Post on 13-Apr-2018
7/24/2019 Checklist Pms tugboat 2
1/5
VESSEL : TB LSBL IX
LOCATION : KELANIS
PIC : 2 MEI 2015
NO. ITEM CHECK POINTS Running
hours REMAKS
Operate satisfactorily. Yes No
Safