 FEET OF 2 INCH POLY AND ABANDON 700 FEET OF 2 INCH POLY AND 1 DISTRICT REGLUATOR STATION ALONG EVANS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
3484 080.64779 108,700 INSTALL 1370 FEET OF 4 INCH POLY ALONG THE STREETS OF PATRIOT POINT APARTMENT COMPLEX. RESIDENTIAL FORT WORTH GROWTH DECEMBER
3485 080.64781 28,447
RELOCATE FACILITIES. INSTALL 340 FEET OF 2 INCH POLY AND 1704 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 2 INCH POLY, 5 FEET OF 3 INCH STEEL, AND 1723 FEET OF 3 INCH POLY ALONG LACKLAND ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3486 080.64783 25,838 INSTALL 4572 FEET OF 4 INCH POLY ALONG THE STREETS OF STALLION RIDGE APARTMENTS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
3487 080.64784 11,960
INSTALL 5 FEET OF 2 INCH POLY AND 20 FEET OF 4 INCH POLY AND 1008 FEET OF 6 INCH POLY AND ABANDON 38 FEET OF 12 INCH STEEL ALONG MARTIN LUTHER KING DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3488 080.64792 4,858 INSTALL 1050 FEET OF 2 INCH POLY MAIN ALONG THE STREETS OF WELLS HILLS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH DECEMBER
3489 080.64799 21
ABANDON DISTRICT REGULATOR STATION #259 IN UNIVERSITY PARK, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1895.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
3490 080.64810 25,900
RELOCATE FACILITIES. INSTALL 275 FEET OF 2 INCH POLY AND ABANDON 8 FEET OF 2 INCH POLY AND 350 FEET OF 4 INCH STEEL ALONG NORTH 7TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3491 080.64819 6,661 INSTALL 352 FEET OF 4 INCH POLY ALONG MOORE STREET TO SERVE CROSS CREEK MARKET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL CEDAR PARK GROWTH JUNE
3492 080.64820 5,928
INSTALL 505 FEET OF 4 INCH AND 2219 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR PHASE 3 SECTION 1B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JUNE
3493 080.64826 116,416
RELOCATE FACILITIES. INSTALL 817 FEET OF 2 INCH POLY AND ABANDON 802 FEET OF 2 INCH POLY ALONG LAMAR STREET TO ACCOMMODATE CITY OF ROANOKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROANOKE
SYSTEM INTEGRITY OCTOBER
3494 080.64827 2,338
INSTALL (1) DISTRICT REGULATOR STATION AND ABANDON (1) DISTRICT REGULATOR STATION ALONG 5TH STREET IN THE TOWN OF CLIFTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
3495 080.64829 32,185 INSTALL 750 FEET OF 4 INCH AND 2800 FEET OF 2 INCH POLY ALONG THE STREETS OF WOODCREEK PHASE 2-D3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FATE GROWTH DECEMBER
3496 080.64830 2,531
INSTALL 79 FEET OF 2 INCH POLY AND 415 FEET OF 4 INCH POLY AND ABANDON 23 FEET OF 2 INCH STEEL AND 52 FEET OF 2 INCH POLY AND 450 FEET OF 4 INCH STEEL ALONG FILLMORE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3497 080.64831 735 INSTALL 1539 FEET OF 4 INCH AND 1719 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY SECTION 71A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
3498 080.64834 11,341
RELOCATE FACILITIES. INSTALL 2392 FEET OF 2 INCH POLY AND ABANDON 2401 FEET OF 2 INCH POLY AND 14 FEET OF 3 INCH POLY ALONG GARLAND AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3499 080.64838 5,478 INSTALL 7 CLOCK SPRINGS ALONG LINE CA(2ND) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
PIPELINE INTEGRITY DECEMBER
3500 080.64842 186 INSTALL 200 FEET OF 4 INCH POLY ALONG NORTH ZANG. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH JULY
3501 080.64843 3,870
INSTALL 975 FEET OF 2 INCH POLY AND ABANDON 1034 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH POLY ALONG CHAFFIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BONHAM
SYSTEM INTEGRITY DECEMBER
3502 080.64846 260
RELOCATE FACILITIES. INSTALL 160 FEET OF 2 INCH POLY ALONG MILL AVENUE AND ABANDON 160 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT ROAD PROJECT FOR NEW SUBDIVISION. ALL CUSTOMERS KELLER
RELOCATION OF FACILITIES MARCH
3503 080.64850 2,788
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG WALNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
3504 080.64864 21,884
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG FORNEY ROAD AND ABANDON 167 FEET OF 4 INCH POLY TO ACCOMMODATE UNION PACIFIC RAILROAD STORM SEWER CONFLICT. ALL CUSTOMERS MESQUITE
RELOCATION OF FACILITIES SEPTEMBER
3505 080.64867 67,411 INSTALL 3550 FEET OF 6 INCH POLY AND 610 FEET OF 4 INCH POLY ALONG THE STREETS OF ALTAMOORE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER
3506 080.64869 5,923 INSTALL 4247 FEET OF 2 INCH AND 833 FEET OF 4 INCH POLY ALONG THE STREETS OF TWIN MILLS PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH APRIL
3507 080.64876 30,966
INSTALL 1050 FEET OF 4 INCH, 995 FEET OF 2 INCH POLY ALONG WASHINGTON STREET AND ABANDON 1395 FEET OF 6 INCH, 1140 FEET OF 3 INCH STEEL, 33 FEET OF 3 INCH, 15 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMMERCE
SYSTEM INTEGRITY DECEMBER
3508 080.64880 133,042
INSTALL 28 FEET OF 8 INCH STEEL AND 2392 FEET OF 12 INCH STEEL AND ABANDON 2406 FEET OF 8 INCH STEEL ALONG AVENUE E IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
3509 080.64888 2 INSTALL 300 FEET OF 4 INCH POLY ALONG NORTHPOINT. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COPPELL GROWTH JANUARY
3510 080.64895 716
RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 35 FEET OF 6 INCH POLY ALONG NORTH JUPITER ROAD TO ACCOMMODATE CITY OF ALLEN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
SYSTEM INTEGRITY DECEMBER
3511 080.64896 28,704
RELOCATE FACILITIES. INSTALL 595 FEET OF 2 INCH POLY, 86 FEET OF 4 INCH POLY, AND 674 FEET OF 6 INCH POLY AND ABANDON 53 FEET OF 3 INCH STEEL, 580 FEET OF 4 INCH STEEL AND 650 FEET OF 6 INCH STEEL ALONG SALEM COURT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3512 080.64898 7,631
INSTALL 1125 FEET OF 4 INCH AND 2250 FEET OF 2 INCH POLY ALONG THE STREETS OF CREEK VALLEY ESTATES PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH DECEMBER
3513 080.64904 10,709
INSTALL 1900 FEET OF 2 INCH POLY ALONG NORTH GLASS STREET AND ABANDON 1880 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRANKLIN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 119 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3514 080.64910 12,144 INSTALL 3460 FEET OF 2 INCH POLY AND 825 FEET OF 4 INCH POLY ALONG THE STREETS OF WHITESTONE ESTATES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PARKER GROWTH DECEMBER
3515 080.64918 4,764
INSTALL 5900 FEET OF 8 INCH AND 1350 FEET OF 2 INCH POLY ALONG THE STREETS OF THE MEADOWS AT MILLICAN RESERVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JANUARY
3516 080.64926 9 INSTALL 1550 FEET OF 4 INCH POLY ALONG THE STREETS OF STOCKYARDS COMMERCIAL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JANUARY
3517 080.64927 3,357
RELOCATE FACILITIES. INSTALL 279 FEET OF 2 INCH POLY AND ABANDON 203 FEET OF 2 INCH STEEL AND 41 FEET OF 2 INCH POLY ALONG 22ND STREET TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
3518 080.64930 14,335
INSTALL 326 FEET OF 2 INCH POLY AND 1749 FEET OF 4 INCH POLY AND ABANDON 332 FEET OF 2 INCH STEEL AND 85 FEET OF 2 INCH POLY AND 1340 FEET OF 4 INCH STEEL AND 156 FEET OF 4 INCH POLY ALONG FILES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ITASCA
SYSTEM INTEGRITY DECEMBER
3519 080.64931 100,000 INSTALL 3,300 FEET OF 4 INCH POLY ALONG GARZA ROAD IN DENTON COUNTY. ALL CUSTOMERS SHADY SHORESSYSTEM
IMPROVEMENT OCTOBER
3520 080.64934 3,548
RELOCATE FACILITIES. INSTALL 312 FEET OF 2 INCH POLY AND ABANDON 10 FEET OF 3 INCH STEEL AND 310 FEET OF 3 INCH POLY ALONG RUCKER TO ACCOMMODATE CITY OF GRANBURY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY
SYSTEM INTEGRITY DECEMBER
3521 080.64935 15 ABANDON 473 FEET OF 8 INCH CAST IRON ALONG ELSBETH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3522 080.64937 30,712
INSTALL 2500 FEET OF 4 INCH POLY ALONG SAINT LOUIS AVENUE AND ABANDON 1800 FEET OF 4 INCH STEEL AND 700 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3523 080.64940 1,705
RELOCATE FACILITIES. INSTALL 292 FEET OF 2 INCH POLY AND ABANDON 363 FEET OF 2 INCH STEEL ALONG BARCELONA COURT TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3524 080.64943 254
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG ELM STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
3525 080.64944 998
INSTALL 245 FEET OF 2 INCH POLY ALONG TYLER AND ABANDON 290 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3526 080.64946 29
ABANDON DISTRICT REGULATOR STATION 30 AS PART OF THE AREA REPLACEMENT IN SAN ANGELO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
3527 080.64947 2,691
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG BRANCH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
3528 080.64959 166 ABANDON DISTRICT REGULATOR STATION 412 IN FORT WORTH ALONG VAUGHN BOULEVARD. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3529 080.64965 6,096
INSTALL 702 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH STEEL, 209 FEET OF 2 INCH POLY, AND 221 FEET OF 4 INCH STEEL ALONG COMMERCE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
3530 080.64966 9,840
INSTALL 1926 FEET OF 2 INCH POLY AND ABANDON 1513 FEET OF 2 INCH STEEL, 52 FEET OF 2 INCH POLY, AND 351 FEET OF 4 INCH STEEL ALONG 3RD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER
SYSTEM INTEGRITY DECEMBER
3531 080.64967 2,186
INSTALL 333 FEET OF 2 INCH POLY AND ABANDON 396 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 05 ALONG BURKETT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
3532 080.64968 3,786
INSTALL 610 FEET OF 2 INCH POLY AND ABANDON 374 FEET OF 2 INCH STEEL, 368 FEET OF 3 INCH STEEL, AND 1 DISTRICT REGLUATOR STATION ALONG EAST 2ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
3533 080.64969 44,624
INSTALL 3105 FEET OF 2 INCH POLY AND 1062 FEET OF 4 INCH POLY AND ABANDON 88 FEET OF 2 INCH STEEL, 305 FEET OF 2 INCH POLY, 3017 FEET OF 3 INCH STEEL, 350 FEET OF 3 INCH POLY, 404 FEET OF 4 INCH STEEL, AND 256 FEET OF 4 INCH POLY ALONG MARSHALL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKDALE
SYSTEM INTEGRITY DECEMBER
3534 080.64973 13,731 INSTALL 2250 FEET OF 8 INCH POLY ALONG O.B. GRONER. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL SHERMAN GROWTH DECEMBER
3535 080.64979 106
ABANDON DISTRICT REGULATOR STATION #080 IN UNIVERSITY PARK, DALLAS COUNTY AS PART OF THE AREA REPLACEMENT PROJECT AR ID#1944.1 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
3536 080.64983 2,872
INSTALL REGULATOR AND RELIEF VALVE AND ABANDON REGULATOR AND RELIEF VALVE AT DRS15 ALONG SEARS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
3537 080.64985 23,265
INSTALL DISTRICT REGULATOR STATION IN SHERMAN (DRS24) AND ABANDON REGULATOR STATION ALONG LAMAR IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
3538 080.64993 3 INSTALL 2160 FEET OF 12 INCH POLY ALONG INTERSTATE 20 TO SERVE COOK CHILDRENS HOSPITAL.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JANUARY
3539 080.64995 1,817 INSTALL CLOCKSPRING(S) ON LINE CA(3RD) TO REPAIR DENT WITH METAL LOSS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3540 080.64999 20,533 INSTALL 1525 FEET OF 6 INCH AND 750 OF 4 INCH OF POLY ALONG NORTHWEST HIGHWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GRAPEVINE GROWTH DECEMBER
3541 080.65002 1,019,257 INSTALL DISTRICT REGULATOR STATION AND 8000 FEEET OF 8 INCH POLY ALONG OLD HWY 6 ROAD. ALL CUSTOMERS VAN ALSTYNE
SYSTEM IMPROVEMENT DECEMBER
3542 080.65005 6,895
RELOCATE FACILITIES. INSTALL 580 FEET OF 4 INCH POLY AND ABANDON 570 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
3543 080.65008 660,316
RELOCATE FACILITIES. INSTALL 3710 FEET OF 8 INCH AND ABANDON 898 FEET OF 4 INCH POLY TO ACCOMODATE THE CITY OF HASLET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HASLET
SYSTEM INTEGRITY DECEMBER
3544 080.65015 14,430
INSTALL 507 FEET OF 2 INCH POLY AND ABANDON 514 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION 04 ALONG CRABELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KAUFMAN
SYSTEM INTEGRITY DECEMBER
3545 080.65018 539,989 INSTALL 7360 FEET OF 8 INCH POLY ALONG UNITED STATES HIGHWAY 287. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
3546 080.65021 5,172
INSTALL 382 FEET OF 2 INCH POLY AND ABANDON 375 FEET OF 2 INCH POLY ALONG EASTFIELD DRIVE AND YALE BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 120 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3547 080.65025 7,485
INSTALL 1206 FEET OF 4 INCH AND 1708 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR PHASE 3 SECTION 2B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JUNE
3548 080.65026 598 INSTALL 2765 FEET OF 2 INCH POLY ALONG STREETS OF PARK AT BLACKHAWK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH JUNE
3549 080.65027 576
INSTALL (2) 2 INCH FISHER EZR REGULATORS AND ABANDON (2) 2 INCH FISHER 399 REGULATORS ON STEPHENVILLE DRS6598.1 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
3550 080.65030 232 INSTALL 5 FEET OF 4 INCH STEEL ALONG BERRY AND PARK HILL BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3551 080.65032 4,314
INSTALL 640 FEET OF 2 INCH POLY ALONG WEST LOVERS AND ABANDON 400 FEET OF 2 INCH STEEL IS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3552 080.65036 1,124 INSTALL 851 FEET OF 4 INCH AND 1549 FEET OF 2 INCH POLY ALONG STREETS OF SANTA RITA RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH OCTOBER
3553 080.65037 9,554
INSTALL 450 FEET OF 2 INCH POLY ALONG ELM STREET AND ABANDON 130 FEET OF 3 INCH STEEL AND 85 FEET OF 2 INCH POLY AND 230 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SANGER
SYSTEM INTEGRITY DECEMBER
3554 080.65038 1,517
INSTALL 280 FEET OF 2 INCH POLY ALONG PAWNEE PATHWAY AND ABANDON 145 FEET OF 6 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3555 080.65040 12 INSTALL 286 FEET OF 2 INCH POLY ALONG HARVEY ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH JULY
3556 080.65043 19,787 INSTALL 1110 FEET OF 8 INCH POLY ALONG JAKES HILL ROAD. ALL CUSTOMERS PFLUGERVILLESYSTEM
IMPROVEMENT APRIL
3557 080.65049 5,840
ABANDON 320 FEET OF 4 INCH STEEL ALONG PALESTINE STREET AND PRARIEVILLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
3558 080.65050 23,856 INSTALL 2655 FEET OF 2 INCH POLY AND 2765 FEET OF 4 INCH POLY ALONG THE STREETS OF PARKS OF ROSEHILL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH SEPTEMBER
3559 080.65057 230,926 INSTALL 800 FEET OF 4 INCH AND 6800 FEET OF 2 INCH POLY ALONG THE STREETS OF CLEMENTS RANCH PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER
3560 080.65059 (6,818)PURCHASE COMPUTER AND TRUCK MODEMS FOR USE IN THE SOUTHWEST DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
3561 080.65061 7,539
INSTALL 837 FEET OF 2 INCH POLY AND ABANDON 651 FEET OF 2 INCH STEEL AND 171 FEET OF 2 INCH POLY AND DISTRICT REGULATOR STATION 07 ALONG AVENUE I AND 33RD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
3562 080.65066 2,359
INSTALL 272 FEET OF 4 INCH POLY AND ABANDON 317 FEET OF 2 INCH STEEL AND 56 FEET OF 2 INCH POLY AND 281 FEET OF 3 INCH STEEL AND 242 FEET OF 4 INCH STEEL AND 22 FEET OF 4 INCH POLY ALONG8TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3563 080.65075 12,998
RELOCATE FACILITIES. INSTALL 379 FEET OF 4 INCH POLY AND ABANDON 369 FEET OF 4 INCH POLY ALONG FAA ROAD TO ACCOMMODATE CONSTRUCTION OF SIDE WALKS AND CART PATHS IN FORT WORTH. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES SEPTEMBER
3564 080.65079 124,670 INSTALL 2000 FEET OF 4 INCH AND 3000 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTHAVEN PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH JUNE
3565 080.65082 8,321
INSTALL 252 FEET OF 2 INCH POLY AND 1346 FEET OF 4 INCH POLY AND ABANDON 585 FEET OF 2 INCH POLY AND 260 FEET OF 3 INCH POLY AND 1025 FEET OF 4 INCH STEEL AND 228 FEET OF 4 INCH POLY ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
3566 080.65091 2,902 INSTALL 2075 FEET OF 2 INCH POLY ALONG THE STREETS OF THE RIVERDANCE PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL KELLER GROWTH MARCH
3567 080.65109 966,813 INSTALL 6000 FEET OF 8 INCH POLY ALONG WILLOW SPRINGS ROAD IN FORT WORTH. ALL CUSTOMERS FORT WORTH
SYSTEM IMPROVEMENT DECEMBER
3568 080.65113 13,586 INSTALL 790 FEET OF 2 INCH POLY ALONG THE STREETS MARVIN DRIVE AND BRENDA LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL KELLER GROWTH SEPTEMBER
3569 080.65114 136,344 INSTALL 400 FEET OF 4 INCH POLY ALONG DALLAS PARKWAY.COMMERCIAL OR
INDUSTRIAL FARMERS BRANCH GROWTH SEPTEMBER
3570 080.65115 1,017 INSTALL 168 FEET OF 2 INCH POLY ALONG CHERRY STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FRISCO GROWTH JUNE
3571 080.65117 22,023
RELOCATE FACILITIES. INSTALL 27 FEET OF 4 INCH POLY AND 1369 FEET OF 6 INCH POLY AND ABANDON 1317 FEET OF 4 INCH STEEL AND 17 FEET OF 4 INCH POLY AND 45 FEET OF 6 INCH STEEL ALONG AMBLER AVENUE TO ACCOMMODATE CITY OF ABILENE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
3572 080.65123 38 INSTALL 2 INCH REGULATOR STATION AND ABANDON 2 INCH REGULATOR STATION ALONG TARRANT. ALL CUSTOMERS BOWIE
SYSTEM INTEGRITY JANUARY
3573 080.65124 14,905
INSTALL A 12 INCH STOPPLE AND (3) BALL VALVES AND ABANDON (3) BALL VALVES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3574 080.65131 148,282 INSTALL A PIG TRAP ON NORTH END OF C22. ALL CUSTOMERS IRVINGPIPELINE
INTEGRITY DECEMBER
3575 080.65135 384 INSTALL 1265 FEET OF 2 INCH POLY ALONG THE STREETS OF THE COTTAGES AT DEERBROOKE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH MARCH
3576 080.65136 4,573
INSTALL 354 FEET OF 4 INCH POLY AND ABANDON 9 FEET OF 2 INCH STEEL AND 538 FEET OF 3 INCH STEEL AND DISTRICT REGULATOR STATION 09 ALONG 17TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
3577 080.65141 15,204
INSTALL 620 FEET OF 2 INCH POLY AND ABANDON 312 FEET OF 2 INCH STEEL AND 635 FEET OF 4 INCH STEEL AND DISTRICT REGULATOR STATION 11 ALONG STREETS OF BALLINGER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BALLINGER
SYSTEM INTEGRITY DECEMBER
3578 080.65144 717,758
RELOCATE FACILITIES. INSTALL 1459 FEET OF 6 INCH, 382 FEET OF 4 INCH AND 246 FEET OF 2 INCH POLY ALONG MAIN STREET AND ABANDON 1715 FEET OF 4 INCH STEEL AND 242 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF CROWLEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
SYSTEM INTEGRITY DECEMBER
3579 080.65145 288
RELOCATE FACILITIES. ABANDON 225 FEET OF 4 INCH STEEL AND 22 FEET OF 4 INCH POLY ALONG WARREN STREET TO ACCOMMODATE CITY OF BURLESON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
3580 080.65146 15,906
INSTALL 438 FEET OF 2 INCH POLY AND ABANDON 386 FEET OF 2 INCH STEEL AND ABANDON DISTRICT REGULATOR STATION 16 ALONG AVENUE H IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SNYDER
SYSTEM INTEGRITY DECEMBER
3581 080.65151 12,581
INSTALL 1864 FEET OF 4 INCH POLY AND 3139 FEET OF 2 INCH POLY ALONG THE STREETS OF SOPRANO WAY AND REPRISE BEND. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JUNE
MTX AdditionsPage 121 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3582 080.65152 173 INSTALL 500 FEET OF 4 INCH POLY MAIN ALONG BELTLINE TO SERVE VELVET TACO. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH APRIL
3583 080.65156 45,755
INSTALL 266 FEET OF 2 INCH AND 1619 FEET OF 4 INCH POLY AND ABANDON 236 FEET OF 2 INCH AND 1695 FEET OF 3 INCH STEEL AND 118 FEET OF 3 INCH POLY ALONG HALL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FAIRFIELD
SYSTEM INTEGRITY DECEMBER
3584 080.65158 2,439
RELOCATE FACILITIES. INSTALL 436 FEET OF 2 INCH POLY AND ABANDON 362 FEET OF 2 INCH STEEL AND 68 FEET OF 2 INCH POLY ALONG MISTLETOE LANE TO ACCOMMODATE CITY OF PANTEGO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PANTEGO
SYSTEM INTEGRITY DECEMBER
3585 080.65159 21,905
INSTALL 1638 FEET OF 2 INCH POLY AND ABANDON 1274 FEET OF 2 INCH STEEL ALONG AUSTIN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
3586 080.65161 7,694
INSTALL 620 FEET OF 4 INCH POLY AND ABANDON 620 FEET OF 4 INCH POLY ALONG HIGHWAY 31 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
3587 080.65168 129,343
INSTALL (108) POLY SERVICES AND ABANDON (108) STEEL SERVICES IN NORTH WEST DALLAS ZONE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3588 080.65169 31,247
INSTALL 1610 FEET OF 8 INCH AND 200 FEET OF 4 INCH POLY ALONG FERGUSON ROAD AND ABANDON 1610 FEET OF 8 INCH, 175 FEET OF 3 INCH AND 25 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3589 080.65176 3 INSTALL 210 FEET OF 2 INCH POLY ALONG COKE STREET. RESIDENTIAL DE LEON GROWTH JANUARY
3590 080.65180 499,314
RELOCATE FACILITIES. INSTALL 2949 FEET OF 2 INCH AND 374 FEET OF 4 INCH POLY ALONG FM 51 AND ABANDON 1813 FEET OF 2 INCH, 292 FEET OF 4 INCH AND 48 FEET OF 1.25 INCH STEEL AND 305 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF SPRINGTOWN DRAINAGE AND STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SPRINGTOWN
SYSTEM INTEGRITY DECEMBER
3591 080.65199 329,179 INSTALL 1300 FEET OF 8 INCH POLY ALONG STREETS OF GREENWAY TRAILS. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER
3592 080.65202 1 INSTALL 132 FEET OF 2 INCH POLY ALONG WASHINGTON STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL THROCKMORTON GROWTH JANUARY
3593 080.65204 7,082
RELOCATE FACILITIES. INSTALL 1,246 FEET OF 2 INCH, 250 FEET OF 4 INCH, 473 FEET OF 6 INCH AND 1,397 FEET OF 8 INCH POLY AND ABANDON 687 FEET OF 2 INCH, 1,045 FEET OF 4 INCH, 1,742 FEET OF 6 INCH ALONG MONROE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
3594 080.65215 3,054
RELOCATE FACILITIES. INSTALL 895 FEET OF 2 INCH POLY AND ABANDON 46 FEET OF 2 INCH STEEL AND 890 FEET OF 3 INCH STEEL AND 10 FEET OF 4 INCH STEEL ALONG CULBERSON TO ACCOMMODATE CITY OF GAINESVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
3595 080.65223 3,489
RELOCATE FACILITIES. INSTALL 161 FEET OF 2 INCH POLY AND 374 FEET OF 4 INCH POLY AND ABANDON 536 FEET OF 4 INCH STEEL ALONG EAST STREET TO ACCOMMODATE CITY OF BELTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON
SYSTEM INTEGRITY DECEMBER
3596 080.65226 27,145
INSTALL 2000 FEET OF 4 INCH POLY AND 1610 FEET OF 2 INCH POLY ALONG THE STREETS OF BREEZY HILL SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER
3597 080.65229 1,739
INSTALL 323 FEET OF 2 INCH POLY AND ABANDON 311 FEET OF 2 INCH STEEL ALONG HUFF STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3598 080.65241 3
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY ALONG KNOX STREET AND ABANDON 180 FEET OF 2 INCH POLY TO ACCOMMODATE INSTALLATION OF SOIL RETENTION SHAFTS FOR WEIRS PLAZA. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES JANUARY
3599 080.65242 24,348
RELOCATE FACILITIES. INSTALL 1285 FEET OF 2 INCH AND 138 FEET OF 4 INCH AND 775 FEET OF 6 INCH POLY AND ABANDON 1221 FEET OF 3 INCH AND 125 FEET OF 4 INCH AND 755 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3600 080.65243 548 INSTALL 2600 FEET OF 4 INCH POLY ALONG STREETS OF WILDLIFE COMMERCE PARK. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GRAND PRAIRIE GROWTH JUNE
3601 080.65244 1,627 INSTALL 100 FEET OF 2 INCH POLY ALONG LAKEMONT DRIVE. RESIDENTIAL DALLAS GROWTH MARCH
3602 080.65246 37,987 INSTALL 2440 FEET OF 4 INCH AND 1830 FEET OF 2 INCH POLY ALONG THE STREETS OF HIGHLAND FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH JUNE
3603 080.65247 2,194
INSTALL 354 FEET OF 2 INCH POLY AND ABANDON 305 FEET OF 2 INCH STEEL ALONG HAMPTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3604 080.65248 2,469 INSTALL 275 FEET OF 2 INCH POLY ALONG WILLIAM D FITCH PARKWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH DECEMBER
3605 080.65250 88,781
INSTALL 3295 FEET OF 2 INCH POLY AND ABANDON 3385 FEET OF 2 INCH STEEL ALONG MORGAN MILL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
3606 080.65251 562 INSTALL 700 FEET OF 4 INCH AND 1180 FEET OF 2 INCH POLY ALONG THE STREETS OF BALLENTYNE PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WELLS BRANCH GROWTH JUNE
3607 080.65252 13,962 INSTALL 7800 FEET OF 2 INCH POLY ALONG THE STREETS OF WILSON TRACT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CEDAR PARK GROWTH OCTOBER
3608 080.65258 612,738
INSTALL 2600 FEET OF 2 INCH POLY ALONG 7TH STREET AND ABANDON 720 FEET OF 4 INCH AND 1600 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
3609 080.65261 1,296 INSTALL 800 FEET OF 4 INCH POLY ALONG STREETS OF TEXAS ROADHOUSE IN TARRANT COUNTY. ALL CUSTOMERS GRAND PRAIRI GROWTH MARCH
3610 080.65264 29,806
INSTALL 1407 FEET OF 2 INCH POLY AND 1476 FEET OF 4 INCH POLY AND ABANDON 805 FEET OF 2 INCH STEEL AND 322 FEET OF 2 INCH POLY AND 1402 FEET OF 4 INCH STEEL AND 110 FEET OF 4 INCH POLY AND 6 FEET OF 6 INCH STEEL ALONG 15TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
3611 080.65266 4,952 INSTALL 1860 FEET OF 4 INCH POLY ALONG BRUSHY CREEK ROAD AND CR174. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CEDAR PARK GROWTH OCTOBER
3612 080.65269 3,310
INSTALL 300 FEET OF 2 INCH POLY ALONG UNIVERSITY DRIVE AND ABANDON DISTRICT REGULATOR STATION, AND 945 FEET OF 2 INCH STEEL AND 151 FEET OF 2 INCH POLY AND 623 FEET OF 3 INCH STEEL AND 15 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON
SYSTEM INTEGRITY DECEMBER
3613 080.65271 248 INSTALL 530 FEET OF 2 INCH POLY TO SERVE COSTCO WHOLESALE LOT 2A. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL PFLUGERVILLE GROWTH MARCH
3614 080.65272 142 INSTALL 270 FEET OF 6 INCH POLY ALONG COLORADO SAND DRIVE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PFLUGERVILLE GROWTH APRIL
3615 080.65273 4,079
INSTALL 700 FEET OF 4 INCH POLY AND 180 FEET OF 2 INCH ALONG A PRIVATE DRIVE TO SERVE DIAMOND OAKS RETAIL AND HOTEL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROUND ROCK GROWTH MARCH
MTX AdditionsPage 122 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3616 080.65274 3,462
RELOCATE FACILITIES. INSTALL 175 FEET OF 4 INCH POLY AND ABANDON 170 FEET OF 4 INCH POLY ALONG SOUTH FIRST STREET TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3617 080.65282 1,251 INSTALL 950 FEET OF 4 INCH POLY ALONG LONG CREEK CROSSING. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL SUNNYVALE GROWTH JUNE
3618 080.65287 20,755
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH POLY ALONG GLENMORE STREET TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3619 080.65294 (508,231)INSTALL WELDOVER SLEEVES ON LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3620 080.65296 3,631
INSTALL 265 FEET OF 4 INCH POLY ALONG S 23RD AND ABANDON 265 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
3621 080.65300 419 INSTALL 300 FEET OF 2 INCH POLY ALONG BENNETT LAWSON ROAD. ALL CUSTOMERS MANSFIELD GROWTH JULY
3622 080.65301 8,785
RELOCATE FACILITIES. INSTALL 371 FEET OF 2 INCH POLY AND 823 FEET OF 4 INCH POLY AND ABANDON 186 FEET OF 2 INCH STEEL AND 184 FEET OF 2 INCH POLY AND 78 FEET OF 3 INCH STEEL AND 665 FEET OF 4 INCH STEEL AND 92 FEET OF 4 INCH POLY ALONG 38TH STREET TO ACCOMMODATE CITY OF CORSICANA STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
3623 080.65302 3,558
INSTALL 480 FEET OF 4 INCH POLY AND ABANDON 478 FEET OF 4 INCH STEEL ALONG STONEWALL DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
3624 080.65303 1,055 INSTALL 1250 FEET OF 4 INCH POLY AND 3845 FEET OF 2 INCH POLY ALONG STREETS OF MARINE CREEK RANCH 13. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JUNE
3625 080.65305 63,736
RELOCATE FACILITIES. INSTALL 215 FEET OF 4 INCH POLY ALONG PRESTON ROAD AND ABANDON 215 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF FRISCO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY SEPTEMBER
3626 080.65306 8,837
INSTALL 633 FEET OF 2 INCH POLY AND ABANDON 693 FEET OF 2 INCH STEEL ALONG LEONA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
3627 080.65307 5,046 INSTALL 2537 FEET OF 2 INCH POLY ALONG STREETS OF BRYSON PHASE 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
3628 080.65308 12,735
RELOCATE FACILITIES. INSTALL 260 FEET OF 2 INCH POLY AND ABANDON 2175 FEET OF 2 INCH STEEL ALONG SLOAN TO ACCOMMODATE INFRASTRUCTURE IMPROVEMENTS AT TARLETON STATE UNIVERSITY. ALL CUSTOMERS STEPHENVILLE
RELOCATION OF FACILITIES FEBRUARY
3629 080.65314 1,131
INSTALL 2150 FEET OF 6 INCH POLY, 2550 FEET OF 4 INCH POLY AND 2845 FEET OF 2 INCH POLY ALONG THE STREETS OF CHAPEL CREEK PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JUNE
3630 080.65315 (9,933)INSTALL 525 FEET OF 4 INCH POLY ALONG SHADY OAKS DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH SEPTEMBER
3631 080.65316 (123)INSTALL 2017 FEET OF 2 INCH POLY ALONG THE STREETS OF BRUSHY CREEK NORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRUSHY CREEK GROWTH APRIL
3632 080.65320 6,282 INSTALL 1000 FEET OF 2 INCH POLY ALONG OXFORD PLACE TO SERVE 11 NEW RESIDENTIAL CUSTOMERS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH OCTOBER
3633 080.65323 6,481 INSTALL 1500 FEET OF 4 INCH POLY AND 4650 FEET OF 2 INCH POLY ALONG STREETS OF FROST FARMS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER
3634 080.65324 11,843
RELOCATE FACILITIES. INSTALL 1160 FEET OF 2 INCH POLY AND ABANDON 50 FEET OF 2 INCH POLY AND 1025 FEET OF 4 INCH STEEL AND 300 FEET OF 4 INCH POLY AND 175 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3635 080.65325 8,099
RELOCATE FACILITIES. INSTALL 494 FEET OF 4 INCH POLY AND 4 FEET OF 8 INCH POLY AND ABANDON 893 FEET OF 4 INCH STEEL AND 50 FEET OF 6 INCH STEEL ALONG AYERS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3636 080.65326 6,602
INSTALL 551 FEET OF 4 INCH POLY AND ABANDON 530 FEET OF 4 INCH CAST IRON ALONG GRAND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
3637 080.65328 3,218
INSTALL 688 FEET OF 4 INCH POLY AND ABANDON 678 FEET OF 4 INCH STEEL ALONG 4TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
3638 080.65329 8,429
RELOCATE FACILITIES. INSTALL 370 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 2 INCH POLY ALONG VIRGINIA AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3639 080.65332 775,475
RELOCATE FACILITIES. INSTALL 840 FEET OF 12 INCH POLY AND 200 FEET OF 4 INCH POLY AND 20 FEET OF 2 INCH POLY AND 1400 FEET OF 6 INCH POLY AND 925 FEET OF 4 INCH AND 80 FEET OF 2 INCH CAST IRON ALONG WALLACE STREET AND ROSEDALE STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3640 080.65333 (15,592)
INSTALL 68 FEET OF 2 INCH POLY AND 80 FEET OF 3 INCH POLY AND ABANDON 68 FEET OF 2 INCH POLY AND 80 FEET OF 3 INCH STEEL ALONG HEMBRY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
SYSTEM INTEGRITY DECEMBER
3641 080.65334 6,451
INSTALL 5500 FEET OF 2 INCH POLY AND 600 FEET OF 4 INCH POLY AND 1600 FEET OF 6 INCH POLY ALONG THE STREETS OF WATERSCAPE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH OCTOBER
3642 080.65339 132
ABANDON 10 FEET OF 2 INCH STEEL AND 242 FEET OF 2 INCH POLY AND 699 FEET OF 3 INCH STEEL ALONG THROCKMORTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERENS
SYSTEM INTEGRITY DECEMBER
3643 080.65340 437
RELOCATE FACILITIES. INSTALL 83 FEET OF 2 INCH POLY AND ABANDON 77 FEET OF 2 INCH STEEL ALONG LONGVIEW TO ACCOMMODATE CITY OF WICHITA FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3644 080.65341 65
ABANDON 217 FEET OF 2 INCH STEEL AND 84 FEET OF 2 INCH POLY ALONG SCOTT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3645 080.65343 140 ABANDON 796 FEET OF 2 INCH STEEL ALONG CHAPMAN ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROLLING MEADOWS
SYSTEM INTEGRITY DECEMBER
3646 080.65344 2,663
INSTALL 710 FEET OF 2 INCH POLY AND ABANDON 706 FEET OF 2 INCH STEEL ALONG GUM SPRINGS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
3647 080.65345 256,177 PURCHASE SECURITY UPGRADES FOR USE AT DALLAS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
3648 080.65347 5,748
INSTALL 40 MOTORIZED REGULATORS AND ABANDON 40 MOTORIZED REGULATORS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3649 080.65350 4 INSTALL 900 FEET OF 4 INCH POLY ALONG MARKETPLACE BOLUVARD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORNEY GROWTH JANUARY
MTX AdditionsPage 123 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3650 080.65351 14,479 PURCHASE ONE PRO SERIES PEDESTAL REINFORMENT CRANE EQUIPMENT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
3651 080.65355 4 INSTALL 800 FEET OF 2 INCH POLY ALONG THE STREETS OF ROWENA RUNNELS. RESIDENTIAL ROWENA GROWTH JANUARY
3652 080.65356 50,028
INSTALL 1703 FEET OF 10 INCH STEEL AND ABANDON 1670 FEET OF 6 INCH STEEL ALONG THE STREETS OF MAYPEARL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MAYPEARL
SYSTEM INTEGRITY DECEMBER
3653 080.65359 20,076
INSTALL 12 FEET OF 3 INCH POLY AND 1012 FEET OF 4 INCH POLY AND ABANDON 998 FEET OF 3 INCH STEEL AND 31 FEET OF 3 INCH POLY ALONG VALWOOD PARKWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
3654 080.65361 1,724
INSTALL 800 FEET OF 2 INCH POLY AND 6 FEET OF 4 INCH POLY AND ABANDON 428 FEET OF 2 INCH POLY AND 6 FEET OF 4 INCH POLY ALONG WASHINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON
SYSTEM INTEGRITY DECEMBER
3655 080.65364 1,387
INSTALL 310 FEET OF 4 INCH POLY AND ABANDON 310 FEET OF 4 INCH STEEL ALONG WELSH AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
3656 080.65368 4,577
ABANDON 4282 FEET OF 2 INCH, 18,720 FEET OF 6 INCH STEEL, 151 FEET OF 2 INCH AND 1687 FEET OF 6 INCH POLY ALONG LINE L26 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
3657 080.65369 92,888 INSTALL 2340 FEET OF 2 INCH POLY ALONG THE STREETS OF PHASE 4C OF THE TRINITY FALLS. RESIDENTIAL MCKINNEY GROWTH DECEMBER
3658 080.65371 139,120
INSTALL 400 FEET OF 4 INCH POLY AND 1150 FEET OF 6 INCH POLY AND ABANDON 260 FEET OF 2 INCH STEEL AND 200 FEET OF 2 INCH POLY AND 1140 FEET OF 6 INCH STEEL ALONG OLIVE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
3659 080.65380 16 ABANDON DISTRICT REGULATOR STATION #82 IN UNIVERSITY PARK, IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
3660 080.65383 6,563 INSTALL 832 FEET OF 2 INCH POLY ALONG THE STREETS OF MAGER MEADOWS PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JUNE
3661 080.65384 (28,628)
RELOCATE FACILITIES. INSTALL 2554 FEET OF 2 INCH POLY AND ABANDON 2475 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF RICE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICE
SYSTEM INTEGRITY DECEMBER
3662 080.65386 44,000 INSTALL DEEP WELL GROUND BED AND RECTIFIER AND INSTALL 1 TEST STATION ALONG LINE U13 IN HASKELL COUNTY. ALL CUSTOMERS HASKELL
SYSTEM INTEGRITY DECEMBER
3663 080.65387 (60)
INSTALL 916 FEET OF 6 INCH, 1881 FEET OF 4 INCH AND 1736 FEET OF 2 INCH POLY ALONG STREETS OF LARKSPUR PHASE 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JANUARY
3664 080.65389 6,982 INSTALL 1318 FEET OF 4 INCH POLY ALONG THE STREETS OF CEDAR PARK. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL CEDAR PARK GROWTH SEPTEMBER
3665 080.65390 18,203
RELOCATE FACILITIES. ABANDON 1077 FEET OF 6 INCH STEEL AND 6 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3666 080.65391 (31) PURCHASE 86 COMBUSTABLE GAS INDICATORS FOR USE IN TEXAS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
3667 080.65392 382,236 INSTALL 3,950 FEET OF 6 INCH POLY ALONG STREETS OF OVILLA ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS WAXAHACHIE GROWTH DECEMBER
3668 080.65394 74,390 INSTALL 3,403 FEET OF 2 INCH AND 1,210 FEET OF 4 INCH POLY ALONG THE STREETS OF SHEPPARD'S PLACE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WAXAHACHIE GROWTH DECEMBER
3669 080.65399 0 INSTALL 342 FEET OF 2 INCH POLY ALONG ROUND GROVE ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH JANUARY
3670 080.65407 20 ABANDON ONE DISTRICT REGULATOR STATION ALONG FAIRMOUNT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3671 080.65411 3 INSTALL 137 FEET OF 2 INCH POLY ALONG HEWITT DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL HEWITT GROWTH JANUARY
3672 080.65412 1
INSTALL 1,560 FEET OF 8 INCH, 975 FEET OF 4 INCH, AND 365 FEET OF 2 INCH POLY ALONG THE STREETS OF MIDTOWN RESERVE PHASE 100. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JANUARY
3673 080.65414 5,246 INSTALL 360 FEET OF 2 INCH POLY ALONG WILLIAM D FITCH PKWY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH DECEMBER
3674 080.65415 643
INSTALL 13 FEET OF 6 INCH POLY AND ABANDON 387 FEET OF 3 INCH AND 11 FEET OF 6 INCH STEEL ALONG BROOK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3675 080.65417 8,366 INSTALL 4846 FEET OF 2 INCH POLY ALONG THE STREETS OF RESERVE AT WYOMING SPRINGS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
3676 080.65418 237 INSTALL 2105 FEET OF 4 INCH AND 3681 FEET OF 2 INCH POLY ALONG THE STREETS OF LARKSPUR PHASE 8. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JUNE
3677 080.65419 740,743 INSTALL 6748 FEET OF 8 INCH POLY ALONG PARMER LANE. ALL CUSTOMERS GEORGETOWNSYSTEM
IMPROVEMENT JULY
3678 080.65422 2,359 INSTALL 2,400 FEET OF 2 INCH POLY ALONG SAM LEE LANE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL NORTHLAKE GROWTH APRIL
3679 080.65423 135 INSTALL 250 FEET OF POLY ALONG PRECINCT LINE ROAD.COMMERCIAL OR
INDUSTRIAL NORTH RICHLAND HILLS GROWTH SEPTEMBER
3680 080.65429 437 INSTALL 3123 FEET OF 2 INCH POLY ALONG STREETS OF STILLWATER PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JUNE
3681 080.65430 4,122 INSTALL 1418 FEET OF 6 INCH AND 1708 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDLEAF PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JUNE
3682 080.65431 (14,698)
INSTALL 1555 FEET OF 2 INCH POLY ALONG KIM STREET AND ABANDON 1856 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
3683 080.65433 (58)INSTALL 1310 FEET OF 6 INCH AND 1819 FEET OF 2 INCH POLY ALONG STREETS OF VIZCAYA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JANUARY
3684 080.65436 18 ABANDON 1629 FEET OF 2 INCH STEEL ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3685 080.65437 293,758
RELOCATE FACILITIES. INSTALL 1284 FEET OF 2 INCH POLY AND ABANDON 143 FEET OF 2 INCH STEEL AND 1098 FEET OF 2 INCH POLY ALONG JAMES AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
3686 080.65438 399 INSTALL 500 FEET OF 2 INCH POLY ALONG THE STREETS OF CARDINAL CROSSING PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH APRIL
3687 080.65443 1,493,093
RELOCATE FACILITIES. INSTALL 5636 FEET OF 2 INCH POLY AND 1271 FEET OF 4 INCH POLY AND ABANDON 3871 FEET OF 2 INCH STEEL AND 4588 FEET OF 2 INCH POLY AND 1148 FEET OF 3 INCH STEEL AND 102 FEET OF 3 INCH POLY AND 827 FEET OF 4 INCH STEEL AND 183 FEET OF 4 INCH POLY AND 879 FEET OF 8 INCH STEEL ALONG GRAHAM STREET TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY SEPTEMBER
3688 080.65444 5,445
INSTALL 903 FEET OF 2 INCH POLY AND ABANDON 903 FEET OF 3 INCH STEEL ALONG WAKE FORREST DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 124 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3689 080.65446 6,495
INSTALL 278 FEET OF 2 INCH POLY AND ABANDON 421 FEET OF 2 INCH STEEL AND 440 FEET OF 2 INCH POLY ALONG TOLOSA ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP
SYSTEM INTEGRITY DECEMBER
3690 080.65451 2,614
RELOCATE FACILITIES. INSTALL 139 FEET OF 4 INCH POLY AND ABANDON 113 FEET OF 3 INCH STEEL ALONG FM1915 TO ACCOMMODATE CITY OF BUCKHOLTS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUCKHOLTS
SYSTEM INTEGRITY DECEMBER
3691 080.65452 205 INSTALL 1320 FEET OF 2 INCH POLY ALONG HIGHWAY 281 AND ABANDON 1320 FEET OF 2 INCH POLY. ALL CUSTOMERS HAMILTON
SYSTEM INTEGRITY JUNE
3692 080.65457 7,815
INSTALL 1371 FEET OF 4 INCH POLY AND 4822 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
3693 080.65459 (22)INSTALL 1985 FEET OF 4 INCH POLY ALONG MEMORIAL DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH JANUARY
3694 080.65461 2,434
RELOCATE FACILITIES. ABANDON 174 FEET OF 2 INCH STEEL AND 293 FEET OF 2 INCH POLY ALONG 16TH STREET TO ACCOMMODATE CITY OF BROWNWOOD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BROWNWOOD
SYSTEM INTEGRITY DECEMBER
3695 080.65462 34,617
INSTALL 831 FEET OF 2 INCH POLY AND ABANDON 450 FEET OF 2 INCH STEEL ALONG NORTH COLLEGE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
3696 080.65465 33,181
INSTALL 3185 FEET OF 4 INCH, 4825 FEET OF 2 INCH AND 100 FEET OF 6 INCH POLY ALONG THE STREETS OF WOODBRIDGE TOWNHOMES PH 1 A3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WYLIE GROWTH OCTOBER
3697 080.65468 8,930
INSTALL 505 FEET OF 8 INCH, 655 FEET OF 6 INCH, AND 3945 FEET OF 2 INCH POLY ALONG THE STREETS OF CANTARRA 1 SECTIONS 6 AND 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER
3698 080.65473 30,299 INSTALL 500 FEET OF 4 INCH POLY ALONG RED BIRD LANE AND WESTMORELAND. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER
3699 080.65476 211,991 INSTALL 7750 FEET OF 2 INCH POLY ALONG THE STREETS OF WILD CAT RANCH PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH JUNE
3700 080.65477 4,230 INSTALL 115 FEET OF 2 INCH POLY ALONG PARK STREET. RESIDENTIAL STAMFORD GROWTH MARCH
3701 080.65479 9,154 INSTALL 5900 FEET OF 2 INCH POLY AND 635 FEET OF 4 INCH POLY ALONG THE STREETS OF SIENA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH JUNE
3702 080.65485 3,938
RELOCATE FACILILTIES. INSTALL 950 FEET OF 2 INCH POLY ALONG ALLEY OF LOMA AND ABANDON 940 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3703 080.65486 886,852
INSTALL 6850 FEET OF 6 INCH POLY ALONG LONE STAR DRIVE AND ABANDON 330 FEET OF 2 INCH, 6275 FEET OF 3 INCH AND 845 FEET OF 4 INCH IP POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3704 080.65487 66 INSTALL 250 FEET OF 2 INCH POLY ALONG FLORA LANE. RESIDENTIAL DENISON GROWTH JANUARY
3705 080.65488 249
ABANDON 15 FEET OF 4 INCH STEEL AND 18 FEET OF 6 INCH POLY AND DISTRICT REGULATOR STATION 04 IN BRYAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
3706 080.65496 27 ABANDON DISTRICT REGULATOR STATION ALONG JIM MILLER AND DAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3707 080.65498 142,211
INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS02 AND DRS03 IN PUTNAM IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS PUTNAM
SYSTEM INTEGRITY DECEMBER
3708 080.65502 411,213
INSTALL AND ABANDON DISTRICT REGULATOR STATIONS AT DRS08, DRS09, DRS10, DRS11, AND DRS12 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS DUBLIN
SYSTEM INTEGRITY DECEMBER
3709 080.65504 458,949
INSTALL 4130 FEET OF 4 INCH POLY AND 14900 FEET OF 2 INCH POLY ALONG THE STREETS OF QUAIL VALLEY PA2B SOUTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
3710 080.65510 1,266
INSTALL 296 FEET OF 2 INCH POLY AND ABANDON 219 FEET OF 2 INCH STEEL AND 69 FEET OF 2 INCH POLY ALONG LOCUST STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PETROLIA
SYSTEM INTEGRITY DECEMBER
3711 080.65511 8,339
INSTALL 57 FEET OF 16 INCH STEEL AND ABANDON 57 FEET OF 16 INCH STEEL ALONG WEST PIPELINE ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
SYSTEM INTEGRITY DECEMBER
3712 080.65513 (1,074) PURCHASE SURVEY EQUIPMENT FOR SOUTHEAST DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
3713 080.65514 5,405
RELOCATE FACILITIES. INSTALL 333 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4 INCH STEEL AND 180 FEET OF 4 INCH POLY ALONG GREEK ROW DRIVE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3714 080.65515 195,913
INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS01 IN SANTA ANNA, DRS01 IN VALERA, DRS01 IN TALPA IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS SANTA ANNA
SYSTEM INTEGRITY DECEMBER
3715 080.65517 40,654
RELOCATE FACILITIES. INSTALL 305 FEET OF 4 INCH POLY AND ABANDON 305 FEET OF 4 INCH POLY ALONG WADE BOULEVARD TO ACCOMMODATE CITY OF FRISCO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FRISCO
SYSTEM INTEGRITY DECEMBER
3716 080.65519 187,886
INSTALL AND ABANDON DISTRICT REGLUATOR STATIONS: DRS02 IN IREDELL, DRS09 IN HAMILTON AND DRS04 IN COMANCHE IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS HAMILTON
SYSTEM INTEGRITY DECEMBER
3717 080.65526 18,930 INSTALL 650 FEET OF 4 INCH POLY ALONG BAIRD FARM ROAD TO SERVE 2024 BAIRD FARM LAUNDRY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ARLINGTON GROWTH OCTOBER
3718 080.65527 573,169
RELOCATE FACILITIES. INSTALL 860 FEET OF 8 INCH, ALONG GREAT OAKS STREET AND ABANDON 644 FEET OF 8 INCH POLY AND 225 FEET OF 8 INCH STEEL TO ACCOMMODATE CITY OF BRUSHY CREEK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRUSHY CREEK
SYSTEM INTEGRITY DECEMBER
3719 080.65534 995,052
RELOCATE FACILITIES. INSTALL 2717 FEET OF 4 INCH POLY AND ABANDON 3111 FEET OF 2 INCH POLY ALONG HIDDEN CREEK ROAD AND MERRYMOUNT ROAD TO ACCOMMODATE CITY OF WESTOVER HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WESTOVER HILLS
SYSTEM INTEGRITY DECEMBER
3720 080.65538 5,316 PURCHASE 12 INCH POLY TOOLS FOR USE IN SOUTHEAST DALLAS REGION. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
3721 080.65542 543
INSTALL FLOW SAFE RELIEF VALVE AT REGULATOR STATION IN SUNNYVALE AND ABANDON ONE GROVE 83 RELIEF VALVES AT DISTRICT REGULATOR STATION #01 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS SUNNYVALE
SYSTEM INTEGRITY DECEMBER
3722 080.65545 111,861
INSTALL 125 FEET OF 2 INCH POLY AND 500 FEET OF 6 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL AND 44 FEET OF 2 INCH POLY AND 397 FEET OF 6 INCH POLY ALONG HARVEY ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY SEPTEMBER
3723 080.65546 5,251
INSTALL 2100 FEET OF 4 INCH POLY ALONG DENNIS LANE AND ABANDON 1785 FEET OF 4 INCH STEEL AND 315 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 125 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3724 080.65547 9,920
INSTALL 1820 FEET OF 6 INCH POLY AND 4923 FEET OF 2 INCH POLY ALONG THE STREETS OF DEERBROOK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER
3725 080.65548 1,992
RELOCATE FACILITIES. INSTALL 404 FEET OF 2 INCH POLY AND ABANDON 404 FEET OF 2 INCH POLY ALONG FOREST PARK BOULEVARD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3726 080.65549 123,704 INSTALL 1550 FEET OF 6 INCH POLY ALONG STREETS OF LADERA. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROCKWALL GROWTH DECEMBER
3727 080.65551 5,381
RELOCATE FACILITIES. INSTALL 750 FEET OF 2, 4, AND 6 INCH POLY ALONG DOVER LANE AND ABANDON 750 FEET OF 2, 4, AND 6 INCH POLY TO ACCOMMODATE RICHLAND HILLS STREET PAVING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS
SYSTEM INTEGRITY DECEMBER
3728 080.65556 2,920 INSTALL 1490 FEET OF 4 INCH POLY ALONG THE STREETS OF PALMERA BLUFF SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH JUNE
3729 080.65558 71,070 INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE ALONG JACKSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3730 080.65559 7,310 INSTALL 920 FEET OF 4 INCH POLY ALONG SUDITH LANE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MIDLOTHIAN GROWTH JULY
3731 080.65560 21,415 INSTALL 1100 FEET OF 2 INCH POLY ALONG EVERT COURT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH SEPTEMBER
3732 080.65563 2,414
RELOCATE FACILITIES. INSTALL 310 FEET OF 2 INCH POLY AND ABANDON 445 FEET OF 2 INCH POLY ALONG BRIDGE STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3733 080.65564 372,424
INSTALL 1397 FEET OF 4 INCH POLY AND ABANDON 978 FEET OF 4 INCH STEEL AND 178 FEET OF 4 INCH POLY AND 11 FEET OF 6 INCH STEEL ALONG MODLIN AVENUE AND MATTISON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY SEPTEMBER
3734 080.65565 1,618,441
FUNCTIONAL PROJECT COVERING THE REPLACEMENT OF MAINS AND SERVICE LINES IN CISCO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
3735 080.65568 4 INSTALL 500 FEET OF 4 INCH POLY ALONG I30. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROCKWALL GROWTH JANUARY
3736 080.65570 13,148
INSTALL 268 FEET OF 6 INCH STEEL AND ABANDON 246 FEET OF 6 INCH STEEL ALONG ROGERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROGERS
SYSTEM INTEGRITY DECEMBER
3737 080.65572 453,266 INSTALL 7400 FEET OF 8 INCH POLY ALONG FM-148 IN KINGSBOROUGH SUBDIVISION. ALL CUSTOMERS CRANDALL GROWTH JUNE
3738 080.65573 8,334 INSTALL 175 FEET OF 2 INCH POLY ALONG TEASLEY LANE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DENTON GROWTH JUNE
3739 080.65574 1,244 INSTALL 2965 FEET OF 2 INCH POLY ALONG THE STREETS OF BERKSHIRE PHASE 3 SECTION 7. RESIDENTIAL FORT WORTH GROWTH JUNE
3740 080.65576 16,681
INSTALL 1480 FEET OF 6 INCH POLY AND 1995 FEET OF 4 INCH POLY AND 6465 FEET OF 2 INCH POLY ALONG THE STREETS OF ENTRADA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER
3741 080.65579 (81) INSTALL 1000 FEET OF 2 INCH POLY ALONG PENINSULA DRIVE. RESIDENTIAL ROCKWALL GROWTH APRIL
3742 080.65580 80,090 INSTALL 2,010 FEET OF 2 INCH POLY ALONG THE STREETS OF BERKSHIRE PHASE 3 SECTION 8 DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
3743 080.65581 3,188 INSTALL 270 FEET OF 4 INCH POLY ALONG HEADQUARTERS DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL PLANO GROWTH JULY
3744 080.65582 73
INSTALL 270 FEET OF 2 INCH POLY AND ABANDON 270 FEET OF 2 INCH STEEL AND 184 FEET OF 2 INCH POLY ALONG JACKSBORO HIGHWAY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3745 080.65588 143
ABANDON 257 FEET OF STEEL AND 25 FEET OF POLY AND DISTRICT REGULATOR STATION ALONG AVENUE C IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KILLEEN
SYSTEM INTEGRITY DECEMBER
3746 080.65589 23,978 INSTALL 4100 FEET OF 2 INCH POLY. ALONG THE STREETS CREEKSIDE AT THOMAS PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CARROLLTON GROWTH DECEMBER
3747 080.65593 317,447
INSTALL REGULATOR AND RELIEF VALVE ALONG DRS324 AND ABANDON REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3748 080.65608 6,764 INSTALL 745 FEET OF 4 INCH POLY ALONG THE STREETS OF FLIX BREWHOUSE AND RESTAURANT. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL HUTTO GROWTH JULY
3749 080.65613 17,615 INSTALL 673 FEET OF 4 INCH AND 2015 FEET OF 2 INCH POLY ALONG THE STREETS OF PALMERA BLUFF. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
3750 080.65620 12,076
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND ABANDON 400 FEET OF 4 INCH POLY ALONG FM 1417 AT SFBN CROSSING TO ACCOMMODATE THE CITY OF SHERMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
3751 080.65621 7,314
RELOCATE FACILITIES. INSTALL 408 FEET OF 8 INCH STEEL AND ABANDON 375 FEET OF 8 INCH STEEL ALONG US 75 AT BNSF CROSSING TO ACCOMMODATE CITY OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
3752 080.65627 131,832
INSTALL DISTRICT REGULATOR STATION IN MOODY AND ABANDON DISTRICT REGULATOR STATION DRS03 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY
SYSTEM INTEGRITY DECEMBER
3753 080.65639 44,432
INSTALL 206 FEET OF 4 INCH AND 930 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY NEIGHBORHOOD 69A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH JUNE
3754 080.65641 (82)INSTALL 120 FEET OF 2 INCH POLY ALONG FARLEY SCHOOL ACCESS ROAD TO SERVE HUTTO FIRE STATION 2. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL HUTTO GROWTH JANUARY
3755 080.65642 93,636
INSTALL AND ABANDON S203 DRS IN THE FOLLOWING LOCATIONS: DRS01 & DRS02 IN BELLEVUE, DRS01 IN OKLAUNION, DRS10 IN PETROLIA, AND DRS09 IN ELECTRA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELLEVUE
SYSTEM INTEGRITY DECEMBER
3756 080.65643 344 INSTALL 1517 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH APRIL
3757 080.65644 169,046
RELOCATE FACILITIES. INSTALL 118 FEET OF 4 INCH POLY AND 663 FEET OF 6 INCH POLY AND ABANDON 118 FEET OF 4 INCH POLY AND 663 FEET OF 6 INCH POLY ALONG HOLLAND ROAD TO ACCOMMODATE CITY OF MANSFIELD STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MANSFIELD
SYSTEM INTEGRITY OCTOBER
3758 080.65646 266,837
RELOCATE FACILITIES. INSTALL 1084 FEET OF 4 INCH POLY AND 367 FEET OF 6 INCH POLY AND ABANDON 155 FEET OF 4 INCH STEEL AND 1199 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF TERRELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY OCTOBER
3759 080.65653 76,210
INSTALL AND ABANDON DISTRICT REGLUATOR STATIONS AT THE FOLLOWING LOCATIONS: DRS045 AND DRS084 IN WICHITA FALLS, DRS33 IN OLNEY, AND DRS01 AND DRS08 IN ARCHER CITY. IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 126 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3760 080.65661 712,125
RELOCATE FACILITIES. INSTALL 2945 FEET OF 2 INCH POLY AND ABANDON 2970 FEET OF 2 INCH STEEL ALONG MINOT AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3761 080.65663 3,471 INSTALL 1610 FEET OF 2 INCH POLY ALONG THE STREETS OF THE NORTH CREEK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MELISSA GROWTH DECEMBER
3762 080.65671 (1,229)
RELOCATE FACILITIES. INSTALL 275 FEET OF 4 INCH POLY AT 1112 INDUSTRIAL BOULEVARD IN CALDWELL AND ABANDON 185 FEET OF 4 INCH POLY TO ACCOMMODATE ZODIAC ENTERPRISES BUILDING EXPANSION. ALL CUSTOMERS CALDWELL
RELOCATION OF FACILITIES SEPTEMBER
3763 080.65672 2,330
INSTALL 283 FEET OF 4 INCH POLY AND ABANDON 190 FEET OF 2 INCH STEEL AND 110 FEET OF 2 INCH POLY AND 260 FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY ALONG ROBERTS ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3764 080.65673 301 ABANDON 3315 FEET OF 3 INCH POLY ALONG COLLIN CREEK MALL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
3765 080.65676 7,355
INSTALL 1097 FEET OF 6 INCH, 1495 FEET OF 4 INCH AND 2431 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JULY
3766 080.65677 9,654
INSTALL 2959 FEET OF 4 INCH AND 1198 FEET OF 2 INCH POLY ALONG THE STREETS OF STAR RANCH SECTION 7 PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH SEPTEMBER
3767 080.65679 123,947
INSTALL AND ABANDON S203 DISTRICT REGULATOR STATION DRS06 IN MERIDIAN IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS MERIDIAN
SYSTEM INTEGRITY DECEMBER
3768 080.65681 435,062
RELOCATE FACILITIES. INSTALL 160 FEET OF 8 INCH STEEL AND 430 FEET OF 2 INCH POLY ALONG NORTHAVEN ROAD AND ABANDON 113 FEET OF 8 INCH STEEL AND 415 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3769 080.65682 98 ABANDON DISTRICT REGULATOR STATION 168 IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3770 080.65683 2,422
INSTALL 602 FEET OF 2 INCH POLY AND ABANDON 80 FEET OF 4 INCH STEEL AND 300 FEET OF 4 INCH POLY ALONG LOVERS LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOWIE
SYSTEM INTEGRITY DECEMBER
3771 080.65690 66,798
INSTALL AND ABANDON DISTRICT REGULATOR STATIONS AT THE FOLLOWING LOCATIONS: DRS33 IN TEMPLE IN ACCORDANCE WITH THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
3772 080.65692 62,137 INSTALL 1600 FEET OF 4 INCH AND 2900 FEET OF 2 INCH POLY ALONG THE STREETS OF LADERA PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER
3773 080.65694 15,487
RELOCATE FACILITIES. INSTALL 10 FEET OF 2 INCH POLY AND 710 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 10 FEET OF 4 INCH STEEL AND 700 FEET OF 4 INCH POLY ALONG CARDINAL LANE TO ACCOMMODATE CITY OF NORTH RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
SYSTEM INTEGRITY DECEMBER
3774 080.65695 4,090
RELOCATE FACILITIES. INSTALL 35 FEET OF 4 INCH POLY AND 135 FEET OF 6 INCH AND ABANDON 45 FEET OF 4 INCH POLY 30 FEET OF 4 INCH AND 160 FEET OF 6 INCH STEEL ALONG WEST BROADWAY AVENUE AT TRAVIS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3775 080.65705 870
RELOCATE FACILITIES. INSTALL 118 FEET OF 6 INCH POLY AND ABANDON 89 FEET OF 6 INCH POLY ALONG OLD BURLESON ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3776 080.65706 116,275
RELOCATE FACILITIES. INSTALL 600 FEET OF 6 INCH POLY AND ABANDON 350 FEET OF 6 INCH STEEL ALONG RISINGER ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3777 080.65707 883,643
RELOCATE FACILITIES. INSTALL 455 FEET OF 6 INCH AND 2260 FEET OF 12 INCH POLY ALONG RISINGER ROAD FROM INTERSTSTE 35W TO TECHNOLOGY BOULEVARD AND ABANDON 132 FEET OF 6 INCH STEEL AND 2062 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3778 080.65715 76,223 INSTALL 1400 FEET OF 4 INCH AND 7975 FEET OF 2 INCH POLY ALONG THE STREETS OF RIDGE RANCH PH 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MESQUITE GROWTH DECEMBER
3779 080.65721 5,605 INSTALL 3425 FEET OF 2 INCH POLY ALONG PARK GROVE LOOP IN SOUTHLAKE TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH JULY
3780 080.65722 12,972 INSTALL 330 FEET OF 2 INCH POLY ALONG JONES STREET IN GRAPEVINE, TEXAS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAPEVINE GROWTH SEPTEMBER
3781 080.65723 10,864 INSTALL 400 FEET OF 2 INCH POLY ALONG DUBLIN STREET IN GRAPEVINE, TEXAS. RESIDENTIAL GRAPEVINE GROWTH JUNE
3782 080.65724 10,102 INSTALL 2280 FEET OF 4 INCH AND 825 FEET OF 2 INCH POLY ALONG MUSTANG DRIVE.
COMMERCIAL OR INDUSTRIAL GRAPEVINE GROWTH DECEMBER
3783 080.65726 162 INSTALL 60 FEET OF 4 INCH AND 190 FEET OF 2 INCH POLY ALONG THE STREETS OF OLYMPUS ON BROADWAY.
COMMERCIAL OR INDUSTRIAL CARROLLTON GROWTH JUNE
3784 080.65731 1,336
ABANDON 361 FEET OF 2 INCH STEEL AND 40 FEET OF 2 INCH POLY ALONG CHAPPELL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEWCASTLE
SYSTEM INTEGRITY DECEMBER
3785 080.65736 4 INSTALL 535 FEET OF 2 INCH POLY ALONG THE STREETS OF MIMOSA PLACE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL RICHARDSON GROWTH JANUARY
3786 080.65739 5,062 INSTALL 2787 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYSON SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
3787 080.65740 519 INSTALL 1120 FEET OF 2 INCH IP POLY TO SERVE THE NEW NOBLE ESTATES SUBDIVSION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH JUNE
3788 080.65741 (26)INSTALL 2350 FEET OF 2 INCH POLY ALONG THE STREETS OF 5MR RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUBREY GROWTH JANUARY
3789 080.65746 9 INSTALL 2770 FEET OF 2 INCH POLY ALONG THE STREETS OF WILLOW RIDGE 6A AND 6B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JANUARY
3790 080.65747 13,204
INSTALL 925 FEET OF 4 INCH POLY ALONG NORTH STREET AND ABANDON 925 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.208. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
3791 080.65748 4,377 INSTALL 2166 FEET OF 2 INCH POLY ALONG THE STREETS OF DEERBROOKE PHASE 2 SECTION 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH JUNE
3792 080.65749 399,955
INSTALL 3 FEET OF 3 INCH POLY AND 1236 FEET OF 4 INCH POLY AND ABANDON 1130 FEET OF 4 INCH POLY ALONG LINDALE LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY DECEMBER
3793 080.65753 13,347 INSTALL 4,325 FEET OF 2 INCH POLY ALONG THE STREETS OF KNOLLS AT SOLANA RESIDENTIAL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WESTLAKE GROWTH SEPTEMBER
3794 080.65754 14,247
RELOCATE FACILITIES. INSTALL 2750 FEET OF 2 INCH POLY AND ABANDON 1217 FEET OF 2 INCH STEEL, 444 FEET OF 2 INCH POLY, 782 FEET OF 1.25 INCH STEEL, AND 585 FEET OF 3 INCH STEEL AND 1 DRS ALONG WAYLAND AND SUNSET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RANGER
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 127 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3795 080.65762 4,221 INSTALL 185 FEET OF 4 INCH POLY ALONG WASHINGTON AVENUE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER
3796 080.65763 6,803 INSTALL 3261 FEET OF 2 INCH POLY ALONG STREETS OF TRAVISSO PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
3797 080.65774 1,438
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 350 FEET OF 4 INCH STEEL ALONG NORTH COLEMAN TO ACCOMMODATE CITY OF PROSPER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER
SYSTEM INTEGRITY DECEMBER
3798 080.65779 9,104 INSTALL 840 FEET OF 4 INCH AND 2400 FEET OF 2 INCH POLY ALONG THE STREETS OF THE STANDARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER
3799 080.65783 (539) INSTALL 75 FEET OF 2 INCH POLY ALONG EAST 3RD STREET.COMMERCIAL OR
INDUSTRIAL BURKBURNETT GROWTH MARCH
3800 080.65784 16,148 INSTALL 100 FEET OF 2 INCH POLY ALONG SANDY LAKE.COMMERCIAL OR
INDUSTRIAL COPPELL GROWTH MARCH
3801 080.65787 207,319
RELOCATE FACILITIES. INSTALL 780 FEET OF 4 INCH AND 37 FEET OF 6 INCH POLY AND ABANDON 221 FEET OF 2 INCH STEEL, 287 FEET OF 2 INCH POLY, 268 FEET OF 3 INCH POLY AND 20 FEET OF 6 INCH POLY ALONG SOUTH BOUND FRONTAGE OF IH35 TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS GEORGETOWN
RELOCATION OF FACILITIES DECEMBER
3802 080.65793 13,120
INSTALL 3450 FEET OF 8 INCH POLY AND 6260 FEET OF 2 INCH POLY ALONG THE STREETS OF CARMEL WEST SUBDIVSION IN PLFLUGERVILLE TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
3803 080.65806 98,298
INSTALL DISTRICT REGULATOR STATION IN AND CORSICANA AND ABANDON DISTRICT REGULATOR STATION DRS07 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
3804 080.65810 193,590 INSTALL AND ABANDON DISTRICT REGULATOR STATIONS #01, #05,#12,#25 AND #26 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
3805 080.65812 118,136 INSTALL DISTRICT REGULATOR STATIONS DRS29, DRS47, DRS50,DRS03 AND DRS16 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
3806 080.65825 16 INSTALL 885 FEET OF 4 INCH AND 2133 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK PHASE 12. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH MARCH
3807 080.65826 916,860
INSTALL 3030 FEET OF 2 INCH POLY ALONG DIVIDEND DRIVE AND ABANDON 3020 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3808 080.65827 3,881
INSTALL 36 FEET OF 2 INCH POLY AND 31 FEET OF 4 INCH POLY AND 2,064 FEET OF 8 INCH POLY ALONG THE STREETS OF WOLF RANCH PARKWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GEORGETOWN GROWTH JULY
3809 080.65829 71,267
RELOCATE FACILITIES. INSTALL 900 FEET OF 4 INCH POLY AND ABANDON 890 FEET OF 4 INCH STEEL ALONG HOWARD ST TO ACCOMMODATE THE CITY OF ROYSE CITY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROYSE CITY
SYSTEM INTEGRITY DECEMBER
3810 080.65830 1,758
RELOCATE FACILITIES. INSTALL 280 FEET OF 4 INCH POLY AND ABANDON 42 FEET OF 4 INCH STEEL AND 220 FEET OF 4 INCH POLY ALONG CLARKSVILLE TO ACCOMMODATE CITY OF PARIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
3811 080.65838 9,315
RELOCATE FACILITIES. INSTALL 504 FEET OF 2 INCH POLY AND 114 FEET OF 4 INCH POLY AND ABANDON 469 FEET OF 2 INCH STEEL AND 16 FEET OF 2 INCH POLY AND 15 FEET OF 4 INCH STEEL AND 85 FEET OF 4 INCH POLY ALONG CURZON AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3812 080.65840 6,164 INSTALL 462 FEET OF 4 INCH AND 2718 FEET OF 2 INCH POLY ALONG THE STREETS OF LOST WOODS PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
3813 080.65844 87,384
INSTALL DISTRICT REGULATOR STATION 02 IN MOODY AND HUTTO AND ABANDON DISTRICT REGULATOR STATION 02 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTTO
SYSTEM INTEGRITY DECEMBER
3814 080.65845 939
RELOCATE FACILITIES. INSTALL 75 FEET OF 4 INCH AND 75 FEET OF 2 INCH POLY ALONG FM 1633 AND ABANDON 75 FEET OF 4 INCH STEEL AND 75 FEET OF 2 INCH POLY TO ACCOMMODATE TXDOT ROAD IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
3815 080.65846 246 INSTALL 265 FEET OF 2 INCH POLY ALONG THE STREETS OF CHICK FIL A. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH SEPTEMBER
3816 080.65849 11,049 INSTALL 900 FEET OF 2 INCH POLY ALONG WILLIAM COURT TO SERVE WILL'S PLACE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH JUNE
3817 080.65853 58,141 INSTALL AND ABANDON DISTRICT REGULATOR 02 IN MART. ALL CUSTOMERS MARTSYSTEM
INTEGRITY DECEMBER
3818 080.65854 51,271
INSTALL DISTRICT REGULATOR STATION 12 IN WACO AND ABANDON DISTRICT REGULATOR STATION 12 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3819 080.65857 119,841
INSTALL DISTRICT REGULATOR STATION 18 IN WACO AND ABANDON DISTRICT REGULATOR STATION 18 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3820 080.65859 2,123
INSTALL 293 FEET OF 4 INCH POLY AND ABANDON 33 FEET OF 2 INCH STEEL AND 215 FEET OF 2 INCH POLY AND 249 FEET OF 4 INCH STEEL AND 38 FEET OF 4 INCH POLY ALONG BUCHANAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3821 080.65861 6,692 INSTALL 3000 FEET OF 4 INCH POLY AND 9100 FEET OF 2 INCH POLY ALONG VERANDAH BLVD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER
3822 080.65866 18,376 INSTALL 1284 FEET OF 4 INCH POLY AND 1428 FEET OF 2 INCH POLY ALONG THE STREETS OF PALMERA RIDGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
3823 080.65870 204,685 PURCHASE SURVEY EQUIPMENT FOR USE IN SOUTHEAST REGION DALLAS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
3824 080.65871 18,154 INSTALL 600 FEET OF 2 INCH POLY ALONG THE STREETS OF WYNDEMERE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH OCTOBER
3825 080.65872 39,204 INSTALL 400 FEET OF 4 INCH POLY ALONG GERAULT ROAD.COMMERCIAL OR
INDUSTRIAL FLOWER MOUND GROWTH JUNE
3826 080.65873 8,199
INSTALL 1776 FEET OF 4 INCH AND 1345 FEET OF 2 INCH POLY ALONG THE STREETS OF ORCHARD RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
3827 080.65877 44 ABANDON DISTRICT REGULATOR STATION 104 IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3828 080.65881 12,960 INSTALL 1000 FEET OF 2 INCH POLY ALONG RICHARDS STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL QUITMAN GROWTH JUNE
3829 080.65887 10,878
INSTALL 280 FEET OF 2 INCH POLY AND 1050 FEET OF 4 INCH POLY AND ABANDON 166 FEET OF 2 INCH POLY AND 558 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
SYSTEM INTEGRITY DECEMBER
3830 080.65890 29,230 INSTALL 100 FEET OF 2 INCH POLY ALONG FEDERAL WAY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH JUNE
MTX AdditionsPage 128 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3831 080.65894 6,549 INSTALL 4894 FEET OF 2 INCH POLY ALONG THE STREETS OF HIGHLAND VILLAGE SUBDIVISION . DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
3832 080.65896 104 ABANDON DISTRICT REGULATOR STATION 01 AND 346 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA
SYSTEM INTEGRITY DECEMBER
3833 080.65901 101,122
RELOCATE FACILITIES. INSTALL 953 FEET OF 2 INCH POLY AND 4 FEET OF 4 INCH POLY AND ABANDON 955 FEET OF 2 INCH STEEL ALONG ALTA VIEW STREET FROM KIMBO RD TO PREMIER STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3834 080.65902 123,780
RELOCATE FACILITIES. INSTALL 2395 FEET OF 2 INCH POLY AND ABANDON 1410 FEET OF 2 INCH STEEL ALONG KIMBO ROAD FROM MESQUITE RD TO EAST END CUL DE SAC TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3835 080.65904 2,723
INSTALL 65 FEET OF 4 INCH AND 245 FEET OF 6 INCH POLY ALONG WEST AVENUE B AND ABANDON 65 FEET OF 3 INCH AND 200 FEET OF 6 INCH STEEL AND 40 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
3836 080.65905 247,544 INSTALL 585 FEET OF 4 INCH POLY AND 8215 FEET OF 2 INCH POLY ALONG THE STREETS OF CARAWAY SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH OCTOBER
3837 080.65907 72,210 INSTALL 950 OF 4 POLY AND 3630 OF 2 POLY ALONG THE STREETS OF ELM CREEK DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH DECEMBER
3838 080.65910 6,214
INSTALL 279 FEET OF 2 INCH POLY AND 251 FEET OF 4 INCH POLY AND ABANDON 279 FEET OF 2 INCH STEEL AND 177 FEET OF 3 INCH STEEL AND 70 FEET OF 4 INCH STEEL ALONG CYPRESS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GROESBECK
SYSTEM INTEGRITY DECEMBER
3839 080.65912 18,913 INSTALL 1,425 FEET OF 2 INCH AND 2,235 FEET OF 4 INCH POLY ALONG STREETS OF PARKVUE PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENTON GROWTH DECEMBER
3840 080.65915 330 INSTALL 100 FEET OF 2 INCH POLY ALONG HIGHWAY 69.COMMERCIAL OR
INDUSTRIAL EMORY GROWTH APRIL
3841 080.65917 1,212
INSTALL 224 FEET OF 2 INCH POLY AND ABANDON 224 FEET OF 2 INCH POLY ALONG WOODBINE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
3842 080.65918 84,326
RELOCATE FACILITIES. INSTALL 1,070 FEET OF 2 INCH POLY ALONG HOUSTON (FM 56) MAXEY AND ABANDON 260 FEET OF 4 INCH AND 600 FEET OF 2 INCH STEEL AND 417 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY JULY
3843 080.65919 111,086
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 260 FEET OF 2 INCH POLY ALONG HAIRY MAN ROAD TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY JUNE
3844 080.65920 42,397 INSTALL 270 FEET OF 2 INCH POLY ALONG BROOKLYN AVENUE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DALLAS GROWTH APRIL
3845 080.65921 48,349
INSTALL 3004 FEET OF 2 INCH POLY AND ABANDON 2171 FEET OF 2 INCH STEEL AND 339 FEET OF 2 INCH POLY AND 190 FEET OF 6 INCH STEEL AND 63 FEET OF 6 INCH POLY ALONG SOUTH 20TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
3846 080.65924 300,497 INSTALL 3300 FEET OF 6 INCH POLY, 470 FEET OF 4 INCH POLY, AND 4260 FEET OF 2 INCH POLY ALONG THE STREETS OF CADDO MILLS TRAILSTONE. RESIDENTIAL CADDO MILLS GROWTH DECEMBER
3847 080.65928 15,622 INSTALL 1930 FEET OF 4 INCH POLY ALONG MARK IV PARKWAY FOR MARK IV INDUSTRIAL PARK. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH OCTOBER
3848 080.65930 6,261
INSTALL 260 FEET OF 4 INCH POLY AND 2 FEET OF 6 INCH POLY AND ABANDON 131 FEET OF 2 INCH STEEL AND 8 FEET OF 6 INCH POLY AND 155 FEET OF 8 INCH STEEL ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3849 080.65933 5,352
INSTALL 811 FEET OF 4 INCH AND 632 FEET OF 2 INCH POLY ALONG THE STREETS OF ORCHARD RIDGE SUBDIVISON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
3850 080.65934 4,588 INSTALL 2098 FEET OF 2 INCH POLY ALONG THE STREETS OF ORCHARD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
3851 080.65943 2,340 INSTALL 300 FEET OF 2 INCH POLY ALONG WHITE ROCK TRAIL AND CHURCH ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DALLAS GROWTH DECEMBER
3852 080.65944 4,880
INSTALL 839 FEET OF 4 INCH AND 786 FEET OF 2 INCH POLY ALONG THE STREETS OF ORCHARD RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
3853 080.65948 5,822
INSTALL 510 FEET OF 4 INCH IP POLY ALONG ANDOVER AND EAST BELTLINE TO SERVE WILMER ELEMENTARY SCHOOL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WILMER GROWTH JULY
3854 080.65953 349 INSTALL 1507 FEET OF 4 INCH POLY ALONG INDIAN TRAIL AND ABANDON 245 FEET OF 2 INCH POLY. ALL CUSTOMERS HARKER HEIGHTS
SYSTEM IMPROVEMENT JUNE
3855 080.65956 362,576
RELOCATE FACILITIES. INSTALL 1721 FEET OF 4 INCH POLY AND ABANDON 197 FEET OF 3 INCH STEEL AND 1621 FEET OF 4 INCH STEEL ALONG PARK HILL DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3856 080.65958 3,565 INSTALL 1290 FEET OF 4 INCH POLY ALONG FRENCH SETTLEMENT ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL LITTLE ELM GROWTH DECEMBER
3857 080.65960 6,850 INSTALL 4797 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKESIDE PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
3858 080.65962 2,292 INSTALL (2) CLOCKSPRINGS AT DFW AIRPORT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
3859 080.65963 (130,860)
RELOCATE FACILITIES. INSTALL 1296 FEET OF 6 INCH POLY AND 1158 FEET OF 6 INCH STEEL AND ABANDON 100 FEET OF 4 INCH POLY AND 100 FEET OF 8 INCH STEEL ALONG SUMMIT DRIVE TO ACCOMMODATE SYSTEM INTEGRITY PROJECT. ALL CUSTOMERS LEWISVILLE
RELOCATION OF FACILITIES DECEMBER
3860 080.65964 205,613
INSTALL 5000 FEET OF 8 INCH, 600 FEET OF 4 INCH AND 1400 FEET OF 2 INCH POLY ALONG STREETS OF GREENWAY TRAILS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH DECEMBER
3861 080.65968 65,096
RELOCATE FACILITIES. INSTALL 498 FEET OF 6 INCH POLY AND 229 FEET OF 4 INCH POLY AND ABANDON 503 FEET OF 6 INCH POLY AND 195 FEET OF 3 INCH POLY ALONG HIGHWAY I35 AND NORTHWEST BLVD TO ACCOMMODATE CITY OF GEORGETOWN STREET IMPROVEMENT PROJECT. ALL CUSTOMERS GEORGETOWN
RELOCATION OF FACILITIES DECEMBER
3862 080.65969 54,269 INSTALL 1550 FEET OF 4 INCH POLY ALONG KINSHIP PARKWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CELINA GROWTH DECEMBER
3863 080.65973 346,025
RELOCATE FACILITES. INSTALL 1198 FEET OF 12 INCH POLY AND ABANDON 1230 FEET OF 12 INCH POLY ALONG FRONTIER PARKWAY TO ACCOMMODATE THE CITY OF CELINA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA
SYSTEM INTEGRITY DECEMBER
3864 080.65989 4,647 INSTALL 1319 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH PHASE 1 SECTION 12. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH APRIL
3865 080.65994 2,560 INSTALL 1400 FEET OF 4 INCH POLY ALONG APACHE TRAIL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL TERRELL GROWTH APRIL
MTX AdditionsPage 129 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3866 080.65998 27,202 INSTALL 775 FEET OF 4 INCH POLY AND 2000 FEET OF 2 INCH POLY ALONG THE STREETS OF COTTONWOOD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GREENVILLE GROWTH DECEMBER
3867 080.66000 43,962
INSTALL 1000 FEET OF 12 INCH POLY AND ABANDON 1040 FEET OF 12 INCH STEEL ALONG WASHINGTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3868 080.66001 20,592 INSTALL 400 FEET OF 4 INCH POLY AND 800 FEET OF 6 INCH POLY ALONG THE STREETS OF DEVONSHIRE VILLAGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER
3869 080.66002 (94)
RELOCATE FACILITIES. INSTALL 424 FEET OF 4 INCH POLY AND ABANDON 176 FEET OF 4 INCH STEEL AND 239 FEET OF 4 INCH POLY TO ACCOMMODATE HEB CONSTRUCTION PROJECT. ALL CUSTOMERS KERRVILLE
RELOCATION OF FACILITIES JANUARY
3870 080.66004 615 INSTALL 250 FEET OF 2 INCH ALONG LILLIE STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL SACHSE GROWTH MARCH
3871 080.66007 2,799
RELOCATE FACILITIES. INSTALL 72 FEET OF 2 INCH POLY AND ABANDON 70 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WHITEHOUSE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITEHOUSE
SYSTEM INTEGRITY DECEMBER
3872 080.66009 4,568 INSTALL 1855 FEET OF 2 INCH POLY. ALONG THE STREETS OF PARK CENTRAL TERRACES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEWISVILLE GROWTH OCTOBER
3873 080.66011 2,093
INSTALL 490 FEET OF 2 INCH POLY AND ABANDON 491 FEET OF 2 INCH STEEL ALONG OLD HICO ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
3874 080.66012 38,584 INSTALL 8 INCH RELIEF VALVE IN IRVING AT DRS 4549.1 AND RETIRE RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY JULY
3875 080.66014 4,213
INSTALL 506 FEET OF 4 INCH POLY AND ABANDON 484 FEET OF 2 INCH STEEL AND 11 FEET OF 3 INCH STEEL ALONG PARRISH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
3876 080.66016 1,141
INSTALL 87 FEET OF 6 INCH STEEL AND ABANDON 88 FEET OF 6 INCH STEEL ALONG LINE U IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STAMFORD
SYSTEM INTEGRITY DECEMBER
3877 080.66017 16,425
RELOCATE FACILITIES. INSTALL 1165 FEET OF 2 INCH POLY ALONG HAMILTON STREET AND ABANDON 796 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FARMERSVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE
SYSTEM INTEGRITY DECEMBER
3878 080.66018 378 INSTALL 100 FETT OF 2 INCH POLY ALONG HART STREET. RESIDENTIAL DALLAS GROWTH APRIL
3879 080.66020 (33)
RELOCATE FACILITIES. INSTALL 2878 FEET OF 6 INCH POLY AND ABANDON 2751 FEET OF 6 INCH POLY ALONG STREETS OF CARTER DISTRIBUTION BUILDINGS TO ACCOMMODATE TEXAS STATE UTILITIES. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES JANUARY
3880 080.66023 12,262
RELOCATE FACILITIES. INSTALL 550 FEET OF 4 INCH POLY ALONG LEON AND ABANDON 570 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF GARLAND STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3881 080.66025 8 INSTALL 560 FEET OF 2 INCH POLY ALONG THE STREETS OF TRADITIONS PHASE 34. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH JANUARY
3882 080.66026 1 INSTALL 1600 FEET OF 2 INCH POLY ALONG THE STREETS OF MID TOWN RESERVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JANUARY
3883 080.66028 55,982 INSTALL 650 FEET OF 2 INCH POLY ALONG THE STREETS OF VILLAS ON HUTTON SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FARMERS BRANCH GROWTH JULY
3884 080.66029 3,390
INSTALL 500 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 4 INCH STEEL ALONG SOUTH GARITTY STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FROST
SYSTEM INTEGRITY DECEMBER
3885 080.66030 26,169
INSTALL 151 FEET OF 3 INCH POLY AND 620 FEET OF 4 INCH POLY AND ABANDON 150 FEET OF 3 INCH POLY AND 613 FEET OF 4 INCH POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
3886 080.66031 1,736
RELOCATE FACILITIES. INSTALL 90 FEET OF 2 INCH POLY ALONG HUDNALL FARMS AND ABANDON 80 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
SYSTEM INTEGRITY DECEMBER
3887 080.66032 51,165
RELOCATE FACILITIES. INSTALL 80 FEET OF 2 INCH POLY ALONG LOST LAKE DRIVE AND ABANDON 70 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
SYSTEM INTEGRITY JUNE
3888 080.66033 4,511
INSTALL 2700 FEET OF 4 INCH POLY AND 2400 FEET OF 2 INCH POLY ALONG THE STREETS OF DIAMOND CREEK ESTATES PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER
3889 080.66034 115,969
RELOCATE FACILITIES. INSTALL 11 FEET OF 4 INCH POLY AND 3963 FEET OF 6 INCH POLY AND ABANDON 2480 FEET OF 4 INCH POLY ALONG REEDER ROAD TO ACCOMMODATE CITY OF FORNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORNEY
SYSTEM INTEGRITY DECEMBER
3890 080.66035 8,636 INSTALL RELIEF VALVE AND ABANDON RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
3891 080.66037 53,043
INSTALL 165 FEET OF 8 INCH STEEL AND ABANDON 165 FEET OF 8 INCH STEEL ALONG HIGHWAY 222 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MUNDAY
SYSTEM INTEGRITY DECEMBER
3892 080.66038 16,170
INSTALL 540 FEET OF 2 INCH POLY ALONG RIVER AND ABANDON 530 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEYMOUR
SYSTEM INTEGRITY DECEMBER
3893 080.66039 22,112 INSTALL 3,200 FEET OF 4 INCH AND 3,900 FEET OF 2 INCH POLY ALONG STREETS OF LEGENDS CROSSING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL IRVING GROWTH DECEMBER
3894 080.66041 247,741
INSTALL 767 FEET OF 2 INCH POLY ALONG SOUTH 9TH STREET AND ABANDON 920 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3895 080.66049 (108)INSTALL 976 FEET OF 4 INCH AND 1052 FEET OF 2 INCH POLY ALONG STREETS OF BOOT RANCH PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH APRIL
3896 080.66050 (304)INSTALL 450 FEET OF 2 INCH POLY ALONG STREETS OF EINSTEIN BROTHERS. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH MARCH
3897 080.66058 157,536
INSTALL 1475 FEET OF 4 INCH POLY AND ABANDON 1430 FEET OF 3 INCH STEEL AND 41 FEET OF 3 INCH POLY ALONG WHALEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY JUNE
3898 080.66065 5,290 INSTALL 600 FEET OF 4 INCH POLY ALONG ATLAS PEAR DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH JUNE
3899 080.66066 6,287 INSTALL 220 FEET OF 4 INCH POLY AND 2240 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTHGATE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FLOWER MOUND GROWTH DECEMBER
3900 080.66067 (4,244)INSTALL 650 FEET OF 4 INCH POLY ALONG DENTON DRIVE AND ABANDON 550 FEET OF 4 INCH POLY AND 50 FEET OF 6 INCH POLY. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
3901 080.66068 218 INSTALL 500 FEET OF 2 INCH POLY ALONG STREETS OF MUSTANG RANCH.COMMERCIAL OR
INDUSTRIAL FARMERS BRANCH GROWTH SEPTEMBER
3902 080.66071 145,141
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH STEEL ALONG WHEATLAND AND ABANDON 40 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
MTX AdditionsPage 130 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3903 080.66082 33,204 INSTALL 330 FEET OF 2 INCH POLY ALONG THE STREETS OF TIMBERBROOK PHASE 1B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL JUSTIN GROWTH JUNE
3904 080.66083 293
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND ABANDON 10 FEET OF 2 INCH STEEL ALONG ELM PARK AND MAPLE PARK DRIVE TO ACCOMMODATE CITY OF RICHLAND HILLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHLAND HILLS
SYSTEM INTEGRITY DECEMBER
3905 080.66084 8 INSTALL 170 FEET OF 2 INCH POLY ALONG GRIM AVENUE AND ABANDON 172 FEET OF 2 INCH AND 81 FEET OF 2 INCH POLY. ALL CUSTOMERS WACO
SYSTEM INTEGRITY JANUARY
3906 080.66086 45,464 INSTALL 480 FEET OF 2 INCH POLY ALONG KENTUCKY STREET. RESIDENTIAL MCKINNEY GROWTH DECEMBER
3907 080.66087 15,081
INSTALL 5740 FEET OF 2 INCH POLY AND 2800 FEET OF 4 INCH POLY ALONG THE STREETS OF THE CREEKS OF LEGACY WEST SUBDIVISION DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH OCTOBER
3908 080.66093 (153)
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND ABANDON 179 FEET OF 2 INCH POLY ALONG WILLIAMS RANCH ROAD TO ACCOMMODATE CONSTRUCTION OF COMMERCIAL BUILDING. ALL CUSTOMERS EARLY
RELOCATION OF FACILITIES JUNE
3909 080.66104 5,657 INSTALL 3152 FEET OF 2 INCH POLY ALONG THE STREETS OF BRYSON PHASE 3 SECTION 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER
3910 080.66105 3,191 INSTALL 1,265 FEET OF 4 INCH AND 200 FEET OF 2 INCH POLY ALONG THE STREETS OF WESTERN RIDGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTH RICHLAND HILLS GROWTH SEPTEMBER
3911 080.66106 18,704
INSTALL APPROXIMATELY 320 FEET OF 4 INCH POLY AND 3530 FEET OF 2 INCH POLY ALONG THE STREETS OF HUDSON HILLS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SACHSE GROWTH SEPTEMBER
3912 080.66107 2,018
INSTALL 500 FEET OF 4 INCH POLY ALONG DALLAS STREET AND ABANDON 500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COOPER
SYSTEM INTEGRITY DECEMBER
3913 080.66108 159,757
INSTALL 2,225 FEET OF 4 INCH POLY AND 2,000 FEET OF 2 INCH POLY ALONG THE STREETS OF THE LONESTAR ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL EULESS GROWTH DECEMBER
3914 080.66111 63 INSTALL 100 FEET OF 2 INCH POLY ALONG FM730.COMMERCIAL OR
INDUSTRIAL BOYD GROWTH APRIL
3915 080.66113 387,997
RELOCATE FACILITIES. INSTALL 1420 FEET OF 2 INCH POLY AND ABANDON 1314 FEET OF 2 INCH STEEL AND 111 FEET OF 2 INCH POLY ALONG BOMBAY AVENUE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3916 080.66115 190,498 INSTALL 4317 FEET OF 4 INCH POLY ALONG GATES OF PROSPER PHASE 2. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL PROSPER GROWTH OCTOBER
3917 080.66125 9,612
RELOCATE FACILITIES. INSTALL 350 FEET OF 2 INCH POLY AND ABANDON 209 FEET OF 2 INCH STEEL AND 82 FEET OF 3 INCH STEEL AND 195 FEET OF 4 INCH STEEL ALONG CARROLL TO ACCOMMODATE CITY OF ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
3918 080.66128 36,218 INSTALL 2716 FEET OF 2 INCH POLY ALONG STREETS OF COTTONWOOD CREEEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH OCTOBER
3919 080.66132 430 INSTALL 2 INCH STEEL PLUG VALVE AND ABANDON 2 INCH STEEL PLUG VALVE AT RULE MEASURING STATION. ALL CUSTOMERS RULE
PIPELINE INTEGRITY JUNE
3920 080.66135 401
INSTALL 161 FEET OF POLY AND ABANDON 161 FEET OF 2 INCH STEEL ALONG AVENUE F IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURKBURNETT
SYSTEM INTEGRITY DECEMBER
3921 080.66136 (182,661)INSTALL 1286 FEET OF 6 INCH POLY ALONG CR 199. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS HUTTO GROWTH APRIL
3922 080.66141 169,506 INSTALL 3400 FEET OF 2 INCH AND 1220 FEET OF 4 INCH POLY ALONG STREETS OF HUGHBRIDGE PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH SEPTEMBER
3923 080.66142 796
INSTALL 160 FEET OF 2 INCH POLY AND ABANDON 292 FEET OF 2 INCH STEEL AND 67 FEET OF 2 INCH POLY ALONG TREMONT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BYERS
SYSTEM INTEGRITY DECEMBER
3924 080.66143 250
INSTALL 875 FEET OF 2 INCH POLY AND 570 FEET OF 4 INCH POLY ALONG THE STREETS OF WATERFORD HEIGHTS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH MARCH
3925 080.66155 386,743
RELOCATE FACILITIES. INSTALL 2246 FEET OF 4 INCH POLY ALONG BELL BOULEVARD AND ABANDON 1289 FEET OF 2 INCH, 277 FEET OF 4 INCH AND 215 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF CEDAR PARK ROAD PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR PARK
SYSTEM INTEGRITY DECEMBER
3926 080.66157 390
INSTALL 96 FEET OF 2 INCH POLY AND ABANDON 98 FEET OF 2 INCH STEEL ALONG FM1085 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYLVESTER
SYSTEM INTEGRITY DECEMBER
3927 080.66159 10,256 INSTALL 850 FEET OF 4 INCH POLY ALONG MILES STREET TO SERVICE CIVITAS SENIOR LIVING. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL SACHSE GROWTH JULY
3928 080.66164 (99)INSTALL 619 FEET OF 4 INCH POLY ALONG WEST BROADE STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH MARCH
3929 080.66165 7,744
INSTALL 1355 FEET OF 4 INCH AND 1585 FEET OF 2 INCH POLY ALONG THE STREETS OF COMMONS AT ROWE LANE PHASE 6B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH SEPTEMBER
3930 080.66172 15,988
RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY AND ABANDON 60 FEET OF 4 INCH POLY ALONG FM 1633 TO ACCOMMODATE A TXDOT ROAD IMPROVEMENT PROJECT IN THE CITY OF MEXIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
3931 080.66173 125,580 INSTALL 1650 FEET 6 INCH POLY ALONG COOK LANE. ALL CUSTOMERS PROSPER GROWTH DECEMBER
3932 080.66174 20,200 INSTALL 100 FEET OF 4 INCH POLY ALONG BOIS D'ARC AVENUE.COMMERCIAL OR
INDUSTRIAL PRINCETON GROWTH DECEMBER
3933 080.66175 (57)INSTALL 220 FEET OF 4 INCH POLY ALONG CAPITAL STREET . DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WYLIE GROWTH APRIL
3934 080.66181 192,698
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY AND 742 FEET OF 4 INCH POLY AND ABANDON 14 FEET OF 2 INCH STEEL AND 666 FEET OF 3 INCH STEEL AND 2168 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF EVERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN
SYSTEM INTEGRITY DECEMBER
3935 080.66186 739
INSTALL REGULATOR AND RELIEF VALVE ALONG DRS02 AND ABANDON REGULATOR AND RELIEF VALVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DECATUR
SYSTEM INTEGRITY DECEMBER
3936 080.66193 (103)INSTALL 256 FEET OF 4 INCH POLY ALONG BROADE STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL LEANDER GROWTH MARCH
3937 080.66197 4,148 INSTALL 575 FEET OF 4 INCH POLY ALONG SUMMER LEE DRIVE. DEVELOPER INSTALLED FACILITY.
COMMERCIAL OR INDUSTRIAL ROCKWALL GROWTH JUNE
3938 080.66198 66,283 INSTALL 1350 OF 4 INCH POLY ALONG VIRIDIAN PARK LANE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER
3939 080.66200 15,431 INSTALL 1026 FEET IF 2 INCH AND 2771 FEET OF 6 INCH POLY ALONG SMYERS LANE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROUND ROCK GROWTH OCTOBER
3940 080.66208 930,863 INSTALL 3600 FEET OF 6 INCH STEEL AND ABANDON 1650 FEET OF 6 INCH STEEL ALONG FM407 ON W7 AND 27 LOOP. ALL CUSTOMERS JUSTIN
SYSTEM INTEGRITY DECEMBER
3941 080.66209 429,589
RELOCATE FACILITIES. INSTALL 2175 FEET OF 6 INCH STEEL AND ABANDON 1165 FEET OF 6 INCH STEEL ALONG FM 407 TO ACCOMMODATE CITY OF JUSTIN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS JUSTIN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 131 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3942 080.66212 227,547
INSTALL 2 INCH WORKER MONITOR AND RELIEF VALVE AND ABANDON RELIEF VALVES ON DISTRICT REGULATOR STATION 08 AND 20 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY SEPTEMBER
3943 080.66213 133,028 REPLACE DISTRICT REGULATOR STATION 09, 01, 17, 02 AND 246 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
3944 080.66214 26
ABANDON 1067 FEET OF 2 INCH POLY, 12 LONG SIDE SERVICE STUBS, AND 19 SHORT SERVICES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
3945 080.66216 1,266
INSTALL 100 FEET OF 4 INCH POLY AND ABANDON 293 FEET OF 4 INCH STEEL ALONG MCCRACKEN ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
3946 080.66217 312
INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 4 INCH STEEL AND 50 FEET OF 6 INCH STEEL ALONG MAIDEN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
3947 080.66218 590
INSTALL 15 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 6 INCH STEEL ALONG PRAIREVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
3948 080.66219 830 INSTALL 1,215 FEET OF 2 INCH POLY ALONG DEACON DRIVE AND FM 2154. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH JUNE
3949 080.66223 277
INSTALL 185 FEET OF 4 INCH POLY AND ABANDON 185 FEET OF 4 INCH STEEL ALONG DEAN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
3950 080.66224 15,700
INSTALL 1418 FEET OF 4 INCH POLY AND ABANDON 318 FEET OF 3 INCH STEEL AND 331 FEET OF 3 INCH POLY AND 740 FEET OF 4 INCH STEEL ALONG BOIS D ARC IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROSCOE
SYSTEM INTEGRITY DECEMBER
3951 080.66227 42,964
INSTALL 7268 FEET OF 2 INCH POLY AND 435 FEET OF 4 INCH POLY ALONG THE STREETS OF COLLINSBROOK FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH DECEMBER
3952 080.66228 12,736 INSTALL 725 FEET OF 2 INCH POLY IN THE CITY OF DENTON. DEVELOPER INSTALLED FACILITY.
COMMERCIAL OR INDUSTRIAL DENTON GROWTH SEPTEMBER
3953 080.66229 31,533
RELOCATE FACILITIES. INSTALL 65 FEET OF 2 INCH POLY ALONG OAK DRIVE AND ABANDON 98 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KELLER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
SYSTEM INTEGRITY DECEMBER
3954 080.66233 5,265 INSTALL CLOCKSPRING ALONG LINE CA(3RD). ALL CUSTOMERS FORT WORTHPIPELINE
INTEGRITY DECEMBER
3955 080.66234 51,157
INSTALLING 900 FEET OF 4 INCH POLY AND 1,150 FEET OF 2 INCH POLY ALONG THE STREETS THE URBAN TRAILS COTTAGES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTH RICHLAND HILLS GROWTH OCTOBER
3956 080.66235 66,354 INSTALL 150 FEET OF 2 INCH POLY ALONG SOUTHLAND IN SAN ANGELO.COMMERCIAL OR
INDUSTRIAL SAN ANGELO GROWTH JULY
3957 080.66242 18,703
INSTALL 3900 FEET OF 6 INCH ALONG THE STREETS OF SHAW CREEK RANCH SUBDIVISION AND ABANDON 360 FEET OF 2 INCH POLY MAIN. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FERRIS
SYSTEM IMPROVEMENT DECEMBER
3958 080.66243 (32,585)RELOCATE FACILITIES. INSTALL 3306 FEET OF 2 INCH POLY AND ABANDON 577 FEET OF 2 INCH POLY ALONG E 16TH STREET. ALL CUSTOMERS GRAPEVINE
RELOCATION OF FACILITIES DECEMBER
3959 080.66244 355
INSTALL 240 FEET OF 2 INCH IP POLY ALONG CAROLINA AND ABANDON 197 FEET OF 2 INCH STEEL, 946 FEET OF 2 INCH STEEL AND 275 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
3960 080.66252 (545)
INSTALL 230 FEET OF 2 INCH POLY ALONG POE AND ABANDON 50 FEET OF 1 INCH STEEL AND DISTRICT REGULATOR STATION 82 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
3961 080.66258 24 ABANDON DRS 303 ALONG SYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3962 080.66259 180,069 INSTALL 4016 FEET OF 4 INCH AND 1556 FEET OF 2 INCH POLY ALONG THE STREETS OF CLEBURNE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CLEBURNE GROWTH DECEMBER
3963 080.66261 24 ABANDON DRS300 ALONG SYLVANIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3964 080.66263 252,796 INSTALL 914 FEET OF 6 INCH POLY ALONG O'CONNOR AND RM 620. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROUND ROCK
SYSTEM IMPROVEMENT OCTOBER
3965 080.66266 8,498 INSTALL 2672 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA NORTH 18. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
3966 080.66267 (174)INSTALL 460 FEET OF 4 INCH POLY ALONG SOUTH VALLEY PARKWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH MARCH
3967 080.66270 (23,254)
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND ABANDON 300 FEET OF 4 INCH POLY ALONG STONEBRIAR WAY TO ACCOMMODATE THE STONEBRIAR CREEK ENTRY DRIVE. ALL CUSTOMERS FRISCO
RELOCATION OF FACILITIES JULY
3968 080.66272 75
ABANDON 1950 FEET OF 2 INCH STEEL AND 50 FEET OF 4 INCH POLY ALONG DODSON LAKE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
3969 080.66274 398,438
RELOCATE FACILITIES. INSTALL 978 FEET OF 4 INCH POLY AND ABANDON 540 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY AND 302 FEET OF 6 INCH STEEL ALONG 5TH STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3970 080.66275 4,930
INSTALL 478 FEET OF 2 INCH POLY AND 829 FEET OF 4 INCH POLY AND ABANDON 262 FEET OF 2 INCH POLY AND 829 FEET OF 4 INCH STEEL AND 65 FEET OF 4 INCH POLY ALONG GRAND AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMANCHE
SYSTEM INTEGRITY DECEMBER
3971 080.66276 7,271 INSTALL 2896 FEET OF 6 INCH AND 78 FEET OF 2 INCH POLY ALONG STREETS OF SANTA RITA NORTH. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LEANDER GROWTH DECEMBER
3972 080.66277 24 ABANDON DRS165 ALONG YATES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
3973 080.66283 9,348 INSTALL 375 FEET OF 6 INCH POLY ALONG COWBOYS WAYS. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FRISCO GROWTH OCTOBER
3974 080.66284 24,854
ABANDON DIAPHRAGM METER AND REPLACE STATION PIPING ALONG HIDDEN CREEK PARKWAY AT MEASUREMENT STATION 4528A IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY JULY
3975 080.66295 109,426
RELOCATE FACILITIES. INSTALL 730 FEET OF 6 INCH POLY ALONG LEONARD DRIVE AND ABANDON 725 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF ANNA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ANNA
SYSTEM INTEGRITY OCTOBER
3976 080.66297 751
RELOCATE FACILITIES. INSTALL 350 FEET OF 4 INCH POLY AND ABANDON 311 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SAN ANGELO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
3977 080.66298 351,923
INSTALL 1532 FEET OF 4 INCH POLY AND ABANDON 813 FEET OF 2 INCH STEEL AND 20 FEET OF 2 INCH POLY AND 1498 FEET OF 3 INCH STEEL ALONG BALDRIGE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 132 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
3978 080.66299 6,852
RELOCATE FACILITIES. INSTALL 483 FEET OF 2 INCH POLY AND 454 FEET OF 4 INCH POLY AND 213 FEET OF 6 INCH POLY AND ABANDON 259 FEET OF 2 INCH STEEL AND 269 FEET OF 2 INCH POLY AND 9 FEET OF 3 INCH STEEL AND 432 FEET OF 3 INCH POLY AND 201 FEET OF 4 INCH STEEL ALONG LEWIS STREET TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
3979 080.66300 (645)
RELOCATE FACILITIES. INSTALL 375 FEET OF 2 INCH POLY AT TEXAS A&M RECREATION CENTER, AND ABANDON 248 FEET OF 2 INCH POLY TO ACCOMMODATE TEXAS A&M SWIMMING AND DIVING EXPANSION. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF FACILITIES MARCH
3980 080.66301 692,174
RELOCATE FACILITIES. INSTALL 180 FEET OF 2 INCH POLY AND 2749 FEET OF 4 INCH POLY AND ABANDON 110 FEET OF 2 INCH STEEL AND 540 FEET OF 2 INCH POLY AND 110 FEET OF 3 INCH POLY AND 2120 FEET OF 4 INCH STEEL ALONG PEMBERTON TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
SYSTEM INTEGRITY DECEMBER
3981 080.66302 107
RELOCATE FACILITIES. INSTALL 28 FEET OF 3 INCH STEEL AND ABANDON 16 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF COMFORT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COMFORT
SYSTEM INTEGRITY DECEMBER
3982 080.66304 20,133 INSTALL 852 FEET OF 4 INCH AND 2705 FEET OF 2 INCH POLY ALONG THE STREETS OF PALMERA RIDGE SECTION 6. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
3983 080.66305 11,750 INSTALL 2470 FEET OF 4 INCH POLY AND 5484 FEET OF 2 INCH POLY ALONG THE STREETS OF BROOKLAND SECTION 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER
3984 080.66312 60,936
RELOCATE FACILITIES. INSTALL 375 FEET OF 8 INCH POLY ALONG TXDOT SH 45 FRONTAGE ROAD AND ABANDON 375 FEET OF 8 INCH POLY TO ACCOMMODATE CITY OF PFLUGERVILLE WASTEWATER LINE PROJECT. ALL CUSTOMERS PFLUGERVILLE
RELOCATION OF FACILITIES DECEMBER
3985 080.66325 6,554 INSTALL 2471 FEET OF 2 INCH POLY ALONG THE STREETS OF BUFFALO RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER
3986 080.66327 (17,627)
RELOCATE FACILITIES. INSTALL 225 FEET OF 4 INCH POLY ALONG CRAWFORD STREET AND 35 FEET OF 4 INCH POLY ALONG CRAWFORD DRIVE AND ABANDON 35 FEET OF 4 INCH POLY AND 225 FEET OF 3 INCH POLY. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES JUNE
3987 080.66331 (9,583)INSTALL 90 FEET OF 4 INCH POLY ALONG FM 1515 AIRPORT ROAD IN DENTON COUNTY.
COMMERCIAL OR INDUSTRIAL DENTON GROWTH SEPTEMBER
3988 080.66338 648,172
RELOCATE FACILITIES. INSTALL 1500 FEET OF 4 INCH POLY AND 500 FEET OF 8 INCH POLY ALONG ERNIE STREET AND ABANDON 500 FEET OF 3 INCH POLY, 1000 FEET OF 4 INCH STEEL AND 500 FEET OF 8 INCH STEEL TO ACCOMMODATE BNSF RAILWAY IMPROVEMENTS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
3989 080.66341 383 PURCHASE OFFICE FURNITURE FOR USE IN MID-TEX. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
3990 080.66344 45,313 INSTALL 1880 FEET OF 4 INCH POLY ALONG ROW OF IH 45.DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ENNIS GROWTH DECEMBER
3991 080.66353 5 PURCHASE 2 JM TRAILERS FOR THE BRYAN COMPLIANCE GROUP. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
3992 080.66365 6,756
PURCHASE (3) ZEBRA TC57 UNITS WITH EXTRA BATTERY, BOOT WITH HAND STRAP, CAR CHARGER, SCREEN PROTECTOR FOR USE IN STEPHENVILLE AND EASTLAND DISTRICTS. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT MARCH
3993 080.66367 8,278 INSTALL 220 FEET OF 2 INCH POLY ALONG LUCAS STREET TO SERVE NEW COMMERCIAL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WAXAHACHIE GROWTH AUGUST
3994 080.66368 49 INSTALL 170 FEET OF 2 INCH POLY ALONG DELEON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL DENISON GROWTH APRIL
3995 080.66373 617,579
RELOCATE FACILITIES. INSTALL 20 FEET OF 20 INCH STEEL AND ABANDON 20 FEET OF 22 INCH STEEL ALONG LINE D TO ACCOMMODATE CREEK IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
3996 080.66375 1,390 INSTALL 300 FEET OF 2 INCH POLY ALONG GRAPEVINE MILLS BOULEVARD.COMMERCIAL OR
INDUSTRIAL GRAPEVIN GROWTH APRIL
3997 080.66376 11,291
INSTALL 445 FEET OF 2 INCH POLY ALONG MILLER PARK AND ABANDON 440 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
3998 080.66379 14,165
RELOCATE FACILITIES. INSTALL 250 OF 2 INCH POLY AND ABANDON 561 FEET OF 2 INCH POLY ALONG AVENUE F TO ACCOMMODATE NEW APARTMENT COMPLEX. ALL CUSTOMERS PLANO
RELOCATION OF FACILITIES JULY
3999 080.66380 (1,134) REPLACE NETWORK EQUIPMENT IN BROWNWOOD SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT MARCH
4000 080.66384 218,211 INSTALL THREE CLOCKSPRINGS ALONG LINE D(DALLAS EAST TO WHITE ROCK). ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
4001 080.66391 1,713 INSTALL RELIEF VALVE ON MARLIN MEASURING STATION AND ABANDON RELIEF VALVE AT MEASURING STATION. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
4002 080.66395 113,287
RELOCATE FACILITIES. INSTALL 474 FEET OF 2 INCH POLY AND ABANDON 385 FEET OF 2 INCH STEEL ALONG FLORENCE ROAD TO ACCOMMODATE CITY OF SOUTHLAKE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SOUTHLAKE
SYSTEM INTEGRITY DECEMBER
4003 080.66397 243 INSTALL 50 FEET OF 2 INCH POLY ALONG CAMDEN DRIVE. RESIDENTIAL LEWISVILLE GROWTH APRIL
4004 080.66398 (2,250)
INSTALL 497 FEET OF 2 INCH POLY AND ABANDON 76 FEET OF 2 INCH POLY AND 1938 FEET OF 3 INCH STEEL AND 179 FEET OF 4 INCH POLY ALONG LORD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH
SYSTEM INTEGRITY DECEMBER
4005 080.66399 249,010
INSTALL 1260 FEET OF 4 INCH AND 5960 FEET OF 2 INCH POLY ALONG STREETS OF BLUEBONNET ESTATES PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ENNIS GROWTH DECEMBER
4006 080.66401 2,267 INSTALL 310 FEET OF 2 INCH POLY ALONG STREETS OF 3 NATIONS BREWERY IN CARROLLTON. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL CARROLLTON GROWTH JUNE
4007 080.66402 182,227
INSTALL 1630 FEET OF INCH 4 INCH POLY AND 2825 FEET OF 2 INCH POLY ALONG THE STREETS OF SENDERA RANCH EAST PHASE 20. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4008 080.66403 8,898
RELOCATE FACILITIES. INSTALL 775 FEET OF 4 INCH, 100 FEET OF 2 INCH POLY AND ABANDON 95 FEET OF 2 INCH STEEL AND 1138 FEET OF 2 INCH POLY ALONG HWY276 TO ACCOMMODATE CITY OF QUINLAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUINLAN
SYSTEM INTEGRITY DECEMBER
4009 080.66407 47,395 INSTALL 1,285 FEET OF 2 INCH POLY ALONG FM 407 AND US 377 IN DENTON COUNTY.
COMMERCIAL OR INDUSTRIAL ARGYLE GROWTH SEPTEMBER
4010 080.66411 11,307 PURCHASE OF FIVE (5) GAMBER JOHNSON MODEL 7212 MOBILE MOUNTS FOR USE IN THE ARLINGTON SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT APRIL
4011 080.66430 6,613
INSTALL 160 FEET OF 8 INCH, 50 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY ALONG ABRAMS ROAD AND ABANDON 160 FEET OF 16 INCH, 60 FEET OF 2 INCH AND 75 FEET OF 3 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4012 080.66447 285,907
INSTALL 1800 FEET OF 2 INCH POLY ALONG 8TH STREET AND ABANDON 670 FEET OF 3 INCH, 700 FEET OF 2 INCH STEEL AND 130 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE
SYSTEM INTEGRITY JULY
MTX AdditionsPage 133 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4013 080.66461 3,800 INSTALL 850 FEET OF 6 INCH POLY ALONG LONE STAR ROAD. ALL CUSTOMERS MANSFIELDSYSTEM
IMPROVEMENT JULY
4014 080.66462 962
INSTALL 261 FEET OF 4 INCH POLY AND ABANDON 261 FEET OF 4 INCH STEEL ALONG CARBONDALE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4015 080.66463 24 ABANDON DISTRICT REGULATOR STATION 166 IN FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4016 080.66471 16,052 INSTALL 1825 FEET OF 2 INCH POLY ALONG THE STREETS OF ROCKY HILLS FARM. RESIDENTIAL FLOWER MOUND GROWTH OCTOBER
4017 080.66472 29,195 INSTALL 1300 FEET OF 4 INCH POLY ALONG STREETS OF PARKSIDE VILLAGE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROYSE CITY GROWTH OCTOBER
4018 080.66479 319,016
INSTALL 1010 FEET OF 4 INCH POLY AND ABANDON 1010 FEET OF 3 INCH STEEL ALONG FM 1660 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HUTTO
SYSTEM INTEGRITY DECEMBER
4019 080.66486 31,475 INSTALL 50 FEET OF INCH AND 735 FEET OF 6 INCH POLY ALONG FM 545. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MELISSA GROWTH OCTOBER
4020 080.66490 42
ABANDON 3770 FEET OF 1 INCH STEEL 237 FEET OF 1.25 INCH POLY AND 13 FEET OF 2 INCH POLY ALONG FM2640 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH
SYSTEM INTEGRITY DECEMBER
4021 080.66495 100,425 INSTALL 2300 FEET OF 4 INCH AND 5600 FEET OF 2 INCH POLY ALONG STRETS OF PARKSIDE VILLAGE PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER
4022 080.66498 11,733 INSTALL 200 FEET OF 2 INCH POLY ALONG HIGHWAY 69. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WHITEWRIGHT GROWTH JUNE
4023 080.66499 43,189 INSTALL 853 FEET OF 4 INCH POLY MAIN ALONG NORTH OKLAHOMA DRIVE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CELINA
SYSTEM IMPROVEMENT DECEMBER
4024 080.66501 (68,173)
RELOCATE FACILITIES. INSTALL 320 FEET OF 6 INCH POLY ALONG ABNER AND ABANDON 240 FEET OF 6 INCH STEEL AND 80 FEET OF 6 INCH POLY TO ACCOMMODATE CONSTRUCTION PROJECT. ALL CUSTOMERS GARRETT
RELOCATION OF FACILITIES AUGUST
4025 080.66502 148,346 INSTALL 4470 FEET OF 2 INCH AND 1000 FEET OF 4 INCH POLY ALONG STREETS OF BROOKSIDE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH DECEMBER
4026 080.66508 564,793
RELOCATE FACILITIES. INSTALL 215 FEET OF 2 INCH POLY AND 1280 FEET OF 4 INCH POLY AND ABANDON 118 FEET OF 2 INCH POLY AND 414 FEET OF 4 INCH STEEL AND 590 FEET OF 4 INCH POLY ALONG SYCAMORE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
4027 080.66510 11,756
INSTALL 686 FEET OF 2 INCH POLY AND ABANDON 685 FEET OF 2 INCH STEEL ALONG I20 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
4028 080.66511 407,974 INSTALL 6,300 FEET OF 8 INCH POLY ALONG CARTWRIGHT ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS VAN ALSTYNE GROWTH DECEMBER
4029 080.66516 605,362
INSTALL 5618 FEET OF 6 INCH ,3080 FEET OF 4 INCH, AND 10755 FEET OF 2 INCH POLY ALONG THE STREETS OF LETARA ADDITION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4030 080.66523 726,032 INSTALL 6000 FEET OF 8 INCH POLY ALONG FM 741 AND COUNTRY ROAD 260. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS CRANDALL GROWTH DECEMBER
4031 080.66524 (19,687)
RELOCATE FACILITIES. INSTALL 632 FEET OF 4 INCH POLY AND ABANDON 327 FEET OF 4 INCH STEEL AND 32 FEET OF 10 INCH STEEL AND 19 FEET OF 6 INCH STEEL ALONG CEDAR AND CYPRESS IN ABILENE TO ACCOMMODATE CONSTRUCTION. ALL CUSTOMERS ABILENE
RELOCATION OF FACILITIES DECEMBER
4032 080.66525 1,016 INSTALL 1650 FEET OF 4 INCH POLY AND 1250 FEET OF 2 INCH POLY ALONG HERITAGE TRACE PARKWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JUNE
4033 080.66534 482 POLY I. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 120 FEET OF 3 INCH POLY I ALONG JUPITER. ALL CUSTOMERS STAR HARBOR
SYSTEM INTEGRITY JUNE
4034 080.66536 132,911 INSTALL 750 FEET OF 8 INCH POLY ALONG STREETS WESTERN EXTRUSIONS.COMMERCIAL OR
INDUSTRIAL CARROLLTON GROWTH DECEMBER
4035 080.66541 367,178
INSTALL 7,905 FEET OF 2 INCH POLY, 4,250 FEET OF 4 INCH POLY AND 2,650 FEET OF 6 INCH POLY ALONG THE STREETS OF SANDBROCK RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUBREY GROWTH DECEMBER
4036 080.66544 4,094 INSTALL 240 FEET OF 2 INCH POLY ALONG BELLMEAD DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BELLMEAD GROWTH APRIL
4037 080.66545 4,449 INSTALL 2,425 FEET OF 4 INCH POLY ALONG THOMAS CROSSING PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4038 080.66563 77,251
INSTALL 530 FEET OF 4 INCH POLY AND ABANDON 147 FEET OF 4 INCH STEEL AND 293 FEET OF 4 INCH POLY ALONG BIG BEND IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE
SYSTEM INTEGRITY DECEMBER
4039 080.66582 23 ABANDON DISTRICT REGULATOR STATION #026 IN DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4040 080.66583 439,881
RELOCATE FACILITIES. 1000 FEET OF 4 INCH STEEL ALONG MARS DRIVE AND ABANDON 1000 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF WACO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY SEPTEMBER
4041 080.66584 20,048
INSTALL 22 FEET OF 2 INCH STEEL AND 24 FEET OF 4 INCH STEEL AND 31 FEET OF 10 INCH STEEL AND ABANDON 23 FEET OF 10 INCH STEEL ALONG STREETS OF HYATT HOTEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAPEVINE
SYSTEM INTEGRITY DECEMBER
4042 080.66585 (1,564) REPLACE 14 DESKTOP COMPUTERS IN SWEETWATER DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
4043 080.66588 (867) REPLACE 5 COMPUTERS AND 8 MONITORS IN THE NORTH EAST REGION. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
4044 080.66590 8,659 INSTALL 300 FEET OF 2 INCH POLY ALONG WILSON DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAKE DALLAS GROWTH JUNE
4045 080.66597 752
INSTALL 120 FEET OF 4 INCH POLY ALONG BENTLEY AND ABANDON 120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
4046 080.66598 957 INSTALL 219 FEET OF 2 INCH POLY ALONG STREETS OF BURGER KING.COMMERCIAL OR
INDUSTRIAL JOSHUA GROWTH JUNE
4047 080.66605 1,130
INSTALL 310 FEET OF 3 INCH AND 180 FEET OF 6 INCH POLY ALONG LEXINGTON AND ABANDON 310 FEET OF 3 INCH AND 180 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
4048 080.66606 494,467 INSTALL 1,300 FEET OF 6 INCH POLY ALONG FORT WORTH DRIVE IN DENTON COUNTY. ALL CUSTOMERS DENTON
SYSTEM IMPROVEMENT OCTOBER
4049 080.66610 4,113
INSTALL 80 FEET OF 4 INCH POLY ALONG 21ST STREET AND ABANDON 50 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
4050 080.66611 15,521 INSTALL 100 FEET OF 2 INCH POLY ALONG WILLOW COURT. RESIDENTIAL FAIRVIEW GROWTH APRIL
4051 080.66612 20,671 INSTALL 100 FEET OF 2 INCH POLY ALONG LODGERS LANE.COMMERCIAL OR
INDUSTRIAL EULESS GROWTH JULY4052 080.66631 14,446 INSTALL 100 FEET OF 2 INCH POLY ALONG ROSS STREET. RESIDENTIAL POWELL GROWTH JUNE
4053 080.66635 11,028
INSTALL 2216 FEET OF 6 INCH POLY, 2035 FEET OF 4 INCH POLY, AND 5345 FEET OF 2 INCH POLY ALONG THE STREETS OF BAR W RANCH WEST PHASE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
4054 080.66639 104,379
INSTALL 392 FEET OF 2 INCH POLY AND ABANDON 402 FEET OF 2 INCH STEEL AND 8 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORAN
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 134 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE 4055 080.66643 1,155 INSTALL 54 FEET OF 2 INCH POLY ALONG BOYCE IN MANOR. RESIDENTIAL MANOR GROWTH AUGUST
4056 080.66644 4,976 INSTALL 1135 FEET OF 4 INCH AND 425 FEET OF 2 INCH POLY ALONG THE STREETS OF RANCHO SIENNA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
4057 080.66645 11,855 INSTALL 2232 FEET OF 2 INCH POLY ALONG STREETS OF RANCHO SIENNA PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4058 080.66646 5,161 INSTALL 1366 FEET OF 4 INCH AND 978 FEET OF 2 INCH POLY ALONG THE STREETS OF RANCHO SIENNA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH OCTOBER
4059 080.66647 4,216 INSTALL 465 FEET OF 2 INCH POLY ALONG THE STREETS OF ELROY CARWASH. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL AUSTIN GROWTH DECEMBER
4060 080.66651 15,190 INSTALL TEST STATION AND DECOUPLER ALONG REAGAN BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEANDER
SYSTEM INTEGRITY APRIL
4061 080.66653 66
RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH POLY ALONG PAIGE DRIVE AND ABANDON 10 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF THE COLONY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS THE COLONY
SYSTEM INTEGRITY DECEMBER
4062 080.66654 444,899
INSTALL AND ABANDON DISTRICT REGULATOR STATION #03,09, 14, 17 IN GORMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN
SYSTEM INTEGRITY DECEMBER
4063 080.66655 1,418
INSTALL 142 FEET OF 4 INCH POLY AND ABANDON 123 FEET OF 4 INCH STEEL AND 7 FEET OF 4 INCH POLY ALONG BUTTERNUT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
4064 080.66656 163,636
INSTALL 1409 FEET OF 2 INCH POLY AND ABANDON 1405 FEET OF 2 INCH STEEL ALONG PINE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY JULY
4065 080.66659 18,676 INSTALL 1700 FEET OF 2 INCH POLY ALONG THE STREETS OF THE GLEN CROSSING WEST. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER
4066 080.66660 14,466 INSTALL 3853 FEET OF 2 INCH POLY ALONG THE STREETS OF HUTTO CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH SEPTEMBER
4067 080.66664 62,145 INSTALL 800 FEET OF 2 INCH POLY ALONG THE STREETS OF THE PROSPER TRAILS ESTATES. RESIDENTIAL PROSPER GROWTH MARCH
4068 080.66668 239,210
RELOCATE FACILITIES. ABANDON 795 FEET OF 4 INCH STEEL AND 100 FEET OF 4 INCH POLY ALONG SILVER CREEK ROAD AND BENNETT STREET TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITE SETTLEMENT
SYSTEM INTEGRITY JULY
4069 080.66669 367,661
RELOCATE FACILITIES. INSTALL 1462 FEET OF 4 INCH POLY AND ABANDON 1295 FEET OF 4 INCH STEEL ALONG SOUTH HUGHES TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4070 080.66670 753,366
RELOCATE FACILITIES. INSTALL 11 FEET OF 4 INCH POLY AND 2625 FEET OF 6 INCH POLY AND ABANDON 16 FEET OF 4 INCH POLY AND 2620 FEET OF 6 INCH STEEL ALONG TUMBLEWEED TRAIL TO ACCOMMODATE CITY OF WHITE SETTLEMENT STREET IMPROVEMENT PROJECT. ALL CUSTOMERS WHITE SETTLEMENT
SYSTEM INTEGRITY DECEMBER
4071 080.66678 84,236
INSTALL 576 FEET OF 4 INCH POLY AND ABANDON 583 FEET OF 2 INCH POLY AND 15 FEET OF 4 INCH STEEL ALONG ARIZONA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CELINA
SYSTEM INTEGRITY DECEMBER
4072 080.66680 13,405 INSTALL 1150 FEET OF 8 INCH POLY ALONG NORTH BEACH STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH SEPTEMBER
4073 080.66682 723 INSTALL 375 FEET OF 2 INCH POLY ALONG CLEMENT. RESIDENTIAL THORNDALE GROWTH APRIL4074 080.66685 12,571 INSTALL 100 FEET OF 2 INCH POLY ALONG GARDEN DRIVE. RESIDENTIAL DALLAS GROWTH JULY
4075 080.66686 8,120
INSTALL 180 FEET OF 2 INCH ALONG AVENUE B AND ABANDON 379 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CISCO
SYSTEM INTEGRITY DECEMBER
4076 080.66692 528,487
RELOCATE FACILITIES. INSTALL 1730 FEET OF 4 INCH POLY AND ABANDON 206 FEET OF 3 INCH STEEL AND 750 FEET OF 4 INCH STEEL AND 818 FEET OF 4 INCH POLY ALONG JASPER STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4077 080.66696 12,876
INSTALL 295 FEET OF 4 INCH POLY AND ABANDON 293 FEET OF 3 INCH STEEL ALONG AVENUE B IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SWEETWATER
SYSTEM INTEGRITY DECEMBER
4078 080.66698 23,888 INSTALL 1200 FEET OF 4 INCH POLY ALONG PROMENADE PARKWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS IRVING GROWTH OCTOBER
4079 080.66701 240,291
RELOCATE FACILITIES. INSTALL 994 FEET OF 2 INCH POLY, 3 FEET OF 3 INCH POLY, AND 460 FEET OF 4 INCH POLY AND ABANDON 940 FEET OF 2 INCH POLY AND 415 FEET OF 3 INCH STEEL ALONG FAIRFIELD STREET TO ACCOMMODATE CITY OF BUFFALO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BUFFALO
SYSTEM INTEGRITY APRIL
4080 080.66703 401,208 INSTALL 2240 FEET OF 4 INCH POLY AND 7550 FEET OF 2 INCH POLY ALONG THE STREETS OF QUAIL VALLEY 2A NORTH. RESIDENTIAL FORT WORTH GROWTH SEPTEMBER
4081 080.66704 193,134
RELOCATE FACILITIES. INSTALL 1523 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 2 INCH POLY ALONG BROADWAY AVENUE TO ACCOMMODATE CITY OF EULESS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
SYSTEM INTEGRITY DECEMBER
4082 080.66705 5,006 INSTALL 70 FEET OF 2 INCH POLY ALONG SOUTH BIRD STREET. RESIDENTIAL GRANGER GROWTH APRIL
4083 080.66708 272
INSTALL 180 FEET OF 2 INCH POLY ALONG CRESCENT AND ABANDON 280 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA
SYSTEM INTEGRITY DECEMBER
4084 080.66709 83,244 INSTALL AND ABANDON DRS01 AND ABANDON DRS02 IN MILES IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MILES
SYSTEM INTEGRITY DECEMBER
4085 080.66713 74,607
INSTALL 625 FEET OF 2 INCH AND 320 FEET OF 4 INCH POLY AND ABANDON DRS STATION 25 AND 334 FEET OF 4 INCH STEEL, 34 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
4086 080.66717 414,377
INSTALL AND ABANDON DISTRICT REGULATOR STATIONS DRS02, DRS03, DRS04, DRS14, DRS15, DRS16 IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS DUBLIN
SYSTEM INTEGRITY DECEMBER
4087 080.66718 752,735
INSTALL 1850 FEET OF 2 INCH AND 1785 FEET OF 4 INCH POLY ALONG FEATHERSTON STREET AND ABANDON 1780 FEET OF 4 INCH STEEL AND 1420 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY OCTOBER
4088 080.66722 41,162 INSTALL 170 FEET OF 2 INCH POLY ALONG LAKE BARDWELL DRIVE.COMMERCIAL OR
INDUSTRIAL ENNIS GROWTH JUNE
4089 080.66724 494 INSTALL 100 FEET OF 2 INCH POLY ALONG BRECKENRIDGE STREET.COMMERCIAL OR
INDUSTRIAL ENNIS GROWTH APRIL
4090 080.66726 64,112 INSTALL AND ABANDON DISTRICT REGULATOR STATION #04 IN HICO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HICO
SYSTEM INTEGRITY DECEMBER
4091 080.66727 95,252 INSTALL 4200 FEET OF 2 INCH POLY ALONG STREETS OF STONE RIVER ESTATES. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH DECEMBER
4092 080.66731 12,911 INSTALL 40 FEET OF 2 INCH POLY ALONG BARNETT BOULEVARD. RESIDENTIAL HIGHLAND VILLAGE GROWTH APRIL
4093 080.66736 34,998
INSTALL 150 FEET OF 2 INCH POLY ALONG JAMES AVENUE AND ABANDON 150 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4094 080.66748 55,515
INSTALL 725 FEET OF 2 INCH POLY ALONG ELLIS AND ABANDON 345 FEET OF 4 INCH STEEL AND 397 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY JULY
MTX AdditionsPage 135 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4095 080.66752 319,760
RELOCATE FACILITIES. INSTALL 1937 FEET OF 2 INCH POLY AND 579 FEET OF 4 INCH POLY AND ABANDON 1859 FEET OF 2 INCH STEEL AND 125 FEET OF 2 INCH POLY AND 244 FEET OF 4 INCH STEEL ALONG FM59 TO ACCOMMODATE CITY OF ATHENS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY DECEMBER
4096 080.66757 3,437 INSTALL 570 FEET OF 2 INCH POLY ALONG SOUTH RIDGE RETAIL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL HEATH GROWTH APRIL
4097 080.66759 (448)INSTALL 450 FEET OF 2 INCH POLY ALONG TARROW STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH MARCH
4098 080.66765 12 POLY I. INSTALL 22 FEET OF 4 INCH POLY AND ABANDON 22 FEET OF 3 INCH POLY I ALONG SUNBURST. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY JANUARY
4099 080.66766 (484) INSTALL 250 FEET OF 2 INCH POLY ALONG GORDON STREET. ALL CUSTOMERS GORDONSYSTEM
INTEGRITY APRIL
4100 080.66767 33,667 INSTALL 350 FEET OF 4 INCHPOLY ALONG WHITE ROCK TRAIL.COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH DECEMBER
4101 080.66769 576,072
RELOCATE FACILITIES. INSTALL 4489 FEET OF POLY AND ABANDON 4494 FEET OF STEEL TO ACCOMODATE THE CITY OF WACO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4102 080.66772 (428) INSTALL 75 FEET OF 2 INCH POLY ALONG ALLEY OF GLENN SOUTH. RESIDENTIAL HENRIETTA GROWTH JUNE
4103 080.66773 440,779
INSTALL 5,589 FEET OF 2 INCH POLY, 5,430 FEET OF 4 INCH POLY AND 1,700 FEET OF 6 INCH POLY ALONG THE STEETS OF VENTANA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4104 080.66786 352,339 INSTALL 4 INCH POLY ALONG COOPER LANE. ALL CUSTOMERS JOSHUASYSTEM
IMPROVEMENT SEPTEMBER
4105 080.66787 140,416
REPLACE WARRANTY, MODEMS, MODEN ANTENNAS, (15) KEYBOARDS, (5) DESKTOPS, (20) LAPTOPS, (4) ENGINEERING LAPTOPS, (9) VDI BRICKS, (20) DELL TABLETS, (20) DOCKING STATIONS, (26) TRUCK MODEMS, AND (10) MONITORS FOR USE IN FORT WORTH. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
4106 080.66791 121,847 INSTALL 3,379 FEET OF 2 INCH POLY ALONG STREETS OF SUNSET POINTE. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4107 080.66793 419,428
RELOCATE FACILITIES. INSTALL 3,920 FEET OF 6 INCH AND 216 FEET OF 2 INCH POLY ALONG MCKINNEY STREET EAST AND ABANDON 1520 FEET OF 6 INCH, 2400 FEET OF 4 INCH AND 190 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
4108 080.66795 2,640 INSTALL 500 FEET OF 4 INCH POLY ALONG NORTH WHITE CHAPEL BOULEVARD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL SOUTHLAKE GROWTH DECEMBER
4109 080.66801 130,298
RELOCATE FACILITIES. INSTALL 620 FEET OF 4 INCH AND 220 FEET OF 2 INCH POLY ALONG HARDY ST AND ABANDON 663 FEET OF 3 INCH, 80 FEET OF 4 INCH, 200 FEET OF 2 INCH POLY, AND 8 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF CEDAR HILL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CEDAR HILL
SYSTEM INTEGRITY DECEMBER
4110 080.66803 31,487 INSTALL 375 FEET OF 2 INCH POLY ALONG BRYCE STREET.COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH OCTOBER
4111 080.66804 148,992
RELOCATE FACILITIES. INSTALL 410 FEET OF 2 INCH POLY ALONG MAIN AND ABANDON 395 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF KEMP IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KEMP
SYSTEM INTEGRITY JULY
4112 080.66805 84,659
RELOCATE FACILITIES. INSTALL 439 FEET OF 2 INCH POLY AND ABANDON 437 FEET OF 2 INCH STEEL ALONG FORBES COURT TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY JULY
4113 080.66808 7,730
INSTALL 935 FEET OF 4 INCH AND 805 FEET OF 2 INCH POLY ALONG THE STREETS OF HIGHLANDS AT MAYFIELD RANCH SECTION 10B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4114 080.66810 28,729
INSTALL 309 FEET OF 4 INCH POLY AND ABANDON 309 FEET OF 2 INCH STEEL ALONG WALNUT STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY JULY
4115 080.66815 182,629
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND 385 FEET OF 4 INCH POLY AND 132 FEET OF 6 INCH POLY AND ABANDON 70 FEET OF 2 INCH POLY AND 22 FEET OF 4 INCH STEEL AND 376 FEET OF 6 INCH STEEL ALONG SMITH BARRY STREET TO ACCOMMODATE CITY OF PANTEGO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PANTEGO
SYSTEM INTEGRITY DECEMBER
4116 080.66818 64,164 INSTALL 340 FEET OF 6 INCH, AND 1300 FEET OF 2 INCH POLY ALONG STREETS OF LAKE PARK SUBDIVISION. RESIDENTIAL MANSFIELD GROWTH DECEMBER
4117 080.66822 265,885
RELOCATE FACILITIES. INSTALL 1450 FEET OF 4 INCH POLY ALONG METHODIST STREET AND ABANDON 1055 FEET OF 2 INCH STEEL AND 395 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF RED OAK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RED OAK
SYSTEM INTEGRITY DECEMBER
4118 080.66827 39,397 INSTALL 4000 FEET OF 4 INCH POLY ALONG THE STREETS OF OUTLOOK AT BRAZOS RIDGE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS WOODWAY GROWTH OCTOBER
4119 080.66828 2,911 INSTALL 215 FEET OF 2 INCH POLY ALONG GRAPEVINE MILLS BOULEVARD.COMMERCIAL OR
INDUSTRIAL GRAPEVINE GROWTH JUNE
4120 080.66829 6,811
INSTALL 840 FEET OF 4 INCH POLY AND 490 FEET OF 2 INCH POLY ALONG THE STREETS OF OUTLOOK AT BRAZOS RIDGE ONSITE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WOODWAY GROWTH JULY
4121 080.66831 104,752
INSTALL 3 FEET OF 3 INCH POLY AND 886 FEET OF 4 INCH POLY AND ABANDON 46 FEET OF 3 INCH POLY AND 53 FEET OF 4 INCH POLY AND 757 FEET OF 6 INCH POLY ALONG BROOKHAVEN CLUB DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERS BRANCH
SYSTEM INTEGRITY DECEMBER
4122 080.66841 325,300
RELOCATE FACILITIES. INSTALL 3,335 FEET OF 4 INCH POLY ALONG ESPLANDE AND ABANDON 1,910 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
4123 080.66842 31,457 PURCHASE OF TABLET, DOCK, MODEM, KEYPAD, TOOL KIT, SENSIT GOLD EQUIPMENT FOR USE IN THE ROUND ROCK SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT DECEMBER
4124 080.66843 4,161 INSTALL 1200 FEET OF 4 INCH POLY ALONG BANK STREET N SOUTHLAKE TX. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL SOUTHLAKE GROWTH SEPTEMBER
4125 080.66844 3,737 PURCHASE (1) METROTECH LOCATOR TO BE USED BY C&M SOUTHEAST REGION DALLAS. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT JANUARY
4126 080.66846 8,020 ABANDON 88 FEET OF 2 INCH STEEL ALONG EAST EXCHANGE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY AUGUST
4127 080.66847 6,152 SECONDARY SWITCH REPLACEMENT FOR CARROLLTON SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT JANUARY4128 080.66848 3,796 INSTALL 80 FEET OF 2 INCH POLY ALONG SILVER LEAF COURT. RESIDENTIAL GRAPEVINE GROWTH DECEMBER
4129 080.66849 15,337 INSTALL 100 FEET OF 2 INCH POLY ALONG HARRELL DRIVE IN SOUTHLAKE. RESIDENTIAL SOUTHLAKE GROWTH SEPTEMBER
4130 080.66850 448,999
RELOCATE FACILITIES. INSTALL 3378 FEET OF 2 INCH POLY AND ABANDON 640 FEET OF 2 INCH STEEL AND 200 FEET OF 3 INCH POLY AND 800 FEET OF 4 INCH POLY ALONG CUMBERLAND ROAD TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
4131 080.66851 7,367 INSTALL 2500 FEET OF 6 INCH POLY ALONG CD BOREN PARKWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FATE GROWTH OCTOBER
MTX AdditionsPage 136 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4132 080.66852 248,414 INSTALL 2,335 FEET OF 8 INCH POLY ALONG STREETS OF LADERO AT TAVOLO PARK. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
4133 080.66853 24,997 PURCHASE 9 TABLETS FOR NEW HIRE SERVICE TECHS IN MCKINNEY, GREENVILLE, PARIS, AND SHERMAN. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT MARCH
4134 080.66854 (46,304)
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY AND ABANDON 30 FEET OF 4 INCH POLY ALONG MIDWAY DRIVE TO ACCOMMODATE RCD DRAIN PIPE INSTALLATION. ALL CUSTOMERS EULESS
RELOCATION OF FACILITIES OCTOBER
4135 080.66859 139,924
INSTALL 117 FEET OF 4 INCH POLY AND 88 FEET OF 6 INCH POLY AND ABANDON 99 FEET OF 4 INCH STEEL, 17 FEET OF 4 INCH POLY, 64 FEET OF 6 INCH STEEL AND, 2 FEET OF 6 INCH POLY IN THE CITY OF ABILENE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY JUNE
4136 080.66863 4,707 PURCHASE MSA 340 ELECTROFUSION PROCESSOR FOR WACO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT JUNE
4137 080.66866 243,720
RELOCATE FACILITIES. INSTALL 280 FEET OF 2 INCH POLY ALONG EDGEWOOD PLACE AND ABANDON 210 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
4138 080.66867 2,601 REPLACE REGULATOR AND RELIEF VALVE ON DENTON DRS06. ALL CUSTOMERS DENTONSYSTEM
INTEGRITY APRIL
4139 080.66869 107,807
RELOCATE FACILITIES. INSTALL (4) .75 INCH POLY SERVICES AND ABANDON (4) .75 INCH POLY SERVICES ALONG FOX HOLLOW STREET TO ACCOMMODATE CITY OF DENTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY OCTOBER
4140 080.66870 977,476
RELOCATE FACILITIES. INSTALL 3,400 FEET OF 2 INCH POLY ALONG HILLCREST STREET AND ABANDON 685 FEET OF 2 INCH POLY AND 2,720 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
4141 080.66873 11,608
INSTALL 1080 FEET OF 4 INCH POLY ALONG FM1741 AND ABANDON 248 FEET OF 2 INCH, 550 FEET OF 4 INCH POLY, AND 13450 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
4142 080.66876 83,952 INSTALL 6900 FEET OF 6 INCH POLY AND 1000 FEET OF 4 INCH POLY ALONG AIRPORT DRIVE.
COMMERCIAL OR INDUSTRIAL EULESS GROWTH OCTOBER
4143 080.66877 113,731 PURCHASE 3 TABLETS, 26 LAPTOPS, 1 ENGINEERING LAPTOPS, 1 INTEGRITY LAPTOP, 11 DESKTOPS, 25 MONITORS FOR USE SYSTEM WIDE. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
4144 080.66878 341,496
RELOCATE FACILITIES. INSTALL 832 FEET OF 4 INCH STEEL AND ABANDON 829 FEET OF 4 INCH STEEL ALONG FM 1187 AND WILDCAT WAY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4145 080.66882 5,232 INSTALL 1500 FEET OF 2 INCH POLY ALONG THE STREETS OF CREEKSIDE ESTATES PHASE 3 AND 4. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL TERRELL GROWTH SEPTEMBER
4146 080.66888 7,499
INSTALL 1527 FEET OF 4 INCH POLY AND 984 FEET OF 2 INCH POLY ALONG THE STREETS OF HAWKES LANDING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH SEPTEMBER
4147 080.66890 1,404
ABANDON 326 FEET OF 2 INCH STEEL AND 434 FEET OF 2 INCH POLY ALONG GROUND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MORAN
SYSTEM INTEGRITY DECEMBER
4148 080.66892 29,908
INSTALL 2,193 FEET OF 4 INCH POLY AND 2,328 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4149 080.66894 8,795 REPLACE A FAILING NETWORK SWITCH AND ACCESS POINT AT THE HILLSBORO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT APRIL
4150 080.66897 (127)INSTALL 120 VOLT UPS DISTRIBUTION ENCLOSURE AND GROUNDING GRIB FOR USE IN ARLINGTON DISTRICT. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY APRIL
4151 080.66899 (539)INSTALL 255 FEET OF 2 INCH POLY ALONG HIGHWAY 121. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BRYAN GROWTH APRIL
4152 080.66900 6,965 INSTALL 1070 FEET OF 4 INCH AND 990 FEET OF 2 INCH POLY ALONG STREETS OF HIGHLANDS AT MAYFIELD RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4153 080.66906 108,795
REPLACE END OF SUPPORT AND OUT OF WARRANTY LINCOLN CENTER AND PLANO SERVICE CENTER IT EQUIPMENT. 49 LAPTOPS, 7 TABLETS, 1 DESKTOP, 20 DOCKS, AND 1 PRINTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
4154 080.66907 2,684 INSTALL 150 FEET OF 4 INCH POLY ALONG SUMMER LEE TO SERVE TRU HILTON. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROCKWALL GROWTH JUNE
4155 080.66908 17,054 INSTALL 390 FEET OF 2 INCH POLY FROM ALLEY WEST OF FERNWOOD TO THE ALLEY WEST OF BRITTON. RESIDENTIAL DALLAS GROWTH JUNE
4156 080.66910 509
RELOCATE FACILITIES. INSTALL 112 FEET OF 4 INCH POLY AND ABANDON 162 FEET OF 4 INCH POLY TO ACCOMMODATE STORM DRAIN IMPROVEMENT PROJECT ALONG HIGHWAY 71 AND FM 973. ALL CUSTOMERS AUSTIN
RELOCATION OF FACILITIES SEPTEMBER
4157 080.66915 4,591 INSTALL 27 FEET OF 2 INCH POLY AND ABANDON 27 FEET OF 2 INCH POLY BEHIND 822 MCDEVITT IN SAN ANGLEO. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY MARCH
4158 080.66916 45,014 INSTALL 500 FEET OF 6 INCH POLY ALONG THE STREETS OF TWU.COMMERCIAL OR
INDUSTRIAL DENTON GROWTH DECEMBER
4159 080.66925 137,764
INSTALL 900 FEET OF 2 INCH POLY AND ABANDON 356 FEET OF 2 INCH STEEL AND 543 FEET OF 2 INCH STEEL ALONG MATADOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY JULY
4160 080.66927 27,568
INSTALL RELIEF VALVE AND RETIRE RELIEF VALVE ON LINE L (SOUTH) NEAR THE INTERSECTION OF COUNTY ROAD 107 AND COUNTY ROAD 100 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY APRIL
4161 080.66929 6,379 PURCHASE 1.25 INCH TAPPING EQUIPMENT FROM TDWILLIAMSON. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
4162 080.66934 3,782
INSTALL GAS SAMPLER AND ABANDON GAS SAMPLER ALONG THE STREETS OF DALLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY APRIL
4163 080.66935 67,354 INSTALL 350 FEET OF 2 INCH IP POLY TO SERVE THREE COMMERCIAL CUSTOMERS ON SHERWOOD IN SAN ANGELO.
COMMERCIAL OR INDUSTRIAL SAN ANGELO GROWTH APRIL
4164 080.66936 21,665 INSTALL 3000 FEET OF 2 INCH POLY ALONG STREETS OF RIVERWALK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH OCTOBER
4165 080.66949 9,969 INSTALL 1250 FEET OF 4 INCH POLY ALONG GRACE LANE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL SOUTHLAKE GROWTH DECEMBER
4166 080.66951 375,360 INSTALL 5410 FEET OF 4 INCH POLY AND 4240 FEET OF 2 POLY ALONG THE STREETS OF PIONEER POINTE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4167 080.66952 215,040 INSTALL 1,261 FEET OF 6 INCH POLY AND 4,964 FEET OF 2 INCH POLY ALONG STREETS OF TAVOLO PARK ADDITION. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4168 080.66954 23,020 INSTALL 165 FEET OF 2 INCH POLY ALONG LIBERTY COURT. RESIDENTIAL DALLAS GROWTH DECEMBER
4169 080.66956 17,335
RELOCATE FACILITIES. INSTALL (9) POLY SERVICES ALONG THE NORTH ALLEY FROM REGAL ROAD AND ABANDON (9) POLY SERVICES TO ACCOMMODATE THE CITY OF PLANO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
4170 080.66959 145,105
RELOCATE FACILITES. INSTALL 1150 FEET OF 2 INCH POLY AND ABANDON 314 FEET OF 3 INCH STEEL AND 399 FEET OF 2 INCH POLY AND 345 FEET OF 2 INCH STEEL IN TRENT, TAYLOR COUNTY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENT
SYSTEM INTEGRITY SEPTEMBER
MTX AdditionsPage 137 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4171 080.66972 306
INSTALL FLOW SAFE RELIEF VALVE AT REGULATOR STATION AND ABANDON 6 INCH GROVE RELIEF VALVE AT DISTRICT REGULATOR STATION IN KELLER IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
SYSTEM INTEGRITY DECEMBER
4172 080.66976 26,500
RELOCATE FACILITIES. INSTALL 40 FEET OF 4 INCH POLY IN THE ALLEY NORTH OF PLUMMER AND ABANDON 40 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
SYSTEM INTEGRITY APRIL
4173 080.66979 9,979
INSTALL 1350 FEET OF 2 INCH POLY AND A 1.25 INCH SERVICE STUB NEEDED TO SERVE KEENAN BRIDGE SERVICE CENTER. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FARMERS BRANCH GROWTH SEPTEMBER
4174 080.66980 125,901
RELOCATE FACILITES. INSTALL 300 FEET OF 6 INCH POLY AND ABANDON 300 FEET OF 6 INCH STEEL ALONG 5TH AND CLINTON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY JULY
4175 080.66981 12,815 INSTALL 100 FEET OF 2 INCH POLY ALONG THE STREETS OF SKYCHEF COMMERICIAL CUSTOMER IN DALLAS COUNTY. ALL CUSTOMERS IRVING GROWTH SEPTEMBER
4176 080.66984 44,791 INSTALL 100 FEET OF 2 INCH POLY ALONG LAKESIDE LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LITTLE ELM GROWTH SEPTEMBER
4177 080.66985 60,190 INSTALL 385 FEET OF 4 INCH MAIN ALONG NE LOOP 820. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL NORTH RICHLAND HILLS GROWTH SEPTEMBER
4178 080.66988 16,794 INSTALL 285 FEET OF 2 INCH POLY ALONG THE STREETS OF MCKINNEY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL MCKINNEY GROWTH APRIL
4179 080.66989 4,901 PURCHASE A SMART MANOMETER DIFFERENTIAL TESTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4180 080.66990 27,912 INSTALL 970 FEET OF 2 INCH POLY ALONG STREETS OF GRANBURY LAKESIDE CENTER. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GRANBURY GROWTH JUNE
4181 080.66991 26,280 PURCHASE 4 RD LINE LOCATE UNITS FOR THE DAMAGE PREVENTION GROUP. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
4182 080.66992 26,841 INSTALL 100 FEET OF 4 INCH POLY ALONG MOORE AVENUE.COMMERCIAL OR
INDUSTRIAL TERRELL GROWTH JUNE
4183 080.66993 410,541
INSTALL 1110 FEET OF 8 INCH POLY, 3510 FEET OF 6 INCH POLY, 1615 FEET OF 4 INCH POLY AND 2725 FEET OF 2 INCH POLY ALONG THE STREETS OF CIBOLO HILLS SUBDIVISION. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4184 080.66997 267,361
RELOCATE FACILITIES. INSTALL 488 FEET OF 2 INCH POLY AND 351 FEET OF 4 INCH POLY AND ABANDON 714 FEET OF 2 INCH POLY AND 460 FEET OF 3 INCH POLY EAST MAIN STREET TO ACCOMMODATE CITY OF ROUND ROCK STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
4185 080.66998 24,492 INSTALL 2000 FEET OF 2 INCH POLY ALONG THE STREETS OF CUNNINGHAM COMMERCIAL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER
4186 080.67008 20,705
RELOCATE FACILITIES. INSTALL 200 FEET OF 6 INCH AND 185 FEET OF 2 INCH POLY ALONG WEST CREEK STREET AND ABANDON 174 FEET OF 6 INCH IP STEEL AND 20 FEET OF 6 INCH IP POLY AND 122 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FREDERICKSBURG
SYSTEM INTEGRITY DECEMBER
4187 080.67010 204,538
INSTALL 376 FEET OF 6 INCH POLY AND ABANDON 364 FEET OF 6 INCH CAST IRON AND 13 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY SEPTEMBER
4188 080.67011 23,160 INSTALL 1856 FEET OF 6 INCH POLY ALONG NE LOOP 820 TO SERVE INTERSTATE CROSSING. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH SEPTEMBER
4189 080.67016 3,178 REPLACE WIFI EQUIPMENT FOR USE IN EASTLAND SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT OCTOBER
4190 080.67019 5,362 PURCHASE 2 ZEBRA TC57 FOR WACO DISTRICTS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JANUARY
4191 080.67025 6,383 INSTALL 360 FEET OF 2 INCH POLY ALONG RENFRO IN JOHNSON COUTY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BURLESON GROWTH SEPTEMBER
4192 080.67026 63,608 INSTALL 2100 FEET OF 2 INCH POLY ALONG THE STREETS OF CLEMENTS RANCH PHASE 5. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH SEPTEMBER
4193 080.67027 345,030
RELOCATE FACILITIES. INSTALL 2000 FEET OF 2 INCH AND 1150 FEET OF 4 INCH POLY ALONG ST MARY AND ABANDON 650 FEET OF 4 INCH AND 845 FEET OF 2 INCH STEEL AND 1655 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF ROCKWALL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
SYSTEM INTEGRITY OCTOBER
4194 080.67028 112,918 INSTALL 4,275 FEET OF 2 INCH POLY ALONG STREETS OF SANDBROCK RANCH PHASE 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUBREY GROWTH DECEMBER
4195 080.67030 119,603
INSTALL 6 FEET OF 2 INCH POLY AND 512 FEET OF 4 INCH POLY AND ABANDON 296 FEET OF 2 INCH STEEL AND 204 FEET OF 2 INCH POLY ALONG MAIN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
SYSTEM INTEGRITY DECEMBER
4196 080.67033 103,763
RELOCATE FACILITIES. INSTALL 540 FEET OF 4 INCH POLY AND ABANDON 596 FEET OF 4 INCH POLY ALONG JOHN MCLAIN ROAD AND WESTCOAT TO ACCOMMODATE CITY OF COLLEYVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
4197 080.67035 5,631 INSTALL 1115 FEET OF 2 INCH POLY ALONG THE STREETS OF CARDINAL CROSSING SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER
4198 080.67036 5,302 INSTALL 695 FEET OF 2 INCH POLY ALONG THE STREETS OF CARDINAL CROSSING PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH SEPTEMBER
4199 080.67046 10,465 INSTALL 3500 FEET OF 4 INCH AND 4300 FEET OF 2 INCH POLY ALONG MONITOR BOLUVARD. DEVELOPER INSTALLED FACILITY. RESIDENTIAL FORNEY GROWTH OCTOBER
4200 080.67047 2,828 INSTALL 160 FEET OF 4 INCH AND 3400 FEET OF 2 INCH POLY ALONG MONITOR BOULEVARD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH JUNE
4201 080.67048 1,535 INSTALL 1525 FEET OF 2 INCH POLY ALONG THE STREETS OF PARKWOOD TRAILS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH JULY
4202 080.67049 4,157 INSTALL 711 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY SUBDIVISION . DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
4203 080.67051 74,909 INSTALL 2610 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
4204 080.67059 24,196 INSTALL 800 FEET OF 4 INCH POLY ALONG POLO ROAD . DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH OCTOBER
4205 080.67062 24,511
INSTALL 280 FEET OF 2 INCH POLY ALONG STATE HIGHWAY 6 FRONTAGE ROAD TO SERVE WALKONS RESTAURANT. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH DECEMBER
4206 080.67063 407 INSTALL 400 FEET OF 6 INCH POLY ALONG MUMFORD ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BRYAN GROWTH JUNE
4207 080.67070 27,437 INSTALL 165 FEET OF 2 INCH POLY ALONG PAULA COURT. RESIDENTIAL NORTH RICHLAND HILLS GROWTH OCTOBER
4208 080.67071 11,915 RELOCATE FACILITIES. INSTALL 793 FEET OF 4 INCH POLY AND ABANDON 505 FEET OF 4 INCH POLY TO ACCOMMODATE DART PROJECT. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES DECEMBER
4209 080.67072 96,816
RELOCATE FACILITIES. INSTALL 1230 FEET OF 2 INCH POLY ALONG CLOVERDALE LANE AND ABANDON 1230 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF DESOTO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
SYSTEM INTEGRITY DECEMBER
4210 080.67074 115,348 PURCHASE 150 MODEMS FOR USE THROUGHOUT MIDTEX RETIRE LAPTOP. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT JUNE
4211 080.67077 898,906
INSTALL 2304 FEET OF 10 INCH STEEL AND ABANDON 2289 FEET OF 12 INCH STEEL ALONG BLACK HILL DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINSVILLE
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 138 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4212 080.67079 25,708 INSTALL 260 FEET OF 4 INCH POLY ALONG WOODED ACRES HEB. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WACO GROWTH SEPTEMBER
4213 080.67080 167,948
PURCHASE 16 LAPTOPS,4 DESKTOP, 40 TABLETS, 20 MONITORS AND PERIPHERALS TO REPLACE OUT OF WARRANTY/LEASE IT HARDWARE IN THE MID-CITIES COVERAGE AREA. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
4214 080.67081 356,540 INSTALL 2720 FEET OF 8 INCH AND 12,100 FEET OF 2 INCH POLY ALONG THE STREETS OF WILDCAT RANCH PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH DECEMBER
4215 080.67085 124,600 INSTALL 1103 FEET OF 4 INCH POLY AND 1169 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4216 080.67092 7,237 CONSTRUCT ADDITONAL WORKSTATION ON LC2 17TH FLOOR FOR CONSTRUCTION MANAGEMENT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT MARCH
4217 080.67096 48,549
RELOCATE FACILITIES. INSTALL 110 FEET OF 2 INCH POLY ALONG 800 AUSTIN AVE AND ABANDON 104 FEET OF 2 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY JUNE
4218 080.67098 4,452 INSTALL 310 FEET OF 2 INCH POLY ALONG THE STREETS OF DIPLOMAT BUSINESS PARK. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FARMERS BRANCH GROWTH JUNE
4219 080.67099 233,919
RELOCATE FACILITIES. INSTALL 180 FEET OF 2 INCH POLY AND 3 FEET OF 4 INCH POLY AND 872 FEET OF 6 INCH POLY AND ABANDON 360 FEET OF 2 INCH STEEL AND 82 FEET OF 2 INCH POLY AND 797 FEET OF 6 INCH STEEL AND 10 FEET OF 6 INCH POLY ALONG KAUFMAN STREET AND MLK JR BLVD TO ACCOMMODATE CITY OF WAXAHACHIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXACHACHIE
SYSTEM INTEGRITY DECEMBER
4220 080.67101 32,728 INSTALL 120 FEET OF 4 INCH POLY ALONG ARTESIA LANE. RESIDENTIAL ROCKWALL GROWTH OCTOBER
4221 080.67107 3,488 REPLACE NON STANDARD CAMERAS AT THE WACO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT MARCH
4222 080.67113 71,812
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 500 FEET OF 2 INCH POLY ALONG SHADYWOOD LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DESOTO
SYSTEM INTEGRITY SEPTEMBER
4223 080.67115 6,859 INSTALL 1249 FEET OF 4 INCH AND 2376 FEET OF 2 INCH POLY ALONG THE STREETS OF LARKSPUR 9. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH SEPTEMBER
4224 080.67116 15,116 INSTALL 220 FEET OF 2 INCH POLY UNDER FM 1417 TO SERVE NEW COMMERCIAL BUILDING.
COMMERCIAL OR INDUSTRIAL DENISON GROWTH JUNE
4225 080.67118 18,057 INSTALL 1550 FEET OF 2 INCH POLY ALONG THE STREETS OF MISSION RANCH PHASE 102. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH NOVEMBER
4226 080.67120 29,335 INSTALL 310 FEET OF 2 INCH POLY ACROSS TEXAS AVENUE SOUTH. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH APRIL
4227 080.67134 25,117 INSTALL 1226 FEET OF 2 INCH AND 139 FEET OF 4 INCH POLY ALONG STREETS OF HOLLYHOCK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FRISCO GROWTH DECEMBER
4228 080.67135 11,605 INSTALL 400 FEET OF 2 INCH POLY ALONG PATTERSON LANE. RESIDENTIAL COLLEYVILLE GROWTH SEPTEMBER
4229 080.67136 7,304 INSTALL 475 FEET OF 2 INCH POLY ALONG RUTH ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL NORTH RICHLAND HILLS GROWTH DECEMBER
4230 080.67137 24,085 REPLACE SEVEN DESKTOP EQUIPMENT IN ABILENE AND SEVEN DESKTOP EQUIPMENT IN BROWNWOOD. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
4231 080.67138 157,945 INSTALL (1) BLACK DIAMOND WRAP TO REMEDIATE LINE D AT APPROX 4677+00 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
4232 080.67139 12,161
INSTALL 2751 FEET OF 6 INCH POLY, 1311 FEET OF 4 INCH POLY AND 5132 FEET OF 2 INCH POLY ALONG THE STREETS OF WOLF RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
4233 080.67140 1,476 PURCHASE TRACK IT III 7887 WACO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JANUARY
4234 080.67142 224,903
RELOCATE FACILITIES. INSTALL 855 FEET OF 4 INCH POLY ALONG SOUTH 26TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY SEPTEMBER
4235 080.67144 102,412 PURCHASE DESKTOP, TABLET, AND LAPTOP REPLACEMENTS FOR USE IN MID TEX NORTH REGION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
4236 080.67146 4,618
INSTALL 1785 FEET OF 2 INCH POLY AND 685 FEET OF 4 INCH POLY ALONG STREETS OF HIGHLANDS AT MAYFIELD RANCH SECTION 14. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4237 080.67161 32,101 INSTALL 852 FEET OF 2 INCH POLY ALONG THE STREETS OF OAK COURT DEVELOPMENT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4238 080.67163 6,140 INSTALL 1419 FEET OF 2 INCH POLY ALONG STREETS OF SANTA RITA SOUTH PHASE 10 A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
4239 080.67164 (6,790)RELOCATE FACILITIES. INSTALL 310 FEET OF 2 INCH POLY AND ABANDON 212 FEET OF 2 INCH POLY IN THE CITY OF ROUND ROCK. ALL CUSTOMERS ROUND ROCK
RELOCATION OF FACILITIES OCTOBER
4240 080.67166 37,347
INSTALL 740 FEET OF 2 INCH POLY ALONG RUSK STREET AND ABANDON 730 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CENTERVILLE
SYSTEM INTEGRITY JUNE
4241 080.67167 9,954
INSTALL 350 FEET OF 2 INCH POLY ALONG S. 6TH AND ABANDON 350 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CHILLICOTHE
SYSTEM INTEGRITY APRIL
4242 080.67170 29,311 INSTALL 2,385 FEET OF 2 INCH POLY ALONG THE STREETS OF ROLLING HILLS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH SEPTEMBER
4243 080.67183 64,615
RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG HERITAGE TRACE PARKWAY AND ABANDON 300 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY JUNE
4244 080.67189 61,654 PURCHASE 2 DPIR, 2 SENSIT GOLD, 2 GENERATORS, 2 HAMMER DRILL, AND 2 RMLD-CS FOR USE IN BY THE AMLD TEAM. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT APRIL
4245 080.67193 10,439 INSTALL 130 FEET OF 2 INCH POLY ALONG BRIDLE BIT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BARTONVILLE GROWTH JULY
4246 080.67204 5,954 INSTALL AUDIO VISUAL EQUIPMENT IN CONFERENCE ROOM 1713. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT MARCH
4247 080.67210 35,546
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION 4746 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW
SYSTEM INTEGRITY JUNE
4248 080.67212 6,956 INSTALL 450 FEET OF 2 INCH POLY ALONG STREET OF SMITH FURNITUE STORE.
COMMERCIAL OR INDUSTRIAL MANSFIELD GROWTH SEPTEMBER
4249 080.67213 161,980
INSTALL 1100 FEET OF 2 INCH POLY ALONG HENDERSON AND ABANDON 1100 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY SEPTEMBER
4250 080.67214 1,805
RELOCATE FACILITIES. INSTALL 15 FEET OF 4 INCH POLY AND ABANDON 16 FEET OF 4 INCH POLY ALONG DIMPLOMAT DRIVE TO ACCOMMODATE CITY OF DALLAS STORM LINE. ALL CUSTOMERS FARMERS BRANCH
RELOCATION OF FACILITIES SEPTEMBER
4251 080.67216 114,998
RELOCATE FACILITIES. INSTALL 68 FEET OF 2 INCH POLY AND ABANDON 43 FEET OF 2 INCH POLY ALONG WASHINGTON AVENUE TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY SEPTEMBER
4252 080.67218 39,191 INSTALL 140 FEET OF 2 INCH POLY ALONG PINE STREET. RESIDENTIAL FRANKSTON GROWTH JULY
4253 080.67219 134,540
INSTALL 100 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY ALONG 17TH & AVE J AND REPLACE DRS STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLIFTON
SYSTEM INTEGRITY DECEMBER
4254 080.67225 6,330 INSTALL 2636 FEET OF 4 INCH AND 1658 FEET OF 2 INCH POLY ALONG THE STREETS OF LARKSPUR. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH OCTOBER
MTX AdditionsPage 139 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4255 080.67226 2,076,160
INSTALL APPROX 72 VALVES AND ABANDON A TOTAL OF APPROX 658 FEET OF STEEL OR POLY ON LOW PRESSURE SYSTEMS ACROSS SOUTH WEST WEST REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
4256 080.67227 516,801 INSTALL 11 VALVES ON LOW PRESSURE SYSTEMS ACROSS SOUTH EAST EAST REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
4257 080.67228 2,593,546 INSTALL 65 VALVES ON LOW PRESSURE SYSTEMS ACROSS NORTH WEST REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
4258 080.67229 213,288 INSTALL 5 VALVES ON LOW PRESSURE SYSTEMS ACROSS SE SOUTH REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
4259 080.67230 927,902 INSTALL 23 VALVES ON LOW PRESSURE SYSTEMS ALONG SOUTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
4260 080.67231 611,797 INSTALL 12 VALVES ON LOW PRESSURE SYSTEMS ACROSS NORTH EAST REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
4261 080.67232 131,041
INSTALL 7 VALVES ON LOW PRESSURE SYSTEMS ACROSS SOUTH WEST FORT WORTH REGION IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
4262 080.67235 1,989 INSTALL 315 FEET OF 4 INCH POLY ALONG I30W. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH JULY
4263 080.67237 9,439
INSTALL 242 FEET OF 6 INCH, 3256 FEET OF 4 INCH AND 3222 FEET OF 2 INCH POLY ALONG STREETS OF WOLF RANCH WEST SECTION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4264 080.67245 190,768
RELOCATE FACILITIES. INSTALL 650 FEET OF 2 INCH POLY ALONG LINDY LANE AND ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
4265 080.67250 335,398
RELOCATE FACILITIES. INSTALL 300 FEET OF 6 INCH POLY ALONG CHADBOURNE AND ABANDON 345 FEET OF 2 INCH POLY, 190 FEET OF 4 INCH POLY, 718 FEET OF 6 INCH STEEL, AND 300 FEET OF 8 INCH STEEL TO ACCOMMODATE THE CITY OF SAN ANGELO IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
4266 080.67255 21,928
RELOCATE FACILITIES. INSTALL 230 FEET OF 2 INCH POLY ALONG AMESBURY DRIVE AND ABANDON 206 FEET OF 2 INCH POLY TO ACCOMMODATE MULTI-FAMILY CONSTRUCTION. ALL CUSTOMERS DALLAS
RELOCATION OF FACILITIES DECEMBER
4267 080.67260 124,347 INSTALL 1250 FEET OF 4 INCH POLY ALONG WYNWOOD DRIVE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PLANO GROWTH DECEMBER
4268 080.67261 264,808
INSTALL 3920 FEET OF 4 INCH POLY AND 5545 FEET OF 2 INCH POLY ALONG THE STREETS OF BRIDGEVIEW SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4269 080.67264 7,355
INSTALL 175 FEET OF 2 INCH AND 175 FEET OF 4 INCH POLY AND ABANDON 170 FEET OF 2 INCH AND 170 FEET OF 4 INCH POLY ALONG THE STREETS OF WICHITA FALLS. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY JULY
4270 080.67267 75,462
RELOCATE FACILITIES. INSTALL 330 FEET OF 2 INCH POLY ALONG FAIRFAX AVENUE AND ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF HIGHLAND PARK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY JUNE
4271 080.67270 78,784
RELOCATE FACILITIES. INSTALL 116 FEET OF 4 INCH POLY AND ABANDON 20 FEET OF 4 INCH STEEL AND 102 FEET OF 4 INCH POLY ALONG COOPER DRIVE TO ACCOMMODATE CITY OF IRVING STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY SEPTEMBER
4272 080.67271 9,724
INSTALL 3392 FEET OF 6 INCH, 1716 FEET OF 4 INCH AND 2081 FEET OF 2 INCH POLY ALONG THE STREETS OF MORNINGSTAR PHASE 3 SECTION 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH JULY
4273 080.67272 8,095
INSTALL 396 FEET OF 6 INCH POLY, 812 FEET OF 4 INCH POLY, AND 1,379 FEET OF 2 INCH POLY ALONG THE STREETS OF SADDLECREEK . DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH SEPTEMBER
4274 080.67274 9,724 INSTALL 1098 FEET OF 6 INCH POLY AND 108 FEET OF 2 INCH POLY ALONG WOODHUL PARKWAY DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GEORGETOWN GROWTH SEPTEMBER
4275 080.67280 188,808
INSTALL 1175 FEET OF 2 INCH POLY AND ABANDON 634 FEET OF 2 INCH AND 4 FEET OF 4 INCH STEEL AND 102 FEET OF 2 INCH POLY ALONG KERR STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TUSCOLA
SYSTEM INTEGRITY JULY
4276 080.67285 6,003 INSTALL 1027 FEET OF 2 INCH POLY ALONG THE STREETS OF WYNWOOD VILLAS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLANO GROWTH DECEMBER
4277 080.67287 122,892
RELOCATE FACILITIES. INSTALL 1530 FEET OF 2 INCH POLY AND ABANDON 175 FEET OF 4 INCH, 100 FEET OF 3 INCH STEEL, 176 FEET OF 3 INCH STEEL, 631 FEET OF 2 INCH POLY AND 365 FEET OF 1.25 INCH POLY TO ACCOMMODATE THE TXDOT WIDENING PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WINDOM
SYSTEM INTEGRITY DECEMBER
4278 080.67288 30,196 INSTALL 100 FEET OF 2 INCH POLY ALONG THE STREETS OF MECURY CIRCLE.COMMERCIAL OR
INDUSTRIAL MCKINNEY GROWTH JULY
4279 080.67296 44,551
RELOCATE FACILITIES. INSTALL 569 FEET OF 2 INCH POLY AND ABANDON 533 FEET OF 2 INCH POLY ALONG COUNTY ROAD 852 TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY OCTOBER
4280 080.67306 12,004 INSTALL 1125 FEET OF 2 INCH POLY ALONG THE STREETS OF BENTWOOD SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH SEPTEMBER
4281 080.67310 3,928 INSTALL 400 FEET OF 2 INCH POLY ALONG TOWNSEND DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROCKWALL GROWTH DECEMBER
4282 080.67312 149,608 INSTALL 5100 FEET OF 2 INCH POLY ALONG THE STREET OF CLEMENTS RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
4283 080.67313 (946)
RELOCATE FACILITIES. INSTALL 1104 FEET OF 4 INCH AND 258 FEET OF 2 INCH POLY AND ABANDON 678 FEET OF 2 INCH STEEL AND 18 FEET OF 2 INCH POLY ALONG CRYER LANE. ALL CUSTOMERS TEMPLE
RELOCATION OF FACILITIES SEPTEMBER
4284 080.67315 10,753 INSTALL 1090 FEET OF 4 INCH POLY ALONG THE STREETS OF WESTGATE APARTMENTS. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WYLIE GROWTH DECEMBER
4285 080.67317 23,987 INSTALL SCADA CONTROLS IN THE CITY OF GARLAND. ALL CUSTOMERS GARLANDGENERAL PLANT -
IT JUNE
4286 080.67318 14,234 INSTALL 1500 FEET OF 2 INCH POLY ALONG TINLEY PARK SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FLOWER MOUND GROWTH DECEMBER
4287 080.67319 9,067 INSTALL 850 FEET OF 4 INCH POLY ALONG THE STREETS OF WILDLIFE COMMERCE PARK. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GRAND PRAIRIE GROWTH JULY
4288 080.67322 146,564
RELOCATE FACILITIES. ABANDON 240 FEET OF 6 INCH STEEL ALONG SOUTH ELM STREET AND WEST PRAIRIE STREET TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
4289 080.67332 131,856
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY AND ABANDON 15 FEET OF 2 INCH POLY AND 164 FEET OF 4 INCH STEEL AND 378 FEET OF 4 INCH POLY ALONG DANIEL DRIVE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 140 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4290 080.67336 305,403
RELOCATE FACILITIES. INSTALL 425 FEET OF 2 INCH POLY AND 1221 FEET OF 4 INCH POLY AND ABANDON 133 FEET OF 2 INCH STEEL AND 432 FEET OF 3 INCH STEEL AND 190 FEET OF 3 INCH POLY ALONG CRINER STREET TO ACCOMMODATE CITY OF GRANDVIEW STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANDVIEW
SYSTEM INTEGRITY DECEMBER
4291 080.67337 1,567 PURCHASE ABOVE GROUND SQUEEZE TOOL FOR GARLAND SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
4292 080.67343 23,229
RELOCATE FACILITIES. INSTALL 107 FEET OF 6 INCH POLY AND ABANDON 84 FEET OF 6 INCH POLY ALONG SPRING CREEK PARKWAY TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY SEPTEMBER
4293 080.67346 50,139
INSTALL 388 FEET OF 2 INCH POLY ALONG ANGELINA AND ABANDON 160 FEET OF 2 INCH STEEL AND 329 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA
SYSTEM INTEGRITY JULY
4294 080.67350 31,576
INSTALL RELIEF VALVE AND MODIFY STATION TO REMOVE BURIED SENSE LINES ALONG 8TH STREET AND AVENUE A IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY
SYSTEM INTEGRITY SEPTEMBER
4295 080.67352 73,101
RELOCATE FACILITIES. INSTALL 670 FEET OF 2 INCH POLY ALONG SHAYNA DR AND ABANDON 670 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4296 080.67353 39,859 INSTALL 1650 FEET OF 2 INCH POLY ALONG THE STREETS OF MID TOWN RESERVE. RESIDENTIAL COLLEGE STATION GROWTH JULY
4297 080.67354 238,031
RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH POLY ALONG CASTLEROCK AND ABANDON 1800 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4298 080.67355 118,528
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG RED CLOUD AND ABANDON 800 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4299 080.67359 233,053
RELOCATE FACILITIES. INSTALL 1600 FEET OF 2 INCH POLY ALONG WEBB KAY AND ABANDON 1600 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4300 080.67362 277,565
RELOCATE FACILITIES. INSTALL 1464 FEET OF 2 INCH POLY AND ABANDON 1500 FEET OF 2 INCH STEEL ALONG DARTRIDGE ROAD TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4301 080.67363 64,364
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY ALONG GREENSPRINT DRIVE AND ABANDON 300 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4302 080.67364 204,392
RELOCATE FACILITIES. INSTALL 1430 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH STEEL AND 1000 FEET OF 3 INCH STEEL ALONG SHADYDALE DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4303 080.67365 109,091
RELOCATE FACILITIES. INSTALL 760 FEET OF 2 INCH POLY AND ABANDON 800 FEET OF 3 INCH STEEL ALONG BUXHILL DRIVE TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4304 080.67366 201,698
RELOCATE FACILITIES. INSTALL 1200 FEET OF 2 INCH POLY ALONG JOYCE WAY AND ABANDON 1200 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4305 080.67368 6,619 REPLACE AIR CONDITIONER IN WACO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
4306 080.67370 703,065
RELOCATE FACILITIES. INSTALL 3010 FEET OF 2 INCH, 2185 FEET OF 4 INCH AND 160 FEET OF 6 INCH POLY ALONG 3RD, LYNN, ROBINSON AND ABANDON 5000 FEET OF 2 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
4307 080.67376 28,946
INSTALL 3504 FEET OF 4 INCH POLY AND 2495 FEET OFPOLY ALONG THE STREETS OF RIDGEVIEW FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
4308 080.67378 13,706
RELOCATE FACILITIES. INSTALL 291 FEET OF 2 INCH POLY AND ABANDON 584 FEET OF 2 INCH STEEL ALONG NORTHHAVEN PLAZA TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY MARCH
4309 080.67381 5,155
INSTALL 500 FEET OF 4 INCH POLY ALONG ANNA AND ABANDON 200 FEET OF 2 INCH AND 300 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY JUNE
4310 080.67382 12,627
INSTALL 2,425 FEET OF 2 INCH POLY AND 125 FEET OF 4 INCH POLY ALONG THE STREETS OF AMHERST SUBSIVISION IN CORINTH TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CORINTH GROWTH DECEMBER
4311 080.67390 50,863
RELOCATE FACILITIES. INSTALL 120 FEET OF 4 INCH POLY AND ABANDON 100 FEET OF 4 INCH POLY ALONG RANDOL MILL ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY AUGUST
4312 080.67397 356,002
RELOCATE FACILITIES. INSTALL 1585 FEET OF 4 INCH POLY AN 60 FEET OF 6 INCH POLY AND ABANDON 975 FEET OF 4 INCH, 285 FEET OF 6 INCH CAST IRON, 200 FEET OF 4 INCH STEEL AND 75 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4313 080.67398 65,074 PURCHASE COMPUTER EQUIPMENT FOR USE IN MIDTEX WEST. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
4314 080.67399 24,044 INSTALL 520 FEET OF 4 INCH POLY ALONG HENRY HYNES AND TEXANA DRIVE IN VAN ALSTYNE.
COMMERCIAL OR INDUSTRIAL VAN ALSTYNE GROWTH SEPTEMBER
4315 080.67400 7,400 INSTALL 1920 FEET OF 2 INCH POLY ALONG THE STREETS OF MAGNOLIA COURT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FLOWER MOUND GROWTH DECEMBER
4316 080.67401 142,953
RELOCATE FACILITIES. INSTALL 577 FEET OF 2 INCH POLY AND ABANDON 319 FEET OF 2 INCH STEEL AND 1 FEET OF 2 INCH POLY ALONG ELLIS AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY SEPTEMBER
4317 080.67403 16,949
INSTALL 320 FEET OF 2 INCH POLY ALONG BURNETT AND ABANDON 320 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY APRIL
4318 080.67404 5,655 INSTALL 1540 FEET OF 6 INCH POLY ALONG CABELLA DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH OCTOBER
4319 080.67405 6,047 INSTALL 250 FEET OF 2 INCH POLY ALONG MADILIZ WAY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH JUNE
4320 080.67411 47,802 INSTALL 900 FEET OF 2 INCH POLY ALONG KENNEDALE SUBLETT ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS KENNEDALE GROWTH DECEMBER
4321 080.67412 28,000 INSTALL 300 FEET OF 2 INCH POLY ALONG OAK COURTS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL KENNEDALE GROWTH OCTOBER
MTX AdditionsPage 141 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4322 080.67416 5,135 INSTALL 4998 FEET OF 2 INCH POLY ALONG THE STREETS OF HIDDEN OAK TWO. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4323 080.67422 283,854
RELOCATE FACILITIES. INSTALL 634 FEET OF 4 INCH POLY AND ABANDON 580 FEET OF 4 INCH STEEL ALONG LITTLE STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4324 080.67423 17,625
INSTALL 765 FEET OF 2 INCH AND 580 FEET OF 4 INCH POLY ALONG THE STREETS OF BLUEBONNET PARK SECTION 10. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WICHITA FALLS GROWTH OCTOBER
4325 080.67426 41,991 INSTALL 1100 FEET OF 2 INCH POLY ALONG THE STREETS OF HEARTLAND. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH OCTOBER
4326 080.67427 77,223
INSTALL 4000 FEET OF 4 INCH POLY AND 5820 FEET OF 2 INCH POLY ALONG THE STREETS OF TALON HILLS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4327 080.67432 (816)
RELOCATE FACILITIES. INSTALL 395 FEET OF 4 INCH POLY AND ABANDON 465 FEET OF 2 INCH POLY ALONG RIVER PLACE DRIVE TO ACCOMMODATE L32 REPLACEMENT PROJECT. ALL CUSTOMERS BELTON
RELOCATION OF FACILITIES SEPTEMBER
4328 080.67433 6,760 INSTALL 3100 FEET OF 2 INCH POLY AND 1800 FEET OF 4 INCH POLY ALONG THE STREETS OF EAGLE RIDGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH OCTOBER
4329 080.67436 339,467
RELOCATE FACILITIES. INSTALL 860 FEET OF 2 INCH, 600 FEET OF 4 INCH AND 440 FEET OF 6 INCH POLY ALONG MILLS STREET AND ABANDON 1900 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF TAYLOR IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TAYLOR
SYSTEM INTEGRITY DECEMBER
4330 080.67437 32,640 PURCHASE SURVEY EQUIPMENT FOR COMPLIACE IN THE NORTH REGION DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT JUNE
4331 080.67440 24,383 INSTALL FENCE ALONG MAINLINE STATION 01 AT BALL STREET. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
4332 080.67441 22,560 INSTALL 100 FEET OF 2 INCH POLY ALONG COCKRELL HILL ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL OVILLA GROWTH SEPTEMBER
4333 080.67450 1,276 PURCHASE DIGITAL MONOMETER FOR TESTING AND CALIBRATION. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH4334 080.67454 28,931 PURCHASE 10 SECURITY CAMERAS FOR THE ABILENE DISTRICT. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
4335 080.67455 955,867
RELOCATE FACILITES. INSTALL 5335 FEET OF 4 INCH AND 325 FEET OF 2 INCH POLY ALONG BELLVIEW AND ABANDON 150 FEET OF 6 INCH POLY AND 10 FEET OF 6 INCH STEEL AND 3380 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF SULPHUR SPRINGS STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SULPHUR SPRINGS
SYSTEM INTEGRITY DECEMBER
4336 080.67464 58,873 REPLACE (16) WARRANTY LAPTOPS FOR THE MIC GROUP. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
4337 080.67467 23,523 INSTALL 2,970 FEET OF 2 INCH POLY ALONG E 3RD AT NORTH BERRY STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BURKBURNETT GROWTH SEPTEMBER
4338 080.67469 162,125
INSTALL 600 FEET OF 2 INCH AND 75 FEET OF 4 INCH POLY ABANDON DRS#01 IN WHITESBORO AND 62 FEET OF 4 INCH STEEL AND 22 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WHITESBORO
SYSTEM INTEGRITY DECEMBER
4339 080.67472 16,019 INSTALL 1500 FEET OF 4 INCH POLY ALONG EDWARDS CHURCH ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL MESQUITE GROWTH JULY
4340 080.67476 79,720 PURCHASE A VEHICLE NEW FOR COMPANY POOL. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
4341 080.67478 45,031
RELOCATE FACILITIES. INSTALL 130 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4 INCH POLY ALONG PARKER ROAD TO ACCOMMODATE CITY OF PLANO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY APRIL
4342 080.67479 15,291 INSTALL 270 FEET OF 2 INCH POLY ALONG SHADY CREEK DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL RICHARDSON GROWTH SEPTEMBER
4343 080.67487 38,735 INSTALL 1320 FT OF 4 INCH AND 530 FT OF 2 INCH POLY ALONG THE STREETS OF THE PRESERVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SHERMAN GROWTH OCTOBER
4344 080.67489 3,957 INSTALL 318 FEET OF 4 INCH POLY ALONG MEADOWBROOK DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH OCTOBER
4345 080.67497 203,535
INSTALL 1027 FEET OF 2 INCH POLY AND ABANDON 6 FEET OF 2 INCH POLY AND 766 FEET OF 4 INCH STEEL ALONG SAINT THOMAS DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ATHENS
SYSTEM INTEGRITY OCTOBER
4346 080.67498 384,184
INSTALL 150 FEET OF 2 INCH AND 1995 FEET OF 4 INCH POLY SOUTH LINGLEVILLE ROAD AND ABANDON 213 FEET OF 3 INCH AND 1697 FEET OF 2 INCH STEEL AND 442 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
4347 080.67499 2,267 INSTALL 300 FEET OF 4 INCH POLY ALONG REGAL DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORNEY GROWTH OCTOBER
4348 080.67501 (10,316)
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY AND 600 FEET OF 2 INCH STEEL ALONG MAYFIELD TO ACCOMMODATE NEW STRUCTURE IN FISHER COUNTY. ALL CUSTOMERS ROBY
RELOCATION OF FACILITIES DECEMBER
4349 080.67508 16,969 PURCHASE AND INSTALL 40 FOOT RADIO TOWER AT FORT WORTH BIRDVILLE STATION. ALL CUSTOMERS FORT WORTH
GENERAL PLANT - EQUIPMENT APRIL
4350 080.67517 (1,771)
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY AT FM 2818 AND DARTMOUTH STREET AND ABANDON 290 FEET OF 2 INCH POLY TO ACCOMMODATE INSTALLATION OF NEW TURN LANE FOR ENCINO TRACE APARTMENTS. ALL CUSTOMERS COLLEGE STATION
RELOCATION OF FACILITIES OCTOBER
4351 080.67532 25,271 INSTALL 24 CUBICLES AND CHAIRS AND REPLACE WORK SPACE AT THE FORT WORTH SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
4352 080.67534 115,410 INSTALL 3010 FEET OF 6 INCH POLY ALONG FEATHERSTONE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROCKWALL GROWTH DECEMBER
4353 080.67536 6,697 INSTALL 300 FEET OF 2 INCH POLY ALONG MEADOWBROOK LANE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL TROPHY CLUB GROWTH OCTOBER
4354 080.67537 114,813
INSTALL 1,800 FEET OF 4 INCH POLY AND 1,600 FEET OF 2 INCH POLY ALONG THE STREETS OF ARROWHEAD FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CALDWELL GROWTH JUNE
4355 080.67545 1,499,187 INSTALL 12,190 FEET OF 12 INCH POLY ALONG STATE HIGHWAY 114. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
4356 080.67551 79,609
INSTALL 288 FEET OF 2 INCH POLY AND ABANDON 196 FEET OF 2 INCH STEEL AND 246 FEET OF 3 INCH STEEL ALONG 15TH STREET AND HICKORY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLORADO CITY
SYSTEM INTEGRITY DECEMBER
4357 080.67556 134,534
RELOCATE FACILITIES. INSTALL (10) .75 INCH POLY SERVICES AND ABANDON (10) .75 INCH POLY SERVICES ALONG CAT MOUNTAIN TO ACCOMMODATE THE CITY OF KELLER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KELLER
SYSTEM INTEGRITY DECEMBER
4358 080.67558 64,874 INSTALL 1995 FEET OF 2 INCH AND 1675 FEET OF 4 INCH POLY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LITTLE ELM GROWTH DECEMBER
4359 080.67560 26,955
INSTALL 113 FEET OF 2 INCH POLY AND ABANDON 309 FEET OF 3 INCH CAST IRON ALONG GRACE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY SEPTEMBER
4360 080.67561 50,829
INSTALL 1,430 FEET OF 2 INCH POLY AND 720 FEET OF 4 INCH POLY ALONG THE STREETS OF MIDTOWN RESERVE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH JULY
4361 080.67562 159,769
INSTALL 190 FEET OF 2 INCH AND 60 FEET OF 6 INCH POLY ALONG FM 1138 AND ABANDON 190 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NEVADA
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 142 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4362 080.67566 511,183
RELOCATE FACILITIES. INSTALL 1300 FEET OF 2 INCH POLY ALONG BRYN MAWR DR AND ABANDON 1300 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4363 080.67568 3,374 INSTALL 149 FEET OF 2 INCH POLY ALONG AMBLER STREET. RESIDENTIAL ABILENE GROWTH DECEMBER
4364 080.67572 3,346
INSTALL 4200 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG THE STREETS OF SADDLE STAR ESTATES SOUTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER
4365 080.67573 6,838
INSTALL 500 FEET OF 6 INCH POLY, 2000 FEET OF 4 INCH POLY AND 7100 FEET OF 2 INCH POLY ALONG THE STREETS OF WATERSCAPE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROYSE CITY GROWTH SEPTEMBER
4366 080.67580 91,713
INSTALL 3 FEET OF 2 INCH POLY AND 950 FEET OF 4 INCH POLY AND ABANDON 1256 FEET OF 2 INCH STEEL AND 4 FEET OF 2 INCH POLY ALONG KEGLEY LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
4367 080.67582 7,191 PURCHASE SIGN FOR HILSBORO OFFICE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JULY
4368 080.67583 22,365
RELOCATE FACILITIES. INSTALL 25 FEET OF 4 INCH POLY AND ABANDON 20 FEET OF 3 INCH POLY ALONG TREZEVANT STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
4369 080.67584 15,280 INSTALL 3641 FEET OF 4 INCH AND 60 FEET OF 2 INCH ALONG THE STREETS OF SOUTHGATE MARKET PLACE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4370 080.67586 20,437 INSTALL 280 FEET OF 4 INCH POLY ALONG HANCOCK STREET.COMMERCIAL OR
INDUSTRIAL GAINESVILLE GROWTH SEPTEMBER
4371 080.67589 9,544 INSTALL 2 INCH VALVE ON DRS 02 IN OLNEY AND ABANDON 2 INCH VALVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY JULY
4372 080.67590 569,819
RELOCATE FACILITIES. INSTALL 3200 FEET OF 6 INCH POLY AND 200 FEET OF 4 INCH POLY ALONG PARKER ROAD AND CUSTER PKWY AND ABANDON 2900 FEET OF 6 INCH POLY, 500 FEET OF 4 INCH IP POLY AND 100 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF PLANO STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
4373 080.67592 45,397
RELOCATE FACILITIES. INSTALL 200 FEET OF 6 INCH POLY AND ABANDON 175 FEET OF 6 INCH POLY ALONG HARMON ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4374 080.67593 17,506 EQUIPMENT REPLACEMENT FOR THE FRONT OFFICE IN ATHENS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
4375 080.67594 5,513 INSTALL 410 FEET OF 4 INCH AND 1250 FEET OF 6 INCH POLY ALONG STREETS OF DENTON CROSSING. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DENTON GROWTH DECEMBER
4376 080.67597 52,016
RELOCATE FACILITIES. INSTALL 290 FEET OF 4 INCH POLY AND 3 FEET OF 6 INCH POLY AND 4 FEET OF 8 INCH POLY AND ABANDON 50 FEET OF 8 INCH STEEL AND 60 FEET OF 8 INCH POLY ALONG PETER SMITH STREET AND HEMPHILL STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY SEPTEMBER
4377 080.67603 449,907 INSTALL 250 FEET OF 6 INCH STEEL AND DISTRICT REGULATOR STATION ALONG HIGHWAY 287. ALL CUSTOMERS SAGINAW
SYSTEM IMPROVEMENT DECEMBER
4378 080.67605 94,936
RELOCATE FACILITIES. INSTALL 710 FEET OF 4 INCH POLY AND ABANDON 738 FEET OF 2 INCH POLY AND 51 FEET OF 3 INCH POLY ALONG PLANO PARKWAY AND ALMA TO ACCOMMODATE MALL CONSTRUCTION. ALL CUSTOMERS PLANO
RELOCATION OF FACILITIES DECEMBER
4379 080.67607 37,276 PURCHASE POLY FUSION EQUIPMENT FOR USE IN ABILENE AND SAN ANGELO DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT JUNE
4380 080.67610 708,688
RELOCATE FACILITIES. INSTALL 3500 FEET OF 4 INCH AND 750 FEET OF 2 INCH POLY ALONG RAMEY AVENUE AND ABANDON 4040 FEET OF 4 INCH, 60 FEET OF 3 INCH AND 280 FEET OF 2 INCH STEEL AND 1270 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4381 080.67616 (4,531)
RELOCATE FACILITIES. INSTALL 925 FEET OF 8 INCH AND 85 FEET OF 4 INCH POLY AND ABANDON 600 FEET OF 8 INCH, 183 FEET OF 4 INCH STEEL AND 10 FEET OF 4 INCH POLY TO ACCOMMODATE NEW APARTMENT COMPLEX. ALL CUSTOMERS PLANO
RELOCATION OF FACILITIES OCTOBER
4382 080.67619 15,614 INSTALL 3,700 FEET OF 4 INCH POLY ALONG IH30. DEVELOPMENT INSTALLED FACILITIES. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER
4383 080.67620 18,708 INSTALL 4315 OF 2 INCH POLY ALONG GIFFORD STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER
4384 080.67622 4,107 INSTALL 200 FEET OF 2 INCH POLY ALONG S AVE B IN HASKELL.COMMERCIAL OR
INDUSTRIAL HASKELL GROWTH DECEMBER
4385 080.67623 17,175
RELOCATE FACILITIES. INSTALL (5) .75 INCH POLY SERVICES ALONG CLIFFSIDE DRIVE AND ABANDON (5) .75 INCH POLY SERVICES TO ACCOMMODATE RIHCARDSON ALLEY PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY SEPTEMBER
4386 080.67626 23,939
RELOCATE FACILITIES. INSTALL 23 FEET OF 4 INCH POLY AND ABANDON 16 FEET OF 2 INCH POLY ALONG CROSSLAKE PARKWAY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY SEPTEMBER
4387 080.67629 8,278 REPLACE OBSOLETE RELIEF VALVE ON DRS38 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY JUNE
4388 080.67630 10,574 INSTALL 400 FEET OF 2 INCH POLY ALONG CENTRAL EAST. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WICHITA FALLS GROWTH OCTOBER
4389 080.67631 284,094
RELOCATE FACILITIES. INSTALL 1000 FEET OF 4 INCH AND 950 FEET OF 2 INCH POLY ALONG SOUTH FOURTH AT MARY AVENUE AND ABANDON 445 FEET OF 6 INCH, 124 FEET OF 4 INCH, 16 FEET OF 3 INCH AND 47 FEET OF 2 INCH STEEL AND 394 FEET OF POLY TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4390 080.67641 1,662 REPLACE THE POWER SUPPLY IN THE ATHENS SERVICE CENTER NETWORK CLOSET. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT JUNE
4391 080.67643 40,798 REPLACE AGING MIC COMPUTERS AND PERIPHERALS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER4392 080.67652 4,937 REPLACE THE ATMOS SIGN AT TEMPLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
4393 080.67653 18,386 REPLACE LAPTOPS IN ATHENS, GARLAND AND LONGVIEW SERVICE CENTERS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
4394 080.67655 79,708 REPLACE MIC MACHINES IN THE ATHENS, GARLAND, AND LONGVIEW SERVICE CENTERS. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
4395 080.67658 3,717 PURCHASE LAPTOP FOR USE IN SAN ANGELO AND RETIRE LAPTOP. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
4396 080.67660 8,453
INSTALL791 FEET OF 4 INCH POLY AND 1554 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
4397 080.67661 4,552
INSTALL 970 FEET OF 4 INCH POLY AND 665 FEET OF 2 INCH POLY ALONG THE STREETS OF SANTA RITA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
MTX AdditionsPage 143 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4398 080.67662 59,981 PURCHASE TRUCK MODEMS AND DOCKS FOR USE IN FORT WORTH DISTRICT. ALL CUSTOMERS FORT WORTHGENERAL PLANT -
IT DECEMBER
4399 080.67664 46,531 REPLACE TABLETS/MIC MACHINES AND DOCKS FOR USE IN DALLAS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT DECEMBER
4400 080.67665 14,202
INSTALL 4,650 FEET OF 2 INCH POLY AND 775 FEET OF 4 INCH POLY ALONG THE STREETS OF HICKORY FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HICKORY CREEK GROWTH DECEMBER
4401 080.67672 80,946
ABANDON 26 MOTORIZED REGULATORS AND INSTALL 26 MOTORIZED REGULATORS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY JULY
4402 080.67675 9,050 INSTALL A LOW POINT PACKAGE ON THE VERIDIAN SYSTEM. ALL CUSTOMERS ARLINGTONSYSTEM
IMPROVEMENT OCTOBER
4403 080.67676 1,323 PURCHASE CLICK SHARE UNIT FOR USE AT SHERMAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT APRIL
4404 080.67682 146,311
RELOCATE FACILITIES. ABANDON 107 FEET OF 2 INCH STEEL AND 870 FEET OF 2 INCH POLY RAMEY AVENUE TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4405 080.67685 18,397 INSTALL 950 FEET OF 2 INCH POLY ALONG STREETS OF BEST WESTERN.COMMERCIAL OR
INDUSTRIAL CHANDLER GROWTH SEPTEMBER
4406 080.67687 2,708 PURCHASE (2) MARKER BALLS FOR USE IN WAXAHACHIE. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
4407 080.67688 56,914
RELOCATE FACILITIES. INSTALL 120 FEET OF 2 INCH POLY AND ABANDON 107 FEET OF 2 INCH POLY ALONG WENZ AVENUE AND MACARTHUR DRIVE TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY JULY
4408 080.67689 8,759 PURCHASE (2) 6 INCH POLY SQUEEZE TOOLS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
4409 080.67693 1,991 PURCHASE SENSIT GOLD G2 LEAK DETECTOR FOR THE SAN ANGELO C&M DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT MARCH
4410 080.67697 24,994 PURCHASE (8) ROTARY GAS METER TESTERS FOR USE IN ABILENE DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT APRIL
4411 080.67711 6,349 INSTALL 886 FEET OF 4 INCH AND 1396 FEET OF 2 INCH POLY ALONG THE STREETS OF VIZCAYA SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4412 080.67713 467,417 INSTALL 5450 FEET OF 8 INCH, 1430 FEET OF 4 INCH AND 5885 FEET OF 2 INCH POLY ALONG THE STREETS OF MANTUA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL VAN ALSTYNE GROWTH DECEMBER
4413 080.67717 2,405 PURCHASE ZEBRA PRINTER FOR THE BRYAN DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
4414 080.67718 1,841 PURCHASE MINI PEELER KIT FOR USE AT BRYAN SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4415 080.67720 372,387
RELOCATE FACILITIES. INSTALL 560 FEET OF 12 INCH POLY AND 180 FEET OF 2 INCH POLY ALONG 9TH AVENUE AND ABANDON 540 FEET OF 12 INCH STEEL AND 190 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4416 080.67722 16,536 PURCHASE (1) ICE MACHINE FOR THE SOUTH REGION DALLAS DISTRICT. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
4417 080.67723 6,377 PURCHASE (3) WORKSTATIONS FOR THE SOUTH REGION DALLAS DISTRICT. ALL CUSTOMERS SYSTEM WIDE STRUCTURES MARCH
4418 080.67725 44,012 INSTALL 2900 FEET OF 2 INCH POLY ALONG KINGSLEY WAY. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEYVILLE GROWTH DECEMBER
4419 080.67726 1,936 INSTALL 420 FEET OF 2 INCH POLY ALONG SYNERGY DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL RICHARDSON GROWTH DECEMBER
4420 080.67727 64,734
RELOCATE FACILITIES. INSTALL 394 FEET OF 4 INCH POLY AND 3 FEET OF 8 INCH POLY AND ABANDON 60 FEET OF 4 INCH POLY AND 337 FEET OF 8 INCH POLY ALONG STONEBRIDGE DRIVE TO ACCOMMODATE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
4421 080.67731 49,521
RELOCATE FACILITIES. INSTALL 80 FEET OF 4 INCH POLY ALONG WOOD STREET AND ABANDON 80 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
4422 080.67734 4,171 INSTALL 300 FEET OF 2 INCH POLY ALONG FINFEATHER ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH DECEMBER
4423 080.67735 23,496 INSTALL 200 FEET OF 2 INCH POLY ALONG GENE DRIVE. RESIDENTIAL HALTOM CITY GROWTH OCTOBER
4424 080.67739 10,483 INSTALL 900 FEET OF 4 INCH POLY ALONG MCGREGOR ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS WOODWAY GROWTH OCTOBER
4425 080.67743 7,425 INSTALL 525 FEET OF 2 INCH POLY ALONG TOWN EAST BOULEVARD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL MESQUITE GROWTH JULY
4426 080.67744 10,134
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND ABANDON 106 FEET OF 2 INCH STEEL ALONG HUMPHRYS STREET TO ACCOMMODATE NEW DRIVEWAY FOR STORE. ALL CUSTOMERS BUFFALO
RELOCATION OF FACILITIES OCTOBER
4427 080.67748 55,065
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH POLY ALONG APRIL HILL ALLEY AND ABANDON 800 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4428 080.67752 9,318 INSTALL 1200 FEET OF 4 INCH POLY FOR NEW COMMERCIAL CUSTOMER IN MANSFIELD, TEXAS. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MANSFIELD GROWTH DECEMBER
4429 080.67753 84,016
INSTALL 416 FEET OF 2 INCH POLY AND ABANDON 1021 FEET OF 2 INCH STEEL AND 15 FEET OF 2 INCH POLY ALONG MCKINNEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
4430 080.67754 111,496
INSTALL 375 FEET OF 2 INCH POLY AND ABANDON 447 FEET OF 3 INCH, 241 FEET OF 2 INCH STEEL, AND DISTRICT REGLUATOR STATION 10 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PETROLIA
SYSTEM INTEGRITY DECEMBER
4431 080.67757 244 ABANDON DISTRICT REGULATOR STATION #023 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY NOVEMBER
4432 080.67761 1,321 INSTALL 220 FEET OF 2 INCH POLY ALONG VALLEY VIEW. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FARMERS BRANCH GROWTH OCTOBER
4433 080.67764 168,314 INSTALL 4995 FEET OF 2 INCH POLY ALONG THE STREETS OF PHEASANT CROSSING. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4434 080.67767 34,937 INSTALL 375 FEET OF 2 INCH POLY ALONG LONG PRAIRIE ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FLOWER MOUND GROWTH DECEMBER
4435 080.67773 6,061 PURCHASE A SQUEEZE TOOL 3/4 - 2 REMOTE STEEL/RISER W/C148 PUMP & GUIDE STOPS FOOTAGE C165 FOR LONGVIEW SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT MARCH
4436 080.67776 5,651
INSTALL 2,400 FEET OF 2 INCH AND 1,300 FEET OF 4 INCH POLY ALONG STREETS OF COTTAGES IN ARABELLA PHASE 2. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BURLESON GROWTH OCTOBER
4437 080.67778 25,428 PURCHASE ROUTER AND SWITCHES FOR USE AT GARLAND SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT JULY
4438 080.67782 645,134
RELOCATE FACILITIES. INSTALL 3600 FEET OF 4 INCH AND 100 FEET OF 6 INCH POLY ALONG RAMEY AVENUE AND ABANDON 3550 FEET OF 4 INCH, 50 FEET OF 3 INCH AND 100 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 144 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4439 080.67783 92,604
INSTALL 288 FEET OF 2 INCH POLY AND ABANDON 280 FEET OF 2 INCH STEEL AND 4 FEET OF 2 INCH POLY ALONG BALLINGER STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY JULY
4440 080.67789 5,272 PURCHASE A VALVE CHANGER TOOL FOR CORSICANA DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT MARCH
4441 080.67790 3,271 INSTALL 195 FEET OF 2 INCH POLY ALONG FLOWER MOUND RD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FLOWER MOUND GROWTH OCTOBER
4442 080.67792 1,669,481
INSTALL 11 FEET OF 2 INCH POLY AND 5 FEET OF 4 INCH POLY AND 22 FEET OF 6 INCH POLY AND 2129 FEET OF 12 INCH POLY AND ABANDON 2115 FEET OF 12 INCH STEEL ALONG BECKLEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
4443 080.67794 80,018 INSTALL 4948 FEET OF 4 INCH POLY ALONG THE STREETS OF COVENTRY ADDITIONS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FARMERS BRANCH GROWTH DECEMBER
4444 080.67796 39,163 INSTALL 325 FEET OF 2 INCH POLY ALONG PECAN CREEK CIRCLE AND ABANDON 225 FEET OF 2 INCH POLY. ALL CUSTOMERS CORINTH
SYSTEM INTEGRITY SEPTEMBER
4445 080.67801 2,078 INSTALL 40 FEET OF 2 INCH POLY ALONG CHARLOTTE ROAD. RESIDENTIAL BURKBURNETT GROWTH JULY4446 080.67803 32,594 INSTALL 800 FEET OF 4 INCH POLY ALONG CORPORATE DRIVE. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER
4447 080.67805 238,828 INSTALL 8802 FEET OF 2 INCH POLY ALONG THE STREETS OF OWNSBY FARMS SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH DECEMBER
4448 080.67806 67,915
RELOCATE FACILITIES. INSTALL 135 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG FOREST VISTA DRIVE AND ABANDON 135 FEET OF 3 INCH AND 150 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FLOWER MOUND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FLOWER MOUND
SYSTEM INTEGRITY DECEMBER
4449 080.67808 175,504
INSTALL 1,981 FEET OF 4 INCH POLY AND 2,506 FEET OF 2 INCH POLY ALONG THE STREETS OF STAR RANCH IN GODLEY TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GODLEY GROWTH DECEMBER
4450 080.67812 293,769 INSTALL 3190 FEET OF 4 INCH POLY AND 4640 FEET OF 2 INCH POLY ALONG THE STREETS OF ELIZABETH CREEK. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4451 080.67813 6,313 INSTALL 1300 FEET OF 4 INCH POLY ALONG THE STREETS OF WOODLANDS CROSSING. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORNEY GROWTH OCTOBER
4452 080.67815 7,809
INSTALL 4550 FEET OF 2 INCH, 320 FEET OF 4 INCH AND 640 FEET OF 6 INCH POLY ALONG THE STREETS OF DEVONSHIRE VILLAGE 10B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
4453 080.67816 7,110 INSTALL 275 FEET OF 4 INCH POLY ALONG THE REAR OF THE PROPOSED 24 HR FITNESS. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROWLETT GROWTH OCTOBER
4454 080.67819 103,788
INSTALL 1,705 FEET OF 6 INCH POLY, 1,650 FEET OF 4 INCH POLY AND 3,135 FEET OF 2 INCH POLY ALONG THE STREETS OF THOMPSON FARMS SUBDIVISION IN VAN ALSTYNE TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL VAN ALSTYNE GROWTH DECEMBER
4455 080.67821 217,376 INSTALL 1120 FEET OF 4 INCH AND 7630 FEET OF 2 INCH POLY ALONG STREETS OF THE STATION SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SACHSE GROWTH DECEMBER
4456 080.67825 540,752
INSTALL 3 FEET OF 3 INCH POLY AND 35 FEET OF 4 INCH POLY AND 1527 FEET OF 12 INCH POLY AND ABANDON 15 FEET OF 3 INCH STEEL AND 23 FEET OF 4 INCH STEEL AND 4 FEET OF 4 INCH POLY AND 1497 FEET OF 10 INCH STEEL ALONG ELMWOOD AND BROOKHOLLOW IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY APRIL
4457 080.67826 539,843
INSTALL 18 FEET OF 6 INCH POLY AND 2817 FEET OF 12 INCH POLY AND ABANDON 36 FEET OF 6 INCH STEEL AND 3008 FEET OF 10 INCH STEEL AND 102 FEET OF 12 INCH POLY ALONG MAPLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY JUNE
4458 080.67827 1,513,124
RELOCATE FACILITIES. INSTALL 4400 FEET OF 2 INCH POLY AND ABANDON 1370 FEET OF 1.25 INCH, 850 FEET OF 2 INCH, 670 FEET OF 2 INCH STEEL, 432 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4459 080.67833 184,434
RELOCATE FACILITIES. INSTALL 480 FEET OF 4 INCH POLY AND ABANDON 475 FEET OF 2 INCH STEEL ALONG DAVIS STREET TO ACCOMMODATE CITY OF WEST STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WEST
SYSTEM INTEGRITY SEPTEMBER
4460 080.67837 7,094
INSTALL 350 FEET OF 4 INCH AND 1100 FEET OF 2 INCH POLY ALONG THE STREETS OF NEW STREAM LAND PARTNERS ROANOKE LLC. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROANOKE GROWTH DECEMBER
4461 080.67839 9,085 PURCHASE AV EQUIPMENT PROJECTOR FOR USE AT WACO SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT SEPTEMBER
4462 080.67842 10,549 PURCHASE REPLACEMENT GATE FOR THE STEPHENVILLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
4463 080.67847 4,389 INSTALL 320 FEET OF 6 INCH POLY ALONG MORGAN PARKWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FARMERS BRANCH GROWTH SEPTEMBER
4464 080.67850 575,365 INSTALL 6510 FEET OF 4 INCH AND 12010 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTHSTAR PHASE 1. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4465 080.67852 77,388 INSTALL 2517 FEET OF 2 INCH POLY ALONG STREETS OF THE BLUEWOOD PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CELINA GROWTH OCTOBER
4466 080.67860 56,377
INSTALL 57 FEET OF 2 INCH POLY AND 84 FEET OF 4 INCH POLY AND ABANDON 7 FEET OF 2 INCH STEEL AND 12 FEET OF 4 INCH STEEL ALONG CHINA STREET AND HANNA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CALVERT
SYSTEM INTEGRITY OCTOBER
4467 080.67862 2,564 INSTALL 31O FEET OF 6 INCH POLY ALONG THE STREETS OF MAJESTIC SUBDIVISION. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4468 080.67863 12,197 INSTALL 155 FEET OF 2 INCH POLY ALONG BOWIE DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL RED OAK GROWTH SEPTEMBER
4469 080.67869 63,898 PURCHASE TOOLS AND EQUIPMENT FOR USE IN SW REGION. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT SEPTEMBER
4470 080.67873 23,930
INSTALL DISTRICT REGULATOR STATION IN DENTON AND ABANDON DISTRICT REGULATOR STATION DRS49 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY JUNE
4471 080.67874 25,572 INSTALL 1233 FEET OF 6 INCH, 2470 FEET OF 4 INCH AND 4943 FEET OF 2 INCH POLY ALONG STREETS OF DEVINE LAKE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4472 080.67887 134,513
INSTALL 840 FEET OF 4 INCH POLY AND ABANDON 772 FEET OF 3 INCH STEEL ALONG COLLINS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY SEPTEMBER
4473 080.67888 133,235
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY AND ABANDON 225 FEET OF 4 INCH STEEL ALONG LD LOCKET ROAD TO ACCOMMODATE THE CITY OF COLLEYVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
4474 080.67890 4,674 INSTALL 100 FEET OF 2 INCH POLY ALONG STRATFORD AVENUE. RESIDENTIAL WICHITA FALLS GROWTH SEPTEMBER
4475 080.67892 18,266
RELOCATE FACILITIES. INSTALL 410 FEET OF 2 INCH AND ABANDON 410 FEET OF 2 INCH POLY ALONG TALAMORE LANE TO ACCOMMODATE THIRD PARTY DAMAGE. ALL CUSTOMERS FRISCO
RELOCATION OF FACILITIES OCTOBER
4476 080.67893 260,563
INSTALL 26 FEET OF 3 INCH POLY AND 1295 FEET OF 8 INCH POLY AND ABANDON 14 FEET OF 3 INCH STEEL AND 1285 FEET OF 8 INCH STEEL ALONG THE STEETS OF KENSINGTON VALLEY SUBDIVISION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SEAGOVILLE
SYSTEM INTEGRITY OCTOBER
4477 080.67895 106,967
INSTALL 800 FEET OF 2 INCH POLY AND ABANDON 615 FEET OF 4 INCH STEEL AND 105 FEET OF 4 INCH POLY ALONG ARMSTRONG IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BLOOMING GROVE
SYSTEM INTEGRITY SEPTEMBER
MTX AdditionsPage 145 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4478 080.67896 20,329 INSTALL 2793 FEET OF 2 INCH POLY ALONG THE STREETS OF SUMMIT WEST. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4479 080.67897 6,242 INSTALL 564 FEET OF 4 INCH AND 2156 FEET OF 2 INCH POLY ALONG STREETS OF WILDLEAF PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
4480 080.67899 78,154 INSTALL 2840 FEET OF 6 INCH POLY ALONG BLUE MOUND ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS HASLET GROWTH DECEMBER
4481 080.67902 6,906 INSTALL 1660 FEET OF 2 INCH POLY ALONG THE STREETS OF WINDERMERE PARK GARDEN VILLAS SECTION 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER
4482 080.67908 174,203
RELOCATE FACILITIES. INSTALL 487 FEET OF 2 INCH POLY AND ABANDON 487 FEET OF 2 INCH STEEL ALONG NANTUCKET TO ACCOMMODATE CITY OF RICHARDSON STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS RICHARDSON
SYSTEM INTEGRITY OCTOBER
4483 080.67909 52,447
INSTALL 330 FEET OF 2 INCH POLY AND ABANDON 310 FEET OF 4 INCH STEEL AND GAINESVILLE DRS08 (S203) IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
4484 080.67911 147,001
INSTALL 1270 FEET OF 2 INCH POLY AND ABANDON DISTRICT REGULATOR STATION # 10 IN GAINESVILLE AND 2283 FEET OF 2 INCH STEEL AND POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GAINESVILLE
SYSTEM INTEGRITY DECEMBER
4485 080.67922 4,422 INSTALL 630 FEET OF 4 INCH POLY ALONG STREETS OF ANNA TOWN CENTER. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ANNA GROWTH DECEMBER
4486 080.67930 555,706
INSTALL 647 FEET OF 2 INCH POLY AND 59 FEET OF 6 INCH POLY AND 29 FEET OF 8 INCH POLY AND 1185 FEET OF 12 INCH POLY AND ABANDON 585 FEET OF 2 INCH STEEL AND 617 FEET OF 6 INCH STEEL AND 839 FEET OF 10 INCH STEEL ALONG T LANE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY OCTOBER
4487 080.67933 199,734
RELOCATE FACILITIES. INSTALL 35 POLY SERVICES ALONG MIRIAM LANE AND ABANDON 35 POLY SERVICES ALONG MIRIAM LANE TO ACCOMMODATE THE CITY OF ARLINGTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
4488 080.67934 67,607
RELOCATE FACILITIES. INSTALL 506 FEET OF 2 INCH POLY AND ABANDON 490 FEET OF 2 INCH POLY ALONG LONGWORTH BOULEVARD TO ACCOMMODATE CITY OF DUNCANVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DUNCANVILLE
SYSTEM INTEGRITY OCTOBER
4489 080.67955 100,695
INSTALL DISTRICT REGULATOR STATION 05 ALONG W SOUTH STREET IN ARCHER CITY AND ABANDON DISTRICT REGULATOR STATION 05 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY
SYSTEM INTEGRITY DECEMBER
4490 080.67956 91,688
INSTALL DISTRICT REGULATOR STATION 08 ALONG VINE AND MAIN STREET IN ARCHER CITY AND ABANDON DISTRICT REGULATOR STATION 08 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY
SYSTEM INTEGRITY DECEMBER
4491 080.67957 89,246 REPLACE ARCHER CITY DRS09 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY
SYSTEM INTEGRITY DECEMBER
4492 080.67959 64,018
INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 119 FEET OF 2 INCH STEEL AND 30 FEET OF 2 INCH POLY AND REPLACE ARCHER CITY DRS13 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY
SYSTEM INTEGRITY DECEMBER
4493 080.67961 79,872 REPLACE BYERS DRS02 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209 ALL CUSTOMERS BYERS
SYSTEM INTEGRITY DECEMBER
4494 080.67962 65,163 REPLACE DISTRICT REGULATOR STATION 4 IN BYERS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BYERS
SYSTEM INTEGRITY DECEMBER
4495 080.67964 35,439 INSTALL CLOCK SPRING ALONG LINE F IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
SYSTEM INTEGRITY SEPTEMBER
4496 080.67967 49,708 REPLACE ELECTRA DRS09 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ELECTRA
SYSTEM INTEGRITY DECEMBER
4497 080.67969 58,754
INSTALL 140 FEET OF 4 INCH AND 10 FEET OF 2 INCH POLY AND ABANDON 11 FEET OF 6 INCH, 75 FEET OF 4 INCH AND 30 FEET OF 2 INCH STEEL AND 15 FEET OF 6 INCH POLY AND REPLACE HENRIETTA DRS04 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA
SYSTEM INTEGRITY DECEMBER
4498 080.67970 75,821 REPLACE HENRIETTA DISTRICT REGULATOR STATION 09 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HENRIETTA
SYSTEM INTEGRITY DECEMBER
4499 080.67971 185,845
INSTALL 1,085 OF POLY ALONG PAYNE AND ABANDON 988 FEET OF STEEL AND ABANDON DISTRICT REGULATOR STATION 12 IN OLNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY DECEMBER
4500 080.67972 143,599
INSTALL 1,030 FEET OF 2 INCH POLY AND ABANDON 1,197 FEET OF 2 INCH STEEL, 136 FEET OF 2 INCH POLY, 20 FEET OF 2 INCH STEEL, 5 FEET OF 4 INCH, AND 27 FEET OF 2 INCH STEEL AND DISTRICT REGULATOR STATION #14 IN OLNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY DECEMBER
4501 080.67973 208,501
INSTALL 1000 FEET OF 2 INCH POLY AND ABANDON 7 FEET OF 4 INCH STEEL, 984 FEET OF 3 INCH STEEL AND 20 FEET OF 2 INCH STEEL AND 274 FEET OF 3 INCH POLY AND 244 FEET OF 2 INCH POLY ALONG GALLOWAY DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY DECEMBER
4502 080.67974 133,117
INSTALL 750 FEET OF 2 INCH POLY AND ABANDON 785 FEET OF POLY AND ABANDON DISTRICT REGULATOR STATION 45 ALONG W MAIN AND S AVENUE K IN OLNEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS OLNEY
SYSTEM INTEGRITY DECEMBER
4503 080.67988 11,206
RELOCATE FACILITIES. INSTALL 45 FEET OF 2 INCH POLY ALONG LOOP 13 AND ABANDON 42 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
4504 080.67989 11,552 INSTALL 490 FEET OF 2 INCH AND 375 FEET OF 6 INCH POLY ALONG THE STREETS OF NORTHLAKE COMMONS. DEVELOPER INSTALLED FACILITES.
COMMERCIAL OR INDUSTRIAL NORTHLAKE GROWTH DECEMBER
4505 080.67997 19,367 PURCHASE NEW ROOF TOP AC UNIT FOR USE IN FORT WORTH DISTRICT. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
4506 080.68007 3,548
RELOCATE FACILITIES. INSTALL 163 FEET OF 6 INCH POLY AND ABANDON 227 FEET OF 6 INCH POLY ALONG SUMMIT LOFTS TO ACCOMMODATE NOVAK SUMMIT LOFTS. ALL CUSTOMERS GEORGETOWN
RELOCATION OF FACILITIES DECEMBER
4507 080.68009 5,150
RELOCATE FACILITIES. INSTALL 25 FEET OF 4 INCH POLY AND ABANDON 1 FEET OF 2 INCH POLY AND 17 FEET OF 4 INCH POLY ALONG SOMERVILLE DRIVE TO ACCOMMODATE WATER MAIN CONFLICT IN MCKINNEY. ALL CUSTOMERS MCKINNEY
RELOCATION OF FACILITIES OCTOBER
4508 080.68010 2,907 PURCHASE GATE OPENER FOR SULPHUR SPRINGS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
4509 080.68023 74,650
INSTALL 3 FEET OF 3 INCH POLY AND 525 FEET OF 4 INCH POLY AND ABANDON 528 FEET OF 3 INCH STEEL ALONG DOUGLAS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CARLSBAD
SYSTEM INTEGRITY DECEMBER
4510 080.68026 23,175 INSTALL 100 FEET OF 2 INCH POLY ALONG PINE STREET. RESIDENTIAL ROANOKE GROWTH DECEMBER
4511 080.68029 209,535
INSTALL 80 FEET OF 4 INCH STEEL ALONG LINE U10 AND ABANDON 80 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KNOX CITY
SYSTEM INTEGRITY OCTOBER
4512 080.68032 5,543 INSTALL 390 FEET OF 2 INCH POLY ALONG THE STREETS OF WESTINGHOUSE RETAIL COMMERCIAL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GEORGETOWN GROWTH DECEMBER
4513 080.68047 104,761
RELOCATE FACILITIES. INSTALL 915 FEET OF 2 INCH POLY AND ABANDON 513 FEET OF 2 INCH STEEL ALONG DANIEL DRIVE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 146 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4514 080.68048 8,357 INSTALL 580 FEET OF 2 INCH POLY ALONG STREETS OF TEALSTONE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL DENTON GROWTH DECEMBER
4515 080.68061 25,675 INSTALL 160 FEET OF 2 INCH POLY ALONG LOUIS HENNA BOULEVARD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROUND ROCK GROWTH DECEMBER
4516 080.68063 65,099
RELOCATE FACILITIES. INSTALL 376 FEET OF 4 INCH POLY AND ABANDON 30 FEET OF 2 INCH POLY AND 350 FEET OF 4 INCH POLY ALONG BOAZ ROAD TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY SEPTEMBER
4517 080.68064 32,122 PURCHASE (10) DELL LAPTOPS, AND POWER SUPPLIES FOR USE IN WAXAHACHIE. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT AUGUST
4518 080.68068 9,785 INSTALL 1200 FEET OF 2 INCH POLY ALONG COOPER STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ARLINGTON GROWTH DECEMBER
4519 080.68078 149,990
INSTALL 1450 FEET OF 2 INCH POLY AND ABANDON 434 FEET OF 4 INCH STEEL AND 441 FEET OF 2 INCH STEEL AND 372 FEET OF 4 INCH POLY AND 238 FEET OF 2 INCH POLY ALONG WALNUT STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
4520 080.68081 292,287 INSTALL 1500 FEET OF 4 INCH POLY AND ABANDON 1650 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
4521 080.68094 67,381 INSTALL 2650 FT OF 6 INCH POLY ALONG US 75. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL VAN ALSTYNE GROWTH DECEMBER
4522 080.68106 14,169 INSTALL 360 FEET OF 4 INCH POLY ALONG JOHNSON RANCH ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BOWIE GROWTH DECEMBER
4523 080.68108 95,412
RELOCATE FACILITIES. INSTALL 682 FEET OF 2 INCH POLY AND ABANDON 682 FEET OF 2 INCH POLY ALONG BEALL STREET TO ACCOMMODATE CITY OF DALLAS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4524 080.68115 3,356 INSTALL DESK, STORAGE AND CHAIRS USE IN ATHENS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
4525 080.68117 137,683 INSTALL 1350 FEET OF 6 INCH POLY ALONG HIGHWAY 377. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROANOKE GROWTH DECEMBER
4526 080.68123 102,159 INSTALL 3000 FEET OF 2 INCH POLY ALONG THE STREETS OF THE LAKEVIEW ESTATES SUBDIVISION IN ANNA TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ANNA GROWTH DECEMBER
4527 080.68128 451,101
RELOCATE FACILITIES. INSTALL 568 FEET OF 4 INCH POLY AND ABANDON 367 FEET OF 3 INCH POLY AND 128 FEET OF 4 INCH POLY ALONG US 281 TO ACCOMMODATE CITY OF MARBLE FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS
SYSTEM INTEGRITY DECEMBER
4528 080.68130 12,100 INSTALL 100 FEET OF 2 INCH POLY ALONG ASHWOOD LANE. RESIDENTIAL FAIRVIEW GROWTH JULY
4529 080.68141 6,396 INSTALL 800 FEET OF 4 INCH POLY ALONG KINGS ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GARLAND GROWTH OCTOBER
4530 080.68157 345,992
RELOCATE FACILITIES. INSTALL 2300 FEET OF 6 INCH ALONG NORTH RIVERSIDE DRIVE AND ABANDON 2175 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4531 080.68158 54,908 INSTALL 260 FEET OF 2 INCH POLY ALONG FELIX GWOZDZ PLACE. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4532 080.68162 329,711
INSTALL 5830 FEET OF 4 INCH POLY AND 5850 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKEPOINTE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LAVON GROWTH DECEMBER
4533 080.68163 200,811 INSTALL 2000 FEET OF 6 INCH POLY ALONG TEXAS 78. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS LAVON GROWTH DECEMBER
4534 080.68188 57,580 INSTALL 1600 FEET OF 6 INCH POLY ALONG NORTH 10TH STREET IN TAYLOR COUNTY.
COMMERCIAL OR INDUSTRIAL ABILENE GROWTH DECEMBER
4535 080.68189 14,938 INSTALL 700 FEET OF 2 INCH POLY ALONG TCC ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL HURST GROWTH DECEMBER
4536 080.68192 2,260 PURCHASE (1) LAPTOP FOR USE IN PRESSURE CONTROL. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT JUNE
4537 080.68194 11,093
INSTALL 1910 FEET OF 4 INCH AND 2200 FEET OF 2 INCH POLY ALONG STREETS OF RANCH PARK VILLAGE PHASE 1. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SACHSE GROWTH DECEMBER
4538 080.68204 12,207 INSTALL 750 FEET OF CABLE FENCING ALONG CA SYSTEM IN SAGINAW. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
4539 080.68205 19,915 INSTALL 600 FEET OF 2 INCH POLY ALONG THE STREETS OF APPLE SPORTS FORD DEALERSHIP. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL MARLIN GROWTH OCTOBER
4540 080.68210 7,223 INSTALL 2004 FEET OF 4 INCH AND 3084 FEET OF 2 INCH POLY ALONG STREETS OF SANTA RITA RANCH SOUTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LIBERTY HILL GROWTH DECEMBER
4541 080.68212 293,471
RELOCATE FACILITIES. REPLACE 84 SERVICE LINES ALONG ALBERMARLE DRIVE AND BURGESS DRIVE AND DARLA DRIVE AND EVEREST DRIVE TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4542 080.68219 8,089 INSTALL 100 FEET OF 4 INCH POLY ALONG HARWOOD ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL EULESS GROWTH DECEMBER
4543 080.68225 52,618 REPLACE GROUND BED ON LINE D17-4 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE
SYSTEM INTEGRITY DECEMBER
4544 080.68227 7,049 INSTALL 1351 FEET OF 4 INCH AND 508 FEET OF 2 INCH POLY ALONG THE STREETS OF STAR RANCH 22. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4545 080.68228 34,247 INSTALL 1065 FEET OF 4 INCH POLY ALONG CANYON CREEK DRIVE. ALL CUSTOMERS TEMPLE GROWTH OCTOBER
4546 080.68239 41,842 INSTALL 3050 FEET OF 2 INCH POLY ALONG THE STREETS OF SOUTH RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ABILENE GROWTH DECEMBER
4547 080.68240 808,175
INSTALL 2050 FEET OF 2 INCH POLY AND ABANDON 890 FEET OF 3 INCH CAST IRON, 265 FEET OF 4 INCH CAST IRON, 420 FEET OF 6 INCH CAST IRON, AND 450 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4548 080.68245 233,779
INSTALL 1650 FEET OF 2 INCH POLY AND ABANDON 5 FEET OF 2 INCH CAST IRON, 800 FEET OF 4 INCH CAST IRON, 455 FEET OF 2 INCH STEEL, 130 FEET OF 2 INCH CAST IRON AND 100 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4549 080.68248 694,167
INSTALL 1520 FEET OF 4 INCH POLY AND ABANDON 1520 FEET OF 8 INCH CAST IRON ALONG CARPENTER AVENUE IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4550 080.68252 371,465
INSTALL 1465 FEET OF 4 INCH POLY AND ABANDON 90 FEET OF 2 INCH CAST IRON, 85 FEET OF 4 INCH CAST IRON AND 1380 FEET OF 8 INCH CAST IRON ALONG STONEWALL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
4551 080.68253 366,301
INSTALL 2450 FEET OF 4 INCH POLY AND ABANDON 1420 FEET OF 4 INCH STEEL AND 985 FEET OF 4 INCH POLY AND 510 FEET OF 6 INCH CAST IRON ALONG AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4552 080.68255 308,646
INSTALL 1600 FEET OF POLY AND ABANDON 278 FEET OF 4 INCH STEEL AND 20 FEET OF 4 INCH POLY AND 699 FEET OF 6 INCH CAST IRON AND 724 FEET OF 6 INCH POLY ALONG BYERS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4553 080.68256 536,291
INSTALL 825 FEET OF 4 INCH POLY, 3000 FEET OF 2 POLY AND ABANDON 1200 FEET OF 4 INCH CAST IRON, 1560 FEET OF 4 INCH STEEL, 1475 FEET OF 6 INCH STEEL ALONG W. HAMMOND STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 147 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4554 080.68258 59,419
REPLACE GROUND BED ALONG LINE O28-6 AND RECTIFIER GROUND BED ALONG LINE O28 IN WYLIE, TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WYLIE
SYSTEM INTEGRITY DECEMBER
4555 080.68259 285,836
INSTALL 2000 FEET OF 4 POLY AND ABANDON 2000 FEET OF 6 INCH CAST IRON ALONG W. HAMMOND STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4556 080.68261 340,246
INSTALL 2500 FEET OF 4 INCH POLY AND ABANDON 633 FEET OF 4 INCH STEEL AND 1605 FEET OF 6 INCH CAST IRON ALONG STREETS OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4557 080.68262 346,187
INSTALL 1440 FEET OF 2 INCH POLY AND ABANDON 570 FEET OF 2 INCH CAST IRON, 45 FEET OF 2 INCH POLY, 125 FEET OF 2 INCH STEEL ALONG HOBSON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4558 080.68264 687,730
INSTALL 235 FEET OF 2 INCH POLY AND 1460 FEET OF 4 INCH POLY AND ABANDON 1595 FEET OF 4 INCH CAST IRON ALONG BUENA VISTA STREET AND LEE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4559 080.68266 25,912
RELOCATE FACILITIES. INSTALL 200 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4560 080.68269 192,514
INSTALL 1310 FEET OF 2 INCH POLY AND ABANDON 1210 FEET OF 4 INCH CAST IRON AND 100 FEET OF 4 INCH STEEL ALONG OWENWOOD AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4561 080.68271 513,715
INSTALL 2090 FEET OF 2 INCH POLY AND ABANDON 2005 FEET OF 4 INCH, 20 FEET OF 6 INCH CAST IRON AND 65 FEET OF 4 INCH POLY ALONG ALASKA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4562 080.68272 63,093
REPLACE DISTRICT REGULATOR STATION #25 IN MARLIN AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
4563 080.68273 67,535
REPLACE DISTRICT REGULATOR STATION #14 IN MARLIN AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
4564 080.68276 4,673
RELOCATE FACILITIES. INSTALL 300 FEET OF 2 INCH POLY AND ABANDON 300 FEET OF 2 INCH POLY ALONG PRINCETON ROAD TO ACCOMMODATE DEVELOPER. ALL CUSTOMERS ROWLETT
RELOCATION OF FACILITIES OCTOBER
4565 080.68278 121,641
INSTALL 6 FEET OF 3 INCH POLY AND 279 FEET OF 4 INCH POLY AND 1 FEET OF 6 INCH POLY AND ABANDON 134 FEET OF 4 INCH STEEL AND 21 FEET OF 4 INCH POLY AND 140 FEET OF 6 INCH STEEL AND 2 FEET OF 6 INCH POLY ALONG MESQUITE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN
SYSTEM INTEGRITY SEPTEMBER
4566 080.68286 9,823 INSTALL 3141 FEET OF 2 INCH POLY ALONG ARROYO ROBLE SUBDIVISION. DEVELOPER INSTALLED FACILITES. RESIDENTIAL LEANDER GROWTH DECEMBER
4567 080.68287 88,395
RELOCATE FACILITES. INSTALL 458 FEET OF 2 INCH POLY ALONG MIMOSA STREET AND ABANDON 349 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF KEERVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
4568 080.68291 125,589 INSTALL 3970 FEET OF 6 INCH POLY ALONG SILVER SOUR. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS GEORGETOWN GROWTH DECEMBER
4569 080.68293 17,139
INSTALL 3446 FEET OF 6 INCH POLY, 204 FEET OF 4 INCH POLY AND 6982 FEET OF 2 INCH POLY ALONG THE STREETS OF LIVELY RANCH SUBDIVISION IN LEANDER TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4570 080.68294 69,946 REPLACE DISTRICT STATION #03 IN BREMOND AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BREMOND
SYSTEM INTEGRITY DECEMBER
4571 080.68298 9,313 INSTALL 235 FEET OF 4 INCH POLY ALONG CHURCH STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS PARIS GROWTH DECEMBER
4572 080.68299 15,712 INSTALL 1500 FEET OF 2 INCH POLY ALONG THE STREETS OF MISSION RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH NOVEMBER
4573 080.68304 16,201 INSTALL 400 FEET OF 4 INCH POLY ALONG COLONNADE PARKWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WOODWAY GROWTH OCTOBER
4574 080.68309 177,601
INSTALL 1760 FEET OF 2 INCH POLY ALONG LAHOMA STREET AND ABANDON 915 FEET OF 4 INCH CAST IRON, 775 FEET OF 6 INCH CAST IRON, AND 70 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4575 080.68310 1,083,575
INSTALL 3130 FEET OF 2 INCH POLY AND ABANDON 2255 FEET OF 4 INCH CAST IRON AND 750 FEET OF 4 INCH POLY ALONG OPAL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4576 080.68312 485,724
INSTALL 450 FEET OF 2 INCH POLY AND 1365 FEET OF 4 INCH POLY AND ABANDON 675 FEET OF 2 INCH CAST IRON AND 1075 FEET OF 4 INCH CAST IRON ALONG FORDHAM ROAD IN ACORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
4577 080.68313 227,069
INSTALL 1390 FEET OF 2 INCH POLY ALONG MARYLAND AVENUE AND ABANDON 665 FEET OF 4 INCH CAST IRON, 520 FEET OF 2 INCH POLY, 170 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4578 080.68314 435,776
INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 660 FEET OF 4 INCH CAST IRON, 350 FEET OF 6 INCH CAST IRON, 1225 FEET OF 4 INCH STEEL ALONG W. BOYCE AVENUE IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4579 080.68315 285,239
INSTALL 1350 FEET OF 4 INCH POLY AND ABANDON 1250 FEET OF 4 INCH CAST IRON AND 375 FEET OF 6 INCH POLY ALONG RYAN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4580 080.68316 285,536
INSTALL 1844 FEET OF 4 INCH POLY AND ABANDON 1950 FEET OF 4 INCH CAST IRON AND 232 FEET OF POLY ALONG WAGGOMAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4581 080.68318 371,411
INSTALL 2000 FEET OF 4 INCH STEEL AND ABANDON 2005 FEET OF 4 INCH CAST IRON AND 500 FEET OF 6 INCH CAST IRON ALONG W. BOYCE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4582 080.68319 330,194
INSTALL 6455 FEET OF 4 INCH POLY AND 4870 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAILS OF ELIZABETH CREEK PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4583 080.68335 30,691
REPLACE DISTRICT REGULATOR STATION #18 IN MARLIN AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
4584 080.68344 491,397 INSTALL COMPOSITE WRAP ON LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
4585 080.68345 13,590 INSTALL 100 FEET OF 2 INCH POLY ALONG LIGHT STREET. RESIDENTIAL WAXAHACHIE GROWTH DECEMBER
4586 080.68346 45,984
INSTALL 61 FEET OF 2 INCH POLY AND 180 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 98 FEET OF 3 INCH STEEL AND 282 FEET OF 4 INCH STEEL ALONG MARKET STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BAIRD
SYSTEM INTEGRITY SEPTEMBER
MTX AdditionsPage 148 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4587 080.68348 4,168 INSTALL 228 FEET OF 2 INCH POLY ALONG THE STREETS OF TRAVISSO PHASE 2 SECTION 2 LOTS 29 AND 30. RESIDENTIAL LEANDER GROWTH OCTOBER
4588 080.68349 26,355
RELOCATE FACILITIES. INSTALL 30 FEET OF 6 INCH POLY ALONG SMITHFIELD ROAD AND ABANDON 20 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF NORTH RICHLAND HILLS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS NORTH RICHLAND HILLS
SYSTEM INTEGRITY OCTOBER
4589 080.68354 19,648 INSTALL 250 FEET OF 2 INCH POLY ALONG MEADOWS BOULEVARD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL MESQUITE GROWTH OCTOBER
4590 080.68360 206,704
RELOCATE FACILITIES. INSTALL 531 FEET OF 6 INCH POLY AND ABANDON 500 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4591 080.68361 306,632
RELOCATE FACILITIES. INSTALL 1159 FEET OF 2 INCH POLY AND 86 FEET OF 4 INCH POLY AND ABANDON 1153 FEET OF 2 INCH STEEL AND 75 FEET OF 4 INCH STEEL ALONG BROOKHOLLOW DRIVE TO ACCOMMODATE CITY OF WOODWAY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WOODWAY
SYSTEM INTEGRITY DECEMBER
4592 080.68362 17,794
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG EAST ROSEDALE STREET AND ABANDON 100 FEET OF 6 INCH POLY AND 300 FEET OF 6 INCH STEEL TO ACCOMMODATE DEVELOPER. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES DECEMBER
4593 080.68365 89,708
RELOCATE FACILITIES. INSTALL 360 FEET OF 4 INCH POLY AND ABANDON 360 FEET OF 4 INCH STEEL ALONG MCHILHANEY STREET AND MARY STREET TO ACCOMMODATE CITY OF STEPHENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY OCTOBER
4594 080.68374 411,728
INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 1050 FEET OF 6 INCH CAST IRON, 500 FEET OF 4 INCH CAST IRON, 635 FEET OF 4 INCH STEEL ALONG W. HAMMOND STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4595 080.68375 157,557
INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 1050 FEET OF 6 INCH CAST IRON AND 500 FEET OF 4 INCH CAST IRON AND 635 FEET OF 4 INCH STEEL ALONG HAMMOND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4596 080.68380 2,734 INSTALL 970 FEET OF 2 INCH AND 305 FEET OF 4 INCH POLY TO SERVE BENTWOOD SUBDIVISION SEC 42A IN SAN ANGELO. RESIDENTIAL SAN ANGELO GROWTH OCTOBER
4597 080.68381 (25,372) INSTALL 181 FEET OF 2 INCH POLY ALONG STREETS OF WALMART.COMMERCIAL OR
INDUSTRIAL BENBROOK GROWTH OCTOBER
4598 080.68382 (5,597)INSTALL 10 FEET OF 4 INCH POLY SERVICE LINE AT 6801- B W ADAMS TO SERVE ENCHANTED ROCK.
COMMERCIAL OR INDUSTRIAL TEMPLE GROWTH DECEMBER
4599 080.68383 (5,847) INSTALL 10 FEET OF 4 INCH POLY ALONG MAIN STREET.COMMERCIAL OR
INDUSTRIAL BELTON GROWTH OCTOBER
4600 080.68385 498,212
INSTALL 1270 FEET OF 2 INCH POLY AND 690 FEET OF 4 INCH POLY AND ABANDON 1270 FEET OF 4 INCH CAST IRON, 340 FEET OF 6 INCH CAST IRON, AND 350 FEET OF 8 INCH CAST IRON ALONG GLASGOW DRIVE AND MARTINIQUE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4601 080.68386 291,182
INSTALL 2035 FEET OF 2 INCH IP POLY AND ABANDON 2035 FEET OF 4 INCH CAST IRON ALONG HOWARD AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4602 080.68390 76,649 INSTALL 3131 FEET OF 2 INCH POLY ALONG THE STREETS OF LAKESIDE AT BLACKHAWK 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PLUGERVILLE GROWTH DECEMBER
4603 080.68391 1,331 INSTALL 250 FEET OF 2 INCH POLY ALONG EAST SECOND STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEARNE GROWTH DECEMBER
4604 080.68393 689,385
INSTALL 2105 FEET OF 4 INCH POLY AND ABANDON 2090 FEET OF 4 INCH CAST IRON, 164 FEET OF 4 INCH POLY, AND 96 FEET OF STEEL ALONG WEBER STREET AND LULU STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4605 080.68395 464,808
INSTALL 1221 FEET OF 4 INCH POLY ABANDON 1042 FEET OF 4 INCH CAST IRON, 178 FEET OF 4 INCH POLY. ALONG DEWEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4606 080.68396 553,000
INSTALL 4000 FEET OF 4 INCH OF POLY AND ABANDON 1515 FEET OF 4 INCH CAST IRON, 560 FEET OF 4 INCH STEEL ALONG W. BOYCE IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4607 080.68398 515,959
INSTALL 3642 FEET OF 4 INCH STEEL AND ABANDON 1075 FEET OF 4 INCH CAST IRON, 1500 FEET OF 6 INCH STEEL, 2567 FEET OF 4 INCH STEEL, 170 FEET OF 4 INCH POLY ALONG AVENUE D IN FORT WORTH, TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4608 080.68399 297,935
INSTALL 2103 FEET OF 4 INCH POLY AND ABANDON 1447 FEET OF 4 INCH STEEL, 463 FEET OF 6 INCH STEEL, AND 146 FEET OF 4 INCH CAST IRON ALONG N COMMERCE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4609 080.68400 276,347
INSTALL 1805 FEET OF 2 INCH POLY AND ABANDON 630 FEET OF 4 INCH CAST IRON, 735 FEET OF 6 INCH CAST IRON, 385 FEET OF 2 INCH STEEL AND 55 FEET OF 3 INCH STEEL ALONG NORTH RAVINIA STRET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
4610 080.68401 32,285 INSTALL 2750 FEET OF 6 INCH POLY ALONG STREETS OF SOUTHPOINTE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS MANSFIELD GROWTH DECEMBER
4611 080.68403 286,697
INSTALL 2010 FEET OF 2 INCH POLY AND ABANDON 945 FEET OF 4 INCH CAST IRON AND 1495 FEET OF 4 INCH STEEL. ALONG MERRIFIELD AVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4612 080.68404 393,470
INSTALL 1920 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 4 INCH CAST IRON AND 640 FEET OF 2 INCH STEEL AND 735 FEET OF 2 INCH STEEL AND 25 FEET OF 4 INCH STEEL AND 10 FEET OF 8 INCH STEEL ALONG STRONG STREET AND WINSTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4613 080.68407 175,841
RELOCATE FACILITIES. INSTALL 880 FEET OF 4 INCH POLY ALONG AVENUE H AND ABANDON 525 FEET OF 4 INCH AND 490 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF GARLAND IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
4614 080.68411 623,071
INSTALL 2300 FEET OF 2 INCH POLY AND ABANDON 2300 FEET OF 4 INCH CAST IRON ALONG PRESIDIA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4615 080.68413 (29,779) INSTALL SERVICE LINE AND METER TO SERVE WALMART ALONG FM1187.COMMERCIAL OR
INDUSTRIAL CROWLEY GROWTH OCTOBER
4616 080.68414 (36,822) INSTALL 60 FEET OF 3 INCH POLY ALONG HIGHWAY 82.COMMERCIAL OR
INDUSTRIAL SHERMAN GROWTH DECEMBER
4617 080.68416 660,487
INSTALL 1500 FEET OF 4 INCH POLY AND 660 FEET OF 2 INCH POLY AND ABANDON 1230 FEET OF 6 INCH CAST IRON, 560 FEET OF 4 INCH POLY, 300 FEET OF 4 INCH CAST IRON, AND 135 FEET OF 4 INCH STEEL ALONG W UNIVERSITY BLVD AND WATEKA DRIVE N ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
4618 080.68418 16,606
REPLACE DISTRICT REGULATOR STATION #03 IN MART AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 149 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4619 080.68421 444,161
INSTALL 1470 FEET OF 2 INCH POLY AND 230 FEET OF 4 INCH POLY AND ABANDON 1630 FEET OF 4 INCH CAST IRON, 1470 FEET OF 6 INCH CAST IRON, 650 FEET OF 8 INCH CAST IRON AND 175 FEET OF 2 INCH STEEL ALONG BRYAN STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4620 080.68422 1,449,573
INSTALL 2350 FEET OF 2 INCH POLY AND 560 FEET OF 6 INCH POLY AND ABANDON 2050 FEET OF 6 INCH CAST IRON, 145 FEET OF 4 INCH POLY AND 15 FEET OF 6 INCH POLY ALONG ORAM STREET AND PROSPECT AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4621 080.68423 100,991
INSTALL 205 FEET OF 2 INCH POLY AND 1395 FEET OF 4 INCH POLY ALONG GLENCOE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
4622 080.68426 (34,611)INSTALL SERVICE LINE AND METER ALONG KENWOOD DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROWLETT GROWTH DECEMBER
4623 080.68435 85,027
INSTALL DISTRICT REGULATOR STATION #18 IN GATESVILLE AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GATESVILLE
SYSTEM INTEGRITY DECEMBER
4624 080.68437 23,889 INSTALL 100 FEET OF 2 INCH POLY ALONG ASBURY COURT. RESIDENTIAL RIVER OAKS GROWTH DECEMBER
4625 080.68439 98,135
INSTALL REGULATOR STATION #05 ALONG CHURCH STREET AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MOODY
SYSTEM INTEGRITY DECEMBER
4626 080.68447 177,993
RELOCATE FACILITIES. INSTALL 752 FEET OF 4 INCH POLY AND ABANDON 103 FEET OF 2 INCH POLY AND 752 FEET OF 4 INCH STEEL AND 320 FEET OF 6 INCH STEEL ALONG EAST FIRST STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4627 080.68448 181,967
RELOCATE FACILITIES. INSTALL 19 FEET OF 2 INCH POLY AND 15 FEET OF 4 INCH POLY AND 1120 FEET OF 6 INCH POLY AND ABANDON 10 FEET OF 2 INCH POLY AND 11 FEET OF 4 INCH POLY AND 1106 FEET OF 6 INCH STEEL ALONG CONWAY STREET TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4628 080.68454 52,795
RELOCATE FACILITIES. INSTALL 301 FEET OF 4 INCH POLY AND ABANDON 285 FEET OF 4 INCH POLY ALONG EAST MAIN STREET TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
4629 080.68455 18,264 INSTALL 75 FEET OF 2 INCH POLY ALONG MAPLE STREET. RESIDENTIAL HONEY GROVE GROWTH DECEMBER
4630 080.68460 1,374 PURCHASE (1) 6" POLY TAP VALVE ADAPTER FOR USE IN THE SOUTH DALLAS REGION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT JUNE
4631 080.68465 126,150
INSTALL 38 FEET OF 2 INCH POLY AND 14 FEET OF 4 INCH POLY AND 820 FEET OF 6 INCH POLY AND ABANDON 8 FEET OF 2 INCH STEEL AND 22 FEET OF 2 INCH POLY AND 557 FEET OF 4 INCH STEEL AND 90 FEET OF 4 INCH POLY AND 155 FEET OF 6 INCH STEEL AND 40 FEET OF 6 INCH POLY ALONG BRADFORD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY OCTOBER
4632 080.68466 6,544 INSTALL 565 FEET OF 2 INCH POLY ALONG WESTGATE LANE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ADDISON GROWTH DECEMBER
4633 080.68468 91,302
RELOCATE FACILITIES. INSTALL 770 FEET OF 4 INCH POLY AND ABANDON 742 FEET OF 4 INCH STEEL AND 500 FEET OF 4 INCH POLY ALONG CEDAR AND 3RD STREET TO ACCOMMODATE CITY OF HEARNE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEARNE
SYSTEM INTEGRITY DECEMBER
4634 080.68469 48,246 INSTALL 575 FEET OF 2 INCH AND 565 FEET OF 4 INCH POLY ALONG THE STREETS OF MIDTOWN RESERVE PHASE 104. RESIDENTIAL COLLEGE STATION GROWTH OCTOBER
4635 080.68474 345,729
INSTALL 1590 FEET OF 2 INCH POLY AND ABANDON 2079 FEET OF 4 INCH STEEL AND 428 FEET OF 4 INCH POLY ALONG DUVAL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
4636 080.68477 172,651
INSTALL 1425 FEET OF 2 INCH POLY AND ABANDON 488 FEET OF 6 INCH STEEL, 1412 FEET OF 4 INCH STEEL, AND 390 FEET OF 2 INCH STEEL AND 200 FEET OF 4 INCH POLY AND 100 FEET OF 2 INCH POLY ALONG ROBERTS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY DECEMBER
4637 080.68480 (28,482) INSTALL 145 FEET OF POLY SERVICE ALONG LAKEWORTH BOULEVARD.COMMERCIAL OR
INDUSTRIAL LAKE WORTH GROWTH DECEMBER
4638 080.68481 7,078 INSTALL 4120 FEET OF 6 INCH POLY ALONG FM HWY 121. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS VAN ALSTYNE GROWTH DECEMBER
4639 080.68482 33,611
INSTALL 1100 FEET OF 4 INCH POLY AND ABANDON 1100 FEET OF 3 INCH STEEL ALONG COMMERCE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
4640 080.68484 7,542 PURCHASE TRACK SYSTEM FOR GATE AT KERVILLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
4641 080.68485 224,428
INSTALL 1257 FEET OF 2 INCH POLY AND ABANDON 1257 FEET OF 2 INCH POLY ALONG WILLIAMS AND GOLDEN OAKS TO ACCOMMODATE THE CITY OF GEORGETOWN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GEORGETOWN
SYSTEM INTEGRITY OCTOBER
4642 080.68488 7,797 INSTALL 1382 FEET OF 2 INCH POLY ALONG THE STREETS OF METZGER PARK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FREDERICKSBURG GROWTH DECEMBER
4643 080.68489 (18,548) INSTALL 2 INCH POLY SERVICE ALONG NORTH SAGINAW BOULEVARD.COMMERCIAL OR
INDUSTRIAL SAGINAW GROWTH DECEMBER
4644 080.68493 (16,324)
RELOCATE FACILITIES. INSTALL 258 FEET OF 8 INCH, 182 FEET OF 2 INCH AND 8 FEET OF 6 INCH POLY AND ABANDON 455 FEET OF 2 INCH AND 3 FEET OF 6 INCH POLY ALONG BRIAR OAKS ROAD TO ACCOMMODATE APT PROJECT. ALL CUSTOMERS BURLESON
RELOCATION OF FACILITIES DECEMBER
4645 080.68494 8,096 INSTALL 440 FEET OF 2 INCH POLY ALONG MEANDERING WAY. RESIDENTIAL FAIRVIEW GROWTH DECEMBER
4646 080.68495 165,636 INSTALL 1,221 FEET OF 6 INCH AND 2,739 FEET OF 2 INCH POLY ALONG TAVOLO PARK 3A. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4647 080.68497 182,520 INSTALL 3,179 FEET OF 2 INCH POLY AND 2,038 FEET OF 6 INCH POLY ALONG THE STREETS OF TAVOLO PARK SUBDIVISION IN FORT WORTH, TX. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4648 080.68499 304,421
RELOCATE FACILITIES. INSTALL 1025 FEET OF 2 INCH POLY AND 179 FEET OF 4 INCH POLY AND ABANDON 1104 FEET OF 3 INCH STEEL AND 156 FEET OF 4 INCH POLY ALONG N 40TH STREET TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4649 080.68500 (23,131) INSTALL 4 INCH POLY ALONG WESTWORTH BOULEVARD.COMMERCIAL OR
INDUSTRIAL WESTWORTH VILLAGE GROWTH DECEMBER
4650 080.68501 284,947
INSTALL 655 FETT OF 4 INCH POLY AND 600 FEET OF 2 INCH POLY AND ABANDON 655 FEET OF 2 INCH STEEL AND 970 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM
SYSTEM INTEGRITY DECEMBER
4651 080.68502 146,743 INSTALL 2130 FEET OF 2 INCH POLY ALONG THE STREETS OF GREENWAY TRAILS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GRAND PRAIRIE GROWTH DECEMBER
4652 080.68504 (19,073)INSTALL 4 INCH POLY SERVICE TO SERVE WALMART ALONG CLIFFORD STREET.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4653 080.68506 9,870 INSTALL 2,080 FEET OF 6 INCH POLY ALONG OAK GROVE ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4654 080.68507 5,072 INSTALL 1675 FEET OF 4 INCH AND 938 FEET OF 2 INCH POLY ALONG STREETS OF VIZCAYA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
MTX AdditionsPage 150 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4655 080.68510 445,286
RELOCATE FACILITIES. INSTALL 69 FEET OF 2 INCH POLY AND 410 FEET OF 4 INCH POLY AND 445 FEET OF 8 INCH POLY AND ABANDON 428 FEET OF 4 INCH STEEL AND 69 FEET OF 4 INCH POLY AND 452 FEET OF 6 INCH STEEL ALONG COLCORD AVENUE TO ACCOMMODATE CITY OF WACO STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4656 080.68511 20,639 INSTALL 1010 FEET OF 4 INCH POLY ALONG GENESIS WAY IN GRAPEVINE.COMMERCIAL OR
INDUSTRIAL GRAPEVINE GROWTH DECEMBER
4657 080.68514 302,132
INSTALL 1705 FEET OF 4 INCH POLY AND ABANDON 751 FEET OF 4 INCH, 403 FEET OF 2 INCH STEEL, 350 FEET OF 2 INCH, 180 FEET OF 4 INCH POLY AND 308 FEET OF 4 INCH CAST IRON ALONG NE 32ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4658 080.68515 332,856
INSTALL 1600 FEET OF 4 INCH POLY AND ABANDON 566 FEET OF 4 INCH CAST IRON AND 890 FEET OF 4 INCH CAST IRON AND 565 FEET OF 4 INCH POLY ALONG AVENUE I IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4659 080.68516 265,405
INSTALL 1600 FEET OF 4 INCH POLY AND ABANDON 500 FEET OF 6 INCH CAST IRON, 850 FEET OF 4 INCH STEEL ALONG AVENUE K IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4660 080.68517 482,750
INSTALL 1817 FEET OF 4 INCH POLY AND ABANDON 667 FEET OF 4 INCH CAST IRON AND 418 FEET OF 2 INCH POLY AND 266 FEET OF 4 INCH POLY AND 11 FEET OF 4 INCH STEEL ALONG SHCWARTZ AVENUE AND OSCAR AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4661 080.68518 210,778
INSTALL 1535 FEET OF 4 INCH POLY AND ABANDON 503 FEET OF 4 INCH CAST IRON AND 958 FEET OF 4 INCH POLY ALONG OSCAR AVENUE IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4662 080.68519 582,079
INSTALL 5600 FEET OF 4 INCH POLY AND ABANDON 1225 FEET OF 6 INCH CAST IRON AND 615 FEET OF 3 INCH STEEL ALONG ROSEMONT AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4663 080.68520 47,982
RELOCATE FACILITIES. INSTALL 450 FEET OF 2 INCH POLY ALONG LAKEVIEW RV PARK AND ABANDON 3910 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4664 080.68521 332,550
INSTALL 1900 FEET OF 4 INCH POLY AND ABANDON 1225 FEET OF 6 INCH CAST IRON AND 615 FEET OF 3 INCH STEEL ALONG ROSEMONT AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4665 080.68522 234,629
INSTALL 1180 FEET OF 4 INCH POLY AND ABANDON 556 FEET OF 6 INCH CAST IRON, 450 FEET OF 4 INCH STEEL, 192 FEET OF 4 INCH CAST IRON ALONG CURRIE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4666 080.68523 272,102
INSTALL 1900 FEET OF 4 INCH POLY AND ABANDON 1800 FEET OF 4 INCH CAST IRON ALONG WILLING AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4667 080.68524 216,720
INSTALL 1175 FEET OF 4 INCH POLY AND ABANDON 1180 FEET OF 6 INCH CAST IRON ALONG W. GAMBRELL STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4668 080.68525 10,706 PURCHASE (1) ICE MAKER FOR USE AT ARLINGTON SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
4669 080.68529 211,603
RELOCATE FACILITIES. INSTALL 1434 FEET OF 6 INCH POLY ALONG LIMOUSINE PARKWAY AND ABANDON 1354 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
4670 080.68532 127,656
INSTALL 3,030 FEET OF 2 INCH POLY AND 1,100 FEET OF 4 INCH POLY ALONG THE STREETS OF BELCLAIRE SUBDIVISON IN CLEBURNE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CLEBURN GROWTH DECEMBER
4671 080.68534 510,889
INSTALL 1920 FEET OF 2 INCH POLY AND ABANDON 1820 FEET OF 8 INCH CAST IRON ALONG MARQUETTE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4672 080.68536 705,897
INSTALL 2695 FEET OF 2 INCH POLY AND ABANDON 945 FEET OF 4 INCH CAST IRON, 765 FEET OF 6 INCH CAST IRON, 1505 FEET OF 8 INCH CAST IRON, 880 FEET OF 4 INCH POLY AND 20 FEET OF 8 INCH POLY ALONG CENTENARY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4673 080.68538 (4,903) INSTALL 300 FEET OF 4 INCH POLY ALONG SOUTH CHURCH STREET. ALL CUSTOMERS HILLSBOROSYSTEM
IMPROVEMENT DECEMBER
4674 080.68541 414,269
INSTALL 458 FEET OF 6 INCH POLY AND ABANDON 425 FEET OF 6 INCH POLY ALONG SH360 AND MAYFIELD ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
4675 080.68546 58,876
INSTALL ANODES AND ABANDON ANODES ALONG GREEN STREET IN LONGVIEW, TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
4676 080.68549 5,098 INSTALL 320 FEET OF 4 INCH POLY ALONG HIGHWAY 79. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FRANKLIN GROWTH SEPTEMBER
4677 080.68562 28,540 INSTALL 304 FEET OF 2 INCH POLY ALONG HWY 80 AND FM 2208 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LONGVIEW
SYSTEM INTEGRITY DECEMBER
4678 080.68564 341,707
RELOCATE FACILITIES. INSTALL 620 FEET OF 6 INCH, 860 FEET OF 4 INCH AND 90 FEET OF 2 INCH POLY ALONG UNIVERSITY PARKS & WEBSTER AVE AND ABANDON 291 FEET OF 6 INCH STEEL AND 768 FEET OF 6 INCH POLY AND 328 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF WACO STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4679 080.68566 129,186
RELOCATE FACILITIES. INSTALL 148 FEET OF 4 INCH POLY AND ABANDON 140 FEET OF 4 INCH POLY ALONG SUNDOWN BOULEVARD AND TEASLEY LANE TO ACCOMMODATE CITY OF DENTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
4680 080.68568 14,547 INSTALL 2900 FEET OF 4 INCH POLY ALONG 45TH STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL CORSICANA GROWTH DECEMBER
4681 080.68571 15,756
REPLACE DISTRICT REGULATOR STATION #04 IN MART AND ABANDON EXISTING DRS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART
SYSTEM INTEGRITY DECEMBER
4682 080.68572 5,858 INSTALL 890 FEET OF 2 INCH POLY ALONG THE STREETS OF EDGEWATER. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4683 080.68577 5,747 INSTALL 2203 FEET OF 2 INCH POLY ALONG SCHULTZ LANE. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4684 080.68582 451,603 INSTALL 1280 FEET OF 2 INCH POLY AND ABANDON 1280 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4685 080.68583 319,876
INSTALL 1400 FEET OF 2 INCH POLY AND ABANDON 1045 FEET OF 2 INCH STEEL ALONG SOUTH OF NORTHVIEW FROM MIDWAY EAST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4686 080.68586 365,588
INSTALL 1820 FEET OF 2 INCH POLY AND ABANDON 1325 FEET OF 2 INCH STEEL ALONG THE ALLEY NORTH OF CEDARBRUSH FROM COX LN EAST IN ACCORDANCE WITH RAIL ROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4687 080.68587 418 INSTALL 20 FEET OF 4 INCH POLY ALONG WESSEX STREET. RESIDENTIAL NORTH RICHLAND HILLS GROWTH OCTOBER
MTX AdditionsPage 151 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4688 080.68588 22,700 INSTALL 60 FEET OF 2 INCH POLY ALONG PECAN RIDGE DRIVE. RESIDENTIAL NORTH RICHLAND HILLS GROWTH OCTOBER
4689 080.68591 710 RELOCATE FACILITIES. INSTALL 12 FEET OF 6 INCH POLY AND ABANDON 8 FEET OF 6 INCH POLY TO ACCOMMODATE SEWER PROJECT. ALL CUSTOMERS PLANO
RELOCATION OF FACILITIES SEPTEMBER
4690 080.68596 2,556 INSTALL 450 FEET OF 4 INCH POLY ALONG TATSCH WALD LANE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FREDERICKSBURG GROWTH DECEMBER
4691 080.68598 31,892 INSTALL 100 FEET OF 2 INCH POLY ALONG SOUTH MAIN STREET.COMMERCIAL OR
INDUSTRIAL MCGREGO GROWTH OCTOBER
4692 080.68619 350,300
INSTALL 2290 FEET OF 2 INCH POLY AND ABANDON 990 FEET OF 4 INCH CAST IRON, 940 FEET OF 4 INCH POLY, 15 FEET OF 6 INCH POLY, 10 FEET OF 8 INCH POLY, 330 FEET OF 2 INCH STEEL AND 5 FEET OF 2 INCH STEEL ALONG SONORA AVENUE AND OPAL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
4693 080.68620 49,065 INSTALL 2201 FEET OF 2 INCH POLY ALONG THE STREETS OF ROWE LANE EAST SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER
4694 080.68621 7,121 INSTALL 1177 FEET OF 2 INCH POLY ALONG THE STREETS OF CRYSTAL SPRINGS PHASE 3. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4695 080.68622 528,470
INSTALL 1520 FEET OF 2 INCH POLY AND 1310 FEET OF 4 INCH POLY AND ABANDON 415 FEET OF 4 INCH CAST IRON, 95 FEET OF 4 INCH POLY AND 1055 FEET OF 4 INCH STEEL ALONG IOWA AVENUE AND GEORGIA AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4696 080.68623 351,161
INSTALL 1640 FEET OF 4 INCH POLY AND ABANDON 1640 FEET OF 8 INCH CAST IRON ALONG CARPENTER AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4697 080.68624 13,790
INSTALL 1236 FEET OF 4 INCH AND 178 FEET OF 2 INCH POLY ALONG STREETS OF CRYSTAL SPRINGS PHASE 3 SECTION 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4698 080.68628 604,301
INSTALL 600 FEET OF 10 INCH STEEL AND ABANDON 486 FEET OF 10 INCH STEEL ALONG NEW YORK AVENUE AND BARDIN ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
4699 080.68633 71,080 INSTALL 468 FEET OF 2 INCH POLY ALONG PECAN STREET. RESIDENTIAL ABILENE GROWTH OCTOBER
4700 080.68646 309,950
INSTALL 1465 FEET OF 2 INCH POLY ALONG ROYAL CHAPEL DRIVE AND ABANDON 1465 FEET OF 2 INCH STEEL IN ACCORDANC WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4701 080.68650 896,515
INSTALL 2400 FEET OF 2 INCH POLY ALONG WILDFLOWER DRIVE AND ABANDON 2400 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4702 080.68651 5,680 PURCHASE SLIDING GATE FOR USE AT IRVING SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES JUNE
4703 080.68652 149,413
INSTALL 1075 FEET OF 6 INCH POLY AND ABANDON 5 FEET OF 4 INCH CAST IRON, 1040 FEET OF 8 INCH CAST IRON, 240 FEET OF 3 INCH STEEL AND 15 FEET OF 4 INCH STEEL ALONG S HASKELL AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4704 080.68653 3,156 INSTALL 1155 FEET OF 4 INCH POLY ALONG SAN JACINTO ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4705 080.68655 275,156
INSTALL 1245 FEET OF 4 INCH POLY AND ABANDON 1245 FEET OF 3 INCH STEEL ALONG GOODYEAR DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
4706 080.68656 528,103
INSTALL 1750 FEET OF 2 INCH AND 300 FEET OF 4 INCH POLY ALONG PONDER DR. AND ABANDON 1750 FEET OF 2 INCH AND 300 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4707 080.68657 681,525
INSTALL 1415 FEET OF 2 INCH POLY AND 845 FEET OF 4 INCH POLY AND ABANDON 1270 FEET OF 4 INCH CAST IRON AND 795 FEET OF 6 INCH CAST IRON IN ACORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4708 080.68659 285,356
INSTALL 1550 FEET OF 2 INCH POLY AND 545 FEET OF 4 INCH POLY AND ABANDON 1280 FEET OF 2 INCH CAST IRON, 190 FEET OF 4 INCH CAST IRON, 15 FEET OF 2 INCH POLY, 105 FEET OF 4 INCH POLY, 15 FEET OF 6 INCH POLY, 10 FEET OF 8 INCH POLY, 275 FEET OF 2 INCH STEEL AND 15 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4709 080.68662 37,286 INSTALL 3790 FEET OF 2 INCH AND 1450 FEET OF 4 INCH POLY ALONG THE STREETS OF OAKMONT. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH DECEMBER
4710 080.68665 (2,764)
RELOCATE FACILITIES. INSTALL 625 FEET OF 6 INCH POLY ALONG FM157 AND ABANDON 625 FEET OF 6 INCH STEEL TO ACCOMMODATE PALLADIUM VENUS DEVELOPMENT. ALL CUSTOMERS VENUS
RELOCATION OF FACILITIES DECEMBER
4711 080.68671 10,738 INSTALL 150 FEET OF 2 INCH POLY ALONG ERIE STREET. RESIDENTIAL CARROLLTON GROWTH SEPTEMBER
4712 080.68681 10,378 PURCHASE 3 INCH TO 6 INCH SQUEEZE TOOLS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4713 080.68682 411,252
INSTALL 1015 FEET OF 2 INCH, 350 FEET OF 4 INCH AND 180 FEET OF 6 INCH POLY ALONG WARD AND ABANDON 1288 FEET OF 4 INCH AND 270 FEET OF 2 INCH STEEL AND 116 FEET OF 6 INCH STEEL AND 656 FEET OF 3 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
4714 080.68689 70,834 INSTALL 340 FEET OF 2 INCH POLY ALONG LAKE STREET AND ABANDON 335 FEET OF 2 INCH POLY AND 20 FEET OF 1.25 INCH STEEL. ALL CUSTOMERS KRUM
SYSTEM INTEGRITY DECEMBER
4715 080.68692 118,277 INSTALL 3560 FEET OF 2 INCH AND 710 FEET OF 4 INCH POLY ALONG STREETS OF HEARTLAND PHASE 15. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH DECEMBER
4716 080.68694 363,132
INSTALL 1900 FEET OF 2 INCH POLY AND ABANDON 1700 FEET OF 4 INCH CAST IRON ALONG TOLUCA ABENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4717 080.68696 104,707
RELOCATE FACILITIES. INSTALL 1550 FEET OF 4 INCH POLY ALONG DAVID DR AND ABANDON 5 FEET OF 4 INCH AND 1010 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF BEDFORD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BEDFORD
SYSTEM INTEGRITY DECEMBER
4718 080.68698 204,955
RELOCATE FACILITIES. INSTALL 1400 FEET OF 4 INCH AND 80 FEET OF 2 INCH POLY ALONG SUFFOLK DRIVE AND ABANDON 1400 FEET OF 4 INCH AND 80 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4719 080.68703 10,339 INSTALL 150 FEET OF 2 INCH POLY ALONG HIGHWAY 11. RESIDENTIAL COMMERCE GROWTH DECEMBER
4720 080.68704 310,010
INSTALL 700 FEET OF 2 INCH POLY AND 740 FEET OF 4 INCH POLY AND ABANDON 5 FEET OF 3 INCH CAST IRON, 1670 FEET OF 4 INCH CAST IRON, 80 FEET OF 6 INCH CAST IRON, 825 FEET OF 8 INCH CAST IRON AND 155 FEET OF 8 INCH CAST IRON ALONG MCKINNEY AVENUE AND TRAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4721 080.68705 715,611
INSTALL 625 FEET OF 2 INCH AND 1120 FEET OF 4 INCH POLY AND ABANDON 1205 FEET OF 4 INCH, 350 FEET OF 6 INCH CAST IRON, 75 FEET OF 4 INCH POLY AND 45 FEET OF 4 INH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
4722 080.68710 6,976 INSTALL 40 FEET OF 2 INH POLY ALONG WOLFE STREET. RESIDENTIAL MCKINNEY GROWTH DECEMBER
4723 080.68711 319,221
INSTALL 1820 FEET OF 2 INCH POLY ALONG HARLANDALE AVENUE AND S EWING AVENUE AND ABANDON 35 FEET OF 4 INCH CAST IRON, 20 FEET OF 2 INCH POLY, 1240 FEET OF 2 INCH STEEL AND 500 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 152 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4724 080.68712 32,069
RELOCATE FACILITIES. INSTALL 126 FEET OF 2 INCH POLY AND ABANDON 28 FEET OF 2 INCH STEEL AND 63 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
4725 080.68713 579,056
INSTALL 3435 FEET OF 2 INCH POLY AND ABANDON 1570 FEET OF 4 INCH AND 1600 FEET OF 6 INCH CAST IRON AND 280 FEET OF 2 INCH STEEL ALONG VERMONT AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
4726 080.68714 283,859
INSTALL 1860 FEET OF 2 INCH POLY AND ABANDON 1285 FEET OF 4 INCH CAST IRON AND 580 FEET OF 4 INCH POLY ALONG VERNON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4727 080.68715 208,640 INSTALL 5850 FEET OF 4 INCH POLY AND 2600 FEET OF POLY ALONG PROMENADE BOULEVARD AND ENGLISH SETTER DRIVE IN ARLINGTON, TX. RESIDENTIAL ARLINGTON GROWTH DECEMBER
4728 080.68717 107,390
RELOCATE FACILITIES. INSTALL 285 FEET OF 6 INCH POLY ALONG MCLEROY BLVD AND ABANDON 285 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF SAGINAW IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW
SYSTEM INTEGRITY DECEMBER
4729 080.68721 2,658 PURCHASE (2) CRYSTAL DIGITAL OUNCE GAUGE FOR ABILENE DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4730 080.68723 12,198 INSTALL 150 FEET OF 2 INCH POLY AND ABANDON 150 FEET OF 2 INCH POLY ALONG BELTLINE ROAD. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY SEPTEMBER
4731 080.68724 33,310
RELOCATE FACILITIES. INSTALL 15 FEET OF 2 INCH POLY AND 70 FEET OF 4 INCH POLY AND ABANDON 12 FEET OF 2 INCH POLY AND 22 FEET OF 3 INCH STEEL AND 44 FEET OF 3 INCH POLY ALONG COTTAGE STREET TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
4732 080.68732 136,210
INSTALL 680 FEET OF 4 INCH POLY AND ABANDON 10 FEET OF 2 INCH AND 173 FEET OF 2 INCH POLY 180 FEET OF 3 INCH AND 309 FEET OF 2 INCH STEEL ALONG N. 13TH AND TREADAWAY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY OCTOBER
4733 080.68733 61,050
INSTALL 423 FEET OF 4 INCH POLY AND ABANDON 330 FEET OF 6 INCH STEEL AND 55 FEET OF 6 INCH POLY ALONG 8TH AND 9TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY OCTOBER
4734 080.68735 13,589 INSTALL 225 FEET OF 2 INCH POLY ALONG RIVER FAIR. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS BELTON GROWTH OCTOBER
4735 080.68739 (35,769)
RELOCATE FACILITIES. INSTALL 250 FEET OF 4 INCH POLY ALONG SOUTHWEST PARKWAY AND ABANDON 245 FEET OF 4 INCH POLY TO ACCOMMODATE CONFLICT WITH THE DART LINE. ALL CUSTOMERS COPPELL
RELOCATION OF FACILITIES DECEMBER
4736 080.68748 12,599
ABANDON 581 FEET OF 4 INCH STEEL AND 230 FEET OF 4 INCH POLY ALONG MARSHALL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS VERNON
SYSTEM INTEGRITY OCTOBER
4737 080.68749 437,590
INSTALL 1480 FEET OF 4 INCH AND 70 FEET OF 2 INCH POLY AND ABANDON 1720 FEET OF 4 INCH STEEL AND 3195 FEET OF 2 INCH STEEL AND 82 FEET OF 4 INCH POLY, 701 FEET OF 2 INCH POLY AND 55 FEET OF 1.25 INCH POLY ALONG PRINCETON AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
4738 080.68750 88,010
INSTALL 860 FEET OF 2 INCH POLY AND ABANDON 1141 FEET OF 2 INCH STEEL AND 297 FEET OF 2 INCH POLY ALONG WICHITA STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
4739 080.68751 472,630
INSTALL 1800 FEET OF 4 INCH POLY ALONG INDIAN TRAIL AND ABANDON 1800 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4740 080.68759 214,463
INSTALL 860 IF 4 INCH AAND 400 FEET OF 2 INCH POLY AND ABANDON 261 FEET OF 2 INCH STEEL AND 748 FEET OF 4 INCH STEEL ALONG 2ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WORTHAM
SYSTEM INTEGRITY DECEMBER
4741 080.68764 234,466
INSTALL 120 FEET OF 8 INCH POLY AND ABANDON 675 FEET OF 6 INCH STEEL ALONG BROWN TRAIL IN HURST IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY DECEMBER
4742 080.68766 304,118
INSTALL 2324 FEET OF 4 INCH POLY AND ABANDON 885 FEET OF 2 INCH POLY, 775 FEET OF 4 INCH CAST IRON, 640 FEET OF 2 INCH STEEL, 398 FEET OF 3 INCH STEEL, 302 FEET OF 6 INCH POLY AND 128 FEET OF 6 INCH STEEL ALONG 29TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4743 080.68769 274,338 INSTALL 2086 FEET OF 8 INCH POLY ALONG US75 SOUTH BEND. ALL CUSTOMERS MCKINNEYSYSTEM
IMPROVEMENT DECEMBER
4744 080.68781 5,483 INSTALL 70 FEET OF 2 INCH POLY ALONG MORGAN LANE.COMMERCIAL OR
INDUSTRIAL COLLEGE STATION GROWTH DECEMBER4745 080.68782 2,438 INSTALL 50 FEET OF 2 INCH POLY ALONG BANKS DRIVE. RESIDENTIAL BRYAN GROWTH JULY
4746 080.68788 19,917
RELOCATE FACILITIES. INSTALL RECTIFIER POLE ALONG NORTH PLANO ROAD AND ABANDON RECTIFIER POLE TO ACCOMMODATE DEVELOPMENT IN RICHARDSON. ALL CUSTOMERS RICHARDSON
RELOCATION OF FACILITIES DECEMBER
4747 080.68794 731,132
INSTALL 255 FEET OF 2 INCH POLY AND 1750 FEET OF 4 INCH POLY AND ABANDON 225 FEET OF 2 INCH STEEL AND 1810 FEET OF 3 INCH STEEL ALONG TIMBERVIEW ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4748 080.68796 2,071 PURCHASE PIPE SCRAPER FOR USE IN BRYAN DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4749 080.68798 178,673
INSTALL 725 FEET OF 4 INCH POLY AND ABANDON 384 FEET OF 4 INCH STEEL, 336 FEET OF 4 INCH CAST IRON, 57 FEET OF 4 INCH POLY ALONG OSCAR AVENUE AND HUTCHINSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4750 080.68799 266,438
ABANDON 565 FEET OF 4 INCH STEEL AND 445 FEET OF 4 INCH CAST IRON AND 160 FEET OF 6 INCH POLY ALONG CLINTON STEET AND HOUSTON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4751 080.68800 219,469
INSTALL 1365 FEET OF 4 INCH POLY AND ABANDON 1365 FEET OF 4 INCH CAST IRON ALONG WETWOOD AVENUE AND N BAILEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4752 080.68801 5,658 INSTALL 100 FEET OF 2 INCH POLY ALONG FARRIS ROAD. RESIDENTIAL DENTON GROWTH SEPTEMBER
4753 080.68803 271,880 INSTALL 1093 FEET OF 4 INCH POLY AND ABANDON 451 FEET OF 4 INCH CAST IRON AND 330 FEET OF 4 INCH STEE ALONG SCHWARTZ AVENUE. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4754 080.68804 453,265
INSTALL 2900 FEET OF 4 INCH POLY AND ABANDON 630 FEET OF 4 INCH CAST IRON, 1090 FEET OF 4 INCH STEEL, 705 FEET OF 4 INCH POLY ALONG ANTHONY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4755 080.68805 6,616 INSTALL 482 FEET OF 4 INCH POLY AND 708 FEET OF 2 INCH POLY ALONG THE STREETS OF SAULS RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4756 080.68806 30,817 INSTALL 1154 FEET OF 2 INCH POLY ALONG THE STREETS OF ROWE LANE EAST SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PFLUGERVILLE GROWTH DECEMBER
4757 080.68807 76,443
INSTALL 365 FEET OF 6 INCH POLY AND ABANDON 376 FEET OF 6 INCH STEEL ALONG BELTLINE ROAD AND PIONEER DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 153 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4758 080.68809 79,819
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG W. CHURCH STREET AND ABANDON 300 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF CLARKSVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLARKSVILLE
SYSTEM INTEGRITY DECEMBER
4759 080.68810 211,458
INSTALL 1053 FEET OF 2 INCH POLY AND ABANDON 1185 FEET OF 2 INCH STEEL AND 15 FEET OF 2 INCH POLY ALONG PULLEN AND E 2ND STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
4760 080.68811 5,120 INSTALL 1334 FEET OF 4 INCH AND 1896 FEET OF 2 INCH POLY ALONG STREETS OF VIZCAYA. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4761 080.68812 210,841
RELOCATE FACILITIES. INSTALL 1,152 FEET OF 2 INCH POLY, 177 FEET OF 4 INCH POLY, 1,319 FEET OF 6 INCH POLY ALONG PATTERSON LANE AND ABANDON 56 FEET OF 2 INCH POLY, 208 FEET OF 3 INCH POLY, 267 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF COLLEYVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
4762 080.68813 354,106
INSTALL 720 FEET OF 6 INCH POLY AND ABANDON 280 FEET OF 3 INCH STEEL AND 1276 FEET OF 4 INCH STEEL AND 549 FEET OF 4 INCH POLY ALONG N 1ST AND GARFIELD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY OCTOBER
4763 080.68814 92,544
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 400 FEET OF 2 INCH STEEL ALONG LEE STREET TO ACCOMMODATE THE CITY OF EVERMAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EVERMAN
SYSTEM INTEGRITY OCTOBER
4764 080.68815 7,089 INSTALL 60 FEET OF 2 INCH POLY ALONG PALASOTA. RESIDENTIAL BRYAN GROWTH OCTOBER
4765 080.68816 37,682
INSTALL 460 FEET OF 2 INCH POLY AND ABANDON 548 FEET OF 2 INCH STEEL AND 259 FEET OF 2 INCH POLY ALONG 4TH AND MAPLE STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GUNTER
SYSTEM INTEGRITY DECEMBER
4766 080.68820 7,235 INSTALL 230 FEET OF 2 INCH POLY ALONG PIONEER PARKWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GRAND PRAIRIE GROWTH DECEMBER
4767 080.68821 315,882
INSTALL 975 FEET OF 10 INCH STEEL AND ABANDON 975 FEET OF 10 INCH STEEL ALONG LONG BRANCH CIRCLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BARDWELL
SYSTEM INTEGRITY DECEMBER
4768 080.68823 558,748
INSTALL 2450 FEET OF 4 INCH POLY AND ABANDON 2430 FEET OF 6 INCH CAST IRON, 430 FEET OF 6 INCH POLY ALONG HENDERSON STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4769 080.68828 280,868
INSTALL 1451 FEET OF 4 INCH POLY AND ABANDON 1577 FEET OF 4 INCH CAST IRON ALONG BAILEY AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4770 080.68830 212,938
INSTALL 1475 FEET OF 2 INCH POLY AND ABANDON 1425 FEET OF 6 INCH CAST IRON AND 360 FEET OF 6 INCH POLY ALONG FOGG STREET IN ACCORDANCE WITH TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4771 080.68831 392,964
INSTALL 1542 FEET OF 4 INCH POLY AND ABANDON 1200 FEET OF 4 INCH CAST IRON, 342 FEET OF 4 INCH POLY ALONG DEWEY STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4772 080.68833 246,585
INSTALL 1030 FEET OF 4 INCH POLY AND ABANDON 771 FEET OF 4 INCH AND 264 FEET OF 4 INCH CAST IRON ALONG DEEN ED ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4773 080.68835 1,429 PURCHASE NEW GREASE GUN. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4774 080.68841 16,246 INSTALL 2375 FEET OF 6 INCH POLY AND 975 FEET OF 4 INCH POLY ALONG FM156. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4775 080.68843 20,756 INSTALL 80 FEET OF 2 INCH POLY ALONG CONNETT. ALL CUSTOMERS LEONARDSYSTEM
INTEGRITY DECEMBER
4776 080.68845 9,855 INSTALL 1250 FEET OF 4 INCH POLY ALONG COUNTY ROAD 504. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BLUE RIDGE GROWTH DECEMBER
4777 080.68848 22,488
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AND ABANDON 20 FEET OF 2 INCH POLY ALONG MINGO STREET TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4778 080.68852 16,635 INSTALL 575 FEET OF 4 INCH POLY ALONG LONG PRAIRIE ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FLOWER MOUND GROWTH DECEMBER
4779 080.68863 72,866
INSTALL 1020 FEET OF 2 INCH POLY AND ABANDON 550 FEET 2 INCH STEEL AND 560 FEET OF 2 INCH POLY ALONG ARTHUR STREET AND EAST 1ST IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
4780 080.68868 321,196
INSTALL 1695 FEET OF 2 INCH POLY AND ABANDON 1160 FEET OF 3 INCH STEEL, 560 FEET OF 2 INCH STEEL AND 148 FEET OF 1.25 INCH STEEL AND 895 FEET OF 2 INCH POLY AND 20 FEET OF 1.25 INCH POLY ALONG NORTH PENN STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK
SYSTEM INTEGRITY DECEMBER
4781 080.68869 104,365
INSTALL 910 FEET OF 2 INCH POLY ALONG NORTH TEXOWA STREET AND ABANDON 761 FEET OF 3 INCH STEEL AND 137 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK
SYSTEM INTEGRITY DECEMBER
4782 080.68871 73,152
RELOCATE FACILITIES. INSTALL 785 FEET OF 4 INCH POLY ALONG ROCKHILL ROAD AND ABANDON 730 FEET OF 3 INCH STEEL, 30 FEET OF 3 INCH POLY AND 25 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
4783 080.68873 384,188
RELOCATE FACILITIES. INSTALL 920 FEET OF 6 INCH, 200 FEET OF 4 INCH POLY ALONG BOSQUE AND ABANDON 920 FEET OF 6 INCH, 10 FEET OF 8 INCH AND 10 FEET OF 4 INCH STEEL AND 65 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF WACO STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4784 080.68874 15,927
INSTALL DISTRICT REGULATOR STATION IN BRYAN ALONG NUCHES LANE AND SCOTT STREET AND ABANDON DISTRICT REGULATOR STATION ML-21 IN ACCORDANCE WITH THE RAILRAOD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY OCTOBER
4785 080.68877 84,978
RELOCATE FACILITIES. INSTALL 173 FEET OF 2 INCH POLY AND 84 FEET OF 4 INCH POLY AND ABANDON 4 FEET OF 1.25 INCH POLY AND 80 FEET OF 2 INCH STEEL AND 72 FEET OF 2 INCH POLY AND 69 FEET OF 3 INCH STEEL AND 80 FEET OF 4 INCH STEEL ALONG AVE M TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY OCTOBER
4786 080.68906 25,472 INSTALL 1863 FEET OF 2 INCH POLY ALONG THE STREETS OF THE WESTON RIDGE SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH DECEMBER
4787 080.68914 1,363 INSTALL 1125 FEET OF 4 INCH POLY ALONG GEORGE BUSH FREEWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL PLANO GROWTH DECEMBER
4788 080.68915 5,704 INSTALL 250 FEET OF 2 INCH POLY ALONG SOUTH WRIGHT STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL CALDWELL GROWTH DECEMBER
4789 080.68919 111,840
INSTALL 1800 FEET OF 4 INCH POLY AND ABANDON 3000 FEET OF 3 INCH STEEL ALONG COMMERCE STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARLIN
SYSTEM INTEGRITY DECEMBER
4790 080.68923 104,754
INSTALL 911 FEET OF 2 INCH POLY AND ABANDON 119 FEET OF 2 INCH STEEL AND 134 FEET OF 3 INCH STEEL AND 64 FEET OF 3 INCH POLY AND 527 FEET OF 4 INCH STEEL ALONG HUGHES STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS QUANAH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 154 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4791 080.68924 375,584
INSTALL 500 FEET OF 4 INCH POLY AND 1000 FEET OF 2 INCH POLY AND ABANDON 615 FEET OF 2 INCH AND 875 FEET OF 3 INCH STEEL ALONG ALTA VIST DRIVE IN ACCORDANCE WITH RAILROAD OCMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4792 080.68926 (4,089)
RELOCATE FACILITIES. INSTALL 470 FEET OF 2 INCH POLY IN A PUE AT THE METHODIST HOME AND ABANDON 390 FEET OF 2 INCH POLY AND 30 FEET OF 2 INCH STEEL TO ACCOMMODATE THE METHODIS HOME PROJECT. ALL CUSTOMERS WACO
RELOCATION OF FACILITIES DECEMBER
4793 080.68927 1,053,150
RELOCATE FACILITIES. INSTALL 615 FEET OF 2 INCH POLY, 834 FEET OF 4 INCH POLY, 3050 FEET OF 6 INCH POLY ALONG TXDOT SH205 TO ACCOMMODATE CITY OF TERRELL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TERRELL
SYSTEM INTEGRITY DECEMBER
4794 080.68930 4,369 INSTALL 325 FEET OF 2 INCH POLY ALONG GLADE ROAD.COMMERCIAL OR
INDUSTRIAL COLLEYVILLE GROWTH DECEMBER
4795 080.68931 60,119
RELOCATE FACILITIES. INSTALL 500 FEET OF 2 INCH POLY ALONG HWY 180 AND ABANDON 500 FEET OF 3 INCH POLY TO ACCOMMODATE TXDOT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALBANY
SYSTEM INTEGRITY DECEMBER
4796 080.68932 115,462
INSTALL 40 FEET OF 4 INCH AND 520 FEET OF 2 INCH POLY ALONG ELM STREET AND ABANDON 524 FEET OF 2 INCH, 29 FEET OF 3 INCH AND 11 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLYDE
SYSTEM INTEGRITY DECEMBER
4797 080.68956 393,937
INSTALL 1845 FEET OF 2 INCH POLY ALONG CRESTWOOD DR AND ABANDON 1690 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4798 080.68957 72,062
INSTALL 620 FEET OF 4 INCH POLY ALONG HUACO LANE AND ABANDON 620 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4799 080.68958 137,355
INSTALL 50 FEET OF 12 INCH POLY, 200 FEET OF 8 INCH POLY, 134 FEET OF 4 INCH POLY AND 20 FEET OF 6 INCH POLY AND ABANDON 39 FEET OF 10 INCH STEEL, 292 FEET OF 8 INCH STEEL AND 155 FEET OF 3 INCH STEEL AND 128 FEET OF 3 INCH POLY ALONG S. 27TH AND SANTA MONICA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
4800 080.68960 171,915
INSTALL 1200 FEET OF 4 INCH POLY ALONG OLDHAM LANE AND ABANDON 465 FEET OF 4 INCH AND 1058 FEET OF 3 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
4801 080.68967 158,306 INSTALL 800 FEET OF 4 INCH POLY AND 2500 FEET OF 2 INCH POLY ALONG THE STREETS OF STONE RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GARLAND GROWTH DECEMBER
4802 080.68990 138,917
INSTALL 940 FEET OF 6 INCH POLY ALONG MONTECITO AND ABANDON 940 FEET OF 8 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAN ANGELO
SYSTEM INTEGRITY DECEMBER
4803 080.68991 113,624
INSTALL 825 FEET OF 2 INCH POLY ALONG ARDATH AND ABANDON 882 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
4804 080.68996 590,668
INSTALL 4150 FEET OF 4 INCH POLY ALONG ELIZABETH AVENUE AND ABANDON 550 FEET OF 6 CAST IRON, 600 FEET OF 6 INCH STEEL, 900 FEET OF 4 INCH STEEL, 950 FEET OF 6 INCH POLY, 1550 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4805 080.69000 435,543
INSTALL 2200 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH CAST IRON, 105 FEET OF 4 INCH STEEL ALONG BALDWIN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4806 080.69006 217,260
INSTALL 1675 FEET OF 4 INCH POLY AND ABANDON 188 FEET OF 4 INCH STEEL, 1120 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4807 080.69008 291,979
INSTALL 1775 OF 4 INCH POLY AND ABANDON 2055 FEET OF 6 INCH CAST IRON ALONG GAMBRELL STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4808 080.69010 27,223
RELOCATE FACILITIES. INSTALL 3 LONGSIDE SERVICE LINES AND ABANDON 3 LONGSIDE TO ACCOMMODATE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4809 080.69011 308,160
INSTALL 1930 FEET OF 4 INCH POLY AND ABANDON 1865 FEET OF 4 INCH CAST IRON ALONG 27TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4810 080.69012 227,928
INSTALL 1483 FEET OF 4 INCH POLY AND ABANDON 685 FEET OF 4 INCH CAST IRON, 501 FEET OF 4 INCH POLY, 79 FEET OF 6 INCH POLY ALONG CLIFF STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4811 080.69013 252,599
INSTALL 1650 FEET OF 4 INCH POLY AND ABANDON 1600 FEET OF 6 INCH CAST IRON ALONG GAMBRELL STREET IN ACCORDACNE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4812 080.69014 923,031
INSTALL 2185 FEET OF 2 INCH POLY ALONG WILDER STREET AND ABANDON 1590 FEET OF 4 INCH CAST IRON AND 465 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4813 080.69015 492,564
INSTALL 1540 FEET OF 2 INCH POLY AND 775 FEET OF 4 INCH POLY AND ABANDON 690 FEET OF 4 INCH CAST IRON AND 1570 FEET OF 6 INCH CAST IRON ALONG MARYLAND AVENUE AND MARSALIS AVENUE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4814 080.69016 479,132
INSTALL 1695 FEET OF 2 INCH POLY AND ABANDON 1670 FEET OF 6 INCH CAST IRON ALONG TERRACE DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4815 080.69019 30,801 PURCHASE POLY SQUEEZE TOOLS FOR USE IN ABILENE DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4816 080.69023 3,403 PURCHASE (1) LOCATOR RECEIVER FOR USE IN STEPHENVILLE DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4817 080.69024 666,389
INSTALL 2898 FEET OF 2 INCH POLY AND ABANDON 3375 FEET OF 2 INCH STEEL ALONG CALYPSO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4818 080.69026 853,495
INSTALL 2553 FEET OF 2 INCH POLY AND ABANDON 2451 FEET OF 2 INCH STEEL AND 110 FEET OF 2 INCH POLY ALONG ANGELINA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4819 080.69051 1,092,985
INSTALL 2650 FEET OF 2 INCH POLY ALONG LEATH AND ABANDON 2650 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4820 080.69052 1,488,797
INSTALL 200 FEET OF 2 INCH AND 3315 FEET OF 4 INCH POLY ALONG BAYSIDE AND ABANDON 3500 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4821 080.69055 26,250 INSTALL 325 FEET OF 2 INCH POLY ALONG HOOK STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HICKORY CREEK GROWTH DECEMBER
4822 080.69056 354,405
INSTALL 285 FEET OF 2 INCH AND 2000 FEET OF 4 INCH POLY AND ABANDON 285 FEET OF 4 INCH, 1745 FEET OF 8 INCH CAST IRON AND 255 FEET OF 8 INCH POLY ALONG SAMUELL BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 155 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4823 080.69057 351,795
INSTALL 1435 FEET OF 2 INCH POLY AND ABANDON 1415 FEET OF 6 INCH CAST IRON ALONG MCNEIL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4824 080.69061 88,785
RELOCATE FACILITIES. INSTALL 25 POLY SERVICES AND ABANDON 25 POLY SERVICES ALONG KIRKMEADOW LANE TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4825 080.69064 7,343 PURCHASE 3 NEW LOCATORS FOR MCKINNEY DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JULY
4826 080.69077 146,610
RELOCATE FACILITIES. INSTALL 1840 FEET OF 4 INCH POLY ALONG LONGHORN TRAIL AND ABANDON 1840 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF CROWLEY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CROWLEY
SYSTEM INTEGRITY DECEMBER
4827 080.69087 16,303 INSTALL 2997 FEET OF 2 INCH POLY ALONG THE STREETS OF CARNEROS RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
4828 080.69100 23,382 INSTALL 95 FEET OF 2 INCH POLY ALONG WEST 19TH STREET IN GEORGETOWN, TX. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4829 080.69101 42,022
RELOCATE FACILITIES. INSTALL 86 FEET OF 4 INCH POLY AND ABANDON 79 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT ALONG OLYMPIC DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
4830 080.69104 27,803 INSTALL 750 FEET OF 2 INCH AND 325 FEET OF 2 INCH POLY ALONG BENNETT STREET. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH DECEMBER
4831 080.69106 21,479 PURCHASE - 3 DESKTOP, 6 MONITORS, AND 6 LAPTOPS FOR USE IN DALLAS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT SEPTEMBER
4832 080.69111 131,440 INSTALL 2650 FEET OF 6 INCH POLY ALONG PRAIRIE ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FLOWER MOUND GROWTH DECEMBER
4833 080.69116 379,213
RELOCATE FACILITIES. INSTALL 2181 FEET OF 6 INCH POLY ALONG FM 455 AND ABANDON 2131 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF SANGER STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
4834 080.69124 8,451 INSTALL 215 FEET OF 2 INCH POLY ALONG GREENS PRAIRIE ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH SEPTEMBER
4835 080.69146 66,490 INSTALL 1985 FEET OF 2 INCH POLY ALONG THE STREETS OF SUN CITY SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4836 080.69149 10,480 PURCHASE REPLACEMENT TOOLS FOR USE IN SHERMAN DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT SEPTEMBER
4837 080.69151 1,849 PURCHASE (1) SENSIT FOR USE IN SHERMAN DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4838 080.69152 21,183 INSTALL 1330 FEET OF 4 INCH POLY ALONG TEHAMA RIDGE PARKWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
4839 080.69154 8,632 INSTALL 670 FEET OF 4 INCH POLY ALONG TEHAMA RIDGE PARKWAY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4840 080.69159 199,483
INSTALL 2150 FEET OF 4 INCH POLY AND ABANDON 1375 FEET OF 4 INCH CAST IRON, 540 FEET OF 6 INCH CAST IRON, 265 FEET OF 6 INCH STEEL ALONG BEDDELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4841 080.69161 158,290
INSTALL 1300 FEET OF 4 INCH POLY AND ABANDON 1550 FEET OF 4 INCH CAST IRON ALONG BEDDELL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4842 080.69162 173,103
INSTALL 2009 FEET OF 4 INCH POLY AND ABANDON 813 FEET OF 4 INCH STEEL AND 1007 FEET OF 4 INCH POLY ALONG CLIFF STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4843 080.69164 73,005
INSTALL 285 FEET OF 4 INCH POLY ALONG COOKE AND ABANDON 285 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXA RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
4844 080.69167 223,735
INSTALL 1405 FEET OF 2 INCH AND 820 FEET OF 4 INCH POLY AND ABANDON 925 FEET OF 2 INCH, 1195 FEET OF 4 INCH CAST IRON AND 105 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4845 080.69168 353,713
INSTALL 1375 FEET OF 2 INCH POLY ALONG LLANO AVENUE AND ABANDON 1365 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4846 080.69169 601,215
INSTALL 1945 FEET OF 2 INCH POLY AND ABANDON 1900 FEET OF 4 INCH CAST IRON ALONG VELASCO AVENUE IN ACCORDANE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4847 080.69170 44,749 REPLACE FARM TAP AND 5 FEET OF STEEL ALONG LINE W7. ALL CUSTOMERS JUSTINSYSTEM
INTEGRITY DECEMBER
4848 080.69171 355,664
INSTALL 2135 FEET OF 2 INCH POLY AND ABANDON 1695 FEET OF 4 INCH CAST IRON, 480 FEET OF 8 INCH CAST IRON AND 170 FEET OF 4 INCH STEEL ALONG FITZHUGH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4849 080.69172 864,636
INSTALL 60 FEET OF 2 INCH AND 2115 FEET OF 4 INCH POLY AND ABANDON 190 FEET OF 4 INCH, 1675 FEET OF 8 INCH CAST IRON, 135 FEET OF 8 INCH POLY AND 105 FEET OF 8 INCH STEEL ALONG WASHINGTON AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4850 080.69173 782,341
INSTALL 185 FEET OF 2 INCH POLY, 925 FEET OF 4 INCH POLY AND ABANDON 510 FEET OF 4 INCH CAST IRON, 410 FEET OF 6 INCH CAST IRON, 1675 FEET OF 8 INCH CAST IRON, 160 FEET OF 2 INCH STEEL AND 155 FEET OF 3 INCH STEEL ALONG PEAK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
4851 080.69175 4,215 INSTALL 760 FEET OF 2 INCH POLY ALONG HAMPTON HILLS.COMMERCIAL OR
INDUSTRIAL ABILENE GROWTH DECEMBER
4852 080.69176 157,690
INSTALL 1670 FEET OF 2 INCH POLY AND 345 FEET OF 4 INCH POLY AND ABANDON 1670 FEET OF 4 INCH CAST IRON AND 345 FEET OF 8 INCH CAST IRON ALONG STANFORD AVENUE AND AMHERST AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4853 080.69177 501,930
INSTALL 1925 FEET OF 2 INCH POLY ALONG DELMAR AVENUE AND ABANDON 1850 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4854 080.69178 508,821
INSTALL 500 FEET OF 6 INCH AND 2200 FEET OF 4 INCH POLY AND ABANDON 2075 FEET OF 4 INCH CAST IRON, 500 FEET OF 8 INCH CAST IRON AND 50 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4855 080.69179 441,468
INSTALL 1850 FEET OF 2 INCH POLY AND ABANDON 765 FEET OF 4 INCH CAST IRON, 995 FEET OF 8 INCH CAST IRON ALONG ELMWOOD BLVD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4856 080.69180 353,984
INSTALL 2020 FEET OF 2 INCH POLY ALONG BRITTON DRIVE AND ABANDON 1980 FEET OF 4 INCH CAST IRON, 30 FEET OF 6 INCH CAST IRON AND 10 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4857 080.69181 500,537
INSTALL 1750 FEET OF 4 INCH POLY AND RETIRE 1275 FEET OF 4 INCH CAST IRON AND 500 FEET OF 4 INCH STEEL ALONG AVENUE J IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4858 080.69184 21,471 INSTALL 100 FEET OF 2 INCH POLY ALONG BACK EASEMENT.COMMERCIAL OR
INDUSTRIAL NORTH RICHLAND HILLS GROWTH DECEMBER
MTX AdditionsPage 156 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4859 080.69189 13,803 PURCHASE (1) ELECTROFUSION PROCESSOR AND SQUEEZE TOOLS FOR USE IN DALLAS DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT JUNE
4860 080.69190 129,669 INSTALL 750 FEET OF 4 INCH AND 180 FEET OF 2 INCH POLY ALONG SOUTH OLD TEMPE ROAD. ALL CUSTOMERS HEWITT GROWTH DECEMBER
4861 080.69191 3,445 PURCHASE 2" MISSILE AND KIT FOR GROESBECK. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT SEPTEMBER
4862 080.69192 2,828 INSTALL 725 FEET OF 2 INCH POLY ALONG CHAPEL BOULEVARD.COMMERCIAL OR
INDUSTRIAL SOUTHLAKE GROWTH DECEMBER
4863 080.69197 12,615 INSTALL 1200 FEET OF 2 INCH POLY ALONG THE STREETS OF GARDEN HOMES SUBDIVISION IN HEWITT TEXAS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEWITT GROWTH DECEMBER
4864 080.69199 227,166 INSTALL 1275 FEET OF 6 INCH AND 6350 FEET OF 2 INCH POLY ALONG STREETS OF TRAILSTONE PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CADDO MILLS GROWTH DECEMBER
4865 080.69200 5,526 PURCHASE (1) ODORATOR FOR USE IN ATHENS DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT JUNE
4866 080.69201 21,550 INSTALL 2,335 FEET OF 2 INCH POLY ALONG STREETS OF MIRAMONT SECTION 7. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH DECEMBER
4867 080.69204 20,486 ROOF REPAIR IN BOWIE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
4868 080.69205 146,200
INSTALL 890 FEET OF 2 INCH POLY AND ABANDON 540 FEET OF 8 INCH CAST IRON ALONG BOEDECKER DRIVE AND N CENTERAL EXPY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4869 080.69206 705,470
INSTALL 1390 FEET OF 2 INCH POLY, 725 FEET OF 4 INCH POLY ALONG BRIARWOOD LANE AND ABANDON 1390 FEET OF 4 INCH CAST IRON AND 725 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4870 080.69207 389,621
INSTALL 2275 FEET OF 2 INCH POLY, 200 FEET OF 6 INCH POLY AND ABANDON 300 FEET OF 4 INCH CAST IRON, 1940 FEET OF 6 INCH CAST IRON AND 235 FEET OF 8 INCH CAST IRON ALONG CORNELIA LANE AND ALEXANDER DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4871 080.69208 642,428
INSTALL 2030 FEET OF 4 INCH POLY AND ABANDON 1305 FEET IF 4 INCH CAST IRON, 385 FEET OF 4 INCH STEEL ALONG REED LN IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4872 080.69209 653,386
INSTALL 1660 FEET OF 2 INCH POLY AND 450 FEET OF 4 INCH POLY AND ABANDON 1125 FEET OF 4 INCH CAST IRON, 610 FEET OF 6 INCH CAST IRON AND 355 FEET OF 8 INCH CAST IRON ALONG EDGEFIELD AVENUE AND S POLK STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4873 080.69212 200,566
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY, 100 FEET OF 4 INCH POLY AND AND ABANDON 50 FEET OF 6 INCH AND 100 FEET OF 4 INCH STEEL ALONG WHITE SETTLEMENT ROAD TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4874 080.69213 54,132
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG PINE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4875 080.69220 27,884
INSTALL DISTRICT REGULATOR STATION IN ABILENE AND ABANDON DISTRICT REGULATOR STATION DRS025 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
4876 080.69222 11,375
RELOCATE FACILITIES. INSTALL 60 FEET OF 6 INCH POLY ALONG COOK LANE AND ABANDON 35 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PROSPER IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PROSPER
SYSTEM INTEGRITY DECEMBER
4877 080.69223 4,006 INSTALL 135 FEET OF 2 INCH POLY ALONG EAST MORRIS DRIVE. RESIDENTIAL MADISONVILLE GROWTH OCTOBER
4878 080.69224 63,022
REPLACE DISTRICT REGULATOR STATION #46 IN WACO AND ABANDON EXISTING DRS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4879 080.69226 586,115
INSTALL 2265 FEET OF 4 INCH POLY ALONG ATLANTA STREET AND ABANDON 1600 FEET OF 4 INCH CAST IRON, 575 FEET OF 6 INCH CAST IRON AND 25 FEET OF 6 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4880 080.69227 294,131
INSTALL 1290 FEET OF 2 INCH POLY AND ABANDON 1290 FEET OF 4 INCH CAST IRON ALONG WHITWORTH STREET IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4881 080.69235 39,519
INSTALL 1950 FEET OF 4 INCH POLY AND 5140 FEET OF 2 INCH POLY ALONG THE STREETS OF SILVER OAKS SUBDIVISION IN MANSFIELD TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MANSFIELD GROWTH DECEMBER
4882 080.69237 377,380 INSTALL 1572 FEET OF 4 INCH POLY AND 13998 FEET OF 2 INCH POLY ALONG CHARTWELL CREST. RESIDENTIAL FARMERS BRANCH GROWTH DECEMBER
4883 080.69238 15,408 INSTALL 200 FEET OF 2 INCH POLY ALONG DODGE AVENUE. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4884 080.69248 69,439
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION, 95 FEET OF 4 INCH STEEL AND INSTALL 5 FEET OF 2 INCH, 95 FEET OF 4 INCH POLY ALONG LEON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON
SYSTEM INTEGRITY DECEMBER
4885 080.69262 6,697
INSTALL DISTRICT REGULATOR STATION AND ABANDON DISTRICT REGULATOR STATION ALONG TRINITY BLVD AND POST OAK BLVD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY JULY
4886 080.69274 290,346
INSTALL 1875 FEET OF 4 INCH POLY AND ABANDON 1450 FEET OF 4 INCH CAST IRON ALONG WEST PAFFORD STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4887 080.69275 500,597
INSTALL 1580 FEET OF 4 INCH POLY AND ABANDON 986 FEET OF 4 INCH CAST IRON, 424 FEET OF 6 INCH POLY ALONG DEEN AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4888 080.69277 138,382
INSTALL 1482 FEET OF 4 INCH POLY, AND ABANDON 859 FEET OF 4 INCH CAST IRON, 533 FT OF 4 INCH POLY ALONG REFUGIO AVENUE IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY SEPTEMBER
4889 080.69282 32,352 INSTALL 1150 FEET OF 2 INCH POLY ALONG THE STREETS OF HUNTON ESTATES SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROBINSON GROWTH DECEMBER
4890 080.69284 31,067 INSTALL 1815 FEET OF 4 INCH POLY ALONG JACK KULTGEN EXPRESSWAY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS WACO GROWTH DECEMBER
4891 080.69295 7,683
INSTALL 366 FEET OF 6 INCH 1122 FEET OF 4 INCH AND 1277 FEET OF 2 INCH POLY ALONG THE STREETS OF SONOMA CONDOS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROUND ROCK GROWTH DECEMBER
4892 080.69296 48,427 INSTALL 270 FEET OF 4 INCH POLY AND 560 FEET OF 2 INCH POLY ALONG STREETS OF STAR PARK DEVELOPMENT. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL IRVING GROWTH DECEMBER
4893 080.69301 18,568 INSTALL 100 FEET OF 2 INCH POLY ALONG SHADY OAK GROVE ROAD. RESIDENTIAL KELLER GROWTH DECEMBER
4894 080.69302 359,232
INSTALL 2265 FEET OF 2 INCH POLY MARYLAND AVENUE AND ABANDON 2065 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4895 080.69303 503,441
INSTALL 2140 FEET OF 2 INCH AND 365 FEET OF 4 INCH POLY AND ABANDON 1590 FEET OF 6 INCH CAST IRON AND 765 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
4896 080.69304 540,747
INSTALL 3060 FEET OF 2 INCH POLY AND ABANDON 1895 FEET OF 4 INCH CAST IRON, 285 FEET OF 4 INCH POLY AND 440 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY OCTOBER
MTX AdditionsPage 157 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4897 080.69306 56,900 INSTALL 750 FEET OF 2 INCH AND 1200 FEET OF 4 INCH POLY ALONG THE STREETS OF MIDTOWN RESERVE. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
4898 080.69307 30,940
INSTALL 3,080 FEET OF 2 INCH, 100 FEET OF 4 INCH, AND 1,100 FEET OF 6 INCH POLY ALONG STREETS OF AUSTIN'S COLONY PHASE 20. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BRYAN GROWTH DECEMBER
4899 080.69308 17,854 INSTALL 1645 FEET OF 4 INCH POLY AND 1130 FEET OF 2 INCH POLY ALONG THE STREETS OF QYEST PROPERTIES. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL WACO GROWTH DECEMBER
4900 080.69309 15,993 INSTALL 650 FEET OF 2 INCH POLY ALONG MAIN STREET. RESIDENTIAL GRAPEVINE GROWTH DECEMBER
4901 080.69312 194,025
RELOCATE FACILITIES. INSTALL 1300 FEET OF 4 INCH POLY AND 150 FEET OF 6 INCH STEEL ALONG SPRING VALLEY ROAD/ FM 2113 AND ABANDON 270 FEET OF 3 INCH POLY TO ACCOMMODATE CITY OF HEWITT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HEWITT
SYSTEM INTEGRITY DECEMBER
4902 080.69313 280,135
RELOCATE FACILITIES. 2617 FEET OF 2 INCH POLY ALONG GRANDVIEW AND ABANDON 2266 FEET OF 2 INCH AND 351 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4903 080.69315 960,138
INSTALL 180 FEET OF 12 INCH, 2060 FEET OF 8 INCH, 1100 FEET OF 6 INCH AN 285 FEET OF 2 INCH POLY AND ABANDON 2180 FEET OF 16 INCH STEEL, 50 FEET OF 8 INCH POLY, 150 FEET OF 6 INCH STEEL AND 150 FEET OF 2 INCH STEEL IN ACCORDANE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY SEPTEMBER
4904 080.69318 20,801 INSTALL 90 FEET OF 2 INCH POLY ALONG PEARL STREET.COMMERCIAL OR
INDUSTRIAL GRANBURY GROWTH DECEMBER
4905 080.69321 5,403 INSTALL 2555 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD SUBDIVISION IN SUNNYVALE TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SUNNYVALE GROWTH DECEMBER
4906 080.69323 356,982
INSTALL 1800 FEET OF 2 INCH POLY AND ABANDON 1565 FEET OF 4 INCH, 485 FEET OF 6 INCH CAST IRON, 170 FEET OF 2 INCH AND 20 FEET OF 4 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4907 080.69331 63,100
INSTALL 5 FEET OF 2 INCH STEEL ALONG CR 186 AND ABANDON 5 FEET OF 2 INCH STEEL IN ACCRODANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS COOLIDGE
SYSTEM INTEGRITY DECEMBER
4908 080.69332 13,412 INSTALL 180 FEET OF 2 INCH POLY ALONG ADELINE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL WACO GROWTH DECEMBER
4909 080.69342 66,465 INSTALL 450 FEET OF 2 INCH POLY ALONG THE STREETS OF STARBUCKS DRIVE. RESIDENTIAL DALLAS GROWTH DECEMBER
4910 080.69344 307,305
RELOCATE FACILITIES. 2510 FEET OF 2 INCH POLY ALONG DESSERT RIDGE DRIVE AND ABANDON 416 FEET OF 2 INCH, 2079 FEET OF 3 INCH AND 15 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4911 080.69345 17,078 INSTALL 166 FEET OF 2 INCH POLY ALONG THE STREETS OF BRENTWOOD SUBDIVISION. RESIDENTIAL SAN ANGELO GROWTH DECEMBER
4912 080.69349 82,439
RELOCATE FACILITIES. INSTALL 20 FEET OF 6 INCH POLY ALONG GARAPAN DR AND ABANDON 20 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4913 080.69354 24,355 INSTALL 280 FEET OF 2 INCH POLY ALONG FAA BOULEVARD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
4914 080.69373 256,165 INSTALL DRS 423 AND ABANDON DRS 423 ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4915 080.69375 307,194
INSTALL 1600 FEET OF 6 INCH POLY ALONG OLD ANSON ROAD AND HWY 277 AND ABANDON 792 FEET OF 4 INCH STEEL AND 791 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
4916 080.69403 185,263 INSTALL 4075 FEET OF 2 INCH POLY ALONG THE STREETS OF NORTHSTAR SUBDIVISION IN FORT WORTH TX. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4917 080.69404 (106,874)
RELOCATE FACILITIES. INSTALL 830 FEET OF 4 INCH POLY AND ABANDON 680 FEET OF 4 INCH AND 140 FEET OF 2 INCH POLY ALONG LBJ TO ACCOMMODATE TXDOT PROJECT. ALL CUSTOMERS GARLAND
RELOCATION OF FACILITIES DECEMBER
4918 080.69406 177,406 INSTALL 4070 FEET OF 4 INCH POLY AND 3020 FEET OF 2 INCH POLY ALONG THE STREETS OF REGAL RIDGE SUBDIVISION IN HASLET TX. RESIDENTIAL HASLET GROWTH DECEMBER
4919 080.69417 88,809
RELOCATE FACILITIES. INSTALL 320 FEET OF 6 INCH, 30 FEET OF 4 INCH AND 30 FEET OF 2 INCH POLY ALONG W MORPHY STREET AND ABANDON 320 FEET OF 6 INCH, 25 FEET OF 4 INCH AND 25 FEET OF 2 INCH STEEL 5 FEET OF 4 INCH AND 5 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4920 080.69420 99,102
RELOCATE FACILITIES. INSTALL 630 FEET OF 4 INCH AND 150 FEET OF 2 INCH POLY ALONG DENVER AVENUE AND ABANDON 780 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF FORT WORTH STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4921 080.69423 3,281 INSTALL 414 FEET OF 2 INCH POLY ALONG JOHN BURGESS. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4922 080.69426 67,662
RELOCATE FACILITIES. INSTALL 540 FEET OF 4 INCH POLY ALONG FOSTER AND ABANDON 520 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEGE STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY OCTOBER
4923 080.69430 290,687
INSTALL 2000 FEET OF 4 INCH POLY ALONG AVENUE L IN FORT WORTH AND ABANDON 1700 FEET OF 4 INCH CAST IRON, 300 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4924 080.69432 77,135
INSTALL 596 FEET OF 4 INCH POLY AND ABANDON 596 FEET OF 4 INCH POLY ALONG COOPER MOUNTAIN DRIVE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
4925 080.69433 198,105
INSTALL 675 FEET OF 4 INCH POLY, AND ABANDON 670 FEET OF 4 INCH STEEL, 58 FEET OF 4 INCH POLY ALONG HUTHCINSON STREET AND HALE AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4926 080.69434 316,748
INSTALL 1700 FEET OF 4 INCH POLY ALONG AVENUE M IN FORT WORTH TX AND ABANDON 1300 FEET OF 4 INCH CAST IRON, 400 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4927 080.69435 215,517
INSTALL 1300 FEET OF 2 INCH POLY ALONG CHERRYWOOD AVENUE AND ABANDON 920 FEET OF 4 INCH CAST IRON, 345 FEET OF 8 INCH CAST IRON, 10 FEET OF 4 INCH POLY AND 25 FEET OF 8 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4928 080.69436 722,503
INSTALL 1690 FEET OF 2 INCH AND 760 FEET OF 4 INCH POLY AND ABANDON 1545 FEET OF 4 INCH AND 760 FEET OF 6 INCH CAST IRON ALONG IILINOIS AVENUE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4929 080.69437 295,126
INSTALL 1300 FEET OF 2 INCH POLY AND ABANDON 1160 FEET OF 4 INCH AND 780 FEET OF 6 INCH CAST IRON ALONG 7TH STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 158 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4930 080.69438 484,225
INSTALL 1015 FEET OF 2 INCH POLY AND 650 FEET OF 4 INCH POLY AND ABANDON 1535 FEET OF 4 INCH CAST IRON AND 100 FEET OF 4 INCH POLY ALONG TRAVIS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4931 080.69439 27,791
INSTALL 385 FEET OF 2 INCH POLY ALONG LOUIS J. RODRQUEZ AND ABANDON 385 FEET OF 2 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
4932 080.69440 297,532
INSTALL 720 FEET OF 4 INCH POLY AND ABANDON 755 FEET OF 4 INCH CAST IRON, 650 FEET OF 8 INCH CAST IRON, 45 FEET OF 2 INCH POLY AND 215 FEET OF 2 INCH STEEL ALONG BUENA VISTA STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4933 080.69441 666,552
INSTALL 1405 FEET OF 2 INCH POLY, 860 FEET OF 4 INCH POLY ALONG VANDELIA STREET AND ABANDON 1120 FEET OF 4 INCH CAST IRON, 2190 FEET OF 6 INCH CAST IRON, 835 FEET OF 8 INCH CAST IRON, 55 FEET OF 6 INCH POLY, 780 FEET OF 4 INCH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4934 080.69444 (361)
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY AND ABANDON 369 FEET OF 2 INCH STEEL ALONG THE STREET OF COMMERICAL CUSTOMER AT THE TAYLOR COUNTY EXPO IN ABILENE TO ACCOMMODATE PARKING LOT. ALL CUSTOMERS ABILENE
RELOCATION OF FACILITIES DECEMBER
4935 080.69446 5,012 INSTALL 1000 FEET OF 4 INCH POLY ALONG PLANO ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL RICHARDSON GROWTH DECEMBER
4936 080.69447 68,677
INSTALL 325 FEET OF 4 INCH POLY AND ABANDON 465 FEET OF 6 INCH POLY, 74 FEET OF 6 INCH STEEL, 41 FEET OF 8 INCH STEEL ALONG ROSS AVENUE AND CLINT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY OCTOBER
4937 080.69448 93,031 PURCHASE 43 5G MODEMS AND ABANDON 43 3G AND 4G MODEMS FOR USE IN THE SOUTHEAST REGION. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT DECEMBER
4938 080.69450 13,174 INSTALL 80 FEET OF 4 INCH POLY ALONG HWY 287.COMMERCIAL OR
INDUSTRIAL FORT WORTH GROWTH DECEMBER
4939 080.69454 71,380 PURCHASE (41) CALIBRATION STATIONS FOR PERSONAL MONITORS FOR USE IN MID-TEX. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT DECEMBER
4940 080.69467 227 INSTALL 150 FEET OF 2 INCH POLY ALONG WELLESLEY. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH DECEMBER
4941 080.69470 384,886
INSTALL 1755 FEET OF 2 INCH POLY AND ABANDON 2040 FEET OF 4 INCH AND 445 FEET OF 6 INCH CAST IRON ALONG VICKERY BOULEVARD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4942 080.69473 139,667 PURCHASE (35) DELL TABLETS AND (64) LAPTOPS FOR CONSTRUCTION OPERATORS. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - IT SEPTEMBER
4943 080.69480 19,246 INSTALL 450 FEET OF 2 INCH POLY ALOG STREETS OF HIGHLAND VILLAGE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HIGHLAND VILLAGE GROWTH DECEMBER
4944 080.69484 46,179
RELOCATE FACILITIES. INSTALL 470 FEET OF 4 INCH POLY AND ABANDON 460 FEET OF 4 INCH POLY ALONG SEETON ROAD TO ACCOMMODATE CITY OF GRAND PRAIRIE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
4945 080.69491 81,128
RELOCATE FACILITIES. INSTALL 350 FEET OF 6 INCH POLY ALONG FM 2181 AND ABANDON 300 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF DENTON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
4946 080.69493 19,705 INSTALL 270 FEET OF 4 INCH POLY ALONG US-175 FRONTAGE ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL SEAGOVILLE GROWTH DECEMBER
4947 080.69497 87,918 INSTALL 2240 FEET OF 2 INCH POLY ALONG STREETS OF TRINITY FALLS. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH DECEMBER
4948 080.69504 152,727
RELOCATE FACILITIES. INSTALL 120 FEET OF 6 INCH POLY AND ABANDON 120 FEET OF 6 INCH POLY ALONG PENNSYLVANIA AVENUE TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4949 080.69508 3,763 INSTALL 320 FEET OF 2 INCH POLY ALONG SHANNON LANE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL HIGHLAND PARK GROWTH DECEMBER
4950 080.69512 31,466 INSTALL 310 FEET OF 2 INCH POLY ALONG BLACKSTONE DRIVE. RESIDENTIAL DALLAS GROWTH OCTOBER4951 080.69515 27,297 INSTALL 385 FEET OF 2 INCH POLY ALONG HIGH MEADOWS DRIVE. RESIDENTIAL ABILENE GROWTH DECEMBER
4952 080.69517 83,360 INSTALL 1495 FEET OF 6 INCH AND 160 FEET OF 4 INCH POLY ALONG FM 548. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORNEY GROWTH DECEMBER
4953 080.69518 92,441 INSTALL 1000 FEET OF 4 INCH AND 7610 FEET OF 2 INCH POLY ALONG THE STREETS OF DEVONSHIRE . DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORNEY GROWTH DECEMBER
4954 080.69519 94,102
RELOCATE FACILITES. INSTALL 2 POLY SERVICE LINES AND ABANDON 2 POLY SERVICE LINES ALONG PLEASANT RUN ROAD TO ACCOMMODATE THE CITY OF COLLEYVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEYVILLE
SYSTEM INTEGRITY DECEMBER
4955 080.69524 9,831 REPLACEMENT OF TWO FIRE ALARM PANELS AT THE ARLINGTON SERVICE CENTER OFFICE AND WAREHOUSE. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
4956 080.69525 1,007 INSTALL 645 FEET OF 2 INCH POLY ALONG GEORGE BUSH DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH DECEMBER
4957 080.69527 6,850 INSTALL 750 FEET OF 2 INCH POLY ALONG OAK RIDGE DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BRYAN GROWTH OCTOBER
4958 080.69532 2,819 INSTALL 320 FEET OF 2 INCH POLY ALONG HIGHWAY 34. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL TERRELL GROWTH DECEMBER
4959 080.69552 53,308 INSTALL 400 FEET OF 4 INCH POLY ALONG STREETS OF JEFFERSON AT THE GATE.
COMMERCIAL OR INDUSTRIAL FRISCO GROWTH OCTOBER
4960 080.69557 2,604 INSTALL 560 FEET OF 4 INCH AND 395 FEET OF 2 INCH POLY ALONG ALPHA DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROCKWALL GROWTH DECEMBER
4961 080.69561 90,120
RELOCATE FACILITIES. INSTALL 180 FEET OF 6 INCH AND 450 FEET OF 2 INCH POLY ALONG WEST VICKERY BOULEVARD AND ABANDON 400 FEET OF 4 INCH POLY AND 50 FEET OF 4 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4962 080.69563 21,791 ABANDON DRS08 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WAXAHACHIE
SYSTEM INTEGRITY DECEMBER
4963 080.69564 6,293 REPLACEMENT GATE OPERATOR AND LOOP FOR AUTOMATIC GATE AT WICHITA FALLS SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
4964 080.69565 6,181 INSTALL 900 FEET OF 2 INCH POLY ALONG STREETS OF IRVING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL IRVING GROWTH DECEMBER
4965 080.69566 15,374 INSTALL 1475 FEET OF 4 INCH POLY ALONG GEORGE BUSH DRIVE. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS COLLEGE STATION GROWTH DECEMBER
4966 080.69567 16,533 INSTALL 2970 FEET OF 8 INCH POLY AONG BEACH STREET. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4967 080.69569 391,398
INSTALL 1875 FEET OF 4 POLY AND RETIRE 1950 FEET OF 4 INCH CAST IRON, 365 FEET OF 4 INCH POLY ALONG W. DREW STREET IN FORT WORTH TX IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
4968 080.69575 29,067 INSTALL 300 FEET OF 2 INCH POLY ALONG COLORADO STREET. ALL CUSTOMERS CELINASYSTEM
INTEGRITY DECEMBER
4969 080.69584 74,062
INSTALL DISTRICT REGULATOR STATION 40 ALONG THE STREETS OF N 33RD STREET AND N 34TH STREET IN WACO AND ABANDON DISTRICT REGULATOR STATION 40 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4970 080.69589 11,127 INSTALL 645 FEET OF 2 INCH POLY ALONG TAYLOR LANE IN BURKBURNETT TX. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BURKBURNETT GROWTH DECEMBER
MTX AdditionsPage 159 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
4971 080.69592 24,212
INSTALL DISTRICT REGULATOR STATION 023 IN ABILENE AND ABANDON DISTRICT REGULATOR STATION 023 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
4972 080.69597 5,414 INSTALL 720 FEET OF 2 INCH POLY ALONG FAA BOULEVARD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
4973 080.69598 28,870 ABANDON DISTRICT REGULATOR STATION #069 IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4974 080.69599 99,579
INSTALL DISTRICT REGULATOR STATION 49 ALONG THE STREETS OF N 42ND STREET AND SANGER STREET IN WACO AND ABANDON DISTRICT REGULATOR STATION 49 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
4975 080.69609 116,473 INSTALL 365 FEET OF 4 INCH POLY ALONG GREENVILLE AVENUE. ALL CUSTOMERS DALLASSYSTEM
IMPROVEMENT DECEMBER
4976 080.69619 20,222 INSTALL 100 FEET OF 2 INCH POLY ALONG BUCK STREET. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER
4977 080.69620 13,959 REPLACE GATE AND OPERATOR FOR USE IN GAINESVILLE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES OCTOBER
4978 080.69624 198,661
INSTALL 1930 FEET OF 4 INCH POLY AND 2885 FEET OF 2 INCH POLY ALONG THE STREETS OF SENDERA RANCH SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4979 080.69630 216,558
INSTALL 225 FEET OF 6 INCH, 1135 FEET OF 4 INCH AND 3325 FEET OF 2 INCH POLY ALONG STREETS OF CHAPEL CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
4980 080.69642 17,884 INSTALL 100 FEET OF 2 INCH POLY ALONG HIGHTOWER DRIVE. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER
4981 080.69651 12,889 INSTALL 1540 FEET OF 6 INCH POLY ALONG GOLDEN TRIANGLE BOULEVARD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
4982 080.69652 17,142 INSTALL 100 FEET OF 2 INCH POLY ALONG OBERMAN LANE. RESIDENTIAL SHADY SHORES GROWTH DECEMBER
4983 080.69653 12,991 INSTALL (1) CP TEST STATION ALONG LINE W22 AT DENTON CREEK AT FENCE GATE. ALL CUSTOMERS ROANOKE
SYSTEM INTEGRITY DECEMBER
4984 080.69666 236,098
RELOCATE FACILITIES. INSTALL 2143 FEET OF 2 INCH POLY ALONG WEST 4TH AND ABANDON 1200 FEET OF 2 INCH BARE STEEL AND 400 FEET OF 2 INCH COATED STEEL AND 543 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
4985 080.69667 6,925 PURCHASE AND INSTALL A NEW REPLACEMENT SL3000 GATE OPERATOR FOR THE SOUTH GATE AT THE ABILENE SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
4986 080.69673 130,136
RELOCATE FACILITIES. INSTALL 1550 FEET OF 2 INCH AND 80 FEET OF 4 INCH POLY ALONG NORTH FREY AND EAST COLLINS AND ABANDON 1550 FEET OF 2 INCH AND 80 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF CORSICANA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CORSICANA
SYSTEM INTEGRITY DECEMBER
4987 080.69675 137,573 INSTALL LEAK REPAIRS IN THE BOYD AREA IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD
SYSTEM INTEGRITY DECEMBER
4988 080.69676 9,456 INSTALL 575 FEET OF 4 INCH AND 2167 FEET OF 2 INCH POLY ALONG THE STREETS OF KASPER SECTION 10. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL GEORGETOWN GROWTH DECEMBER
4989 080.69681 6,568 INSTALL 540 FEET OF 2 INCH POLY ALONG ROUND GROVE ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH DECEMBER
4990 080.69682 32,262 INSTALL 1390 FEET OF 6 INCH POLY ALONG WILMETH ROAD.COMMERCIAL OR
INDUSTRIAL MCKINNEY GROWTH DECEMBER
4991 080.69688 6,252 INSTALL 620 FEET OF 2 INCH POLY ALONG HARVEST HILL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL MIDLOTHIAN GROWTH DECEMBER
4992 080.69689 15,484 INSTALL 1175 FEET OF 4 INCH POLY ALONG GREEN HOLLOW. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS TEMPLE GROWTH DECEMBER
4993 080.69690 9,887 INSTALL 420 FEET OF 2 INCH POLY ALONG BARNES BRIDGE ROAD. RESIDENTIAL SUNNYVALE GROWTH DECEMBER
4994 080.69697 231,098
RELOCATE FACILITIES. INSTALL 800 FEET OF 2 INCH AND 900 FEET OF 4 INCH POLY ALONG MARSHALL DRIVE AND BRENT COURT AND ABANDON 1700 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
4995 080.69700 30,987 INSTALL 100 FEET OF 2 INCH POLY ALONG SYLVAN AVENUE. RESIDENTIAL DALLAS GROWTH DECEMBER
4996 080.69701 14,281 INSTALL 300 FEET OF 2 INCH POLY ALONG JAKE COURT. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BURLESON GROWTH DECEMBER
4997 080.69707 97,588
RELOCATE FACILITIES. INSTALL 785 FEET OF 2 INCH POLY AND ABANDON 395 FEET OF 3 INCH AND 390 FEET OF 4 INCH STEEL ALONG MEEK STREET TO ACCOMMODATE THE CITY OF DALLAS IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
4998 080.69708 8,251 INSTALL 1496 FEET OF 2 INCH POLY ALONG STREETS OF BRATTON. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUSTIN GROWTH DECEMBER
4999 080.69709 4,146 INSTALL 1015 FEET OF 4 INCH AND 2717 FEET OF 2 INCH POLY ALONG THE STREETS OF BRATTON II NORTH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL AUSTIN GROWTH DECEMBER
5000 080.69710 31,875 INSTALL 120 FEET OF 2 INCH POLY ALONG WESTVIEW. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL STAR HARBOR GROWTH DECEMBER
5001 080.69716 53,843
RELOCATE FACILITIES. INSTALL 90 FEET OF 6 INCH POLY ALONG WESTPORT PARKWAY AND ABANDON 80 FEET OF 6 INCH POLY TO ACCOMODATE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5002 080.69718 27,083 PURCHASE RMLD, EXTRA BATTERY AND PROVER METER FOR USE IN SHERMAN DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT SEPTEMBER
5003 080.69719 582,874
RELOCATE FACILITIES. INSTALL 400 FEET OF 6 INCH POLY 4900 FEET OF 4 INCH POLY ALONG STONEWALL STREET AND ABANDON 175 FEET OF 6 INCH, 1680 FEET OF 4 INCH STEEL,50 FEET OF 4 INCH POLY, 2865 FEET OF 3 INCH STEEL TO ACCOMMODATE CITY OF GREENVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GREENVILLE
SYSTEM INTEGRITY DECEMBER
5004 080.69720 42,848 REPLACE GROUND BED ON C16-3 SYSTEM IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HURST
SYSTEM INTEGRITY DECEMBER
5005 080.69723 23,958 INSTALL 120 FEET OF 4 INCH POLY ALONG STREETS OF GOOD TIDING CHURCH.
COMMERCIAL OR INDUSTRIAL PALESTINE GROWTH DECEMBER
5006 080.69728 48,925
INSTALL 585 FEET OF 4 INCH POLY ALONG W AVE L AND ABANDON 6 FEET OF 6 INCH POLY AND 75 FEET OF 3 INCH STEEL AND 485 FEET OF 6 INCH CAST IRON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
5007 080.69739 (10,751)RELOCATE FACILITIES. INSTALL 340 OF 6 INCH POLY AND ABANDON 340 FEET OF 6 INCH POLY TO ACCOMMODATE STORM DRAIN PROJECTIN MANSFIELD. ALL CUSTOMERS MANSFIELD
RELOCATION OF FACILITIES DECEMBER
5008 080.69740 150,937
RELOCATE FACILITIES. INSTALL 700 FEET OF 12 INCH POLY ALONG AVENUE G AND ABANDON 700 FEET OF 12 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5009 080.69741 (2,677)
RELOCATE FACILITIES. INSTALL 114 FEET OF 4 INCH POLY ALONG JEFFERSON STREET AND ABANDON 109 FEET OF 4 INCH POLY TO ACCOMMODATE HEB ROAD CONSTRUCTION PROJECT. ALL CUSTOMERS KERRVILLE
RELOCATION OF FACILITIES DECEMBER
5010 080.69746 107,622
RELOCATE FACILITIES. INSTALL 1057 FEET OF 4 INCH POLY ALONG EAST DIETERT AND ABANDON 1146 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 160 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
5011 080.69750 4,410 INSTALL 1210 FEET OF 2 INCH POLY ALONG STREETS OF CHANDLER CREEK TOWNHOMES. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL ROUND ROCK GROWTH DECEMBER
5012 080.69751 19,603 INSTALL 100 FEET OF 2 INCH POLY ALONG JOYCE LANE. RESIDENTIAL ARGYLE GROWTH DECEMBER
5013 080.69757 53,826
INSTALL REGULATOR STATION IN IRVING AND ABANDON REGULATOR STATION MLR 10 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
5014 080.69759 24,276 INSTALL 260 FEET OF 2 INCH POLY ALONG AVENUE L. RESIDENTIAL DALLAS GROWTH DECEMBER5015 080.69762 11,247 REPLACE AC UNIT AT THE IRVING SERVICE CENTER. ALL CUSTOMERS SYSTEM WIDE STRUCTURES SEPTEMBER
5016 080.69766 27,928 INSTALL 200 FEET OF 4 INCH POLY AND 4320 FEET OF 2 INCH POLY ALONG COLLETT SUBLETT ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL KENNEDALE GROWTH DECEMBER
5017 080.69779 71,704
RELOCATE FACILITIES. REPLACE 5 SERVICE LINES ALONG HANDLEY DRIVE TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5018 080.69783 580,144
INSTALL 1815 FEET OF 2 INCH POLY AND ABANDON 435 FEET OF 4 INCH CAST IRON AND 1380 FEET OF 6 INCH CAST IRON ALONG LATIMER STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
5019 080.69785 13,994
RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY AND ABANDON 30 FEET OF 3 INCH POLY ALONG PECAN PARK DRIVE TO ACCOMMODATE CITY OF ARLINGTON STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
5020 080.69790 55,645
RELOCATE FACILITIES. INSTALL 620 FEET OF 2 INCH POLY ALONG FRANCISCO LEMOS STREET AND ABANDON 584 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF KERRVILLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISION OF TEXAS RULE 8.209. ALL CUSTOMERS KERRVILLE
SYSTEM INTEGRITY DECEMBER
5021 080.69792 21,859 INSTALL 100 FEET OF 2 INCH POLY ALONG SOUTH COLLEGE AVENUE. RESIDENTIAL JUSTIN GROWTH DECEMBER
5022 080.69793 129,592
RELOCATE FACILITIES. REPLACE 50 SERVICE LINES ALONG ELLIS ROAD TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5023 080.69803 62,503
RELOCATE FACILITIES. INSTALL 370 FEET OF 4 INCH POLY AND ABANDON 348 FEET OF 3 INCH STEEL ALONG WEBSTER AND 4TH TO ACCOMMODATE THE CITY OF GLEN ROSE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GLEN ROSE
SYSTEM INTEGRITY DECEMBER
5024 080.69813 (103,334)
RELOCATE FACILITIES. INSTALL 120 FEET OF 3 INCH STEEL AND ABANDON 120 FEET OF 3 INCH STEEL ALONG LINE W4 IN DENTON COUNTY TO ACCOMODATE STORM SEWER PROJECT. ALL CUSTOMERS DENTON
RELOCATION OF FACILITIES DECEMBER
5025 080.69814 7,938 INSTALL 250 FEET OF 4 INCH AND 3800 FEET OF 2 INCH POLY ALONG THE STREETS OF BAYSIDE WEST. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROWLETT GROWTH DECEMBER
5026 080.69815 15,027 INSTALL 120 FEET OF 2 INCH POLY ALONG WADE STREET. RESIDENTIAL ROCKWALL GROWTH DECEMBER
5027 080.69820 15,958 INSTALL 125 FEET OF 2 INCH POLY ALONG AVENUE I. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BROWNWOOD GROWTH DECEMBER
5028 080.69826 6,572 PURCHASE (1) PIPE LOCATOR AND TEST FITTING FOR USE IN SOUTH REGION DALLAS. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT SEPTEMBER
5029 080.69837 22,525 INSTALL 400 FEET OF 4 INCH POLY ALONG SHADY OAK DRIVE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SOUTHLAKE GROWTH DECEMBER
5030 080.69845 138,168
RELOCATE FACILITIES. INSTALL 960 FEET OF 6 INCH POLY ALONG HILLCREST AND CRESTLINE ROAD AND ABANDON 946 FEET OF 6 INCH STEEL TO ACCOMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5031 080.69850 14,144
INSTALL 5410 FEET OF 2 INCH AND 2120 FEET OF 6 INCH POLY ALONG STREETS OF THE WINCHESTER SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL PRINCETON GROWTH DECEMBER
5032 080.69862 6,448 PURCHASE (2) MANOMETERS FOR USE IN SOUTH REGION DALLAS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT SEPTEMBER
5033 080.69863 185,567
RELOCATE FACILITIES. INSTALL 782 FEET OF 2 INCH POLY ALONG CRESTVIEW AND ABANDON 102 FEET OF 2 INCH AND 839 FEET OF 2 INCH STEEL TO ACCOMMODATE CITY OF MARBLE FALLS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MARBLE FALLS
SYSTEM INTEGRITY DECEMBER
5034 080.69865 10,211 RELOCATE FACILITIES. INSTALL 800 FEET OF 4 INCH POLY AND ABANDON 625 FEET OF 4 INCH POLY TO ACCOMMODATE NEW COMMERCIAL DEVELOPMENT. ALL CUSTOMERS MESQUITE
RELOCATION OF FACILITIES DECEMBER
5035 080.69869 6,557 INSTALL 550 FEET OF 2 INCH POLY ALONG TEGLAN STREET IN BOWIE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL BOWIE GROWTH DECEMBER
5036 080.69873 11,628
INSTALL 225 FEET OF 2 INCH POLY AND ABANDON 154 FEET OF 3 INCH CAST IRON ALONG PINE AND CARDINAL STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ECTOR
SYSTEM INTEGRITY DECEMBER
5037 080.69879 31,635 INSTALL 500 FEET OF 2 INCH POLY ALONG NORTH PRESTON STREET. RESIDENTIAL VAN ALSTYNE GROWTH DECEMBER
5038 080.69881 21,417 PURCHASE NEW TOOLS FOR NORTH CENTRAL. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT DECEMBER
5039 080.69896 28,879
RELOCATE FACILITIES. INSTALL 330 FEET OF 2 INCH POLY AND ABANDON 325 FEET OF 2 INCH STEEL ALONG E. GANTT STREET TO ACCOMMODATE THE CITY OF PRINCETON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PRINCETON
SYSTEM INTEGRITY DECEMBER
5040 080.69904 63,829
RELOCATE FACILITIES. INSTALL 525 FEET OF 4 INCH POLY ALONG FM 8 AND ABANDON 340 FEET OF 4 INCH, 139 FEET OF 3 INCH POLY TO ACCOMMODATE THE CITY OF STEPHENVILLE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
5041 080.69907 26,432
RELOCATE FACILITIES. INSTALL 230 FEET OF 4 INCH POLY AND ABANDON 206 FEET OF 4 INCH STEEL ALONG W 17TH STREET TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
5042 080.69908 21,670 INSTALL 185 FEET OF 2 INCH POLY ALONG FOREST HILL. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FOREST HILL GROWTH DECEMBER
5043 080.69912 62,395
INSTALL 360 FEET OF 2 INCH, ALONG 5TH AVE AT PECAN AND ABANDON 240 FEET OF 3 INCH STEEL AND 106 FEET OF 2 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLEMAN
SYSTEM INTEGRITY DECEMBER
5044 080.69913 (14,881) INSTALL 35 FEET OF 8 INCH POLY ALONG WENDLAND ROAD.COMMERCIAL OR
INDUSTRIAL TEMPLE GROWTH DECEMBER
5045 080.69914 2,577 PURCHASE UTILITY TRAILER FOR NORTH CENTRAL. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT DECEMBER
5046 080.69916 4,650 INSTALL 900 FEET OF 4 INCH POLY ALONG EASTGATE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BALCH SPRINGS GROWTH DECEMBER
5047 080.69918 680 INSTALL 400 FEET OF 2 INCH POLY ALONG THE STREETS OF RIO CONCHO SUBDIVISION. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL SAN ANGELO GROWTH DECEMBER
5048 080.69919 3,050 INSTALL 250 FEET OF 4 INCH POLY ALONG HIGHWAY 80. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORNEY GROWTH DECEMBER
5049 080.69923 21,774 INSTALL 100 FEET OF 2 INCH POLY ALONG ROBERT B CULLUM BOULEVARD.COMMERCIAL OR
INDUSTRIAL DALLAS GROWTH DECEMBER
5050 080.69928 2,679 INSTALL 20 FEET OF 4 INCH STEEL ALONG MARS DRIVE IN WACO TX.COMMERCIAL OR
INDUSTRIAL WACO GROWTH DECEMBER
5051 080.69937 9,826 INSTALL 566 FEET OF 6 INCH POLY ALONG STREETS OF KIDDIE ACADEMY. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS HUTTO GROWTH DECEMBER
5052 080.69938 6,470 INSTALL 75 FEET OF 2 INCH POLY ALONG KUBIN STREET. RESIDENTIAL BRYAN GROWTH DECEMBER
MTX AdditionsPage 161 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
5053 080.69940 25,458
RELOCATE FACILITIES. INSTALL 400 FEET OF 2 INCH POLY AND ABANDON 255 FEET OF 2 INCH STEEL ALONG COUNTRY CLUB ROAD TO ACCOMMODATE CITY OF ENNIS STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ENNIS
SYSTEM INTEGRITY DECEMBER
5054 080.69950 4,885 INSTALL 90 FEET OF 2 INCH POLY ALONG DANSBY STREET. RESIDENTIAL BRYAN GROWTH DECEMBER
5055 080.69956 34,559
RELOCATE FACILITIES. INSTALL 100 FEET OF 2 INCH POLY AND ABANDON 100 FEET OF 2 INCH STEEL ALONG HERVIE STREET TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5056 080.69957 79,262
RELOCATE FACILITIES. INSTALL 900 FEET OF 2 INCH POLY ALONG LOCKE AVENUE AND ABANDON 900 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5057 080.69958 341,712
RELOCATE FACILITIES. INSTALL 1940 FEET OF 4 INCH POLY ALONG VOLDER AVENUE AND ABANDON 1940 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5058 080.69962 72,003
RELOCATE FACILITIES. INSTALL 62 FEET OF 4 INCH POLY AND ABANDON 40 FEET OF 4 INCH POLY ALONG WINDY RYON WAY AND HIGHWAY 287 TO ACCOMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES DECEMBER
5059 080.69978 72,554
INSTALL 600 FEET OF 2 INCH POLY ALONG SAUNDERS (FM 814) AND ABANDON 505 FEET OF 3 INCH AND 286 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TRENTON
SYSTEM INTEGRITY DECEMBER
5060 080.69979 37,766 INSTALL 356 FEET OF 2 INCH POLY ALONG BOGARTE DRIVE. ALL CUSTOMERS GRAND PRAIRIE GROWTH DECEMBER
5061 080.69980 54,773 INSTALL 4450 FEET OF 2 INCH POLY ALONG THE STREETS OF WILMETH RIDGE SOUTH RESIDENTIAL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL MCKINNEY GROWTH DECEMBER
5062 080.69981 88,078
RELOCATE FACILITIES. INSTALL 300 FEET OF 4 INCH POLY ALONG WJ BOAZ AND ABANDON 300 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5063 080.69982 4,600 INSTALL 400 FEET OF 6 INCH POLY AND 600 FEET OF 2 INCH POLY ALONG GOLDEN TRIANGLE BLVD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
5064 080.69988 3,642 INSTALL 100 FEET OF 2 INCH POLY ALONG 8TH STREET. RESIDENTIAL DENISON GROWTH DECEMBER
5065 080.69994 5,727 INSTALL 235 FEET OF 2 INCH POLY ALONG SHADY BROOK DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL GRAPEVINE GROWTH DECEMBER
5066 080.69995 2,690 INSTALL 1240 FEET OF 4 INCH POLY ALONG BELLEVUE DRIVE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL PLANO GROWTH DECEMBER
5067 080.70024 12,269
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY AND ABANDON 50 FEET OF 6 INCH POLY ALONG STREETS OF MELISSA VILLAGE TO ACCOMMODATE PROPOSED STORM DRAIN PROJECT. ALL CUSTOMERS MELISSA
RELOCATION OF FACILITIES DECEMBER
5068 080.70028 41,927 INSTALL 340 FEET OF 2 INCH POLY ALONG BLANTON STREET. RESIDENTIAL DALLAS GROWTH DECEMBER
5069 080.70029 5,010 INSTALL 1030 FEET OF 6 INCH POLY ALONG GOLDEN TRIANGLE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FORT WORTH GROWTH DECEMBER
5070 080.70033 16,140
POLY 1. INSTALL 102 FEET OF 2 INCH AND 24 FEET OF 4 INCH POLY ALONG MAPLE AND ABANDON 35 FEET OF 3 INCH POLY 1, 67 FEET OF 2 INCH POLY AND 24 FEET OF 4 INCH POLY. ALL CUSTOMERS FERRIS
SYSTEM INTEGRITY DECEMBER
5071 080.70066 77,386
INSTALL 1 GROUND BED, RECTIFIER AND TEST STATION ALONG LINE L14 IN BELL COUNTY AND ABANDON 1 GROUND BED, RECTIFIER AND TEST STATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON
SYSTEM INTEGRITY DECEMBER
5072 080.70076 2,609 PURCHASE PROVER METER FOR USE IN SHERMAN COMPLIANCE. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT OCTOBER
5073 080.70082 34,111 INSTALL 600 FEET OF 2 INCH POLY ALONG LONG PRAIRIE ROAD. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL FLOWER MOUND GROWTH DECEMBER
5074 080.70094 152,428
RELOCATE FACILITIES. INSTALL 850 FEET OF 2 INCH POLY ALONG RED BUD LANE AND ABANDON 850 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF FORT WORTH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5075 080.70104 455,675
RELOCATE FACILITIES. INSTALL 3500 FEET OF 4 INCH AND 300 FEET OF 2 INCH POLY ALONG NW 7TH STREET AND ABANDON 2700 FEET OF 4 INCH AND 450 FEET OF 6 INCH STEEL AND 230 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
5076 080.70111 7,575 INSTALL 3600 FEET OF 4 INCH POLY AND 500 FEET OF 2 INCH POLY ALONG THE STREETS OF BREEZY HILL. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER
5077 080.70115 5,126 INSTALL 250 FEET OF 2 INCH POLY ALONG GRAHAM. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL COLLEGE STATION GROWTH DECEMBER
5078 080.70121 13,762
INSTALL 270 FEET OF 2 INCH POLY ALONG SOUTH ASH AND ABANDON 270 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARCHER CITY
SYSTEM INTEGRITY DECEMBER
5079 080.70122 269,205
INSTALL 15050 FEET OF 6 INCH POLY AND 2015 FEET OF 2 INCH POLY ALONG THE STREETS OF LIBERTY TRAILS PHASE 1A. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5080 080.70133 35,513 INSTALL 375 FEET OF 2 INCH POLY ALONG 2700 OLD DENTON ROAD.COMMERCIAL OR
INDUSTRIAL CARROLLTON GROWTH DECEMBER
5081 080.70143 4,231 INSTALL 4062 FEET OF 2 INCH POLY ALONG STREETS OF CROSS CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HUTTO GROWTH DECEMBER
5082 080.70149 136,037
INSTALL 1272 FEET OF 4 INCH POLY AND ABANDON 329 FEET OF 8 INCH, 17 FEET OF 4 INCH AND 91 FEET OF 2 INCH STEEL 440 FEET OF 3 INCH AND 219 FEET OF 2 INCH POLY ALONG CHESTNUT AND CRAWFORD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
5083 080.70158 21,559
RELOCATE FACILITIES. INSTALL 100 FEET OF 4 INCH POLY ALONG 509 COULTER DRIVE AND ABANDON 100 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF BRYAN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
5084 080.70169 116,850
RELOCATE FACILITIES. INSTALL 880 FEET OF 2 INCH POLY AND ABANDON 1780 FEET OF 1.25 INCH POLY ALONG CLOTELL DRIVE TO ACCOMMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5085 080.70172 5,491 PURCHASE CGI GOLD FOR USE IN AMLD TECHNICIANS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT SEPTEMBER
5086 080.70193 64,224 REPLACE AMLD MAINS 5 TO 250 IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
5087 080.70194 97,667 REPLACE AMLD MAINS 5 TO 250 IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
5088 080.70195 128,285 REPLACE AMLD MAINS 5 TO 250 IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD
SYSTEM INTEGRITY DECEMBER
5089 080.70196 1,289,385 REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
5090 080.70197 64,516 REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
5091 080.70198 47,845 REPLACE AMLD MAINS 5 TO 250 IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
5092 080.70199 109,982 REPLACE AMLD MAINS 5 TO 250 IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 162 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
5093 080.70200 90,190 REPLACE AMLD MAINS 5 TO 250 IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALRINGTON
SYSTEM INTEGRITY DECEMBER
5094 080.70201 1,529,400 REPLACE AMLD MAINS 5 TO 250 IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5095 080.70202 167,481 REPLACE AMLD SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
5096 080.70203 70,690 REPLACE AMLD SERVICE LINES IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
5097 080.70204 813,612 REPLACE AMLD SERVICE LINES IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
5098 080.70205 79,736 REPLACE AMLD SERVICE LINES IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
5099 080.70206 85,453 REPLACE AMLD SERVICE LINES IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
5100 080.70207 102,978 REPLACE AMLD SERVICE LINES IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5101 080.70208 98,523 REPLACE AMLD SERVICE LINES IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
5102 080.70209 26,025 REPLACE AMLD SERVICE LINES IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
5103 080.70210 636,307 REPLACE AMLD SERVICE LINES IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5104 080.70211 178,371 REPLACE MAIN 5-250' IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PARIS
SYSTEM INTEGRITY DECEMBER
5105 080.70212 383,339 REPLACE MAIN 5-250' IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
5106 080.70213 820,874 REPLACE MAIN 5-250' IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD
SYSTEM INTEGRITY DECEMBER
5107 080.70214 1,641,337 REPLACE MAIN 5-250' IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
5108 080.70215 1,081,943
REPLACE MAIN 5-250' IN THE SOUTH EAST REGION DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
5109 080.70216 672,782 REPLACE MAIN 5-250' IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
5110 080.70217 452,684 REPLACE MAIN 5-250' IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5111 080.70218 294,341 REPLACE MAIN 5-250' IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
5112 080.70219 1,432,532 REPLACE MAIN 5-250' IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
5113 080.70220 604,545 REPLACE SERVICE LINES IN THE NORTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
5114 080.70221 422,852 REPLACE SERVICE LINES IN THE NORTH CENTRAL REGION ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
5115 080.70222 879,608 REPLACE SERVICE LINES IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BOYD
SYSTEM INTEGRITY DECEMBER
5116 080.70223 2,471,221 REPLACE SERVICE LINES IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
5117 080.70224 869,597 REPLACE SERVICE LINES IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
5118 080.70225 766,735 REPLACE SERVICE LINES IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
5119 080.70226 846,562 REPLACE SERVICE LINES IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5120 080.70227 505,510 REPLACE SERVICE LINES IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
5121 080.70228 618,036 REPLACE SERVICE LINES IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5122 080.70229 911,626
REPLACE METERS IN THE NORTH EAST REGION DUE TO HIGH RISK DETERMINATION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
5123 080.70230 1,157,903 REPLACE METERS IN THE NORTH CENTRAL REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
5124 080.70231 814,801 REPLACE METERS IN THE NORTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WICHITA FALLS
SYSTEM INTEGRITY DECEMBER
5125 080.70232 2,179,109 REPLACE METERS IN THE SOUTH DALLAS REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SYSTEM WIDE
SYSTEM INTEGRITY DECEMBER
5126 080.70233 456,218 REPLACE METERS IN THE SOUTH EAST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
5127 080.70234 665,611 REPLACE METERS IN THE SOUTH WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
5128 080.70235 1,120,851 REPLACE METERS IN THE WEST FORT WORTH REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5129 080.70236 286,020 REPLACE METERS IN THE WEST ARLINGTON IRVING REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
5130 080.70237 403,979 REPLACE METERS IN THE WEST WEST REGION IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5131 080.70242 1,938
RELOCATE FACILITIES. INSTALL 20 FEET OF 2 INCH POLY AT INTERSECTION OF I45 AND US 287 AND ABANDON 20 FEET OF 2 INCH POLY TO ACCOMMODATE THE CITY OF CORSICANA STORM WATER PROJECT. ALL CUSTOMERS CORSICANA
RELOCATION OF FACILITIES DECEMBER
5132 080.70245 (44,045)INSTALL 4 INCH SERVICE LINE AND METER ALONG STREETS OF WALMART IN SAN ANGELO.
COMMERCIAL OR INDUSTRIAL SAN ANGELO GROWTH DECEMBER
5133 080.70254 64,470
RELOCATE FACILITIES. INSTALL 400 FEET OF 4 INCH POLY AND 40 FEET OF 2 INCH POLY ALONG SW 5TH STREET AND ABANDON 390 FEET OF 4 INCH STEEL TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRIE
SYSTEM INTEGRITY DECEMBER
5134 080.70255 3,363 PURCHASE (20) TRAK IT UNITS FOR COMPLIANCE. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT SEPTEMBER
5135 080.70256 17,062
RELOCATE FACILITIES. INSTALL 60 FEET OF 4 INCH POLY ALONG MEADOW CREEK DRIVE AND ABANDON 60 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF IRVING IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
5136 080.70266 23,490 INSTALL 1200 FEET OF 4 INCH POLY ALONG WOODWAY STREET. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS WACO GROWTH DECEMBER
5137 080.70268 22,703
RELOCATE FACILITIES. INSTALL 240 FEET OF 4 INCH POLY ALONG FRANCIS DRIVE AND ABANDON 240 FEET OF 3 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEGE STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
5138 080.70269 29,812 PURCHASE V3 LOCATOR AND 3 WATT TRANSMITTER AND ACCESORIES FOR USE IN GARLAND DISTRICT. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT OCTOBER
5139 080.70272 128,737
RELOCATE FACILITIES. INSTALL 100 FEET OF 6 INCH POLY ALONG PARKER ROAD AND CUSTER PKWY AND ABANDON 100 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF PLANO IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS PLANO
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 163 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
5140 080.70275 36,570
RELOCATE FACILITIES. INSTALL 330 FEET OF 4 INCH POLY ALONG SEETON ROAD AND ABANDON 550 FEET OF 4 INCH POLY TO ACCOMMODATE THE CITY OF GRAND PRAIRIE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRAND PRAIRI
SYSTEM INTEGRITY DECEMBER
5141 080.70277 159,221
INSTALL CLOCK SPRING ON LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
5142 080.70282 49,265 PURCHASE 20 DELL TABLETS FOR USE IN DALLAS. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
IT DECEMBER
5143 080.70289 1,210,815 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN NORTH EAST REGION. ALL CUSTOMERS PARIS GROWTH DECEMBER
5144 080.70290 1,554,145 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER
5145 080.70291 1,369,658 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN NORTH WEST REGION. ALL CUSTOMERS WICHITA FALLS GROWTH DECEMBER
5146 080.70292 1,627,339 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN SOUTH DALLAS REGION. ALL CUSTOMERS DALLAS GROWTH DECEMBER
5147 080.70293 520,850 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN SOUTH EAST REGION. ALL CUSTOMERS WACO GROWTH DECEMBER
5148 080.70294 1,962,585 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER
5149 080.70295 1,580,370 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN WEST FORT WORTH REGION. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
5150 080.70296 496,936 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER
5151 080.70297 344,432 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW SERVICES IN WEST REGION. ALL CUSTOMERS ABILENE GROWTH DECEMBER
5152 080.70298 515,849 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH EAST REGION. ALL CUSTOMERS PARIS GROWTH DECEMBER
5153 080.70299 710,376 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER
5154 080.70300 548,472 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH WEST REGION. ALL CUSTOMERS WICHITA FALLS GROWTH DECEMBER
5155 080.70301 386,603 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH REGION. ALL CUSTOMERS WACO GROWTH DECEMBER
5156 080.70302 188,731 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH EAST REGION. ALL CUSTOMERS WACO GROWTH DECEMBER
5157 080.70303 1,014,469 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER
5158 080.70304 653,207 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST FORT WORTH REGION. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
5159 080.70305 251,799 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER
5160 080.70306 96,910 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST REGION. ALL CUSTOMERS ABILENE GROWTH DECEMBER
5161 080.70307 392,451 REPLACE SERVICE LINES IN THE NORTH EAST DISTRICT. ALL CUSTOMERS GARLANDSYSTEM
INTEGRITY DECEMBER
5162 080.70308 485,511 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH CENTRAL DISTRICT. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
5163 080.70309 763,074 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN NORTH WEST DISTRICT. ALL CUSTOMERS BOYD
SYSTEM INTEGRITY DECEMBER
5164 080.70310 266,282 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH DALLAS. ALL CUSTOMERS DALLASSYSTEM
INTEGRITY DECEMBER
5165 080.70311 289,735 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH EAST DISTRICT. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
5166 080.70312 220,604 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN SOUTH WEST DISTRICT. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
5167 080.70313 410,758 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTHSYSTEM
INTEGRITY DECEMBER
5168 080.70314 59,304 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST ARLINGTON IRVING. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
5169 080.70315 83,448 NON GROWTH FUNCTIONAL. REPLACE SERVICE LINES IN WEST DISTRICT. ALL CUSTOMERS ABILENESYSTEM
INTEGRITY DECEMBER
5170 080.70316 379,611 NON GROWTH FUNCTIONAL MAINS IN NORTH EAST. ALL CUSTOMERS GARLANDSYSTEM
INTEGRITY DECEMBER
5171 080.70317 426,678 NON GROWTH FUNCTIONAL FOR THE REPLACEMENT OF MAINS IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
5172 080.70318 460,860 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN NORTH WEST REGION. ALL CUSTOMERS BOYD
SYSTEM INTEGRITY DECEMBER
5173 080.70319 560,757 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH DALLAS. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
5174 080.70320 222,371 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH EAST REGION. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
5175 080.70321 147,688 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
5176 080.70322 665,682 NON GROWTH FUNCTIONAL MAINS PROJECT IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTHSYSTEM
INTEGRITY DECEMBER
5177 080.70323 30,716 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
5178 080.70324 216,624 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF MAINS IN WEST REGION. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5179 080.70325 260,896 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH EAST REGION. ALL CUSTOMERS GARLAND GROWTH DECEMBER
5180 080.70326 301,103 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY GROWTH DECEMBER
5181 080.70327 245,731 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN NORTH WEST REGION. ALL CUSTOMERS BOYD GROWTH DECEMBER
5182 080.70328 632,061 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH DALLAS REGION. ALL CUSTOMERS DALLAS GROWTH DECEMBER
5183 080.70329 213,647 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH EAST REGION. ALL CUSTOMERS WACO GROWTH DECEMBER
5184 080.70330 164,188 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER
5185 080.70331 360,440 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST FORT WORTH REGION. ALL CUSTOMERS FORT WORTH GROWTH DECEMBER
5186 080.70332 137,685 GROWTH FUNCTIONAL PROJECT FOR THE INSTALLATION OF NEW METERS IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON GROWTH DECEMBER
5187 080.70333 241,139 NON GROWTH FUNCTIONAL METERS IN WEST DISTRICT. ALL CUSTOMERS ABILENE GROWTH DECEMBER
5188 080.70334 166,335 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN NORTH EAST REGION. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
5189 080.70335 57,282 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN NORTH CENTRAL REGION. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
5190 080.70336 203,149 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN NORTH WEST REGION. ALL CUSTOMERS BOYD
SYSTEM INTEGRITY DECEMBER
5191 080.70337 349,804 NON GROWTH FUNCTIONAL CATHODIC PROTECTION IN SOUTH DALLAS. ALL CUSTOMERS DALLASSYSTEM
INTEGRITY DECEMBER
5192 080.70338 205,611 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN SOUTH EAST REGION. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 164 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
5193 080.70339 131,008 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN SOUTH WEST REGION. ALL CUSTOMERS ROUND ROCK
SYSTEM INTEGRITY DECEMBER
5194 080.70340 201,581 NON GROWTH FUNCTIONAL CATHODIC PROTECTION IN WEST FORT WORTH. ALL CUSTOMERS FORT WORTHSYSTEM
INTEGRITY DECEMBER
5195 080.70341 293,487 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN WEST ARLINGTON REGION. ALL CUSTOMERS ARLINGTON
SYSTEM INTEGRITY DECEMBER
5196 080.70342 202,506 NON GROWTH FUNCTIONAL FOR THE INSTALLATION OF CATHODIC PROTECTION IN WEST REGION. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5197 080.70343 58,410
RELOCATE FACILITIES. INSTALL 780 FEET OF 2 INCH POLY AND ABANDON 735 FEET OF 2 INCH STEEL ALONG COLLIER STREET TO ACCOMMODATE THE CITY OF DENTON STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
5198 080.70344 386,634 PERFORM REPAIRS ON LINE D IN DALLAS COUNTY TO REMEDIATE ANOMALIES IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IRVING
SYSTEM INTEGRITY DECEMBER
5199 080.70355 297,997
RELOCATE FACILITIES. INSTALL 500 FEET OF 6 INCH STEEL ALONG 1101 FRANCIS DRIVE AND ABANDON 500 FEET OF 6 INCH STEEL TO ACCOMMODATE THE CITY OF COLLEGE STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
5200 080.70361 13,507 INSTALL 410 FEET OF 2 INCH POLY ALONG THE STREETS PALISTINE TEXAS.COMMERCIAL OR
INDUSTRIAL PALESTINE GROWTH DECEMBER
5201 080.70365 (22,625) INSTALL 4 INCH SERVICE LINE AND METER ALONG SHERWOOD WAY.COMMERCIAL OR
INDUSTRIAL SAN ANGELO GROWTH DECEMBER
5202 080.70366 126,364 REPLACE DRS47 ALONG WENDLAND ROAD IN TEMPLE. ALL CUSTOMERS TEMPLESYSTEM
IMPROVEMENT DECEMBER
5203 080.70375 4,002 INSTALL 2700 FEET OF 6 INCH POLY ALONG WHITE ROAD. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS HEATH GROWTH DECEMBER
5204 080.70376 4,803 INSTALL 7100 FEET OF 2 INCH POLY ALONG THE STREETS OF HEATH CROSSING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL HEATH GROWTH DECEMBER
5205 080.70379 119,086
RELOCATE FACILITIES. INSTALL 1100 FEET OF 4 INCH POLY ALONG SKYLINE AND ABANDON 1090 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF ROWLETT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROWLETT
SYSTEM INTEGRITY DECEMBER
5206 080.70380 68,065 GAS CONTROL ROOMS AT THE GREENVILLE AVENUE SERVICE CENTER. ALL CUSTOMERS DALLAS STRUCTURES DECEMBER
5207 080.70384 5,168 INSTALL 387 FEET OF 6 INCH POLY AND 220 FEET OF 4 INCH POLY ALONG INTERSTATE 35. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ROUND ROCK GROWTH DECEMBER
5208 080.70391 21,151
RELOCATE FACILITIES. INSTALL 12 FEET OF 4 INCH STEEL AND ABANDON 10 FEET OF 4 INCH STEEL ALONG 14TH STREET TO ACCOMMODATE CITY OF PLANO PROJECT. ALL CUSTOMERS PLANO
RELOCATION OF FACILITIES DECEMBER
5209 080.70401 5,655 INSTALL 170 FEET OF 4 INCH POLY ALONG SKYLINE COMMERCE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL MESQUITE GROWTH DECEMBER
5210 080.70402 11,046 INSTALL 1360 FEET OF 4 INCH AND 2015 FEET OF 2 INCH POLY ALONG THE STREETS OF HEARTLAND 16. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL CRANDALL GROWTH DECEMBER
5211 080.70406 204,572
RELOCATE FACILITIES. INSTALL 6 INCH POLY ALONG ROSEDALE AND FOREST PARK IN FORT WORTH AND ABANDON 12 INCH STEEL TO ACCOMMODATE THIRD PARTY DAMAGE. ALL CUSTOMERS FORT WORTH
RELOCATION OF FACILITIES DECEMBER
5212 080.70412 8,332
ABANDON 860 FEET OF 4 INCH STEEL AND 35 FEET OF 3 INCH STEEL ALONG HILL STREET IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FARMERSVILLE
SYSTEM INTEGRITY DECEMBER
5213 080.70413 4,351 PURCHASE (1) METROTECH VM-810 LOCATOR FOR USE IN SOUTH REGION DALLAS. ALL CUSTOMERS SYSTEM WIDE
GENERAL PLANT - EQUIPMENT DECEMBER
5214 080.70414 18,936
RELOCATE FACILITES. INSTALL 5 FEET OF 4 INCH POLY ALONG FARM MARKET ROAD 107 AND ABANDON 5 FEET OF 3 INCH POLY TO ACCOMMODATE 3RD PARTY STREET PROJECT. ALL CUSTOMERS CHILTON
RELOCATION OF FACILITIES DECEMBER
5215 080.70415 3,644 INSTALL 2494 FEET OF 2 INCH POLY ALONG THE STREETS OF HOMESTEAD PHASE 2. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5216 080.70436 98,938
INSTALL 745 FEET OF 4 INCH POLY ALONG S 4TH STREET IN ABILENE TX AND ABANDON 340 FEET OF 6 INCH CAST IRON, 30 FEET OF 6 INCH STEEL, 25 FEET OF 6 INCH POLY IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5217 080.70442 25,182 INSTALL 100 FEET OF 2 INCH POLY ALONG WOODCREST DRIVE. RESIDENTIAL COLLEYVILLE GROWTH DECEMBER
5218 080.70445 13,475 INSTALL 315 FEET OF 2 INCH POLY ALONG PARK PLACE. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL IOWA PARK GROWTH DECEMBER
5219 080.70460 11,948 INSTALL 100 FEET OF 2 INCH POLY ALONG EAST FIFTH STREET. RESIDENTIAL MUENSTER GROWTH DECEMBER5220 080.70465 37,047 INSTALL 270 FEET OF 2 INCH POLY ALONG OVERTON PARK. RESIDENTIAL FORT WORTH GROWTH DECEMBER5221 080.70472 18,426 INSTALL 100 FEET. OF 2 INCH POLY ALONG WEDGELEA DRIVE. RESIDENTIAL BEDFORD GROWTH DECEMBER
5222 080.70475 20,117
RELOCATE FACILITIES. INSTALL 50 FEET OF 6 INCH POLY ALONG SW ALSURY BOULEVARD AND ABANDON 40 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF BURLESON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BURLESON
SYSTEM INTEGRITY DECEMBER
5223 080.70476 97,947 REPLACE DISTRICT REGULATOR STATION # 04 ON BELL AND SANTA FE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROGERS
SYSTEM INTEGRITY DECEMBER
5224 080.70477 48,935
INSTALL DISTRICT REGULATOR STATION 15 ALONG THE STREETS OF AVENUE D AND MITCHELL IN BELTON TX AND ABANDON DISTRICT REGULATOR STATION 15 IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BELTON
SYSTEM INTEGRITY DECEMBER
5225 080.70478 218,635 RELOCATE FACILITIES. INSTALL 350 FEET OF 6 INCH POLY AND ABANDON 250 FEET OF 6 INCH POLY TO ACCOMMODATE CONSTRUCTION ON TELECOM LINE. ALL CUSTOMERS PLANO
RELOCATION OF FACILITIES DECEMBER
5226 080.70479 68,600 REPLACE DISTRICT REGULATOR STATION ALONG FANNIN IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CAMERON
SYSTEM INTEGRITY DECEMBER
5227 080.70498 38,168
INSTALL 485 FEET OF 2 INCH POLY ALONG HERON AND ABANDON 400 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENISON
SYSTEM INTEGRITY DECEMBER
5228 080.70501 17,245 INSTALL 10 FEET OF 6 INCH WITH 10 FEET OF 6 INCH POLY ALONG NORTH PERAL STREET AND ABANDON 10 FEET OF 6 INCH POLY. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
5229 080.70502 103,044
RELOCATE FACILITIES. INSTALL 1150 FEET OF 4 INCH POLY AND ABANDON 1150 FEET OF 3 INCH STEEL ALONG PALASOTA DRIVE TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
5230 080.70503 2,096 PURCHASE KIT SCRAPER FOR USE IN THE ROCKWALL DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT DECEMBER
5231 080.70505 43,596
RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY AND ABANDON 30 FEET OF 6 INCH POLY ALONG SACHSE ROAD TO ACCOMMODATE THE CITY OF SACHSE IN BROWNWOOD IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE
SYSTEM INTEGRITY DECEMBER
5232 080.70519 25,301 INSTALL 320 FEET OF 4 INCH POLY ALONG JOHNSON ROAD. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL IOWA PARK GROWTH DECEMBER
5233 080.70522 53,639
RELOCATE FACILITIES. INSTALL 750 FEET OF 4 INCH POLY ALONG BAILEY BOSWELL ROAD AND ABANDON 700 FEET OF 4 INCH POLY TO ACCOMODATE CITY OF FORT WORTH STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SAGINAW
RELOCATION OF FACILITIES DECEMBER
5234 080.70561 22,299 INSTALL 100 FEET OF 2 INCH POLY ALONG CARROL DRIVE. RESIDENTIAL KELLER GROWTH DECEMBER
5235 080.70574 15,072 INSTALL 600 FEET OF 4 INCH POLY ALONG STREETS OF COMMERCIAL CUSTOMER. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL BELLMEAD GROWTH DECEMBER
5236 080.70580 15,322
RELOCATE FACILITIES. INSTALL 500 FEET OF 6 INCH POLY AND ABANDON 500 FEET OF 6 INCH POLY ALONG YUKON DEVELOPMENT TO ACCOMMODATE BURLESON DEVELOPMENT. ALL CUSTOMERS BURLESON
RELOCATION OF FACILITIES DECEMBER
MTX AdditionsPage 165 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
5237 080.70582 48,641 INSTALL 2,152 FEET OF 4 INCH AND 873 FEET OF 2 INCH POLY ALONG STREETS OF JOSHUA MEADOWS 3B. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL JOSHUA GROWTH DECEMBER
5238 080.70608 86,716
INSTALL 640 FEET OF 2 INCH POLY AND ABANDON 625 FEET OF 2 INCH STEEL ALONG ROGERS STREET IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCGREGO
SYSTEM INTEGRITY DECEMBER
5239 080.70627 19,239 INSTALL 50 FEET OF 4 INCH POLY ALONG MINOR STREET.COMMERCIAL OR
INDUSTRIAL FROST GROWTH DECEMBER
5240 080.70629 15,931 INSTALL 100 FEET OF 2 INCH POLY ALONG PARKWAY AVENUE. RESIDENTIAL NORTH RICHLAND HILLS GROWTH DECEMBER
5241 080.70633 21,155
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY ALONG BATES AND ELM AND ABANDON 418 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF STEPHENVILLE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS STEPHENVILLE
SYSTEM INTEGRITY DECEMBER
5242 080.70650 169,779
RELOCATE FACILITIES. INSTALL 1800 FEET OF 2 INCH POLY ALONG AUSTIN AND OAK AND ABANDON 482 FEET OF 2 INCH POLY AND 1310 FEET OF 2 INCH STEEL TO ACCOMMODATE THE CITY OF DELEON IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DELEON
SYSTEM INTEGRITY DECEMBER
5243 080.70678 79,054
RELOCATE FACILITIES. INSTALL 600 FEET OF 2 INCH POLY ALONG LEONARD STREET AND WALTERS STREET AND ABANDON 2725 FEET OF 2 INCH STEEL TO ACCOMODATE CITY OF LEWISVILLE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS LEWISVILLE
SYSTEM INTEGRITY DECEMBER
5244 080.70712 62,950
INSTALL 5 FEET OF 10 INCH STEEL AND 268 FEET OF 2 INCH POLY AND ABANDON 3 FEET OF 10 INCH STEEL AND 280 FEET OF 4 INCH POLY ALONG ALONG WILLIAM A TAYLOR IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
5245 080.70713 4,664 INSTALL 1342 FEET OF 4 INCH POLY AND 412 FEET OF 8 INCH POLY ALONG THE STREETS OF PGA OMNI.
COMMERCIAL OR INDUSTRIAL FRISCO GROWTH DECEMBER
5246 080.70716 4,757
INSTALL 785 FEET OF 6 INCH POLY, 2735 FEET OF 4 INCH POLY AND 3765 FEET OF 2 INCH POLY ALONG THE STREETS OF STONE CREEK. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL ROCKWALL GROWTH DECEMBER
5247 080.70747 10,523 INSTALL 1956 FEET OF 4 INCH AND 2116 FEET OF 2 INCH POLY ALONG STREETS OF HAWKES LANDING. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL LEANDER GROWTH DECEMBER
5248 080.70784 5,325 PURCHASE HEATH ODORATOR FOR USE IN THE SAN ANGELO DISTRICT. ALL CUSTOMERS SYSTEM WIDEGENERAL PLANT -
EQUIPMENT DECEMBER
5249 080.70787 34,840
RELOCATE FACILITIES. INSTALL 50 FEET OF 4 INCH POLY ALONG CARUTH PARK AND ABANDON 24 FEET OF POLY TO ACCOMMODATE THE CITY OF UNIVERSITY PARK IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HIGHLAND PARK
SYSTEM INTEGRITY DECEMBER
5250 080.70798 22,689
REPLACE DISTRICT REGULATOR STATION 409 IN FORT WORTH AND ABANDON DISTRICT REGULATOR STATION IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
5251 080.70806 100,992
RELOCATE FACILITIES. INSTALL 750 FT OF 2 INCH POLY ABANDON 740 FEET OF 1.25 INCH POLY TO ACCOMMODATE CITY OF ROCKWALL STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ROCKWALL
SYSTEM INTEGRITY DECEMBER
5252 080.70809 27,992
RELOCATE FACILITIES. INSTALL 60 FEET OF 6 INCH POLY ALONG NOLAN RIVER ROAD AND ABANDON 50 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF CLEBURNE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
5253 080.70816 30,935
RELOCATE FACILITIES. INSTALL 260 FEET OF 2 INCH POLY ALONG NORTH ANNA DRIVE AND ABANDON 395 FEET OF 2 INCH STEEL AND 40 FEET OF 4 INCH POLY TO ACCOMODATE THE CITY OF ALLEN PAVING IMPROVEMENT PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ALLEN
SYSTEM INTEGRITY DECEMBER
5254 080.70831 125,949 INSTALL 3 CLOCKSPRINGS ALONG LINE D IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GARLAND
SYSTEM INTEGRITY DECEMBER
5255 080.70843 101,463
RELOCATE FACILITIES. INSTALL 500 FEET OF 6 INCH POLY AND 100 FEET OF 4 INCH POLY AND ABANDON 495 FEET OF 6 INCH POLY AND 95 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF SACHSE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SACHSE
SYSTEM INTEGRITY DECEMBER
5256 080.70849 60,435
INSTALL 10 FEET OF 16 INCH STEEL AND ABANDON 10 FEET OF 16 INCH STEEL ALONG PIPELINE ROAD AND EULESS IN EULESS IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EULESS
SYSTEM INTEGRITY DECEMBER
5257 080.70866 53,208 INSTALL 1460 FEET 4 INCH POLY AND ABANDON 250 FEET OF 2 INCH STEEL ALONG 4TH STREET. ALL CUSTOMERS MILES
SYSTEM IMPROVEMENT DECEMBER
5258 080.70868 70,010
RELOCATE FACILITIES. INSTALL 1000 FEET OF 2 INCH POLY ALONG PARK PLACE AND ABANDON 1000 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS COLLEGE STATION
SYSTEM INTEGRITY DECEMBER
5259 080.70873 60,864
INSTALL 420 FEET OF 4 INCH POLY ALONG W ROBERTS STREET AND ABANDON 392 FEET OF 4 INCH STEEL AND 28 FEET OF 4 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GORMAN
SYSTEM INTEGRITY DECEMBER
5260 080.70874 16,959 INSTALL 100 FEET OF 2 INCH POLY ALONG THE STREETS OF FOOD EXPERIENCE.
COMMERCIAL OR INDUSTRIAL AUBREY GROWTH DECEMBER
5261 080.70887 4,107 INSTALL 375 FEET OF 2 INCH POLY ALONG VISTA. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH DECEMBER
5262 080.70892 30,511
RELOCATE FACILITIES. INSTALL 220 FEET OF 2 INCH POLY ALONG 32ND AVENUE AND ABANDON 400 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
5263 080.70934 11,828 INSTALL CAMERAS AT SAN ANGELO SERVICE CENTER. ALL CUSTOMERS SAN ANGELO STRUCTURES DECEMBER
5264 080.70935 558,102 INSTALL WELD OVER SLEEVE ALONG LINE D AT 635 AND DENTON DRIVE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DALLAS
SYSTEM INTEGRITY DECEMBER
5265 080.70946 6,092 INSTALL 525 FEET OF 4 INCH POLY ALONG EDMONDS LANE. DEVELOPER INSTALLED FACILITIES.
COMMERCIAL OR INDUSTRIAL LEWISVILLE GROWTH DECEMBER
5266 080.70962 31,995
RELOCATE FACILITIES. INSTALL 1400 FEET OF 2 INCH POLY ALONG HOLLEMAN DRIVE AND WELLBORN ROAD AND ABANDON 1400 FEET OF 4 INCH POLY TO ACCOMMODATE CITY OF COLLEGE STATION STREET PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
5267 080.70972 13,691 INSTALL 1530 FEET OF 2 INCH POLY ALONG THE STREETS OF MISSION RANCH. DEVELOPER INSTALLED FACILITIES. RESIDENTIAL COLLEGE STATION GROWTH DECEMBER
5268 080.70983 1,098 INSTALL 94 FEET OF 2 INCH POLY ALONG WILLOWOOD COURT. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5269 080.70999 9,810 INSTALL 1068 FEET OF 6 INCH, 339 FEET OF 4 INCH AND 206 FEET OF 2 INCH POLY ALONG STREETS OF CELINA 15. DEVELOPER INSTALLED FACILITIES. ALL CUSTOMERS ALLEN GROWTH DECEMBER
5270 080.71001 5,431
RELOCATE FACILITIES. INSTALL 250 FEET OF 2 INCH POLY ALONG WOODVILLE ROAD AND ABANDON 250 FEET OF 2 INCH POLY TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
5271 080.71014 33,911
REPLACE DISTRICT REGULATOR STATION 204 WITH 2 INCH PRESSURE REGULATOR, RELIEF VALVE, AND ABOVE GROUND SENSING LINE IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS FORT WORTH
SYSTEM INTEGRITY DECEMBER
MTX AdditionsPage 166 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS FOR CALENDAR YEAR 2020
LINE NO. PROJECT NO. COST (1)DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN
CALENDAR YEAR 2020 (2)CUSTOMERS BENEFITED LOCATION
PURPOSE OF PROJECT
DATE PLACED IN GAS PLANT
IN SERVICE
5272 080.71015 61,808
INSTALL 500 FEET OF 4 INCH POLY ALONG LONDONDERRY DRIVE AND ABANDON 490 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS WACO
SYSTEM INTEGRITY DECEMBER
5273 080.71028 48,210
INSTALL 230 FEET OF 4 INCH POLY ALONG HANNAFORD AND RUCKER ROAD AND ABANDON 310 FEET OF 3 INCH POLY IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS GRANBURY
SYSTEM INTEGRITY DECEMBER
5274 080.71030 73,976 REPLACE HIGH PRESSURE SERVICE LINE ON LINE KC (WEST) IN ACCORDANCE WITH THE RAILAROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5275 080.71038 25,160 INSTALL 100 FEET OF 4 INCH POLY ALONG REBECCA LANE. RESIDENTIAL ABILENE GROWTH DECEMBER
5276 080.71045 (21,752) INSTALL 35 FEET OF 4 INCH POLY ALONG GATTIS SCHOOL ROAD.COMMERCIAL OR
INDUSTRIAL HUTTO GROWTH DECEMBER
5277 080.71050 15,507
RELOCATE FACILITIES. INSTALL 95 FEET OF 4 INCH POLY ALONG EAST 31ST STREET AND ABANDON 200 FEET OF 2 INCH AND 150 FEET OF 4 INCH STEEL TO ACCOMMODATE CITY OF BRYAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS BRYAN
SYSTEM INTEGRITY DECEMBER
5278 080.71080 4,090 PURCHASE (2) SENSIT GAS DETECTORS FOR USE IN WAXAHACHIE DISTRICT. ALL CUSTOMERS WAXAHACHIEGENERAL PLANT -
EQUIPMENT DECEMBER
5279 080.71082 223,162
INSTALL 380 FEET OF 4 INCH POLY ALONG EMERSON AND PRESTON ROAD AND ABANDON 380 FEET OF 4 INCH STEEL IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS UNIVERSITY PARK
SYSTEM INTEGRITY DECEMBER
5280 080.71087 2,106 PURCHASE (1) PEELER AND SCRAPER KIT FOR USE IN EASTLAND DISTRICT. ALL CUSTOMERS EASTLANDGENERAL PLANT -
EQUIPMENT DECEMBER
5281 080.71090 29,575
INSTALL 350 FEET OF 2 INCH POLY ALONG ROSS AVENUE AND LESLIE STREET AND ABANDON 950 FEET OF 2 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS HILLSBORO
SYSTEM INTEGRITY DECEMBER
5282 080.71093 3,782
RELOCATE FACILITIES. INSTALL 40 FEET OF 6 INCH POLY ALONG STAR TRAIL AND ABANDON 40 FEET OF 6 INCH POLY TO ACCOMMODATE STORM DRAIN IMPROVEMENTS. ALL CUSTOMERS PROSPER
RELOCATION OF FACILITIES DECEMBER
5283 080.71099 111,478
INSTALL 1260 FEET OF 4 INCH POLY ALONG MOSS STREET AND ABANDON 1747 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILRAOD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS EASTLAND
SYSTEM INTEGRITY DECEMBER
5284 080.71102 27,266 INSTALL 290 FEET OF 4 INCH POLY AND ABANDON 290 FEET OF 3 INCH IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEAGUE
SYSTEM INTEGRITY DECEMBER
5285 080.71107 62,218
INSTALL 670 FEET OF 4 INCH POLY ALONG BONHAM STREET AND ABANDON 670 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MEXIA
SYSTEM INTEGRITY DECEMBER
5286 080.71111 8,996 INSTALL 100 FEET OF 2 INCH POLY ALONG MOUNT HORUM WAY. RESIDENTIAL FORT WORTH GROWTH DECEMBER
5287 080.71112 8,336 INSTALL 100 FEET OF 2 INCH POLY ALONG WEST 7TH AVENUE.COMMERCIAL OR
INDUSTRIAL CORSICANA GROWTH DECEMBER
5288 080.71113 11,569 INSTALL 80 FEET OF 2 INCH POLY ALONG BETWEEN NORTH COMMERCE STREET. RESIDENTIAL CORSICANA GROWTH DECEMBER
5289 080.71114 3,351
RELOCATE FACILITIES. INSTALL 175 FEET OF 2 INCH POLY AND ABANDON 160 FEET OF 2 INCH STEEL ALONG NORTH ASH STREET TO ACCOMMODATE CITY OF SPRINGTOWN STREET PROJECT IN ACCORDANCE TO THE TEXAS RAILROAD COMMISSION RULE 8.209. ALL CUSTOMERS SPRINGTOWN
SYSTEM INTEGRITY DECEMBER
5290 080.71116 111,166 INSTALL (3) LOW PRESSURE VALVES ON ABILENE LOW PRESSURE SYSTEM IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5291 080.71118 15,621 INSTALL 180 FEET OF 2 INCH POLY ALONG PRESTON DRIVE. RESIDENTIAL POTTSBORO GROWTH DECEMBER
5292 080.71124 58,811
INSTALL 715 FEET OF 2 INCH POLY ALONG N. SMYTH STREET AND ABANDON 315 FEET OF 4 INCH STEEL IN ACCORDANCE WITH THE RAILORAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MART
SYSTEM INTEGRITY DECEMBER
5293 080.71145 58,737
RELOCATE FACILITIES. INSTALL 462 FEET OF 6 INCH POLY ALONG WILMETH ROAD AND ABANDON 508 FEET OF 6 INCH POLY TO ACCOMMODATE THE CITY OF MCKINNEY ROAD PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS MCKINNEY
SYSTEM INTEGRITY DECEMBER
5294 080.71150 31,466
INSTALL 175 FEET OF 4 INCH POLY ALONG SOUTH 11TH STREET AND ABANDON 175 FEET OF 4 INCH CAST IRON IN ACCRODANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS ABILENE
SYSTEM INTEGRITY DECEMBER
5295 080.71161 6,313 PURCHASE (1) VALVE CHANGER KIT FOR USE IN SAN ANGELO DISTRICT. ALL CUSTOMERS SAN ANGELOGENERAL PLANT -
EQUIPMENT DECEMBER
5296 080.71267 40,186
RELOCATE FACILITIES. INSTALL 80 FEET OF 6 INCH POLY ALONG WOODWARD AVENUE AND ABANDON 80 FEET OF 6 INCH POLY TO ACCOMMODATE CITY OF CLEBURNE STREET PROJECT IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS CLEBURNE
SYSTEM INTEGRITY DECEMBER
5297 080.71282 4,264 PURCHASE (1) METROTECH LOCATOR FOR USE IN WICHITA FALLS DISTRICT. ALL CUSTOMERS WICHITA FALLSGENERAL PLANT -
EQUIPMENT DECEMBER
5298 080.71331 14,227 INSTALL 75 FEET OF 2 INCH POLY ALONG 21ST STREET.COMMERCIAL OR
INDUSTRIAL CORSICANA GROWTH DECEMBER
5299 080.71342 38,238
RELOCATE FACILITIES. INSTALL 115 FEET OF 6 INCH STEEL ALONG JACK WHITE STREET AND ABANDON 115 FEET OF 6 INCH STEEL TO ACCOMMODATE CITY OF TEMPLE STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS TEMPLE
SYSTEM INTEGRITY DECEMBER
5300 080.71343 19,253
RELOCATE FACILITIES. INSTALL 290 FEET OF 2 INCH POLY AND ABANDON 230 FEET OF 3 INCH AND 2 INCH STEEL ALONG US75 TO ACCOMMODATE CITY OF SHERMAN STREET IMPROVEMENT PROJECT IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS SHERMAN
SYSTEM INTEGRITY DECEMBER
5301 080.71443 5,837
INSTALL 630 FEET OF 4 INCH POLY AND ABANDON 550 FEET OF 4 INCH STEEL AND 80 FEET OF 4 INCH POLY ALONG CASH AND TEXOWA IN ACCORDANCE WITH THE RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS IOWA PARK
SYSTEM INTEGRITY DECEMBER
5302 080.71505 81,409 INSTALL WELDOVER SLEEVES ON INTEGRITY DIGS ALONG D9-2-1-2. ALL CUSTOMERS MCKINNEYPIPELINE
INTEGRITY DECEMBER
5303 080.71539 2,371,139
INSTALL 7500 FEET 6 IN STEEL AND 7500 FEET OF 6 INCH STEEL ALONG FISHTRAP ROAD IN ACCORDANCE WITH RAILROAD COMMISSION OF TEXAS RULE 8.209. ALL CUSTOMERS DENTON
SYSTEM INTEGRITY DECEMBER
5304
TOTAL MTX ADDITIONS
(LN. 1 - LN. 5303) 868,821,981 530553065307 NOTES:5308 (1) The "COST" column reflects the capitalized portion of the cost only.5309 (2) The "DESCRIPTION OF COMPLETED PROJECTS DEDICATED TO PUBLIC USE IN CALENDAR YEAR 2020" column describes capitalized costs only.
MTX AdditionsPage 167 of 167
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.33149 38000 (30) 080 190 - Mid-Tex Gas Division Addition 080.33150 38000 (16,224) 080 190 - Mid-Tex Gas Division Addition 080.33174 37601 (24) 080 190 - Mid-Tex Gas Division Addition 080.33174 37602 24 080 190 - Mid-Tex Gas Division Addition 080.33345 38000 8,516 080 190 - Mid-Tex Gas Division Addition 080.33346 38000 18,980 080 190 - Mid-Tex Gas Division Addition 080.33347 38000 41,217 080 190 - Mid-Tex Gas Division Addition 080.33348 38000 12,266 080 190 - Mid-Tex Gas Division Addition 080.33349 37602 34 080 190 - Mid-Tex Gas Division Addition 080.33349 38000 11,051 080 190 - Mid-Tex Gas Division Addition 080.33350 38000 25,233 080 190 - Mid-Tex Gas Division Addition 080.33351 38000 8,364 080 190 - Mid-Tex Gas Division Addition 080.33352 38000 9,282 080 190 - Mid-Tex Gas Division Addition 080.33353 37601 940 080 190 - Mid-Tex Gas Division Addition 080.33353 37602 5,719 080 190 - Mid-Tex Gas Division Addition 080.33354 37601 1,939 080 190 - Mid-Tex Gas Division Addition 080.33354 37602 19,363 080 190 - Mid-Tex Gas Division Addition 080.33355 37601 5,427 080 190 - Mid-Tex Gas Division Addition 080.33355 37602 16,525 080 190 - Mid-Tex Gas Division Addition 080.33356 37601 873 080 190 - Mid-Tex Gas Division Addition 080.33356 37602 3,378 080 190 - Mid-Tex Gas Division Addition 080.33357 37601 318 080 190 - Mid-Tex Gas Division Addition 080.33357 37602 14,046 080 190 - Mid-Tex Gas Division Addition 080.33358 37601 2,621 080 190 - Mid-Tex Gas Division Addition 080.33358 37602 9,860 080 190 - Mid-Tex Gas Division Addition 080.33359 37601 77,681 080 190 - Mid-Tex Gas Division Addition 080.33359 37602 (73,031) 080 190 - Mid-Tex Gas Division Addition 080.33359 38100 2 080 190 - Mid-Tex Gas Division Addition 080.33360 37601 1,787 080 190 - Mid-Tex Gas Division Addition 080.33360 37602 16,021 080 190 - Mid-Tex Gas Division Addition 080.33487 37602 717 080 190 - Mid-Tex Gas Division Addition 080.33487 38000 116 080 190 - Mid-Tex Gas Division Addition 080.33492 37602 203 080 190 - Mid-Tex Gas Division Addition 080.33492 38000 35 080 190 - Mid-Tex Gas Division Addition 080.33502 37602 236 080 190 - Mid-Tex Gas Division Addition 080.33506 37601 99 080 190 - Mid-Tex Gas Division Addition 080.33507 37602 135 080 190 - Mid-Tex Gas Division Addition 080.33513 37602 15 080 190 - Mid-Tex Gas Division Addition 080.33513 38000 1 080 190 - Mid-Tex Gas Division Addition 080.33519 37602 5 080 190 - Mid-Tex Gas Division Addition 080.33519 38000 0.22 080 190 - Mid-Tex Gas Division Addition 080.33520 37601 254 080 190 - Mid-Tex Gas Division Addition 080.33520 38000 1 080 190 - Mid-Tex Gas Division Addition 080.33546 37602 133 080 190 - Mid-Tex Gas Division Addition 080.33546 38000 249 080 190 - Mid-Tex Gas Division Addition 080.33548 37602 36 080 190 - Mid-Tex Gas Division Addition 080.33548 38000 143 080 190 - Mid-Tex Gas Division Addition 080.33561 37601 3,021 080 190 - Mid-Tex Gas Division Addition 080.33604 37602 280 080 190 - Mid-Tex Gas Division Addition 080.33604 38000 72 080 190 - Mid-Tex Gas Division Addition 080.33654 37602 371 080 190 - Mid-Tex Gas Division Addition 080.33662 37602 16 080 190 - Mid-Tex Gas Division Addition 080.33663 37602 15 080 190 - Mid-Tex Gas Division Addition 080.33676 37602 75 080 190 - Mid-Tex Gas Division Addition 080.33676 38000 31 080 190 - Mid-Tex Gas Division Addition 080.33726 37602 281 080 190 - Mid-Tex Gas Division Addition 080.33726 38000 7 080 190 - Mid-Tex Gas Division Addition 080.33733 37602 63 080 190 - Mid-Tex Gas Division Addition 080.33733 38000 16 080 190 - Mid-Tex Gas Division Addition 080.33734 37602 58 080 190 - Mid-Tex Gas Division Addition 080.33734 38000 21 080 190 - Mid-Tex Gas Division Addition 080.33735 37602 60 080 190 - Mid-Tex Gas Division Addition 080.33735 38000 6 080 190 - Mid-Tex Gas Division Addition 080.33742 37602 814 080 190 - Mid-Tex Gas Division Addition 080.33742 38000 11 080 190 - Mid-Tex Gas Division Addition 080.33746 37602 21 080 190 - Mid-Tex Gas Division Addition 080.33746 38000 1 080 190 - Mid-Tex Gas Division Addition 080.33776 37602 60 080 190 - Mid-Tex Gas Division Addition 080.33798 37601 602 080 190 - Mid-Tex Gas Division Addition 080.33801 37602 21 080 190 - Mid-Tex Gas Division Addition 080.33801 38000 3 080 190 - Mid-Tex Gas Division Addition 080.33840 37602 29 080 190 - Mid-Tex Gas Division Addition 080.33842 37602 380 080 190 - Mid-Tex Gas Division Addition 080.33844 37602 112 080 190 - Mid-Tex Gas Division Addition 080.33844 38000 18 080 190 - Mid-Tex Gas Division Addition 080.33849 37601 313 080 190 - Mid-Tex Gas Division Addition 080.33870 37602 40 080 190 - Mid-Tex Gas Division Addition 080.33900 37602 242 080 190 - Mid-Tex Gas Division Addition 080.33900 38000 52 080 190 - Mid-Tex Gas Division Addition 080.33906 37602 19 080 190 - Mid-Tex Gas Division Addition 080.33907 37602 111 080 190 - Mid-Tex Gas Division Addition 080.33907 38000 107 080 190 - Mid-Tex Gas Division Addition 080.33909 37602 337 080 190 - Mid-Tex Gas Division Addition 080.33909 38000 11 080 190 - Mid-Tex Gas Division Addition 080.33951 37602 102 080 190 - Mid-Tex Gas Division Addition 080.33951 38000 18 080 190 - Mid-Tex Gas Division Addition 080.33979 37602 286 080 190 - Mid-Tex Gas Division Addition 080.33981 37602 32 080 190 - Mid-Tex Gas Division Addition 080.34037 37602 114 080 190 - Mid-Tex Gas Division Addition 080.34048 37602 18 080 190 - Mid-Tex Gas Division Addition 080.34070 37602 86 080 190 - Mid-Tex Gas Division Addition 080.34087 37602 55 080 190 - Mid-Tex Gas Division Addition 080.34087 38000 16 080 190 - Mid-Tex Gas Division Addition 080.34091 37602 284 080 190 - Mid-Tex Gas Division Addition 080.34091 38000 14 080 190 - Mid-Tex Gas Division Addition 080.34136 37602 57 080 190 - Mid-Tex Gas Division Addition 080.34136 38000 11 080 190 - Mid-Tex Gas Division Addition 080.34137 37602 22 080 190 - Mid-Tex Gas Division Addition 080.34143 37602 273 080 190 - Mid-Tex Gas Division Addition 080.34143 38000 111 080 190 - Mid-Tex Gas Division Addition 080.34146 37602 276 080 190 - Mid-Tex Gas Division Addition 080.34175 37602 325 080 190 - Mid-Tex Gas Division Addition 080.34175 38000 10 080 190 - Mid-Tex Gas Division Addition 080.34176 37602 139 080 190 - Mid-Tex Gas Division Addition 080.34176 38000 21 080 190 - Mid-Tex Gas Division Addition 080.34177 37602 262 080 190 - Mid-Tex Gas Division Addition 080.34177 38000 372 080 190 - Mid-Tex Gas Division Addition 080.34187 37602 187
MTX Additions by FERCPage 1 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.34187 38000 101 080 190 - Mid-Tex Gas Division Addition 080.34188 37602 1,370 080 190 - Mid-Tex Gas Division Addition 080.34188 38000 49 080 190 - Mid-Tex Gas Division Addition 080.34208 37602 686 080 190 - Mid-Tex Gas Division Addition 080.34210 37602 218 080 190 - Mid-Tex Gas Division Addition 080.34210 38000 23 080 190 - Mid-Tex Gas Division Addition 080.34228 37602 588 080 190 - Mid-Tex Gas Division Addition 080.34251 37602 67 080 190 - Mid-Tex Gas Division Addition 080.34251 38000 7 080 190 - Mid-Tex Gas Division Addition 080.34286 37602 131 080 190 - Mid-Tex Gas Division Addition 080.34286 38000 22 080 190 - Mid-Tex Gas Division Addition 080.34294 37602 739 080 190 - Mid-Tex Gas Division Addition 080.34294 38000 53 080 190 - Mid-Tex Gas Division Addition 080.34320 37602 34 080 190 - Mid-Tex Gas Division Addition 080.34326 37601 212 080 190 - Mid-Tex Gas Division Addition 080.34395 37602 110 080 190 - Mid-Tex Gas Division Addition 080.34402 37601 207 080 190 - Mid-Tex Gas Division Addition 080.34402 38000 1 080 190 - Mid-Tex Gas Division Addition 080.34403 37601 152 080 190 - Mid-Tex Gas Division Addition 080.34417 37602 242 080 190 - Mid-Tex Gas Division Addition 080.34432 37602 308 080 190 - Mid-Tex Gas Division Addition 080.34470 37602 83 080 190 - Mid-Tex Gas Division Addition 080.34491 37602 97 080 190 - Mid-Tex Gas Division Addition 080.34502 37602 444 080 190 - Mid-Tex Gas Division Addition 080.34502 38000 123 080 190 - Mid-Tex Gas Division Addition 080.34508 37602 66 080 190 - Mid-Tex Gas Division Addition 080.34520 37602 399 080 190 - Mid-Tex Gas Division Addition 080.34520 38000 104 080 190 - Mid-Tex Gas Division Addition 080.34532 37602 20 080 190 - Mid-Tex Gas Division Addition 080.34532 38000 11 080 190 - Mid-Tex Gas Division Addition 080.34543 37602 62 080 190 - Mid-Tex Gas Division Addition 080.34543 38000 12 080 190 - Mid-Tex Gas Division Addition 080.34555 37602 113 080 190 - Mid-Tex Gas Division Addition 080.34555 38000 16 080 190 - Mid-Tex Gas Division Addition 080.34560 37602 623 080 190 - Mid-Tex Gas Division Addition 080.34562 37602 206 080 190 - Mid-Tex Gas Division Addition 080.34579 37602 298 080 190 - Mid-Tex Gas Division Addition 080.34579 38000 66 080 190 - Mid-Tex Gas Division Addition 080.34704 37602 12 080 190 - Mid-Tex Gas Division Addition 080.34729 37602 53 080 190 - Mid-Tex Gas Division Addition 080.34737 37602 677 080 190 - Mid-Tex Gas Division Addition 080.34741 37602 9 080 190 - Mid-Tex Gas Division Addition 080.34741 38000 0.15 080 190 - Mid-Tex Gas Division Addition 080.34745 37602 80 080 190 - Mid-Tex Gas Division Addition 080.34745 38000 29 080 190 - Mid-Tex Gas Division Addition 080.34747 37602 155 080 190 - Mid-Tex Gas Division Addition 080.34753 37601 113 080 190 - Mid-Tex Gas Division Addition 080.34776 37602 8 080 190 - Mid-Tex Gas Division Addition 080.34785 37602 76 080 190 - Mid-Tex Gas Division Addition 080.34785 38000 6 080 190 - Mid-Tex Gas Division Addition 080.34862 37602 139 080 190 - Mid-Tex Gas Division Addition 080.34866 37602 124 080 190 - Mid-Tex Gas Division Addition 080.34881 37602 310 080 190 - Mid-Tex Gas Division Addition 080.34960 37601 168 080 190 - Mid-Tex Gas Division Addition 080.34982 37602 147 080 190 - Mid-Tex Gas Division Addition 080.34982 38000 40 080 190 - Mid-Tex Gas Division Addition 080.34994 37602 560 080 190 - Mid-Tex Gas Division Addition 080.34994 38000 35 080 190 - Mid-Tex Gas Division Addition 080.34998 37602 135 080 190 - Mid-Tex Gas Division Addition 080.35032 37602 221 080 190 - Mid-Tex Gas Division Addition 080.35156 37602 82 080 190 - Mid-Tex Gas Division Addition 080.35164 37602 37 080 190 - Mid-Tex Gas Division Addition 080.35164 38000 16 080 190 - Mid-Tex Gas Division Addition 080.35180 38000 5 080 190 - Mid-Tex Gas Division Addition 080.35242 37602 4 080 190 - Mid-Tex Gas Division Addition 080.35242 38000 17 080 190 - Mid-Tex Gas Division Addition 080.35255 37602 63 080 190 - Mid-Tex Gas Division Addition 080.37203 37602 0.01 080 190 - Mid-Tex Gas Division Addition 080.38117 37602 90 080 190 - Mid-Tex Gas Division Addition 080.38117 38000 44 080 190 - Mid-Tex Gas Division Addition 080.38382 37601 0.36 080 190 - Mid-Tex Gas Division Addition 080.38667 37602 2,869 080 190 - Mid-Tex Gas Division Addition 080.39929 37600 (94,305) 080 190 - Mid-Tex Gas Division Addition 080.40366 37600 0.02 080 190 - Mid-Tex Gas Division Addition 080.40413 37600 86 080 190 - Mid-Tex Gas Division Addition 080.40669 37600 553 080 190 - Mid-Tex Gas Division Addition 080.40785 37602 0.01 080 190 - Mid-Tex Gas Division Addition 080.41157 38000 (2,204) 080 190 - Mid-Tex Gas Division Addition 080.41251 37602 0.01 080 190 - Mid-Tex Gas Division Addition 080.41251 38000 0.01 080 190 - Mid-Tex Gas Division Addition 080.41262 37602 (8) 080 190 - Mid-Tex Gas Division Addition 080.41262 38000 (4) 080 190 - Mid-Tex Gas Division Addition 080.41748 37602 18,112 080 190 - Mid-Tex Gas Division Addition 080.41874 37601 32 080 190 - Mid-Tex Gas Division Addition 080.41874 37602 297 080 190 - Mid-Tex Gas Division Addition 080.41874 38000 18 080 190 - Mid-Tex Gas Division Addition 080.41874 38100 4 080 190 - Mid-Tex Gas Division Addition 080.41874 38200 4 080 190 - Mid-Tex Gas Division Addition 080.41874 38300 4 080 190 - Mid-Tex Gas Division Addition 080.42117 37602 939 080 190 - Mid-Tex Gas Division Addition 080.42131 37601 0.01 080 190 - Mid-Tex Gas Division Addition 080.42141 38000 38 080 190 - Mid-Tex Gas Division Addition 080.42372 37601 (2) 080 190 - Mid-Tex Gas Division Addition 080.42372 37800 (2) 080 190 - Mid-Tex Gas Division Addition 080.42388 37601 2,538 080 190 - Mid-Tex Gas Division Addition 080.42388 37602 12,149 080 190 - Mid-Tex Gas Division Addition 080.42388 37800 516 080 190 - Mid-Tex Gas Division Addition 080.42454 37601 691 080 190 - Mid-Tex Gas Division Addition 080.42454 37602 3,156 080 190 - Mid-Tex Gas Division Addition 080.43732 37602 1,225 080 190 - Mid-Tex Gas Division Addition 080.43732 38000 267 080 190 - Mid-Tex Gas Division Addition 080.44243 37602 1,080 080 190 - Mid-Tex Gas Division Addition 080.44473 37602 154 080 190 - Mid-Tex Gas Division Addition 080.44481 37602 308 080 190 - Mid-Tex Gas Division Addition 080.44697 37602 206 080 190 - Mid-Tex Gas Division Addition 080.44814 37602 3,608 080 190 - Mid-Tex Gas Division Addition 080.44865 37602 206 080 190 - Mid-Tex Gas Division Addition 080.45244 37602 19
MTX Additions by FERCPage 2 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.45244 38000 8 080 190 - Mid-Tex Gas Division Addition 080.45244 38100 0.32 080 190 - Mid-Tex Gas Division Addition 080.45244 38200 0.27 080 190 - Mid-Tex Gas Division Addition 080.45244 38300 0.07 080 190 - Mid-Tex Gas Division Addition 080.45245 37602 249 080 190 - Mid-Tex Gas Division Addition 080.45245 38000 38 080 190 - Mid-Tex Gas Division Addition 080.45245 38100 5 080 190 - Mid-Tex Gas Division Addition 080.45245 38200 13 080 190 - Mid-Tex Gas Division Addition 080.45245 38300 3 080 190 - Mid-Tex Gas Division Addition 080.45301 37602 0.31 080 190 - Mid-Tex Gas Division Addition 080.45301 38000 0.05 080 190 - Mid-Tex Gas Division Addition 080.45509 37601 (222) 080 190 - Mid-Tex Gas Division Addition 080.45509 38500 (3) 080 190 - Mid-Tex Gas Division Addition 080.45614 37602 101 080 190 - Mid-Tex Gas Division Addition 080.45614 38000 21 080 190 - Mid-Tex Gas Division Addition 080.45614 38100 0.13 080 190 - Mid-Tex Gas Division Addition 080.45614 38200 1 080 190 - Mid-Tex Gas Division Addition 080.45614 38300 0.07 080 190 - Mid-Tex Gas Division Addition 080.45638 37601 (8,685) 080 190 - Mid-Tex Gas Division Addition 080.45638 37800 (278) 080 190 - Mid-Tex Gas Division Addition 080.45650 37602 0.22 080 190 - Mid-Tex Gas Division Addition 080.45650 38000 0.02 080 190 - Mid-Tex Gas Division Addition 080.45658 37601 14,340 080 190 - Mid-Tex Gas Division Addition 080.45658 37602 3,519 080 190 - Mid-Tex Gas Division Addition 080.45658 38000 153 080 190 - Mid-Tex Gas Division Addition 080.45693 37602 28 080 190 - Mid-Tex Gas Division Addition 080.45693 38000 6 080 190 - Mid-Tex Gas Division Addition 080.45693 38100 2 080 190 - Mid-Tex Gas Division Addition 080.45693 38200 2 080 190 - Mid-Tex Gas Division Addition 080.45693 38300 2 080 190 - Mid-Tex Gas Division Addition 080.45700 37602 613 080 190 - Mid-Tex Gas Division Addition 080.45700 38000 290 080 190 - Mid-Tex Gas Division Addition 080.45737 37602 237 080 190 - Mid-Tex Gas Division Addition 080.45737 38000 30 080 190 - Mid-Tex Gas Division Addition 080.45737 38100 12 080 190 - Mid-Tex Gas Division Addition 080.45737 38200 9 080 190 - Mid-Tex Gas Division Addition 080.45737 38300 9 080 190 - Mid-Tex Gas Division Addition 080.45825 37602 464 080 190 - Mid-Tex Gas Division Addition 080.45874 37601 0.02 080 190 - Mid-Tex Gas Division Addition 080.46022 37600 6,140 080 190 - Mid-Tex Gas Division Addition 080.46065 37602 467 080 190 - Mid-Tex Gas Division Addition 080.46065 38000 135 080 190 - Mid-Tex Gas Division Addition 080.46065 38100 37 080 190 - Mid-Tex Gas Division Addition 080.46065 38200 5 080 190 - Mid-Tex Gas Division Addition 080.46065 38300 4 080 190 - Mid-Tex Gas Division Addition 080.46146 37602 1,761 080 190 - Mid-Tex Gas Division Addition 080.46146 38000 52 080 190 - Mid-Tex Gas Division Addition 080.46146 38100 52 080 190 - Mid-Tex Gas Division Addition 080.46146 38200 104 080 190 - Mid-Tex Gas Division Addition 080.46146 38300 52 080 190 - Mid-Tex Gas Division Addition 080.46332 37602 309 080 190 - Mid-Tex Gas Division Addition 080.46343 37602 11 080 190 - Mid-Tex Gas Division Addition 080.46343 38000 0.21 080 190 - Mid-Tex Gas Division Addition 080.46369 37602 650 080 190 - Mid-Tex Gas Division Addition 080.46447 37601 2,009,313 080 190 - Mid-Tex Gas Division Addition 080.46449 37602 1,082 080 190 - Mid-Tex Gas Division Addition 080.46449 38000 127 080 190 - Mid-Tex Gas Division Addition 080.46449 38100 38 080 190 - Mid-Tex Gas Division Addition 080.46449 38200 13 080 190 - Mid-Tex Gas Division Addition 080.46449 38300 13 080 190 - Mid-Tex Gas Division Addition 080.46450 37602 1,192 080 190 - Mid-Tex Gas Division Addition 080.46450 38000 194 080 190 - Mid-Tex Gas Division Addition 080.46450 38100 45 080 190 - Mid-Tex Gas Division Addition 080.46450 38200 45 080 190 - Mid-Tex Gas Division Addition 080.46450 38300 15 080 190 - Mid-Tex Gas Division Addition 080.46479 37602 1,404 080 190 - Mid-Tex Gas Division Addition 080.46479 38000 165 080 190 - Mid-Tex Gas Division Addition 080.46479 38100 50 080 190 - Mid-Tex Gas Division Addition 080.46479 38200 16 080 190 - Mid-Tex Gas Division Addition 080.46479 38300 16 080 190 - Mid-Tex Gas Division Addition 080.46900 37602 (3) 080 190 - Mid-Tex Gas Division Addition 080.46948 37602 619 080 190 - Mid-Tex Gas Division Addition 080.47046 37602 99,679 080 190 - Mid-Tex Gas Division Addition 080.47046 38000 1,007 080 190 - Mid-Tex Gas Division Addition 080.47061 37601 10,076 080 190 - Mid-Tex Gas Division Addition 080.47061 37602 1,008 080 190 - Mid-Tex Gas Division Addition 080.47061 38000 112 080 190 - Mid-Tex Gas Division Addition 080.47064 37601 (1) 080 190 - Mid-Tex Gas Division Addition 080.47076 37602 0.13 080 190 - Mid-Tex Gas Division Addition 080.47076 38000 0.04 080 190 - Mid-Tex Gas Division Addition 080.47076 38100 0.02 080 190 - Mid-Tex Gas Division Addition 080.47076 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.47076 38300 0.01 080 190 - Mid-Tex Gas Division Addition 080.47077 37602 154 080 190 - Mid-Tex Gas Division Addition 080.47077 38000 33 080 190 - Mid-Tex Gas Division Addition 080.47077 38100 1 080 190 - Mid-Tex Gas Division Addition 080.47077 38200 10 080 190 - Mid-Tex Gas Division Addition 080.47077 38300 2 080 190 - Mid-Tex Gas Division Addition 080.47079 37602 120 080 190 - Mid-Tex Gas Division Addition 080.47079 38000 114 080 190 - Mid-Tex Gas Division Addition 080.47079 38100 4 080 190 - Mid-Tex Gas Division Addition 080.47079 38200 1 080 190 - Mid-Tex Gas Division Addition 080.47079 38300 1 080 190 - Mid-Tex Gas Division Addition 080.47091 37602 214 080 190 - Mid-Tex Gas Division Addition 080.47091 38000 126 080 190 - Mid-Tex Gas Division Addition 080.47091 38100 7 080 190 - Mid-Tex Gas Division Addition 080.47091 38200 6 080 190 - Mid-Tex Gas Division Addition 080.47091 38300 2 080 190 - Mid-Tex Gas Division Addition 080.47150 37602 68 080 190 - Mid-Tex Gas Division Addition 080.47150 38000 2 080 190 - Mid-Tex Gas Division Addition 080.47150 38100 0.03 080 190 - Mid-Tex Gas Division Addition 080.47150 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.47220 37602 (0.01) 080 190 - Mid-Tex Gas Division Addition 080.47231 37602 4,330 080 190 - Mid-Tex Gas Division Addition 080.47303 37602 357 080 190 - Mid-Tex Gas Division Addition 080.47303 38000 79 080 190 - Mid-Tex Gas Division Addition 080.47303 38100 9 080 190 - Mid-Tex Gas Division Addition 080.47303 38200 1
MTX Additions by FERCPage 3 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.47303 38300 4 080 190 - Mid-Tex Gas Division Addition 080.47311 37602 1,091 080 190 - Mid-Tex Gas Division Addition 080.47311 38000 154 080 190 - Mid-Tex Gas Division Addition 080.47311 38100 46 080 190 - Mid-Tex Gas Division Addition 080.47311 38200 56 080 190 - Mid-Tex Gas Division Addition 080.47311 38300 14 080 190 - Mid-Tex Gas Division Addition 080.47398 37602 143 080 190 - Mid-Tex Gas Division Addition 080.47398 38000 35 080 190 - Mid-Tex Gas Division Addition 080.47445 37602 1,523 080 190 - Mid-Tex Gas Division Addition 080.47445 38000 1,149 080 190 - Mid-Tex Gas Division Addition 080.47445 38100 42 080 190 - Mid-Tex Gas Division Addition 080.47445 38200 5 080 190 - Mid-Tex Gas Division Addition 080.47445 38300 16 080 190 - Mid-Tex Gas Division Addition 080.47446 37602 24 080 190 - Mid-Tex Gas Division Addition 080.47446 38000 2 080 190 - Mid-Tex Gas Division Addition 080.47446 38100 0.02 080 190 - Mid-Tex Gas Division Addition 080.47446 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.47446 38300 0.02 080 190 - Mid-Tex Gas Division Addition 080.47461 37600 1 080 190 - Mid-Tex Gas Division Addition 080.47461 37601 456 080 190 - Mid-Tex Gas Division Addition 080.47461 37602 4 080 190 - Mid-Tex Gas Division Addition 080.47461 37800 30 080 190 - Mid-Tex Gas Division Addition 080.47512 37602 0.09 080 190 - Mid-Tex Gas Division Addition 080.47512 38000 2 080 190 - Mid-Tex Gas Division Addition 080.47597 37602 339 080 190 - Mid-Tex Gas Division Addition 080.47597 38000 291 080 190 - Mid-Tex Gas Division Addition 080.47597 38100 20 080 190 - Mid-Tex Gas Division Addition 080.47597 38200 13 080 190 - Mid-Tex Gas Division Addition 080.47597 38300 13 080 190 - Mid-Tex Gas Division Addition 080.47598 37602 538 080 190 - Mid-Tex Gas Division Addition 080.47598 38000 169 080 190 - Mid-Tex Gas Division Addition 080.47598 38100 31 080 190 - Mid-Tex Gas Division Addition 080.47598 38200 15 080 190 - Mid-Tex Gas Division Addition 080.47598 38300 15 080 190 - Mid-Tex Gas Division Addition 080.47600 37602 1,004 080 190 - Mid-Tex Gas Division Addition 080.47600 38000 430 080 190 - Mid-Tex Gas Division Addition 080.47601 37602 3,793 080 190 - Mid-Tex Gas Division Addition 080.47601 38000 2,325 080 190 - Mid-Tex Gas Division Addition 080.47603 37602 17,535 080 190 - Mid-Tex Gas Division Addition 080.47603 38000 6,484 080 190 - Mid-Tex Gas Division Addition 080.47605 37602 13,866 080 190 - Mid-Tex Gas Division Addition 080.47605 38000 5,138 080 190 - Mid-Tex Gas Division Addition 080.47606 37602 6,897 080 190 - Mid-Tex Gas Division Addition 080.47606 38000 2,178 080 190 - Mid-Tex Gas Division Addition 080.47607 38000 8,792 080 190 - Mid-Tex Gas Division Addition 080.47617 37602 79 080 190 - Mid-Tex Gas Division Addition 080.47617 38000 38 080 190 - Mid-Tex Gas Division Addition 080.47617 38200 1 080 190 - Mid-Tex Gas Division Addition 080.47617 38300 1 080 190 - Mid-Tex Gas Division Addition 080.47681 37602 8,658 080 190 - Mid-Tex Gas Division Addition 080.47681 38000 5,306 080 190 - Mid-Tex Gas Division Addition 080.47682 37602 16,665 080 190 - Mid-Tex Gas Division Addition 080.47682 38000 11,597 080 190 - Mid-Tex Gas Division Addition 080.47728 37602 1,186 080 190 - Mid-Tex Gas Division Addition 080.47728 38000 62 080 190 - Mid-Tex Gas Division Addition 080.47780 37601 (3) 080 190 - Mid-Tex Gas Division Addition 080.47780 37602 (462) 080 190 - Mid-Tex Gas Division Addition 080.47836 37602 52 080 190 - Mid-Tex Gas Division Addition 080.47848 37602 799 080 190 - Mid-Tex Gas Division Addition 080.47848 38000 216 080 190 - Mid-Tex Gas Division Addition 080.47848 38100 32 080 190 - Mid-Tex Gas Division Addition 080.47848 38200 22 080 190 - Mid-Tex Gas Division Addition 080.47848 38300 11 080 190 - Mid-Tex Gas Division Addition 080.47849 37602 1,038 080 190 - Mid-Tex Gas Division Addition 080.47849 38000 182 080 190 - Mid-Tex Gas Division Addition 080.47849 38100 26 080 190 - Mid-Tex Gas Division Addition 080.47849 38200 26 080 190 - Mid-Tex Gas Division Addition 080.47849 38300 26 080 190 - Mid-Tex Gas Division Addition 080.47850 37602 1,264 080 190 - Mid-Tex Gas Division Addition 080.47850 38000 342 080 190 - Mid-Tex Gas Division Addition 080.47850 38100 17 080 190 - Mid-Tex Gas Division Addition 080.47850 38200 17 080 190 - Mid-Tex Gas Division Addition 080.47850 38300 34 080 190 - Mid-Tex Gas Division Addition 080.47857 37602 2,332 080 190 - Mid-Tex Gas Division Addition 080.47857 38000 640 080 190 - Mid-Tex Gas Division Addition 080.47857 38100 96 080 190 - Mid-Tex Gas Division Addition 080.47857 38200 64 080 190 - Mid-Tex Gas Division Addition 080.47857 38300 64 080 190 - Mid-Tex Gas Division Addition 080.47882 37602 6 080 190 - Mid-Tex Gas Division Addition 080.47882 38000 0.02 080 190 - Mid-Tex Gas Division Addition 080.47884 37602 90 080 190 - Mid-Tex Gas Division Addition 080.47884 38000 12 080 190 - Mid-Tex Gas Division Addition 080.47884 38100 2 080 190 - Mid-Tex Gas Division Addition 080.47884 38200 3 080 190 - Mid-Tex Gas Division Addition 080.47884 38300 1 080 190 - Mid-Tex Gas Division Addition 080.47894 37600 (613) 080 190 - Mid-Tex Gas Division Addition 080.47935 37601 8 080 190 - Mid-Tex Gas Division Addition 080.47942 37601 0.17 080 190 - Mid-Tex Gas Division Addition 080.47942 37800 0.02 080 190 - Mid-Tex Gas Division Addition 080.48000 37602 18 080 190 - Mid-Tex Gas Division Addition 080.48000 38100 0.02 080 190 - Mid-Tex Gas Division Addition 080.48000 38200 0.29 080 190 - Mid-Tex Gas Division Addition 080.48010 37602 65 080 190 - Mid-Tex Gas Division Addition 080.48010 38000 5 080 190 - Mid-Tex Gas Division Addition 080.48010 38100 0.32 080 190 - Mid-Tex Gas Division Addition 080.48010 38200 0.32 080 190 - Mid-Tex Gas Division Addition 080.48110 37601 360 080 190 - Mid-Tex Gas Division Addition 080.48110 37800 102 080 190 - Mid-Tex Gas Division Addition 080.48110 38000 0.24 080 190 - Mid-Tex Gas Division Addition 080.48165 37602 206 080 190 - Mid-Tex Gas Division Addition 080.48198 37602 8 080 190 - Mid-Tex Gas Division Addition 080.48198 38000 2 080 190 - Mid-Tex Gas Division Addition 080.48198 38100 0.17 080 190 - Mid-Tex Gas Division Addition 080.48198 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.48198 38300 0.07 080 190 - Mid-Tex Gas Division Addition 080.48282 37602 9,742 080 190 - Mid-Tex Gas Division Addition 080.48323 39000 32,149 080 190 - Mid-Tex Gas Division Addition 080.48388 37601 65
MTX Additions by FERCPage 4 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.48432 37601 0.11 080 190 - Mid-Tex Gas Division Addition 080.48464 37602 5 080 190 - Mid-Tex Gas Division Addition 080.48464 38000 3 080 190 - Mid-Tex Gas Division Addition 080.48464 38100 1 080 190 - Mid-Tex Gas Division Addition 080.48464 38200 1 080 190 - Mid-Tex Gas Division Addition 080.48464 38300 1 080 190 - Mid-Tex Gas Division Addition 080.48474 37601 5 080 190 - Mid-Tex Gas Division Addition 080.48519 37602 482 080 190 - Mid-Tex Gas Division Addition 080.48519 38000 297 080 190 - Mid-Tex Gas Division Addition 080.48519 38100 8 080 190 - Mid-Tex Gas Division Addition 080.48519 38200 8 080 190 - Mid-Tex Gas Division Addition 080.48519 38300 8 080 190 - Mid-Tex Gas Division Addition 080.48572 37602 92 080 190 - Mid-Tex Gas Division Addition 080.48572 38000 84 080 190 - Mid-Tex Gas Division Addition 080.48583 37602 67 080 190 - Mid-Tex Gas Division Addition 080.48583 38000 3 080 190 - Mid-Tex Gas Division Addition 080.48651 37602 42 080 190 - Mid-Tex Gas Division Addition 080.48651 38000 25 080 190 - Mid-Tex Gas Division Addition 080.48651 38100 1 080 190 - Mid-Tex Gas Division Addition 080.48651 38200 7 080 190 - Mid-Tex Gas Division Addition 080.48651 38300 6 080 190 - Mid-Tex Gas Division Addition 080.48677 37602 118 080 190 - Mid-Tex Gas Division Addition 080.48677 38000 19 080 190 - Mid-Tex Gas Division Addition 080.48677 38100 3 080 190 - Mid-Tex Gas Division Addition 080.48677 38200 0.11 080 190 - Mid-Tex Gas Division Addition 080.48677 38300 0.26 080 190 - Mid-Tex Gas Division Addition 080.48683 37602 1 080 190 - Mid-Tex Gas Division Addition 080.48683 38100 0.10 080 190 - Mid-Tex Gas Division Addition 080.48683 38200 0.36 080 190 - Mid-Tex Gas Division Addition 080.48683 38300 0.47 080 190 - Mid-Tex Gas Division Addition 080.48694 37602 52 080 190 - Mid-Tex Gas Division Addition 080.48694 38000 6 080 190 - Mid-Tex Gas Division Addition 080.48741 37602 27 080 190 - Mid-Tex Gas Division Addition 080.48741 38000 5 080 190 - Mid-Tex Gas Division Addition 080.48741 38300 0.03 080 190 - Mid-Tex Gas Division Addition 080.48743 37602 178 080 190 - Mid-Tex Gas Division Addition 080.48760 37601 155,199 080 190 - Mid-Tex Gas Division Addition 080.48782 37602 49 080 190 - Mid-Tex Gas Division Addition 080.48782 38000 1 080 190 - Mid-Tex Gas Division Addition 080.48782 38100 0.40 080 190 - Mid-Tex Gas Division Addition 080.48782 38200 1 080 190 - Mid-Tex Gas Division Addition 080.48782 38300 0.08 080 190 - Mid-Tex Gas Division Addition 080.48800 37602 551 080 190 - Mid-Tex Gas Division Addition 080.48800 38000 116 080 190 - Mid-Tex Gas Division Addition 080.48800 38100 7 080 190 - Mid-Tex Gas Division Addition 080.48800 38200 7 080 190 - Mid-Tex Gas Division Addition 080.48800 38300 7 080 190 - Mid-Tex Gas Division Addition 080.48844 37602 263 080 190 - Mid-Tex Gas Division Addition 080.48844 38000 6 080 190 - Mid-Tex Gas Division Addition 080.48844 38100 14 080 190 - Mid-Tex Gas Division Addition 080.48844 38200 2 080 190 - Mid-Tex Gas Division Addition 080.48844 38300 0.34 080 190 - Mid-Tex Gas Division Addition 080.48845 37602 185 080 190 - Mid-Tex Gas Division Addition 080.48845 38000 129 080 190 - Mid-Tex Gas Division Addition 080.48845 38100 18 080 190 - Mid-Tex Gas Division Addition 080.48845 38300 18 080 190 - Mid-Tex Gas Division Addition 080.48846 37602 2 080 190 - Mid-Tex Gas Division Addition 080.48847 37602 1,399 080 190 - Mid-Tex Gas Division Addition 080.48847 38000 651 080 190 - Mid-Tex Gas Division Addition 080.48847 38100 101 080 190 - Mid-Tex Gas Division Addition 080.48847 38200 62 080 190 - Mid-Tex Gas Division Addition 080.48847 38300 6 080 190 - Mid-Tex Gas Division Addition 080.48921 37602 9,081 080 190 - Mid-Tex Gas Division Addition 080.48922 37602 115 080 190 - Mid-Tex Gas Division Addition 080.48922 38000 6 080 190 - Mid-Tex Gas Division Addition 080.48942 37602 0.13 080 190 - Mid-Tex Gas Division Addition 080.48996 37602 21,288 080 190 - Mid-Tex Gas Division Addition 080.49008 37602 472 080 190 - Mid-Tex Gas Division Addition 080.49008 38000 94 080 190 - Mid-Tex Gas Division Addition 080.49008 38100 3 080 190 - Mid-Tex Gas Division Addition 080.49008 38200 1 080 190 - Mid-Tex Gas Division Addition 080.49008 38300 1 080 190 - Mid-Tex Gas Division Addition 080.49033 37602 1 080 190 - Mid-Tex Gas Division Addition 080.49033 38000 1 080 190 - Mid-Tex Gas Division Addition 080.49033 38100 0.41 080 190 - Mid-Tex Gas Division Addition 080.49033 38200 0.13 080 190 - Mid-Tex Gas Division Addition 080.49033 38300 0.28 080 190 - Mid-Tex Gas Division Addition 080.49072 37601 35 080 190 - Mid-Tex Gas Division Addition 080.49082 37602 554 080 190 - Mid-Tex Gas Division Addition 080.49082 38000 27 080 190 - Mid-Tex Gas Division Addition 080.49145 37600 28,076 080 190 - Mid-Tex Gas Division Addition 080.49145 37601 2,294,259 080 190 - Mid-Tex Gas Division Addition 080.49145 37800 449,218 080 190 - Mid-Tex Gas Division Addition 080.49148 37600 9,246 080 190 - Mid-Tex Gas Division Addition 080.49148 37601 767,438 080 190 - Mid-Tex Gas Division Addition 080.49148 37800 147,681 080 190 - Mid-Tex Gas Division Addition 080.49174 37602 628 080 190 - Mid-Tex Gas Division Addition 080.49178 37601 223,753 080 190 - Mid-Tex Gas Division Addition 080.49198 37602 3 080 190 - Mid-Tex Gas Division Addition 080.49198 38000 1 080 190 - Mid-Tex Gas Division Addition 080.49198 38200 0.20 080 190 - Mid-Tex Gas Division Addition 080.49198 38300 0.20 080 190 - Mid-Tex Gas Division Addition 080.49209 37602 17 080 190 - Mid-Tex Gas Division Addition 080.49209 38000 1 080 190 - Mid-Tex Gas Division Addition 080.49232 38000 (0.04) 080 190 - Mid-Tex Gas Division Addition 080.49242 38000 0.04 080 190 - Mid-Tex Gas Division Addition 080.49245 38000 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.49256 38000 (3) 080 190 - Mid-Tex Gas Division Addition 080.49273 37602 2,031 080 190 - Mid-Tex Gas Division Addition 080.49273 38000 1,117 080 190 - Mid-Tex Gas Division Addition 080.49273 38100 135 080 190 - Mid-Tex Gas Division Addition 080.49273 38200 68 080 190 - Mid-Tex Gas Division Addition 080.49273 38300 34 080 190 - Mid-Tex Gas Division Addition 080.49313 37602 6,185 080 190 - Mid-Tex Gas Division Addition 080.49407 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.49410 37602 47 080 190 - Mid-Tex Gas Division Addition 080.49410 38000 35 080 190 - Mid-Tex Gas Division Addition 080.49410 38100 2
MTX Additions by FERCPage 5 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.49410 38200 2 080 190 - Mid-Tex Gas Division Addition 080.49410 38300 2 080 190 - Mid-Tex Gas Division Addition 080.49414 37602 162 080 190 - Mid-Tex Gas Division Addition 080.49414 38000 97 080 190 - Mid-Tex Gas Division Addition 080.49414 38100 8 080 190 - Mid-Tex Gas Division Addition 080.49414 38200 1 080 190 - Mid-Tex Gas Division Addition 080.49414 38300 1 080 190 - Mid-Tex Gas Division Addition 080.49423 37602 (3,699) 080 190 - Mid-Tex Gas Division Addition 080.49423 37800 (247) 080 190 - Mid-Tex Gas Division Addition 080.49423 38000 (164) 080 190 - Mid-Tex Gas Division Addition 080.49441 37602 265 080 190 - Mid-Tex Gas Division Addition 080.49441 38000 87 080 190 - Mid-Tex Gas Division Addition 080.49441 38100 11 080 190 - Mid-Tex Gas Division Addition 080.49441 38200 4 080 190 - Mid-Tex Gas Division Addition 080.49441 38300 6 080 190 - Mid-Tex Gas Division Addition 080.49454 37602 21 080 190 - Mid-Tex Gas Division Addition 080.49454 38000 13 080 190 - Mid-Tex Gas Division Addition 080.49454 38100 1 080 190 - Mid-Tex Gas Division Addition 080.49454 38200 0.21 080 190 - Mid-Tex Gas Division Addition 080.49454 38300 0.21 080 190 - Mid-Tex Gas Division Addition 080.49455 37602 23 080 190 - Mid-Tex Gas Division Addition 080.49455 38000 0.47 080 190 - Mid-Tex Gas Division Addition 080.49469 37602 402 080 190 - Mid-Tex Gas Division Addition 080.49469 38000 55 080 190 - Mid-Tex Gas Division Addition 080.49469 38100 25 080 190 - Mid-Tex Gas Division Addition 080.49469 38200 10 080 190 - Mid-Tex Gas Division Addition 080.49469 38300 10 080 190 - Mid-Tex Gas Division Addition 080.49471 37602 1,219 080 190 - Mid-Tex Gas Division Addition 080.49471 38000 183 080 190 - Mid-Tex Gas Division Addition 080.49471 38100 61 080 190 - Mid-Tex Gas Division Addition 080.49471 38200 30 080 190 - Mid-Tex Gas Division Addition 080.49471 38300 30 080 190 - Mid-Tex Gas Division Addition 080.49473 37602 24 080 190 - Mid-Tex Gas Division Addition 080.49473 38000 1 080 190 - Mid-Tex Gas Division Addition 080.49476 37602 541 080 190 - Mid-Tex Gas Division Addition 080.49480 37602 72 080 190 - Mid-Tex Gas Division Addition 080.49480 38000 58 080 190 - Mid-Tex Gas Division Addition 080.49480 38100 2 080 190 - Mid-Tex Gas Division Addition 080.49480 38200 1 080 190 - Mid-Tex Gas Division Addition 080.49480 38300 1 080 190 - Mid-Tex Gas Division Addition 080.49516 37602 24 080 190 - Mid-Tex Gas Division Addition 080.49516 38000 6 080 190 - Mid-Tex Gas Division Addition 080.49527 37602 206 080 190 - Mid-Tex Gas Division Addition 080.49535 37602 16 080 190 - Mid-Tex Gas Division Addition 080.49578 37602 35 080 190 - Mid-Tex Gas Division Addition 080.49578 38000 37 080 190 - Mid-Tex Gas Division Addition 080.49578 38100 5 080 190 - Mid-Tex Gas Division Addition 080.49578 38200 2 080 190 - Mid-Tex Gas Division Addition 080.49578 38300 3 080 190 - Mid-Tex Gas Division Addition 080.49593 38000 2,159 080 190 - Mid-Tex Gas Division Addition 080.49593 38100 45 080 190 - Mid-Tex Gas Division Addition 080.49593 38200 81 080 190 - Mid-Tex Gas Division Addition 080.49593 38300 64 080 190 - Mid-Tex Gas Division Addition 080.49647 37602 359 080 190 - Mid-Tex Gas Division Addition 080.49649 37602 152 080 190 - Mid-Tex Gas Division Addition 080.49678 37602 67 080 190 - Mid-Tex Gas Division Addition 080.49678 38000 19 080 190 - Mid-Tex Gas Division Addition 080.49679 38000 601 080 190 - Mid-Tex Gas Division Addition 080.49679 38100 70 080 190 - Mid-Tex Gas Division Addition 080.49679 38200 164 080 190 - Mid-Tex Gas Division Addition 080.49679 38300 35 080 190 - Mid-Tex Gas Division Addition 080.49680 37602 0.30 080 190 - Mid-Tex Gas Division Addition 080.49681 37602 489 080 190 - Mid-Tex Gas Division Addition 080.49705 37602 6 080 190 - Mid-Tex Gas Division Addition 080.49705 38000 1 080 190 - Mid-Tex Gas Division Addition 080.49732 37601 86 080 190 - Mid-Tex Gas Division Addition 080.49752 37602 3 080 190 - Mid-Tex Gas Division Addition 080.49752 38000 0.32 080 190 - Mid-Tex Gas Division Addition 080.49759 37602 10,142 080 190 - Mid-Tex Gas Division Addition 080.49759 38000 99 080 190 - Mid-Tex Gas Division Addition 080.49762 37602 73 080 190 - Mid-Tex Gas Division Addition 080.49765 37602 105 080 190 - Mid-Tex Gas Division Addition 080.49765 38000 8 080 190 - Mid-Tex Gas Division Addition 080.49765 38100 2 080 190 - Mid-Tex Gas Division Addition 080.49765 38200 2 080 190 - Mid-Tex Gas Division Addition 080.49765 38300 1 080 190 - Mid-Tex Gas Division Addition 080.49832 37602 1,018 080 190 - Mid-Tex Gas Division Addition 080.49832 38100 60 080 190 - Mid-Tex Gas Division Addition 080.49832 38200 60 080 190 - Mid-Tex Gas Division Addition 080.49832 38300 60 080 190 - Mid-Tex Gas Division Addition 080.49860 37602 107 080 190 - Mid-Tex Gas Division Addition 080.49860 38000 10 080 190 - Mid-Tex Gas Division Addition 080.49860 38100 1 080 190 - Mid-Tex Gas Division Addition 080.49860 38200 2 080 190 - Mid-Tex Gas Division Addition 080.49860 38300 0.47 080 190 - Mid-Tex Gas Division Addition 080.49865 37602 0.15 080 190 - Mid-Tex Gas Division Addition 080.49903 37602 37 080 190 - Mid-Tex Gas Division Addition 080.49903 38000 1 080 190 - Mid-Tex Gas Division Addition 080.49909 37602 0.28 080 190 - Mid-Tex Gas Division Addition 080.49909 38000 0.44 080 190 - Mid-Tex Gas Division Addition 080.49910 37602 30 080 190 - Mid-Tex Gas Division Addition 080.49910 38000 31 080 190 - Mid-Tex Gas Division Addition 080.49910 38100 3 080 190 - Mid-Tex Gas Division Addition 080.49910 38200 2 080 190 - Mid-Tex Gas Division Addition 080.49910 38300 2 080 190 - Mid-Tex Gas Division Addition 080.49916 37602 (1) 080 190 - Mid-Tex Gas Division Addition 080.49916 38000 (1) 080 190 - Mid-Tex Gas Division Addition 080.49916 38100 (0.10) 080 190 - Mid-Tex Gas Division Addition 080.49916 38200 (0.06) 080 190 - Mid-Tex Gas Division Addition 080.49916 38300 (0.04) 080 190 - Mid-Tex Gas Division Addition 080.49950 37602 1,435 080 190 - Mid-Tex Gas Division Addition 080.49970 37602 73 080 190 - Mid-Tex Gas Division Addition 080.49970 38000 38 080 190 - Mid-Tex Gas Division Addition 080.49970 38200 0.21 080 190 - Mid-Tex Gas Division Addition 080.49970 38300 1 080 190 - Mid-Tex Gas Division Addition 080.49979 37602 23 080 190 - Mid-Tex Gas Division Addition 080.49979 38000 1 080 190 - Mid-Tex Gas Division Addition 080.49979 38100 0.01
MTX Additions by FERCPage 6 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.49979 38200 0.43 080 190 - Mid-Tex Gas Division Addition 080.49979 38300 0.09 080 190 - Mid-Tex Gas Division Addition 080.49984 37602 269 080 190 - Mid-Tex Gas Division Addition 080.49984 38000 31 080 190 - Mid-Tex Gas Division Addition 080.49984 38100 3 080 190 - Mid-Tex Gas Division Addition 080.49984 38200 3 080 190 - Mid-Tex Gas Division Addition 080.49984 38300 3 080 190 - Mid-Tex Gas Division Addition 080.49985 37602 293 080 190 - Mid-Tex Gas Division Addition 080.49985 38000 55 080 190 - Mid-Tex Gas Division Addition 080.49985 38200 0.34 080 190 - Mid-Tex Gas Division Addition 080.49987 37602 81 080 190 - Mid-Tex Gas Division Addition 080.49988 37602 23 080 190 - Mid-Tex Gas Division Addition 080.49988 38000 8 080 190 - Mid-Tex Gas Division Addition 080.49988 38100 1 080 190 - Mid-Tex Gas Division Addition 080.49988 38200 1 080 190 - Mid-Tex Gas Division Addition 080.49988 38300 0.35 080 190 - Mid-Tex Gas Division Addition 080.50032 37602 0.03 080 190 - Mid-Tex Gas Division Addition 080.50032 38000 0.08 080 190 - Mid-Tex Gas Division Addition 080.50032 38200 0.02 080 190 - Mid-Tex Gas Division Addition 080.50036 37602 12,732 080 190 - Mid-Tex Gas Division Addition 080.50060 37602 40 080 190 - Mid-Tex Gas Division Addition 080.50088 37602 4 080 190 - Mid-Tex Gas Division Addition 080.50109 37602 42 080 190 - Mid-Tex Gas Division Addition 080.50109 38000 3 080 190 - Mid-Tex Gas Division Addition 080.50109 38100 0.30 080 190 - Mid-Tex Gas Division Addition 080.50109 38300 0.02 080 190 - Mid-Tex Gas Division Addition 080.50110 37602 11 080 190 - Mid-Tex Gas Division Addition 080.50110 38000 4 080 190 - Mid-Tex Gas Division Addition 080.50115 37602 39 080 190 - Mid-Tex Gas Division Addition 080.50115 38000 9 080 190 - Mid-Tex Gas Division Addition 080.50115 38100 0.42 080 190 - Mid-Tex Gas Division Addition 080.50115 38200 0.17 080 190 - Mid-Tex Gas Division Addition 080.50115 38300 0.10 080 190 - Mid-Tex Gas Division Addition 080.50116 37602 648 080 190 - Mid-Tex Gas Division Addition 080.50116 38000 127 080 190 - Mid-Tex Gas Division Addition 080.50116 38100 8 080 190 - Mid-Tex Gas Division Addition 080.50116 38200 50 080 190 - Mid-Tex Gas Division Addition 080.50116 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50119 37602 12 080 190 - Mid-Tex Gas Division Addition 080.50136 37602 522 080 190 - Mid-Tex Gas Division Addition 080.50138 37602 33 080 190 - Mid-Tex Gas Division Addition 080.50138 38100 0.37 080 190 - Mid-Tex Gas Division Addition 080.50138 38300 7 080 190 - Mid-Tex Gas Division Addition 080.50149 37601 1 080 190 - Mid-Tex Gas Division Addition 080.50162 37602 2 080 190 - Mid-Tex Gas Division Addition 080.50162 38000 0.12 080 190 - Mid-Tex Gas Division Addition 080.50163 37602 41 080 190 - Mid-Tex Gas Division Addition 080.50163 38000 13 080 190 - Mid-Tex Gas Division Addition 080.50163 38100 3 080 190 - Mid-Tex Gas Division Addition 080.50163 38200 3 080 190 - Mid-Tex Gas Division Addition 080.50163 38300 3 080 190 - Mid-Tex Gas Division Addition 080.50167 37602 1,174 080 190 - Mid-Tex Gas Division Addition 080.50189 37602 9 080 190 - Mid-Tex Gas Division Addition 080.50189 38000 0.20 080 190 - Mid-Tex Gas Division Addition 080.50189 38100 0.32 080 190 - Mid-Tex Gas Division Addition 080.50200 37602 3 080 190 - Mid-Tex Gas Division Addition 080.50200 38000 0.35 080 190 - Mid-Tex Gas Division Addition 080.50207 37602 282 080 190 - Mid-Tex Gas Division Addition 080.50207 38000 18 080 190 - Mid-Tex Gas Division Addition 080.50213 37602 0.25 080 190 - Mid-Tex Gas Division Addition 080.50213 38000 0.03 080 190 - Mid-Tex Gas Division Addition 080.50213 38100 0.01 080 190 - Mid-Tex Gas Division Addition 080.50213 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.50213 38300 0.01 080 190 - Mid-Tex Gas Division Addition 080.50214 37602 51 080 190 - Mid-Tex Gas Division Addition 080.50214 38000 3 080 190 - Mid-Tex Gas Division Addition 080.50214 38100 3 080 190 - Mid-Tex Gas Division Addition 080.50214 38200 3 080 190 - Mid-Tex Gas Division Addition 080.50214 38300 3 080 190 - Mid-Tex Gas Division Addition 080.50215 38000 138 080 190 - Mid-Tex Gas Division Addition 080.50215 38200 8 080 190 - Mid-Tex Gas Division Addition 080.50215 38300 8 080 190 - Mid-Tex Gas Division Addition 080.50220 37602 73 080 190 - Mid-Tex Gas Division Addition 080.50220 38000 6 080 190 - Mid-Tex Gas Division Addition 080.50270 37602 119 080 190 - Mid-Tex Gas Division Addition 080.50270 38000 43 080 190 - Mid-Tex Gas Division Addition 080.50270 38100 12 080 190 - Mid-Tex Gas Division Addition 080.50270 38200 1 080 190 - Mid-Tex Gas Division Addition 080.50270 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50300 37602 0.02 080 190 - Mid-Tex Gas Division Addition 080.50307 37602 0.11 080 190 - Mid-Tex Gas Division Addition 080.50307 38000 0.04 080 190 - Mid-Tex Gas Division Addition 080.50315 37602 4 080 190 - Mid-Tex Gas Division Addition 080.50324 37602 11 080 190 - Mid-Tex Gas Division Addition 080.50324 38000 8 080 190 - Mid-Tex Gas Division Addition 080.50327 37602 203 080 190 - Mid-Tex Gas Division Addition 080.50327 38000 76 080 190 - Mid-Tex Gas Division Addition 080.50327 38100 5 080 190 - Mid-Tex Gas Division Addition 080.50327 38200 1 080 190 - Mid-Tex Gas Division Addition 080.50327 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50331 37602 675 080 190 - Mid-Tex Gas Division Addition 080.50336 37602 4 080 190 - Mid-Tex Gas Division Addition 080.50352 37601 78 080 190 - Mid-Tex Gas Division Addition 080.50352 37800 235 080 190 - Mid-Tex Gas Division Addition 080.50368 37602 0.16 080 190 - Mid-Tex Gas Division Addition 080.50373 37602 66 080 190 - Mid-Tex Gas Division Addition 080.50373 38000 4 080 190 - Mid-Tex Gas Division Addition 080.50373 38200 4 080 190 - Mid-Tex Gas Division Addition 080.50373 38300 4 080 190 - Mid-Tex Gas Division Addition 080.50400 37602 2 080 190 - Mid-Tex Gas Division Addition 080.50409 37602 140 080 190 - Mid-Tex Gas Division Addition 080.50409 38000 7 080 190 - Mid-Tex Gas Division Addition 080.50416 37602 92 080 190 - Mid-Tex Gas Division Addition 080.50416 38000 90 080 190 - Mid-Tex Gas Division Addition 080.50416 38200 12 080 190 - Mid-Tex Gas Division Addition 080.50416 38300 9 080 190 - Mid-Tex Gas Division Addition 080.50420 38000 456 080 190 - Mid-Tex Gas Division Addition 080.50421 37602 175
MTX Additions by FERCPage 7 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.50421 38000 300 080 190 - Mid-Tex Gas Division Addition 080.50421 38100 8 080 190 - Mid-Tex Gas Division Addition 080.50421 38200 3 080 190 - Mid-Tex Gas Division Addition 080.50422 37602 236 080 190 - Mid-Tex Gas Division Addition 080.50422 38000 437 080 190 - Mid-Tex Gas Division Addition 080.50422 38100 19 080 190 - Mid-Tex Gas Division Addition 080.50422 38200 138 080 190 - Mid-Tex Gas Division Addition 080.50423 37602 0.04 080 190 - Mid-Tex Gas Division Addition 080.50423 38000 0.02 080 190 - Mid-Tex Gas Division Addition 080.50424 37602 12 080 190 - Mid-Tex Gas Division Addition 080.50424 38000 277 080 190 - Mid-Tex Gas Division Addition 080.50424 38100 9 080 190 - Mid-Tex Gas Division Addition 080.50424 38200 5 080 190 - Mid-Tex Gas Division Addition 080.50424 38300 35 080 190 - Mid-Tex Gas Division Addition 080.50425 37602 26 080 190 - Mid-Tex Gas Division Addition 080.50425 38000 13 080 190 - Mid-Tex Gas Division Addition 080.50426 37602 36 080 190 - Mid-Tex Gas Division Addition 080.50426 38000 32 080 190 - Mid-Tex Gas Division Addition 080.50426 38100 2 080 190 - Mid-Tex Gas Division Addition 080.50426 38200 0.21 080 190 - Mid-Tex Gas Division Addition 080.50426 38300 0.45 080 190 - Mid-Tex Gas Division Addition 080.50437 37600 (2,138) 080 190 - Mid-Tex Gas Division Addition 080.50454 37602 126 080 190 - Mid-Tex Gas Division Addition 080.50454 38000 18 080 190 - Mid-Tex Gas Division Addition 080.50454 38100 1 080 190 - Mid-Tex Gas Division Addition 080.50454 38200 1 080 190 - Mid-Tex Gas Division Addition 080.50454 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50497 37602 56 080 190 - Mid-Tex Gas Division Addition 080.50504 37602 215 080 190 - Mid-Tex Gas Division Addition 080.50504 38000 29 080 190 - Mid-Tex Gas Division Addition 080.50504 38100 10 080 190 - Mid-Tex Gas Division Addition 080.50504 38200 22 080 190 - Mid-Tex Gas Division Addition 080.50504 38300 5 080 190 - Mid-Tex Gas Division Addition 080.50512 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.50514 37602 0.19 080 190 - Mid-Tex Gas Division Addition 080.50514 38000 0.02 080 190 - Mid-Tex Gas Division Addition 080.50516 37602 11 080 190 - Mid-Tex Gas Division Addition 080.50516 38000 0.27 080 190 - Mid-Tex Gas Division Addition 080.50517 37602 0.02 080 190 - Mid-Tex Gas Division Addition 080.50529 38000 687 080 190 - Mid-Tex Gas Division Addition 080.50529 38100 38 080 190 - Mid-Tex Gas Division Addition 080.50529 38200 38 080 190 - Mid-Tex Gas Division Addition 080.50531 37602 31 080 190 - Mid-Tex Gas Division Addition 080.50531 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50531 38100 1 080 190 - Mid-Tex Gas Division Addition 080.50531 38200 1 080 190 - Mid-Tex Gas Division Addition 080.50531 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50532 37602 63 080 190 - Mid-Tex Gas Division Addition 080.50532 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50532 38100 1 080 190 - Mid-Tex Gas Division Addition 080.50532 38200 1 080 190 - Mid-Tex Gas Division Addition 080.50532 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50533 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.50545 37602 31 080 190 - Mid-Tex Gas Division Addition 080.50545 38000 8 080 190 - Mid-Tex Gas Division Addition 080.50545 38100 0.33 080 190 - Mid-Tex Gas Division Addition 080.50545 38200 0.42 080 190 - Mid-Tex Gas Division Addition 080.50545 38300 0.03 080 190 - Mid-Tex Gas Division Addition 080.50551 37602 3 080 190 - Mid-Tex Gas Division Addition 080.50580 37602 771 080 190 - Mid-Tex Gas Division Addition 080.50585 37601 (0.04) 080 190 - Mid-Tex Gas Division Addition 080.50585 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.50585 37800 (0.16) 080 190 - Mid-Tex Gas Division Addition 080.50586 37601 (0.06) 080 190 - Mid-Tex Gas Division Addition 080.50586 37602 (0.04) 080 190 - Mid-Tex Gas Division Addition 080.50586 37800 (0.09) 080 190 - Mid-Tex Gas Division Addition 080.50602 37602 17,449 080 190 - Mid-Tex Gas Division Addition 080.50603 37602 25,501 080 190 - Mid-Tex Gas Division Addition 080.50622 37602 313 080 190 - Mid-Tex Gas Division Addition 080.50635 38000 374 080 190 - Mid-Tex Gas Division Addition 080.50635 38100 38 080 190 - Mid-Tex Gas Division Addition 080.50635 38200 19 080 190 - Mid-Tex Gas Division Addition 080.50635 38300 21 080 190 - Mid-Tex Gas Division Addition 080.50646 38000 0.13 080 190 - Mid-Tex Gas Division Addition 080.50659 37602 116 080 190 - Mid-Tex Gas Division Addition 080.50659 38000 70 080 190 - Mid-Tex Gas Division Addition 080.50659 38100 14 080 190 - Mid-Tex Gas Division Addition 080.50659 38200 5 080 190 - Mid-Tex Gas Division Addition 080.50659 38300 5 080 190 - Mid-Tex Gas Division Addition 080.50662 38000 20 080 190 - Mid-Tex Gas Division Addition 080.50662 38100 3 080 190 - Mid-Tex Gas Division Addition 080.50662 38200 2 080 190 - Mid-Tex Gas Division Addition 080.50662 38300 3 080 190 - Mid-Tex Gas Division Addition 080.50667 37602 80 080 190 - Mid-Tex Gas Division Addition 080.50668 37602 24 080 190 - Mid-Tex Gas Division Addition 080.50668 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50668 38200 0.31 080 190 - Mid-Tex Gas Division Addition 080.50668 38300 0.29 080 190 - Mid-Tex Gas Division Addition 080.50669 37601 1 080 190 - Mid-Tex Gas Division Addition 080.50669 37602 20 080 190 - Mid-Tex Gas Division Addition 080.50669 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50676 37602 (32) 080 190 - Mid-Tex Gas Division Addition 080.50676 38000 (3) 080 190 - Mid-Tex Gas Division Addition 080.50681 37602 160 080 190 - Mid-Tex Gas Division Addition 080.50681 38000 25 080 190 - Mid-Tex Gas Division Addition 080.50681 38100 0.11 080 190 - Mid-Tex Gas Division Addition 080.50681 38200 7 080 190 - Mid-Tex Gas Division Addition 080.50681 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50692 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.50705 37602 61 080 190 - Mid-Tex Gas Division Addition 080.50705 38000 6 080 190 - Mid-Tex Gas Division Addition 080.50705 38100 0.27 080 190 - Mid-Tex Gas Division Addition 080.50705 38200 3 080 190 - Mid-Tex Gas Division Addition 080.50705 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50716 37602 17 080 190 - Mid-Tex Gas Division Addition 080.50716 38000 2 080 190 - Mid-Tex Gas Division Addition 080.50716 38100 2 080 190 - Mid-Tex Gas Division Addition 080.50716 38200 0.18
MTX Additions by FERCPage 8 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.50716 38300 0.18 080 190 - Mid-Tex Gas Division Addition 080.50717 37602 13 080 190 - Mid-Tex Gas Division Addition 080.50717 38000 0.28 080 190 - Mid-Tex Gas Division Addition 080.50717 38300 0.01 080 190 - Mid-Tex Gas Division Addition 080.50727 37602 20 080 190 - Mid-Tex Gas Division Addition 080.50727 38000 4 080 190 - Mid-Tex Gas Division Addition 080.50727 38100 0.47 080 190 - Mid-Tex Gas Division Addition 080.50727 38200 1 080 190 - Mid-Tex Gas Division Addition 080.50727 38300 0.23 080 190 - Mid-Tex Gas Division Addition 080.50734 37602 4 080 190 - Mid-Tex Gas Division Addition 080.50734 38000 0.20 080 190 - Mid-Tex Gas Division Addition 080.50741 37602 25 080 190 - Mid-Tex Gas Division Addition 080.50741 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50745 37602 383 080 190 - Mid-Tex Gas Division Addition 080.50745 38000 776 080 190 - Mid-Tex Gas Division Addition 080.50745 38100 154 080 190 - Mid-Tex Gas Division Addition 080.50745 38200 42 080 190 - Mid-Tex Gas Division Addition 080.50745 38300 42 080 190 - Mid-Tex Gas Division Addition 080.50753 37602 684 080 190 - Mid-Tex Gas Division Addition 080.50753 38000 307 080 190 - Mid-Tex Gas Division Addition 080.50761 37602 2 080 190 - Mid-Tex Gas Division Addition 080.50761 38000 0.22 080 190 - Mid-Tex Gas Division Addition 080.50761 38100 0.01 080 190 - Mid-Tex Gas Division Addition 080.50761 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.50789 37602 51 080 190 - Mid-Tex Gas Division Addition 080.50796 37602 67 080 190 - Mid-Tex Gas Division Addition 080.50796 38000 60 080 190 - Mid-Tex Gas Division Addition 080.50796 38100 4 080 190 - Mid-Tex Gas Division Addition 080.50796 38200 1 080 190 - Mid-Tex Gas Division Addition 080.50796 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50803 37602 23 080 190 - Mid-Tex Gas Division Addition 080.50803 38000 8 080 190 - Mid-Tex Gas Division Addition 080.50803 38100 1 080 190 - Mid-Tex Gas Division Addition 080.50803 38200 0.18 080 190 - Mid-Tex Gas Division Addition 080.50803 38300 0.17 080 190 - Mid-Tex Gas Division Addition 080.50815 37602 1,340 080 190 - Mid-Tex Gas Division Addition 080.50819 37602 200 080 190 - Mid-Tex Gas Division Addition 080.50819 38000 21 080 190 - Mid-Tex Gas Division Addition 080.50819 38100 15 080 190 - Mid-Tex Gas Division Addition 080.50819 38200 10 080 190 - Mid-Tex Gas Division Addition 080.50819 38300 10 080 190 - Mid-Tex Gas Division Addition 080.50830 38000 449 080 190 - Mid-Tex Gas Division Addition 080.50830 38100 51 080 190 - Mid-Tex Gas Division Addition 080.50830 38200 5 080 190 - Mid-Tex Gas Division Addition 080.50830 38300 5 080 190 - Mid-Tex Gas Division Addition 080.50838 37602 120 080 190 - Mid-Tex Gas Division Addition 080.50838 38000 28 080 190 - Mid-Tex Gas Division Addition 080.50838 38200 8 080 190 - Mid-Tex Gas Division Addition 080.50838 38300 2 080 190 - Mid-Tex Gas Division Addition 080.50840 37602 2 080 190 - Mid-Tex Gas Division Addition 080.50847 37602 68 080 190 - Mid-Tex Gas Division Addition 080.50847 38000 5 080 190 - Mid-Tex Gas Division Addition 080.50847 38100 1 080 190 - Mid-Tex Gas Division Addition 080.50847 38200 1 080 190 - Mid-Tex Gas Division Addition 080.50847 38300 0.25 080 190 - Mid-Tex Gas Division Addition 080.50850 37601 1 080 190 - Mid-Tex Gas Division Addition 080.50850 38500 1 080 190 - Mid-Tex Gas Division Addition 080.50862 37602 56 080 190 - Mid-Tex Gas Division Addition 080.50862 38000 7 080 190 - Mid-Tex Gas Division Addition 080.50862 38100 1 080 190 - Mid-Tex Gas Division Addition 080.50862 38200 1 080 190 - Mid-Tex Gas Division Addition 080.50862 38300 1 080 190 - Mid-Tex Gas Division Addition 080.50863 37602 0.05 080 190 - Mid-Tex Gas Division Addition 080.50867 37602 1,362 080 190 - Mid-Tex Gas Division Addition 080.50867 38000 89 080 190 - Mid-Tex Gas Division Addition 080.50867 38100 30 080 190 - Mid-Tex Gas Division Addition 080.50903 37602 197 080 190 - Mid-Tex Gas Division Addition 080.50914 38000 194 080 190 - Mid-Tex Gas Division Addition 080.50916 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.50917 37602 89 080 190 - Mid-Tex Gas Division Addition 080.50917 38000 1 080 190 - Mid-Tex Gas Division Addition 080.50917 38100 0.07 080 190 - Mid-Tex Gas Division Addition 080.50917 38200 0.34 080 190 - Mid-Tex Gas Division Addition 080.50917 38300 0.02 080 190 - Mid-Tex Gas Division Addition 080.50920 37602 1 080 190 - Mid-Tex Gas Division Addition 080.50934 37602 39 080 190 - Mid-Tex Gas Division Addition 080.50934 38000 13 080 190 - Mid-Tex Gas Division Addition 080.50934 38100 22 080 190 - Mid-Tex Gas Division Addition 080.50934 38200 12 080 190 - Mid-Tex Gas Division Addition 080.50934 38300 12 080 190 - Mid-Tex Gas Division Addition 080.50939 37602 106 080 190 - Mid-Tex Gas Division Addition 080.50939 38000 84 080 190 - Mid-Tex Gas Division Addition 080.50939 38100 13 080 190 - Mid-Tex Gas Division Addition 080.50939 38200 12 080 190 - Mid-Tex Gas Division Addition 080.50939 38300 16 080 190 - Mid-Tex Gas Division Addition 080.50944 37602 10 080 190 - Mid-Tex Gas Division Addition 080.50953 37602 130 080 190 - Mid-Tex Gas Division Addition 080.50953 38000 49 080 190 - Mid-Tex Gas Division Addition 080.50953 38100 33 080 190 - Mid-Tex Gas Division Addition 080.50953 38200 5 080 190 - Mid-Tex Gas Division Addition 080.50956 37602 3,548 080 190 - Mid-Tex Gas Division Addition 080.50956 38000 459 080 190 - Mid-Tex Gas Division Addition 080.50956 38100 83 080 190 - Mid-Tex Gas Division Addition 080.50956 38300 83 080 190 - Mid-Tex Gas Division Addition 080.50975 37602 632 080 190 - Mid-Tex Gas Division Addition 080.50975 38000 108 080 190 - Mid-Tex Gas Division Addition 080.50975 38100 108 080 190 - Mid-Tex Gas Division Addition 080.50975 38200 27 080 190 - Mid-Tex Gas Division Addition 080.50975 38300 27 080 190 - Mid-Tex Gas Division Addition 080.50986 37602 14 080 190 - Mid-Tex Gas Division Addition 080.50986 38000 10 080 190 - Mid-Tex Gas Division Addition 080.50986 38200 3 080 190 - Mid-Tex Gas Division Addition 080.50986 38300 3 080 190 - Mid-Tex Gas Division Addition 080.51003 37602 148 080 190 - Mid-Tex Gas Division Addition 080.51003 38000 5 080 190 - Mid-Tex Gas Division Addition 080.51003 38100 5 080 190 - Mid-Tex Gas Division Addition 080.51003 38200 42 080 190 - Mid-Tex Gas Division Addition 080.51003 38300 11
MTX Additions by FERCPage 9 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.51004 38000 176 080 190 - Mid-Tex Gas Division Addition 080.51004 38200 3 080 190 - Mid-Tex Gas Division Addition 080.51004 38300 18 080 190 - Mid-Tex Gas Division Addition 080.51005 37602 63 080 190 - Mid-Tex Gas Division Addition 080.51005 38000 7 080 190 - Mid-Tex Gas Division Addition 080.51005 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51005 38300 1 080 190 - Mid-Tex Gas Division Addition 080.51025 37602 3,093 080 190 - Mid-Tex Gas Division Addition 080.51030 37602 454 080 190 - Mid-Tex Gas Division Addition 080.51030 38000 197 080 190 - Mid-Tex Gas Division Addition 080.51030 38100 25 080 190 - Mid-Tex Gas Division Addition 080.51030 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51030 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51033 37602 217 080 190 - Mid-Tex Gas Division Addition 080.51033 38000 87 080 190 - Mid-Tex Gas Division Addition 080.51033 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51033 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51034 37602 185 080 190 - Mid-Tex Gas Division Addition 080.51034 38000 91 080 190 - Mid-Tex Gas Division Addition 080.51034 38100 20 080 190 - Mid-Tex Gas Division Addition 080.51034 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51034 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51041 37602 252 080 190 - Mid-Tex Gas Division Addition 080.51041 38000 115 080 190 - Mid-Tex Gas Division Addition 080.51041 38100 46 080 190 - Mid-Tex Gas Division Addition 080.51041 38200 23 080 190 - Mid-Tex Gas Division Addition 080.51041 38300 23 080 190 - Mid-Tex Gas Division Addition 080.51042 37601 16 080 190 - Mid-Tex Gas Division Addition 080.51053 37602 1,349 080 190 - Mid-Tex Gas Division Addition 080.51053 38000 491 080 190 - Mid-Tex Gas Division Addition 080.51053 38100 368 080 190 - Mid-Tex Gas Division Addition 080.51053 38200 123 080 190 - Mid-Tex Gas Division Addition 080.51053 38300 123 080 190 - Mid-Tex Gas Division Addition 080.51054 37602 1,094 080 190 - Mid-Tex Gas Division Addition 080.51054 38000 65 080 190 - Mid-Tex Gas Division Addition 080.51054 38100 65 080 190 - Mid-Tex Gas Division Addition 080.51054 38200 39 080 190 - Mid-Tex Gas Division Addition 080.51054 38300 39 080 190 - Mid-Tex Gas Division Addition 080.51058 37602 0.28 080 190 - Mid-Tex Gas Division Addition 080.51058 38000 0.04 080 190 - Mid-Tex Gas Division Addition 080.51062 37602 0.02 080 190 - Mid-Tex Gas Division Addition 080.51071 37602 0.02 080 190 - Mid-Tex Gas Division Addition 080.51075 37602 913 080 190 - Mid-Tex Gas Division Addition 080.51083 38000 141 080 190 - Mid-Tex Gas Division Addition 080.51083 38200 18 080 190 - Mid-Tex Gas Division Addition 080.51083 38300 18 080 190 - Mid-Tex Gas Division Addition 080.51088 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51088 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.51088 38300 0.03 080 190 - Mid-Tex Gas Division Addition 080.51093 38000 95 080 190 - Mid-Tex Gas Division Addition 080.51093 38100 14 080 190 - Mid-Tex Gas Division Addition 080.51093 38200 26 080 190 - Mid-Tex Gas Division Addition 080.51093 38300 4 080 190 - Mid-Tex Gas Division Addition 080.51094 38000 231 080 190 - Mid-Tex Gas Division Addition 080.51094 38100 116 080 190 - Mid-Tex Gas Division Addition 080.51094 38200 19 080 190 - Mid-Tex Gas Division Addition 080.51094 38300 19 080 190 - Mid-Tex Gas Division Addition 080.51095 38000 0.18 080 190 - Mid-Tex Gas Division Addition 080.51095 38100 0.07 080 190 - Mid-Tex Gas Division Addition 080.51095 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.51095 38300 0.01 080 190 - Mid-Tex Gas Division Addition 080.51096 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51096 38100 0.38 080 190 - Mid-Tex Gas Division Addition 080.51096 38200 0.19 080 190 - Mid-Tex Gas Division Addition 080.51096 38300 0.19 080 190 - Mid-Tex Gas Division Addition 080.51097 38000 7 080 190 - Mid-Tex Gas Division Addition 080.51097 38100 1 080 190 - Mid-Tex Gas Division Addition 080.51097 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51097 38300 0.46 080 190 - Mid-Tex Gas Division Addition 080.51101 38000 0.02 080 190 - Mid-Tex Gas Division Addition 080.51104 38000 (0.08) 080 190 - Mid-Tex Gas Division Addition 080.51105 38000 8 080 190 - Mid-Tex Gas Division Addition 080.51105 38100 0.26 080 190 - Mid-Tex Gas Division Addition 080.51105 38200 0.26 080 190 - Mid-Tex Gas Division Addition 080.51105 38300 0.26 080 190 - Mid-Tex Gas Division Addition 080.51108 38000 0.36 080 190 - Mid-Tex Gas Division Addition 080.51108 38100 0.02 080 190 - Mid-Tex Gas Division Addition 080.51108 38200 0.02 080 190 - Mid-Tex Gas Division Addition 080.51108 38300 0.02 080 190 - Mid-Tex Gas Division Addition 080.51109 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51109 38100 0.01 080 190 - Mid-Tex Gas Division Addition 080.51109 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.51109 38300 0.01 080 190 - Mid-Tex Gas Division Addition 080.51110 38000 9 080 190 - Mid-Tex Gas Division Addition 080.51110 38100 0.30 080 190 - Mid-Tex Gas Division Addition 080.51110 38200 0.30 080 190 - Mid-Tex Gas Division Addition 080.51110 38300 0.30 080 190 - Mid-Tex Gas Division Addition 080.51112 38000 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.51131 38100 953 080 190 - Mid-Tex Gas Division Addition 080.51131 38300 57 080 190 - Mid-Tex Gas Division Addition 080.51132 38100 570 080 190 - Mid-Tex Gas Division Addition 080.51132 38300 35 080 190 - Mid-Tex Gas Division Addition 080.51133 38100 3,661 080 190 - Mid-Tex Gas Division Addition 080.51133 38200 192 080 190 - Mid-Tex Gas Division Addition 080.51133 38300 129 080 190 - Mid-Tex Gas Division Addition 080.51134 38100 539 080 190 - Mid-Tex Gas Division Addition 080.51134 38300 33 080 190 - Mid-Tex Gas Division Addition 080.51135 38100 2,267 080 190 - Mid-Tex Gas Division Addition 080.51135 38200 157 080 190 - Mid-Tex Gas Division Addition 080.51135 38300 97 080 190 - Mid-Tex Gas Division Addition 080.51136 38100 3,246 080 190 - Mid-Tex Gas Division Addition 080.51136 38200 99 080 190 - Mid-Tex Gas Division Addition 080.51136 38300 128 080 190 - Mid-Tex Gas Division Addition 080.51137 38100 442 080 190 - Mid-Tex Gas Division Addition 080.51137 38300 28 080 190 - Mid-Tex Gas Division Addition 080.51138 38100 872 080 190 - Mid-Tex Gas Division Addition 080.51138 38200 43 080 190 - Mid-Tex Gas Division Addition 080.51138 38300 32
MTX Additions by FERCPage 10 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.51142 37602 215,402 080 190 - Mid-Tex Gas Division Addition 080.51142 38000 2,175 080 190 - Mid-Tex Gas Division Addition 080.51158 37602 51 080 190 - Mid-Tex Gas Division Addition 080.51159 37602 81 080 190 - Mid-Tex Gas Division Addition 080.51162 37602 76 080 190 - Mid-Tex Gas Division Addition 080.51162 38000 31 080 190 - Mid-Tex Gas Division Addition 080.51162 38200 11 080 190 - Mid-Tex Gas Division Addition 080.51162 38300 11 080 190 - Mid-Tex Gas Division Addition 080.51171 37602 104 080 190 - Mid-Tex Gas Division Addition 080.51171 38000 11 080 190 - Mid-Tex Gas Division Addition 080.51171 38200 0.48 080 190 - Mid-Tex Gas Division Addition 080.51176 37602 716 080 190 - Mid-Tex Gas Division Addition 080.51176 38100 2 080 190 - Mid-Tex Gas Division Addition 080.51176 38200 4 080 190 - Mid-Tex Gas Division Addition 080.51176 38300 1 080 190 - Mid-Tex Gas Division Addition 080.51193 37602 (3) 080 190 - Mid-Tex Gas Division Addition 080.51193 38000 (0.37) 080 190 - Mid-Tex Gas Division Addition 080.51203 37602 0.06 080 190 - Mid-Tex Gas Division Addition 080.51207 37600 251 080 190 - Mid-Tex Gas Division Addition 080.51208 37602 19 080 190 - Mid-Tex Gas Division Addition 080.51208 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51208 38100 0.12 080 190 - Mid-Tex Gas Division Addition 080.51208 38200 0.30 080 190 - Mid-Tex Gas Division Addition 080.51208 38300 0.06 080 190 - Mid-Tex Gas Division Addition 080.51221 37602 157 080 190 - Mid-Tex Gas Division Addition 080.51221 38000 35 080 190 - Mid-Tex Gas Division Addition 080.51221 38100 4 080 190 - Mid-Tex Gas Division Addition 080.51221 38200 9 080 190 - Mid-Tex Gas Division Addition 080.51221 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51222 37602 0.08 080 190 - Mid-Tex Gas Division Addition 080.51222 38000 0.03 080 190 - Mid-Tex Gas Division Addition 080.51222 38100 0.01 080 190 - Mid-Tex Gas Division Addition 080.51222 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.51222 38300 0.01 080 190 - Mid-Tex Gas Division Addition 080.51235 37602 (491) 080 190 - Mid-Tex Gas Division Addition 080.51235 38000 (55) 080 190 - Mid-Tex Gas Division Addition 080.51243 37602 53 080 190 - Mid-Tex Gas Division Addition 080.51243 38000 7 080 190 - Mid-Tex Gas Division Addition 080.51243 38100 4 080 190 - Mid-Tex Gas Division Addition 080.51243 38200 4 080 190 - Mid-Tex Gas Division Addition 080.51243 38300 4 080 190 - Mid-Tex Gas Division Addition 080.51244 37602 52 080 190 - Mid-Tex Gas Division Addition 080.51250 37602 268 080 190 - Mid-Tex Gas Division Addition 080.51250 38000 42 080 190 - Mid-Tex Gas Division Addition 080.51250 38100 5 080 190 - Mid-Tex Gas Division Addition 080.51250 38200 11 080 190 - Mid-Tex Gas Division Addition 080.51250 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51255 37602 277 080 190 - Mid-Tex Gas Division Addition 080.51255 38000 73 080 190 - Mid-Tex Gas Division Addition 080.51263 37602 90 080 190 - Mid-Tex Gas Division Addition 080.51263 38000 27 080 190 - Mid-Tex Gas Division Addition 080.51263 38100 5 080 190 - Mid-Tex Gas Division Addition 080.51263 38200 3 080 190 - Mid-Tex Gas Division Addition 080.51263 38300 3 080 190 - Mid-Tex Gas Division Addition 080.51268 37602 15 080 190 - Mid-Tex Gas Division Addition 080.51268 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51273 38000 0.35 080 190 - Mid-Tex Gas Division Addition 080.51279 37601 1,981 080 190 - Mid-Tex Gas Division Addition 080.51279 37800 353 080 190 - Mid-Tex Gas Division Addition 080.51282 37602 0.37 080 190 - Mid-Tex Gas Division Addition 080.51282 38000 0.14 080 190 - Mid-Tex Gas Division Addition 080.51282 38100 0.12 080 190 - Mid-Tex Gas Division Addition 080.51282 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.51282 38300 0.03 080 190 - Mid-Tex Gas Division Addition 080.51283 37601 27 080 190 - Mid-Tex Gas Division Addition 080.51309 37602 (3) 080 190 - Mid-Tex Gas Division Addition 080.51313 37602 34 080 190 - Mid-Tex Gas Division Addition 080.51313 38000 35 080 190 - Mid-Tex Gas Division Addition 080.51313 38100 3 080 190 - Mid-Tex Gas Division Addition 080.51313 38200 4 080 190 - Mid-Tex Gas Division Addition 080.51313 38300 5 080 190 - Mid-Tex Gas Division Addition 080.51317 37602 271 080 190 - Mid-Tex Gas Division Addition 080.51317 38000 30 080 190 - Mid-Tex Gas Division Addition 080.51317 38100 3 080 190 - Mid-Tex Gas Division Addition 080.51317 38200 8 080 190 - Mid-Tex Gas Division Addition 080.51317 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51318 37602 400 080 190 - Mid-Tex Gas Division Addition 080.51318 38000 28 080 190 - Mid-Tex Gas Division Addition 080.51318 38100 8 080 190 - Mid-Tex Gas Division Addition 080.51318 38200 0.23 080 190 - Mid-Tex Gas Division Addition 080.51318 38300 1 080 190 - Mid-Tex Gas Division Addition 080.51329 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.51332 37602 81 080 190 - Mid-Tex Gas Division Addition 080.51332 38000 5 080 190 - Mid-Tex Gas Division Addition 080.51332 38100 5 080 190 - Mid-Tex Gas Division Addition 080.51332 38200 2 080 190 - Mid-Tex Gas Division Addition 080.51332 38300 0.37 080 190 - Mid-Tex Gas Division Addition 080.51346 37602 104 080 190 - Mid-Tex Gas Division Addition 080.51371 37602 1,958 080 190 - Mid-Tex Gas Division Addition 080.51371 38000 490 080 190 - Mid-Tex Gas Division Addition 080.51376 37602 67 080 190 - Mid-Tex Gas Division Addition 080.51376 38000 6 080 190 - Mid-Tex Gas Division Addition 080.51376 38100 0.29 080 190 - Mid-Tex Gas Division Addition 080.51376 38200 0.22 080 190 - Mid-Tex Gas Division Addition 080.51376 38300 0.22 080 190 - Mid-Tex Gas Division Addition 080.51391 37602 191 080 190 - Mid-Tex Gas Division Addition 080.51391 38000 2 080 190 - Mid-Tex Gas Division Addition 080.51393 37602 3 080 190 - Mid-Tex Gas Division Addition 080.51395 37602 273 080 190 - Mid-Tex Gas Division Addition 080.51396 37602 168 080 190 - Mid-Tex Gas Division Addition 080.51396 38000 9 080 190 - Mid-Tex Gas Division Addition 080.51396 38100 2 080 190 - Mid-Tex Gas Division Addition 080.51396 38200 2 080 190 - Mid-Tex Gas Division Addition 080.51396 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51397 37602 2 080 190 - Mid-Tex Gas Division Addition 080.51397 38000 0.30 080 190 - Mid-Tex Gas Division Addition 080.51397 38100 0.14 080 190 - Mid-Tex Gas Division Addition 080.51405 37602 323
MTX Additions by FERCPage 11 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.51405 38000 280 080 190 - Mid-Tex Gas Division Addition 080.51405 38100 9 080 190 - Mid-Tex Gas Division Addition 080.51405 38200 5 080 190 - Mid-Tex Gas Division Addition 080.51405 38300 11 080 190 - Mid-Tex Gas Division Addition 080.51407 37602 (0.13) 080 190 - Mid-Tex Gas Division Addition 080.51407 38000 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.51411 37602 6 080 190 - Mid-Tex Gas Division Addition 080.51411 38000 3 080 190 - Mid-Tex Gas Division Addition 080.51413 37602 36 080 190 - Mid-Tex Gas Division Addition 080.51413 38000 6 080 190 - Mid-Tex Gas Division Addition 080.51413 38100 1 080 190 - Mid-Tex Gas Division Addition 080.51413 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.51413 38300 0.10 080 190 - Mid-Tex Gas Division Addition 080.51414 37602 47 080 190 - Mid-Tex Gas Division Addition 080.51414 38000 11 080 190 - Mid-Tex Gas Division Addition 080.51414 38100 3 080 190 - Mid-Tex Gas Division Addition 080.51420 37602 146 080 190 - Mid-Tex Gas Division Addition 080.51420 38000 58 080 190 - Mid-Tex Gas Division Addition 080.51420 38100 44 080 190 - Mid-Tex Gas Division Addition 080.51420 38200 15 080 190 - Mid-Tex Gas Division Addition 080.51420 38300 29 080 190 - Mid-Tex Gas Division Addition 080.51421 37602 504 080 190 - Mid-Tex Gas Division Addition 080.51421 38000 12 080 190 - Mid-Tex Gas Division Addition 080.51421 38100 8 080 190 - Mid-Tex Gas Division Addition 080.51421 38200 18 080 190 - Mid-Tex Gas Division Addition 080.51421 38300 4 080 190 - Mid-Tex Gas Division Addition 080.51427 37601 4 080 190 - Mid-Tex Gas Division Addition 080.51427 37602 4 080 190 - Mid-Tex Gas Division Addition 080.51430 37602 38 080 190 - Mid-Tex Gas Division Addition 080.51430 38000 26 080 190 - Mid-Tex Gas Division Addition 080.51430 38100 2 080 190 - Mid-Tex Gas Division Addition 080.51430 38200 0.08 080 190 - Mid-Tex Gas Division Addition 080.51430 38300 0.19 080 190 - Mid-Tex Gas Division Addition 080.51434 37602 258 080 190 - Mid-Tex Gas Division Addition 080.51434 38000 117 080 190 - Mid-Tex Gas Division Addition 080.51434 38100 23 080 190 - Mid-Tex Gas Division Addition 080.51434 38200 23 080 190 - Mid-Tex Gas Division Addition 080.51434 38300 23 080 190 - Mid-Tex Gas Division Addition 080.51451 37602 51 080 190 - Mid-Tex Gas Division Addition 080.51459 37602 177 080 190 - Mid-Tex Gas Division Addition 080.51460 37601 0.02 080 190 - Mid-Tex Gas Division Addition 080.51471 37602 114 080 190 - Mid-Tex Gas Division Addition 080.51471 38000 62 080 190 - Mid-Tex Gas Division Addition 080.51471 38100 7 080 190 - Mid-Tex Gas Division Addition 080.51471 38200 3 080 190 - Mid-Tex Gas Division Addition 080.51471 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51473 37602 551 080 190 - Mid-Tex Gas Division Addition 080.51473 38000 138 080 190 - Mid-Tex Gas Division Addition 080.51473 38100 138 080 190 - Mid-Tex Gas Division Addition 080.51473 38200 46 080 190 - Mid-Tex Gas Division Addition 080.51473 38300 46 080 190 - Mid-Tex Gas Division Addition 080.51474 37602 631 080 190 - Mid-Tex Gas Division Addition 080.51474 38000 135 080 190 - Mid-Tex Gas Division Addition 080.51474 38100 68 080 190 - Mid-Tex Gas Division Addition 080.51474 38200 23 080 190 - Mid-Tex Gas Division Addition 080.51474 38300 45 080 190 - Mid-Tex Gas Division Addition 080.51479 37602 6 080 190 - Mid-Tex Gas Division Addition 080.51479 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51479 38300 0.35 080 190 - Mid-Tex Gas Division Addition 080.51486 37602 163 080 190 - Mid-Tex Gas Division Addition 080.51486 38000 39 080 190 - Mid-Tex Gas Division Addition 080.51486 38100 23 080 190 - Mid-Tex Gas Division Addition 080.51486 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51486 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51487 37602 35 080 190 - Mid-Tex Gas Division Addition 080.51487 38000 17 080 190 - Mid-Tex Gas Division Addition 080.51487 38100 3 080 190 - Mid-Tex Gas Division Addition 080.51487 38200 0.10 080 190 - Mid-Tex Gas Division Addition 080.51488 37602 27 080 190 - Mid-Tex Gas Division Addition 080.51488 38000 13 080 190 - Mid-Tex Gas Division Addition 080.51488 38100 1 080 190 - Mid-Tex Gas Division Addition 080.51488 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.51495 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51503 37602 38 080 190 - Mid-Tex Gas Division Addition 080.51503 38000 24 080 190 - Mid-Tex Gas Division Addition 080.51503 38100 4 080 190 - Mid-Tex Gas Division Addition 080.51503 38200 0.07 080 190 - Mid-Tex Gas Division Addition 080.51503 38300 0.19 080 190 - Mid-Tex Gas Division Addition 080.51504 37602 0.12 080 190 - Mid-Tex Gas Division Addition 080.51506 37602 35 080 190 - Mid-Tex Gas Division Addition 080.51506 38000 26 080 190 - Mid-Tex Gas Division Addition 080.51513 38000 367 080 190 - Mid-Tex Gas Division Addition 080.51513 38100 43 080 190 - Mid-Tex Gas Division Addition 080.51513 38200 2 080 190 - Mid-Tex Gas Division Addition 080.51513 38300 5 080 190 - Mid-Tex Gas Division Addition 080.51516 37602 67 080 190 - Mid-Tex Gas Division Addition 080.51516 38000 20 080 190 - Mid-Tex Gas Division Addition 080.51516 38100 8 080 190 - Mid-Tex Gas Division Addition 080.51516 38200 0.25 080 190 - Mid-Tex Gas Division Addition 080.51516 38300 0.49 080 190 - Mid-Tex Gas Division Addition 080.51517 37602 60 080 190 - Mid-Tex Gas Division Addition 080.51517 38000 28 080 190 - Mid-Tex Gas Division Addition 080.51517 38200 0.19 080 190 - Mid-Tex Gas Division Addition 080.51517 38300 0.44 080 190 - Mid-Tex Gas Division Addition 080.51529 38000 24 080 190 - Mid-Tex Gas Division Addition 080.51529 38100 1 080 190 - Mid-Tex Gas Division Addition 080.51529 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51529 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51530 38000 73 080 190 - Mid-Tex Gas Division Addition 080.51530 38200 20 080 190 - Mid-Tex Gas Division Addition 080.51530 38300 4 080 190 - Mid-Tex Gas Division Addition 080.51537 37602 39 080 190 - Mid-Tex Gas Division Addition 080.51543 37602 119 080 190 - Mid-Tex Gas Division Addition 080.51543 38000 22 080 190 - Mid-Tex Gas Division Addition 080.51543 38100 2 080 190 - Mid-Tex Gas Division Addition 080.51543 38200 0.27 080 190 - Mid-Tex Gas Division Addition 080.51543 38300 1 080 190 - Mid-Tex Gas Division Addition 080.51544 37602 0.11
MTX Additions by FERCPage 12 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.51544 38000 0.02 080 190 - Mid-Tex Gas Division Addition 080.51551 37602 11 080 190 - Mid-Tex Gas Division Addition 080.51551 38000 2 080 190 - Mid-Tex Gas Division Addition 080.51551 38100 0.02 080 190 - Mid-Tex Gas Division Addition 080.51551 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.51551 38300 0.04 080 190 - Mid-Tex Gas Division Addition 080.51552 37602 3 080 190 - Mid-Tex Gas Division Addition 080.51552 37800 9 080 190 - Mid-Tex Gas Division Addition 080.51557 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.51557 37800 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.51573 37602 0.02 080 190 - Mid-Tex Gas Division Addition 080.51575 37602 4 080 190 - Mid-Tex Gas Division Addition 080.51575 37800 17 080 190 - Mid-Tex Gas Division Addition 080.51576 37602 0.23 080 190 - Mid-Tex Gas Division Addition 080.51584 37602 0.04 080 190 - Mid-Tex Gas Division Addition 080.51584 38000 0.02 080 190 - Mid-Tex Gas Division Addition 080.51585 37602 (0.27) 080 190 - Mid-Tex Gas Division Addition 080.51617 37602 596 080 190 - Mid-Tex Gas Division Addition 080.51617 38000 15 080 190 - Mid-Tex Gas Division Addition 080.51617 38100 4 080 190 - Mid-Tex Gas Division Addition 080.51617 38200 9 080 190 - Mid-Tex Gas Division Addition 080.51617 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51620 37602 81 080 190 - Mid-Tex Gas Division Addition 080.51620 38000 59 080 190 - Mid-Tex Gas Division Addition 080.51620 38100 4 080 190 - Mid-Tex Gas Division Addition 080.51620 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51620 38300 1 080 190 - Mid-Tex Gas Division Addition 080.51621 37602 11 080 190 - Mid-Tex Gas Division Addition 080.51621 38000 0.25 080 190 - Mid-Tex Gas Division Addition 080.51621 38200 0.02 080 190 - Mid-Tex Gas Division Addition 080.51634 37602 7 080 190 - Mid-Tex Gas Division Addition 080.51634 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51640 37601 0.02 080 190 - Mid-Tex Gas Division Addition 080.51640 37602 0.15 080 190 - Mid-Tex Gas Division Addition 080.51640 37800 0.19 080 190 - Mid-Tex Gas Division Addition 080.51648 37602 75 080 190 - Mid-Tex Gas Division Addition 080.51648 38000 9 080 190 - Mid-Tex Gas Division Addition 080.51648 38100 3 080 190 - Mid-Tex Gas Division Addition 080.51648 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51648 38300 1 080 190 - Mid-Tex Gas Division Addition 080.51653 37602 840 080 190 - Mid-Tex Gas Division Addition 080.51653 38000 99 080 190 - Mid-Tex Gas Division Addition 080.51653 38200 20 080 190 - Mid-Tex Gas Division Addition 080.51653 38300 30 080 190 - Mid-Tex Gas Division Addition 080.51655 37602 44 080 190 - Mid-Tex Gas Division Addition 080.51655 38000 17 080 190 - Mid-Tex Gas Division Addition 080.51655 38100 2 080 190 - Mid-Tex Gas Division Addition 080.51655 38200 2 080 190 - Mid-Tex Gas Division Addition 080.51655 38300 0.28 080 190 - Mid-Tex Gas Division Addition 080.51656 37602 (1) 080 190 - Mid-Tex Gas Division Addition 080.51656 38000 (2) 080 190 - Mid-Tex Gas Division Addition 080.51656 38100 (0.21) 080 190 - Mid-Tex Gas Division Addition 080.51656 38200 (0.21) 080 190 - Mid-Tex Gas Division Addition 080.51656 38300 (0.21) 080 190 - Mid-Tex Gas Division Addition 080.51663 37602 749 080 190 - Mid-Tex Gas Division Addition 080.51663 38000 260 080 190 - Mid-Tex Gas Division Addition 080.51663 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51663 38300 1 080 190 - Mid-Tex Gas Division Addition 080.51668 37602 0.20 080 190 - Mid-Tex Gas Division Addition 080.51668 38000 0.07 080 190 - Mid-Tex Gas Division Addition 080.51668 38100 0.02 080 190 - Mid-Tex Gas Division Addition 080.51668 38200 0.02 080 190 - Mid-Tex Gas Division Addition 080.51668 38300 0.02 080 190 - Mid-Tex Gas Division Addition 080.51676 37602 (184) 080 190 - Mid-Tex Gas Division Addition 080.51676 38000 (23) 080 190 - Mid-Tex Gas Division Addition 080.51676 38100 (4) 080 190 - Mid-Tex Gas Division Addition 080.51676 38200 (0.14) 080 190 - Mid-Tex Gas Division Addition 080.51676 38300 (0.38) 080 190 - Mid-Tex Gas Division Addition 080.51682 38000 2 080 190 - Mid-Tex Gas Division Addition 080.51682 38100 0.07 080 190 - Mid-Tex Gas Division Addition 080.51682 38200 0.37 080 190 - Mid-Tex Gas Division Addition 080.51682 38300 0.02 080 190 - Mid-Tex Gas Division Addition 080.51684 37602 21 080 190 - Mid-Tex Gas Division Addition 080.51702 37602 926 080 190 - Mid-Tex Gas Division Addition 080.51702 38000 232 080 190 - Mid-Tex Gas Division Addition 080.51708 37602 5 080 190 - Mid-Tex Gas Division Addition 080.51728 37602 0.13 080 190 - Mid-Tex Gas Division Addition 080.51728 38100 2 080 190 - Mid-Tex Gas Division Addition 080.51740 37600 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.51743 37602 178 080 190 - Mid-Tex Gas Division Addition 080.51743 38000 39 080 190 - Mid-Tex Gas Division Addition 080.51743 38100 2 080 190 - Mid-Tex Gas Division Addition 080.51743 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51743 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51754 37601 2,431 080 190 - Mid-Tex Gas Division Addition 080.51755 38000 14 080 190 - Mid-Tex Gas Division Addition 080.51755 38100 0.04 080 190 - Mid-Tex Gas Division Addition 080.51755 38200 4 080 190 - Mid-Tex Gas Division Addition 080.51755 38300 1 080 190 - Mid-Tex Gas Division Addition 080.51760 37602 0.04 080 190 - Mid-Tex Gas Division Addition 080.51761 37602 4 080 190 - Mid-Tex Gas Division Addition 080.51764 37602 1,237 080 190 - Mid-Tex Gas Division Addition 080.51783 37602 145 080 190 - Mid-Tex Gas Division Addition 080.51783 38000 8 080 190 - Mid-Tex Gas Division Addition 080.51786 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51786 38000 0.03 080 190 - Mid-Tex Gas Division Addition 080.51786 38100 5 080 190 - Mid-Tex Gas Division Addition 080.51786 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.51786 38300 0.01 080 190 - Mid-Tex Gas Division Addition 080.51794 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.51799 37602 1,725 080 190 - Mid-Tex Gas Division Addition 080.51799 38000 1,208 080 190 - Mid-Tex Gas Division Addition 080.51799 38100 73 080 190 - Mid-Tex Gas Division Addition 080.51799 38200 7 080 190 - Mid-Tex Gas Division Addition 080.51799 38300 18 080 190 - Mid-Tex Gas Division Addition 080.51801 37602 1,324 080 190 - Mid-Tex Gas Division Addition 080.51801 38000 669 080 190 - Mid-Tex Gas Division Addition 080.51801 38100 130
MTX Additions by FERCPage 13 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.51801 38200 4 080 190 - Mid-Tex Gas Division Addition 080.51801 38300 10 080 190 - Mid-Tex Gas Division Addition 080.51804 37602 25 080 190 - Mid-Tex Gas Division Addition 080.51804 38000 0.26 080 190 - Mid-Tex Gas Division Addition 080.51804 38100 0.26 080 190 - Mid-Tex Gas Division Addition 080.51804 38200 0.26 080 190 - Mid-Tex Gas Division Addition 080.51804 38300 0.26 080 190 - Mid-Tex Gas Division Addition 080.51806 37602 3,245 080 190 - Mid-Tex Gas Division Addition 080.51806 38000 1,695 080 190 - Mid-Tex Gas Division Addition 080.51806 38100 285 080 190 - Mid-Tex Gas Division Addition 080.51806 38200 9 080 190 - Mid-Tex Gas Division Addition 080.51806 38300 25 080 190 - Mid-Tex Gas Division Addition 080.51809 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.51823 37602 281 080 190 - Mid-Tex Gas Division Addition 080.51823 38000 197 080 190 - Mid-Tex Gas Division Addition 080.51823 38100 28 080 190 - Mid-Tex Gas Division Addition 080.51823 38200 28 080 190 - Mid-Tex Gas Division Addition 080.51823 38300 28 080 190 - Mid-Tex Gas Division Addition 080.51824 37602 76 080 190 - Mid-Tex Gas Division Addition 080.51824 38000 15 080 190 - Mid-Tex Gas Division Addition 080.51825 37602 57 080 190 - Mid-Tex Gas Division Addition 080.51825 38000 7 080 190 - Mid-Tex Gas Division Addition 080.51825 38100 4 080 190 - Mid-Tex Gas Division Addition 080.51825 38200 2 080 190 - Mid-Tex Gas Division Addition 080.51825 38300 2 080 190 - Mid-Tex Gas Division Addition 080.51829 37602 24 080 190 - Mid-Tex Gas Division Addition 080.51829 38000 1 080 190 - Mid-Tex Gas Division Addition 080.51829 38100 1 080 190 - Mid-Tex Gas Division Addition 080.51829 38200 0.28 080 190 - Mid-Tex Gas Division Addition 080.51829 38300 0.28 080 190 - Mid-Tex Gas Division Addition 080.51835 37602 1 080 190 - Mid-Tex Gas Division Addition 080.51835 38000 0.07 080 190 - Mid-Tex Gas Division Addition 080.51835 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.51835 38300 0.02 080 190 - Mid-Tex Gas Division Addition 080.51840 37602 359 080 190 - Mid-Tex Gas Division Addition 080.51840 38000 45 080 190 - Mid-Tex Gas Division Addition 080.51840 38100 22 080 190 - Mid-Tex Gas Division Addition 080.51840 38200 9 080 190 - Mid-Tex Gas Division Addition 080.51840 38300 13 080 190 - Mid-Tex Gas Division Addition 080.51843 37602 11,705 080 190 - Mid-Tex Gas Division Addition 080.51843 38000 1,301 080 190 - Mid-Tex Gas Division Addition 080.51844 37601 6,553 080 190 - Mid-Tex Gas Division Addition 080.51844 37602 1,153 080 190 - Mid-Tex Gas Division Addition 080.51844 38000 243 080 190 - Mid-Tex Gas Division Addition 080.51844 38100 81 080 190 - Mid-Tex Gas Division Addition 080.51844 38200 20 080 190 - Mid-Tex Gas Division Addition 080.51844 38300 40 080 190 - Mid-Tex Gas Division Addition 080.51846 37602 619 080 190 - Mid-Tex Gas Division Addition 080.51846 38000 108 080 190 - Mid-Tex Gas Division Addition 080.51846 38100 15 080 190 - Mid-Tex Gas Division Addition 080.51846 38200 15 080 190 - Mid-Tex Gas Division Addition 080.51846 38300 15 080 190 - Mid-Tex Gas Division Addition 080.51850 37602 13 080 190 - Mid-Tex Gas Division Addition 080.51852 37602 (3,634) 080 190 - Mid-Tex Gas Division Addition 080.51852 38000 (274) 080 190 - Mid-Tex Gas Division Addition 080.51853 37602 7 080 190 - Mid-Tex Gas Division Addition 080.51854 37602 (2,411) 080 190 - Mid-Tex Gas Division Addition 080.51854 38000 (127) 080 190 - Mid-Tex Gas Division Addition 080.51862 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.51870 37602 38 080 190 - Mid-Tex Gas Division Addition 080.51870 38000 5 080 190 - Mid-Tex Gas Division Addition 080.51870 38100 1 080 190 - Mid-Tex Gas Division Addition 080.51870 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51870 38300 1 080 190 - Mid-Tex Gas Division Addition 080.51871 37602 8 080 190 - Mid-Tex Gas Division Addition 080.51871 38000 0.16 080 190 - Mid-Tex Gas Division Addition 080.51873 37602 5 080 190 - Mid-Tex Gas Division Addition 080.51886 37602 313 080 190 - Mid-Tex Gas Division Addition 080.51887 37602 3 080 190 - Mid-Tex Gas Division Addition 080.51889 37602 8,470 080 190 - Mid-Tex Gas Division Addition 080.51899 37601 2 080 190 - Mid-Tex Gas Division Addition 080.51920 37602 73,744 080 190 - Mid-Tex Gas Division Addition 080.51920 38000 (19,032) 080 190 - Mid-Tex Gas Division Addition 080.51920 38100 (19,032) 080 190 - Mid-Tex Gas Division Addition 080.51920 38300 (38,064) 080 190 - Mid-Tex Gas Division Addition 080.51942 37602 0.11 080 190 - Mid-Tex Gas Division Addition 080.51942 38000 0.01 080 190 - Mid-Tex Gas Division Addition 080.51944 37601 267 080 190 - Mid-Tex Gas Division Addition 080.51958 37602 4 080 190 - Mid-Tex Gas Division Addition 080.51958 38000 3 080 190 - Mid-Tex Gas Division Addition 080.51958 38100 0.43 080 190 - Mid-Tex Gas Division Addition 080.51958 38200 0.21 080 190 - Mid-Tex Gas Division Addition 080.51958 38300 0.21 080 190 - Mid-Tex Gas Division Addition 080.51962 37602 (0.07) 080 190 - Mid-Tex Gas Division Addition 080.51962 38000 (0.05) 080 190 - Mid-Tex Gas Division Addition 080.51980 37602 36 080 190 - Mid-Tex Gas Division Addition 080.51980 38000 6 080 190 - Mid-Tex Gas Division Addition 080.51980 38200 1 080 190 - Mid-Tex Gas Division Addition 080.51982 37602 2,993 080 190 - Mid-Tex Gas Division Addition 080.51992 37602 (10) 080 190 - Mid-Tex Gas Division Addition 080.51994 37602 2,128 080 190 - Mid-Tex Gas Division Addition 080.51994 38000 118 080 190 - Mid-Tex Gas Division Addition 080.51994 38100 71 080 190 - Mid-Tex Gas Division Addition 080.51994 38200 24 080 190 - Mid-Tex Gas Division Addition 080.51994 38300 24 080 190 - Mid-Tex Gas Division Addition 080.52004 37602 23 080 190 - Mid-Tex Gas Division Addition 080.52004 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52004 38100 1 080 190 - Mid-Tex Gas Division Addition 080.52004 38200 0.25 080 190 - Mid-Tex Gas Division Addition 080.52004 38300 0.25 080 190 - Mid-Tex Gas Division Addition 080.52012 37601 2 080 190 - Mid-Tex Gas Division Addition 080.52012 37602 2 080 190 - Mid-Tex Gas Division Addition 080.52012 38000 2 080 190 - Mid-Tex Gas Division Addition 080.52014 37602 72 080 190 - Mid-Tex Gas Division Addition 080.52014 38000 4 080 190 - Mid-Tex Gas Division Addition 080.52014 38200 0.38 080 190 - Mid-Tex Gas Division Addition 080.52014 38300 0.38 080 190 - Mid-Tex Gas Division Addition 080.52022 37602 0.26
MTX Additions by FERCPage 14 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.52022 38100 0.08 080 190 - Mid-Tex Gas Division Addition 080.52022 38200 0.06 080 190 - Mid-Tex Gas Division Addition 080.52022 38300 0.06 080 190 - Mid-Tex Gas Division Addition 080.52029 37602 507 080 190 - Mid-Tex Gas Division Addition 080.52033 37602 10 080 190 - Mid-Tex Gas Division Addition 080.52033 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52033 38100 0.49 080 190 - Mid-Tex Gas Division Addition 080.52033 38200 0.37 080 190 - Mid-Tex Gas Division Addition 080.52033 38300 0.37 080 190 - Mid-Tex Gas Division Addition 080.52036 37602 1,704 080 190 - Mid-Tex Gas Division Addition 080.52039 37602 127 080 190 - Mid-Tex Gas Division Addition 080.52039 38000 10 080 190 - Mid-Tex Gas Division Addition 080.52039 38100 1 080 190 - Mid-Tex Gas Division Addition 080.52039 38300 1 080 190 - Mid-Tex Gas Division Addition 080.52044 37602 41 080 190 - Mid-Tex Gas Division Addition 080.52044 38000 3 080 190 - Mid-Tex Gas Division Addition 080.52044 38100 0.46 080 190 - Mid-Tex Gas Division Addition 080.52044 38200 0.46 080 190 - Mid-Tex Gas Division Addition 080.52044 38300 0.46 080 190 - Mid-Tex Gas Division Addition 080.52052 38000 1,350 080 190 - Mid-Tex Gas Division Addition 080.52052 38200 14 080 190 - Mid-Tex Gas Division Addition 080.52052 38300 14 080 190 - Mid-Tex Gas Division Addition 080.52053 38000 686 080 190 - Mid-Tex Gas Division Addition 080.52055 38000 1,208 080 190 - Mid-Tex Gas Division Addition 080.52056 38000 726 080 190 - Mid-Tex Gas Division Addition 080.52056 38200 22 080 190 - Mid-Tex Gas Division Addition 080.52058 37602 168 080 190 - Mid-Tex Gas Division Addition 080.52058 38000 24 080 190 - Mid-Tex Gas Division Addition 080.52058 38100 24 080 190 - Mid-Tex Gas Division Addition 080.52058 38200 12 080 190 - Mid-Tex Gas Division Addition 080.52058 38300 12 080 190 - Mid-Tex Gas Division Addition 080.52062 37602 154 080 190 - Mid-Tex Gas Division Addition 080.52062 38000 38 080 190 - Mid-Tex Gas Division Addition 080.52062 38100 11 080 190 - Mid-Tex Gas Division Addition 080.52062 38200 11 080 190 - Mid-Tex Gas Division Addition 080.52062 38300 11 080 190 - Mid-Tex Gas Division Addition 080.52067 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52077 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.52080 37800 25 080 190 - Mid-Tex Gas Division Addition 080.52094 37602 0.02 080 190 - Mid-Tex Gas Division Addition 080.52098 37601 489 080 190 - Mid-Tex Gas Division Addition 080.52106 37602 3 080 190 - Mid-Tex Gas Division Addition 080.52106 38000 0.24 080 190 - Mid-Tex Gas Division Addition 080.52106 38100 11 080 190 - Mid-Tex Gas Division Addition 080.52112 37602 0.01 080 190 - Mid-Tex Gas Division Addition 080.52112 38000 0.01 080 190 - Mid-Tex Gas Division Addition 080.52121 37602 9 080 190 - Mid-Tex Gas Division Addition 080.52121 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52121 38200 0.26 080 190 - Mid-Tex Gas Division Addition 080.52121 38300 0.26 080 190 - Mid-Tex Gas Division Addition 080.52135 37602 27 080 190 - Mid-Tex Gas Division Addition 080.52135 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52135 38100 0.30 080 190 - Mid-Tex Gas Division Addition 080.52135 38300 0.30 080 190 - Mid-Tex Gas Division Addition 080.52141 38000 0.28 080 190 - Mid-Tex Gas Division Addition 080.52141 38300 0.17 080 190 - Mid-Tex Gas Division Addition 080.52153 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52163 37602 9 080 190 - Mid-Tex Gas Division Addition 080.52163 38000 2 080 190 - Mid-Tex Gas Division Addition 080.52163 38300 0.48 080 190 - Mid-Tex Gas Division Addition 080.52167 37602 0.02 080 190 - Mid-Tex Gas Division Addition 080.52168 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.52170 37602 4 080 190 - Mid-Tex Gas Division Addition 080.52170 38000 0.28 080 190 - Mid-Tex Gas Division Addition 080.52170 38100 0.28 080 190 - Mid-Tex Gas Division Addition 080.52170 38200 0.28 080 190 - Mid-Tex Gas Division Addition 080.52170 38300 0.28 080 190 - Mid-Tex Gas Division Addition 080.52171 37602 9 080 190 - Mid-Tex Gas Division Addition 080.52171 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52171 38100 1 080 190 - Mid-Tex Gas Division Addition 080.52171 38200 1 080 190 - Mid-Tex Gas Division Addition 080.52171 38300 1 080 190 - Mid-Tex Gas Division Addition 080.52179 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.52180 37602 7 080 190 - Mid-Tex Gas Division Addition 080.52180 38000 0.30 080 190 - Mid-Tex Gas Division Addition 080.52192 37601 179 080 190 - Mid-Tex Gas Division Addition 080.52193 37602 47,938 080 190 - Mid-Tex Gas Division Addition 080.52201 37602 0.05 080 190 - Mid-Tex Gas Division Addition 080.52201 38000 0.01 080 190 - Mid-Tex Gas Division Addition 080.52203 37602 62 080 190 - Mid-Tex Gas Division Addition 080.52203 38000 21 080 190 - Mid-Tex Gas Division Addition 080.52203 38100 10 080 190 - Mid-Tex Gas Division Addition 080.52203 38200 5 080 190 - Mid-Tex Gas Division Addition 080.52203 38300 5 080 190 - Mid-Tex Gas Division Addition 080.52209 37602 2 080 190 - Mid-Tex Gas Division Addition 080.52209 37800 9 080 190 - Mid-Tex Gas Division Addition 080.52212 37602 62 080 190 - Mid-Tex Gas Division Addition 080.52212 38000 8 080 190 - Mid-Tex Gas Division Addition 080.52212 38100 4 080 190 - Mid-Tex Gas Division Addition 080.52230 37602 391 080 190 - Mid-Tex Gas Division Addition 080.52231 37602 11 080 190 - Mid-Tex Gas Division Addition 080.52231 38000 6 080 190 - Mid-Tex Gas Division Addition 080.52231 38100 0.35 080 190 - Mid-Tex Gas Division Addition 080.52231 38200 0.35 080 190 - Mid-Tex Gas Division Addition 080.52231 38300 0.35 080 190 - Mid-Tex Gas Division Addition 080.52232 38000 128 080 190 - Mid-Tex Gas Division Addition 080.52232 38100 7 080 190 - Mid-Tex Gas Division Addition 080.52232 38200 6 080 190 - Mid-Tex Gas Division Addition 080.52232 38300 6 080 190 - Mid-Tex Gas Division Addition 080.52233 38000 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.52245 37602 120 080 190 - Mid-Tex Gas Division Addition 080.52245 38000 50 080 190 - Mid-Tex Gas Division Addition 080.52245 38100 15 080 190 - Mid-Tex Gas Division Addition 080.52245 38200 14 080 190 - Mid-Tex Gas Division Addition 080.52245 38300 5 080 190 - Mid-Tex Gas Division Addition 080.52260 37602 703 080 190 - Mid-Tex Gas Division Addition 080.52262 37602 0.08 080 190 - Mid-Tex Gas Division Addition 080.52277 37602 1,192
MTX Additions by FERCPage 15 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.52277 38000 340 080 190 - Mid-Tex Gas Division Addition 080.52277 38100 68 080 190 - Mid-Tex Gas Division Addition 080.52277 38200 51 080 190 - Mid-Tex Gas Division Addition 080.52277 38300 51 080 190 - Mid-Tex Gas Division Addition 080.52287 37602 3,245 080 190 - Mid-Tex Gas Division Addition 080.52287 38000 176 080 190 - Mid-Tex Gas Division Addition 080.52287 38100 35 080 190 - Mid-Tex Gas Division Addition 080.52287 38200 35 080 190 - Mid-Tex Gas Division Addition 080.52287 38300 35 080 190 - Mid-Tex Gas Division Addition 080.52296 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.52297 37602 0.10 080 190 - Mid-Tex Gas Division Addition 080.52297 38000 0.04 080 190 - Mid-Tex Gas Division Addition 080.52297 38100 0.03 080 190 - Mid-Tex Gas Division Addition 080.52297 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.52327 37602 301 080 190 - Mid-Tex Gas Division Addition 080.52327 38100 13 080 190 - Mid-Tex Gas Division Addition 080.52327 38200 7 080 190 - Mid-Tex Gas Division Addition 080.52327 38300 7 080 190 - Mid-Tex Gas Division Addition 080.52338 37602 165 080 190 - Mid-Tex Gas Division Addition 080.52340 37602 0.09 080 190 - Mid-Tex Gas Division Addition 080.52340 38000 0.01 080 190 - Mid-Tex Gas Division Addition 080.52351 37601 0.05 080 190 - Mid-Tex Gas Division Addition 080.52352 37602 5 080 190 - Mid-Tex Gas Division Addition 080.52352 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52352 38100 3 080 190 - Mid-Tex Gas Division Addition 080.52353 37602 12 080 190 - Mid-Tex Gas Division Addition 080.52353 38000 6 080 190 - Mid-Tex Gas Division Addition 080.52353 38100 1 080 190 - Mid-Tex Gas Division Addition 080.52353 38200 0.38 080 190 - Mid-Tex Gas Division Addition 080.52353 38300 1 080 190 - Mid-Tex Gas Division Addition 080.52354 37602 12 080 190 - Mid-Tex Gas Division Addition 080.52354 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52354 38100 1 080 190 - Mid-Tex Gas Division Addition 080.52354 38200 0.34 080 190 - Mid-Tex Gas Division Addition 080.52354 38300 0.34 080 190 - Mid-Tex Gas Division Addition 080.52356 37602 18 080 190 - Mid-Tex Gas Division Addition 080.52356 37800 0.22 080 190 - Mid-Tex Gas Division Addition 080.52356 38000 2 080 190 - Mid-Tex Gas Division Addition 080.52356 38200 0.22 080 190 - Mid-Tex Gas Division Addition 080.52356 38300 0.11 080 190 - Mid-Tex Gas Division Addition 080.52364 37601 95 080 190 - Mid-Tex Gas Division Addition 080.52364 37602 7 080 190 - Mid-Tex Gas Division Addition 080.52364 37800 44 080 190 - Mid-Tex Gas Division Addition 080.52367 37602 316 080 190 - Mid-Tex Gas Division Addition 080.52367 38000 105 080 190 - Mid-Tex Gas Division Addition 080.52367 38100 53 080 190 - Mid-Tex Gas Division Addition 080.52367 38200 26 080 190 - Mid-Tex Gas Division Addition 080.52367 38300 26 080 190 - Mid-Tex Gas Division Addition 080.52375 37602 (0.06) 080 190 - Mid-Tex Gas Division Addition 080.52380 37602 5 080 190 - Mid-Tex Gas Division Addition 080.52380 37800 8 080 190 - Mid-Tex Gas Division Addition 080.52392 37602 0.02 080 190 - Mid-Tex Gas Division Addition 080.52398 37602 60 080 190 - Mid-Tex Gas Division Addition 080.52398 38000 9 080 190 - Mid-Tex Gas Division Addition 080.52398 38100 4 080 190 - Mid-Tex Gas Division Addition 080.52398 38200 1 080 190 - Mid-Tex Gas Division Addition 080.52398 38300 2 080 190 - Mid-Tex Gas Division Addition 080.52412 37602 134 080 190 - Mid-Tex Gas Division Addition 080.52420 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.52442 37601 10,503 080 190 - Mid-Tex Gas Division Addition 080.52442 37800 2,792 080 190 - Mid-Tex Gas Division Addition 080.52451 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52452 37602 1,372 080 190 - Mid-Tex Gas Division Addition 080.52452 38000 152 080 190 - Mid-Tex Gas Division Addition 080.52463 37602 1,502 080 190 - Mid-Tex Gas Division Addition 080.52463 38000 644 080 190 - Mid-Tex Gas Division Addition 080.52466 37602 263 080 190 - Mid-Tex Gas Division Addition 080.52466 38000 117 080 190 - Mid-Tex Gas Division Addition 080.52466 38100 88 080 190 - Mid-Tex Gas Division Addition 080.52466 38200 117 080 190 - Mid-Tex Gas Division Addition 080.52467 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52467 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52467 38100 0.29 080 190 - Mid-Tex Gas Division Addition 080.52467 38200 0.15 080 190 - Mid-Tex Gas Division Addition 080.52467 38300 0.29 080 190 - Mid-Tex Gas Division Addition 080.52468 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52468 38000 0.22 080 190 - Mid-Tex Gas Division Addition 080.52468 38100 0.05 080 190 - Mid-Tex Gas Division Addition 080.52468 38200 0.05 080 190 - Mid-Tex Gas Division Addition 080.52468 38300 0.05 080 190 - Mid-Tex Gas Division Addition 080.52469 37602 34 080 190 - Mid-Tex Gas Division Addition 080.52469 38000 6 080 190 - Mid-Tex Gas Division Addition 080.52469 38100 0.42 080 190 - Mid-Tex Gas Division Addition 080.52469 38200 1 080 190 - Mid-Tex Gas Division Addition 080.52469 38300 1 080 190 - Mid-Tex Gas Division Addition 080.52476 37602 1,696 080 190 - Mid-Tex Gas Division Addition 080.52476 38000 242 080 190 - Mid-Tex Gas Division Addition 080.52476 38100 242 080 190 - Mid-Tex Gas Division Addition 080.52476 38200 121 080 190 - Mid-Tex Gas Division Addition 080.52476 38300 121 080 190 - Mid-Tex Gas Division Addition 080.52477 37601 2 080 190 - Mid-Tex Gas Division Addition 080.52477 37602 7 080 190 - Mid-Tex Gas Division Addition 080.52477 37800 2 080 190 - Mid-Tex Gas Division Addition 080.52491 38000 (1) 080 190 - Mid-Tex Gas Division Addition 080.52491 38100 (0.11) 080 190 - Mid-Tex Gas Division Addition 080.52491 38200 (0.04) 080 190 - Mid-Tex Gas Division Addition 080.52494 37602 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.52496 37602 7 080 190 - Mid-Tex Gas Division Addition 080.52497 37602 11 080 190 - Mid-Tex Gas Division Addition 080.52497 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52497 38100 0.02 080 190 - Mid-Tex Gas Division Addition 080.52497 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.52508 37601 232 080 190 - Mid-Tex Gas Division Addition 080.52508 38000 2 080 190 - Mid-Tex Gas Division Addition 080.52508 38500 2 080 190 - Mid-Tex Gas Division Addition 080.52516 37602 (0.01) 080 190 - Mid-Tex Gas Division Addition 080.52517 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52519 37602 4
MTX Additions by FERCPage 16 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.52519 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52519 38100 0.27 080 190 - Mid-Tex Gas Division Addition 080.52519 38200 0.27 080 190 - Mid-Tex Gas Division Addition 080.52519 38300 0.27 080 190 - Mid-Tex Gas Division Addition 080.52521 37602 0.03 080 190 - Mid-Tex Gas Division Addition 080.52537 37602 138 080 190 - Mid-Tex Gas Division Addition 080.52537 38000 16 080 190 - Mid-Tex Gas Division Addition 080.52537 38100 1 080 190 - Mid-Tex Gas Division Addition 080.52537 38200 1 080 190 - Mid-Tex Gas Division Addition 080.52537 38300 0.43 080 190 - Mid-Tex Gas Division Addition 080.52538 37602 248 080 190 - Mid-Tex Gas Division Addition 080.52538 38000 103 080 190 - Mid-Tex Gas Division Addition 080.52538 38100 21 080 190 - Mid-Tex Gas Division Addition 080.52538 38200 21 080 190 - Mid-Tex Gas Division Addition 080.52538 38300 21 080 190 - Mid-Tex Gas Division Addition 080.52539 37602 62 080 190 - Mid-Tex Gas Division Addition 080.52539 38000 26 080 190 - Mid-Tex Gas Division Addition 080.52539 38100 3 080 190 - Mid-Tex Gas Division Addition 080.52539 38200 5 080 190 - Mid-Tex Gas Division Addition 080.52539 38300 5 080 190 - Mid-Tex Gas Division Addition 080.52540 37602 298 080 190 - Mid-Tex Gas Division Addition 080.52540 38000 52 080 190 - Mid-Tex Gas Division Addition 080.52540 38100 11 080 190 - Mid-Tex Gas Division Addition 080.52540 38200 7 080 190 - Mid-Tex Gas Division Addition 080.52540 38300 7 080 190 - Mid-Tex Gas Division Addition 080.52586 38000 9 080 190 - Mid-Tex Gas Division Addition 080.52586 38100 0.20 080 190 - Mid-Tex Gas Division Addition 080.52586 38200 0.20 080 190 - Mid-Tex Gas Division Addition 080.52586 38300 0.20 080 190 - Mid-Tex Gas Division Addition 080.52594 38000 91 080 190 - Mid-Tex Gas Division Addition 080.52594 38100 26 080 190 - Mid-Tex Gas Division Addition 080.52594 38200 7 080 190 - Mid-Tex Gas Division Addition 080.52594 38300 7 080 190 - Mid-Tex Gas Division Addition 080.52599 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52599 38000 0.13 080 190 - Mid-Tex Gas Division Addition 080.52599 38100 0.02 080 190 - Mid-Tex Gas Division Addition 080.52599 38200 0.06 080 190 - Mid-Tex Gas Division Addition 080.52599 38300 0.06 080 190 - Mid-Tex Gas Division Addition 080.52601 37602 17 080 190 - Mid-Tex Gas Division Addition 080.52601 38000 6 080 190 - Mid-Tex Gas Division Addition 080.52601 38100 0.48 080 190 - Mid-Tex Gas Division Addition 080.52601 38200 0.48 080 190 - Mid-Tex Gas Division Addition 080.52601 38300 0.48 080 190 - Mid-Tex Gas Division Addition 080.52610 37602 57 080 190 - Mid-Tex Gas Division Addition 080.52610 38000 2 080 190 - Mid-Tex Gas Division Addition 080.52610 38100 0.12 080 190 - Mid-Tex Gas Division Addition 080.52610 38200 0.06 080 190 - Mid-Tex Gas Division Addition 080.52610 38300 0.06 080 190 - Mid-Tex Gas Division Addition 080.52611 37602 0.05 080 190 - Mid-Tex Gas Division Addition 080.52635 37602 0.12 080 190 - Mid-Tex Gas Division Addition 080.52659 37602 0.26 080 190 - Mid-Tex Gas Division Addition 080.52685 37602 (0.06) 080 190 - Mid-Tex Gas Division Addition 080.52691 37602 2 080 190 - Mid-Tex Gas Division Addition 080.52691 38100 0.02 080 190 - Mid-Tex Gas Division Addition 080.52713 37602 3,188 080 190 - Mid-Tex Gas Division Addition 080.52713 38000 100 080 190 - Mid-Tex Gas Division Addition 080.52713 38100 33 080 190 - Mid-Tex Gas Division Addition 080.52713 38200 8 080 190 - Mid-Tex Gas Division Addition 080.52713 38300 8 080 190 - Mid-Tex Gas Division Addition 080.52714 37602 23 080 190 - Mid-Tex Gas Division Addition 080.52718 37800 (0.16) 080 190 - Mid-Tex Gas Division Addition 080.52731 37601 21 080 190 - Mid-Tex Gas Division Addition 080.52731 37602 21 080 190 - Mid-Tex Gas Division Addition 080.52731 37800 42 080 190 - Mid-Tex Gas Division Addition 080.52732 37800 518 080 190 - Mid-Tex Gas Division Addition 080.52774 38000 4 080 190 - Mid-Tex Gas Division Addition 080.52774 38100 1 080 190 - Mid-Tex Gas Division Addition 080.52774 38200 0.27 080 190 - Mid-Tex Gas Division Addition 080.52774 38300 0.27 080 190 - Mid-Tex Gas Division Addition 080.52775 38000 24 080 190 - Mid-Tex Gas Division Addition 080.52775 38100 2 080 190 - Mid-Tex Gas Division Addition 080.52775 38200 2 080 190 - Mid-Tex Gas Division Addition 080.52775 38300 2 080 190 - Mid-Tex Gas Division Addition 080.52782 37602 (0.46) 080 190 - Mid-Tex Gas Division Addition 080.52787 37602 4 080 190 - Mid-Tex Gas Division Addition 080.52787 38000 0.34 080 190 - Mid-Tex Gas Division Addition 080.52787 38100 36 080 190 - Mid-Tex Gas Division Addition 080.52787 38200 0.04 080 190 - Mid-Tex Gas Division Addition 080.52802 38000 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.52803 37602 112 080 190 - Mid-Tex Gas Division Addition 080.52803 38000 41 080 190 - Mid-Tex Gas Division Addition 080.52803 38100 21 080 190 - Mid-Tex Gas Division Addition 080.52803 38200 17 080 190 - Mid-Tex Gas Division Addition 080.52803 38300 17 080 190 - Mid-Tex Gas Division Addition 080.52815 37600 15 080 190 - Mid-Tex Gas Division Addition 080.52821 38000 250 080 190 - Mid-Tex Gas Division Addition 080.52821 38100 3 080 190 - Mid-Tex Gas Division Addition 080.52821 38200 3 080 190 - Mid-Tex Gas Division Addition 080.52821 38300 3 080 190 - Mid-Tex Gas Division Addition 080.52827 37602 3 080 190 - Mid-Tex Gas Division Addition 080.52838 37602 3 080 190 - Mid-Tex Gas Division Addition 080.52838 38000 0.11 080 190 - Mid-Tex Gas Division Addition 080.52838 38100 5 080 190 - Mid-Tex Gas Division Addition 080.52838 38200 0.04 080 190 - Mid-Tex Gas Division Addition 080.52838 38300 2 080 190 - Mid-Tex Gas Division Addition 080.52840 37601 4 080 190 - Mid-Tex Gas Division Addition 080.52840 37602 30 080 190 - Mid-Tex Gas Division Addition 080.52840 37800 6 080 190 - Mid-Tex Gas Division Addition 080.52852 37602 15 080 190 - Mid-Tex Gas Division Addition 080.52852 38000 4 080 190 - Mid-Tex Gas Division Addition 080.52852 38100 0.42 080 190 - Mid-Tex Gas Division Addition 080.52852 38200 0.42 080 190 - Mid-Tex Gas Division Addition 080.52853 37602 11 080 190 - Mid-Tex Gas Division Addition 080.52853 38000 0.23 080 190 - Mid-Tex Gas Division Addition 080.52853 38100 0.12 080 190 - Mid-Tex Gas Division Addition 080.52853 38200 0.12 080 190 - Mid-Tex Gas Division Addition 080.52853 38300 0.12 080 190 - Mid-Tex Gas Division Addition 080.52875 37602 76
MTX Additions by FERCPage 17 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.52875 38000 29 080 190 - Mid-Tex Gas Division Addition 080.52875 38100 10 080 190 - Mid-Tex Gas Division Addition 080.52875 38200 6 080 190 - Mid-Tex Gas Division Addition 080.52875 38300 6 080 190 - Mid-Tex Gas Division Addition 080.52882 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52896 37602 2,165 080 190 - Mid-Tex Gas Division Addition 080.52904 37602 444 080 190 - Mid-Tex Gas Division Addition 080.52904 38000 185 080 190 - Mid-Tex Gas Division Addition 080.52904 38100 56 080 190 - Mid-Tex Gas Division Addition 080.52904 38200 19 080 190 - Mid-Tex Gas Division Addition 080.52904 38300 37 080 190 - Mid-Tex Gas Division Addition 080.52906 37601 (2,060) 080 190 - Mid-Tex Gas Division Addition 080.52906 37602 (29) 080 190 - Mid-Tex Gas Division Addition 080.52906 37800 (853) 080 190 - Mid-Tex Gas Division Addition 080.52909 37602 1,244 080 190 - Mid-Tex Gas Division Addition 080.52909 38000 477 080 190 - Mid-Tex Gas Division Addition 080.52909 38100 155 080 190 - Mid-Tex Gas Division Addition 080.52909 38200 104 080 190 - Mid-Tex Gas Division Addition 080.52909 38300 93 080 190 - Mid-Tex Gas Division Addition 080.52910 37602 203 080 190 - Mid-Tex Gas Division Addition 080.52910 38000 14 080 190 - Mid-Tex Gas Division Addition 080.52910 38100 14 080 190 - Mid-Tex Gas Division Addition 080.52910 38200 29 080 190 - Mid-Tex Gas Division Addition 080.52910 38300 29 080 190 - Mid-Tex Gas Division Addition 080.52913 37602 165 080 190 - Mid-Tex Gas Division Addition 080.52914 37602 80 080 190 - Mid-Tex Gas Division Addition 080.52914 38000 7 080 190 - Mid-Tex Gas Division Addition 080.52914 38100 1 080 190 - Mid-Tex Gas Division Addition 080.52914 38200 1 080 190 - Mid-Tex Gas Division Addition 080.52914 38300 1 080 190 - Mid-Tex Gas Division Addition 080.52917 37602 5,064 080 190 - Mid-Tex Gas Division Addition 080.52917 38000 1,264 080 190 - Mid-Tex Gas Division Addition 080.52933 37602 10 080 190 - Mid-Tex Gas Division Addition 080.52933 38000 3 080 190 - Mid-Tex Gas Division Addition 080.52933 38100 6 080 190 - Mid-Tex Gas Division Addition 080.52933 38200 3 080 190 - Mid-Tex Gas Division Addition 080.52933 38300 3 080 190 - Mid-Tex Gas Division Addition 080.52936 37602 115 080 190 - Mid-Tex Gas Division Addition 080.52936 38000 29 080 190 - Mid-Tex Gas Division Addition 080.52936 38100 100 080 190 - Mid-Tex Gas Division Addition 080.52936 38200 22 080 190 - Mid-Tex Gas Division Addition 080.52936 38300 22 080 190 - Mid-Tex Gas Division Addition 080.52943 37602 6 080 190 - Mid-Tex Gas Division Addition 080.52950 37602 1 080 190 - Mid-Tex Gas Division Addition 080.52954 37602 4 080 190 - Mid-Tex Gas Division Addition 080.52954 38000 0.04 080 190 - Mid-Tex Gas Division Addition 080.52955 37602 44 080 190 - Mid-Tex Gas Division Addition 080.52955 38000 2 080 190 - Mid-Tex Gas Division Addition 080.52958 37602 68 080 190 - Mid-Tex Gas Division Addition 080.52958 38000 9 080 190 - Mid-Tex Gas Division Addition 080.52958 38100 14 080 190 - Mid-Tex Gas Division Addition 080.52958 38200 3 080 190 - Mid-Tex Gas Division Addition 080.52958 38300 3 080 190 - Mid-Tex Gas Division Addition 080.52960 37602 77 080 190 - Mid-Tex Gas Division Addition 080.52960 38100 2 080 190 - Mid-Tex Gas Division Addition 080.52960 38300 1 080 190 - Mid-Tex Gas Division Addition 080.52961 37602 15 080 190 - Mid-Tex Gas Division Addition 080.52961 38000 0.30 080 190 - Mid-Tex Gas Division Addition 080.52961 38100 0.48 080 190 - Mid-Tex Gas Division Addition 080.52961 38200 0.15 080 190 - Mid-Tex Gas Division Addition 080.52961 38300 0.33 080 190 - Mid-Tex Gas Division Addition 080.52962 37602 10 080 190 - Mid-Tex Gas Division Addition 080.52962 38000 1 080 190 - Mid-Tex Gas Division Addition 080.52962 38100 0.23 080 190 - Mid-Tex Gas Division Addition 080.52962 38200 0.23 080 190 - Mid-Tex Gas Division Addition 080.52962 38300 0.23 080 190 - Mid-Tex Gas Division Addition 080.52966 37602 4 080 190 - Mid-Tex Gas Division Addition 080.52971 38000 0.26 080 190 - Mid-Tex Gas Division Addition 080.52978 37602 0.02 080 190 - Mid-Tex Gas Division Addition 080.52982 37602 104 080 190 - Mid-Tex Gas Division Addition 080.52982 38000 13 080 190 - Mid-Tex Gas Division Addition 080.52982 38100 4 080 190 - Mid-Tex Gas Division Addition 080.52982 38200 4 080 190 - Mid-Tex Gas Division Addition 080.52982 38300 4 080 190 - Mid-Tex Gas Division Addition 080.52989 37602 2 080 190 - Mid-Tex Gas Division Addition 080.52989 38100 0.11 080 190 - Mid-Tex Gas Division Addition 080.52998 37602 7 080 190 - Mid-Tex Gas Division Addition 080.52998 38000 0.36 080 190 - Mid-Tex Gas Division Addition 080.52998 38100 0.22 080 190 - Mid-Tex Gas Division Addition 080.52998 38200 0.07 080 190 - Mid-Tex Gas Division Addition 080.52998 38300 0.07 080 190 - Mid-Tex Gas Division Addition 080.53002 37602 5,979 080 190 - Mid-Tex Gas Division Addition 080.53005 37602 465 080 190 - Mid-Tex Gas Division Addition 080.53005 38000 264 080 190 - Mid-Tex Gas Division Addition 080.53005 38100 23 080 190 - Mid-Tex Gas Division Addition 080.53005 38200 8 080 190 - Mid-Tex Gas Division Addition 080.53005 38300 16 080 190 - Mid-Tex Gas Division Addition 080.53007 37602 743 080 190 - Mid-Tex Gas Division Addition 080.53007 38000 170 080 190 - Mid-Tex Gas Division Addition 080.53007 38100 56 080 190 - Mid-Tex Gas Division Addition 080.53007 38200 56 080 190 - Mid-Tex Gas Division Addition 080.53007 38300 114 080 190 - Mid-Tex Gas Division Addition 080.53009 37602 152 080 190 - Mid-Tex Gas Division Addition 080.53009 38000 8 080 190 - Mid-Tex Gas Division Addition 080.53009 38100 2 080 190 - Mid-Tex Gas Division Addition 080.53009 38200 2 080 190 - Mid-Tex Gas Division Addition 080.53009 38300 2 080 190 - Mid-Tex Gas Division Addition 080.53019 37602 59 080 190 - Mid-Tex Gas Division Addition 080.53019 38000 45 080 190 - Mid-Tex Gas Division Addition 080.53019 38100 15 080 190 - Mid-Tex Gas Division Addition 080.53019 38200 15 080 190 - Mid-Tex Gas Division Addition 080.53019 38300 15 080 190 - Mid-Tex Gas Division Addition 080.53024 37602 (0.35) 080 190 - Mid-Tex Gas Division Addition 080.53024 37800 (0.39) 080 190 - Mid-Tex Gas Division Addition 080.53031 37602 14 080 190 - Mid-Tex Gas Division Addition 080.53031 37800 43 080 190 - Mid-Tex Gas Division Addition 080.53046 37602 51 080 190 - Mid-Tex Gas Division Addition 080.53046 38000 4
MTX Additions by FERCPage 18 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.53046 38100 2 080 190 - Mid-Tex Gas Division Addition 080.53046 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53046 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53048 37602 664 080 190 - Mid-Tex Gas Division Addition 080.53048 38000 86 080 190 - Mid-Tex Gas Division Addition 080.53048 38100 16 080 190 - Mid-Tex Gas Division Addition 080.53048 38200 8 080 190 - Mid-Tex Gas Division Addition 080.53048 38300 8 080 190 - Mid-Tex Gas Division Addition 080.53070 37602 (0.05) 080 190 - Mid-Tex Gas Division Addition 080.53070 38000 (0.02) 080 190 - Mid-Tex Gas Division Addition 080.53075 37602 114 080 190 - Mid-Tex Gas Division Addition 080.53075 38000 16 080 190 - Mid-Tex Gas Division Addition 080.53075 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53075 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53075 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53080 37602 11 080 190 - Mid-Tex Gas Division Addition 080.53081 37602 37 080 190 - Mid-Tex Gas Division Addition 080.53081 38000 8 080 190 - Mid-Tex Gas Division Addition 080.53081 38100 0.08 080 190 - Mid-Tex Gas Division Addition 080.53081 38200 0.04 080 190 - Mid-Tex Gas Division Addition 080.53082 37602 21 080 190 - Mid-Tex Gas Division Addition 080.53082 38000 0.20 080 190 - Mid-Tex Gas Division Addition 080.53087 37602 121 080 190 - Mid-Tex Gas Division Addition 080.53087 38000 5 080 190 - Mid-Tex Gas Division Addition 080.53087 38100 4 080 190 - Mid-Tex Gas Division Addition 080.53087 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53088 37602 20 080 190 - Mid-Tex Gas Division Addition 080.53088 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53088 38100 0.23 080 190 - Mid-Tex Gas Division Addition 080.53088 38200 0.01 080 190 - Mid-Tex Gas Division Addition 080.53089 37602 5 080 190 - Mid-Tex Gas Division Addition 080.53089 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53089 38100 0.10 080 190 - Mid-Tex Gas Division Addition 080.53092 37602 0.27 080 190 - Mid-Tex Gas Division Addition 080.53092 38000 0.03 080 190 - Mid-Tex Gas Division Addition 080.53099 37602 167 080 190 - Mid-Tex Gas Division Addition 080.53099 38000 2 080 190 - Mid-Tex Gas Division Addition 080.53099 38100 7 080 190 - Mid-Tex Gas Division Addition 080.53104 37602 464 080 190 - Mid-Tex Gas Division Addition 080.53105 37602 9 080 190 - Mid-Tex Gas Division Addition 080.53105 38000 4 080 190 - Mid-Tex Gas Division Addition 080.53105 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53105 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53105 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53106 37602 3 080 190 - Mid-Tex Gas Division Addition 080.53106 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53106 38100 0.23 080 190 - Mid-Tex Gas Division Addition 080.53117 37602 13 080 190 - Mid-Tex Gas Division Addition 080.53127 37602 12 080 190 - Mid-Tex Gas Division Addition 080.53143 37602 33 080 190 - Mid-Tex Gas Division Addition 080.53143 38000 2 080 190 - Mid-Tex Gas Division Addition 080.53143 38100 4 080 190 - Mid-Tex Gas Division Addition 080.53143 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53143 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53153 37602 519 080 190 - Mid-Tex Gas Division Addition 080.53153 38000 311 080 190 - Mid-Tex Gas Division Addition 080.53153 38100 42 080 190 - Mid-Tex Gas Division Addition 080.53153 38200 114 080 190 - Mid-Tex Gas Division Addition 080.53153 38300 52 080 190 - Mid-Tex Gas Division Addition 080.53159 37602 477 080 190 - Mid-Tex Gas Division Addition 080.53159 38000 199 080 190 - Mid-Tex Gas Division Addition 080.53159 38100 20 080 190 - Mid-Tex Gas Division Addition 080.53159 38200 40 080 190 - Mid-Tex Gas Division Addition 080.53159 38300 40 080 190 - Mid-Tex Gas Division Addition 080.53160 37602 386 080 190 - Mid-Tex Gas Division Addition 080.53160 38000 210 080 190 - Mid-Tex Gas Division Addition 080.53160 38100 18 080 190 - Mid-Tex Gas Division Addition 080.53160 38200 35 080 190 - Mid-Tex Gas Division Addition 080.53160 38300 35 080 190 - Mid-Tex Gas Division Addition 080.53162 37602 (0.04) 080 190 - Mid-Tex Gas Division Addition 080.53166 37602 (0.32) 080 190 - Mid-Tex Gas Division Addition 080.53166 38000 (0.04) 080 190 - Mid-Tex Gas Division Addition 080.53166 38100 (0.01) 080 190 - Mid-Tex Gas Division Addition 080.53166 38200 (0.01) 080 190 - Mid-Tex Gas Division Addition 080.53168 37602 2,987 080 190 - Mid-Tex Gas Division Addition 080.53168 38000 398 080 190 - Mid-Tex Gas Division Addition 080.53168 38100 199 080 190 - Mid-Tex Gas Division Addition 080.53168 38200 199 080 190 - Mid-Tex Gas Division Addition 080.53168 38300 199 080 190 - Mid-Tex Gas Division Addition 080.53173 37602 5 080 190 - Mid-Tex Gas Division Addition 080.53174 37601 412 080 190 - Mid-Tex Gas Division Addition 080.53174 38000 46 080 190 - Mid-Tex Gas Division Addition 080.53178 37601 58 080 190 - Mid-Tex Gas Division Addition 080.53179 37602 67 080 190 - Mid-Tex Gas Division Addition 080.53179 38000 15 080 190 - Mid-Tex Gas Division Addition 080.53179 38100 3 080 190 - Mid-Tex Gas Division Addition 080.53179 38200 0.08 080 190 - Mid-Tex Gas Division Addition 080.53179 38300 0.23 080 190 - Mid-Tex Gas Division Addition 080.53186 37601 4 080 190 - Mid-Tex Gas Division Addition 080.53189 37602 849 080 190 - Mid-Tex Gas Division Addition 080.53189 38000 283 080 190 - Mid-Tex Gas Division Addition 080.53189 38100 198 080 190 - Mid-Tex Gas Division Addition 080.53189 38200 57 080 190 - Mid-Tex Gas Division Addition 080.53189 38300 849 080 190 - Mid-Tex Gas Division Addition 080.53190 37600 3 080 190 - Mid-Tex Gas Division Addition 080.53191 37602 44 080 190 - Mid-Tex Gas Division Addition 080.53191 38000 3 080 190 - Mid-Tex Gas Division Addition 080.53192 37601 39 080 190 - Mid-Tex Gas Division Addition 080.53193 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53193 38000 0.40 080 190 - Mid-Tex Gas Division Addition 080.53195 37602 802 080 190 - Mid-Tex Gas Division Addition 080.53195 38000 172 080 190 - Mid-Tex Gas Division Addition 080.53195 38100 57 080 190 - Mid-Tex Gas Division Addition 080.53195 38200 57 080 190 - Mid-Tex Gas Division Addition 080.53195 38300 57 080 190 - Mid-Tex Gas Division Addition 080.53199 37602 1,931 080 190 - Mid-Tex Gas Division Addition 080.53199 38000 105 080 190 - Mid-Tex Gas Division Addition 080.53199 38100 21
MTX Additions by FERCPage 19 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.53199 38200 21 080 190 - Mid-Tex Gas Division Addition 080.53199 38300 21 080 190 - Mid-Tex Gas Division Addition 080.53200 37602 62 080 190 - Mid-Tex Gas Division Addition 080.53200 38000 19 080 190 - Mid-Tex Gas Division Addition 080.53200 38100 2 080 190 - Mid-Tex Gas Division Addition 080.53200 38200 0.48 080 190 - Mid-Tex Gas Division Addition 080.53200 38300 0.48 080 190 - Mid-Tex Gas Division Addition 080.53202 37602 55 080 190 - Mid-Tex Gas Division Addition 080.53203 37602 39 080 190 - Mid-Tex Gas Division Addition 080.53203 38000 13 080 190 - Mid-Tex Gas Division Addition 080.53203 38100 22 080 190 - Mid-Tex Gas Division Addition 080.53203 38200 12 080 190 - Mid-Tex Gas Division Addition 080.53203 38300 12 080 190 - Mid-Tex Gas Division Addition 080.53204 37602 122 080 190 - Mid-Tex Gas Division Addition 080.53204 38000 40 080 190 - Mid-Tex Gas Division Addition 080.53204 38100 98 080 190 - Mid-Tex Gas Division Addition 080.53204 38200 15 080 190 - Mid-Tex Gas Division Addition 080.53204 38300 31 080 190 - Mid-Tex Gas Division Addition 080.53205 37602 55 080 190 - Mid-Tex Gas Division Addition 080.53205 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53205 38200 0.05 080 190 - Mid-Tex Gas Division Addition 080.53205 38300 0.12 080 190 - Mid-Tex Gas Division Addition 080.53207 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53207 38000 0.02 080 190 - Mid-Tex Gas Division Addition 080.53214 37602 2,195 080 190 - Mid-Tex Gas Division Addition 080.53214 38000 549 080 190 - Mid-Tex Gas Division Addition 080.53214 38100 275 080 190 - Mid-Tex Gas Division Addition 080.53214 38200 275 080 190 - Mid-Tex Gas Division Addition 080.53214 38300 275 080 190 - Mid-Tex Gas Division Addition 080.53215 37602 1,655 080 190 - Mid-Tex Gas Division Addition 080.53215 38000 100 080 190 - Mid-Tex Gas Division Addition 080.53215 38100 104 080 190 - Mid-Tex Gas Division Addition 080.53215 38200 100 080 190 - Mid-Tex Gas Division Addition 080.53215 38300 100 080 190 - Mid-Tex Gas Division Addition 080.53216 37602 0.31 080 190 - Mid-Tex Gas Division Addition 080.53216 38000 0.01 080 190 - Mid-Tex Gas Division Addition 080.53217 37602 3 080 190 - Mid-Tex Gas Division Addition 080.53217 38000 0.18 080 190 - Mid-Tex Gas Division Addition 080.53217 38100 0.04 080 190 - Mid-Tex Gas Division Addition 080.53217 38200 0.07 080 190 - Mid-Tex Gas Division Addition 080.53217 38300 0.07 080 190 - Mid-Tex Gas Division Addition 080.53219 37602 81 080 190 - Mid-Tex Gas Division Addition 080.53219 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53221 37602 117,197 080 190 - Mid-Tex Gas Division Addition 080.53221 38000 8,823 080 190 - Mid-Tex Gas Division Addition 080.53238 37602 213 080 190 - Mid-Tex Gas Division Addition 080.53238 38000 116 080 190 - Mid-Tex Gas Division Addition 080.53238 38100 19 080 190 - Mid-Tex Gas Division Addition 080.53238 38200 19 080 190 - Mid-Tex Gas Division Addition 080.53238 38300 19 080 190 - Mid-Tex Gas Division Addition 080.53242 37602 147 080 190 - Mid-Tex Gas Division Addition 080.53242 38000 17 080 190 - Mid-Tex Gas Division Addition 080.53242 38100 3 080 190 - Mid-Tex Gas Division Addition 080.53242 38200 2 080 190 - Mid-Tex Gas Division Addition 080.53242 38300 2 080 190 - Mid-Tex Gas Division Addition 080.53254 37602 746 080 190 - Mid-Tex Gas Division Addition 080.53254 38100 44 080 190 - Mid-Tex Gas Division Addition 080.53254 38200 44 080 190 - Mid-Tex Gas Division Addition 080.53254 38300 44 080 190 - Mid-Tex Gas Division Addition 080.53261 37600 0.27 080 190 - Mid-Tex Gas Division Addition 080.53265 38300 19,739 080 190 - Mid-Tex Gas Division Addition 080.53268 37602 148 080 190 - Mid-Tex Gas Division Addition 080.53268 38000 51 080 190 - Mid-Tex Gas Division Addition 080.53268 38100 4 080 190 - Mid-Tex Gas Division Addition 080.53268 38200 4 080 190 - Mid-Tex Gas Division Addition 080.53268 38300 4 080 190 - Mid-Tex Gas Division Addition 080.53270 37602 347 080 190 - Mid-Tex Gas Division Addition 080.53270 38000 159 080 190 - Mid-Tex Gas Division Addition 080.53270 38100 8 080 190 - Mid-Tex Gas Division Addition 080.53270 38200 8 080 190 - Mid-Tex Gas Division Addition 080.53270 38300 8 080 190 - Mid-Tex Gas Division Addition 080.53271 37602 12,886 080 190 - Mid-Tex Gas Division Addition 080.53273 37602 13,917 080 190 - Mid-Tex Gas Division Addition 080.53274 37602 (1) 080 190 - Mid-Tex Gas Division Addition 080.53274 38000 (0.11) 080 190 - Mid-Tex Gas Division Addition 080.53274 38100 (0.01) 080 190 - Mid-Tex Gas Division Addition 080.53274 38200 (0.04) 080 190 - Mid-Tex Gas Division Addition 080.53274 38300 (0.04) 080 190 - Mid-Tex Gas Division Addition 080.53277 37602 870 080 190 - Mid-Tex Gas Division Addition 080.53277 38000 235 080 190 - Mid-Tex Gas Division Addition 080.53277 38100 24 080 190 - Mid-Tex Gas Division Addition 080.53277 38200 23 080 190 - Mid-Tex Gas Division Addition 080.53277 38300 23 080 190 - Mid-Tex Gas Division Addition 080.53282 37602 54 080 190 - Mid-Tex Gas Division Addition 080.53282 38000 3 080 190 - Mid-Tex Gas Division Addition 080.53282 38100 3 080 190 - Mid-Tex Gas Division Addition 080.53282 38200 3 080 190 - Mid-Tex Gas Division Addition 080.53282 38300 3 080 190 - Mid-Tex Gas Division Addition 080.53297 37602 43 080 190 - Mid-Tex Gas Division Addition 080.53297 38000 43 080 190 - Mid-Tex Gas Division Addition 080.53297 38100 11 080 190 - Mid-Tex Gas Division Addition 080.53297 38200 6 080 190 - Mid-Tex Gas Division Addition 080.53297 38300 4 080 190 - Mid-Tex Gas Division Addition 080.53299 37602 36,598 080 190 - Mid-Tex Gas Division Addition 080.53302 37602 381 080 190 - Mid-Tex Gas Division Addition 080.53302 38000 159 080 190 - Mid-Tex Gas Division Addition 080.53302 38100 32 080 190 - Mid-Tex Gas Division Addition 080.53302 38200 32 080 190 - Mid-Tex Gas Division Addition 080.53302 38300 32 080 190 - Mid-Tex Gas Division Addition 080.53322 37602 124 080 190 - Mid-Tex Gas Division Addition 080.53322 38000 3 080 190 - Mid-Tex Gas Division Addition 080.53323 37602 81 080 190 - Mid-Tex Gas Division Addition 080.53323 38000 2 080 190 - Mid-Tex Gas Division Addition 080.53323 38100 2 080 190 - Mid-Tex Gas Division Addition 080.53325 37602 28 080 190 - Mid-Tex Gas Division Addition 080.53325 38000 3 080 190 - Mid-Tex Gas Division Addition 080.53325 38100 0.31 080 190 - Mid-Tex Gas Division Addition 080.53325 38300 0.31
MTX Additions by FERCPage 20 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.53333 37601 180 080 190 - Mid-Tex Gas Division Addition 080.53333 37602 16,707 080 190 - Mid-Tex Gas Division Addition 080.53333 37800 1,078 080 190 - Mid-Tex Gas Division Addition 080.53343 37602 0.07 080 190 - Mid-Tex Gas Division Addition 080.53351 37602 10 080 190 - Mid-Tex Gas Division Addition 080.53351 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53351 38200 0.28 080 190 - Mid-Tex Gas Division Addition 080.53351 38300 0.28 080 190 - Mid-Tex Gas Division Addition 080.53363 37602 8,193 080 190 - Mid-Tex Gas Division Addition 080.53366 37602 948 080 190 - Mid-Tex Gas Division Addition 080.53367 37602 37,886 080 190 - Mid-Tex Gas Division Addition 080.53368 37602 10 080 190 - Mid-Tex Gas Division Addition 080.53368 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53377 37602 42 080 190 - Mid-Tex Gas Division Addition 080.53379 37602 93 080 190 - Mid-Tex Gas Division Addition 080.53379 38000 5 080 190 - Mid-Tex Gas Division Addition 080.53380 37800 0.36 080 190 - Mid-Tex Gas Division Addition 080.53384 37602 79,490 080 190 - Mid-Tex Gas Division Addition 080.53385 37600 15,085 080 190 - Mid-Tex Gas Division Addition 080.53392 37602 117 080 190 - Mid-Tex Gas Division Addition 080.53392 38000 47 080 190 - Mid-Tex Gas Division Addition 080.53392 38100 23 080 190 - Mid-Tex Gas Division Addition 080.53392 38200 23 080 190 - Mid-Tex Gas Division Addition 080.53392 38300 23 080 190 - Mid-Tex Gas Division Addition 080.53398 37602 1 080 190 - Mid-Tex Gas Division Addition 080.53398 37800 5 080 190 - Mid-Tex Gas Division Addition 080.53400 37602 (1) 080 190 - Mid-Tex Gas Division Addition 080.53400 37800 (1) 080 190 - Mid-Tex Gas Division Addition 080.53407 37602 4 080 190 - Mid-Tex Gas Division Addition 080.53407 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53409 37602 54 080 190 - Mid-Tex Gas Division Addition 080.53409 38000 8 080 190 - Mid-Tex Gas Division Addition 080.53409 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53409 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53419 37602 2,583 080 190 - Mid-Tex Gas Division Addition 080.53422 37601 21 080 190 - Mid-Tex Gas Division Addition 080.53427 37602 1,814 080 190 - Mid-Tex Gas Division Addition 080.53427 38000 363 080 190 - Mid-Tex Gas Division Addition 080.53427 38100 45 080 190 - Mid-Tex Gas Division Addition 080.53427 38200 23 080 190 - Mid-Tex Gas Division Addition 080.53427 38300 23 080 190 - Mid-Tex Gas Division Addition 080.53428 37602 212 080 190 - Mid-Tex Gas Division Addition 080.53444 37602 (0.08) 080 190 - Mid-Tex Gas Division Addition 080.53449 37602 0.49 080 190 - Mid-Tex Gas Division Addition 080.53449 38000 0.22 080 190 - Mid-Tex Gas Division Addition 080.53450 37602 183 080 190 - Mid-Tex Gas Division Addition 080.53450 38000 4 080 190 - Mid-Tex Gas Division Addition 080.53450 38200 2 080 190 - Mid-Tex Gas Division Addition 080.53451 37602 811 080 190 - Mid-Tex Gas Division Addition 080.53451 38000 376 080 190 - Mid-Tex Gas Division Addition 080.53451 38100 21 080 190 - Mid-Tex Gas Division Addition 080.53451 38200 10 080 190 - Mid-Tex Gas Division Addition 080.53451 38300 21 080 190 - Mid-Tex Gas Division Addition 080.53467 37602 73 080 190 - Mid-Tex Gas Division Addition 080.53467 38000 4 080 190 - Mid-Tex Gas Division Addition 080.53473 37602 6,495 080 190 - Mid-Tex Gas Division Addition 080.53479 37602 7,162 080 190 - Mid-Tex Gas Division Addition 080.53479 38000 398 080 190 - Mid-Tex Gas Division Addition 080.53479 38100 159 080 190 - Mid-Tex Gas Division Addition 080.53479 38200 80 080 190 - Mid-Tex Gas Division Addition 080.53479 38300 159 080 190 - Mid-Tex Gas Division Addition 080.53481 37602 1,204 080 190 - Mid-Tex Gas Division Addition 080.53481 38100 12 080 190 - Mid-Tex Gas Division Addition 080.53481 38200 12 080 190 - Mid-Tex Gas Division Addition 080.53481 38300 12 080 190 - Mid-Tex Gas Division Addition 080.53495 37602 1,775 080 190 - Mid-Tex Gas Division Addition 080.53495 38000 118 080 190 - Mid-Tex Gas Division Addition 080.53495 38100 39 080 190 - Mid-Tex Gas Division Addition 080.53495 38200 15 080 190 - Mid-Tex Gas Division Addition 080.53495 38300 20 080 190 - Mid-Tex Gas Division Addition 080.53496 37602 4 080 190 - Mid-Tex Gas Division Addition 080.53504 37602 12,448 080 190 - Mid-Tex Gas Division Addition 080.53509 37602 56 080 190 - Mid-Tex Gas Division Addition 080.53509 38000 45 080 190 - Mid-Tex Gas Division Addition 080.53509 38100 6 080 190 - Mid-Tex Gas Division Addition 080.53509 38200 3 080 190 - Mid-Tex Gas Division Addition 080.53509 38300 3 080 190 - Mid-Tex Gas Division Addition 080.53517 37601 1 080 190 - Mid-Tex Gas Division Addition 080.53523 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53523 38100 0.07 080 190 - Mid-Tex Gas Division Addition 080.53523 38200 0.02 080 190 - Mid-Tex Gas Division Addition 080.53523 38300 0.02 080 190 - Mid-Tex Gas Division Addition 080.53531 37602 94 080 190 - Mid-Tex Gas Division Addition 080.53531 38000 11 080 190 - Mid-Tex Gas Division Addition 080.53531 38100 3 080 190 - Mid-Tex Gas Division Addition 080.53531 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53531 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53533 38000 264 080 190 - Mid-Tex Gas Division Addition 080.53533 38100 18 080 190 - Mid-Tex Gas Division Addition 080.53533 38200 6 080 190 - Mid-Tex Gas Division Addition 080.53533 38300 6 080 190 - Mid-Tex Gas Division Addition 080.53535 37602 2,047 080 190 - Mid-Tex Gas Division Addition 080.53535 38000 88 080 190 - Mid-Tex Gas Division Addition 080.53535 38100 44 080 190 - Mid-Tex Gas Division Addition 080.53535 38300 22 080 190 - Mid-Tex Gas Division Addition 080.53555 37602 541 080 190 - Mid-Tex Gas Division Addition 080.53555 38000 133 080 190 - Mid-Tex Gas Division Addition 080.53555 38100 42 080 190 - Mid-Tex Gas Division Addition 080.53555 38200 50 080 190 - Mid-Tex Gas Division Addition 080.53555 38300 50 080 190 - Mid-Tex Gas Division Addition 080.53561 37602 84 080 190 - Mid-Tex Gas Division Addition 080.53561 38000 74 080 190 - Mid-Tex Gas Division Addition 080.53561 38100 23 080 190 - Mid-Tex Gas Division Addition 080.53561 38200 15 080 190 - Mid-Tex Gas Division Addition 080.53561 38300 15 080 190 - Mid-Tex Gas Division Addition 080.53563 37601 22 080 190 - Mid-Tex Gas Division Addition 080.53564 37602 6 080 190 - Mid-Tex Gas Division Addition 080.53564 37800 6
MTX Additions by FERCPage 21 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.53568 37602 76 080 190 - Mid-Tex Gas Division Addition 080.53568 38000 10 080 190 - Mid-Tex Gas Division Addition 080.53572 37602 103 080 190 - Mid-Tex Gas Division Addition 080.53572 38000 19 080 190 - Mid-Tex Gas Division Addition 080.53572 38200 6 080 190 - Mid-Tex Gas Division Addition 080.53582 37602 33 080 190 - Mid-Tex Gas Division Addition 080.53582 38000 9 080 190 - Mid-Tex Gas Division Addition 080.53582 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53582 38200 0.04 080 190 - Mid-Tex Gas Division Addition 080.53584 37602 0.38 080 190 - Mid-Tex Gas Division Addition 080.53584 38000 0.11 080 190 - Mid-Tex Gas Division Addition 080.53584 38100 5 080 190 - Mid-Tex Gas Division Addition 080.53589 37602 137,892 080 190 - Mid-Tex Gas Division Addition 080.53591 37602 19,350 080 190 - Mid-Tex Gas Division Addition 080.53592 37602 56 080 190 - Mid-Tex Gas Division Addition 080.53592 38000 12 080 190 - Mid-Tex Gas Division Addition 080.53592 38100 4 080 190 - Mid-Tex Gas Division Addition 080.53592 38200 8 080 190 - Mid-Tex Gas Division Addition 080.53598 37602 183 080 190 - Mid-Tex Gas Division Addition 080.53598 38000 43 080 190 - Mid-Tex Gas Division Addition 080.53598 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53598 38200 0.24 080 190 - Mid-Tex Gas Division Addition 080.53598 38300 0.46 080 190 - Mid-Tex Gas Division Addition 080.53599 37602 0.20 080 190 - Mid-Tex Gas Division Addition 080.53608 37602 12 080 190 - Mid-Tex Gas Division Addition 080.53612 37602 807 080 190 - Mid-Tex Gas Division Addition 080.53612 38000 248 080 190 - Mid-Tex Gas Division Addition 080.53612 38100 62 080 190 - Mid-Tex Gas Division Addition 080.53612 38200 62 080 190 - Mid-Tex Gas Division Addition 080.53612 38300 62 080 190 - Mid-Tex Gas Division Addition 080.53614 37602 225 080 190 - Mid-Tex Gas Division Addition 080.53614 38000 75 080 190 - Mid-Tex Gas Division Addition 080.53619 37602 1,684 080 190 - Mid-Tex Gas Division Addition 080.53619 38000 438 080 190 - Mid-Tex Gas Division Addition 080.53619 38200 2 080 190 - Mid-Tex Gas Division Addition 080.53619 38300 6 080 190 - Mid-Tex Gas Division Addition 080.53623 37602 202 080 190 - Mid-Tex Gas Division Addition 080.53623 38000 112 080 190 - Mid-Tex Gas Division Addition 080.53623 38100 11 080 190 - Mid-Tex Gas Division Addition 080.53623 38200 18 080 190 - Mid-Tex Gas Division Addition 080.53623 38300 18 080 190 - Mid-Tex Gas Division Addition 080.53624 37602 698 080 190 - Mid-Tex Gas Division Addition 080.53624 38000 291 080 190 - Mid-Tex Gas Division Addition 080.53624 38100 58 080 190 - Mid-Tex Gas Division Addition 080.53624 38200 58 080 190 - Mid-Tex Gas Division Addition 080.53624 38300 58 080 190 - Mid-Tex Gas Division Addition 080.53625 37602 26 080 190 - Mid-Tex Gas Division Addition 080.53625 38000 2 080 190 - Mid-Tex Gas Division Addition 080.53625 38200 2 080 190 - Mid-Tex Gas Division Addition 080.53625 38300 2 080 190 - Mid-Tex Gas Division Addition 080.53627 37602 344 080 190 - Mid-Tex Gas Division Addition 080.53627 38000 143 080 190 - Mid-Tex Gas Division Addition 080.53627 38100 29 080 190 - Mid-Tex Gas Division Addition 080.53627 38200 29 080 190 - Mid-Tex Gas Division Addition 080.53627 38300 29 080 190 - Mid-Tex Gas Division Addition 080.53631 37602 (479) 080 190 - Mid-Tex Gas Division Addition 080.53650 37600 329 080 190 - Mid-Tex Gas Division Addition 080.53651 37602 205 080 190 - Mid-Tex Gas Division Addition 080.53651 38000 102 080 190 - Mid-Tex Gas Division Addition 080.53651 38100 17 080 190 - Mid-Tex Gas Division Addition 080.53651 38300 17 080 190 - Mid-Tex Gas Division Addition 080.53652 37600 33 080 190 - Mid-Tex Gas Division Addition 080.53652 37602 1,019 080 190 - Mid-Tex Gas Division Addition 080.53652 38000 55 080 190 - Mid-Tex Gas Division Addition 080.53654 37602 2,465 080 190 - Mid-Tex Gas Division Addition 080.53654 38000 320 080 190 - Mid-Tex Gas Division Addition 080.53654 38100 119 080 190 - Mid-Tex Gas Division Addition 080.53654 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53665 38000 170 080 190 - Mid-Tex Gas Division Addition 080.53665 38100 4 080 190 - Mid-Tex Gas Division Addition 080.53665 38200 2 080 190 - Mid-Tex Gas Division Addition 080.53665 38300 2 080 190 - Mid-Tex Gas Division Addition 080.53668 37602 633 080 190 - Mid-Tex Gas Division Addition 080.53668 38000 219 080 190 - Mid-Tex Gas Division Addition 080.53668 38100 184 080 190 - Mid-Tex Gas Division Addition 080.53668 38200 57 080 190 - Mid-Tex Gas Division Addition 080.53668 38300 57 080 190 - Mid-Tex Gas Division Addition 080.53669 37602 116 080 190 - Mid-Tex Gas Division Addition 080.53669 38000 81 080 190 - Mid-Tex Gas Division Addition 080.53669 38100 23 080 190 - Mid-Tex Gas Division Addition 080.53669 38200 12 080 190 - Mid-Tex Gas Division Addition 080.53670 38000 834 080 190 - Mid-Tex Gas Division Addition 080.53670 38100 9 080 190 - Mid-Tex Gas Division Addition 080.53670 38200 9 080 190 - Mid-Tex Gas Division Addition 080.53670 38300 9 080 190 - Mid-Tex Gas Division Addition 080.53671 37602 2,347 080 190 - Mid-Tex Gas Division Addition 080.53671 38000 1,304 080 190 - Mid-Tex Gas Division Addition 080.53671 38100 1,043 080 190 - Mid-Tex Gas Division Addition 080.53671 38200 261 080 190 - Mid-Tex Gas Division Addition 080.53671 38300 261 080 190 - Mid-Tex Gas Division Addition 080.53674 37602 3 080 190 - Mid-Tex Gas Division Addition 080.53674 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53675 38000 7 080 190 - Mid-Tex Gas Division Addition 080.53675 38100 259 080 190 - Mid-Tex Gas Division Addition 080.53675 38200 0.06 080 190 - Mid-Tex Gas Division Addition 080.53675 38300 0.06 080 190 - Mid-Tex Gas Division Addition 080.53676 37602 7 080 190 - Mid-Tex Gas Division Addition 080.53676 38000 3 080 190 - Mid-Tex Gas Division Addition 080.53676 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53676 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53676 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53677 37601 45 080 190 - Mid-Tex Gas Division Addition 080.53677 37602 55 080 190 - Mid-Tex Gas Division Addition 080.53678 38000 1,921 080 190 - Mid-Tex Gas Division Addition 080.53678 38100 20 080 190 - Mid-Tex Gas Division Addition 080.53678 38200 20 080 190 - Mid-Tex Gas Division Addition 080.53678 38300 20 080 190 - Mid-Tex Gas Division Addition 080.53679 38000 64
MTX Additions by FERCPage 22 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.53679 38100 9 080 190 - Mid-Tex Gas Division Addition 080.53679 38200 55 080 190 - Mid-Tex Gas Division Addition 080.53679 38300 55 080 190 - Mid-Tex Gas Division Addition 080.53680 38000 657 080 190 - Mid-Tex Gas Division Addition 080.53680 38100 14 080 190 - Mid-Tex Gas Division Addition 080.53680 38200 14 080 190 - Mid-Tex Gas Division Addition 080.53680 38300 14 080 190 - Mid-Tex Gas Division Addition 080.53681 38000 255 080 190 - Mid-Tex Gas Division Addition 080.53681 38200 3 080 190 - Mid-Tex Gas Division Addition 080.53682 38000 180 080 190 - Mid-Tex Gas Division Addition 080.53682 38100 8 080 190 - Mid-Tex Gas Division Addition 080.53682 38200 6 080 190 - Mid-Tex Gas Division Addition 080.53682 38300 6 080 190 - Mid-Tex Gas Division Addition 080.53684 37602 24 080 190 - Mid-Tex Gas Division Addition 080.53685 38000 620 080 190 - Mid-Tex Gas Division Addition 080.53685 38100 103 080 190 - Mid-Tex Gas Division Addition 080.53685 38200 155 080 190 - Mid-Tex Gas Division Addition 080.53685 38300 155 080 190 - Mid-Tex Gas Division Addition 080.53696 37602 822 080 190 - Mid-Tex Gas Division Addition 080.53696 38000 448 080 190 - Mid-Tex Gas Division Addition 080.53696 38100 75 080 190 - Mid-Tex Gas Division Addition 080.53696 38200 75 080 190 - Mid-Tex Gas Division Addition 080.53696 38300 75 080 190 - Mid-Tex Gas Division Addition 080.53697 37602 983 080 190 - Mid-Tex Gas Division Addition 080.53697 38000 590 080 190 - Mid-Tex Gas Division Addition 080.53697 38100 236 080 190 - Mid-Tex Gas Division Addition 080.53697 38200 79 080 190 - Mid-Tex Gas Division Addition 080.53697 38300 79 080 190 - Mid-Tex Gas Division Addition 080.53699 37602 126 080 190 - Mid-Tex Gas Division Addition 080.53699 38000 68 080 190 - Mid-Tex Gas Division Addition 080.53699 38100 23 080 190 - Mid-Tex Gas Division Addition 080.53699 38200 11 080 190 - Mid-Tex Gas Division Addition 080.53700 37602 604 080 190 - Mid-Tex Gas Division Addition 080.53700 38000 329 080 190 - Mid-Tex Gas Division Addition 080.53700 38100 110 080 190 - Mid-Tex Gas Division Addition 080.53700 38200 55 080 190 - Mid-Tex Gas Division Addition 080.53711 38000 223 080 190 - Mid-Tex Gas Division Addition 080.53711 38100 9 080 190 - Mid-Tex Gas Division Addition 080.53711 38200 2 080 190 - Mid-Tex Gas Division Addition 080.53711 38300 2 080 190 - Mid-Tex Gas Division Addition 080.53712 37602 171 080 190 - Mid-Tex Gas Division Addition 080.53712 38100 28 080 190 - Mid-Tex Gas Division Addition 080.53712 38200 28 080 190 - Mid-Tex Gas Division Addition 080.53712 38300 57 080 190 - Mid-Tex Gas Division Addition 080.53713 37602 427 080 190 - Mid-Tex Gas Division Addition 080.53713 38000 131 080 190 - Mid-Tex Gas Division Addition 080.53713 38100 33 080 190 - Mid-Tex Gas Division Addition 080.53713 38200 33 080 190 - Mid-Tex Gas Division Addition 080.53713 38300 33 080 190 - Mid-Tex Gas Division Addition 080.53724 37602 218 080 190 - Mid-Tex Gas Division Addition 080.53724 38000 24 080 190 - Mid-Tex Gas Division Addition 080.53730 37602 68 080 190 - Mid-Tex Gas Division Addition 080.53730 38000 4 080 190 - Mid-Tex Gas Division Addition 080.53730 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53730 38200 0.44 080 190 - Mid-Tex Gas Division Addition 080.53730 38300 0.44 080 190 - Mid-Tex Gas Division Addition 080.53731 37602 161 080 190 - Mid-Tex Gas Division Addition 080.53731 38000 45 080 190 - Mid-Tex Gas Division Addition 080.53731 38100 9 080 190 - Mid-Tex Gas Division Addition 080.53731 38200 4 080 190 - Mid-Tex Gas Division Addition 080.53731 38300 4 080 190 - Mid-Tex Gas Division Addition 080.53739 37602 9 080 190 - Mid-Tex Gas Division Addition 080.53739 38000 2 080 190 - Mid-Tex Gas Division Addition 080.53739 38100 0.26 080 190 - Mid-Tex Gas Division Addition 080.53739 38200 0.26 080 190 - Mid-Tex Gas Division Addition 080.53739 38300 0.26 080 190 - Mid-Tex Gas Division Addition 080.53740 37602 14 080 190 - Mid-Tex Gas Division Addition 080.53740 38000 0.15 080 190 - Mid-Tex Gas Division Addition 080.53742 37602 (4) 080 190 - Mid-Tex Gas Division Addition 080.53743 37601 4,741 080 190 - Mid-Tex Gas Division Addition 080.53748 37602 17 080 190 - Mid-Tex Gas Division Addition 080.53751 37602 787 080 190 - Mid-Tex Gas Division Addition 080.53751 38000 61 080 190 - Mid-Tex Gas Division Addition 080.53751 38200 7 080 190 - Mid-Tex Gas Division Addition 080.53751 38300 7 080 190 - Mid-Tex Gas Division Addition 080.53759 37602 5,636 080 190 - Mid-Tex Gas Division Addition 080.53760 37602 12,038 080 190 - Mid-Tex Gas Division Addition 080.53761 37602 17,205 080 190 - Mid-Tex Gas Division Addition 080.53761 38300 1,721 080 190 - Mid-Tex Gas Division Addition 080.53766 37602 73 080 190 - Mid-Tex Gas Division Addition 080.53766 38000 4 080 190 - Mid-Tex Gas Division Addition 080.53766 38100 2 080 190 - Mid-Tex Gas Division Addition 080.53766 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53766 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53767 37601 30 080 190 - Mid-Tex Gas Division Addition 080.53778 37602 240 080 190 - Mid-Tex Gas Division Addition 080.53778 38000 19 080 190 - Mid-Tex Gas Division Addition 080.53778 38100 3 080 190 - Mid-Tex Gas Division Addition 080.53778 38200 3 080 190 - Mid-Tex Gas Division Addition 080.53778 38300 5 080 190 - Mid-Tex Gas Division Addition 080.53779 37602 288 080 190 - Mid-Tex Gas Division Addition 080.53779 38000 73 080 190 - Mid-Tex Gas Division Addition 080.53779 38100 13 080 190 - Mid-Tex Gas Division Addition 080.53779 38200 0.44 080 190 - Mid-Tex Gas Division Addition 080.53779 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53783 37602 222 080 190 - Mid-Tex Gas Division Addition 080.53783 38000 12 080 190 - Mid-Tex Gas Division Addition 080.53783 38100 4 080 190 - Mid-Tex Gas Division Addition 080.53783 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53783 38300 2 080 190 - Mid-Tex Gas Division Addition 080.53785 37602 280 080 190 - Mid-Tex Gas Division Addition 080.53785 38000 10 080 190 - Mid-Tex Gas Division Addition 080.53785 38100 3 080 190 - Mid-Tex Gas Division Addition 080.53785 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53785 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53797 37602 30 080 190 - Mid-Tex Gas Division Addition 080.53807 37602 472 080 190 - Mid-Tex Gas Division Addition 080.53807 38000 23
MTX Additions by FERCPage 23 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.53807 38100 21 080 190 - Mid-Tex Gas Division Addition 080.53807 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53807 38300 904 080 190 - Mid-Tex Gas Division Addition 080.53809 37602 207 080 190 - Mid-Tex Gas Division Addition 080.53809 38000 9 080 190 - Mid-Tex Gas Division Addition 080.53809 38100 3 080 190 - Mid-Tex Gas Division Addition 080.53809 38200 0.03 080 190 - Mid-Tex Gas Division Addition 080.53809 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53810 37602 1,570 080 190 - Mid-Tex Gas Division Addition 080.53810 38000 112 080 190 - Mid-Tex Gas Division Addition 080.53810 38100 39 080 190 - Mid-Tex Gas Division Addition 080.53810 38200 19 080 190 - Mid-Tex Gas Division Addition 080.53810 38300 19 080 190 - Mid-Tex Gas Division Addition 080.53811 37602 801 080 190 - Mid-Tex Gas Division Addition 080.53811 38000 308 080 190 - Mid-Tex Gas Division Addition 080.53811 38100 74 080 190 - Mid-Tex Gas Division Addition 080.53811 38200 25 080 190 - Mid-Tex Gas Division Addition 080.53811 38300 25 080 190 - Mid-Tex Gas Division Addition 080.53812 37602 22 080 190 - Mid-Tex Gas Division Addition 080.53812 38000 3 080 190 - Mid-Tex Gas Division Addition 080.53812 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53812 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53813 37602 1,301 080 190 - Mid-Tex Gas Division Addition 080.53813 38000 263 080 190 - Mid-Tex Gas Division Addition 080.53813 38100 49 080 190 - Mid-Tex Gas Division Addition 080.53813 38200 16 080 190 - Mid-Tex Gas Division Addition 080.53813 38300 16 080 190 - Mid-Tex Gas Division Addition 080.53822 37602 945 080 190 - Mid-Tex Gas Division Addition 080.53822 38000 394 080 190 - Mid-Tex Gas Division Addition 080.53822 38100 79 080 190 - Mid-Tex Gas Division Addition 080.53822 38200 79 080 190 - Mid-Tex Gas Division Addition 080.53822 38300 79 080 190 - Mid-Tex Gas Division Addition 080.53823 37601 161 080 190 - Mid-Tex Gas Division Addition 080.53824 37602 4,463 080 190 - Mid-Tex Gas Division Addition 080.53824 38000 235 080 190 - Mid-Tex Gas Division Addition 080.53826 37602 36 080 190 - Mid-Tex Gas Division Addition 080.53826 38000 3 080 190 - Mid-Tex Gas Division Addition 080.53826 38100 0.41 080 190 - Mid-Tex Gas Division Addition 080.53826 38200 0.41 080 190 - Mid-Tex Gas Division Addition 080.53827 37602 31 080 190 - Mid-Tex Gas Division Addition 080.53827 38000 4 080 190 - Mid-Tex Gas Division Addition 080.53827 38100 0.33 080 190 - Mid-Tex Gas Division Addition 080.53827 38200 0.33 080 190 - Mid-Tex Gas Division Addition 080.53828 37602 5 080 190 - Mid-Tex Gas Division Addition 080.53829 37602 1,075 080 190 - Mid-Tex Gas Division Addition 080.53829 38000 202 080 190 - Mid-Tex Gas Division Addition 080.53829 38100 55 080 190 - Mid-Tex Gas Division Addition 080.53829 38300 9 080 190 - Mid-Tex Gas Division Addition 080.53830 37602 17 080 190 - Mid-Tex Gas Division Addition 080.53831 37602 1,403 080 190 - Mid-Tex Gas Division Addition 080.53831 37800 374 080 190 - Mid-Tex Gas Division Addition 080.53831 38000 94 080 190 - Mid-Tex Gas Division Addition 080.53841 37602 119 080 190 - Mid-Tex Gas Division Addition 080.53841 38000 4 080 190 - Mid-Tex Gas Division Addition 080.53841 38200 3 080 190 - Mid-Tex Gas Division Addition 080.53849 37602 1,240 080 190 - Mid-Tex Gas Division Addition 080.53849 38100 26 080 190 - Mid-Tex Gas Division Addition 080.53849 38200 26 080 190 - Mid-Tex Gas Division Addition 080.53849 38300 26 080 190 - Mid-Tex Gas Division Addition 080.53856 37602 2,972 080 190 - Mid-Tex Gas Division Addition 080.53856 38000 175 080 190 - Mid-Tex Gas Division Addition 080.53856 38100 210 080 190 - Mid-Tex Gas Division Addition 080.53856 38200 35 080 190 - Mid-Tex Gas Division Addition 080.53856 38300 105 080 190 - Mid-Tex Gas Division Addition 080.53859 37602 153 080 190 - Mid-Tex Gas Division Addition 080.53859 38000 3 080 190 - Mid-Tex Gas Division Addition 080.53859 38100 2 080 190 - Mid-Tex Gas Division Addition 080.53859 38200 2 080 190 - Mid-Tex Gas Division Addition 080.53859 38300 2 080 190 - Mid-Tex Gas Division Addition 080.53874 37602 3,455 080 190 - Mid-Tex Gas Division Addition 080.53874 38000 1,911 080 190 - Mid-Tex Gas Division Addition 080.53874 38100 367 080 190 - Mid-Tex Gas Division Addition 080.53874 38200 41 080 190 - Mid-Tex Gas Division Addition 080.53874 38300 41 080 190 - Mid-Tex Gas Division Addition 080.53878 37602 12 080 190 - Mid-Tex Gas Division Addition 080.53881 37602 11 080 190 - Mid-Tex Gas Division Addition 080.53885 37602 204 080 190 - Mid-Tex Gas Division Addition 080.53885 38000 68 080 190 - Mid-Tex Gas Division Addition 080.53885 38100 34 080 190 - Mid-Tex Gas Division Addition 080.53885 38200 17 080 190 - Mid-Tex Gas Division Addition 080.53885 38300 17 080 190 - Mid-Tex Gas Division Addition 080.53891 37602 319 080 190 - Mid-Tex Gas Division Addition 080.53892 37602 9,278 080 190 - Mid-Tex Gas Division Addition 080.53893 37602 12,371 080 190 - Mid-Tex Gas Division Addition 080.53894 37602 12,990 080 190 - Mid-Tex Gas Division Addition 080.53895 37602 361 080 190 - Mid-Tex Gas Division Addition 080.53909 37601 25,329 080 190 - Mid-Tex Gas Division Addition 080.53937 37602 87 080 190 - Mid-Tex Gas Division Addition 080.53937 38000 17 080 190 - Mid-Tex Gas Division Addition 080.53937 38100 5 080 190 - Mid-Tex Gas Division Addition 080.53937 38200 17 080 190 - Mid-Tex Gas Division Addition 080.53937 38300 42 080 190 - Mid-Tex Gas Division Addition 080.53956 37602 9 080 190 - Mid-Tex Gas Division Addition 080.53956 38000 1 080 190 - Mid-Tex Gas Division Addition 080.53956 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53959 37602 502 080 190 - Mid-Tex Gas Division Addition 080.53959 38000 63 080 190 - Mid-Tex Gas Division Addition 080.53959 38200 32 080 190 - Mid-Tex Gas Division Addition 080.53959 38300 32 080 190 - Mid-Tex Gas Division Addition 080.53968 37602 116 080 190 - Mid-Tex Gas Division Addition 080.53968 38000 5 080 190 - Mid-Tex Gas Division Addition 080.53968 38100 3 080 190 - Mid-Tex Gas Division Addition 080.53968 38200 3 080 190 - Mid-Tex Gas Division Addition 080.53968 38300 3 080 190 - Mid-Tex Gas Division Addition 080.53974 37602 22 080 190 - Mid-Tex Gas Division Addition 080.53974 38000 3 080 190 - Mid-Tex Gas Division Addition 080.53974 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53974 38200 0.27
MTX Additions by FERCPage 24 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.53974 38300 0.27 080 190 - Mid-Tex Gas Division Addition 080.53981 37602 475 080 190 - Mid-Tex Gas Division Addition 080.53981 38000 83 080 190 - Mid-Tex Gas Division Addition 080.53981 38100 12 080 190 - Mid-Tex Gas Division Addition 080.53981 38200 12 080 190 - Mid-Tex Gas Division Addition 080.53981 38300 12 080 190 - Mid-Tex Gas Division Addition 080.53992 37602 1,511 080 190 - Mid-Tex Gas Division Addition 080.53992 38000 276 080 190 - Mid-Tex Gas Division Addition 080.53992 38100 18 080 190 - Mid-Tex Gas Division Addition 080.53992 38200 18 080 190 - Mid-Tex Gas Division Addition 080.53992 38300 18 080 190 - Mid-Tex Gas Division Addition 080.53994 37602 59 080 190 - Mid-Tex Gas Division Addition 080.53994 38000 17 080 190 - Mid-Tex Gas Division Addition 080.53994 38100 1 080 190 - Mid-Tex Gas Division Addition 080.53994 38200 1 080 190 - Mid-Tex Gas Division Addition 080.53994 38300 1 080 190 - Mid-Tex Gas Division Addition 080.53999 37602 12 080 190 - Mid-Tex Gas Division Addition 080.53999 38000 2 080 190 - Mid-Tex Gas Division Addition 080.54000 37602 1,776 080 190 - Mid-Tex Gas Division Addition 080.54000 38000 197 080 190 - Mid-Tex Gas Division Addition 080.54001 37602 4,384 080 190 - Mid-Tex Gas Division Addition 080.54002 37602 1,307 080 190 - Mid-Tex Gas Division Addition 080.54002 38000 229 080 190 - Mid-Tex Gas Division Addition 080.54002 38200 33 080 190 - Mid-Tex Gas Division Addition 080.54002 38300 65 080 190 - Mid-Tex Gas Division Addition 080.54003 37602 54 080 190 - Mid-Tex Gas Division Addition 080.54003 38000 7 080 190 - Mid-Tex Gas Division Addition 080.54003 38100 1 080 190 - Mid-Tex Gas Division Addition 080.54003 38300 1 080 190 - Mid-Tex Gas Division Addition 080.54008 37602 1,806 080 190 - Mid-Tex Gas Division Addition 080.54015 37602 835 080 190 - Mid-Tex Gas Division Addition 080.54017 37602 11 080 190 - Mid-Tex Gas Division Addition 080.54021 37602 2,718 080 190 - Mid-Tex Gas Division Addition 080.54021 38000 1,821 080 190 - Mid-Tex Gas Division Addition 080.54021 38100 107 080 190 - Mid-Tex Gas Division Addition 080.54021 38200 107 080 190 - Mid-Tex Gas Division Addition 080.54021 38300 107 080 190 - Mid-Tex Gas Division Addition 080.54037 37602 6,056 080 190 - Mid-Tex Gas Division Addition 080.54040 37602 (9) 080 190 - Mid-Tex Gas Division Addition 080.54040 38000 (0.30) 080 190 - Mid-Tex Gas Division Addition 080.54043 37602 3,947 080 190 - Mid-Tex Gas Division Addition 080.54043 38000 2,135 080 190 - Mid-Tex Gas Division Addition 080.54043 38100 335 080 190 - Mid-Tex Gas Division Addition 080.54043 38200 11 080 190 - Mid-Tex Gas Division Addition 080.54043 38300 30 080 190 - Mid-Tex Gas Division Addition 080.54046 37602 27,721 080 190 - Mid-Tex Gas Division Addition 080.54046 38000 5,280 080 190 - Mid-Tex Gas Division Addition 080.54047 37602 20 080 190 - Mid-Tex Gas Division Addition 080.54047 38000 0.41 080 190 - Mid-Tex Gas Division Addition 080.54050 37602 1,648 080 190 - Mid-Tex Gas Division Addition 080.54050 38000 657 080 190 - Mid-Tex Gas Division Addition 080.54050 38100 55 080 190 - Mid-Tex Gas Division Addition 080.54050 38200 12 080 190 - Mid-Tex Gas Division Addition 080.54050 38300 17 080 190 - Mid-Tex Gas Division Addition 080.54051 37602 6 080 190 - Mid-Tex Gas Division Addition 080.54052 38000 510 080 190 - Mid-Tex Gas Division Addition 080.54052 38200 11 080 190 - Mid-Tex Gas Division Addition 080.54052 38300 11 080 190 - Mid-Tex Gas Division Addition 080.54070 37602 (1) 080 190 - Mid-Tex Gas Division Addition 080.54081 37602 259,756 080 190 - Mid-Tex Gas Division Addition 080.54086 37602 323 080 190 - Mid-Tex Gas Division Addition 080.54086 38000 1,242 080 190 - Mid-Tex Gas Division Addition 080.54086 38100 16 080 190 - Mid-Tex Gas Division Addition 080.54086 38200 16 080 190 - Mid-Tex Gas Division Addition 080.54086 38300 16 080 190 - Mid-Tex Gas Division Addition 080.54090 37602 2,413 080 190 - Mid-Tex Gas Division Addition 080.54090 38000 762 080 190 - Mid-Tex Gas Division Addition 080.54097 37602 1,120 080 190 - Mid-Tex Gas Division Addition 080.54112 37602 12,186 080 190 - Mid-Tex Gas Division Addition 080.54128 37602 13 080 190 - Mid-Tex Gas Division Addition 080.54128 38000 3 080 190 - Mid-Tex Gas Division Addition 080.54128 38100 0.33 080 190 - Mid-Tex Gas Division Addition 080.54128 38200 0.17 080 190 - Mid-Tex Gas Division Addition 080.54131 37602 12 080 190 - Mid-Tex Gas Division Addition 080.54131 38000 0.24 080 190 - Mid-Tex Gas Division Addition 080.54141 37602 6,509 080 190 - Mid-Tex Gas Division Addition 080.54141 38000 2,791 080 190 - Mid-Tex Gas Division Addition 080.54155 37602 162 080 190 - Mid-Tex Gas Division Addition 080.54155 38000 76 080 190 - Mid-Tex Gas Division Addition 080.54155 38100 5 080 190 - Mid-Tex Gas Division Addition 080.54155 38200 5 080 190 - Mid-Tex Gas Division Addition 080.54155 38300 5 080 190 - Mid-Tex Gas Division Addition 080.54160 37601 5,836 080 190 - Mid-Tex Gas Division Addition 080.54160 37602 2,501 080 190 - Mid-Tex Gas Division Addition 080.54166 37602 7,122 080 190 - Mid-Tex Gas Division Addition 080.54166 38000 375 080 190 - Mid-Tex Gas Division Addition 080.54183 37602 544 080 190 - Mid-Tex Gas Division Addition 080.54183 38000 68 080 190 - Mid-Tex Gas Division Addition 080.54183 38100 27 080 190 - Mid-Tex Gas Division Addition 080.54183 38200 27 080 190 - Mid-Tex Gas Division Addition 080.54183 38300 14 080 190 - Mid-Tex Gas Division Addition 080.54187 37602 33,271 080 190 - Mid-Tex Gas Division Addition 080.54195 37602 2,232 080 190 - Mid-Tex Gas Division Addition 080.54195 38000 542 080 190 - Mid-Tex Gas Division Addition 080.54195 38100 64 080 190 - Mid-Tex Gas Division Addition 080.54195 38200 3 080 190 - Mid-Tex Gas Division Addition 080.54195 38300 14 080 190 - Mid-Tex Gas Division Addition 080.54208 37602 126 080 190 - Mid-Tex Gas Division Addition 080.54208 37800 28 080 190 - Mid-Tex Gas Division Addition 080.54210 37602 505 080 190 - Mid-Tex Gas Division Addition 080.54210 38000 225 080 190 - Mid-Tex Gas Division Addition 080.54210 38100 85 080 190 - Mid-Tex Gas Division Addition 080.54210 38200 45 080 190 - Mid-Tex Gas Division Addition 080.54210 38300 41 080 190 - Mid-Tex Gas Division Addition 080.54211 37602 1,788 080 190 - Mid-Tex Gas Division Addition 080.54211 38000 715 080 190 - Mid-Tex Gas Division Addition 080.54211 38100 215 080 190 - Mid-Tex Gas Division Addition 080.54211 38200 72
MTX Additions by FERCPage 25 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.54211 38300 72 080 190 - Mid-Tex Gas Division Addition 080.54213 37602 573 080 190 - Mid-Tex Gas Division Addition 080.54213 38000 132 080 190 - Mid-Tex Gas Division Addition 080.54213 38100 88 080 190 - Mid-Tex Gas Division Addition 080.54213 38200 44 080 190 - Mid-Tex Gas Division Addition 080.54213 38300 44 080 190 - Mid-Tex Gas Division Addition 080.54217 37602 999 080 190 - Mid-Tex Gas Division Addition 080.54217 38000 416 080 190 - Mid-Tex Gas Division Addition 080.54217 38100 83 080 190 - Mid-Tex Gas Division Addition 080.54217 38200 83 080 190 - Mid-Tex Gas Division Addition 080.54217 38300 83 080 190 - Mid-Tex Gas Division Addition 080.54236 37602 830 080 190 - Mid-Tex Gas Division Addition 080.54236 38000 237 080 190 - Mid-Tex Gas Division Addition 080.54236 38100 59 080 190 - Mid-Tex Gas Division Addition 080.54236 38200 59 080 190 - Mid-Tex Gas Division Addition 080.54253 37602 7,991 080 190 - Mid-Tex Gas Division Addition 080.54264 37602 7,249 080 190 - Mid-Tex Gas Division Addition 080.54264 38000 632 080 190 - Mid-Tex Gas Division Addition 080.54265 37602 1,657 080 190 - Mid-Tex Gas Division Addition 080.54265 38000 221 080 190 - Mid-Tex Gas Division Addition 080.54265 38200 24 080 190 - Mid-Tex Gas Division Addition 080.54265 38300 24 080 190 - Mid-Tex Gas Division Addition 080.54270 37602 10,023 080 190 - Mid-Tex Gas Division Addition 080.54270 38000 5,586 080 190 - Mid-Tex Gas Division Addition 080.54273 37602 3,902 080 190 - Mid-Tex Gas Division Addition 080.54273 38000 289 080 190 - Mid-Tex Gas Division Addition 080.54273 38100 17 080 190 - Mid-Tex Gas Division Addition 080.54273 38200 2 080 190 - Mid-Tex Gas Division Addition 080.54273 38300 2 080 190 - Mid-Tex Gas Division Addition 080.54284 37602 693 080 190 - Mid-Tex Gas Division Addition 080.54284 38000 54 080 190 - Mid-Tex Gas Division Addition 080.54284 38100 8 080 190 - Mid-Tex Gas Division Addition 080.54284 38200 8 080 190 - Mid-Tex Gas Division Addition 080.54284 38300 8 080 190 - Mid-Tex Gas Division Addition 080.54286 37602 265 080 190 - Mid-Tex Gas Division Addition 080.54286 38000 11 080 190 - Mid-Tex Gas Division Addition 080.54286 38200 3 080 190 - Mid-Tex Gas Division Addition 080.54287 37602 712 080 190 - Mid-Tex Gas Division Addition 080.54287 38000 355 080 190 - Mid-Tex Gas Division Addition 080.54287 38100 58 080 190 - Mid-Tex Gas Division Addition 080.54287 38200 29 080 190 - Mid-Tex Gas Division Addition 080.54287 38300 29 080 190 - Mid-Tex Gas Division Addition 080.54291 37602 4,369 080 190 - Mid-Tex Gas Division Addition 080.54299 37602 982 080 190 - Mid-Tex Gas Division Addition 080.54299 38000 20 080 190 - Mid-Tex Gas Division Addition 080.54302 37602 652 080 190 - Mid-Tex Gas Division Addition 080.54306 37602 194 080 190 - Mid-Tex Gas Division Addition 080.54313 38000 5,189 080 190 - Mid-Tex Gas Division Addition 080.54313 38100 108 080 190 - Mid-Tex Gas Division Addition 080.54313 38200 54 080 190 - Mid-Tex Gas Division Addition 080.54313 38300 54 080 190 - Mid-Tex Gas Division Addition 080.54315 38000 7,758 080 190 - Mid-Tex Gas Division Addition 080.54315 38100 80 080 190 - Mid-Tex Gas Division Addition 080.54315 38200 80 080 190 - Mid-Tex Gas Division Addition 080.54315 38300 80 080 190 - Mid-Tex Gas Division Addition 080.54318 38000 2,615 080 190 - Mid-Tex Gas Division Addition 080.54318 38100 27 080 190 - Mid-Tex Gas Division Addition 080.54318 38200 27 080 190 - Mid-Tex Gas Division Addition 080.54318 38300 27 080 190 - Mid-Tex Gas Division Addition 080.54320 38000 4,692 080 190 - Mid-Tex Gas Division Addition 080.54320 38100 48 080 190 - Mid-Tex Gas Division Addition 080.54320 38200 48 080 190 - Mid-Tex Gas Division Addition 080.54320 38300 48 080 190 - Mid-Tex Gas Division Addition 080.54321 38000 24 080 190 - Mid-Tex Gas Division Addition 080.54322 38000 428 080 190 - Mid-Tex Gas Division Addition 080.54322 38100 214 080 190 - Mid-Tex Gas Division Addition 080.54322 38200 214 080 190 - Mid-Tex Gas Division Addition 080.54322 38300 214 080 190 - Mid-Tex Gas Division Addition 080.54325 38000 738 080 190 - Mid-Tex Gas Division Addition 080.54325 38100 21 080 190 - Mid-Tex Gas Division Addition 080.54325 38200 42 080 190 - Mid-Tex Gas Division Addition 080.54325 38300 42 080 190 - Mid-Tex Gas Division Addition 080.54327 38000 1,562 080 190 - Mid-Tex Gas Division Addition 080.54327 38100 16 080 190 - Mid-Tex Gas Division Addition 080.54327 38200 16 080 190 - Mid-Tex Gas Division Addition 080.54327 38300 16 080 190 - Mid-Tex Gas Division Addition 080.54328 38000 1,211 080 190 - Mid-Tex Gas Division Addition 080.54328 38100 12 080 190 - Mid-Tex Gas Division Addition 080.54328 38200 12 080 190 - Mid-Tex Gas Division Addition 080.54330 38000 206 080 190 - Mid-Tex Gas Division Addition 080.54330 38100 7 080 190 - Mid-Tex Gas Division Addition 080.54330 38200 9 080 190 - Mid-Tex Gas Division Addition 080.54330 38300 7 080 190 - Mid-Tex Gas Division Addition 080.54331 38000 7,104 080 190 - Mid-Tex Gas Division Addition 080.54331 38100 418 080 190 - Mid-Tex Gas Division Addition 080.54331 38200 418 080 190 - Mid-Tex Gas Division Addition 080.54331 38300 418 080 190 - Mid-Tex Gas Division Addition 080.54333 37602 59 080 190 - Mid-Tex Gas Division Addition 080.54333 38000 3 080 190 - Mid-Tex Gas Division Addition 080.54340 37602 631 080 190 - Mid-Tex Gas Division Addition 080.54340 38000 150 080 190 - Mid-Tex Gas Division Addition 080.54340 38100 164 080 190 - Mid-Tex Gas Division Addition 080.54340 38200 150 080 190 - Mid-Tex Gas Division Addition 080.54340 38300 150 080 190 - Mid-Tex Gas Division Addition 080.54341 37602 1,305 080 190 - Mid-Tex Gas Division Addition 080.54341 38000 542 080 190 - Mid-Tex Gas Division Addition 080.54341 38100 109 080 190 - Mid-Tex Gas Division Addition 080.54341 38200 107 080 190 - Mid-Tex Gas Division Addition 080.54341 38300 107 080 190 - Mid-Tex Gas Division Addition 080.54344 37602 0.14 080 190 - Mid-Tex Gas Division Addition 080.54345 37602 132 080 190 - Mid-Tex Gas Division Addition 080.54345 38000 33 080 190 - Mid-Tex Gas Division Addition 080.54346 37602 2,015 080 190 - Mid-Tex Gas Division Addition 080.54346 38000 583 080 190 - Mid-Tex Gas Division Addition 080.54346 38100 112 080 190 - Mid-Tex Gas Division Addition 080.54346 38200 86 080 190 - Mid-Tex Gas Division Addition 080.54346 38300 86 080 190 - Mid-Tex Gas Division Addition 080.54349 37602 3,567
MTX Additions by FERCPage 26 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.54349 38000 196 080 190 - Mid-Tex Gas Division Addition 080.54349 38100 39 080 190 - Mid-Tex Gas Division Addition 080.54349 38200 39 080 190 - Mid-Tex Gas Division Addition 080.54349 38300 78 080 190 - Mid-Tex Gas Division Addition 080.54354 37602 279 080 190 - Mid-Tex Gas Division Addition 080.54356 38000 1,877 080 190 - Mid-Tex Gas Division Addition 080.54356 38100 316 080 190 - Mid-Tex Gas Division Addition 080.54356 38200 11 080 190 - Mid-Tex Gas Division Addition 080.54356 38300 28 080 190 - Mid-Tex Gas Division Addition 080.54357 38000 369 080 190 - Mid-Tex Gas Division Addition 080.54357 38100 53 080 190 - Mid-Tex Gas Division Addition 080.54357 38200 53 080 190 - Mid-Tex Gas Division Addition 080.54357 38300 53 080 190 - Mid-Tex Gas Division Addition 080.54359 38000 2,367 080 190 - Mid-Tex Gas Division Addition 080.54359 38100 338 080 190 - Mid-Tex Gas Division Addition 080.54359 38200 338 080 190 - Mid-Tex Gas Division Addition 080.54359 38300 338 080 190 - Mid-Tex Gas Division Addition 080.54360 38000 480 080 190 - Mid-Tex Gas Division Addition 080.54360 38100 799 080 190 - Mid-Tex Gas Division Addition 080.54360 38200 160 080 190 - Mid-Tex Gas Division Addition 080.54360 38300 160 080 190 - Mid-Tex Gas Division Addition 080.54365 37602 (2) 080 190 - Mid-Tex Gas Division Addition 080.54365 38500 (1) 080 190 - Mid-Tex Gas Division Addition 080.54366 37602 1,015 080 190 - Mid-Tex Gas Division Addition 080.54366 38000 423 080 190 - Mid-Tex Gas Division Addition 080.54366 38100 85 080 190 - Mid-Tex Gas Division Addition 080.54366 38200 85 080 190 - Mid-Tex Gas Division Addition 080.54366 38300 85 080 190 - Mid-Tex Gas Division Addition 080.54370 38000 1,376 080 190 - Mid-Tex Gas Division Addition 080.54370 38100 44 080 190 - Mid-Tex Gas Division Addition 080.54370 38200 11 080 190 - Mid-Tex Gas Division Addition 080.54370 38300 25 080 190 - Mid-Tex Gas Division Addition 080.54371 37602 778 080 190 - Mid-Tex Gas Division Addition 080.54371 38000 729 080 190 - Mid-Tex Gas Division Addition 080.54371 38100 81 080 190 - Mid-Tex Gas Division Addition 080.54371 38200 16 080 190 - Mid-Tex Gas Division Addition 080.54371 38300 16 080 190 - Mid-Tex Gas Division Addition 080.54383 37602 1,397 080 190 - Mid-Tex Gas Division Addition 080.54386 37602 94 080 190 - Mid-Tex Gas Division Addition 080.54394 37602 1,297 080 190 - Mid-Tex Gas Division Addition 080.54394 38000 142 080 190 - Mid-Tex Gas Division Addition 080.54394 38100 3 080 190 - Mid-Tex Gas Division Addition 080.54394 38200 2 080 190 - Mid-Tex Gas Division Addition 080.54394 38300 2 080 190 - Mid-Tex Gas Division Addition 080.54399 37602 100 080 190 - Mid-Tex Gas Division Addition 080.54402 37602 275 080 190 - Mid-Tex Gas Division Addition 080.54402 38000 29 080 190 - Mid-Tex Gas Division Addition 080.54402 38100 16 080 190 - Mid-Tex Gas Division Addition 080.54413 37800 44 080 190 - Mid-Tex Gas Division Addition 080.54416 37800 (4) 080 190 - Mid-Tex Gas Division Addition 080.54417 37602 276 080 190 - Mid-Tex Gas Division Addition 080.54417 38000 50 080 190 - Mid-Tex Gas Division Addition 080.54417 38100 4 080 190 - Mid-Tex Gas Division Addition 080.54417 38200 2 080 190 - Mid-Tex Gas Division Addition 080.54427 37602 2,354 080 190 - Mid-Tex Gas Division Addition 080.54427 38000 1,140 080 190 - Mid-Tex Gas Division Addition 080.54427 38100 191 080 190 - Mid-Tex Gas Division Addition 080.54427 38200 7 080 190 - Mid-Tex Gas Division Addition 080.54427 38300 39 080 190 - Mid-Tex Gas Division Addition 080.54428 37602 7,650 080 190 - Mid-Tex Gas Division Addition 080.54428 38000 4,147 080 190 - Mid-Tex Gas Division Addition 080.54428 38100 760 080 190 - Mid-Tex Gas Division Addition 080.54428 38200 25 080 190 - Mid-Tex Gas Division Addition 080.54428 38300 77 080 190 - Mid-Tex Gas Division Addition 080.54431 37602 352 080 190 - Mid-Tex Gas Division Addition 080.54431 38000 31 080 190 - Mid-Tex Gas Division Addition 080.54431 38200 8 080 190 - Mid-Tex Gas Division Addition 080.54432 38000 25 080 190 - Mid-Tex Gas Division Addition 080.54432 38200 0.13 080 190 - Mid-Tex Gas Division Addition 080.54432 38300 0.13 080 190 - Mid-Tex Gas Division Addition 080.54443 37602 3,684 080 190 - Mid-Tex Gas Division Addition 080.54443 38000 709 080 190 - Mid-Tex Gas Division Addition 080.54443 38100 234 080 190 - Mid-Tex Gas Division Addition 080.54443 38200 46 080 190 - Mid-Tex Gas Division Addition 080.54443 38300 46 080 190 - Mid-Tex Gas Division Addition 080.54446 37602 1,442 080 190 - Mid-Tex Gas Division Addition 080.54446 38000 80 080 190 - Mid-Tex Gas Division Addition 080.54446 38100 16 080 190 - Mid-Tex Gas Division Addition 080.54446 38200 16 080 190 - Mid-Tex Gas Division Addition 080.54446 38300 48 080 190 - Mid-Tex Gas Division Addition 080.54447 37602 5,616 080 190 - Mid-Tex Gas Division Addition 080.54447 38000 505 080 190 - Mid-Tex Gas Division Addition 080.54447 38100 316 080 190 - Mid-Tex Gas Division Addition 080.54447 38300 132 080 190 - Mid-Tex Gas Division Addition 080.54448 37602 4,845 080 190 - Mid-Tex Gas Division Addition 080.54449 37800 69 080 190 - Mid-Tex Gas Division Addition 080.54450 37602 387 080 190 - Mid-Tex Gas Division Addition 080.54456 37602 1,200 080 190 - Mid-Tex Gas Division Addition 080.54456 38000 38 080 190 - Mid-Tex Gas Division Addition 080.54456 38100 13 080 190 - Mid-Tex Gas Division Addition 080.54456 38200 13 080 190 - Mid-Tex Gas Division Addition 080.54456 38300 13 080 190 - Mid-Tex Gas Division Addition 080.54468 37602 1,506 080 190 - Mid-Tex Gas Division Addition 080.54468 38000 377 080 190 - Mid-Tex Gas Division Addition 080.54468 38100 1,318 080 190 - Mid-Tex Gas Division Addition 080.54468 38200 282 080 190 - Mid-Tex Gas Division Addition 080.54468 38300 282 080 190 - Mid-Tex Gas Division Addition 080.54472 37602 787 080 190 - Mid-Tex Gas Division Addition 080.54472 38000 195 080 190 - Mid-Tex Gas Division Addition 080.54472 38100 683 080 190 - Mid-Tex Gas Division Addition 080.54472 38200 146 080 190 - Mid-Tex Gas Division Addition 080.54472 38300 146 080 190 - Mid-Tex Gas Division Addition 080.54478 37602 943 080 190 - Mid-Tex Gas Division Addition 080.54478 38000 333 080 190 - Mid-Tex Gas Division Addition 080.54478 38100 76 080 190 - Mid-Tex Gas Division Addition 080.54478 38200 61 080 190 - Mid-Tex Gas Division Addition 080.54478 38300 93 080 190 - Mid-Tex Gas Division Addition 080.54484 38500 52
MTX Additions by FERCPage 27 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.54486 37602 313 080 190 - Mid-Tex Gas Division Addition 080.54492 37602 259 080 190 - Mid-Tex Gas Division Addition 080.54492 38000 14 080 190 - Mid-Tex Gas Division Addition 080.54494 37601 791 080 190 - Mid-Tex Gas Division Addition 080.54498 37602 31 080 190 - Mid-Tex Gas Division Addition 080.54498 37800 228 080 190 - Mid-Tex Gas Division Addition 080.54510 37602 528 080 190 - Mid-Tex Gas Division Addition 080.54517 37800 82 080 190 - Mid-Tex Gas Division Addition 080.54524 37602 3,754 080 190 - Mid-Tex Gas Division Addition 080.54524 38000 469 080 190 - Mid-Tex Gas Division Addition 080.54524 38100 26 080 190 - Mid-Tex Gas Division Addition 080.54524 38200 9 080 190 - Mid-Tex Gas Division Addition 080.54524 38300 4 080 190 - Mid-Tex Gas Division Addition 080.54528 37602 255 080 190 - Mid-Tex Gas Division Addition 080.54528 37800 504 080 190 - Mid-Tex Gas Division Addition 080.54528 38000 15 080 190 - Mid-Tex Gas Division Addition 080.54529 37602 403 080 190 - Mid-Tex Gas Division Addition 080.54529 38000 31 080 190 - Mid-Tex Gas Division Addition 080.54529 38100 4 080 190 - Mid-Tex Gas Division Addition 080.54529 38200 4 080 190 - Mid-Tex Gas Division Addition 080.54529 38300 4 080 190 - Mid-Tex Gas Division Addition 080.54538 37602 2,032 080 190 - Mid-Tex Gas Division Addition 080.54538 38000 747 080 190 - Mid-Tex Gas Division Addition 080.54538 38100 104 080 190 - Mid-Tex Gas Division Addition 080.54538 38200 59 080 190 - Mid-Tex Gas Division Addition 080.54538 38300 30 080 190 - Mid-Tex Gas Division Addition 080.54546 37602 460 080 190 - Mid-Tex Gas Division Addition 080.54546 38000 191 080 190 - Mid-Tex Gas Division Addition 080.54546 38100 42 080 190 - Mid-Tex Gas Division Addition 080.54546 38200 42 080 190 - Mid-Tex Gas Division Addition 080.54546 38300 42 080 190 - Mid-Tex Gas Division Addition 080.54548 37602 167 080 190 - Mid-Tex Gas Division Addition 080.54550 37602 386 080 190 - Mid-Tex Gas Division Addition 080.54550 38000 322 080 190 - Mid-Tex Gas Division Addition 080.54550 38100 450 080 190 - Mid-Tex Gas Division Addition 080.54550 38200 64 080 190 - Mid-Tex Gas Division Addition 080.54550 38300 64 080 190 - Mid-Tex Gas Division Addition 080.54551 37602 4,482 080 190 - Mid-Tex Gas Division Addition 080.54553 37601 96 080 190 - Mid-Tex Gas Division Addition 080.54565 37602 237 080 190 - Mid-Tex Gas Division Addition 080.54568 37602 824 080 190 - Mid-Tex Gas Division Addition 080.54570 37602 3,673 080 190 - Mid-Tex Gas Division Addition 080.54570 38000 432 080 190 - Mid-Tex Gas Division Addition 080.54570 38100 130 080 190 - Mid-Tex Gas Division Addition 080.54570 38200 43 080 190 - Mid-Tex Gas Division Addition 080.54570 38300 43 080 190 - Mid-Tex Gas Division Addition 080.54574 37602 15 080 190 - Mid-Tex Gas Division Addition 080.54579 38000 507 080 190 - Mid-Tex Gas Division Addition 080.54579 38100 85 080 190 - Mid-Tex Gas Division Addition 080.54579 38200 10 080 190 - Mid-Tex Gas Division Addition 080.54589 37602 366 080 190 - Mid-Tex Gas Division Addition 080.54589 38000 73 080 190 - Mid-Tex Gas Division Addition 080.54589 38200 9 080 190 - Mid-Tex Gas Division Addition 080.54589 38300 9 080 190 - Mid-Tex Gas Division Addition 080.54590 37602 812 080 190 - Mid-Tex Gas Division Addition 080.54590 38000 487 080 190 - Mid-Tex Gas Division Addition 080.54590 38100 162 080 190 - Mid-Tex Gas Division Addition 080.54590 38200 81 080 190 - Mid-Tex Gas Division Addition 080.54590 38300 81 080 190 - Mid-Tex Gas Division Addition 080.54591 37602 445 080 190 - Mid-Tex Gas Division Addition 080.54591 38000 263 080 190 - Mid-Tex Gas Division Addition 080.54591 38100 70 080 190 - Mid-Tex Gas Division Addition 080.54591 38200 52 080 190 - Mid-Tex Gas Division Addition 080.54591 38300 52 080 190 - Mid-Tex Gas Division Addition 080.54592 37602 3,405 080 190 - Mid-Tex Gas Division Addition 080.54592 38000 401 080 190 - Mid-Tex Gas Division Addition 080.54592 38100 120 080 190 - Mid-Tex Gas Division Addition 080.54592 38200 40 080 190 - Mid-Tex Gas Division Addition 080.54592 38300 40 080 190 - Mid-Tex Gas Division Addition 080.54593 37602 474 080 190 - Mid-Tex Gas Division Addition 080.54593 38000 37 080 190 - Mid-Tex Gas Division Addition 080.54593 38100 985 080 190 - Mid-Tex Gas Division Addition 080.54593 38200 5 080 190 - Mid-Tex Gas Division Addition 080.54593 38300 5 080 190 - Mid-Tex Gas Division Addition 080.54600 37602 587 080 190 - Mid-Tex Gas Division Addition 080.54600 38000 129 080 190 - Mid-Tex Gas Division Addition 080.54608 38000 8 080 190 - Mid-Tex Gas Division Addition 080.54610 37602 716 080 190 - Mid-Tex Gas Division Addition 080.54610 38000 298 080 190 - Mid-Tex Gas Division Addition 080.54610 38100 58 080 190 - Mid-Tex Gas Division Addition 080.54610 38200 58 080 190 - Mid-Tex Gas Division Addition 080.54610 38300 58 080 190 - Mid-Tex Gas Division Addition 080.54611 37602 684 080 190 - Mid-Tex Gas Division Addition 080.54611 38000 239 080 190 - Mid-Tex Gas Division Addition 080.54611 38100 103 080 190 - Mid-Tex Gas Division Addition 080.54611 38200 57 080 190 - Mid-Tex Gas Division Addition 080.54611 38300 57 080 190 - Mid-Tex Gas Division Addition 080.54612 37602 1,501 080 190 - Mid-Tex Gas Division Addition 080.54622 37602 276 080 190 - Mid-Tex Gas Division Addition 080.54622 38000 15 080 190 - Mid-Tex Gas Division Addition 080.54624 37602 819 080 190 - Mid-Tex Gas Division Addition 080.54624 38000 117 080 190 - Mid-Tex Gas Division Addition 080.54624 38100 117 080 190 - Mid-Tex Gas Division Addition 080.54624 38200 59 080 190 - Mid-Tex Gas Division Addition 080.54624 38300 59 080 190 - Mid-Tex Gas Division Addition 080.54625 37602 2,102 080 190 - Mid-Tex Gas Division Addition 080.54625 38100 22 080 190 - Mid-Tex Gas Division Addition 080.54625 38200 22 080 190 - Mid-Tex Gas Division Addition 080.54625 38300 22 080 190 - Mid-Tex Gas Division Addition 080.54635 37602 203 080 190 - Mid-Tex Gas Division Addition 080.54640 37602 485 080 190 - Mid-Tex Gas Division Addition 080.54640 38000 31 080 190 - Mid-Tex Gas Division Addition 080.54655 37602 382 080 190 - Mid-Tex Gas Division Addition 080.54655 38000 21 080 190 - Mid-Tex Gas Division Addition 080.54655 38200 4 080 190 - Mid-Tex Gas Division Addition 080.54655 38300 4 080 190 - Mid-Tex Gas Division Addition 080.54658 37602 472 080 190 - Mid-Tex Gas Division Addition 080.54658 38000 5
MTX Additions by FERCPage 28 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.54661 37600 13,409 080 190 - Mid-Tex Gas Division Addition 080.54661 37601 562,482 080 190 - Mid-Tex Gas Division Addition 080.54661 37602 1,341 080 190 - Mid-Tex Gas Division Addition 080.54661 37800 93,188 080 190 - Mid-Tex Gas Division Addition 080.54665 37602 268 080 190 - Mid-Tex Gas Division Addition 080.54665 38000 95 080 190 - Mid-Tex Gas Division Addition 080.54665 38200 7 080 190 - Mid-Tex Gas Division Addition 080.54665 38300 7 080 190 - Mid-Tex Gas Division Addition 080.54666 37602 3,917 080 190 - Mid-Tex Gas Division Addition 080.54681 38000 955 080 190 - Mid-Tex Gas Division Addition 080.54681 38100 10 080 190 - Mid-Tex Gas Division Addition 080.54681 38200 10 080 190 - Mid-Tex Gas Division Addition 080.54681 38300 10 080 190 - Mid-Tex Gas Division Addition 080.54685 37602 25,987 080 190 - Mid-Tex Gas Division Addition 080.54703 37602 331 080 190 - Mid-Tex Gas Division Addition 080.54703 38000 138 080 190 - Mid-Tex Gas Division Addition 080.54703 38100 28 080 190 - Mid-Tex Gas Division Addition 080.54703 38200 28 080 190 - Mid-Tex Gas Division Addition 080.54703 38300 28 080 190 - Mid-Tex Gas Division Addition 080.54704 37602 1,211 080 190 - Mid-Tex Gas Division Addition 080.54704 38000 516 080 190 - Mid-Tex Gas Division Addition 080.54704 38100 104 080 190 - Mid-Tex Gas Division Addition 080.54704 38200 104 080 190 - Mid-Tex Gas Division Addition 080.54704 38300 104 080 190 - Mid-Tex Gas Division Addition 080.54705 37602 640 080 190 - Mid-Tex Gas Division Addition 080.54705 38000 267 080 190 - Mid-Tex Gas Division Addition 080.54705 38100 53 080 190 - Mid-Tex Gas Division Addition 080.54705 38200 53 080 190 - Mid-Tex Gas Division Addition 080.54705 38300 53 080 190 - Mid-Tex Gas Division Addition 080.54706 37602 603 080 190 - Mid-Tex Gas Division Addition 080.54706 38000 56 080 190 - Mid-Tex Gas Division Addition 080.54706 38100 84 080 190 - Mid-Tex Gas Division Addition 080.54706 38200 93 080 190 - Mid-Tex Gas Division Addition 080.54706 38300 93 080 190 - Mid-Tex Gas Division Addition 080.54707 37602 555 080 190 - Mid-Tex Gas Division Addition 080.54707 38000 185 080 190 - Mid-Tex Gas Division Addition 080.54707 38100 46 080 190 - Mid-Tex Gas Division Addition 080.54707 38200 46 080 190 - Mid-Tex Gas Division Addition 080.54707 38300 46 080 190 - Mid-Tex Gas Division Addition 080.54709 37602 670 080 190 - Mid-Tex Gas Division Addition 080.54709 38000 96 080 190 - Mid-Tex Gas Division Addition 080.54709 38100 96 080 190 - Mid-Tex Gas Division Addition 080.54709 38200 48 080 190 - Mid-Tex Gas Division Addition 080.54709 38300 48 080 190 - Mid-Tex Gas Division Addition 080.54710 38000 2,941 080 190 - Mid-Tex Gas Division Addition 080.54710 38100 346 080 190 - Mid-Tex Gas Division Addition 080.54710 38200 17 080 190 - Mid-Tex Gas Division Addition 080.54710 38300 59 080 190 - Mid-Tex Gas Division Addition 080.54711 37602 1,305 080 190 - Mid-Tex Gas Division Addition 080.54711 38000 704 080 190 - Mid-Tex Gas Division Addition 080.54711 38100 339 080 190 - Mid-Tex Gas Division Addition 080.54711 38200 130 080 190 - Mid-Tex Gas Division Addition 080.54711 38300 130 080 190 - Mid-Tex Gas Division Addition 080.54716 37602 1,154 080 190 - Mid-Tex Gas Division Addition 080.54716 38000 216 080 190 - Mid-Tex Gas Division Addition 080.54716 38100 43 080 190 - Mid-Tex Gas Division Addition 080.54716 38200 14 080 190 - Mid-Tex Gas Division Addition 080.54716 38300 14 080 190 - Mid-Tex Gas Division Addition 080.54717 37602 558 080 190 - Mid-Tex Gas Division Addition 080.54717 38000 233 080 190 - Mid-Tex Gas Division Addition 080.54717 38100 47 080 190 - Mid-Tex Gas Division Addition 080.54717 38200 47 080 190 - Mid-Tex Gas Division Addition 080.54717 38300 47 080 190 - Mid-Tex Gas Division Addition 080.54718 37602 598 080 190 - Mid-Tex Gas Division Addition 080.54718 38000 10 080 190 - Mid-Tex Gas Division Addition 080.54723 37602 1,379 080 190 - Mid-Tex Gas Division Addition 080.54723 38000 160 080 190 - Mid-Tex Gas Division Addition 080.54723 38100 32 080 190 - Mid-Tex Gas Division Addition 080.54723 38300 32 080 190 - Mid-Tex Gas Division Addition 080.54727 37602 231 080 190 - Mid-Tex Gas Division Addition 080.54727 38000 26 080 190 - Mid-Tex Gas Division Addition 080.54733 37601 104,757 080 190 - Mid-Tex Gas Division Addition 080.54733 37602 1,233 080 190 - Mid-Tex Gas Division Addition 080.54733 37800 17,252 080 190 - Mid-Tex Gas Division Addition 080.54748 37601 4,594 080 190 - Mid-Tex Gas Division Addition 080.54759 37602 297 080 190 - Mid-Tex Gas Division Addition 080.54761 37602 438 080 190 - Mid-Tex Gas Division Addition 080.54761 38000 233 080 190 - Mid-Tex Gas Division Addition 080.54761 38100 39 080 190 - Mid-Tex Gas Division Addition 080.54761 38200 1 080 190 - Mid-Tex Gas Division Addition 080.54761 38300 3 080 190 - Mid-Tex Gas Division Addition 080.54794 37602 755 080 190 - Mid-Tex Gas Division Addition 080.54794 38000 385 080 190 - Mid-Tex Gas Division Addition 080.54794 38100 241 080 190 - Mid-Tex Gas Division Addition 080.54794 38200 112 080 190 - Mid-Tex Gas Division Addition 080.54794 38300 112 080 190 - Mid-Tex Gas Division Addition 080.54795 37602 1,237 080 190 - Mid-Tex Gas Division Addition 080.54797 37602 1,316 080 190 - Mid-Tex Gas Division Addition 080.54797 38000 439 080 190 - Mid-Tex Gas Division Addition 080.54797 38100 219 080 190 - Mid-Tex Gas Division Addition 080.54797 38200 110 080 190 - Mid-Tex Gas Division Addition 080.54797 38300 110 080 190 - Mid-Tex Gas Division Addition 080.54799 37601 12 080 190 - Mid-Tex Gas Division Addition 080.54817 37602 856 080 190 - Mid-Tex Gas Division Addition 080.54817 38000 114 080 190 - Mid-Tex Gas Division Addition 080.54817 38100 57 080 190 - Mid-Tex Gas Division Addition 080.54817 38200 57 080 190 - Mid-Tex Gas Division Addition 080.54817 38300 57 080 190 - Mid-Tex Gas Division Addition 080.54818 37602 276 080 190 - Mid-Tex Gas Division Addition 080.54818 38000 232 080 190 - Mid-Tex Gas Division Addition 080.54818 38100 22 080 190 - Mid-Tex Gas Division Addition 080.54818 38200 11 080 190 - Mid-Tex Gas Division Addition 080.54818 38300 11 080 190 - Mid-Tex Gas Division Addition 080.54835 38000 1,360 080 190 - Mid-Tex Gas Division Addition 080.54835 38100 544 080 190 - Mid-Tex Gas Division Addition 080.54835 38200 408 080 190 - Mid-Tex Gas Division Addition 080.54835 38300 408 080 190 - Mid-Tex Gas Division Addition 080.54837 38000 3,941
MTX Additions by FERCPage 29 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.54837 38100 232 080 190 - Mid-Tex Gas Division Addition 080.54837 38200 232 080 190 - Mid-Tex Gas Division Addition 080.54837 38300 232 080 190 - Mid-Tex Gas Division Addition 080.54838 38000 380 080 190 - Mid-Tex Gas Division Addition 080.54838 38100 633 080 190 - Mid-Tex Gas Division Addition 080.54838 38200 760 080 190 - Mid-Tex Gas Division Addition 080.54838 38300 760 080 190 - Mid-Tex Gas Division Addition 080.54839 38000 3,164 080 190 - Mid-Tex Gas Division Addition 080.54839 38100 33 080 190 - Mid-Tex Gas Division Addition 080.54839 38200 33 080 190 - Mid-Tex Gas Division Addition 080.54839 38300 33 080 190 - Mid-Tex Gas Division Addition 080.54842 38000 4,666 080 190 - Mid-Tex Gas Division Addition 080.54842 38100 149 080 190 - Mid-Tex Gas Division Addition 080.54842 38200 50 080 190 - Mid-Tex Gas Division Addition 080.54842 38300 99 080 190 - Mid-Tex Gas Division Addition 080.54853 38100 227 080 190 - Mid-Tex Gas Division Addition 080.54854 37602 2,312 080 190 - Mid-Tex Gas Division Addition 080.54854 38000 385 080 190 - Mid-Tex Gas Division Addition 080.54854 38100 385 080 190 - Mid-Tex Gas Division Addition 080.54854 38200 385 080 190 - Mid-Tex Gas Division Addition 080.54854 38300 385 080 190 - Mid-Tex Gas Division Addition 080.54858 37602 19,572 080 190 - Mid-Tex Gas Division Addition 080.54858 38000 1,505 080 190 - Mid-Tex Gas Division Addition 080.54858 38100 3,011 080 190 - Mid-Tex Gas Division Addition 080.54858 38200 3,011 080 190 - Mid-Tex Gas Division Addition 080.54858 38300 3,011 080 190 - Mid-Tex Gas Division Addition 080.54859 37602 2,949 080 190 - Mid-Tex Gas Division Addition 080.54860 37600 256 080 190 - Mid-Tex Gas Division Addition 080.54863 37602 1,961 080 190 - Mid-Tex Gas Division Addition 080.54863 38000 346 080 190 - Mid-Tex Gas Division Addition 080.54874 38000 179 080 190 - Mid-Tex Gas Division Addition 080.54875 37602 2,627 080 190 - Mid-Tex Gas Division Addition 080.54875 38000 761 080 190 - Mid-Tex Gas Division Addition 080.54875 38100 44 080 190 - Mid-Tex Gas Division Addition 080.54875 38200 35 080 190 - Mid-Tex Gas Division Addition 080.54875 38300 64 080 190 - Mid-Tex Gas Division Addition 080.54876 37602 141 080 190 - Mid-Tex Gas Division Addition 080.54882 37602 205 080 190 - Mid-Tex Gas Division Addition 080.54882 38200 2 080 190 - Mid-Tex Gas Division Addition 080.54882 38300 4 080 190 - Mid-Tex Gas Division Addition 080.54886 37602 128 080 190 - Mid-Tex Gas Division Addition 080.54886 38000 9 080 190 - Mid-Tex Gas Division Addition 080.54886 38100 18 080 190 - Mid-Tex Gas Division Addition 080.54886 38200 18 080 190 - Mid-Tex Gas Division Addition 080.54886 38300 9 080 190 - Mid-Tex Gas Division Addition 080.54894 37602 34,703 080 190 - Mid-Tex Gas Division Addition 080.54895 37602 816 080 190 - Mid-Tex Gas Division Addition 080.54895 38000 45 080 190 - Mid-Tex Gas Division Addition 080.54895 38100 27 080 190 - Mid-Tex Gas Division Addition 080.54895 38200 9 080 190 - Mid-Tex Gas Division Addition 080.54895 38300 9 080 190 - Mid-Tex Gas Division Addition 080.54909 37602 1,183 080 190 - Mid-Tex Gas Division Addition 080.54909 38000 266 080 190 - Mid-Tex Gas Division Addition 080.54909 38100 15 080 190 - Mid-Tex Gas Division Addition 080.54909 38200 15 080 190 - Mid-Tex Gas Division Addition 080.54910 37602 813 080 190 - Mid-Tex Gas Division Addition 080.54910 38000 18 080 190 - Mid-Tex Gas Division Addition 080.54910 38100 27 080 190 - Mid-Tex Gas Division Addition 080.54910 38200 18 080 190 - Mid-Tex Gas Division Addition 080.54910 38300 18 080 190 - Mid-Tex Gas Division Addition 080.54912 38000 461 080 190 - Mid-Tex Gas Division Addition 080.54912 38100 29 080 190 - Mid-Tex Gas Division Addition 080.54912 38200 10 080 190 - Mid-Tex Gas Division Addition 080.54912 38300 10 080 190 - Mid-Tex Gas Division Addition 080.54926 37602 494 080 190 - Mid-Tex Gas Division Addition 080.54926 38000 16 080 190 - Mid-Tex Gas Division Addition 080.54926 38200 5 080 190 - Mid-Tex Gas Division Addition 080.54926 38300 5 080 190 - Mid-Tex Gas Division Addition 080.54927 37602 370 080 190 - Mid-Tex Gas Division Addition 080.54931 37602 856 080 190 - Mid-Tex Gas Division Addition 080.54934 37602 6,024 080 190 - Mid-Tex Gas Division Addition 080.54934 38000 717 080 190 - Mid-Tex Gas Division Addition 080.54934 38100 287 080 190 - Mid-Tex Gas Division Addition 080.54934 38200 72 080 190 - Mid-Tex Gas Division Addition 080.54934 38300 72 080 190 - Mid-Tex Gas Division Addition 080.54942 38000 3,363 080 190 - Mid-Tex Gas Division Addition 080.54942 38100 75 080 190 - Mid-Tex Gas Division Addition 080.54942 38200 149 080 190 - Mid-Tex Gas Division Addition 080.54942 38300 149 080 190 - Mid-Tex Gas Division Addition 080.54943 37602 2,320 080 190 - Mid-Tex Gas Division Addition 080.54955 37602 1,053 080 190 - Mid-Tex Gas Division Addition 080.54955 38000 804 080 190 - Mid-Tex Gas Division Addition 080.54955 38100 19 080 190 - Mid-Tex Gas Division Addition 080.54955 38200 19 080 190 - Mid-Tex Gas Division Addition 080.54955 38300 19 080 190 - Mid-Tex Gas Division Addition 080.54961 37900 15 080 190 - Mid-Tex Gas Division Addition 080.54964 37602 773 080 190 - Mid-Tex Gas Division Addition 080.54965 37602 283 080 190 - Mid-Tex Gas Division Addition 080.54967 37602 594 080 190 - Mid-Tex Gas Division Addition 080.54969 37602 767 080 190 - Mid-Tex Gas Division Addition 080.54969 38000 24 080 190 - Mid-Tex Gas Division Addition 080.54984 37602 383 080 190 - Mid-Tex Gas Division Addition 080.54984 38000 1,246 080 190 - Mid-Tex Gas Division Addition 080.54984 38100 115 080 190 - Mid-Tex Gas Division Addition 080.54984 38200 77 080 190 - Mid-Tex Gas Division Addition 080.54984 38300 96 080 190 - Mid-Tex Gas Division Addition 080.54988 38000 1,625 080 190 - Mid-Tex Gas Division Addition 080.54988 38100 203 080 190 - Mid-Tex Gas Division Addition 080.54988 38200 102 080 190 - Mid-Tex Gas Division Addition 080.54988 38300 102 080 190 - Mid-Tex Gas Division Addition 080.54993 37602 370 080 190 - Mid-Tex Gas Division Addition 080.54993 38000 74 080 190 - Mid-Tex Gas Division Addition 080.54993 38100 25 080 190 - Mid-Tex Gas Division Addition 080.54993 38200 25 080 190 - Mid-Tex Gas Division Addition 080.55009 37602 5 080 190 - Mid-Tex Gas Division Addition 080.55018 37602 159 080 190 - Mid-Tex Gas Division Addition 080.55022 37602 906 080 190 - Mid-Tex Gas Division Addition 080.55022 38000 43
MTX Additions by FERCPage 30 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.55022 38100 96 080 190 - Mid-Tex Gas Division Addition 080.55022 38200 5 080 190 - Mid-Tex Gas Division Addition 080.55022 38300 16 080 190 - Mid-Tex Gas Division Addition 080.55026 37602 1,390 080 190 - Mid-Tex Gas Division Addition 080.55026 38000 321 080 190 - Mid-Tex Gas Division Addition 080.55026 38100 214 080 190 - Mid-Tex Gas Division Addition 080.55026 38200 107 080 190 - Mid-Tex Gas Division Addition 080.55026 38300 107 080 190 - Mid-Tex Gas Division Addition 080.55033 37602 484 080 190 - Mid-Tex Gas Division Addition 080.55033 38000 27 080 190 - Mid-Tex Gas Division Addition 080.55033 38200 11 080 190 - Mid-Tex Gas Division Addition 080.55033 38300 11 080 190 - Mid-Tex Gas Division Addition 080.55041 37601 52 080 190 - Mid-Tex Gas Division Addition 080.55041 37602 935 080 190 - Mid-Tex Gas Division Addition 080.55041 38000 52 080 190 - Mid-Tex Gas Division Addition 080.55042 37601 541 080 190 - Mid-Tex Gas Division Addition 080.55043 37602 1,342 080 190 - Mid-Tex Gas Division Addition 080.55043 38000 349 080 190 - Mid-Tex Gas Division Addition 080.55043 38100 17 080 190 - Mid-Tex Gas Division Addition 080.55043 38200 17 080 190 - Mid-Tex Gas Division Addition 080.55043 38300 17 080 190 - Mid-Tex Gas Division Addition 080.55045 37602 1,638 080 190 - Mid-Tex Gas Division Addition 080.55045 38000 504 080 190 - Mid-Tex Gas Division Addition 080.55045 38100 126 080 190 - Mid-Tex Gas Division Addition 080.55045 38200 126 080 190 - Mid-Tex Gas Division Addition 080.55045 38300 126 080 190 - Mid-Tex Gas Division Addition 080.55047 37602 955 080 190 - Mid-Tex Gas Division Addition 080.55047 38000 6 080 190 - Mid-Tex Gas Division Addition 080.55047 38100 10 080 190 - Mid-Tex Gas Division Addition 080.55047 38200 10 080 190 - Mid-Tex Gas Division Addition 080.55047 38300 10 080 190 - Mid-Tex Gas Division Addition 080.55049 37601 859 080 190 - Mid-Tex Gas Division Addition 080.55054 37602 1,129 080 190 - Mid-Tex Gas Division Addition 080.55054 38000 470 080 190 - Mid-Tex Gas Division Addition 080.55054 38100 94 080 190 - Mid-Tex Gas Division Addition 080.55054 38200 94 080 190 - Mid-Tex Gas Division Addition 080.55054 38300 94 080 190 - Mid-Tex Gas Division Addition 080.55055 37602 596 080 190 - Mid-Tex Gas Division Addition 080.55055 38000 464 080 190 - Mid-Tex Gas Division Addition 080.55055 38100 132 080 190 - Mid-Tex Gas Division Addition 080.55055 38200 66 080 190 - Mid-Tex Gas Division Addition 080.55055 38300 66 080 190 - Mid-Tex Gas Division Addition 080.55059 37602 696 080 190 - Mid-Tex Gas Division Addition 080.55059 38000 37 080 190 - Mid-Tex Gas Division Addition 080.55060 37602 39,865 080 190 - Mid-Tex Gas Division Addition 080.55060 38000 13,954 080 190 - Mid-Tex Gas Division Addition 080.55064 37602 1,954 080 190 - Mid-Tex Gas Division Addition 080.55064 38000 498 080 190 - Mid-Tex Gas Division Addition 080.55064 38100 79 080 190 - Mid-Tex Gas Division Addition 080.55064 38200 7 080 190 - Mid-Tex Gas Division Addition 080.55064 38300 8 080 190 - Mid-Tex Gas Division Addition 080.55065 37601 692,700 080 190 - Mid-Tex Gas Division Addition 080.55065 37602 86,035 080 190 - Mid-Tex Gas Division Addition 080.55065 37800 68,828 080 190 - Mid-Tex Gas Division Addition 080.55065 38000 8,604 080 190 - Mid-Tex Gas Division Addition 080.55067 37602 750 080 190 - Mid-Tex Gas Division Addition 080.55067 38000 152 080 190 - Mid-Tex Gas Division Addition 080.55067 38100 9 080 190 - Mid-Tex Gas Division Addition 080.55067 38200 5 080 190 - Mid-Tex Gas Division Addition 080.55067 38300 5 080 190 - Mid-Tex Gas Division Addition 080.55070 37602 926 080 190 - Mid-Tex Gas Division Addition 080.55070 38000 49 080 190 - Mid-Tex Gas Division Addition 080.55073 37602 219 080 190 - Mid-Tex Gas Division Addition 080.55073 38000 219 080 190 - Mid-Tex Gas Division Addition 080.55073 38100 63 080 190 - Mid-Tex Gas Division Addition 080.55073 38200 63 080 190 - Mid-Tex Gas Division Addition 080.55073 38300 63 080 190 - Mid-Tex Gas Division Addition 080.55074 37602 162 080 190 - Mid-Tex Gas Division Addition 080.55079 37602 927 080 190 - Mid-Tex Gas Division Addition 080.55079 38000 278 080 190 - Mid-Tex Gas Division Addition 080.55079 38100 463 080 190 - Mid-Tex Gas Division Addition 080.55079 38200 93 080 190 - Mid-Tex Gas Division Addition 080.55079 38300 93 080 190 - Mid-Tex Gas Division Addition 080.55083 37602 1,898 080 190 - Mid-Tex Gas Division Addition 080.55083 38000 136 080 190 - Mid-Tex Gas Division Addition 080.55083 38100 1,740 080 190 - Mid-Tex Gas Division Addition 080.55083 38200 45 080 190 - Mid-Tex Gas Division Addition 080.55083 38300 45 080 190 - Mid-Tex Gas Division Addition 080.55091 37602 2,788 080 190 - Mid-Tex Gas Division Addition 080.55097 37602 713 080 190 - Mid-Tex Gas Division Addition 080.55097 38000 334 080 190 - Mid-Tex Gas Division Addition 080.55097 38100 22 080 190 - Mid-Tex Gas Division Addition 080.55097 38200 22 080 190 - Mid-Tex Gas Division Addition 080.55097 38300 22 080 190 - Mid-Tex Gas Division Addition 080.55100 37602 1,008 080 190 - Mid-Tex Gas Division Addition 080.55100 38000 53 080 190 - Mid-Tex Gas Division Addition 080.55111 37601 14 080 190 - Mid-Tex Gas Division Addition 080.55132 38000 82 080 190 - Mid-Tex Gas Division Addition 080.55144 37602 1,279 080 190 - Mid-Tex Gas Division Addition 080.55144 38000 13 080 190 - Mid-Tex Gas Division Addition 080.55156 37602 940 080 190 - Mid-Tex Gas Division Addition 080.55157 37602 333 080 190 - Mid-Tex Gas Division Addition 080.55166 37602 309 080 190 - Mid-Tex Gas Division Addition 080.55170 37602 27,250 080 190 - Mid-Tex Gas Division Addition 080.55172 37602 2,021 080 190 - Mid-Tex Gas Division Addition 080.55172 38000 112 080 190 - Mid-Tex Gas Division Addition 080.55172 38200 67 080 190 - Mid-Tex Gas Division Addition 080.55172 38300 45 080 190 - Mid-Tex Gas Division Addition 080.55178 37602 2,077 080 190 - Mid-Tex Gas Division Addition 080.55178 38000 119 080 190 - Mid-Tex Gas Division Addition 080.55178 38100 95 080 190 - Mid-Tex Gas Division Addition 080.55178 38200 48 080 190 - Mid-Tex Gas Division Addition 080.55178 38300 48 080 190 - Mid-Tex Gas Division Addition 080.55180 37602 2,896 080 190 - Mid-Tex Gas Division Addition 080.55180 38000 152 080 190 - Mid-Tex Gas Division Addition 080.55192 37602 983 080 190 - Mid-Tex Gas Division Addition 080.55192 38000 688 080 190 - Mid-Tex Gas Division Addition 080.55192 38100 98
MTX Additions by FERCPage 31 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.55192 38200 98 080 190 - Mid-Tex Gas Division Addition 080.55192 38300 98 080 190 - Mid-Tex Gas Division Addition 080.55195 37602 2,056 080 190 - Mid-Tex Gas Division Addition 080.55195 38100 257 080 190 - Mid-Tex Gas Division Addition 080.55195 38200 129 080 190 - Mid-Tex Gas Division Addition 080.55195 38300 129 080 190 - Mid-Tex Gas Division Addition 080.55196 37602 2,244 080 190 - Mid-Tex Gas Division Addition 080.55196 38000 601 080 190 - Mid-Tex Gas Division Addition 080.55196 38100 80 080 190 - Mid-Tex Gas Division Addition 080.55196 38200 3 080 190 - Mid-Tex Gas Division Addition 080.55196 38300 1 080 190 - Mid-Tex Gas Division Addition 080.55203 37602 619 080 190 - Mid-Tex Gas Division Addition 080.55203 38000 433 080 190 - Mid-Tex Gas Division Addition 080.55203 38100 62 080 190 - Mid-Tex Gas Division Addition 080.55203 38200 62 080 190 - Mid-Tex Gas Division Addition 080.55203 38300 62 080 190 - Mid-Tex Gas Division Addition 080.55204 37602 29,357 080 190 - Mid-Tex Gas Division Addition 080.55204 38000 10,182 080 190 - Mid-Tex Gas Division Addition 080.55205 37602 390 080 190 - Mid-Tex Gas Division Addition 080.55205 38000 163 080 190 - Mid-Tex Gas Division Addition 080.55205 38100 33 080 190 - Mid-Tex Gas Division Addition 080.55205 38200 33 080 190 - Mid-Tex Gas Division Addition 080.55205 38300 33 080 190 - Mid-Tex Gas Division Addition 080.55206 37602 554 080 190 - Mid-Tex Gas Division Addition 080.55206 38000 119 080 190 - Mid-Tex Gas Division Addition 080.55206 38100 40 080 190 - Mid-Tex Gas Division Addition 080.55206 38200 40 080 190 - Mid-Tex Gas Division Addition 080.55206 38300 40 080 190 - Mid-Tex Gas Division Addition 080.55210 37602 15,061 080 190 - Mid-Tex Gas Division Addition 080.55210 38000 1,772 080 190 - Mid-Tex Gas Division Addition 080.55211 37602 460 080 190 - Mid-Tex Gas Division Addition 080.55219 37602 49 080 190 - Mid-Tex Gas Division Addition 080.55221 37602 1,794 080 190 - Mid-Tex Gas Division Addition 080.55221 38000 199 080 190 - Mid-Tex Gas Division Addition 080.55230 37602 483 080 190 - Mid-Tex Gas Division Addition 080.55230 38000 104 080 190 - Mid-Tex Gas Division Addition 080.55230 38100 35 080 190 - Mid-Tex Gas Division Addition 080.55230 38200 35 080 190 - Mid-Tex Gas Division Addition 080.55230 38300 35 080 190 - Mid-Tex Gas Division Addition 080.55232 37602 332 080 190 - Mid-Tex Gas Division Addition 080.55232 38000 30 080 190 - Mid-Tex Gas Division Addition 080.55232 38100 8 080 190 - Mid-Tex Gas Division Addition 080.55232 38200 8 080 190 - Mid-Tex Gas Division Addition 080.55233 37602 41 080 190 - Mid-Tex Gas Division Addition 080.55234 37602 1,025 080 190 - Mid-Tex Gas Division Addition 080.55239 37602 767 080 190 - Mid-Tex Gas Division Addition 080.55239 38000 272 080 190 - Mid-Tex Gas Division Addition 080.55239 38100 99 080 190 - Mid-Tex Gas Division Addition 080.55239 38200 49 080 190 - Mid-Tex Gas Division Addition 080.55239 38300 49 080 190 - Mid-Tex Gas Division Addition 080.55241 37602 1,271 080 190 - Mid-Tex Gas Division Addition 080.55241 38000 163 080 190 - Mid-Tex Gas Division Addition 080.55241 38100 163 080 190 - Mid-Tex Gas Division Addition 080.55241 38200 16 080 190 - Mid-Tex Gas Division Addition 080.55241 38300 16 080 190 - Mid-Tex Gas Division Addition 080.55244 37602 520 080 190 - Mid-Tex Gas Division Addition 080.55244 37800 1 080 190 - Mid-Tex Gas Division Addition 080.55244 38000 0.29 080 190 - Mid-Tex Gas Division Addition 080.55251 37602 874 080 190 - Mid-Tex Gas Division Addition 080.55251 38000 233 080 190 - Mid-Tex Gas Division Addition 080.55251 38100 35 080 190 - Mid-Tex Gas Division Addition 080.55251 38200 12 080 190 - Mid-Tex Gas Division Addition 080.55251 38300 12 080 190 - Mid-Tex Gas Division Addition 080.55257 37602 2,984 080 190 - Mid-Tex Gas Division Addition 080.55257 38000 157 080 190 - Mid-Tex Gas Division Addition 080.55257 38100 27 080 190 - Mid-Tex Gas Division Addition 080.55257 38200 7 080 190 - Mid-Tex Gas Division Addition 080.55257 38300 10 080 190 - Mid-Tex Gas Division Addition 080.55259 37602 213 080 190 - Mid-Tex Gas Division Addition 080.55259 38100 2 080 190 - Mid-Tex Gas Division Addition 080.55259 38200 2 080 190 - Mid-Tex Gas Division Addition 080.55259 38300 2 080 190 - Mid-Tex Gas Division Addition 080.55260 37602 1,012 080 190 - Mid-Tex Gas Division Addition 080.55260 38000 675 080 190 - Mid-Tex Gas Division Addition 080.55267 37602 358 080 190 - Mid-Tex Gas Division Addition 080.55267 38000 251 080 190 - Mid-Tex Gas Division Addition 080.55267 38100 6 080 190 - Mid-Tex Gas Division Addition 080.55267 38200 6 080 190 - Mid-Tex Gas Division Addition 080.55267 38300 6 080 190 - Mid-Tex Gas Division Addition 080.55279 37602 1,804 080 190 - Mid-Tex Gas Division Addition 080.55279 38000 492 080 190 - Mid-Tex Gas Division Addition 080.55279 38100 656 080 190 - Mid-Tex Gas Division Addition 080.55279 38200 164 080 190 - Mid-Tex Gas Division Addition 080.55279 38300 164 080 190 - Mid-Tex Gas Division Addition 080.55280 37602 2,105 080 190 - Mid-Tex Gas Division Addition 080.55280 38000 2,339 080 190 - Mid-Tex Gas Division Addition 080.55280 38100 187 080 190 - Mid-Tex Gas Division Addition 080.55280 38200 47 080 190 - Mid-Tex Gas Division Addition 080.55288 37602 1,195 080 190 - Mid-Tex Gas Division Addition 080.55288 38000 351 080 190 - Mid-Tex Gas Division Addition 080.55288 38100 16 080 190 - Mid-Tex Gas Division Addition 080.55288 38200 16 080 190 - Mid-Tex Gas Division Addition 080.55288 38300 16 080 190 - Mid-Tex Gas Division Addition 080.55294 37600 168 080 190 - Mid-Tex Gas Division Addition 080.55299 37602 108,031 080 190 - Mid-Tex Gas Division Addition 080.55300 37602 7 080 190 - Mid-Tex Gas Division Addition 080.55301 37800 38 080 190 - Mid-Tex Gas Division Addition 080.55304 37602 34,030 080 190 - Mid-Tex Gas Division Addition 080.55304 38000 3,366 080 190 - Mid-Tex Gas Division Addition 080.55305 37602 5,251 080 190 - Mid-Tex Gas Division Addition 080.55320 37602 43,859 080 190 - Mid-Tex Gas Division Addition 080.55320 38000 7,048 080 190 - Mid-Tex Gas Division Addition 080.55321 37602 843 080 190 - Mid-Tex Gas Division Addition 080.55321 38000 281 080 190 - Mid-Tex Gas Division Addition 080.55321 38100 197 080 190 - Mid-Tex Gas Division Addition 080.55321 38200 42 080 190 - Mid-Tex Gas Division Addition 080.55321 38300 857 080 190 - Mid-Tex Gas Division Addition 080.55322 37602 2,997
MTX Additions by FERCPage 32 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.55322 38000 1,285 080 190 - Mid-Tex Gas Division Addition 080.55335 37602 1,178 080 190 - Mid-Tex Gas Division Addition 080.55335 38000 65 080 190 - Mid-Tex Gas Division Addition 080.55335 38200 39 080 190 - Mid-Tex Gas Division Addition 080.55335 38300 26 080 190 - Mid-Tex Gas Division Addition 080.55337 37601 46,485 080 190 - Mid-Tex Gas Division Addition 080.55337 37602 1,024 080 190 - Mid-Tex Gas Division Addition 080.55337 37800 3,584 080 190 - Mid-Tex Gas Division Addition 080.55343 37602 44 080 190 - Mid-Tex Gas Division Addition 080.55346 37602 2,992 080 190 - Mid-Tex Gas Division Addition 080.55350 37602 213 080 190 - Mid-Tex Gas Division Addition 080.55350 38000 53 080 190 - Mid-Tex Gas Division Addition 080.55351 37602 3,029 080 190 - Mid-Tex Gas Division Addition 080.55351 38000 94 080 190 - Mid-Tex Gas Division Addition 080.55352 37602 156 080 190 - Mid-Tex Gas Division Addition 080.55379 37602 757 080 190 - Mid-Tex Gas Division Addition 080.55379 38000 437 080 190 - Mid-Tex Gas Division Addition 080.55379 38100 168 080 190 - Mid-Tex Gas Division Addition 080.55379 38200 135 080 190 - Mid-Tex Gas Division Addition 080.55379 38300 168 080 190 - Mid-Tex Gas Division Addition 080.55380 37602 1,456 080 190 - Mid-Tex Gas Division Addition 080.55380 38000 485 080 190 - Mid-Tex Gas Division Addition 080.55380 38100 243 080 190 - Mid-Tex Gas Division Addition 080.55380 38200 121 080 190 - Mid-Tex Gas Division Addition 080.55380 38300 121 080 190 - Mid-Tex Gas Division Addition 080.55383 37602 127 080 190 - Mid-Tex Gas Division Addition 080.55383 38000 22 080 190 - Mid-Tex Gas Division Addition 080.55386 37602 672 080 190 - Mid-Tex Gas Division Addition 080.55386 38000 363 080 190 - Mid-Tex Gas Division Addition 080.55386 38100 22 080 190 - Mid-Tex Gas Division Addition 080.55386 38200 22 080 190 - Mid-Tex Gas Division Addition 080.55386 38300 22 080 190 - Mid-Tex Gas Division Addition 080.55387 37602 502 080 190 - Mid-Tex Gas Division Addition 080.55387 38000 26 080 190 - Mid-Tex Gas Division Addition 080.55397 37602 1,232 080 190 - Mid-Tex Gas Division Addition 080.55397 38000 140 080 190 - Mid-Tex Gas Division Addition 080.55397 38100 14 080 190 - Mid-Tex Gas Division Addition 080.55397 38300 14 080 190 - Mid-Tex Gas Division Addition 080.55405 37601 176,514 080 190 - Mid-Tex Gas Division Addition 080.55405 37800 17,661 080 190 - Mid-Tex Gas Division Addition 080.55415 37602 1,139 080 190 - Mid-Tex Gas Division Addition 080.55417 37600 300 080 190 - Mid-Tex Gas Division Addition 080.55419 37602 3,888 080 190 - Mid-Tex Gas Division Addition 080.55419 38000 515 080 190 - Mid-Tex Gas Division Addition 080.55419 38100 187 080 190 - Mid-Tex Gas Division Addition 080.55419 38200 47 080 190 - Mid-Tex Gas Division Addition 080.55419 38300 47 080 190 - Mid-Tex Gas Division Addition 080.55422 37602 1,320 080 190 - Mid-Tex Gas Division Addition 080.55422 38000 377 080 190 - Mid-Tex Gas Division Addition 080.55422 38100 94 080 190 - Mid-Tex Gas Division Addition 080.55422 38300 94 080 190 - Mid-Tex Gas Division Addition 080.55423 37602 1,201 080 190 - Mid-Tex Gas Division Addition 080.55423 38000 63 080 190 - Mid-Tex Gas Division Addition 080.55424 37602 1,210 080 190 - Mid-Tex Gas Division Addition 080.55424 38000 465 080 190 - Mid-Tex Gas Division Addition 080.55424 38100 93 080 190 - Mid-Tex Gas Division Addition 080.55424 38300 93 080 190 - Mid-Tex Gas Division Addition 080.55425 37602 532 080 190 - Mid-Tex Gas Division Addition 080.55425 38000 22 080 190 - Mid-Tex Gas Division Addition 080.55427 37602 (93,826) 080 190 - Mid-Tex Gas Division Addition 080.55432 37602 453 080 190 - Mid-Tex Gas Division Addition 080.55432 38000 24 080 190 - Mid-Tex Gas Division Addition 080.55432 38100 5 080 190 - Mid-Tex Gas Division Addition 080.55437 37602 159 080 190 - Mid-Tex Gas Division Addition 080.55441 37601 588 080 190 - Mid-Tex Gas Division Addition 080.55445 37602 417 080 190 - Mid-Tex Gas Division Addition 080.55445 38000 118 080 190 - Mid-Tex Gas Division Addition 080.55445 38100 12 080 190 - Mid-Tex Gas Division Addition 080.55445 38200 3 080 190 - Mid-Tex Gas Division Addition 080.55445 38300 3 080 190 - Mid-Tex Gas Division Addition 080.55469 37602 1,364 080 190 - Mid-Tex Gas Division Addition 080.55469 38000 193 080 190 - Mid-Tex Gas Division Addition 080.55469 38100 32 080 190 - Mid-Tex Gas Division Addition 080.55469 38300 16 080 190 - Mid-Tex Gas Division Addition 080.55470 38000 3,064 080 190 - Mid-Tex Gas Division Addition 080.55470 38100 32 080 190 - Mid-Tex Gas Division Addition 080.55470 38200 32 080 190 - Mid-Tex Gas Division Addition 080.55470 38300 32 080 190 - Mid-Tex Gas Division Addition 080.55471 37601 632 080 190 - Mid-Tex Gas Division Addition 080.55474 37602 616 080 190 - Mid-Tex Gas Division Addition 080.55484 37602 503 080 190 - Mid-Tex Gas Division Addition 080.55484 38000 302 080 190 - Mid-Tex Gas Division Addition 080.55484 38100 101 080 190 - Mid-Tex Gas Division Addition 080.55484 38200 50 080 190 - Mid-Tex Gas Division Addition 080.55484 38300 50 080 190 - Mid-Tex Gas Division Addition 080.55485 37602 909 080 190 - Mid-Tex Gas Division Addition 080.55485 38000 160 080 190 - Mid-Tex Gas Division Addition 080.55487 37602 1,346 080 190 - Mid-Tex Gas Division Addition 080.55487 38000 462 080 190 - Mid-Tex Gas Division Addition 080.55487 38100 38 080 190 - Mid-Tex Gas Division Addition 080.55487 38200 38 080 190 - Mid-Tex Gas Division Addition 080.55487 38300 38 080 190 - Mid-Tex Gas Division Addition 080.55488 37602 2,429 080 190 - Mid-Tex Gas Division Addition 080.55488 38000 929 080 190 - Mid-Tex Gas Division Addition 080.55488 38100 71 080 190 - Mid-Tex Gas Division Addition 080.55488 38200 71 080 190 - Mid-Tex Gas Division Addition 080.55488 38300 71 080 190 - Mid-Tex Gas Division Addition 080.55491 37602 165 080 190 - Mid-Tex Gas Division Addition 080.55491 38000 2 080 190 - Mid-Tex Gas Division Addition 080.55495 37602 23,251 080 190 - Mid-Tex Gas Division Addition 080.55512 38000 2,900 080 190 - Mid-Tex Gas Division Addition 080.55512 38100 30 080 190 - Mid-Tex Gas Division Addition 080.55512 38200 30 080 190 - Mid-Tex Gas Division Addition 080.55512 38300 30 080 190 - Mid-Tex Gas Division Addition 080.55513 38000 5,651 080 190 - Mid-Tex Gas Division Addition 080.55513 38100 208 080 190 - Mid-Tex Gas Division Addition 080.55513 38200 30 080 190 - Mid-Tex Gas Division Addition 080.55513 38300 59
MTX Additions by FERCPage 33 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.55520 37602 231 080 190 - Mid-Tex Gas Division Addition 080.55520 38000 12 080 190 - Mid-Tex Gas Division Addition 080.55526 37602 132 080 190 - Mid-Tex Gas Division Addition 080.55530 37602 81 080 190 - Mid-Tex Gas Division Addition 080.55539 37602 206 080 190 - Mid-Tex Gas Division Addition 080.55543 37602 540 080 190 - Mid-Tex Gas Division Addition 080.55546 37601 39 080 190 - Mid-Tex Gas Division Addition 080.55548 37601 21 080 190 - Mid-Tex Gas Division Addition 080.55564 37602 439 080 190 - Mid-Tex Gas Division Addition 080.55565 37602 1,483 080 190 - Mid-Tex Gas Division Addition 080.55565 38000 508 080 190 - Mid-Tex Gas Division Addition 080.55565 38100 42 080 190 - Mid-Tex Gas Division Addition 080.55565 38200 42 080 190 - Mid-Tex Gas Division Addition 080.55565 38300 42 080 190 - Mid-Tex Gas Division Addition 080.55568 37602 2,386 080 190 - Mid-Tex Gas Division Addition 080.55568 38000 89 080 190 - Mid-Tex Gas Division Addition 080.55568 38100 60 080 190 - Mid-Tex Gas Division Addition 080.55568 38200 209 080 190 - Mid-Tex Gas Division Addition 080.55568 38300 239 080 190 - Mid-Tex Gas Division Addition 080.55602 37602 5 080 190 - Mid-Tex Gas Division Addition 080.55614 38000 172 080 190 - Mid-Tex Gas Division Addition 080.55621 37602 44 080 190 - Mid-Tex Gas Division Addition 080.55623 37601 1,446 080 190 - Mid-Tex Gas Division Addition 080.55625 37602 467 080 190 - Mid-Tex Gas Division Addition 080.55625 38000 103 080 190 - Mid-Tex Gas Division Addition 080.55625 38100 140 080 190 - Mid-Tex Gas Division Addition 080.55625 38200 112 080 190 - Mid-Tex Gas Division Addition 080.55625 38300 112 080 190 - Mid-Tex Gas Division Addition 080.55627 37600 322 080 190 - Mid-Tex Gas Division Addition 080.55630 37602 237 080 190 - Mid-Tex Gas Division Addition 080.55639 37602 2,680 080 190 - Mid-Tex Gas Division Addition 080.55640 37602 7,577 080 190 - Mid-Tex Gas Division Addition 080.55641 37602 1,127 080 190 - Mid-Tex Gas Division Addition 080.55641 38000 50 080 190 - Mid-Tex Gas Division Addition 080.55641 38100 25 080 190 - Mid-Tex Gas Division Addition 080.55641 38200 25 080 190 - Mid-Tex Gas Division Addition 080.55641 38300 25 080 190 - Mid-Tex Gas Division Addition 080.55642 37602 21,816 080 190 - Mid-Tex Gas Division Addition 080.55642 38000 5,137 080 190 - Mid-Tex Gas Division Addition 080.55642 38200 29 080 190 - Mid-Tex Gas Division Addition 080.55642 38300 76 080 190 - Mid-Tex Gas Division Addition 080.55648 37602 216 080 190 - Mid-Tex Gas Division Addition 080.55648 37800 254 080 190 - Mid-Tex Gas Division Addition 080.55650 37602 715 080 190 - Mid-Tex Gas Division Addition 080.55650 38000 48 080 190 - Mid-Tex Gas Division Addition 080.55650 38100 95 080 190 - Mid-Tex Gas Division Addition 080.55650 38200 48 080 190 - Mid-Tex Gas Division Addition 080.55650 38300 48 080 190 - Mid-Tex Gas Division Addition 080.55656 37800 4 080 190 - Mid-Tex Gas Division Addition 080.55656 38000 372 080 190 - Mid-Tex Gas Division Addition 080.55656 38100 4 080 190 - Mid-Tex Gas Division Addition 080.55656 38200 4 080 190 - Mid-Tex Gas Division Addition 080.55667 37602 266 080 190 - Mid-Tex Gas Division Addition 080.55667 38000 8 080 190 - Mid-Tex Gas Division Addition 080.55667 38200 3 080 190 - Mid-Tex Gas Division Addition 080.55667 38300 3 080 190 - Mid-Tex Gas Division Addition 080.55670 37602 3,226 080 190 - Mid-Tex Gas Division Addition 080.55670 38000 93 080 190 - Mid-Tex Gas Division Addition 080.55670 38100 9 080 190 - Mid-Tex Gas Division Addition 080.55670 38200 2 080 190 - Mid-Tex Gas Division Addition 080.55670 38300 2 080 190 - Mid-Tex Gas Division Addition 080.55673 37602 29,032 080 190 - Mid-Tex Gas Division Addition 080.55674 37602 3,587 080 190 - Mid-Tex Gas Division Addition 080.55674 38000 80 080 190 - Mid-Tex Gas Division Addition 080.55674 38100 159 080 190 - Mid-Tex Gas Division Addition 080.55674 38200 80 080 190 - Mid-Tex Gas Division Addition 080.55674 38300 80 080 190 - Mid-Tex Gas Division Addition 080.55675 37602 311 080 190 - Mid-Tex Gas Division Addition 080.55682 37602 5,914 080 190 - Mid-Tex Gas Division Addition 080.55682 38000 887 080 190 - Mid-Tex Gas Division Addition 080.55682 38100 296 080 190 - Mid-Tex Gas Division Addition 080.55682 38200 148 080 190 - Mid-Tex Gas Division Addition 080.55682 38300 148 080 190 - Mid-Tex Gas Division Addition 080.55683 37602 13,577 080 190 - Mid-Tex Gas Division Addition 080.55683 38000 9,052 080 190 - Mid-Tex Gas Division Addition 080.55690 37602 75 080 190 - Mid-Tex Gas Division Addition 080.55692 37602 689 080 190 - Mid-Tex Gas Division Addition 080.55692 38000 345 080 190 - Mid-Tex Gas Division Addition 080.55692 38100 345 080 190 - Mid-Tex Gas Division Addition 080.55692 38200 172 080 190 - Mid-Tex Gas Division Addition 080.55692 38300 172 080 190 - Mid-Tex Gas Division Addition 080.55697 37602 1,281 080 190 - Mid-Tex Gas Division Addition 080.55697 38000 53 080 190 - Mid-Tex Gas Division Addition 080.55702 37602 1,344 080 190 - Mid-Tex Gas Division Addition 080.55702 38000 28 080 190 - Mid-Tex Gas Division Addition 080.55702 38100 14 080 190 - Mid-Tex Gas Division Addition 080.55702 38200 14 080 190 - Mid-Tex Gas Division Addition 080.55702 38300 14 080 190 - Mid-Tex Gas Division Addition 080.55710 37602 1,047 080 190 - Mid-Tex Gas Division Addition 080.55710 38000 251 080 190 - Mid-Tex Gas Division Addition 080.55710 38100 56 080 190 - Mid-Tex Gas Division Addition 080.55710 38200 28 080 190 - Mid-Tex Gas Division Addition 080.55710 38300 14 080 190 - Mid-Tex Gas Division Addition 080.55711 37602 670 080 190 - Mid-Tex Gas Division Addition 080.55711 38000 117 080 190 - Mid-Tex Gas Division Addition 080.55711 38100 8 080 190 - Mid-Tex Gas Division Addition 080.55711 38200 17 080 190 - Mid-Tex Gas Division Addition 080.55711 38300 17 080 190 - Mid-Tex Gas Division Addition 080.55714 37602 874 080 190 - Mid-Tex Gas Division Addition 080.55714 38000 225 080 190 - Mid-Tex Gas Division Addition 080.55714 38100 125 080 190 - Mid-Tex Gas Division Addition 080.55714 38200 12 080 190 - Mid-Tex Gas Division Addition 080.55714 38300 12 080 190 - Mid-Tex Gas Division Addition 080.55715 37602 353 080 190 - Mid-Tex Gas Division Addition 080.55719 38000 650 080 190 - Mid-Tex Gas Division Addition 080.55719 38100 10 080 190 - Mid-Tex Gas Division Addition 080.55719 38200 3 080 190 - Mid-Tex Gas Division Addition 080.55719 38300 7
MTX Additions by FERCPage 34 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.55723 37602 619 080 190 - Mid-Tex Gas Division Addition 080.55728 37601 29,225 080 190 - Mid-Tex Gas Division Addition 080.55752 37602 950 080 190 - Mid-Tex Gas Division Addition 080.55758 37602 652 080 190 - Mid-Tex Gas Division Addition 080.55758 38000 79 080 190 - Mid-Tex Gas Division Addition 080.55758 38100 24 080 190 - Mid-Tex Gas Division Addition 080.55758 38200 16 080 190 - Mid-Tex Gas Division Addition 080.55758 38300 16 080 190 - Mid-Tex Gas Division Addition 080.55759 37602 198 080 190 - Mid-Tex Gas Division Addition 080.55759 38000 51 080 190 - Mid-Tex Gas Division Addition 080.55759 38100 5 080 190 - Mid-Tex Gas Division Addition 080.55759 38200 1 080 190 - Mid-Tex Gas Division Addition 080.55759 38300 1 080 190 - Mid-Tex Gas Division Addition 080.55761 37602 970 080 190 - Mid-Tex Gas Division Addition 080.55761 38000 76 080 190 - Mid-Tex Gas Division Addition 080.55765 37600 344 080 190 - Mid-Tex Gas Division Addition 080.55772 37602 304 080 190 - Mid-Tex Gas Division Addition 080.55772 38000 35 080 190 - Mid-Tex Gas Division Addition 080.55772 38100 7 080 190 - Mid-Tex Gas Division Addition 080.55775 37602 13,515 080 190 - Mid-Tex Gas Division Addition 080.55775 38000 4,749 080 190 - Mid-Tex Gas Division Addition 080.55784 37602 288 080 190 - Mid-Tex Gas Division Addition 080.55785 37602 103 080 190 - Mid-Tex Gas Division Addition 080.55785 38000 22 080 190 - Mid-Tex Gas Division Addition 080.55785 38100 7 080 190 - Mid-Tex Gas Division Addition 080.55785 38200 7 080 190 - Mid-Tex Gas Division Addition 080.55785 38300 7 080 190 - Mid-Tex Gas Division Addition 080.55797 38000 2,675 080 190 - Mid-Tex Gas Division Addition 080.55797 38100 158 080 190 - Mid-Tex Gas Division Addition 080.55797 38200 14 080 190 - Mid-Tex Gas Division Addition 080.55797 38300 29 080 190 - Mid-Tex Gas Division Addition 080.55799 37602 282 080 190 - Mid-Tex Gas Division Addition 080.55799 38000 1 080 190 - Mid-Tex Gas Division Addition 080.55818 37602 772 080 190 - Mid-Tex Gas Division Addition 080.55822 37602 825 080 190 - Mid-Tex Gas Division Addition 080.55823 37602 500 080 190 - Mid-Tex Gas Division Addition 080.55839 38000 2,291 080 190 - Mid-Tex Gas Division Addition 080.55839 38100 286 080 190 - Mid-Tex Gas Division Addition 080.55839 38200 143 080 190 - Mid-Tex Gas Division Addition 080.55839 38300 143 080 190 - Mid-Tex Gas Division Addition 080.55840 38000 2,881 080 190 - Mid-Tex Gas Division Addition 080.55840 38100 52 080 190 - Mid-Tex Gas Division Addition 080.55840 38200 15 080 190 - Mid-Tex Gas Division Addition 080.55840 38300 22 080 190 - Mid-Tex Gas Division Addition 080.55841 38000 3,829 080 190 - Mid-Tex Gas Division Addition 080.55841 38100 165 080 190 - Mid-Tex Gas Division Addition 080.55841 38200 41 080 190 - Mid-Tex Gas Division Addition 080.55841 38300 82 080 190 - Mid-Tex Gas Division Addition 080.55842 38000 2,386 080 190 - Mid-Tex Gas Division Addition 080.55842 38100 140 080 190 - Mid-Tex Gas Division Addition 080.55842 38200 140 080 190 - Mid-Tex Gas Division Addition 080.55842 38300 140 080 190 - Mid-Tex Gas Division Addition 080.55857 37602 202 080 190 - Mid-Tex Gas Division Addition 080.55857 38000 23 080 190 - Mid-Tex Gas Division Addition 080.55857 38100 5 080 190 - Mid-Tex Gas Division Addition 080.55857 38200 2 080 190 - Mid-Tex Gas Division Addition 080.55857 38300 2 080 190 - Mid-Tex Gas Division Addition 080.55858 37602 518 080 190 - Mid-Tex Gas Division Addition 080.55867 37602 657 080 190 - Mid-Tex Gas Division Addition 080.55867 38000 474 080 190 - Mid-Tex Gas Division Addition 080.55867 38100 219 080 190 - Mid-Tex Gas Division Addition 080.55867 38200 36 080 190 - Mid-Tex Gas Division Addition 080.55867 38300 36 080 190 - Mid-Tex Gas Division Addition 080.55868 37602 713 080 190 - Mid-Tex Gas Division Addition 080.55868 38000 158 080 190 - Mid-Tex Gas Division Addition 080.55868 38100 28 080 190 - Mid-Tex Gas Division Addition 080.55868 38200 19 080 190 - Mid-Tex Gas Division Addition 080.55868 38300 9 080 190 - Mid-Tex Gas Division Addition 080.55871 37602 24,161 080 190 - Mid-Tex Gas Division Addition 080.55872 37602 12 080 190 - Mid-Tex Gas Division Addition 080.55879 37800 64 080 190 - Mid-Tex Gas Division Addition 080.55889 37602 209 080 190 - Mid-Tex Gas Division Addition 080.55889 38000 6 080 190 - Mid-Tex Gas Division Addition 080.55897 37602 1,026 080 190 - Mid-Tex Gas Division Addition 080.55897 38000 513 080 190 - Mid-Tex Gas Division Addition 080.55897 38100 68 080 190 - Mid-Tex Gas Division Addition 080.55897 38200 51 080 190 - Mid-Tex Gas Division Addition 080.55897 38300 51 080 190 - Mid-Tex Gas Division Addition 080.55898 37602 174 080 190 - Mid-Tex Gas Division Addition 080.55899 37602 279 080 190 - Mid-Tex Gas Division Addition 080.55910 37602 558 080 190 - Mid-Tex Gas Division Addition 080.55910 38000 208 080 190 - Mid-Tex Gas Division Addition 080.55910 38100 33 080 190 - Mid-Tex Gas Division Addition 080.55910 38200 17 080 190 - Mid-Tex Gas Division Addition 080.55910 38300 17 080 190 - Mid-Tex Gas Division Addition 080.55920 37602 2,127 080 190 - Mid-Tex Gas Division Addition 080.55920 38000 204 080 190 - Mid-Tex Gas Division Addition 080.55920 38100 408 080 190 - Mid-Tex Gas Division Addition 080.55920 38200 87 080 190 - Mid-Tex Gas Division Addition 080.55920 38300 87 080 190 - Mid-Tex Gas Division Addition 080.55922 37602 736 080 190 - Mid-Tex Gas Division Addition 080.55922 38000 362 080 190 - Mid-Tex Gas Division Addition 080.55922 38100 36 080 190 - Mid-Tex Gas Division Addition 080.55922 38200 36 080 190 - Mid-Tex Gas Division Addition 080.55922 38300 36 080 190 - Mid-Tex Gas Division Addition 080.55923 37602 2,435 080 190 - Mid-Tex Gas Division Addition 080.55923 38000 630 080 190 - Mid-Tex Gas Division Addition 080.55923 38100 102 080 190 - Mid-Tex Gas Division Addition 080.55923 38200 4 080 190 - Mid-Tex Gas Division Addition 080.55923 38300 9 080 190 - Mid-Tex Gas Division Addition 080.55925 37600 249 080 190 - Mid-Tex Gas Division Addition 080.55926 37602 8,688 080 190 - Mid-Tex Gas Division Addition 080.55926 38000 1,353 080 190 - Mid-Tex Gas Division Addition 080.55943 37602 393 080 190 - Mid-Tex Gas Division Addition 080.55944 37602 10,644 080 190 - Mid-Tex Gas Division Addition 080.55949 37602 7,925 080 190 - Mid-Tex Gas Division Addition 080.55950 37601 25 080 190 - Mid-Tex Gas Division Addition 080.55950 37602 2,080
MTX Additions by FERCPage 35 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.55950 38000 304 080 190 - Mid-Tex Gas Division Addition 080.55950 38100 76 080 190 - Mid-Tex Gas Division Addition 080.55950 38200 25 080 190 - Mid-Tex Gas Division Addition 080.55950 38300 25 080 190 - Mid-Tex Gas Division Addition 080.55951 37602 686 080 190 - Mid-Tex Gas Division Addition 080.55951 38000 101 080 190 - Mid-Tex Gas Division Addition 080.55951 38100 119 080 190 - Mid-Tex Gas Division Addition 080.55951 38200 9 080 190 - Mid-Tex Gas Division Addition 080.55952 37601 5,229,718 080 190 - Mid-Tex Gas Division Addition 080.55952 37602 563,201 080 190 - Mid-Tex Gas Division Addition 080.55952 37800 2,252,802 080 190 - Mid-Tex Gas Division Addition 080.55957 37602 38 080 190 - Mid-Tex Gas Division Addition 080.55961 37602 766 080 190 - Mid-Tex Gas Division Addition 080.55961 38000 153 080 190 - Mid-Tex Gas Division Addition 080.55961 38100 459 080 190 - Mid-Tex Gas Division Addition 080.55961 38200 77 080 190 - Mid-Tex Gas Division Addition 080.55961 38300 77 080 190 - Mid-Tex Gas Division Addition 080.55963 37602 1,028 080 190 - Mid-Tex Gas Division Addition 080.55963 38000 147 080 190 - Mid-Tex Gas Division Addition 080.55963 38100 1,028 080 190 - Mid-Tex Gas Division Addition 080.55963 38200 441 080 190 - Mid-Tex Gas Division Addition 080.55963 38300 294 080 190 - Mid-Tex Gas Division Addition 080.55964 37602 817 080 190 - Mid-Tex Gas Division Addition 080.55964 38000 179 080 190 - Mid-Tex Gas Division Addition 080.55966 37602 978 080 190 - Mid-Tex Gas Division Addition 080.55966 38000 10 080 190 - Mid-Tex Gas Division Addition 080.55975 37602 23,111 080 190 - Mid-Tex Gas Division Addition 080.55975 38000 15,407 080 190 - Mid-Tex Gas Division Addition 080.55976 37602 25,236 080 190 - Mid-Tex Gas Division Addition 080.55976 38000 16,827 080 190 - Mid-Tex Gas Division Addition 080.55978 37602 9,536 080 190 - Mid-Tex Gas Division Addition 080.55979 37602 39,269 080 190 - Mid-Tex Gas Division Addition 080.55980 37602 1,386 080 190 - Mid-Tex Gas Division Addition 080.55980 38000 87 080 190 - Mid-Tex Gas Division Addition 080.55980 38100 87 080 190 - Mid-Tex Gas Division Addition 080.55980 38200 87 080 190 - Mid-Tex Gas Division Addition 080.55980 38300 87 080 190 - Mid-Tex Gas Division Addition 080.55984 37602 519 080 190 - Mid-Tex Gas Division Addition 080.55984 38000 29 080 190 - Mid-Tex Gas Division Addition 080.55984 38200 17 080 190 - Mid-Tex Gas Division Addition 080.55984 38300 12 080 190 - Mid-Tex Gas Division Addition 080.55986 37602 1,546 080 190 - Mid-Tex Gas Division Addition 080.55989 37601 739 080 190 - Mid-Tex Gas Division Addition 080.55990 37602 534 080 190 - Mid-Tex Gas Division Addition 080.55990 38000 233 080 190 - Mid-Tex Gas Division Addition 080.55990 38100 34 080 190 - Mid-Tex Gas Division Addition 080.55990 38200 3 080 190 - Mid-Tex Gas Division Addition 080.55990 38300 7 080 190 - Mid-Tex Gas Division Addition 080.55992 37602 931 080 190 - Mid-Tex Gas Division Addition 080.55992 38000 164 080 190 - Mid-Tex Gas Division Addition 080.56006 37602 282 080 190 - Mid-Tex Gas Division Addition 080.56006 38000 12 080 190 - Mid-Tex Gas Division Addition 080.56006 38200 3 080 190 - Mid-Tex Gas Division Addition 080.56012 37602 587 080 190 - Mid-Tex Gas Division Addition 080.56012 38000 31 080 190 - Mid-Tex Gas Division Addition 080.56016 37602 534 080 190 - Mid-Tex Gas Division Addition 080.56016 38000 67 080 190 - Mid-Tex Gas Division Addition 080.56016 38100 33 080 190 - Mid-Tex Gas Division Addition 080.56016 38200 20 080 190 - Mid-Tex Gas Division Addition 080.56016 38300 13 080 190 - Mid-Tex Gas Division Addition 080.56023 37601 10 080 190 - Mid-Tex Gas Division Addition 080.56030 37602 1,878 080 190 - Mid-Tex Gas Division Addition 080.56030 38000 552 080 190 - Mid-Tex Gas Division Addition 080.56030 38100 49 080 190 - Mid-Tex Gas Division Addition 080.56030 38200 12 080 190 - Mid-Tex Gas Division Addition 080.56030 38300 12 080 190 - Mid-Tex Gas Division Addition 080.56033 37602 1,474 080 190 - Mid-Tex Gas Division Addition 080.56033 38000 260 080 190 - Mid-Tex Gas Division Addition 080.56034 37602 1,584 080 190 - Mid-Tex Gas Division Addition 080.56034 38000 176 080 190 - Mid-Tex Gas Division Addition 080.56037 37602 357 080 190 - Mid-Tex Gas Division Addition 080.56037 38000 65 080 190 - Mid-Tex Gas Division Addition 080.56037 38100 6 080 190 - Mid-Tex Gas Division Addition 080.56037 38200 1 080 190 - Mid-Tex Gas Division Addition 080.56037 38300 1 080 190 - Mid-Tex Gas Division Addition 080.56044 37602 2,384 080 190 - Mid-Tex Gas Division Addition 080.56064 37602 297 080 190 - Mid-Tex Gas Division Addition 080.56064 38000 16 080 190 - Mid-Tex Gas Division Addition 080.56065 37602 1,923 080 190 - Mid-Tex Gas Division Addition 080.56065 38000 2,259 080 190 - Mid-Tex Gas Division Addition 080.56067 37602 633 080 190 - Mid-Tex Gas Division Addition 080.56067 38000 90 080 190 - Mid-Tex Gas Division Addition 080.56067 38100 90 080 190 - Mid-Tex Gas Division Addition 080.56067 38200 45 080 190 - Mid-Tex Gas Division Addition 080.56067 38300 45 080 190 - Mid-Tex Gas Division Addition 080.56068 37602 597 080 190 - Mid-Tex Gas Division Addition 080.56068 38000 308 080 190 - Mid-Tex Gas Division Addition 080.56070 37601 340 080 190 - Mid-Tex Gas Division Addition 080.56076 37602 410 080 190 - Mid-Tex Gas Division Addition 080.56097 37602 1,354 080 190 - Mid-Tex Gas Division Addition 080.56097 38000 73 080 190 - Mid-Tex Gas Division Addition 080.56097 38100 15 080 190 - Mid-Tex Gas Division Addition 080.56097 38200 15 080 190 - Mid-Tex Gas Division Addition 080.56097 38300 15 080 190 - Mid-Tex Gas Division Addition 080.56107 37602 4,791 080 190 - Mid-Tex Gas Division Addition 080.56107 38000 564 080 190 - Mid-Tex Gas Division Addition 080.56107 38100 155 080 190 - Mid-Tex Gas Division Addition 080.56107 38200 71 080 190 - Mid-Tex Gas Division Addition 080.56107 38300 56 080 190 - Mid-Tex Gas Division Addition 080.56110 37600 5,868 080 190 - Mid-Tex Gas Division Addition 080.56131 37602 313 080 190 - Mid-Tex Gas Division Addition 080.56144 37602 1,000 080 190 - Mid-Tex Gas Division Addition 080.56144 38000 125 080 190 - Mid-Tex Gas Division Addition 080.56144 38100 63 080 190 - Mid-Tex Gas Division Addition 080.56144 38200 25 080 190 - Mid-Tex Gas Division Addition 080.56144 38300 38 080 190 - Mid-Tex Gas Division Addition 080.56147 37602 474 080 190 - Mid-Tex Gas Division Addition 080.56147 38000 59
MTX Additions by FERCPage 36 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.56147 38100 30 080 190 - Mid-Tex Gas Division Addition 080.56147 38200 12 080 190 - Mid-Tex Gas Division Addition 080.56147 38300 18 080 190 - Mid-Tex Gas Division Addition 080.56148 37602 4,160 080 190 - Mid-Tex Gas Division Addition 080.56150 37602 1,095 080 190 - Mid-Tex Gas Division Addition 080.56150 38100 58 080 190 - Mid-Tex Gas Division Addition 080.56153 38000 2,427 080 190 - Mid-Tex Gas Division Addition 080.56153 38100 347 080 190 - Mid-Tex Gas Division Addition 080.56153 38200 347 080 190 - Mid-Tex Gas Division Addition 080.56153 38300 347 080 190 - Mid-Tex Gas Division Addition 080.56154 38000 1,698 080 190 - Mid-Tex Gas Division Addition 080.56154 38100 113 080 190 - Mid-Tex Gas Division Addition 080.56154 38200 57 080 190 - Mid-Tex Gas Division Addition 080.56154 38300 19 080 190 - Mid-Tex Gas Division Addition 080.56155 38000 2,349 080 190 - Mid-Tex Gas Division Addition 080.56155 38100 49 080 190 - Mid-Tex Gas Division Addition 080.56155 38200 24 080 190 - Mid-Tex Gas Division Addition 080.56155 38300 24 080 190 - Mid-Tex Gas Division Addition 080.56158 38000 2,518 080 190 - Mid-Tex Gas Division Addition 080.56158 38100 26 080 190 - Mid-Tex Gas Division Addition 080.56158 38200 26 080 190 - Mid-Tex Gas Division Addition 080.56158 38300 26 080 190 - Mid-Tex Gas Division Addition 080.56159 38000 1,836 080 190 - Mid-Tex Gas Division Addition 080.56160 37602 2,459 080 190 - Mid-Tex Gas Division Addition 080.56160 38000 273 080 190 - Mid-Tex Gas Division Addition 080.56162 38000 8,160 080 190 - Mid-Tex Gas Division Addition 080.56164 37602 955 080 190 - Mid-Tex Gas Division Addition 080.56164 38000 318 080 190 - Mid-Tex Gas Division Addition 080.56165 37602 187 080 190 - Mid-Tex Gas Division Addition 080.56165 38000 16 080 190 - Mid-Tex Gas Division Addition 080.56165 38300 1 080 190 - Mid-Tex Gas Division Addition 080.56171 37602 470 080 190 - Mid-Tex Gas Division Addition 080.56171 38000 5 080 190 - Mid-Tex Gas Division Addition 080.56171 38100 5 080 190 - Mid-Tex Gas Division Addition 080.56171 38200 5 080 190 - Mid-Tex Gas Division Addition 080.56171 38300 5 080 190 - Mid-Tex Gas Division Addition 080.56173 37602 2,462 080 190 - Mid-Tex Gas Division Addition 080.56173 38000 1,055 080 190 - Mid-Tex Gas Division Addition 080.56174 37602 1,234 080 190 - Mid-Tex Gas Division Addition 080.56174 38000 405 080 190 - Mid-Tex Gas Division Addition 080.56174 38100 53 080 190 - Mid-Tex Gas Division Addition 080.56174 38200 35 080 190 - Mid-Tex Gas Division Addition 080.56174 38300 35 080 190 - Mid-Tex Gas Division Addition 080.56175 37602 1,377 080 190 - Mid-Tex Gas Division Addition 080.56175 38000 184 080 190 - Mid-Tex Gas Division Addition 080.56175 38100 92 080 190 - Mid-Tex Gas Division Addition 080.56175 38200 92 080 190 - Mid-Tex Gas Division Addition 080.56175 38300 92 080 190 - Mid-Tex Gas Division Addition 080.56180 37602 1,551 080 190 - Mid-Tex Gas Division Addition 080.56180 38000 267 080 190 - Mid-Tex Gas Division Addition 080.56185 37602 190 080 190 - Mid-Tex Gas Division Addition 080.56186 37602 1,050 080 190 - Mid-Tex Gas Division Addition 080.56186 38000 117 080 190 - Mid-Tex Gas Division Addition 080.56187 37602 1,118 080 190 - Mid-Tex Gas Division Addition 080.56187 38100 49 080 190 - Mid-Tex Gas Division Addition 080.56187 38200 24 080 190 - Mid-Tex Gas Division Addition 080.56187 38300 24 080 190 - Mid-Tex Gas Division Addition 080.56188 37602 764 080 190 - Mid-Tex Gas Division Addition 080.56188 38100 74 080 190 - Mid-Tex Gas Division Addition 080.56188 38200 74 080 190 - Mid-Tex Gas Division Addition 080.56188 38300 74 080 190 - Mid-Tex Gas Division Addition 080.56194 37602 1,714 080 190 - Mid-Tex Gas Division Addition 080.56194 38000 90 080 190 - Mid-Tex Gas Division Addition 080.56195 37602 234 080 190 - Mid-Tex Gas Division Addition 080.56195 38000 7 080 190 - Mid-Tex Gas Division Addition 080.56195 38500 5 080 190 - Mid-Tex Gas Division Addition 080.56199 37602 803 080 190 - Mid-Tex Gas Division Addition 080.56199 38000 434 080 190 - Mid-Tex Gas Division Addition 080.56199 38100 209 080 190 - Mid-Tex Gas Division Addition 080.56199 38200 80 080 190 - Mid-Tex Gas Division Addition 080.56199 38300 80 080 190 - Mid-Tex Gas Division Addition 080.56200 37602 2,864 080 190 - Mid-Tex Gas Division Addition 080.56200 38000 2,343 080 190 - Mid-Tex Gas Division Addition 080.56205 37602 1,088 080 190 - Mid-Tex Gas Division Addition 080.56205 38000 319 080 190 - Mid-Tex Gas Division Addition 080.56205 38100 44 080 190 - Mid-Tex Gas Division Addition 080.56206 37602 673 080 190 - Mid-Tex Gas Division Addition 080.56208 37602 5,876 080 190 - Mid-Tex Gas Division Addition 080.56209 37602 1,777 080 190 - Mid-Tex Gas Division Addition 080.56209 38000 197 080 190 - Mid-Tex Gas Division Addition 080.56210 37602 832 080 190 - Mid-Tex Gas Division Addition 080.56210 38000 832 080 190 - Mid-Tex Gas Division Addition 080.56214 37602 341 080 190 - Mid-Tex Gas Division Addition 080.56214 38000 14 080 190 - Mid-Tex Gas Division Addition 080.56214 38200 1 080 190 - Mid-Tex Gas Division Addition 080.56214 38300 1 080 190 - Mid-Tex Gas Division Addition 080.56222 37602 582 080 190 - Mid-Tex Gas Division Addition 080.56222 38000 65 080 190 - Mid-Tex Gas Division Addition 080.56222 38100 272 080 190 - Mid-Tex Gas Division Addition 080.56222 38200 181 080 190 - Mid-Tex Gas Division Addition 080.56222 38300 194 080 190 - Mid-Tex Gas Division Addition 080.56225 38000 1,760 080 190 - Mid-Tex Gas Division Addition 080.56225 38100 401 080 190 - Mid-Tex Gas Division Addition 080.56226 37602 23 080 190 - Mid-Tex Gas Division Addition 080.56226 38100 699 080 190 - Mid-Tex Gas Division Addition 080.56226 38300 1 080 190 - Mid-Tex Gas Division Addition 080.56228 37602 3,635 080 190 - Mid-Tex Gas Division Addition 080.56228 38000 2,974 080 190 - Mid-Tex Gas Division Addition 080.56229 37602 1,118 080 190 - Mid-Tex Gas Division Addition 080.56229 38000 23 080 190 - Mid-Tex Gas Division Addition 080.56230 37602 88 080 190 - Mid-Tex Gas Division Addition 080.56232 37602 1,479 080 190 - Mid-Tex Gas Division Addition 080.56232 38000 444 080 190 - Mid-Tex Gas Division Addition 080.56232 38100 444 080 190 - Mid-Tex Gas Division Addition 080.56232 38200 148 080 190 - Mid-Tex Gas Division Addition 080.56232 38300 296 080 190 - Mid-Tex Gas Division Addition 080.56234 37602 925 080 190 - Mid-Tex Gas Division Addition 080.56234 38000 103
MTX Additions by FERCPage 37 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.56236 37602 600 080 190 - Mid-Tex Gas Division Addition 080.56236 38000 6 080 190 - Mid-Tex Gas Division Addition 080.56236 38100 1 080 190 - Mid-Tex Gas Division Addition 080.56236 38200 1 080 190 - Mid-Tex Gas Division Addition 080.56236 38300 1 080 190 - Mid-Tex Gas Division Addition 080.56237 37602 652 080 190 - Mid-Tex Gas Division Addition 080.56237 38000 21 080 190 - Mid-Tex Gas Division Addition 080.56237 38100 7 080 190 - Mid-Tex Gas Division Addition 080.56237 38300 7 080 190 - Mid-Tex Gas Division Addition 080.56240 37602 573 080 190 - Mid-Tex Gas Division Addition 080.56244 37602 628 080 190 - Mid-Tex Gas Division Addition 080.56244 38000 179 080 190 - Mid-Tex Gas Division Addition 080.56244 38100 54 080 190 - Mid-Tex Gas Division Addition 080.56244 38200 18 080 190 - Mid-Tex Gas Division Addition 080.56244 38300 18 080 190 - Mid-Tex Gas Division Addition 080.56245 37602 93,727 080 190 - Mid-Tex Gas Division Addition 080.56245 38000 4,933 080 190 - Mid-Tex Gas Division Addition 080.56246 37602 688 080 190 - Mid-Tex Gas Division Addition 080.56246 38000 52 080 190 - Mid-Tex Gas Division Addition 080.56249 37602 419 080 190 - Mid-Tex Gas Division Addition 080.56249 38000 32 080 190 - Mid-Tex Gas Division Addition 080.56251 37602 5,379 080 190 - Mid-Tex Gas Division Addition 080.56315 38000 5,220,175 080 190 - Mid-Tex Gas Division Addition 080.56315 38100 4 080 190 - Mid-Tex Gas Division Addition 080.56315 38300 1 080 190 - Mid-Tex Gas Division Addition 080.56316 38000 4,404,909 080 190 - Mid-Tex Gas Division Addition 080.56316 38100 55,359 080 190 - Mid-Tex Gas Division Addition 080.56316 38300 (1) 080 190 - Mid-Tex Gas Division Addition 080.56317 38000 3,833,041 080 190 - Mid-Tex Gas Division Addition 080.56318 38000 3,136,099 080 190 - Mid-Tex Gas Division Addition 080.56319 38000 1,810,929 080 190 - Mid-Tex Gas Division Addition 080.56319 38100 (6) 080 190 - Mid-Tex Gas Division Addition 080.56320 38000 10,389,331 080 190 - Mid-Tex Gas Division Addition 080.56320 38100 23 080 190 - Mid-Tex Gas Division Addition 080.56320 38300 0.22 080 190 - Mid-Tex Gas Division Addition 080.56321 38000 7,125,672 080 190 - Mid-Tex Gas Division Addition 080.56322 38000 1,087,019 080 190 - Mid-Tex Gas Division Addition 080.56323 38100 721,418 080 190 - Mid-Tex Gas Division Addition 080.56323 38200 977,332 080 190 - Mid-Tex Gas Division Addition 080.56323 38300 17,136 080 190 - Mid-Tex Gas Division Addition 080.56324 38100 634,334 080 190 - Mid-Tex Gas Division Addition 080.56324 38200 891,686 080 190 - Mid-Tex Gas Division Addition 080.56324 38300 8,837 080 190 - Mid-Tex Gas Division Addition 080.56325 38100 452,381 080 190 - Mid-Tex Gas Division Addition 080.56325 38200 524,988 080 190 - Mid-Tex Gas Division Addition 080.56325 38300 88,092 080 190 - Mid-Tex Gas Division Addition 080.56326 38100 535,793 080 190 - Mid-Tex Gas Division Addition 080.56326 38200 884,111 080 190 - Mid-Tex Gas Division Addition 080.56326 38300 13,837 080 190 - Mid-Tex Gas Division Addition 080.56327 38100 217,607 080 190 - Mid-Tex Gas Division Addition 080.56327 38200 331,534 080 190 - Mid-Tex Gas Division Addition 080.56327 38300 556 080 190 - Mid-Tex Gas Division Addition 080.56328 38100 1,158,151 080 190 - Mid-Tex Gas Division Addition 080.56328 38200 1,512,981 080 190 - Mid-Tex Gas Division Addition 080.56328 38300 9,524 080 190 - Mid-Tex Gas Division Addition 080.56329 38100 1,058,149 080 190 - Mid-Tex Gas Division Addition 080.56329 38200 1,611,913 080 190 - Mid-Tex Gas Division Addition 080.56329 38300 (10,579) 080 190 - Mid-Tex Gas Division Addition 080.56330 38100 130,352 080 190 - Mid-Tex Gas Division Addition 080.56330 38200 110,976 080 190 - Mid-Tex Gas Division Addition 080.56330 38300 1,862 080 190 - Mid-Tex Gas Division Addition 080.56331 38000 550,495 080 190 - Mid-Tex Gas Division Addition 080.56332 38000 407,191 080 190 - Mid-Tex Gas Division Addition 080.56333 38000 4,652 080 190 - Mid-Tex Gas Division Addition 080.56334 38000 358,942 080 190 - Mid-Tex Gas Division Addition 080.56335 38000 220,165 080 190 - Mid-Tex Gas Division Addition 080.56336 38000 268,002 080 190 - Mid-Tex Gas Division Addition 080.56336 38300 616 080 190 - Mid-Tex Gas Division Addition 080.56337 38000 137,978 080 190 - Mid-Tex Gas Division Addition 080.56338 37600 35,266 080 190 - Mid-Tex Gas Division Addition 080.56338 38000 131,963 080 190 - Mid-Tex Gas Division Addition 080.56339 37601 64,991 080 190 - Mid-Tex Gas Division Addition 080.56339 37602 (22,489) 080 190 - Mid-Tex Gas Division Addition 080.56340 37601 287,546 080 190 - Mid-Tex Gas Division Addition 080.56340 37602 (4,796) 080 190 - Mid-Tex Gas Division Addition 080.56341 37601 55,299 080 190 - Mid-Tex Gas Division Addition 080.56341 37602 (210,317) 080 190 - Mid-Tex Gas Division Addition 080.56342 37601 272,612 080 190 - Mid-Tex Gas Division Addition 080.56342 37602 (3,579) 080 190 - Mid-Tex Gas Division Addition 080.56343 37601 41,758 080 190 - Mid-Tex Gas Division Addition 080.56343 37602 (64,263) 080 190 - Mid-Tex Gas Division Addition 080.56344 37601 376,006 080 190 - Mid-Tex Gas Division Addition 080.56344 37602 65,273 080 190 - Mid-Tex Gas Division Addition 080.56345 37601 71,509 080 190 - Mid-Tex Gas Division Addition 080.56345 37602 (27,496) 080 190 - Mid-Tex Gas Division Addition 080.56346 37601 247,454 080 190 - Mid-Tex Gas Division Addition 080.56346 37602 (10,341) 080 190 - Mid-Tex Gas Division Addition 080.56346 38300 101 080 190 - Mid-Tex Gas Division Addition 080.56347 38100 200,570 080 190 - Mid-Tex Gas Division Addition 080.56347 38200 479,527 080 190 - Mid-Tex Gas Division Addition 080.56347 38300 (15,012) 080 190 - Mid-Tex Gas Division Addition 080.56348 38100 339,626 080 190 - Mid-Tex Gas Division Addition 080.56348 38200 499,467 080 190 - Mid-Tex Gas Division Addition 080.56348 38300 (1,300) 080 190 - Mid-Tex Gas Division Addition 080.56349 38100 591,276 080 190 - Mid-Tex Gas Division Addition 080.56349 38200 502,787 080 190 - Mid-Tex Gas Division Addition 080.56349 38300 (1,670) 080 190 - Mid-Tex Gas Division Addition 080.56350 38100 208,151 080 190 - Mid-Tex Gas Division Addition 080.56350 38200 434,375 080 190 - Mid-Tex Gas Division Addition 080.56350 38300 (2,364) 080 190 - Mid-Tex Gas Division Addition 080.56351 38100 196,198 080 190 - Mid-Tex Gas Division Addition 080.56351 38200 377,600 080 190 - Mid-Tex Gas Division Addition 080.56351 38300 (4,079) 080 190 - Mid-Tex Gas Division Addition 080.56352 38100 544,786 080 190 - Mid-Tex Gas Division Addition 080.56352 38200 667,963 080 190 - Mid-Tex Gas Division Addition 080.56352 38300 (3,423) 080 190 - Mid-Tex Gas Division Addition 080.56353 38100 140,867 080 190 - Mid-Tex Gas Division Addition 080.56353 38200 209,946
MTX Additions by FERCPage 38 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.56353 38300 (3,152) 080 190 - Mid-Tex Gas Division Addition 080.56354 38100 208,067 080 190 - Mid-Tex Gas Division Addition 080.56354 38200 365,116 080 190 - Mid-Tex Gas Division Addition 080.56354 38300 (6,642) 080 190 - Mid-Tex Gas Division Addition 080.56355 37600 181,561 080 190 - Mid-Tex Gas Division Addition 080.56356 37600 1,280,403 080 190 - Mid-Tex Gas Division Addition 080.56357 37600 660,019 080 190 - Mid-Tex Gas Division Addition 080.56358 37600 583,698 080 190 - Mid-Tex Gas Division Addition 080.56359 37600 433,324 080 190 - Mid-Tex Gas Division Addition 080.56360 37600 760,209 080 190 - Mid-Tex Gas Division Addition 080.56361 37600 268,892 080 190 - Mid-Tex Gas Division Addition 080.56362 37600 847,177 080 190 - Mid-Tex Gas Division Addition 080.56363 38000 3,562,812 080 190 - Mid-Tex Gas Division Addition 080.56363 38100 (18) 080 190 - Mid-Tex Gas Division Addition 080.56364 38000 8,330,107 080 190 - Mid-Tex Gas Division Addition 080.56364 38100 (47) 080 190 - Mid-Tex Gas Division Addition 080.56364 38300 4,498 080 190 - Mid-Tex Gas Division Addition 080.56365 38000 30,940,549 080 190 - Mid-Tex Gas Division Addition 080.56366 38000 5,350,407 080 190 - Mid-Tex Gas Division Addition 080.56366 38300 (4) 080 190 - Mid-Tex Gas Division Addition 080.56367 38000 6,299,568 080 190 - Mid-Tex Gas Division Addition 080.56368 38000 10,996,175 080 190 - Mid-Tex Gas Division Addition 080.56368 38100 653 080 190 - Mid-Tex Gas Division Addition 080.56369 38000 3,272,206 080 190 - Mid-Tex Gas Division Addition 080.56369 38100 (51) 080 190 - Mid-Tex Gas Division Addition 080.56369 38300 (1) 080 190 - Mid-Tex Gas Division Addition 080.56370 38000 5,526,466 080 190 - Mid-Tex Gas Division Addition 080.56370 38100 (67) 080 190 - Mid-Tex Gas Division Addition 080.56370 38300 (1) 080 190 - Mid-Tex Gas Division Addition 080.56371 38100 1,825,702 080 190 - Mid-Tex Gas Division Addition 080.56371 38200 2,020,977 080 190 - Mid-Tex Gas Division Addition 080.56371 38300 26,822 080 190 - Mid-Tex Gas Division Addition 080.56372 38100 1,480,580 080 190 - Mid-Tex Gas Division Addition 080.56372 38200 2,471,344 080 190 - Mid-Tex Gas Division Addition 080.56372 38300 23,428 080 190 - Mid-Tex Gas Division Addition 080.56373 38100 3,404,599 080 190 - Mid-Tex Gas Division Addition 080.56373 38200 2,748,962 080 190 - Mid-Tex Gas Division Addition 080.56373 38300 50,834 080 190 - Mid-Tex Gas Division Addition 080.56374 38100 1,225,737 080 190 - Mid-Tex Gas Division Addition 080.56374 38200 1,662,910 080 190 - Mid-Tex Gas Division Addition 080.56374 38300 16,108 080 190 - Mid-Tex Gas Division Addition 080.56375 38100 912,009 080 190 - Mid-Tex Gas Division Addition 080.56375 38200 1,106,840 080 190 - Mid-Tex Gas Division Addition 080.56375 38300 8,845 080 190 - Mid-Tex Gas Division Addition 080.56376 38100 2,416,344 080 190 - Mid-Tex Gas Division Addition 080.56376 38200 2,610,374 080 190 - Mid-Tex Gas Division Addition 080.56376 38300 21,922 080 190 - Mid-Tex Gas Division Addition 080.56377 38100 881,992 080 190 - Mid-Tex Gas Division Addition 080.56377 38200 1,093,794 080 190 - Mid-Tex Gas Division Addition 080.56377 38300 8,580 080 190 - Mid-Tex Gas Division Addition 080.56378 38100 707,047 080 190 - Mid-Tex Gas Division Addition 080.56378 38200 831,465 080 190 - Mid-Tex Gas Division Addition 080.56378 38300 10,683 080 190 - Mid-Tex Gas Division Addition 080.56387 37601 745,157 080 190 - Mid-Tex Gas Division Addition 080.56387 37602 1,790,495 080 190 - Mid-Tex Gas Division Addition 080.56388 37601 1,034,578 080 190 - Mid-Tex Gas Division Addition 080.56388 37602 9,376,858 080 190 - Mid-Tex Gas Division Addition 080.56389 37601 825,844 080 190 - Mid-Tex Gas Division Addition 080.56389 37602 676,561 080 190 - Mid-Tex Gas Division Addition 080.56390 37601 723,507 080 190 - Mid-Tex Gas Division Addition 080.56390 37602 2,503,136 080 190 - Mid-Tex Gas Division Addition 080.56391 37601 788,398 080 190 - Mid-Tex Gas Division Addition 080.56391 37602 5,575,118 080 190 - Mid-Tex Gas Division Addition 080.56392 37601 3,706,825 080 190 - Mid-Tex Gas Division Addition 080.56392 37602 1,946,036 080 190 - Mid-Tex Gas Division Addition 080.56392 38100 311 080 190 - Mid-Tex Gas Division Addition 080.56392 38300 383 080 190 - Mid-Tex Gas Division Addition 080.56393 37601 712,830 080 190 - Mid-Tex Gas Division Addition 080.56393 37602 1,221,172 080 190 - Mid-Tex Gas Division Addition 080.56393 38100 2,010 080 190 - Mid-Tex Gas Division Addition 080.56393 38300 73 080 190 - Mid-Tex Gas Division Addition 080.56394 37601 623,690 080 190 - Mid-Tex Gas Division Addition 080.56394 37602 11,125,351 080 190 - Mid-Tex Gas Division Addition 080.56403 37602 273 080 190 - Mid-Tex Gas Division Addition 080.56403 38000 182 080 190 - Mid-Tex Gas Division Addition 080.56405 37602 951 080 190 - Mid-Tex Gas Division Addition 080.56405 38000 106 080 190 - Mid-Tex Gas Division Addition 080.56408 37602 1,200 080 190 - Mid-Tex Gas Division Addition 080.56408 38000 141 080 190 - Mid-Tex Gas Division Addition 080.56408 38100 42 080 190 - Mid-Tex Gas Division Addition 080.56408 38200 14 080 190 - Mid-Tex Gas Division Addition 080.56408 38300 14 080 190 - Mid-Tex Gas Division Addition 080.56409 37602 1,067 080 190 - Mid-Tex Gas Division Addition 080.56409 38000 132 080 190 - Mid-Tex Gas Division Addition 080.56409 38100 66 080 190 - Mid-Tex Gas Division Addition 080.56409 38200 26 080 190 - Mid-Tex Gas Division Addition 080.56409 38300 26 080 190 - Mid-Tex Gas Division Addition 080.56410 37602 1,350 080 190 - Mid-Tex Gas Division Addition 080.56410 38000 28 080 190 - Mid-Tex Gas Division Addition 080.56415 37602 228 080 190 - Mid-Tex Gas Division Addition 080.56415 38000 358 080 190 - Mid-Tex Gas Division Addition 080.56415 38100 39 080 190 - Mid-Tex Gas Division Addition 080.56415 38200 13 080 190 - Mid-Tex Gas Division Addition 080.56415 38300 13 080 190 - Mid-Tex Gas Division Addition 080.56416 37602 1,289 080 190 - Mid-Tex Gas Division Addition 080.56416 38000 595 080 190 - Mid-Tex Gas Division Addition 080.56416 38100 60 080 190 - Mid-Tex Gas Division Addition 080.56416 38200 20 080 190 - Mid-Tex Gas Division Addition 080.56416 38300 20 080 190 - Mid-Tex Gas Division Addition 080.56419 37602 764 080 190 - Mid-Tex Gas Division Addition 080.56419 38000 153 080 190 - Mid-Tex Gas Division Addition 080.56419 38100 153 080 190 - Mid-Tex Gas Division Addition 080.56419 38200 229 080 190 - Mid-Tex Gas Division Addition 080.56419 38300 229 080 190 - Mid-Tex Gas Division Addition 080.56420 37602 595 080 190 - Mid-Tex Gas Division Addition 080.56420 38000 99 080 190 - Mid-Tex Gas Division Addition 080.56420 38100 99 080 190 - Mid-Tex Gas Division Addition 080.56420 38200 99
MTX Additions by FERCPage 39 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.56420 38300 99 080 190 - Mid-Tex Gas Division Addition 080.56421 37602 3,102 080 190 - Mid-Tex Gas Division Addition 080.56421 38000 926 080 190 - Mid-Tex Gas Division Addition 080.56422 37602 2,251 080 190 - Mid-Tex Gas Division Addition 080.56422 38000 1,060 080 190 - Mid-Tex Gas Division Addition 080.56423 37601 84 080 190 - Mid-Tex Gas Division Addition 080.56430 37602 1,009 080 190 - Mid-Tex Gas Division Addition 080.56430 38000 422 080 190 - Mid-Tex Gas Division Addition 080.56430 38100 45 080 190 - Mid-Tex Gas Division Addition 080.56430 38200 15 080 190 - Mid-Tex Gas Division Addition 080.56430 38300 15 080 190 - Mid-Tex Gas Division Addition 080.56431 37601 3,444 080 190 - Mid-Tex Gas Division Addition 080.56433 37602 3,839 080 190 - Mid-Tex Gas Division Addition 080.56433 38000 269 080 190 - Mid-Tex Gas Division Addition 080.56433 38100 46 080 190 - Mid-Tex Gas Division Addition 080.56433 38200 1 080 190 - Mid-Tex Gas Division Addition 080.56433 38300 4 080 190 - Mid-Tex Gas Division Addition 080.56435 37602 500 080 190 - Mid-Tex Gas Division Addition 080.56435 38000 81 080 190 - Mid-Tex Gas Division Addition 080.56435 38200 1 080 190 - Mid-Tex Gas Division Addition 080.56436 37602 1,074 080 190 - Mid-Tex Gas Division Addition 080.56436 38000 114 080 190 - Mid-Tex Gas Division Addition 080.56436 38100 25 080 190 - Mid-Tex Gas Division Addition 080.56436 38200 51 080 190 - Mid-Tex Gas Division Addition 080.56441 37601 138 080 190 - Mid-Tex Gas Division Addition 080.56442 37602 1,503 080 190 - Mid-Tex Gas Division Addition 080.56442 38000 205 080 190 - Mid-Tex Gas Division Addition 080.56445 37602 693 080 190 - Mid-Tex Gas Division Addition 080.56445 38000 4 080 190 - Mid-Tex Gas Division Addition 080.56445 38100 124 080 190 - Mid-Tex Gas Division Addition 080.56445 38200 4 080 190 - Mid-Tex Gas Division Addition 080.56448 37602 24 080 190 - Mid-Tex Gas Division Addition 080.56448 38100 727 080 190 - Mid-Tex Gas Division Addition 080.56456 37602 492 080 190 - Mid-Tex Gas Division Addition 080.56475 37601 13 080 190 - Mid-Tex Gas Division Addition 080.56477 37602 4 080 190 - Mid-Tex Gas Division Addition 080.56483 37602 519 080 190 - Mid-Tex Gas Division Addition 080.56483 38000 59 080 190 - Mid-Tex Gas Division Addition 080.56483 38500 12 080 190 - Mid-Tex Gas Division Addition 080.56492 37602 15 080 190 - Mid-Tex Gas Division Addition 080.56493 37602 181 080 190 - Mid-Tex Gas Division Addition 080.56493 38000 4 080 190 - Mid-Tex Gas Division Addition 080.56493 38100 2 080 190 - Mid-Tex Gas Division Addition 080.56493 38200 2 080 190 - Mid-Tex Gas Division Addition 080.56493 38300 2 080 190 - Mid-Tex Gas Division Addition 080.56497 37602 2,232 080 190 - Mid-Tex Gas Division Addition 080.56497 38000 653 080 190 - Mid-Tex Gas Division Addition 080.56497 38100 61 080 190 - Mid-Tex Gas Division Addition 080.56497 38200 16 080 190 - Mid-Tex Gas Division Addition 080.56497 38300 16 080 190 - Mid-Tex Gas Division Addition 080.56502 37602 235 080 190 - Mid-Tex Gas Division Addition 080.56502 38000 26 080 190 - Mid-Tex Gas Division Addition 080.56510 37602 16,623 080 190 - Mid-Tex Gas Division Addition 080.56510 38000 11,083 080 190 - Mid-Tex Gas Division Addition 080.56514 37602 972 080 190 - Mid-Tex Gas Division Addition 080.56514 38000 108 080 190 - Mid-Tex Gas Division Addition 080.56519 37602 88 080 190 - Mid-Tex Gas Division Addition 080.56519 38000 11 080 190 - Mid-Tex Gas Division Addition 080.56522 37602 88 080 190 - Mid-Tex Gas Division Addition 080.56523 37602 130 080 190 - Mid-Tex Gas Division Addition 080.56534 37602 113 080 190 - Mid-Tex Gas Division Addition 080.56534 38000 6 080 190 - Mid-Tex Gas Division Addition 080.56538 37602 579 080 190 - Mid-Tex Gas Division Addition 080.56538 38000 6 080 190 - Mid-Tex Gas Division Addition 080.56543 37602 5,181 080 190 - Mid-Tex Gas Division Addition 080.56543 38000 984 080 190 - Mid-Tex Gas Division Addition 080.56543 38100 262 080 190 - Mid-Tex Gas Division Addition 080.56543 38200 66 080 190 - Mid-Tex Gas Division Addition 080.56543 38300 66 080 190 - Mid-Tex Gas Division Addition 080.56544 37602 1,289 080 190 - Mid-Tex Gas Division Addition 080.56544 38000 859 080 190 - Mid-Tex Gas Division Addition 080.56545 37602 6,123 080 190 - Mid-Tex Gas Division Addition 080.56545 38000 1,166 080 190 - Mid-Tex Gas Division Addition 080.56546 37602 633 080 190 - Mid-Tex Gas Division Addition 080.56546 38000 66 080 190 - Mid-Tex Gas Division Addition 080.56546 38100 15 080 190 - Mid-Tex Gas Division Addition 080.56546 38200 7 080 190 - Mid-Tex Gas Division Addition 080.56546 38300 7 080 190 - Mid-Tex Gas Division Addition 080.56548 37602 611 080 190 - Mid-Tex Gas Division Addition 080.56548 38000 115 080 190 - Mid-Tex Gas Division Addition 080.56548 38100 25 080 190 - Mid-Tex Gas Division Addition 080.56548 38300 13 080 190 - Mid-Tex Gas Division Addition 080.56556 37602 2,220 080 190 - Mid-Tex Gas Division Addition 080.56556 38000 392 080 190 - Mid-Tex Gas Division Addition 080.56558 37602 1,070 080 190 - Mid-Tex Gas Division Addition 080.56558 38000 189 080 190 - Mid-Tex Gas Division Addition 080.56567 37601 252 080 190 - Mid-Tex Gas Division Addition 080.56567 37800 755 080 190 - Mid-Tex Gas Division Addition 080.56568 37602 682 080 190 - Mid-Tex Gas Division Addition 080.56568 38000 14 080 190 - Mid-Tex Gas Division Addition 080.56571 37601 56,276 080 190 - Mid-Tex Gas Division Addition 080.56571 37800 1,149 080 190 - Mid-Tex Gas Division Addition 080.56572 37601 66,774 080 190 - Mid-Tex Gas Division Addition 080.56577 37602 33 080 190 - Mid-Tex Gas Division Addition 080.56577 38000 10 080 190 - Mid-Tex Gas Division Addition 080.56577 38100 3 080 190 - Mid-Tex Gas Division Addition 080.56577 38200 3 080 190 - Mid-Tex Gas Division Addition 080.56577 38300 3 080 190 - Mid-Tex Gas Division Addition 080.56583 37602 989 080 190 - Mid-Tex Gas Division Addition 080.56583 38000 212 080 190 - Mid-Tex Gas Division Addition 080.56586 37602 5,571 080 190 - Mid-Tex Gas Division Addition 080.56586 38000 1,391 080 190 - Mid-Tex Gas Division Addition 080.56588 38000 432 080 190 - Mid-Tex Gas Division Addition 080.56588 38100 9 080 190 - Mid-Tex Gas Division Addition 080.56588 38200 4 080 190 - Mid-Tex Gas Division Addition 080.56588 38300 4 080 190 - Mid-Tex Gas Division Addition 080.56593 37602 4,454 080 190 - Mid-Tex Gas Division Addition 080.56593 38000 1,114
MTX Additions by FERCPage 40 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.56598 37602 376 080 190 - Mid-Tex Gas Division Addition 080.56605 37602 51 080 190 - Mid-Tex Gas Division Addition 080.56605 37800 154 080 190 - Mid-Tex Gas Division Addition 080.56606 37800 127 080 190 - Mid-Tex Gas Division Addition 080.56607 37602 115 080 190 - Mid-Tex Gas Division Addition 080.56607 37800 344 080 190 - Mid-Tex Gas Division Addition 080.56608 37602 44 080 190 - Mid-Tex Gas Division Addition 080.56608 37800 131 080 190 - Mid-Tex Gas Division Addition 080.56610 38000 169 080 190 - Mid-Tex Gas Division Addition 080.56611 37602 2,472 080 190 - Mid-Tex Gas Division Addition 080.56611 38000 1,331 080 190 - Mid-Tex Gas Division Addition 080.56612 37602 4,088 080 190 - Mid-Tex Gas Division Addition 080.56612 38000 1,153 080 190 - Mid-Tex Gas Division Addition 080.56613 37602 599 080 190 - Mid-Tex Gas Division Addition 080.56613 38000 205 080 190 - Mid-Tex Gas Division Addition 080.56613 38100 17 080 190 - Mid-Tex Gas Division Addition 080.56613 38200 17 080 190 - Mid-Tex Gas Division Addition 080.56613 38300 17 080 190 - Mid-Tex Gas Division Addition 080.56614 37602 2,779 080 190 - Mid-Tex Gas Division Addition 080.56614 38000 830 080 190 - Mid-Tex Gas Division Addition 080.56618 37602 4,082 080 190 - Mid-Tex Gas Division Addition 080.56618 38000 958 080 190 - Mid-Tex Gas Division Addition 080.56627 37800 33 080 190 - Mid-Tex Gas Division Addition 080.56633 37602 98 080 190 - Mid-Tex Gas Division Addition 080.56651 37600 126,659 080 190 - Mid-Tex Gas Division Addition 080.56652 37602 6,029 080 190 - Mid-Tex Gas Division Addition 080.56662 37602 27,914 080 190 - Mid-Tex Gas Division Addition 080.56662 38000 4,243 080 190 - Mid-Tex Gas Division Addition 080.56670 37601 5,785 080 190 - Mid-Tex Gas Division Addition 080.56670 37800 32,782 080 190 - Mid-Tex Gas Division Addition 080.56672 37602 773 080 190 - Mid-Tex Gas Division Addition 080.56672 38000 17 080 190 - Mid-Tex Gas Division Addition 080.56672 38100 34 080 190 - Mid-Tex Gas Division Addition 080.56672 38200 17 080 190 - Mid-Tex Gas Division Addition 080.56672 38300 17 080 190 - Mid-Tex Gas Division Addition 080.56679 37602 1,162 080 190 - Mid-Tex Gas Division Addition 080.56679 38000 12 080 190 - Mid-Tex Gas Division Addition 080.56680 37602 2,510 080 190 - Mid-Tex Gas Division Addition 080.56680 38000 1,293 080 190 - Mid-Tex Gas Division Addition 080.56681 37602 5,290 080 190 - Mid-Tex Gas Division Addition 080.56681 38000 1,322 080 190 - Mid-Tex Gas Division Addition 080.56685 37602 1,439 080 190 - Mid-Tex Gas Division Addition 080.56685 38000 112 080 190 - Mid-Tex Gas Division Addition 080.56685 38100 16 080 190 - Mid-Tex Gas Division Addition 080.56685 38200 16 080 190 - Mid-Tex Gas Division Addition 080.56685 38300 16 080 190 - Mid-Tex Gas Division Addition 080.56686 37602 1,794 080 190 - Mid-Tex Gas Division Addition 080.56686 38000 288 080 190 - Mid-Tex Gas Division Addition 080.56686 38100 89 080 190 - Mid-Tex Gas Division Addition 080.56686 38200 22 080 190 - Mid-Tex Gas Division Addition 080.56686 38300 22 080 190 - Mid-Tex Gas Division Addition 080.56694 37601 210 080 190 - Mid-Tex Gas Division Addition 080.56717 38000 2,562 080 190 - Mid-Tex Gas Division Addition 080.56717 38100 101 080 190 - Mid-Tex Gas Division Addition 080.56717 38200 14 080 190 - Mid-Tex Gas Division Addition 080.56717 38300 20 080 190 - Mid-Tex Gas Division Addition 080.56719 38000 3,858 080 190 - Mid-Tex Gas Division Addition 080.56719 38200 214 080 190 - Mid-Tex Gas Division Addition 080.56719 38300 214 080 190 - Mid-Tex Gas Division Addition 080.56720 38000 9,314 080 190 - Mid-Tex Gas Division Addition 080.56720 38100 95 080 190 - Mid-Tex Gas Division Addition 080.56720 38300 95 080 190 - Mid-Tex Gas Division Addition 080.56721 37602 106 080 190 - Mid-Tex Gas Division Addition 080.56721 37800 1 080 190 - Mid-Tex Gas Division Addition 080.56721 38000 6 080 190 - Mid-Tex Gas Division Addition 080.56721 38100 1 080 190 - Mid-Tex Gas Division Addition 080.56721 38200 1 080 190 - Mid-Tex Gas Division Addition 080.56722 37602 2,992 080 190 - Mid-Tex Gas Division Addition 080.56722 38000 427 080 190 - Mid-Tex Gas Division Addition 080.56722 38100 427 080 190 - Mid-Tex Gas Division Addition 080.56722 38200 214 080 190 - Mid-Tex Gas Division Addition 080.56722 38300 214 080 190 - Mid-Tex Gas Division Addition 080.56723 37602 1,501 080 190 - Mid-Tex Gas Division Addition 080.56723 38000 1,001 080 190 - Mid-Tex Gas Division Addition 080.56724 37602 5,142 080 190 - Mid-Tex Gas Division Addition 080.56724 38000 1,714 080 190 - Mid-Tex Gas Division Addition 080.56726 38000 10,075 080 190 - Mid-Tex Gas Division Addition 080.56727 37601 22 080 190 - Mid-Tex Gas Division Addition 080.56731 37602 1,324 080 190 - Mid-Tex Gas Division Addition 080.56731 38000 794 080 190 - Mid-Tex Gas Division Addition 080.56731 38200 265 080 190 - Mid-Tex Gas Division Addition 080.56731 38300 265 080 190 - Mid-Tex Gas Division Addition 080.56735 37602 1,105 080 190 - Mid-Tex Gas Division Addition 080.56735 38000 1,208 080 190 - Mid-Tex Gas Division Addition 080.56735 38100 154 080 190 - Mid-Tex Gas Division Addition 080.56735 38200 51 080 190 - Mid-Tex Gas Division Addition 080.56735 38300 51 080 190 - Mid-Tex Gas Division Addition 080.56737 37602 202 080 190 - Mid-Tex Gas Division Addition 080.56737 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56738 37602 242 080 190 - Mid-Tex Gas Division Addition 080.56738 38000 37 080 190 - Mid-Tex Gas Division Addition 080.56738 38100 3 080 190 - Mid-Tex Gas Division Addition 080.56738 38200 3 080 190 - Mid-Tex Gas Division Addition 080.56739 37602 1,861 080 190 - Mid-Tex Gas Division Addition 080.56739 38000 588 080 190 - Mid-Tex Gas Division Addition 080.56743 37602 7,194 080 190 - Mid-Tex Gas Division Addition 080.56743 38000 2,470 080 190 - Mid-Tex Gas Division Addition 080.56746 37602 2,409 080 190 - Mid-Tex Gas Division Addition 080.56746 38000 150 080 190 - Mid-Tex Gas Division Addition 080.56747 37602 635 080 190 - Mid-Tex Gas Division Addition 080.56747 38000 327 080 190 - Mid-Tex Gas Division Addition 080.56756 37602 839 080 190 - Mid-Tex Gas Division Addition 080.56762 37602 387 080 190 - Mid-Tex Gas Division Addition 080.56762 38100 4 080 190 - Mid-Tex Gas Division Addition 080.56762 38200 8 080 190 - Mid-Tex Gas Division Addition 080.56762 38300 8 080 190 - Mid-Tex Gas Division Addition 080.56782 37602 10,856 080 190 - Mid-Tex Gas Division Addition 080.56789 37602 277
MTX Additions by FERCPage 41 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.56789 38000 15 080 190 - Mid-Tex Gas Division Addition 080.56800 37601 (11) 080 190 - Mid-Tex Gas Division Addition 080.56800 37602 (1,050) 080 190 - Mid-Tex Gas Division Addition 080.56800 38000 (33) 080 190 - Mid-Tex Gas Division Addition 080.56806 37602 495 080 190 - Mid-Tex Gas Division Addition 080.56809 37602 1,291 080 190 - Mid-Tex Gas Division Addition 080.56809 38000 553 080 190 - Mid-Tex Gas Division Addition 080.56810 37602 1,446 080 190 - Mid-Tex Gas Division Addition 080.56810 38000 413 080 190 - Mid-Tex Gas Division Addition 080.56810 38100 103 080 190 - Mid-Tex Gas Division Addition 080.56810 38200 41 080 190 - Mid-Tex Gas Division Addition 080.56810 38300 62 080 190 - Mid-Tex Gas Division Addition 080.56817 37601 2,934 080 190 - Mid-Tex Gas Division Addition 080.56817 37602 587 080 190 - Mid-Tex Gas Division Addition 080.56817 37800 2,347 080 190 - Mid-Tex Gas Division Addition 080.56826 37602 134 080 190 - Mid-Tex Gas Division Addition 080.56828 37602 1,260 080 190 - Mid-Tex Gas Division Addition 080.56838 37602 358 080 190 - Mid-Tex Gas Division Addition 080.56838 38000 7 080 190 - Mid-Tex Gas Division Addition 080.56850 37601 1,876 080 190 - Mid-Tex Gas Division Addition 080.56850 38000 49 080 190 - Mid-Tex Gas Division Addition 080.56850 38100 73 080 190 - Mid-Tex Gas Division Addition 080.56850 38200 24 080 190 - Mid-Tex Gas Division Addition 080.56850 38300 49 080 190 - Mid-Tex Gas Division Addition 080.56850 38500 244 080 190 - Mid-Tex Gas Division Addition 080.56853 37602 3 080 190 - Mid-Tex Gas Division Addition 080.56853 37800 138 080 190 - Mid-Tex Gas Division Addition 080.56853 38000 2 080 190 - Mid-Tex Gas Division Addition 080.56855 37602 108,877 080 190 - Mid-Tex Gas Division Addition 080.56855 38000 116,182 080 190 - Mid-Tex Gas Division Addition 080.56856 37602 115,864 080 190 - Mid-Tex Gas Division Addition 080.56856 38000 23,986 080 190 - Mid-Tex Gas Division Addition 080.56857 37602 454 080 190 - Mid-Tex Gas Division Addition 080.56857 38000 454 080 190 - Mid-Tex Gas Division Addition 080.56858 37602 2,474,296 080 190 - Mid-Tex Gas Division Addition 080.56858 38000 153,378 080 190 - Mid-Tex Gas Division Addition 080.56860 37602 1,478,799 080 190 - Mid-Tex Gas Division Addition 080.56860 38000 824,373 080 190 - Mid-Tex Gas Division Addition 080.56860 38100 0.10 080 190 - Mid-Tex Gas Division Addition 080.56860 38300 2 080 190 - Mid-Tex Gas Division Addition 080.56861 37602 31,077 080 190 - Mid-Tex Gas Division Addition 080.56861 38000 (22,649) 080 190 - Mid-Tex Gas Division Addition 080.56862 37602 1,579,798 080 190 - Mid-Tex Gas Division Addition 080.56862 38000 157,459 080 190 - Mid-Tex Gas Division Addition 080.56863 37602 3,097,221 080 190 - Mid-Tex Gas Division Addition 080.56863 38000 269,139 080 190 - Mid-Tex Gas Division Addition 080.56863 38100 36,867 080 190 - Mid-Tex Gas Division Addition 080.56864 37602 1,241,567 080 190 - Mid-Tex Gas Division Addition 080.56864 38000 104,618 080 190 - Mid-Tex Gas Division Addition 080.56865 37602 349,873 080 190 - Mid-Tex Gas Division Addition 080.56865 38000 57,068 080 190 - Mid-Tex Gas Division Addition 080.56866 37602 329,068 080 190 - Mid-Tex Gas Division Addition 080.56866 38000 (54,089) 080 190 - Mid-Tex Gas Division Addition 080.56867 37602 2,132,175 080 190 - Mid-Tex Gas Division Addition 080.56867 38000 624,024 080 190 - Mid-Tex Gas Division Addition 080.56869 37602 19 080 190 - Mid-Tex Gas Division Addition 080.56869 38000 19 080 190 - Mid-Tex Gas Division Addition 080.56870 37601 61,670 080 190 - Mid-Tex Gas Division Addition 080.56870 37602 21,786 080 190 - Mid-Tex Gas Division Addition 080.56870 38000 (42,378) 080 190 - Mid-Tex Gas Division Addition 080.56871 37602 244,744 080 190 - Mid-Tex Gas Division Addition 080.56871 38000 (20,807) 080 190 - Mid-Tex Gas Division Addition 080.56872 37602 25 080 190 - Mid-Tex Gas Division Addition 080.56872 38000 25 080 190 - Mid-Tex Gas Division Addition 080.56873 37602 878,058 080 190 - Mid-Tex Gas Division Addition 080.56873 38000 (774,483) 080 190 - Mid-Tex Gas Division Addition 080.56874 37602 462,941 080 190 - Mid-Tex Gas Division Addition 080.56874 38000 (64,679) 080 190 - Mid-Tex Gas Division Addition 080.56875 37602 14 080 190 - Mid-Tex Gas Division Addition 080.56875 38000 14 080 190 - Mid-Tex Gas Division Addition 080.56876 37602 529,511 080 190 - Mid-Tex Gas Division Addition 080.56876 38000 1,711,998 080 190 - Mid-Tex Gas Division Addition 080.56882 37602 1,423 080 190 - Mid-Tex Gas Division Addition 080.56882 38000 356 080 190 - Mid-Tex Gas Division Addition 080.56882 38100 712 080 190 - Mid-Tex Gas Division Addition 080.56882 38200 534 080 190 - Mid-Tex Gas Division Addition 080.56882 38300 534 080 190 - Mid-Tex Gas Division Addition 080.56884 37602 1,300 080 190 - Mid-Tex Gas Division Addition 080.56884 38000 557 080 190 - Mid-Tex Gas Division Addition 080.56891 37602 1,365 080 190 - Mid-Tex Gas Division Addition 080.56891 38000 171 080 190 - Mid-Tex Gas Division Addition 080.56891 38100 137 080 190 - Mid-Tex Gas Division Addition 080.56891 38200 17 080 190 - Mid-Tex Gas Division Addition 080.56891 38300 17 080 190 - Mid-Tex Gas Division Addition 080.56894 37602 212 080 190 - Mid-Tex Gas Division Addition 080.56894 38000 4 080 190 - Mid-Tex Gas Division Addition 080.56897 37602 124 080 190 - Mid-Tex Gas Division Addition 080.56904 37602 963 080 190 - Mid-Tex Gas Division Addition 080.56904 38000 303 080 190 - Mid-Tex Gas Division Addition 080.56904 38100 26 080 190 - Mid-Tex Gas Division Addition 080.56904 38200 13 080 190 - Mid-Tex Gas Division Addition 080.56904 38300 13 080 190 - Mid-Tex Gas Division Addition 080.56912 37602 4,330 080 190 - Mid-Tex Gas Division Addition 080.56917 37602 737 080 190 - Mid-Tex Gas Division Addition 080.56917 38000 259 080 190 - Mid-Tex Gas Division Addition 080.56918 37602 2,057 080 190 - Mid-Tex Gas Division Addition 080.56918 38000 514 080 190 - Mid-Tex Gas Division Addition 080.56919 37602 17,500 080 190 - Mid-Tex Gas Division Addition 080.56919 38000 14,318 080 190 - Mid-Tex Gas Division Addition 080.56920 37602 6,267 080 190 - Mid-Tex Gas Division Addition 080.56920 38000 5,338 080 190 - Mid-Tex Gas Division Addition 080.56921 37602 2,719 080 190 - Mid-Tex Gas Division Addition 080.56921 38000 480 080 190 - Mid-Tex Gas Division Addition 080.56922 37602 909 080 190 - Mid-Tex Gas Division Addition 080.56922 38000 271 080 190 - Mid-Tex Gas Division Addition 080.56925 37800 31 080 190 - Mid-Tex Gas Division Addition 080.56928 37602 481 080 190 - Mid-Tex Gas Division Addition 080.56938 37602 6,201
MTX Additions by FERCPage 42 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.56938 38000 2,657 080 190 - Mid-Tex Gas Division Addition 080.56947 37602 866 080 190 - Mid-Tex Gas Division Addition 080.56947 38000 289 080 190 - Mid-Tex Gas Division Addition 080.56949 37602 602 080 190 - Mid-Tex Gas Division Addition 080.56949 38100 1 080 190 - Mid-Tex Gas Division Addition 080.56949 38200 0.24 080 190 - Mid-Tex Gas Division Addition 080.56949 38300 0.24 080 190 - Mid-Tex Gas Division Addition 080.56955 37602 10,309 080 190 - Mid-Tex Gas Division Addition 080.56965 37602 3,452 080 190 - Mid-Tex Gas Division Addition 080.56965 38000 2,301 080 190 - Mid-Tex Gas Division Addition 080.56971 37602 540 080 190 - Mid-Tex Gas Division Addition 080.56971 38000 29 080 190 - Mid-Tex Gas Division Addition 080.56971 38100 6 080 190 - Mid-Tex Gas Division Addition 080.56971 38200 6 080 190 - Mid-Tex Gas Division Addition 080.56971 38300 6 080 190 - Mid-Tex Gas Division Addition 080.56974 37602 735 080 190 - Mid-Tex Gas Division Addition 080.56974 38000 82 080 190 - Mid-Tex Gas Division Addition 080.56975 37602 823 080 190 - Mid-Tex Gas Division Addition 080.56975 38000 91 080 190 - Mid-Tex Gas Division Addition 080.56978 37602 2,474 080 190 - Mid-Tex Gas Division Addition 080.56980 37602 26 080 190 - Mid-Tex Gas Division Addition 080.56981 38000 935 080 190 - Mid-Tex Gas Division Addition 080.56981 38500 8,368 080 190 - Mid-Tex Gas Division Addition 080.56988 37602 1,029 080 190 - Mid-Tex Gas Division Addition 080.56988 38000 203 080 190 - Mid-Tex Gas Division Addition 080.56988 38100 13 080 190 - Mid-Tex Gas Division Addition 080.56988 38200 13 080 190 - Mid-Tex Gas Division Addition 080.56988 38300 13 080 190 - Mid-Tex Gas Division Addition 080.56989 37602 1,947 080 190 - Mid-Tex Gas Division Addition 080.56989 38000 1,298 080 190 - Mid-Tex Gas Division Addition 080.56991 37602 2,327 080 190 - Mid-Tex Gas Division Addition 080.56991 38000 452 080 190 - Mid-Tex Gas Division Addition 080.56991 38100 259 080 190 - Mid-Tex Gas Division Addition 080.56991 38200 65 080 190 - Mid-Tex Gas Division Addition 080.56991 38300 129 080 190 - Mid-Tex Gas Division Addition 080.56995 37602 909 080 190 - Mid-Tex Gas Division Addition 080.56995 38000 160 080 190 - Mid-Tex Gas Division Addition 080.57008 37602 13,863 080 190 - Mid-Tex Gas Division Addition 080.57008 37800 12,530 080 190 - Mid-Tex Gas Division Addition 080.57008 38000 267 080 190 - Mid-Tex Gas Division Addition 080.57011 37602 1,574 080 190 - Mid-Tex Gas Division Addition 080.57013 37602 2,261 080 190 - Mid-Tex Gas Division Addition 080.57013 38000 564 080 190 - Mid-Tex Gas Division Addition 080.57045 37601 34,958 080 190 - Mid-Tex Gas Division Addition 080.57053 37602 3,447 080 190 - Mid-Tex Gas Division Addition 080.57053 38000 2,297 080 190 - Mid-Tex Gas Division Addition 080.57058 37602 3,910 080 190 - Mid-Tex Gas Division Addition 080.57058 38000 1,409 080 190 - Mid-Tex Gas Division Addition 080.57061 37602 (4) 080 190 - Mid-Tex Gas Division Addition 080.57061 38000 (4) 080 190 - Mid-Tex Gas Division Addition 080.57061 38100 (4) 080 190 - Mid-Tex Gas Division Addition 080.57063 37602 588,159 080 190 - Mid-Tex Gas Division Addition 080.57063 38000 353,456 080 190 - Mid-Tex Gas Division Addition 080.57069 37602 3,678 080 190 - Mid-Tex Gas Division Addition 080.57069 38000 5 080 190 - Mid-Tex Gas Division Addition 080.57069 38100 91 080 190 - Mid-Tex Gas Division Addition 080.57069 38200 23 080 190 - Mid-Tex Gas Division Addition 080.57069 38300 23 080 190 - Mid-Tex Gas Division Addition 080.57070 37602 950 080 190 - Mid-Tex Gas Division Addition 080.57070 38000 238 080 190 - Mid-Tex Gas Division Addition 080.57071 37602 5,952 080 190 - Mid-Tex Gas Division Addition 080.57071 38000 249 080 190 - Mid-Tex Gas Division Addition 080.57072 37602 5,126 080 190 - Mid-Tex Gas Division Addition 080.57072 38000 5,126 080 190 - Mid-Tex Gas Division Addition 080.57076 37602 4,294 080 190 - Mid-Tex Gas Division Addition 080.57076 38000 477 080 190 - Mid-Tex Gas Division Addition 080.57090 37602 606 080 190 - Mid-Tex Gas Division Addition 080.57090 38000 213 080 190 - Mid-Tex Gas Division Addition 080.57090 38100 17 080 190 - Mid-Tex Gas Division Addition 080.57090 38200 9 080 190 - Mid-Tex Gas Division Addition 080.57090 38300 9 080 190 - Mid-Tex Gas Division Addition 080.57096 37602 67 080 190 - Mid-Tex Gas Division Addition 080.57104 37602 632 080 190 - Mid-Tex Gas Division Addition 080.57117 37602 26 080 190 - Mid-Tex Gas Division Addition 080.57123 37602 4,621 080 190 - Mid-Tex Gas Division Addition 080.57123 38000 96 080 190 - Mid-Tex Gas Division Addition 080.57123 38200 96 080 190 - Mid-Tex Gas Division Addition 080.57131 37800 671 080 190 - Mid-Tex Gas Division Addition 080.57133 37601 18 080 190 - Mid-Tex Gas Division Addition 080.57134 37602 2,977 080 190 - Mid-Tex Gas Division Addition 080.57134 38000 331 080 190 - Mid-Tex Gas Division Addition 080.57138 37602 5,899 080 190 - Mid-Tex Gas Division Addition 080.57152 37602 195 080 190 - Mid-Tex Gas Division Addition 080.57152 38000 39 080 190 - Mid-Tex Gas Division Addition 080.57152 38100 1 080 190 - Mid-Tex Gas Division Addition 080.57152 38200 0.06 080 190 - Mid-Tex Gas Division Addition 080.57152 38300 0.12 080 190 - Mid-Tex Gas Division Addition 080.57168 37602 302 080 190 - Mid-Tex Gas Division Addition 080.57168 38000 3 080 190 - Mid-Tex Gas Division Addition 080.57168 38100 3 080 190 - Mid-Tex Gas Division Addition 080.57170 37602 655 080 190 - Mid-Tex Gas Division Addition 080.57170 38000 34 080 190 - Mid-Tex Gas Division Addition 080.57171 37602 52,350 080 190 - Mid-Tex Gas Division Addition 080.57171 38000 12,956 080 190 - Mid-Tex Gas Division Addition 080.57174 37602 417 080 190 - Mid-Tex Gas Division Addition 080.57176 37602 230 080 190 - Mid-Tex Gas Division Addition 080.57179 37601 43 080 190 - Mid-Tex Gas Division Addition 080.57193 37602 2,885 080 190 - Mid-Tex Gas Division Addition 080.57193 38000 152 080 190 - Mid-Tex Gas Division Addition 080.57196 37602 22,165 080 190 - Mid-Tex Gas Division Addition 080.57200 37602 51,546 080 190 - Mid-Tex Gas Division Addition 080.57202 37602 1,131 080 190 - Mid-Tex Gas Division Addition 080.57202 38000 81 080 190 - Mid-Tex Gas Division Addition 080.57202 38100 67 080 190 - Mid-Tex Gas Division Addition 080.57202 38200 27 080 190 - Mid-Tex Gas Division Addition 080.57202 38300 40 080 190 - Mid-Tex Gas Division Addition 080.57208 37602 15 080 190 - Mid-Tex Gas Division Addition 080.57214 37602 384
MTX Additions by FERCPage 43 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.57217 37602 78 080 190 - Mid-Tex Gas Division Addition 080.57225 37601 30 080 190 - Mid-Tex Gas Division Addition 080.57225 37800 566 080 190 - Mid-Tex Gas Division Addition 080.57240 37602 10,598 080 190 - Mid-Tex Gas Division Addition 080.57240 38000 2,650 080 190 - Mid-Tex Gas Division Addition 080.57242 37602 107 080 190 - Mid-Tex Gas Division Addition 080.57247 37602 304 080 190 - Mid-Tex Gas Division Addition 080.57248 37602 (364) 080 190 - Mid-Tex Gas Division Addition 080.57259 37602 954 080 190 - Mid-Tex Gas Division Addition 080.57259 38000 10 080 190 - Mid-Tex Gas Division Addition 080.57261 37602 84,782 080 190 - Mid-Tex Gas Division Addition 080.57261 38000 21,196 080 190 - Mid-Tex Gas Division Addition 080.57262 37602 418 080 190 - Mid-Tex Gas Division Addition 080.57268 37602 460 080 190 - Mid-Tex Gas Division Addition 080.57268 38000 122 080 190 - Mid-Tex Gas Division Addition 080.57269 37602 10,321 080 190 - Mid-Tex Gas Division Addition 080.57269 38000 898 080 190 - Mid-Tex Gas Division Addition 080.57278 37602 4,913 080 190 - Mid-Tex Gas Division Addition 080.57278 38000 157 080 190 - Mid-Tex Gas Division Addition 080.57278 38100 52 080 190 - Mid-Tex Gas Division Addition 080.57278 38200 52 080 190 - Mid-Tex Gas Division Addition 080.57278 38300 52 080 190 - Mid-Tex Gas Division Addition 080.57282 37602 30,145 080 190 - Mid-Tex Gas Division Addition 080.57283 37602 1,255 080 190 - Mid-Tex Gas Division Addition 080.57283 38000 222 080 190 - Mid-Tex Gas Division Addition 080.57285 37602 1,723 080 190 - Mid-Tex Gas Division Addition 080.57285 38000 4,066 080 190 - Mid-Tex Gas Division Addition 080.57287 37602 254 080 190 - Mid-Tex Gas Division Addition 080.57287 38000 13 080 190 - Mid-Tex Gas Division Addition 080.57293 37602 10,169 080 190 - Mid-Tex Gas Division Addition 080.57293 38000 208 080 190 - Mid-Tex Gas Division Addition 080.57294 37602 11,106 080 190 - Mid-Tex Gas Division Addition 080.57294 38000 1,960 080 190 - Mid-Tex Gas Division Addition 080.57296 37601 185 080 190 - Mid-Tex Gas Division Addition 080.57296 37800 740 080 190 - Mid-Tex Gas Division Addition 080.57297 37602 174 080 190 - Mid-Tex Gas Division Addition 080.57309 37602 180 080 190 - Mid-Tex Gas Division Addition 080.57312 37602 49,742 080 190 - Mid-Tex Gas Division Addition 080.57312 38000 5,527 080 190 - Mid-Tex Gas Division Addition 080.57314 37602 980 080 190 - Mid-Tex Gas Division Addition 080.57314 38000 150 080 190 - Mid-Tex Gas Division Addition 080.57314 38300 23 080 190 - Mid-Tex Gas Division Addition 080.57332 37602 93 080 190 - Mid-Tex Gas Division Addition 080.57344 37602 2,505 080 190 - Mid-Tex Gas Division Addition 080.57348 37601 1,213 080 190 - Mid-Tex Gas Division Addition 080.57348 37602 4,853 080 190 - Mid-Tex Gas Division Addition 080.57351 37800 6 080 190 - Mid-Tex Gas Division Addition 080.57362 37602 29 080 190 - Mid-Tex Gas Division Addition 080.57370 37602 410 080 190 - Mid-Tex Gas Division Addition 080.57371 37602 1,912 080 190 - Mid-Tex Gas Division Addition 080.57371 38000 891 080 190 - Mid-Tex Gas Division Addition 080.57371 38100 51 080 190 - Mid-Tex Gas Division Addition 080.57371 38200 13 080 190 - Mid-Tex Gas Division Addition 080.57371 38300 13 080 190 - Mid-Tex Gas Division Addition 080.57374 37602 861 080 190 - Mid-Tex Gas Division Addition 080.57374 38000 45 080 190 - Mid-Tex Gas Division Addition 080.57388 37602 80 080 190 - Mid-Tex Gas Division Addition 080.57388 38000 21 080 190 - Mid-Tex Gas Division Addition 080.57388 38100 567 080 190 - Mid-Tex Gas Division Addition 080.57388 38200 3 080 190 - Mid-Tex Gas Division Addition 080.57391 37602 6,685 080 190 - Mid-Tex Gas Division Addition 080.57391 38000 503 080 190 - Mid-Tex Gas Division Addition 080.57392 37602 10,390 080 190 - Mid-Tex Gas Division Addition 080.57392 38000 3,279 080 190 - Mid-Tex Gas Division Addition 080.57393 37602 13,259 080 190 - Mid-Tex Gas Division Addition 080.57393 38000 4,419 080 190 - Mid-Tex Gas Division Addition 080.57394 37601 233 080 190 - Mid-Tex Gas Division Addition 080.57395 37602 56 080 190 - Mid-Tex Gas Division Addition 080.57396 37602 15,351 080 190 - Mid-Tex Gas Division Addition 080.57396 38000 3,838 080 190 - Mid-Tex Gas Division Addition 080.57397 37602 20,226 080 190 - Mid-Tex Gas Division Addition 080.57397 38000 5,057 080 190 - Mid-Tex Gas Division Addition 080.57398 37602 68 080 190 - Mid-Tex Gas Division Addition 080.57399 37602 15,153 080 190 - Mid-Tex Gas Division Addition 080.57399 38000 2,385 080 190 - Mid-Tex Gas Division Addition 080.57400 37602 4,495 080 190 - Mid-Tex Gas Division Addition 080.57400 38000 1,926 080 190 - Mid-Tex Gas Division Addition 080.57402 37602 27,214 080 190 - Mid-Tex Gas Division Addition 080.57402 38000 14,019 080 190 - Mid-Tex Gas Division Addition 080.57405 37602 4,120 080 190 - Mid-Tex Gas Division Addition 080.57405 38000 2,747 080 190 - Mid-Tex Gas Division Addition 080.57406 37602 15,051 080 190 - Mid-Tex Gas Division Addition 080.57406 38000 6,451 080 190 - Mid-Tex Gas Division Addition 080.57419 37602 710 080 190 - Mid-Tex Gas Division Addition 080.57431 37602 588 080 190 - Mid-Tex Gas Division Addition 080.57431 38000 65 080 190 - Mid-Tex Gas Division Addition 080.57435 37602 (1,728) 080 190 - Mid-Tex Gas Division Addition 080.57437 37601 50,647 080 190 - Mid-Tex Gas Division Addition 080.57446 37601 662 080 190 - Mid-Tex Gas Division Addition 080.57449 37602 317 080 190 - Mid-Tex Gas Division Addition 080.57449 38000 35 080 190 - Mid-Tex Gas Division Addition 080.57469 37602 389 080 190 - Mid-Tex Gas Division Addition 080.57470 37602 105 080 190 - Mid-Tex Gas Division Addition 080.57475 37602 262 080 190 - Mid-Tex Gas Division Addition 080.57478 37601 2,969 080 190 - Mid-Tex Gas Division Addition 080.57492 37800 492 080 190 - Mid-Tex Gas Division Addition 080.57493 37602 1,124 080 190 - Mid-Tex Gas Division Addition 080.57497 37602 2,653 080 190 - Mid-Tex Gas Division Addition 080.57497 38000 663 080 190 - Mid-Tex Gas Division Addition 080.57498 37602 689 080 190 - Mid-Tex Gas Division Addition 080.57498 38000 172 080 190 - Mid-Tex Gas Division Addition 080.57499 37602 12,517 080 190 - Mid-Tex Gas Division Addition 080.57499 38000 4,285 080 190 - Mid-Tex Gas Division Addition 080.57502 37602 4,286 080 190 - Mid-Tex Gas Division Addition 080.57502 38000 1,072 080 190 - Mid-Tex Gas Division Addition 080.57503 37602 5,499 080 190 - Mid-Tex Gas Division Addition 080.57503 38000 1,932 080 190 - Mid-Tex Gas Division Addition 080.57506 37602 161
MTX Additions by FERCPage 44 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.57508 37602 3,939 080 190 - Mid-Tex Gas Division Addition 080.57508 38000 15,764 080 190 - Mid-Tex Gas Division Addition 080.57509 37602 925 080 190 - Mid-Tex Gas Division Addition 080.57509 38000 308 080 190 - Mid-Tex Gas Division Addition 080.57510 37602 2,435 080 190 - Mid-Tex Gas Division Addition 080.57510 38000 1,311 080 190 - Mid-Tex Gas Division Addition 080.57518 37602 23,742 080 190 - Mid-Tex Gas Division Addition 080.57520 37602 3 080 190 - Mid-Tex Gas Division Addition 080.57525 37602 19,860 080 190 - Mid-Tex Gas Division Addition 080.57525 38000 23,313 080 190 - Mid-Tex Gas Division Addition 080.57528 37602 46,230 080 190 - Mid-Tex Gas Division Addition 080.57528 38000 8,158 080 190 - Mid-Tex Gas Division Addition 080.57529 37602 686 080 190 - Mid-Tex Gas Division Addition 080.57529 38000 171 080 190 - Mid-Tex Gas Division Addition 080.57540 37602 12,833 080 190 - Mid-Tex Gas Division Addition 080.57540 38000 3,208 080 190 - Mid-Tex Gas Division Addition 080.57544 37601 39 080 190 - Mid-Tex Gas Division Addition 080.57545 37602 157 080 190 - Mid-Tex Gas Division Addition 080.57545 38000 8 080 190 - Mid-Tex Gas Division Addition 080.57549 37602 2,506 080 190 - Mid-Tex Gas Division Addition 080.57549 38000 2,050 080 190 - Mid-Tex Gas Division Addition 080.57551 37602 9,991 080 190 - Mid-Tex Gas Division Addition 080.57551 38000 2,507 080 190 - Mid-Tex Gas Division Addition 080.57552 37602 3,997 080 190 - Mid-Tex Gas Division Addition 080.57552 38000 1,554 080 190 - Mid-Tex Gas Division Addition 080.57556 37601 222 080 190 - Mid-Tex Gas Division Addition 080.57568 37602 45,633 080 190 - Mid-Tex Gas Division Addition 080.57568 38000 9,766 080 190 - Mid-Tex Gas Division Addition 080.57570 37602 192 080 190 - Mid-Tex Gas Division Addition 080.57579 37602 2,024 080 190 - Mid-Tex Gas Division Addition 080.57579 38000 41 080 190 - Mid-Tex Gas Division Addition 080.57580 37602 2,450 080 190 - Mid-Tex Gas Division Addition 080.57580 38000 33 080 190 - Mid-Tex Gas Division Addition 080.57580 38100 8 080 190 - Mid-Tex Gas Division Addition 080.57580 38200 26 080 190 - Mid-Tex Gas Division Addition 080.57580 38300 26 080 190 - Mid-Tex Gas Division Addition 080.57585 37602 9 080 190 - Mid-Tex Gas Division Addition 080.57599 37601 2,657 080 190 - Mid-Tex Gas Division Addition 080.57607 37602 187 080 190 - Mid-Tex Gas Division Addition 080.57607 38000 22 080 190 - Mid-Tex Gas Division Addition 080.57607 38200 11 080 190 - Mid-Tex Gas Division Addition 080.57613 37602 195 080 190 - Mid-Tex Gas Division Addition 080.57615 38000 8,065 080 190 - Mid-Tex Gas Division Addition 080.57615 38100 1,611 080 190 - Mid-Tex Gas Division Addition 080.57615 38200 537 080 190 - Mid-Tex Gas Division Addition 080.57615 38300 537 080 190 - Mid-Tex Gas Division Addition 080.57627 37602 317 080 190 - Mid-Tex Gas Division Addition 080.57627 38000 56 080 190 - Mid-Tex Gas Division Addition 080.57629 37800 6,358 080 190 - Mid-Tex Gas Division Addition 080.57630 37602 1,334 080 190 - Mid-Tex Gas Division Addition 080.57631 37602 699 080 190 - Mid-Tex Gas Division Addition 080.57631 38000 22 080 190 - Mid-Tex Gas Division Addition 080.57631 38100 7 080 190 - Mid-Tex Gas Division Addition 080.57631 38200 7 080 190 - Mid-Tex Gas Division Addition 080.57631 38300 7 080 190 - Mid-Tex Gas Division Addition 080.57632 37602 2,261 080 190 - Mid-Tex Gas Division Addition 080.57632 38000 21 080 190 - Mid-Tex Gas Division Addition 080.57634 37602 116 080 190 - Mid-Tex Gas Division Addition 080.57641 37602 1,461 080 190 - Mid-Tex Gas Division Addition 080.57658 37602 4,643 080 190 - Mid-Tex Gas Division Addition 080.57658 38000 2,969 080 190 - Mid-Tex Gas Division Addition 080.57661 37602 295 080 190 - Mid-Tex Gas Division Addition 080.57665 37601 23,198 080 190 - Mid-Tex Gas Division Addition 080.57665 37800 54,131 080 190 - Mid-Tex Gas Division Addition 080.57669 37602 426 080 190 - Mid-Tex Gas Division Addition 080.57672 37602 5,361 080 190 - Mid-Tex Gas Division Addition 080.57672 38000 3,575 080 190 - Mid-Tex Gas Division Addition 080.57675 37602 379 080 190 - Mid-Tex Gas Division Addition 080.57675 38000 42 080 190 - Mid-Tex Gas Division Addition 080.57679 37602 31,249 080 190 - Mid-Tex Gas Division Addition 080.57679 38000 30,024 080 190 - Mid-Tex Gas Division Addition 080.57689 37602 867 080 190 - Mid-Tex Gas Division Addition 080.57689 38000 47 080 190 - Mid-Tex Gas Division Addition 080.57689 38100 9 080 190 - Mid-Tex Gas Division Addition 080.57689 38200 9 080 190 - Mid-Tex Gas Division Addition 080.57689 38300 9 080 190 - Mid-Tex Gas Division Addition 080.57693 37601 16,641 080 190 - Mid-Tex Gas Division Addition 080.57697 37602 1,043 080 190 - Mid-Tex Gas Division Addition 080.57697 38000 55 080 190 - Mid-Tex Gas Division Addition 080.57703 37600 260 080 190 - Mid-Tex Gas Division Addition 080.57703 37601 12,721 080 190 - Mid-Tex Gas Division Addition 080.57711 37602 1,823 080 190 - Mid-Tex Gas Division Addition 080.57713 37602 688 080 190 - Mid-Tex Gas Division Addition 080.57716 37602 98 080 190 - Mid-Tex Gas Division Addition 080.57716 38000 22 080 190 - Mid-Tex Gas Division Addition 080.57719 37602 226 080 190 - Mid-Tex Gas Division Addition 080.57725 37602 8,800 080 190 - Mid-Tex Gas Division Addition 080.57725 38000 5,866 080 190 - Mid-Tex Gas Division Addition 080.57729 37602 1,658 080 190 - Mid-Tex Gas Division Addition 080.57729 38000 414 080 190 - Mid-Tex Gas Division Addition 080.57730 37601 16 080 190 - Mid-Tex Gas Division Addition 080.57747 37602 4,779 080 190 - Mid-Tex Gas Division Addition 080.57747 38000 2,461 080 190 - Mid-Tex Gas Division Addition 080.57748 37602 78 080 190 - Mid-Tex Gas Division Addition 080.57748 38000 26 080 190 - Mid-Tex Gas Division Addition 080.57751 37602 199 080 190 - Mid-Tex Gas Division Addition 080.57753 37602 2,863 080 190 - Mid-Tex Gas Division Addition 080.57753 38000 1,286 080 190 - Mid-Tex Gas Division Addition 080.57754 37602 19,869 080 190 - Mid-Tex Gas Division Addition 080.57754 38000 6,623 080 190 - Mid-Tex Gas Division Addition 080.57755 37602 1,516 080 190 - Mid-Tex Gas Division Addition 080.57756 37601 650 080 190 - Mid-Tex Gas Division Addition 080.57756 37602 650 080 190 - Mid-Tex Gas Division Addition 080.57756 37800 11,700 080 190 - Mid-Tex Gas Division Addition 080.57757 37602 1,578 080 190 - Mid-Tex Gas Division Addition 080.57757 38000 88 080 190 - Mid-Tex Gas Division Addition 080.57758 37602 1,428 080 190 - Mid-Tex Gas Division Addition 080.57758 38000 158
MTX Additions by FERCPage 45 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.57763 37602 1,941 080 190 - Mid-Tex Gas Division Addition 080.57763 38000 517 080 190 - Mid-Tex Gas Division Addition 080.57767 37602 4,873 080 190 - Mid-Tex Gas Division Addition 080.57767 38000 76 080 190 - Mid-Tex Gas Division Addition 080.57767 38100 50 080 190 - Mid-Tex Gas Division Addition 080.57767 38200 50 080 190 - Mid-Tex Gas Division Addition 080.57767 38300 50 080 190 - Mid-Tex Gas Division Addition 080.57795 37602 12,600 080 190 - Mid-Tex Gas Division Addition 080.57795 38000 2,224 080 190 - Mid-Tex Gas Division Addition 080.57796 37602 6,607 080 190 - Mid-Tex Gas Division Addition 080.57796 38000 2,181 080 190 - Mid-Tex Gas Division Addition 080.57800 37602 15,436 080 190 - Mid-Tex Gas Division Addition 080.57800 38000 323 080 190 - Mid-Tex Gas Division Addition 080.57809 37602 830 080 190 - Mid-Tex Gas Division Addition 080.57809 38000 17 080 190 - Mid-Tex Gas Division Addition 080.57818 37602 469 080 190 - Mid-Tex Gas Division Addition 080.57818 38000 83 080 190 - Mid-Tex Gas Division Addition 080.57820 37602 947 080 190 - Mid-Tex Gas Division Addition 080.57823 37602 19,490 080 190 - Mid-Tex Gas Division Addition 080.57823 38000 12,989 080 190 - Mid-Tex Gas Division Addition 080.57824 37601 60,414 080 190 - Mid-Tex Gas Division Addition 080.57824 37800 10,667 080 190 - Mid-Tex Gas Division Addition 080.57836 38000 51 080 190 - Mid-Tex Gas Division Addition 080.57848 37602 351 080 190 - Mid-Tex Gas Division Addition 080.57850 37602 730 080 190 - Mid-Tex Gas Division Addition 080.57852 37602 20,160 080 190 - Mid-Tex Gas Division Addition 080.57852 38000 2,240 080 190 - Mid-Tex Gas Division Addition 080.57856 37602 22,088 080 190 - Mid-Tex Gas Division Addition 080.57856 38000 13,538 080 190 - Mid-Tex Gas Division Addition 080.57859 37602 22,014 080 190 - Mid-Tex Gas Division Addition 080.57859 38000 14,676 080 190 - Mid-Tex Gas Division Addition 080.57861 37602 12,881 080 190 - Mid-Tex Gas Division Addition 080.57861 38000 3,226 080 190 - Mid-Tex Gas Division Addition 080.57866 37602 22,759 080 190 - Mid-Tex Gas Division Addition 080.57866 38000 5,690 080 190 - Mid-Tex Gas Division Addition 080.57874 37602 13,110 080 190 - Mid-Tex Gas Division Addition 080.57874 38000 1,936 080 190 - Mid-Tex Gas Division Addition 080.57877 37601 38,416 080 190 - Mid-Tex Gas Division Addition 080.57879 37800 15,191 080 190 - Mid-Tex Gas Division Addition 080.57902 37602 504 080 190 - Mid-Tex Gas Division Addition 080.57904 37602 2,553 080 190 - Mid-Tex Gas Division Addition 080.57904 38000 2,658 080 190 - Mid-Tex Gas Division Addition 080.57908 37602 2,407 080 190 - Mid-Tex Gas Division Addition 080.57908 38000 936 080 190 - Mid-Tex Gas Division Addition 080.57909 37602 137 080 190 - Mid-Tex Gas Division Addition 080.57912 37601 14 080 190 - Mid-Tex Gas Division Addition 080.57914 37602 7,741 080 190 - Mid-Tex Gas Division Addition 080.57914 38000 8,057 080 190 - Mid-Tex Gas Division Addition 080.57915 37602 23,133 080 190 - Mid-Tex Gas Division Addition 080.57915 38000 16,076 080 190 - Mid-Tex Gas Division Addition 080.57916 37602 2,069 080 190 - Mid-Tex Gas Division Addition 080.57916 38000 230 080 190 - Mid-Tex Gas Division Addition 080.57924 37602 3,555 080 190 - Mid-Tex Gas Division Addition 080.57924 38000 889 080 190 - Mid-Tex Gas Division Addition 080.57926 37602 13,405 080 190 - Mid-Tex Gas Division Addition 080.57926 38000 1,166 080 190 - Mid-Tex Gas Division Addition 080.57929 37602 4,917 080 190 - Mid-Tex Gas Division Addition 080.57929 38000 546 080 190 - Mid-Tex Gas Division Addition 080.57930 37800 4 080 190 - Mid-Tex Gas Division Addition 080.57932 37602 3,362 080 190 - Mid-Tex Gas Division Addition 080.57932 38000 69 080 190 - Mid-Tex Gas Division Addition 080.57938 37602 54,771 080 190 - Mid-Tex Gas Division Addition 080.57938 38000 13,693 080 190 - Mid-Tex Gas Division Addition 080.57940 37602 5,521 080 190 - Mid-Tex Gas Division Addition 080.57941 37602 5,791 080 190 - Mid-Tex Gas Division Addition 080.57941 38000 644 080 190 - Mid-Tex Gas Division Addition 080.57944 37602 10,199 080 190 - Mid-Tex Gas Division Addition 080.57944 38000 87 080 190 - Mid-Tex Gas Division Addition 080.57954 37602 8,833 080 190 - Mid-Tex Gas Division Addition 080.57954 38000 2,208 080 190 - Mid-Tex Gas Division Addition 080.57959 37602 9,953 080 190 - Mid-Tex Gas Division Addition 080.57959 38000 101 080 190 - Mid-Tex Gas Division Addition 080.57960 37602 8,026 080 190 - Mid-Tex Gas Division Addition 080.57960 38000 3,779 080 190 - Mid-Tex Gas Division Addition 080.57963 37602 9,349 080 190 - Mid-Tex Gas Division Addition 080.57963 38000 1,038 080 190 - Mid-Tex Gas Division Addition 080.57964 37601 53,465 080 190 - Mid-Tex Gas Division Addition 080.57971 37602 17,366 080 190 - Mid-Tex Gas Division Addition 080.57971 38000 254 080 190 - Mid-Tex Gas Division Addition 080.57983 37601 852,677 080 190 - Mid-Tex Gas Division Addition 080.57983 37602 203,018 080 190 - Mid-Tex Gas Division Addition 080.57983 37800 974,488 080 190 - Mid-Tex Gas Division Addition 080.57985 37601 447,912 080 190 - Mid-Tex Gas Division Addition 080.57985 37800 49,768 080 190 - Mid-Tex Gas Division Addition 080.57986 37601 187,257 080 190 - Mid-Tex Gas Division Addition 080.57986 37800 57,674 080 190 - Mid-Tex Gas Division Addition 080.57990 37800 10,444 080 190 - Mid-Tex Gas Division Addition 080.57991 37602 6,813 080 190 - Mid-Tex Gas Division Addition 080.57991 38000 757 080 190 - Mid-Tex Gas Division Addition 080.57992 37602 5,350 080 190 - Mid-Tex Gas Division Addition 080.57992 38000 3,567 080 190 - Mid-Tex Gas Division Addition 080.57993 37602 14,424 080 190 - Mid-Tex Gas Division Addition 080.57993 38000 9,628 080 190 - Mid-Tex Gas Division Addition 080.57996 37602 825 080 190 - Mid-Tex Gas Division Addition 080.57997 37602 38,384 080 190 - Mid-Tex Gas Division Addition 080.57997 38000 17,245 080 190 - Mid-Tex Gas Division Addition 080.58003 37602 2,035 080 190 - Mid-Tex Gas Division Addition 080.58003 38000 536 080 190 - Mid-Tex Gas Division Addition 080.58008 37602 349 080 190 - Mid-Tex Gas Division Addition 080.58009 37602 7,766 080 190 - Mid-Tex Gas Division Addition 080.58009 38000 3,328 080 190 - Mid-Tex Gas Division Addition 080.58012 37602 9,307 080 190 - Mid-Tex Gas Division Addition 080.58012 38000 2,327 080 190 - Mid-Tex Gas Division Addition 080.58013 37602 (1,876) 080 190 - Mid-Tex Gas Division Addition 080.58013 38000 (38) 080 190 - Mid-Tex Gas Division Addition 080.58020 37602 27,259 080 190 - Mid-Tex Gas Division Addition 080.58020 38000 14,678 080 190 - Mid-Tex Gas Division Addition 080.58023 37602 11,530
MTX Additions by FERCPage 46 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.58023 38000 9,433 080 190 - Mid-Tex Gas Division Addition 080.58024 37602 26,221 080 190 - Mid-Tex Gas Division Addition 080.58024 38000 9,009 080 190 - Mid-Tex Gas Division Addition 080.58026 37601 7,205 080 190 - Mid-Tex Gas Division Addition 080.58026 38000 4,795 080 190 - Mid-Tex Gas Division Addition 080.58027 37602 25,327 080 190 - Mid-Tex Gas Division Addition 080.58027 38000 2,081 080 190 - Mid-Tex Gas Division Addition 080.58029 37602 5,607 080 190 - Mid-Tex Gas Division Addition 080.58029 38000 3,293 080 190 - Mid-Tex Gas Division Addition 080.58034 37602 5,322 080 190 - Mid-Tex Gas Division Addition 080.58034 38000 462 080 190 - Mid-Tex Gas Division Addition 080.58036 37602 11,691 080 190 - Mid-Tex Gas Division Addition 080.58036 38000 6,299 080 190 - Mid-Tex Gas Division Addition 080.58037 37602 18,353 080 190 - Mid-Tex Gas Division Addition 080.58037 38000 9,882 080 190 - Mid-Tex Gas Division Addition 080.58038 37602 21,755 080 190 - Mid-Tex Gas Division Addition 080.58038 38000 14,534 080 190 - Mid-Tex Gas Division Addition 080.58040 37602 10,275 080 190 - Mid-Tex Gas Division Addition 080.58040 38000 6,850 080 190 - Mid-Tex Gas Division Addition 080.58042 37602 11,056 080 190 - Mid-Tex Gas Division Addition 080.58042 38000 7,367 080 190 - Mid-Tex Gas Division Addition 080.58051 38000 6,619 080 190 - Mid-Tex Gas Division Addition 080.58052 37602 5,324 080 190 - Mid-Tex Gas Division Addition 080.58052 38000 281 080 190 - Mid-Tex Gas Division Addition 080.58054 37602 16,621 080 190 - Mid-Tex Gas Division Addition 080.58054 38000 172 080 190 - Mid-Tex Gas Division Addition 080.58055 38000 3,743 080 190 - Mid-Tex Gas Division Addition 080.58056 38000 4,321 080 190 - Mid-Tex Gas Division Addition 080.58060 37602 52,797 080 190 - Mid-Tex Gas Division Addition 080.58060 38000 5,867 080 190 - Mid-Tex Gas Division Addition 080.58061 38000 42,539 080 190 - Mid-Tex Gas Division Addition 080.58068 37601 392 080 190 - Mid-Tex Gas Division Addition 080.58083 38000 118 080 190 - Mid-Tex Gas Division Addition 080.58084 38000 163 080 190 - Mid-Tex Gas Division Addition 080.58085 37602 23,749 080 190 - Mid-Tex Gas Division Addition 080.58085 38000 6,313 080 190 - Mid-Tex Gas Division Addition 080.58086 37602 27,270 080 190 - Mid-Tex Gas Division Addition 080.58086 38000 4,814 080 190 - Mid-Tex Gas Division Addition 080.58087 38000 12,007 080 190 - Mid-Tex Gas Division Addition 080.58088 38000 66,093 080 190 - Mid-Tex Gas Division Addition 080.58099 37602 1,819 080 190 - Mid-Tex Gas Division Addition 080.58099 38000 320 080 190 - Mid-Tex Gas Division Addition 080.58100 37602 13,130 080 190 - Mid-Tex Gas Division Addition 080.58100 38000 4,377 080 190 - Mid-Tex Gas Division Addition 080.58101 37602 13,641 080 190 - Mid-Tex Gas Division Addition 080.58101 38000 4,075 080 190 - Mid-Tex Gas Division Addition 080.58103 37602 12,455 080 190 - Mid-Tex Gas Division Addition 080.58103 38000 3,709 080 190 - Mid-Tex Gas Division Addition 080.58104 37602 6,725 080 190 - Mid-Tex Gas Division Addition 080.58104 38000 137 080 190 - Mid-Tex Gas Division Addition 080.58105 37602 80,789 080 190 - Mid-Tex Gas Division Addition 080.58105 38000 1,649 080 190 - Mid-Tex Gas Division Addition 080.58107 37602 8,815 080 190 - Mid-Tex Gas Division Addition 080.58107 38000 1,554 080 190 - Mid-Tex Gas Division Addition 080.58109 37602 116 080 190 - Mid-Tex Gas Division Addition 080.58110 37602 2,345 080 190 - Mid-Tex Gas Division Addition 080.58110 37800 1,565 080 190 - Mid-Tex Gas Division Addition 080.58112 37602 (467) 080 190 - Mid-Tex Gas Division Addition 080.58113 37602 1,574 080 190 - Mid-Tex Gas Division Addition 080.58113 38000 49 080 190 - Mid-Tex Gas Division Addition 080.58115 38000 9,255 080 190 - Mid-Tex Gas Division Addition 080.58117 37602 4,347 080 190 - Mid-Tex Gas Division Addition 080.58117 38000 483 080 190 - Mid-Tex Gas Division Addition 080.58119 37602 3,982 080 190 - Mid-Tex Gas Division Addition 080.58119 38000 442 080 190 - Mid-Tex Gas Division Addition 080.58126 37601 29,000 080 190 - Mid-Tex Gas Division Addition 080.58126 37602 371,195 080 190 - Mid-Tex Gas Division Addition 080.58126 37800 179,798 080 190 - Mid-Tex Gas Division Addition 080.58131 37602 1,915 080 190 - Mid-Tex Gas Division Addition 080.58147 38000 224 080 190 - Mid-Tex Gas Division Addition 080.58149 37602 5,445 080 190 - Mid-Tex Gas Division Addition 080.58153 37602 16,747 080 190 - Mid-Tex Gas Division Addition 080.58153 38000 342 080 190 - Mid-Tex Gas Division Addition 080.58154 37602 32,002 080 190 - Mid-Tex Gas Division Addition 080.58154 38000 10,673 080 190 - Mid-Tex Gas Division Addition 080.58158 37601 27,846 080 190 - Mid-Tex Gas Division Addition 080.58159 37602 50,239 080 190 - Mid-Tex Gas Division Addition 080.58159 38000 9,248 080 190 - Mid-Tex Gas Division Addition 080.58161 37602 24,469 080 190 - Mid-Tex Gas Division Addition 080.58161 38000 5,371 080 190 - Mid-Tex Gas Division Addition 080.58162 38000 14,437 080 190 - Mid-Tex Gas Division Addition 080.58167 37602 24,400 080 190 - Mid-Tex Gas Division Addition 080.58167 38000 1,286 080 190 - Mid-Tex Gas Division Addition 080.58169 37601 10,392 080 190 - Mid-Tex Gas Division Addition 080.58169 38000 216 080 190 - Mid-Tex Gas Division Addition 080.58172 38000 5,968 080 190 - Mid-Tex Gas Division Addition 080.58174 37602 7,539 080 190 - Mid-Tex Gas Division Addition 080.58189 37601 332 080 190 - Mid-Tex Gas Division Addition 080.58189 37602 332 080 190 - Mid-Tex Gas Division Addition 080.58192 37800 50 080 190 - Mid-Tex Gas Division Addition 080.58195 37602 1,775 080 190 - Mid-Tex Gas Division Addition 080.58195 38000 94 080 190 - Mid-Tex Gas Division Addition 080.58204 37602 3,153 080 190 - Mid-Tex Gas Division Addition 080.58204 38000 1,052 080 190 - Mid-Tex Gas Division Addition 080.58212 37602 10,208 080 190 - Mid-Tex Gas Division Addition 080.58217 37602 30,281 080 190 - Mid-Tex Gas Division Addition 080.58217 38000 3,364 080 190 - Mid-Tex Gas Division Addition 080.58218 37602 15,391 080 190 - Mid-Tex Gas Division Addition 080.58225 37602 16,237 080 190 - Mid-Tex Gas Division Addition 080.58225 38000 5,414 080 190 - Mid-Tex Gas Division Addition 080.58229 37602 1,043 080 190 - Mid-Tex Gas Division Addition 080.58229 38000 52 080 190 - Mid-Tex Gas Division Addition 080.58233 37602 1,452 080 190 - Mid-Tex Gas Division Addition 080.58233 38000 161 080 190 - Mid-Tex Gas Division Addition 080.58234 37601 4,081 080 190 - Mid-Tex Gas Division Addition 080.58242 37602 2,944 080 190 - Mid-Tex Gas Division Addition 080.58242 38000 93 080 190 - Mid-Tex Gas Division Addition 080.58252 37602 2,480
MTX Additions by FERCPage 47 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.58252 38000 130 080 190 - Mid-Tex Gas Division Addition 080.58254 37602 3,047 080 190 - Mid-Tex Gas Division Addition 080.58258 37602 2,706 080 190 - Mid-Tex Gas Division Addition 080.58258 38000 2,706 080 190 - Mid-Tex Gas Division Addition 080.58265 37602 23,349 080 190 - Mid-Tex Gas Division Addition 080.58265 38000 4,446 080 190 - Mid-Tex Gas Division Addition 080.58267 37602 48,760 080 190 - Mid-Tex Gas Division Addition 080.58267 38000 2,567 080 190 - Mid-Tex Gas Division Addition 080.58276 37602 21,168 080 190 - Mid-Tex Gas Division Addition 080.58276 38000 5,292 080 190 - Mid-Tex Gas Division Addition 080.58286 37601 93 080 190 - Mid-Tex Gas Division Addition 080.58286 37602 90 080 190 - Mid-Tex Gas Division Addition 080.58306 37602 12,288 080 190 - Mid-Tex Gas Division Addition 080.58306 38000 3,070 080 190 - Mid-Tex Gas Division Addition 080.58307 37601 393 080 190 - Mid-Tex Gas Division Addition 080.58308 37602 357 080 190 - Mid-Tex Gas Division Addition 080.58320 37602 5,160 080 190 - Mid-Tex Gas Division Addition 080.58320 38000 271 080 190 - Mid-Tex Gas Division Addition 080.58327 37602 15,813 080 190 - Mid-Tex Gas Division Addition 080.58327 38000 832 080 190 - Mid-Tex Gas Division Addition 080.58329 37602 8,764 080 190 - Mid-Tex Gas Division Addition 080.58329 38000 976 080 190 - Mid-Tex Gas Division Addition 080.58330 37602 15,413 080 190 - Mid-Tex Gas Division Addition 080.58330 38000 811 080 190 - Mid-Tex Gas Division Addition 080.58340 37602 529 080 190 - Mid-Tex Gas Division Addition 080.58359 37602 12,880 080 190 - Mid-Tex Gas Division Addition 080.58359 38000 3,219 080 190 - Mid-Tex Gas Division Addition 080.58361 37602 38,416 080 190 - Mid-Tex Gas Division Addition 080.58361 38000 5,011 080 190 - Mid-Tex Gas Division Addition 080.58372 37602 825 080 190 - Mid-Tex Gas Division Addition 080.58373 37601 6,279 080 190 - Mid-Tex Gas Division Addition 080.58373 37602 571 080 190 - Mid-Tex Gas Division Addition 080.58373 37800 50,238 080 190 - Mid-Tex Gas Division Addition 080.58384 37602 7,367 080 190 - Mid-Tex Gas Division Addition 080.58384 38000 1,300 080 190 - Mid-Tex Gas Division Addition 080.58387 37602 2,856 080 190 - Mid-Tex Gas Division Addition 080.58387 38000 504 080 190 - Mid-Tex Gas Division Addition 080.58389 37800 54 080 190 - Mid-Tex Gas Division Addition 080.58390 37800 120 080 190 - Mid-Tex Gas Division Addition 080.58398 37800 120 080 190 - Mid-Tex Gas Division Addition 080.58402 37800 30 080 190 - Mid-Tex Gas Division Addition 080.58413 37602 10,928 080 190 - Mid-Tex Gas Division Addition 080.58418 37800 117 080 190 - Mid-Tex Gas Division Addition 080.58429 37602 593 080 190 - Mid-Tex Gas Division Addition 080.58429 38000 66 080 190 - Mid-Tex Gas Division Addition 080.58444 37602 14,113 080 190 - Mid-Tex Gas Division Addition 080.58451 37602 41,859 080 190 - Mid-Tex Gas Division Addition 080.58451 38000 10,465 080 190 - Mid-Tex Gas Division Addition 080.58452 38000 5,389 080 190 - Mid-Tex Gas Division Addition 080.58454 37601 636 080 190 - Mid-Tex Gas Division Addition 080.58460 37602 2,218 080 190 - Mid-Tex Gas Division Addition 080.58460 38000 116 080 190 - Mid-Tex Gas Division Addition 080.58462 37602 10,324 080 190 - Mid-Tex Gas Division Addition 080.58462 38000 1,021 080 190 - Mid-Tex Gas Division Addition 080.58464 37601 11 080 190 - Mid-Tex Gas Division Addition 080.58464 37602 11 080 190 - Mid-Tex Gas Division Addition 080.58469 37602 949 080 190 - Mid-Tex Gas Division Addition 080.58480 37602 4,572 080 190 - Mid-Tex Gas Division Addition 080.58484 37602 29,283 080 190 - Mid-Tex Gas Division Addition 080.58485 38000 14,054 080 190 - Mid-Tex Gas Division Addition 080.58490 37602 17,325 080 190 - Mid-Tex Gas Division Addition 080.58490 38000 536 080 190 - Mid-Tex Gas Division Addition 080.58494 37602 755 080 190 - Mid-Tex Gas Division Addition 080.58499 37602 8,360 080 190 - Mid-Tex Gas Division Addition 080.58509 37602 1,680 080 190 - Mid-Tex Gas Division Addition 080.58509 38000 1,681 080 190 - Mid-Tex Gas Division Addition 080.58514 37602 23,696 080 190 - Mid-Tex Gas Division Addition 080.58514 38000 1,247 080 190 - Mid-Tex Gas Division Addition 080.58515 37602 1,636 080 190 - Mid-Tex Gas Division Addition 080.58544 37602 9,704 080 190 - Mid-Tex Gas Division Addition 080.58545 37602 21,869 080 190 - Mid-Tex Gas Division Addition 080.58545 38000 4,971 080 190 - Mid-Tex Gas Division Addition 080.58551 37602 527 080 190 - Mid-Tex Gas Division Addition 080.58556 37602 19,355 080 190 - Mid-Tex Gas Division Addition 080.58559 37602 9,242 080 190 - Mid-Tex Gas Division Addition 080.58564 37602 1,266 080 190 - Mid-Tex Gas Division Addition 080.58564 38000 317 080 190 - Mid-Tex Gas Division Addition 080.58577 37602 32,765 080 190 - Mid-Tex Gas Division Addition 080.58577 38000 1,319 080 190 - Mid-Tex Gas Division Addition 080.58583 37601 3,812 080 190 - Mid-Tex Gas Division Addition 080.58587 37602 764 080 190 - Mid-Tex Gas Division Addition 080.58587 38000 84 080 190 - Mid-Tex Gas Division Addition 080.58590 37601 296,066 080 190 - Mid-Tex Gas Division Addition 080.58593 37602 13,175 080 190 - Mid-Tex Gas Division Addition 080.58593 38000 8,424 080 190 - Mid-Tex Gas Division Addition 080.58594 37602 4,528 080 190 - Mid-Tex Gas Division Addition 080.58594 38000 1,418 080 190 - Mid-Tex Gas Division Addition 080.58598 37601 41,288 080 190 - Mid-Tex Gas Division Addition 080.58598 37800 36,654 080 190 - Mid-Tex Gas Division Addition 080.58604 37601 32 080 190 - Mid-Tex Gas Division Addition 080.58604 37602 33 080 190 - Mid-Tex Gas Division Addition 080.58608 37602 1,942 080 190 - Mid-Tex Gas Division Addition 080.58610 37602 3,361 080 190 - Mid-Tex Gas Division Addition 080.58618 37602 12,539 080 190 - Mid-Tex Gas Division Addition 080.58618 38000 3,131 080 190 - Mid-Tex Gas Division Addition 080.58619 37602 14,282 080 190 - Mid-Tex Gas Division Addition 080.58619 38000 4,747 080 190 - Mid-Tex Gas Division Addition 080.58620 37602 19,249 080 190 - Mid-Tex Gas Division Addition 080.58620 38000 6,416 080 190 - Mid-Tex Gas Division Addition 080.58621 37602 2,563 080 190 - Mid-Tex Gas Division Addition 080.58621 38000 135 080 190 - Mid-Tex Gas Division Addition 080.58622 37602 6,367 080 190 - Mid-Tex Gas Division Addition 080.58622 38000 1,592 080 190 - Mid-Tex Gas Division Addition 080.58630 37602 11,145 080 190 - Mid-Tex Gas Division Addition 080.58634 37602 14,017 080 190 - Mid-Tex Gas Division Addition 080.58634 38000 6,070 080 190 - Mid-Tex Gas Division Addition 080.58635 37602 2,964 080 190 - Mid-Tex Gas Division Addition 080.58635 38000 524
MTX Additions by FERCPage 48 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.58639 37602 24,139 080 190 - Mid-Tex Gas Division Addition 080.58639 38000 4,261 080 190 - Mid-Tex Gas Division Addition 080.58640 37602 24,693 080 190 - Mid-Tex Gas Division Addition 080.58640 38000 16,471 080 190 - Mid-Tex Gas Division Addition 080.58646 37602 2,564 080 190 - Mid-Tex Gas Division Addition 080.58646 38000 1,382 080 190 - Mid-Tex Gas Division Addition 080.58658 37602 24,539 080 190 - Mid-Tex Gas Division Addition 080.58658 38000 1,295 080 190 - Mid-Tex Gas Division Addition 080.58669 37602 2,240 080 190 - Mid-Tex Gas Division Addition 080.58670 37602 5,602 080 190 - Mid-Tex Gas Division Addition 080.58670 38000 295 080 190 - Mid-Tex Gas Division Addition 080.58684 37602 131 080 190 - Mid-Tex Gas Division Addition 080.58691 37602 39,614 080 190 - Mid-Tex Gas Division Addition 080.58691 38000 2,085 080 190 - Mid-Tex Gas Division Addition 080.58692 37602 97,126 080 190 - Mid-Tex Gas Division Addition 080.58692 38000 5,112 080 190 - Mid-Tex Gas Division Addition 080.58693 37602 1,601 080 190 - Mid-Tex Gas Division Addition 080.58693 38000 83 080 190 - Mid-Tex Gas Division Addition 080.58694 37602 1,831 080 190 - Mid-Tex Gas Division Addition 080.58708 37602 32,279 080 190 - Mid-Tex Gas Division Addition 080.58708 38000 14,041 080 190 - Mid-Tex Gas Division Addition 080.58712 37602 15,710 080 190 - Mid-Tex Gas Division Addition 080.58712 38000 3,928 080 190 - Mid-Tex Gas Division Addition 080.58713 37602 131 080 190 - Mid-Tex Gas Division Addition 080.58714 37602 2,147 080 190 - Mid-Tex Gas Division Addition 080.58723 37602 2,065 080 190 - Mid-Tex Gas Division Addition 080.58726 37602 11,454 080 190 - Mid-Tex Gas Division Addition 080.58733 37602 1,636 080 190 - Mid-Tex Gas Division Addition 080.58733 38000 183 080 190 - Mid-Tex Gas Division Addition 080.58734 37602 33,990 080 190 - Mid-Tex Gas Division Addition 080.58734 38000 12,661 080 190 - Mid-Tex Gas Division Addition 080.58735 37602 9,917 080 190 - Mid-Tex Gas Division Addition 080.58735 38000 1,479 080 190 - Mid-Tex Gas Division Addition 080.58736 37602 6,437 080 190 - Mid-Tex Gas Division Addition 080.58737 37601 8,478 080 190 - Mid-Tex Gas Division Addition 080.58737 38000 456 080 190 - Mid-Tex Gas Division Addition 080.58738 37602 7,185 080 190 - Mid-Tex Gas Division Addition 080.58738 38000 380 080 190 - Mid-Tex Gas Division Addition 080.58740 37602 17,319 080 190 - Mid-Tex Gas Division Addition 080.58748 38000 30,404 080 190 - Mid-Tex Gas Division Addition 080.58750 37602 34,056 080 190 - Mid-Tex Gas Division Addition 080.58750 38000 2,563 080 190 - Mid-Tex Gas Division Addition 080.58751 37602 38,503 080 190 - Mid-Tex Gas Division Addition 080.58753 37602 53,264 080 190 - Mid-Tex Gas Division Addition 080.58753 38000 5,918 080 190 - Mid-Tex Gas Division Addition 080.58755 37602 25,705 080 190 - Mid-Tex Gas Division Addition 080.58756 37602 45,070 080 190 - Mid-Tex Gas Division Addition 080.58756 38000 7,547 080 190 - Mid-Tex Gas Division Addition 080.58768 37602 928 080 190 - Mid-Tex Gas Division Addition 080.58788 37602 4,601 080 190 - Mid-Tex Gas Division Addition 080.58788 38000 1,534 080 190 - Mid-Tex Gas Division Addition 080.58791 37602 1,493 080 190 - Mid-Tex Gas Division Addition 080.58791 38000 377 080 190 - Mid-Tex Gas Division Addition 080.58792 37602 73,551 080 190 - Mid-Tex Gas Division Addition 080.58792 38000 8,217 080 190 - Mid-Tex Gas Division Addition 080.58796 38000 6,236 080 190 - Mid-Tex Gas Division Addition 080.58797 37602 14,971 080 190 - Mid-Tex Gas Division Addition 080.58797 38000 1,663 080 190 - Mid-Tex Gas Division Addition 080.58798 37602 8,835 080 190 - Mid-Tex Gas Division Addition 080.58798 38000 466 080 190 - Mid-Tex Gas Division Addition 080.58800 37602 164,751 080 190 - Mid-Tex Gas Division Addition 080.58800 38000 88,622 080 190 - Mid-Tex Gas Division Addition 080.58801 37602 11,436 080 190 - Mid-Tex Gas Division Addition 080.58801 38000 602 080 190 - Mid-Tex Gas Division Addition 080.58806 37602 2,179 080 190 - Mid-Tex Gas Division Addition 080.58807 38000 5,117 080 190 - Mid-Tex Gas Division Addition 080.58810 37602 2,268 080 190 - Mid-Tex Gas Division Addition 080.58815 37602 9,588 080 190 - Mid-Tex Gas Division Addition 080.58816 37602 309 080 190 - Mid-Tex Gas Division Addition 080.58817 37602 515 080 190 - Mid-Tex Gas Division Addition 080.58824 37602 6,820 080 190 - Mid-Tex Gas Division Addition 080.58824 38000 3,100 080 190 - Mid-Tex Gas Division Addition 080.58830 37601 54,858 080 190 - Mid-Tex Gas Division Addition 080.58830 37602 13,714 080 190 - Mid-Tex Gas Division Addition 080.58831 37602 15,810 080 190 - Mid-Tex Gas Division Addition 080.58831 38000 3,952 080 190 - Mid-Tex Gas Division Addition 080.58834 37602 34,370 080 190 - Mid-Tex Gas Division Addition 080.58834 38000 8,593 080 190 - Mid-Tex Gas Division Addition 080.58837 37602 54,120 080 190 - Mid-Tex Gas Division Addition 080.58837 38000 23,194 080 190 - Mid-Tex Gas Division Addition 080.58849 37602 396 080 190 - Mid-Tex Gas Division Addition 080.58860 37602 5,716 080 190 - Mid-Tex Gas Division Addition 080.58860 38000 1,009 080 190 - Mid-Tex Gas Division Addition 080.58863 37602 35,004 080 190 - Mid-Tex Gas Division Addition 080.58866 37602 40,315 080 190 - Mid-Tex Gas Division Addition 080.58866 38000 19,857 080 190 - Mid-Tex Gas Division Addition 080.58867 37602 27,281 080 190 - Mid-Tex Gas Division Addition 080.58867 38000 1,137 080 190 - Mid-Tex Gas Division Addition 080.58871 37602 37,743 080 190 - Mid-Tex Gas Division Addition 080.58871 38000 1,986 080 190 - Mid-Tex Gas Division Addition 080.58872 37602 46,994 080 190 - Mid-Tex Gas Division Addition 080.58872 38000 5,222 080 190 - Mid-Tex Gas Division Addition 080.58878 37602 12,222 080 190 - Mid-Tex Gas Division Addition 080.58878 38000 3,656 080 190 - Mid-Tex Gas Division Addition 080.58879 37601 67,315 080 190 - Mid-Tex Gas Division Addition 080.58879 38000 7,480 080 190 - Mid-Tex Gas Division Addition 080.58880 37602 14,217 080 190 - Mid-Tex Gas Division Addition 080.58880 38000 2,912 080 190 - Mid-Tex Gas Division Addition 080.58881 37602 47,659 080 190 - Mid-Tex Gas Division Addition 080.58881 38000 8,410 080 190 - Mid-Tex Gas Division Addition 080.58882 37602 27,546 080 190 - Mid-Tex Gas Division Addition 080.58882 38000 1,450 080 190 - Mid-Tex Gas Division Addition 080.58883 37602 24,674 080 190 - Mid-Tex Gas Division Addition 080.58883 38000 1,299 080 190 - Mid-Tex Gas Division Addition 080.58888 37602 11,736 080 190 - Mid-Tex Gas Division Addition 080.58888 38000 7,824 080 190 - Mid-Tex Gas Division Addition 080.58890 37602 44,356 080 190 - Mid-Tex Gas Division Addition 080.58890 38000 4,937
MTX Additions by FERCPage 49 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.58891 37602 9,176 080 190 - Mid-Tex Gas Division Addition 080.58891 38000 8,652 080 190 - Mid-Tex Gas Division Addition 080.58895 37602 902 080 190 - Mid-Tex Gas Division Addition 080.58895 38000 47 080 190 - Mid-Tex Gas Division Addition 080.58896 37601 5,646 080 190 - Mid-Tex Gas Division Addition 080.58896 38000 301 080 190 - Mid-Tex Gas Division Addition 080.58899 37602 13,343 080 190 - Mid-Tex Gas Division Addition 080.58899 38000 1,483 080 190 - Mid-Tex Gas Division Addition 080.58900 37602 15,734 080 190 - Mid-Tex Gas Division Addition 080.58900 38000 10,489 080 190 - Mid-Tex Gas Division Addition 080.58901 37602 7,991 080 190 - Mid-Tex Gas Division Addition 080.58901 38000 5,328 080 190 - Mid-Tex Gas Division Addition 080.58903 37602 30,032 080 190 - Mid-Tex Gas Division Addition 080.58903 38000 3,387 080 190 - Mid-Tex Gas Division Addition 080.58907 37602 33,219 080 190 - Mid-Tex Gas Division Addition 080.58907 38000 3,691 080 190 - Mid-Tex Gas Division Addition 080.58911 37602 2,887 080 190 - Mid-Tex Gas Division Addition 080.58921 37602 12,610 080 190 - Mid-Tex Gas Division Addition 080.58921 38000 949 080 190 - Mid-Tex Gas Division Addition 080.58928 37602 17,640 080 190 - Mid-Tex Gas Division Addition 080.58928 38000 17,640 080 190 - Mid-Tex Gas Division Addition 080.58929 37602 39,911 080 190 - Mid-Tex Gas Division Addition 080.58929 38000 9,978 080 190 - Mid-Tex Gas Division Addition 080.58931 37800 118 080 190 - Mid-Tex Gas Division Addition 080.58942 37602 28,023 080 190 - Mid-Tex Gas Division Addition 080.58942 38000 15,715 080 190 - Mid-Tex Gas Division Addition 080.58945 37602 13,651 080 190 - Mid-Tex Gas Division Addition 080.58945 38000 9,100 080 190 - Mid-Tex Gas Division Addition 080.58946 37602 14,631 080 190 - Mid-Tex Gas Division Addition 080.58946 38000 7,878 080 190 - Mid-Tex Gas Division Addition 080.58951 37602 73,512 080 190 - Mid-Tex Gas Division Addition 080.58951 38000 27,035 080 190 - Mid-Tex Gas Division Addition 080.58952 37602 2,936 080 190 - Mid-Tex Gas Division Addition 080.58961 37602 1,309 080 190 - Mid-Tex Gas Division Addition 080.58961 38000 231 080 190 - Mid-Tex Gas Division Addition 080.58965 37602 14,908 080 190 - Mid-Tex Gas Division Addition 080.58965 38000 9,955 080 190 - Mid-Tex Gas Division Addition 080.58969 37602 53,805 080 190 - Mid-Tex Gas Division Addition 080.58969 38000 21,184 080 190 - Mid-Tex Gas Division Addition 080.58970 37602 16,715 080 190 - Mid-Tex Gas Division Addition 080.58970 38000 31,042 080 190 - Mid-Tex Gas Division Addition 080.58974 38000 46,186 080 190 - Mid-Tex Gas Division Addition 080.58976 37602 21,593 080 190 - Mid-Tex Gas Division Addition 080.58976 38000 2,399 080 190 - Mid-Tex Gas Division Addition 080.58978 37602 4,478 080 190 - Mid-Tex Gas Division Addition 080.58978 38000 236 080 190 - Mid-Tex Gas Division Addition 080.58980 37602 28,570 080 190 - Mid-Tex Gas Division Addition 080.58980 38000 21,552 080 190 - Mid-Tex Gas Division Addition 080.58982 37602 6,645 080 190 - Mid-Tex Gas Division Addition 080.58985 37602 619 080 190 - Mid-Tex Gas Division Addition 080.58991 37602 2,309 080 190 - Mid-Tex Gas Division Addition 080.58999 37602 89,510 080 190 - Mid-Tex Gas Division Addition 080.58999 38000 35,854 080 190 - Mid-Tex Gas Division Addition 080.59001 37602 52 080 190 - Mid-Tex Gas Division Addition 080.59001 38000 48 080 190 - Mid-Tex Gas Division Addition 080.59003 37602 1,038 080 190 - Mid-Tex Gas Division Addition 080.59003 38000 11 080 190 - Mid-Tex Gas Division Addition 080.59007 37602 13,816 080 190 - Mid-Tex Gas Division Addition 080.59007 38000 6,998 080 190 - Mid-Tex Gas Division Addition 080.59008 37602 20,317 080 190 - Mid-Tex Gas Division Addition 080.59008 38000 2,257 080 190 - Mid-Tex Gas Division Addition 080.59014 37602 12,747 080 190 - Mid-Tex Gas Division Addition 080.59014 38000 5,207 080 190 - Mid-Tex Gas Division Addition 080.59016 37602 10,842 080 190 - Mid-Tex Gas Division Addition 080.59016 38000 10,417 080 190 - Mid-Tex Gas Division Addition 080.59020 37602 67,448 080 190 - Mid-Tex Gas Division Addition 080.59020 38000 3,550 080 190 - Mid-Tex Gas Division Addition 080.59021 38000 53,905 080 190 - Mid-Tex Gas Division Addition 080.59031 37602 49,375 080 190 - Mid-Tex Gas Division Addition 080.59031 38000 2,598 080 190 - Mid-Tex Gas Division Addition 080.59039 37800 1,265 080 190 - Mid-Tex Gas Division Addition 080.59045 37602 17,849 080 190 - Mid-Tex Gas Division Addition 080.59050 37602 9,071 080 190 - Mid-Tex Gas Division Addition 080.59051 37602 19,102 080 190 - Mid-Tex Gas Division Addition 080.59051 38000 19,102 080 190 - Mid-Tex Gas Division Addition 080.59052 37602 5,381 080 190 - Mid-Tex Gas Division Addition 080.59054 37602 3,403 080 190 - Mid-Tex Gas Division Addition 080.59054 38000 378 080 190 - Mid-Tex Gas Division Addition 080.59055 37602 6,771 080 190 - Mid-Tex Gas Division Addition 080.59060 37602 29,074 080 190 - Mid-Tex Gas Division Addition 080.59060 38000 7,268 080 190 - Mid-Tex Gas Division Addition 080.59062 37602 141,329 080 190 - Mid-Tex Gas Division Addition 080.59062 38000 15,771 080 190 - Mid-Tex Gas Division Addition 080.59064 37602 45,476 080 190 - Mid-Tex Gas Division Addition 080.59064 38000 13,938 080 190 - Mid-Tex Gas Division Addition 080.59068 37602 15,607 080 190 - Mid-Tex Gas Division Addition 080.59068 38000 6,689 080 190 - Mid-Tex Gas Division Addition 080.59069 37602 20,226 080 190 - Mid-Tex Gas Division Addition 080.59069 38000 17,937 080 190 - Mid-Tex Gas Division Addition 080.59070 37602 2,218 080 190 - Mid-Tex Gas Division Addition 080.59074 37602 9,013 080 190 - Mid-Tex Gas Division Addition 080.59074 38000 6,009 080 190 - Mid-Tex Gas Division Addition 080.59075 37602 13,534 080 190 - Mid-Tex Gas Division Addition 080.59075 38000 9,023 080 190 - Mid-Tex Gas Division Addition 080.59078 37602 31,580 080 190 - Mid-Tex Gas Division Addition 080.59078 38000 15,031 080 190 - Mid-Tex Gas Division Addition 080.59090 37602 7,857 080 190 - Mid-Tex Gas Division Addition 080.59093 37602 837 080 190 - Mid-Tex Gas Division Addition 080.59100 37602 3,679 080 190 - Mid-Tex Gas Division Addition 080.59112 37602 0.18 080 190 - Mid-Tex Gas Division Addition 080.59117 37602 108,502 080 190 - Mid-Tex Gas Division Addition 080.59117 38000 1,096 080 190 - Mid-Tex Gas Division Addition 080.59124 37602 29,690 080 190 - Mid-Tex Gas Division Addition 080.59125 37602 (10) 080 190 - Mid-Tex Gas Division Addition 080.59132 38000 53,275 080 190 - Mid-Tex Gas Division Addition 080.59135 37601 114,876 080 190 - Mid-Tex Gas Division Addition 080.59140 37800 994 080 190 - Mid-Tex Gas Division Addition 080.59142 37601 2,961,103
MTX Additions by FERCPage 50 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.59144 37602 2,962 080 190 - Mid-Tex Gas Division Addition 080.59153 37602 16,481 080 190 - Mid-Tex Gas Division Addition 080.59153 38000 5,018 080 190 - Mid-Tex Gas Division Addition 080.59157 37602 12,696 080 190 - Mid-Tex Gas Division Addition 080.59157 38000 9,156 080 190 - Mid-Tex Gas Division Addition 080.59162 38000 2,061 080 190 - Mid-Tex Gas Division Addition 080.59165 37601 157,484 080 190 - Mid-Tex Gas Division Addition 080.59167 37602 9,472 080 190 - Mid-Tex Gas Division Addition 080.59172 37602 9,992 080 190 - Mid-Tex Gas Division Addition 080.59172 38000 1,235 080 190 - Mid-Tex Gas Division Addition 080.59173 37602 11,298 080 190 - Mid-Tex Gas Division Addition 080.59173 38000 1,540 080 190 - Mid-Tex Gas Division Addition 080.59175 37602 12,368 080 190 - Mid-Tex Gas Division Addition 080.59175 38000 125 080 190 - Mid-Tex Gas Division Addition 080.59176 37602 8,174 080 190 - Mid-Tex Gas Division Addition 080.59185 37800 659 080 190 - Mid-Tex Gas Division Addition 080.59199 38000 33,700 080 190 - Mid-Tex Gas Division Addition 080.59202 37602 30,134 080 190 - Mid-Tex Gas Division Addition 080.59202 38000 8,234 080 190 - Mid-Tex Gas Division Addition 080.59214 37602 11,481 080 190 - Mid-Tex Gas Division Addition 080.59214 38000 1,716 080 190 - Mid-Tex Gas Division Addition 080.59215 37602 1,866 080 190 - Mid-Tex Gas Division Addition 080.59216 37602 38,966 080 190 - Mid-Tex Gas Division Addition 080.59216 38000 5,322 080 190 - Mid-Tex Gas Division Addition 080.59218 37800 162 080 190 - Mid-Tex Gas Division Addition 080.59221 37602 17,595 080 190 - Mid-Tex Gas Division Addition 080.59221 38000 4,399 080 190 - Mid-Tex Gas Division Addition 080.59261 37602 18,627 080 190 - Mid-Tex Gas Division Addition 080.59261 38000 6,889 080 190 - Mid-Tex Gas Division Addition 080.59268 37602 15,276 080 190 - Mid-Tex Gas Division Addition 080.59268 38000 4,309 080 190 - Mid-Tex Gas Division Addition 080.59269 37600 15,472 080 190 - Mid-Tex Gas Division Addition 080.59272 37602 54,521 080 190 - Mid-Tex Gas Division Addition 080.59272 38000 4,138 080 190 - Mid-Tex Gas Division Addition 080.59274 38000 931 080 190 - Mid-Tex Gas Division Addition 080.59277 37602 8,067 080 190 - Mid-Tex Gas Division Addition 080.59288 37602 57,086 080 190 - Mid-Tex Gas Division Addition 080.59288 38000 1,175 080 190 - Mid-Tex Gas Division Addition 080.59292 37602 21,389 080 190 - Mid-Tex Gas Division Addition 080.59292 38000 2,377 080 190 - Mid-Tex Gas Division Addition 080.59293 37602 54,011 080 190 - Mid-Tex Gas Division Addition 080.59293 38000 5,361 080 190 - Mid-Tex Gas Division Addition 080.59307 37602 4,165 080 190 - Mid-Tex Gas Division Addition 080.59309 38000 64,479 080 190 - Mid-Tex Gas Division Addition 080.59330 37602 20,739 080 190 - Mid-Tex Gas Division Addition 080.59330 38000 2,304 080 190 - Mid-Tex Gas Division Addition 080.59331 37602 13,611 080 190 - Mid-Tex Gas Division Addition 080.59332 37602 750 080 190 - Mid-Tex Gas Division Addition 080.59335 37602 376 080 190 - Mid-Tex Gas Division Addition 080.59337 37602 9,133 080 190 - Mid-Tex Gas Division Addition 080.59337 38000 687 080 190 - Mid-Tex Gas Division Addition 080.59339 37602 7,918 080 190 - Mid-Tex Gas Division Addition 080.59339 38000 2,639 080 190 - Mid-Tex Gas Division Addition 080.59340 37602 18,303 080 190 - Mid-Tex Gas Division Addition 080.59340 38000 4,865 080 190 - Mid-Tex Gas Division Addition 080.59342 37602 25,369 080 190 - Mid-Tex Gas Division Addition 080.59342 38000 11,938 080 190 - Mid-Tex Gas Division Addition 080.59344 37602 1,959 080 190 - Mid-Tex Gas Division Addition 080.59345 37602 15,363 080 190 - Mid-Tex Gas Division Addition 080.59345 38000 12,264 080 190 - Mid-Tex Gas Division Addition 080.59346 37602 26,922 080 190 - Mid-Tex Gas Division Addition 080.59346 38000 17,948 080 190 - Mid-Tex Gas Division Addition 080.59347 37602 13,222 080 190 - Mid-Tex Gas Division Addition 080.59347 38000 6,811 080 190 - Mid-Tex Gas Division Addition 080.59348 37602 32,018 080 190 - Mid-Tex Gas Division Addition 080.59348 38000 20,471 080 190 - Mid-Tex Gas Division Addition 080.59350 37602 52,939 080 190 - Mid-Tex Gas Division Addition 080.59350 38000 19,462 080 190 - Mid-Tex Gas Division Addition 080.59360 37602 2,918 080 190 - Mid-Tex Gas Division Addition 080.59362 37602 309 080 190 - Mid-Tex Gas Division Addition 080.59365 37602 17,997 080 190 - Mid-Tex Gas Division Addition 080.59365 38000 370 080 190 - Mid-Tex Gas Division Addition 080.59369 37602 22,321 080 190 - Mid-Tex Gas Division Addition 080.59369 38000 12,556 080 190 - Mid-Tex Gas Division Addition 080.59372 37602 26,976 080 190 - Mid-Tex Gas Division Addition 080.59372 38000 2,997 080 190 - Mid-Tex Gas Division Addition 080.59377 37602 10,519 080 190 - Mid-Tex Gas Division Addition 080.59377 38000 671 080 190 - Mid-Tex Gas Division Addition 080.59378 37601 31,509 080 190 - Mid-Tex Gas Division Addition 080.59381 37602 7,771 080 190 - Mid-Tex Gas Division Addition 080.59381 38000 4,170 080 190 - Mid-Tex Gas Division Addition 080.59387 37602 1,763 080 190 - Mid-Tex Gas Division Addition 080.59387 38000 311 080 190 - Mid-Tex Gas Division Addition 080.59402 37602 18,961 080 190 - Mid-Tex Gas Division Addition 080.59402 38000 998 080 190 - Mid-Tex Gas Division Addition 080.59408 37602 11,704 080 190 - Mid-Tex Gas Division Addition 080.59408 38000 2,065 080 190 - Mid-Tex Gas Division Addition 080.59409 37602 16,707 080 190 - Mid-Tex Gas Division Addition 080.59409 38000 2,948 080 190 - Mid-Tex Gas Division Addition 080.59411 37602 447 080 190 - Mid-Tex Gas Division Addition 080.59411 38000 50 080 190 - Mid-Tex Gas Division Addition 080.59414 37602 20,485 080 190 - Mid-Tex Gas Division Addition 080.59414 38000 2,026 080 190 - Mid-Tex Gas Division Addition 080.59416 37602 31,784 080 190 - Mid-Tex Gas Division Addition 080.59416 38000 3,532 080 190 - Mid-Tex Gas Division Addition 080.59427 37602 20,339 080 190 - Mid-Tex Gas Division Addition 080.59427 38000 6,780 080 190 - Mid-Tex Gas Division Addition 080.59430 37800 3,125 080 190 - Mid-Tex Gas Division Addition 080.59432 37602 30,785 080 190 - Mid-Tex Gas Division Addition 080.59432 38000 7,258 080 190 - Mid-Tex Gas Division Addition 080.59445 37602 16,698 080 190 - Mid-Tex Gas Division Addition 080.59445 38000 879 080 190 - Mid-Tex Gas Division Addition 080.59454 37602 11,694 080 190 - Mid-Tex Gas Division Addition 080.59454 38000 4,777 080 190 - Mid-Tex Gas Division Addition 080.59456 37800 117 080 190 - Mid-Tex Gas Division Addition 080.59457 37602 1 080 190 - Mid-Tex Gas Division Addition 080.59463 37602 16,357 080 190 - Mid-Tex Gas Division Addition 080.59463 38000 3,837
MTX Additions by FERCPage 51 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.59468 37602 20,577 080 190 - Mid-Tex Gas Division Addition 080.59468 38000 8,819 080 190 - Mid-Tex Gas Division Addition 080.59469 37602 7,668 080 190 - Mid-Tex Gas Division Addition 080.59469 38000 5,112 080 190 - Mid-Tex Gas Division Addition 080.59470 37602 16,007 080 190 - Mid-Tex Gas Division Addition 080.59470 38000 6,860 080 190 - Mid-Tex Gas Division Addition 080.59473 37800 118 080 190 - Mid-Tex Gas Division Addition 080.59477 37602 3,843 080 190 - Mid-Tex Gas Division Addition 080.59477 38000 475 080 190 - Mid-Tex Gas Division Addition 080.59482 37602 3,329 080 190 - Mid-Tex Gas Division Addition 080.59482 38000 175 080 190 - Mid-Tex Gas Division Addition 080.59484 37602 685 080 190 - Mid-Tex Gas Division Addition 080.59488 37602 2,181 080 190 - Mid-Tex Gas Division Addition 080.59488 38000 975 080 190 - Mid-Tex Gas Division Addition 080.59495 37602 5,799 080 190 - Mid-Tex Gas Division Addition 080.59496 37602 28,060 080 190 - Mid-Tex Gas Division Addition 080.59496 38000 7,015 080 190 - Mid-Tex Gas Division Addition 080.59497 37602 9,156 080 190 - Mid-Tex Gas Division Addition 080.59497 38000 1,017 080 190 - Mid-Tex Gas Division Addition 080.59510 37602 376,327 080 190 - Mid-Tex Gas Division Addition 080.59510 38000 19,807 080 190 - Mid-Tex Gas Division Addition 080.59511 37602 332,585 080 190 - Mid-Tex Gas Division Addition 080.59511 38000 17,504 080 190 - Mid-Tex Gas Division Addition 080.59512 38100 210,385 080 190 - Mid-Tex Gas Division Addition 080.59513 37601 (29,387) 080 190 - Mid-Tex Gas Division Addition 080.59518 37601 212 080 190 - Mid-Tex Gas Division Addition 080.59530 37602 14,218 080 190 - Mid-Tex Gas Division Addition 080.59530 38000 11,633 080 190 - Mid-Tex Gas Division Addition 080.59533 37602 12,070 080 190 - Mid-Tex Gas Division Addition 080.59533 38000 5,423 080 190 - Mid-Tex Gas Division Addition 080.59534 37602 9,283 080 190 - Mid-Tex Gas Division Addition 080.59534 38000 3,978 080 190 - Mid-Tex Gas Division Addition 080.59535 37602 4,124 080 190 - Mid-Tex Gas Division Addition 080.59535 38000 4,651 080 190 - Mid-Tex Gas Division Addition 080.59539 37602 19,931 080 190 - Mid-Tex Gas Division Addition 080.59539 38000 6,781 080 190 - Mid-Tex Gas Division Addition 080.59541 37602 26,392 080 190 - Mid-Tex Gas Division Addition 080.59541 38000 1,389 080 190 - Mid-Tex Gas Division Addition 080.59546 37601 49,780 080 190 - Mid-Tex Gas Division Addition 080.59546 38000 2,633 080 190 - Mid-Tex Gas Division Addition 080.59548 37602 5,272 080 190 - Mid-Tex Gas Division Addition 080.59548 38000 930 080 190 - Mid-Tex Gas Division Addition 080.59553 37602 23,654 080 190 - Mid-Tex Gas Division Addition 080.59553 38000 2,628 080 190 - Mid-Tex Gas Division Addition 080.59559 37602 30,493 080 190 - Mid-Tex Gas Division Addition 080.59559 38000 3,426 080 190 - Mid-Tex Gas Division Addition 080.59571 37800 338 080 190 - Mid-Tex Gas Division Addition 080.59578 37602 (24) 080 190 - Mid-Tex Gas Division Addition 080.59580 37602 16,718 080 190 - Mid-Tex Gas Division Addition 080.59580 38000 2,950 080 190 - Mid-Tex Gas Division Addition 080.59590 37602 14,032 080 190 - Mid-Tex Gas Division Addition 080.59590 38000 1,559 080 190 - Mid-Tex Gas Division Addition 080.59600 37602 15,470 080 190 - Mid-Tex Gas Division Addition 080.59600 38000 2,730 080 190 - Mid-Tex Gas Division Addition 080.59601 37602 24,335 080 190 - Mid-Tex Gas Division Addition 080.59601 38000 2,704 080 190 - Mid-Tex Gas Division Addition 080.59603 37602 30,555 080 190 - Mid-Tex Gas Division Addition 080.59603 38000 14,580 080 190 - Mid-Tex Gas Division Addition 080.59606 37602 5,795 080 190 - Mid-Tex Gas Division Addition 080.59611 37800 12,900 080 190 - Mid-Tex Gas Division Addition 080.59612 37602 76,118 080 190 - Mid-Tex Gas Division Addition 080.59612 38000 7,528 080 190 - Mid-Tex Gas Division Addition 080.59620 37602 26,416 080 190 - Mid-Tex Gas Division Addition 080.59620 38000 1,390 080 190 - Mid-Tex Gas Division Addition 080.59625 37602 16,521 080 190 - Mid-Tex Gas Division Addition 080.59625 38000 1,678 080 190 - Mid-Tex Gas Division Addition 080.59637 37602 18,048 080 190 - Mid-Tex Gas Division Addition 080.59637 38000 6,016 080 190 - Mid-Tex Gas Division Addition 080.59639 37602 27,390 080 190 - Mid-Tex Gas Division Addition 080.59639 38000 8,644 080 190 - Mid-Tex Gas Division Addition 080.59640 37602 25,927 080 190 - Mid-Tex Gas Division Addition 080.59640 38000 12,202 080 190 - Mid-Tex Gas Division Addition 080.59642 37602 3,652 080 190 - Mid-Tex Gas Division Addition 080.59643 37602 31,574 080 190 - Mid-Tex Gas Division Addition 080.59643 38000 10,525 080 190 - Mid-Tex Gas Division Addition 080.59644 37602 14,290 080 190 - Mid-Tex Gas Division Addition 080.59644 38000 2,326 080 190 - Mid-Tex Gas Division Addition 080.59645 37602 4,966 080 190 - Mid-Tex Gas Division Addition 080.59649 37602 915,966 080 190 - Mid-Tex Gas Division Addition 080.59649 38000 48,209 080 190 - Mid-Tex Gas Division Addition 080.59660 37602 33,484 080 190 - Mid-Tex Gas Division Addition 080.59660 38000 11,765 080 190 - Mid-Tex Gas Division Addition 080.59666 37602 27,479 080 190 - Mid-Tex Gas Division Addition 080.59666 38000 3,053 080 190 - Mid-Tex Gas Division Addition 080.59672 37602 3,118 080 190 - Mid-Tex Gas Division Addition 080.59672 38000 164 080 190 - Mid-Tex Gas Division Addition 080.59675 37602 21,246 080 190 - Mid-Tex Gas Division Addition 080.59675 38000 1,118 080 190 - Mid-Tex Gas Division Addition 080.59678 37602 9,625 080 190 - Mid-Tex Gas Division Addition 080.59678 38000 2,406 080 190 - Mid-Tex Gas Division Addition 080.59679 37602 3,268 080 190 - Mid-Tex Gas Division Addition 080.59679 38000 172 080 190 - Mid-Tex Gas Division Addition 080.59681 37602 7,718 080 190 - Mid-Tex Gas Division Addition 080.59683 38000 3,176 080 190 - Mid-Tex Gas Division Addition 080.59688 37602 31,977 080 190 - Mid-Tex Gas Division Addition 080.59688 38000 11,080 080 190 - Mid-Tex Gas Division Addition 080.59691 37602 8,772 080 190 - Mid-Tex Gas Division Addition 080.59697 37602 13,407 080 190 - Mid-Tex Gas Division Addition 080.59697 38000 415 080 190 - Mid-Tex Gas Division Addition 080.59700 38000 16,835 080 190 - Mid-Tex Gas Division Addition 080.59702 37602 59,270 080 190 - Mid-Tex Gas Division Addition 080.59702 38000 14,818 080 190 - Mid-Tex Gas Division Addition 080.59705 37602 2,819 080 190 - Mid-Tex Gas Division Addition 080.59713 37900 1,456 080 190 - Mid-Tex Gas Division Addition 080.59724 37602 1,753 080 190 - Mid-Tex Gas Division Addition 080.59726 37602 31,589 080 190 - Mid-Tex Gas Division Addition 080.59726 38000 2,016 080 190 - Mid-Tex Gas Division Addition 080.59728 37602 4,664
MTX Additions by FERCPage 52 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.59729 37602 25,663 080 190 - Mid-Tex Gas Division Addition 080.59729 38000 4,529 080 190 - Mid-Tex Gas Division Addition 080.59733 37602 2,910 080 190 - Mid-Tex Gas Division Addition 080.59738 37602 17,297 080 190 - Mid-Tex Gas Division Addition 080.59741 37602 19,728 080 190 - Mid-Tex Gas Division Addition 080.59741 38000 6,931 080 190 - Mid-Tex Gas Division Addition 080.59745 37602 21,210 080 190 - Mid-Tex Gas Division Addition 080.59745 38000 5,982 080 190 - Mid-Tex Gas Division Addition 080.59746 37602 35,678 080 190 - Mid-Tex Gas Division Addition 080.59746 38000 19,211 080 190 - Mid-Tex Gas Division Addition 080.59747 37602 28,046 080 190 - Mid-Tex Gas Division Addition 080.59747 38000 15,775 080 190 - Mid-Tex Gas Division Addition 080.59753 37602 27,210 080 190 - Mid-Tex Gas Division Addition 080.59753 38000 8,555 080 190 - Mid-Tex Gas Division Addition 080.59775 37602 26,591 080 190 - Mid-Tex Gas Division Addition 080.59775 38000 7,420 080 190 - Mid-Tex Gas Division Addition 080.59784 37900 19,312 080 190 - Mid-Tex Gas Division Addition 080.59792 37602 9,132 080 190 - Mid-Tex Gas Division Addition 080.59803 37602 19,843 080 190 - Mid-Tex Gas Division Addition 080.59818 38000 2,121 080 190 - Mid-Tex Gas Division Addition 080.59823 37800 7,530 080 190 - Mid-Tex Gas Division Addition 080.59824 37602 15,543 080 190 - Mid-Tex Gas Division Addition 080.59824 38000 4,908 080 190 - Mid-Tex Gas Division Addition 080.59825 37602 17,462 080 190 - Mid-Tex Gas Division Addition 080.59825 38000 7,484 080 190 - Mid-Tex Gas Division Addition 080.59827 37602 38,993 080 190 - Mid-Tex Gas Division Addition 080.59830 37602 26,613 080 190 - Mid-Tex Gas Division Addition 080.59830 38000 11,439 080 190 - Mid-Tex Gas Division Addition 080.59831 37602 31,340 080 190 - Mid-Tex Gas Division Addition 080.59836 37602 2,567 080 190 - Mid-Tex Gas Division Addition 080.59836 38000 285 080 190 - Mid-Tex Gas Division Addition 080.59845 37602 33,127 080 190 - Mid-Tex Gas Division Addition 080.59845 38000 7,513 080 190 - Mid-Tex Gas Division Addition 080.59854 37602 24,816 080 190 - Mid-Tex Gas Division Addition 080.59854 38000 4,321 080 190 - Mid-Tex Gas Division Addition 080.59857 37600 284 080 190 - Mid-Tex Gas Division Addition 080.59866 37602 9 080 190 - Mid-Tex Gas Division Addition 080.59879 37602 11,009 080 190 - Mid-Tex Gas Division Addition 080.59879 38000 9,007 080 190 - Mid-Tex Gas Division Addition 080.59880 37602 217,027 080 190 - Mid-Tex Gas Division Addition 080.59881 37602 9,664 080 190 - Mid-Tex Gas Division Addition 080.59881 38000 1,916 080 190 - Mid-Tex Gas Division Addition 080.59882 37602 46,234 080 190 - Mid-Tex Gas Division Addition 080.59882 38000 5,138 080 190 - Mid-Tex Gas Division Addition 080.59886 37602 25,772 080 190 - Mid-Tex Gas Division Addition 080.59886 38000 1,645 080 190 - Mid-Tex Gas Division Addition 080.59889 37602 1,290,543 080 190 - Mid-Tex Gas Division Addition 080.59889 38000 624,627 080 190 - Mid-Tex Gas Division Addition 080.59889 38100 437,337 080 190 - Mid-Tex Gas Division Addition 080.59889 38200 437,336 080 190 - Mid-Tex Gas Division Addition 080.59889 38300 437,337 080 190 - Mid-Tex Gas Division Addition 080.59893 37602 60,535 080 190 - Mid-Tex Gas Division Addition 080.59893 38000 6,055 080 190 - Mid-Tex Gas Division Addition 080.59894 37602 4,473 080 190 - Mid-Tex Gas Division Addition 080.59905 37602 39,662 080 190 - Mid-Tex Gas Division Addition 080.59905 38000 2,088 080 190 - Mid-Tex Gas Division Addition 080.59907 37602 14,593 080 190 - Mid-Tex Gas Division Addition 080.59907 38000 4,864 080 190 - Mid-Tex Gas Division Addition 080.59909 37602 6,932 080 190 - Mid-Tex Gas Division Addition 080.59912 37602 5,760 080 190 - Mid-Tex Gas Division Addition 080.59925 37602 1 080 190 - Mid-Tex Gas Division Addition 080.59939 37602 39,967 080 190 - Mid-Tex Gas Division Addition 080.59939 38000 6,180 080 190 - Mid-Tex Gas Division Addition 080.59943 37601 411,052 080 190 - Mid-Tex Gas Division Addition 080.59943 37602 32,884 080 190 - Mid-Tex Gas Division Addition 080.59943 37800 311,341 080 190 - Mid-Tex Gas Division Addition 080.59946 37602 55,405 080 190 - Mid-Tex Gas Division Addition 080.59946 38000 6,160 080 190 - Mid-Tex Gas Division Addition 080.59947 37602 36,163 080 190 - Mid-Tex Gas Division Addition 080.59947 38000 9,041 080 190 - Mid-Tex Gas Division Addition 080.59948 37602 40,602 080 190 - Mid-Tex Gas Division Addition 080.59948 38000 5,033 080 190 - Mid-Tex Gas Division Addition 080.59956 37602 3,967 080 190 - Mid-Tex Gas Division Addition 080.59970 37602 6,380 080 190 - Mid-Tex Gas Division Addition 080.59971 37602 115,560 080 190 - Mid-Tex Gas Division Addition 080.59971 38000 6,082 080 190 - Mid-Tex Gas Division Addition 080.59980 37602 162,326 080 190 - Mid-Tex Gas Division Addition 080.59983 37602 141,221 080 190 - Mid-Tex Gas Division Addition 080.59984 37602 12 080 190 - Mid-Tex Gas Division Addition 080.59994 37602 2,305 080 190 - Mid-Tex Gas Division Addition 080.59994 38000 256 080 190 - Mid-Tex Gas Division Addition 080.60000 37602 8,505 080 190 - Mid-Tex Gas Division Addition 080.60006 37602 1,227 080 190 - Mid-Tex Gas Division Addition 080.60022 37602 8,169 080 190 - Mid-Tex Gas Division Addition 080.60022 38000 908 080 190 - Mid-Tex Gas Division Addition 080.60041 37602 107,576 080 190 - Mid-Tex Gas Division Addition 080.60047 37602 82,794 080 190 - Mid-Tex Gas Division Addition 080.60047 38000 1,690 080 190 - Mid-Tex Gas Division Addition 080.60048 37602 20,734 080 190 - Mid-Tex Gas Division Addition 080.60048 38000 11,164 080 190 - Mid-Tex Gas Division Addition 080.60050 37602 104,041 080 190 - Mid-Tex Gas Division Addition 080.60050 38000 3,218 080 190 - Mid-Tex Gas Division Addition 080.60063 37602 26,140 080 190 - Mid-Tex Gas Division Addition 080.60063 38000 1,808 080 190 - Mid-Tex Gas Division Addition 080.60064 37602 6,185 080 190 - Mid-Tex Gas Division Addition 080.60077 37602 16,227 080 190 - Mid-Tex Gas Division Addition 080.60077 38000 4,057 080 190 - Mid-Tex Gas Division Addition 080.60079 37602 21,088 080 190 - Mid-Tex Gas Division Addition 080.60079 38000 5,932 080 190 - Mid-Tex Gas Division Addition 080.60080 37601 8,958 080 190 - Mid-Tex Gas Division Addition 080.60080 37602 59 080 190 - Mid-Tex Gas Division Addition 080.60080 37800 124 080 190 - Mid-Tex Gas Division Addition 080.60083 37600 224 080 190 - Mid-Tex Gas Division Addition 080.60087 37602 18,774 080 190 - Mid-Tex Gas Division Addition 080.60087 38000 12,516 080 190 - Mid-Tex Gas Division Addition 080.60088 37602 3,639 080 190 - Mid-Tex Gas Division Addition 080.60091 37602 8,734 080 190 - Mid-Tex Gas Division Addition 080.60091 38000 2,184
MTX Additions by FERCPage 53 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.60092 37602 479 080 190 - Mid-Tex Gas Division Addition 080.60094 37602 52,361 080 190 - Mid-Tex Gas Division Addition 080.60094 38000 8,524 080 190 - Mid-Tex Gas Division Addition 080.60097 37602 8,714 080 190 - Mid-Tex Gas Division Addition 080.60100 37602 70,607 080 190 - Mid-Tex Gas Division Addition 080.60100 38000 3,716 080 190 - Mid-Tex Gas Division Addition 080.60103 37602 81,925 080 190 - Mid-Tex Gas Division Addition 080.60103 38000 3,413 080 190 - Mid-Tex Gas Division Addition 080.60104 37602 64,462 080 190 - Mid-Tex Gas Division Addition 080.60104 38000 27,627 080 190 - Mid-Tex Gas Division Addition 080.60105 37602 139,774 080 190 - Mid-Tex Gas Division Addition 080.60105 38000 34,946 080 190 - Mid-Tex Gas Division Addition 080.60106 37602 56,500 080 190 - Mid-Tex Gas Division Addition 080.60106 38000 571 080 190 - Mid-Tex Gas Division Addition 080.60107 37602 43,416 080 190 - Mid-Tex Gas Division Addition 080.60107 38000 1,343 080 190 - Mid-Tex Gas Division Addition 080.60108 37602 81,368 080 190 - Mid-Tex Gas Division Addition 080.60108 38000 2,517 080 190 - Mid-Tex Gas Division Addition 080.60110 37602 95,582 080 190 - Mid-Tex Gas Division Addition 080.60110 38000 1,951 080 190 - Mid-Tex Gas Division Addition 080.60111 37602 250,359 080 190 - Mid-Tex Gas Division Addition 080.60111 38000 27,818 080 190 - Mid-Tex Gas Division Addition 080.60112 37602 136,851 080 190 - Mid-Tex Gas Division Addition 080.60112 38000 45,617 080 190 - Mid-Tex Gas Division Addition 080.60113 37602 345,720 080 190 - Mid-Tex Gas Division Addition 080.60113 38000 86,434 080 190 - Mid-Tex Gas Division Addition 080.60114 37602 8,299 080 190 - Mid-Tex Gas Division Addition 080.60117 37602 13,170 080 190 - Mid-Tex Gas Division Addition 080.60117 38000 5,644 080 190 - Mid-Tex Gas Division Addition 080.60125 37800 8,688 080 190 - Mid-Tex Gas Division Addition 080.60126 37800 9,859 080 190 - Mid-Tex Gas Division Addition 080.60142 37602 10,390 080 190 - Mid-Tex Gas Division Addition 080.60143 37602 12,760 080 190 - Mid-Tex Gas Division Addition 080.60143 38000 672 080 190 - Mid-Tex Gas Division Addition 080.60145 37601 48,465 080 190 - Mid-Tex Gas Division Addition 080.60145 37800 4,524 080 190 - Mid-Tex Gas Division Addition 080.60146 37602 39,365 080 190 - Mid-Tex Gas Division Addition 080.60146 38000 2,072 080 190 - Mid-Tex Gas Division Addition 080.60150 37602 7,947 080 190 - Mid-Tex Gas Division Addition 080.60150 38000 2,435 080 190 - Mid-Tex Gas Division Addition 080.60151 37602 34,639 080 190 - Mid-Tex Gas Division Addition 080.60157 37602 10,109 080 190 - Mid-Tex Gas Division Addition 080.60157 38000 532 080 190 - Mid-Tex Gas Division Addition 080.60158 37602 17,871 080 190 - Mid-Tex Gas Division Addition 080.60163 37602 18,788 080 190 - Mid-Tex Gas Division Addition 080.60163 38000 989 080 190 - Mid-Tex Gas Division Addition 080.60167 37602 36,730 080 190 - Mid-Tex Gas Division Addition 080.60167 38000 9,183 080 190 - Mid-Tex Gas Division Addition 080.60170 37602 3,360 080 190 - Mid-Tex Gas Division Addition 080.60170 37800 3,024 080 190 - Mid-Tex Gas Division Addition 080.60170 38000 336 080 190 - Mid-Tex Gas Division Addition 080.60171 37602 20,735 080 190 - Mid-Tex Gas Division Addition 080.60171 38000 5,203 080 190 - Mid-Tex Gas Division Addition 080.60172 37602 17,916 080 190 - Mid-Tex Gas Division Addition 080.60172 38000 5,802 080 190 - Mid-Tex Gas Division Addition 080.60173 37602 11,200 080 190 - Mid-Tex Gas Division Addition 080.60173 38000 604 080 190 - Mid-Tex Gas Division Addition 080.60178 37602 1,270 080 190 - Mid-Tex Gas Division Addition 080.60178 38000 1,269 080 190 - Mid-Tex Gas Division Addition 080.60182 37900 4,768 080 190 - Mid-Tex Gas Division Addition 080.60188 37602 10,547 080 190 - Mid-Tex Gas Division Addition 080.60191 37602 13,159 080 190 - Mid-Tex Gas Division Addition 080.60191 38000 407 080 190 - Mid-Tex Gas Division Addition 080.60200 37602 173,707 080 190 - Mid-Tex Gas Division Addition 080.60200 38000 3,556 080 190 - Mid-Tex Gas Division Addition 080.60201 37602 107,716 080 190 - Mid-Tex Gas Division Addition 080.60201 38000 11,968 080 190 - Mid-Tex Gas Division Addition 080.60202 37602 157,007 080 190 - Mid-Tex Gas Division Addition 080.60202 38000 6,542 080 190 - Mid-Tex Gas Division Addition 080.60204 37602 106,343 080 190 - Mid-Tex Gas Division Addition 080.60204 38000 3,289 080 190 - Mid-Tex Gas Division Addition 080.60217 37602 3,239 080 190 - Mid-Tex Gas Division Addition 080.60225 37602 22,226 080 190 - Mid-Tex Gas Division Addition 080.60248 37601 16,658 080 190 - Mid-Tex Gas Division Addition 080.60250 37602 30,360 080 190 - Mid-Tex Gas Division Addition 080.60250 38000 1,598 080 190 - Mid-Tex Gas Division Addition 080.60254 37602 43,005 080 190 - Mid-Tex Gas Division Addition 080.60254 38000 7,589 080 190 - Mid-Tex Gas Division Addition 080.60259 37602 13,455 080 190 - Mid-Tex Gas Division Addition 080.60279 37602 4,662 080 190 - Mid-Tex Gas Division Addition 080.60285 37602 28,963 080 190 - Mid-Tex Gas Division Addition 080.60285 38000 7,241 080 190 - Mid-Tex Gas Division Addition 080.60287 37602 30,421 080 190 - Mid-Tex Gas Division Addition 080.60287 38000 3,380 080 190 - Mid-Tex Gas Division Addition 080.60288 37602 6,456 080 190 - Mid-Tex Gas Division Addition 080.60294 37602 28,901 080 190 - Mid-Tex Gas Division Addition 080.60295 37601 16,783 080 190 - Mid-Tex Gas Division Addition 080.60297 37602 5,979 080 190 - Mid-Tex Gas Division Addition 080.60298 37602 3,505 080 190 - Mid-Tex Gas Division Addition 080.60299 37601 18,437 080 190 - Mid-Tex Gas Division Addition 080.60302 37800 840 080 190 - Mid-Tex Gas Division Addition 080.60313 37602 112,756 080 190 - Mid-Tex Gas Division Addition 080.60328 37602 7,962 080 190 - Mid-Tex Gas Division Addition 080.60337 37602 125,481 080 190 - Mid-Tex Gas Division Addition 080.60345 37602 5,994 080 190 - Mid-Tex Gas Division Addition 080.60359 37602 9,990 080 190 - Mid-Tex Gas Division Addition 080.60361 38000 288,232 080 190 - Mid-Tex Gas Division Addition 080.60364 37602 15,705 080 190 - Mid-Tex Gas Division Addition 080.60364 38000 2,772 080 190 - Mid-Tex Gas Division Addition 080.60371 37602 3,917 080 190 - Mid-Tex Gas Division Addition 080.60378 37602 8,472 080 190 - Mid-Tex Gas Division Addition 080.60379 37800 984 080 190 - Mid-Tex Gas Division Addition 080.60381 37602 9,426 080 190 - Mid-Tex Gas Division Addition 080.60381 38000 2,801 080 190 - Mid-Tex Gas Division Addition 080.60382 37800 1,055 080 190 - Mid-Tex Gas Division Addition 080.60383 37800 1,152 080 190 - Mid-Tex Gas Division Addition 080.60390 37602 4,302 080 190 - Mid-Tex Gas Division Addition 080.60390 38000 1,076
MTX Additions by FERCPage 54 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.60391 37602 1,508 080 190 - Mid-Tex Gas Division Addition 080.60391 38000 377 080 190 - Mid-Tex Gas Division Addition 080.60396 37601 58,922 080 190 - Mid-Tex Gas Division Addition 080.60397 37602 26,493 080 190 - Mid-Tex Gas Division Addition 080.60397 38000 10,183 080 190 - Mid-Tex Gas Division Addition 080.60399 37601 1,086 080 190 - Mid-Tex Gas Division Addition 080.60399 37602 60,795 080 190 - Mid-Tex Gas Division Addition 080.60399 38000 3,277 080 190 - Mid-Tex Gas Division Addition 080.60402 37602 630 080 190 - Mid-Tex Gas Division Addition 080.60411 37602 1 080 190 - Mid-Tex Gas Division Addition 080.60413 37602 17,021 080 190 - Mid-Tex Gas Division Addition 080.60413 38000 896 080 190 - Mid-Tex Gas Division Addition 080.60419 37602 21,660 080 190 - Mid-Tex Gas Division Addition 080.60419 38000 1,140 080 190 - Mid-Tex Gas Division Addition 080.60430 37602 4,552 080 190 - Mid-Tex Gas Division Addition 080.60439 37602 37,217 080 190 - Mid-Tex Gas Division Addition 080.60439 38000 376 080 190 - Mid-Tex Gas Division Addition 080.60441 37602 29,189 080 190 - Mid-Tex Gas Division Addition 080.60441 38000 1,216 080 190 - Mid-Tex Gas Division Addition 080.60442 37602 9,840 080 190 - Mid-Tex Gas Division Addition 080.60442 38000 820 080 190 - Mid-Tex Gas Division Addition 080.60446 37602 10,019 080 190 - Mid-Tex Gas Division Addition 080.60446 38000 3,161 080 190 - Mid-Tex Gas Division Addition 080.60449 37602 20,747 080 190 - Mid-Tex Gas Division Addition 080.60449 38000 423 080 190 - Mid-Tex Gas Division Addition 080.60452 37602 26,393 080 190 - Mid-Tex Gas Division Addition 080.60452 38000 1,391 080 190 - Mid-Tex Gas Division Addition 080.60453 37602 21 080 190 - Mid-Tex Gas Division Addition 080.60454 37602 6,538 080 190 - Mid-Tex Gas Division Addition 080.60454 38000 569 080 190 - Mid-Tex Gas Division Addition 080.60455 37602 29,111 080 190 - Mid-Tex Gas Division Addition 080.60455 38000 2,531 080 190 - Mid-Tex Gas Division Addition 080.60473 37601 24,019 080 190 - Mid-Tex Gas Division Addition 080.60474 37602 5,535 080 190 - Mid-Tex Gas Division Addition 080.60478 37602 8,499 080 190 - Mid-Tex Gas Division Addition 080.60478 38000 1,499 080 190 - Mid-Tex Gas Division Addition 080.60486 37602 27,197 080 190 - Mid-Tex Gas Division Addition 080.60486 38000 8,892 080 190 - Mid-Tex Gas Division Addition 080.60495 37602 8,189 080 190 - Mid-Tex Gas Division Addition 080.60507 37602 17,042 080 190 - Mid-Tex Gas Division Addition 080.60507 38000 315 080 190 - Mid-Tex Gas Division Addition 080.60516 37602 14,142 080 190 - Mid-Tex Gas Division Addition 080.60516 38000 744 080 190 - Mid-Tex Gas Division Addition 080.60517 37601 3,560 080 190 - Mid-Tex Gas Division Addition 080.60517 37800 32,046 080 190 - Mid-Tex Gas Division Addition 080.60518 37602 9,118 080 190 - Mid-Tex Gas Division Addition 080.60521 37602 14,691 080 190 - Mid-Tex Gas Division Addition 080.60524 37602 916 080 190 - Mid-Tex Gas Division Addition 080.60542 37602 2,071 080 190 - Mid-Tex Gas Division Addition 080.60546 37602 9,608 080 190 - Mid-Tex Gas Division Addition 080.60546 38000 400 080 190 - Mid-Tex Gas Division Addition 080.60547 37602 655 080 190 - Mid-Tex Gas Division Addition 080.60548 37602 21,171 080 190 - Mid-Tex Gas Division Addition 080.60548 38000 2,352 080 190 - Mid-Tex Gas Division Addition 080.60559 37602 19,424 080 190 - Mid-Tex Gas Division Addition 080.60559 38000 10,607 080 190 - Mid-Tex Gas Division Addition 080.60560 37602 12,639 080 190 - Mid-Tex Gas Division Addition 080.60561 37602 7,365 080 190 - Mid-Tex Gas Division Addition 080.60561 38000 4,910 080 190 - Mid-Tex Gas Division Addition 080.60572 37602 1,351 080 190 - Mid-Tex Gas Division Addition 080.60575 37602 9,484 080 190 - Mid-Tex Gas Division Addition 080.60580 37601 158,820 080 190 - Mid-Tex Gas Division Addition 080.60584 37602 1,396 080 190 - Mid-Tex Gas Division Addition 080.60584 38000 29 080 190 - Mid-Tex Gas Division Addition 080.60585 37602 27,797 080 190 - Mid-Tex Gas Division Addition 080.60585 38000 5,693 080 190 - Mid-Tex Gas Division Addition 080.60586 37602 30,416 080 190 - Mid-Tex Gas Division Addition 080.60586 38000 13,036 080 190 - Mid-Tex Gas Division Addition 080.60596 38000 82,206 080 190 - Mid-Tex Gas Division Addition 080.60598 38000 47,055 080 190 - Mid-Tex Gas Division Addition 080.60599 38000 53,594 080 190 - Mid-Tex Gas Division Addition 080.60604 37602 6,218 080 190 - Mid-Tex Gas Division Addition 080.60604 38000 327 080 190 - Mid-Tex Gas Division Addition 080.60608 37602 7,247 080 190 - Mid-Tex Gas Division Addition 080.60611 37602 38,362 080 190 - Mid-Tex Gas Division Addition 080.60611 38000 24,300 080 190 - Mid-Tex Gas Division Addition 080.60612 37602 5,464 080 190 - Mid-Tex Gas Division Addition 080.60615 37602 76,275 080 190 - Mid-Tex Gas Division Addition 080.60615 38000 8,475 080 190 - Mid-Tex Gas Division Addition 080.60616 37602 17,413 080 190 - Mid-Tex Gas Division Addition 080.60616 38000 355 080 190 - Mid-Tex Gas Division Addition 080.60619 37602 13,118 080 190 - Mid-Tex Gas Division Addition 080.60619 38000 3,279 080 190 - Mid-Tex Gas Division Addition 080.60628 37602 7,251 080 190 - Mid-Tex Gas Division Addition 080.60629 37602 2,978 080 190 - Mid-Tex Gas Division Addition 080.60629 38000 1,158 080 190 - Mid-Tex Gas Division Addition 080.60634 37602 8,017 080 190 - Mid-Tex Gas Division Addition 080.60636 37602 13,186 080 190 - Mid-Tex Gas Division Addition 080.60644 37800 867 080 190 - Mid-Tex Gas Division Addition 080.60646 37602 6,519 080 190 - Mid-Tex Gas Division Addition 080.60646 38000 724 080 190 - Mid-Tex Gas Division Addition 080.60647 37602 19,911 080 190 - Mid-Tex Gas Division Addition 080.60655 37602 61,604 080 190 - Mid-Tex Gas Division Addition 080.60655 38000 3,242 080 190 - Mid-Tex Gas Division Addition 080.60661 37602 24,503 080 190 - Mid-Tex Gas Division Addition 080.60661 38000 6,126 080 190 - Mid-Tex Gas Division Addition 080.60662 37602 29,646 080 190 - Mid-Tex Gas Division Addition 080.60662 38000 5,232 080 190 - Mid-Tex Gas Division Addition 080.60663 37602 6,979 080 190 - Mid-Tex Gas Division Addition 080.60664 37602 21,198 080 190 - Mid-Tex Gas Division Addition 080.60664 38000 14,132 080 190 - Mid-Tex Gas Division Addition 080.60670 37601 5,474,341 080 190 - Mid-Tex Gas Division Addition 080.60670 37602 509,242 080 190 - Mid-Tex Gas Division Addition 080.60670 37800 381,932 080 190 - Mid-Tex Gas Division Addition 080.60673 37602 2,474 080 190 - Mid-Tex Gas Division Addition 080.60679 37602 16,773 080 190 - Mid-Tex Gas Division Addition 080.60679 38000 10,724 080 190 - Mid-Tex Gas Division Addition 080.60681 37602 10,704
MTX Additions by FERCPage 55 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.60681 38000 5,444 080 190 - Mid-Tex Gas Division Addition 080.60683 37602 24,892 080 190 - Mid-Tex Gas Division Addition 080.60683 38000 7,435 080 190 - Mid-Tex Gas Division Addition 080.60684 37602 10,314 080 190 - Mid-Tex Gas Division Addition 080.60685 37602 5,352 080 190 - Mid-Tex Gas Division Addition 080.60685 38000 1,338 080 190 - Mid-Tex Gas Division Addition 080.60688 37602 14,593 080 190 - Mid-Tex Gas Division Addition 080.60688 38000 2,780 080 190 - Mid-Tex Gas Division Addition 080.60690 37601 27,747 080 190 - Mid-Tex Gas Division Addition 080.60690 37800 (67,022) 080 190 - Mid-Tex Gas Division Addition 080.60690 38500 16,712 080 190 - Mid-Tex Gas Division Addition 080.60691 37602 39,939 080 190 - Mid-Tex Gas Division Addition 080.60691 38000 2,102 080 190 - Mid-Tex Gas Division Addition 080.60693 37602 37,292 080 190 - Mid-Tex Gas Division Addition 080.60693 38000 769 080 190 - Mid-Tex Gas Division Addition 080.60694 37602 30,942 080 190 - Mid-Tex Gas Division Addition 080.60694 38000 21,472 080 190 - Mid-Tex Gas Division Addition 080.60699 37602 3,239 080 190 - Mid-Tex Gas Division Addition 080.60704 37602 23,688 080 190 - Mid-Tex Gas Division Addition 080.60704 38000 8,003 080 190 - Mid-Tex Gas Division Addition 080.60705 37602 17,025 080 190 - Mid-Tex Gas Division Addition 080.60705 38000 5,495 080 190 - Mid-Tex Gas Division Addition 080.60706 37602 39,871 080 190 - Mid-Tex Gas Division Addition 080.60706 38000 18,979 080 190 - Mid-Tex Gas Division Addition 080.60707 37602 41,667 080 190 - Mid-Tex Gas Division Addition 080.60707 38000 1,736 080 190 - Mid-Tex Gas Division Addition 080.60714 37602 42,419 080 190 - Mid-Tex Gas Division Addition 080.60718 37602 9,258 080 190 - Mid-Tex Gas Division Addition 080.60718 38000 6,172 080 190 - Mid-Tex Gas Division Addition 080.60719 37602 28,857 080 190 - Mid-Tex Gas Division Addition 080.60719 38000 9,619 080 190 - Mid-Tex Gas Division Addition 080.60720 37602 18,088 080 190 - Mid-Tex Gas Division Addition 080.60721 37602 15,451 080 190 - Mid-Tex Gas Division Addition 080.60722 37602 10,752 080 190 - Mid-Tex Gas Division Addition 080.60722 38000 7,472 080 190 - Mid-Tex Gas Division Addition 080.60723 37602 7,653 080 190 - Mid-Tex Gas Division Addition 080.60723 38000 3,602 080 190 - Mid-Tex Gas Division Addition 080.60724 37602 30,869 080 190 - Mid-Tex Gas Division Addition 080.60724 38000 3,430 080 190 - Mid-Tex Gas Division Addition 080.60725 37602 20,618 080 190 - Mid-Tex Gas Division Addition 080.60725 38000 6,511 080 190 - Mid-Tex Gas Division Addition 080.60727 37602 10,260 080 190 - Mid-Tex Gas Division Addition 080.60727 38000 12,540 080 190 - Mid-Tex Gas Division Addition 080.60728 37602 14,958 080 190 - Mid-Tex Gas Division Addition 080.60728 38000 9,973 080 190 - Mid-Tex Gas Division Addition 080.60729 37602 16,078 080 190 - Mid-Tex Gas Division Addition 080.60730 37602 13,372 080 190 - Mid-Tex Gas Division Addition 080.60730 38000 7,200 080 190 - Mid-Tex Gas Division Addition 080.60732 37602 25,362 080 190 - Mid-Tex Gas Division Addition 080.60732 38000 9,863 080 190 - Mid-Tex Gas Division Addition 080.60733 37602 12,013 080 190 - Mid-Tex Gas Division Addition 080.60733 38000 2,120 080 190 - Mid-Tex Gas Division Addition 080.60734 37602 9,712 080 190 - Mid-Tex Gas Division Addition 080.60734 38000 9,713 080 190 - Mid-Tex Gas Division Addition 080.60735 37602 18,348 080 190 - Mid-Tex Gas Division Addition 080.60735 38000 4,880 080 190 - Mid-Tex Gas Division Addition 080.60736 37602 43,634 080 190 - Mid-Tex Gas Division Addition 080.60736 38000 17,822 080 190 - Mid-Tex Gas Division Addition 080.60737 37602 12,759 080 190 - Mid-Tex Gas Division Addition 080.60737 38000 1,418 080 190 - Mid-Tex Gas Division Addition 080.60738 37602 7,881 080 190 - Mid-Tex Gas Division Addition 080.60738 38000 5,039 080 190 - Mid-Tex Gas Division Addition 080.60740 37602 12,725 080 190 - Mid-Tex Gas Division Addition 080.60740 38000 3,181 080 190 - Mid-Tex Gas Division Addition 080.60741 37602 23,923 080 190 - Mid-Tex Gas Division Addition 080.60741 38000 488 080 190 - Mid-Tex Gas Division Addition 080.60743 37602 12,432 080 190 - Mid-Tex Gas Division Addition 080.60743 38000 2,833 080 190 - Mid-Tex Gas Division Addition 080.60744 37602 31,219 080 190 - Mid-Tex Gas Division Addition 080.60744 38000 1,643 080 190 - Mid-Tex Gas Division Addition 080.60745 37602 13,181 080 190 - Mid-Tex Gas Division Addition 080.60745 38000 1,798 080 190 - Mid-Tex Gas Division Addition 080.60747 37602 34,595 080 190 - Mid-Tex Gas Division Addition 080.60747 38000 14,820 080 190 - Mid-Tex Gas Division Addition 080.60750 37602 12,491 080 190 - Mid-Tex Gas Division Addition 080.60754 37601 746,474 080 190 - Mid-Tex Gas Division Addition 080.60754 37602 186,679 080 190 - Mid-Tex Gas Division Addition 080.60760 37602 8,270 080 190 - Mid-Tex Gas Division Addition 080.60760 38000 435 080 190 - Mid-Tex Gas Division Addition 080.60762 37602 1,443 080 190 - Mid-Tex Gas Division Addition 080.60763 37602 2,062 080 190 - Mid-Tex Gas Division Addition 080.60769 37602 180,303 080 190 - Mid-Tex Gas Division Addition 080.60769 38000 29,352 080 190 - Mid-Tex Gas Division Addition 080.60770 37602 4,412 080 190 - Mid-Tex Gas Division Addition 080.60770 38000 1,103 080 190 - Mid-Tex Gas Division Addition 080.60781 37602 9,789 080 190 - Mid-Tex Gas Division Addition 080.60781 38000 2,447 080 190 - Mid-Tex Gas Division Addition 080.60797 37602 25,475 080 190 - Mid-Tex Gas Division Addition 080.60797 38000 16,984 080 190 - Mid-Tex Gas Division Addition 080.60806 37602 13,344 080 190 - Mid-Tex Gas Division Addition 080.60808 37602 51,656 080 190 - Mid-Tex Gas Division Addition 080.60808 38000 5,740 080 190 - Mid-Tex Gas Division Addition 080.60809 37602 12,393 080 190 - Mid-Tex Gas Division Addition 080.60809 38000 5,311 080 190 - Mid-Tex Gas Division Addition 080.60817 37602 2,169 080 190 - Mid-Tex Gas Division Addition 080.60819 37602 1,317 080 190 - Mid-Tex Gas Division Addition 080.60822 37602 16,371 080 190 - Mid-Tex Gas Division Addition 080.60822 38000 3,539 080 190 - Mid-Tex Gas Division Addition 080.60823 37602 13,111 080 190 - Mid-Tex Gas Division Addition 080.60826 37602 37,872 080 190 - Mid-Tex Gas Division Addition 080.60826 38000 12,624 080 190 - Mid-Tex Gas Division Addition 080.60841 37602 37,335 080 190 - Mid-Tex Gas Division Addition 080.60844 37602 5,579 080 190 - Mid-Tex Gas Division Addition 080.60844 38000 1,395 080 190 - Mid-Tex Gas Division Addition 080.60847 37602 13,399 080 190 - Mid-Tex Gas Division Addition 080.60847 38000 3,360 080 190 - Mid-Tex Gas Division Addition 080.60852 37602 6,036 080 190 - Mid-Tex Gas Division Addition 080.60857 37602 25,064
MTX Additions by FERCPage 56 of 93
ATMOS ENERGY CORP., MID‐TEX DIVISIONPROJECT REPORT ADDITIONS BY FERC ACCOUNT FOR CALENDAR YEAR 2020
Atmos Energy Corp., Mid-Tex DivisionCY 2020 Project Additions by FERC Account
Company Business Segment FERC Activity Code Project Number Utility Account Total080 190 - Mid-Tex Gas Division Addition 080.60857 38000 5,504 080 190 - Mid-Tex Gas Division Addition 080.60859 37602 15,488 080 190 - Mid-Tex Gas Division Addition 080.60859 38000 4,891 080 190 - Mid-Tex Gas Division Addition 080.60865 37602 13,536 080 190 - Mid-Tex Gas Division Addition 080.60865 38000 8,578 080 190 - Mid-Tex Gas Division Addition 080.60866 37602 10,746 080 190 - Mid-Tex Gas Division Addition 080.60866 38000 1,896 080 190 - Mid-Tex Gas Division Addition 080.60868 37602 31,720 080 190 - Mid-Tex Gas Division Addition 080.60868 38000 5,164 080 190 - Mid-Tex Gas Division Addition 080.60871 37602 19,335 080 190 - Mid-Tex Gas Division Addition 080.60871 37800 5,156 080 190 - Mid-Tex Gas Division Addition 080.60871 38000 1,289 080 190 - Mid-Tex Gas Division Addition 080.60872 37602 13,832 080 190 - Mid-Tex Gas Division Addition 080.60872 38000 2,634 080 190 - Mid-Tex Gas Division Addition 080.60878 37602 19,150 080 190 - Mid-Tex Gas Division Addition 080.60878 38000 19,150 080 190 - Mid-Tex Gas Division Addition 080.60879 37800 1,250 080 190 - Mid-Tex Gas Division Addition 080.60880 37601 230,214 080 190 - Mid-Tex Gas Division Addition 080.60880 37800 123,962 080 190 - Mid-Tex Gas Division Addition 080.60894 37602 12,151 080 190 - Mid-Tex Gas Division Addition 080.60894 38000 2,144 080 190 - Mid-Tex Gas Division Addition 080.60897 37602 41,855 080 190 - Mid-Tex Gas Division Addition 080.60897 38000 4,651 080 190 - Mid-Tex Gas Division Addition 080.60899 37601 72,037 080 190 - Mid-Tex Gas Division Addition 080.60911 37602 3,540 080 190 - Mid-Tex Gas Division Addition 080.60914 37602 18,690 080 190 - Mid-Tex Gas Division Addition 080.60917 37600 59,207 080 190 - Mid-Tex Gas Division Addition 080.60917 37800 6,579 080 190 - Mid-Tex Gas Division Addition 080.60921 37602 2,474 080 190 - Mid-Tex Gas Division Addition 080.60922 37602 24,815 080 190 - Mid-Tex Gas Division Addition 080.60930 37602 23,180 080 190 - Mid-Tex Gas Division Addition 080.60930 38000 473 080 190 - Mid-Tex Gas Division Addition 080.60931 37602 6,807 080 190 - Mid-Tex Gas Division Addition 080.60931 38000 1,702 080 190 - Mid-Tex Gas Division Addition 080.60933 37602 21,159 080 190 - Mid-Tex Gas Division Addition 080.60933 38000 654 080 190 - Mid-Tex Gas Division Addition 080.60934 37602 27,934 080 190 - Mid-Tex Gas Division Addition 080.60934 38000 570 080 190 - Mid-Tex Gas Division Addition 080.60936 37602 2,320 080 190 - Mid-Tex Gas Division Addition 080.60941 37602 28 080 190 - Mid-Tex Gas Division Addition 080.60942 37602 24,976 080 190 - Mid-Tex Gas Division Addition 080.60942 38000 2,606 080 190 - Mid-Tex Gas Division Addition 080.60943 37602 39,491,334 080 190 - Mid-Tex Gas Division Addition 080.60943 38000 6,746,889 080 190 - Mid-Tex Gas Division Addition 080.60944 37602 1,290,355 080 190 - Mid-Tex Gas Division Addition 080.60944 38000 (1,033,846) 080 190 - Mid-Tex Gas Division Addition 080.60946 37602 54,625 080 190 - Mid-Tex Gas Division Addition 080.60946 38000 44,901 080 190 - Mid-Tex Gas Division Addition 080.60960 37602 10,627 080 190 - Mid-Tex Gas Division Addition 080.60960 38000 559 080 190 - Mid-Tex Gas Division Addition 080.60967 37602 13,003 080 190 - Mid-Tex Gas Division Addition 080.60967 38000 684 080 190 - Mid-Tex Gas Division Addition 080.60984 37602 48,443 080 190 - Mid-Tex Gas Division Addition 080.60988 37602 85,885 080 190 - Mid-Tex Gas Division Addition 080.60995 37602 2,010 080 190 - Mid-Tex Gas Division Addition 080.60997 37602 2,629 080 190 - Mid-Tex Gas Division Addition 080.61000 37602 26,722 080 190 - Mid-Tex Gas Division Addition 080.61000 38000 2,969 080 190 - Mid-Tex Gas Division Addition 080.61007 37602 13,923 080 190 - Mid-Tex Gas Division Addition 080.61007 38000 1,547 080 190 - Mid-Tex Gas Division Addition 080.61016 37602 12,886 080 190 - Mid-Tex Gas Division Addition 080.61042 37602 5,939 080 190 - Mid-Tex Gas Division Addition 080.61057 37602 3,866 080 190 - Mid-Tex Gas Division Addition 080.61058 37600 66 080 190 - Mid-Tex Gas Division Addition 080.61058 37602 3,233 080 190 - Mid-Tex Gas Division Addition 080.61069 37602 6,636 080 190 - Mid-Tex Gas Division Addition 080.61071 37602 33,803 080 190 - Mid-Tex Gas Division Addition 080.61071 38000 690 080 190 - Mid-Tex Gas Division Addition 080.61072 37602 6,792 080 190 - Mid-Tex Gas Division Addition 080.61072 38000 2,264 080 190 - Mid-Tex Gas Division Addition 080.61075 37602 70,360 080 190 - Mid-Tex Gas Division Addition 080.61082 37602 13,721 080 190 - Mid-Tex Gas Division Addition 080.61085 37602 (1,116) 080 190 - Mid-Tex Gas Division Addition 080.61087 37602 12,680 080 190 - Mid-Tex Gas Division Addition 080.61087 38000 667 080 190 - Mid-Tex Gas Division Addition 080.61088 37800 625 080 190 - Mid-Tex Gas Division Addition 080.61091 37800 158 080 190 - Mid-Tex Gas Division Addition 080.61101 37602 12,123 080 190 - Mid-Tex Gas Division Addition 080.61116 37602 2,305 080 190 - Mid-Tex Gas Division Addition 080.61119 37602 8,315 080 190 - Mid-Tex Gas Division Addition 080.61121 37602 55,264 080 190 - Mid-Tex Gas Division Addition 080.61121 38000 627 080 190 - Mid-Tex Gas Division Addition 080.61133 37800 8,466 080 190 - Mid-Tex Gas Division Addition 080.61144 37602 6,409 080 190 - Mid-Tex Gas Division Addition 080.61146 38000 21,229 080 190 - Mid-Tex Gas Division Addition 080.61162 37602 5,670 080 190 - Mid-Tex Gas Division Addition 080.61165 37601 782 080 190 - Mid-Tex Gas Division Addition 080.61182 37602 10,560 080 190 - Mid-Tex Gas Division Addition 080.61182 38000 556 080 190 - Mid-Tex Gas Division Addition 080.61183 37602 10,842 080 190 - Mid-Tex Gas Division Addition 080.61183 38000 571 080 190 - Mid-Tex Gas Division Addition 080.61187 37602 4,021 080 190 - Mid-Tex Gas Division Addition 080.61193 37602 11,725 080 190 - Mid-Tex Gas Division Addition 080.61193 38000 3,908 080 190 - Mid-Tex Gas Division Addition 080.61196 37601 19,346 080 190 - Mid-Tex Gas Division Addition 080.61196 37602 19,346 080 190 - Mid-Tex Gas Division Addition 080.61196 37800 58,037 080 190 - Mid-Tex Gas Division Addition 080.61204 37602 1,570 080 190 - Mid-Tex Gas Division Addition 080.61204 38000 83 080 190 - Mid-Tex Gas Division Addition 080.61216 37601 11,439 080 190 - Mid-Tex Gas Division Addition 080.61216 37800 2,860 080 190 - Mid-Tex Gas Division Addition 080.61227 37602 18,179 080 190 - Mid-Tex Gas Division Addition 080.61227 38000 957 080 190 - Mid-Tex Gas Division Addition 080.61228 37602 106,233 080 190 - Mid-Tex Gas Division Addition 080.61233 37602 192 080 190 - Mid-Tex Gas Division Addition 080.61253 37602 59,827 080 190 - Mid-Tex Gas Division Addition 080.61259 37602 13,815 080 190 - Mid-Tex Gas Division Addition 080.61272 37602 3,145
MTX Additions by FERCPage 57 of 93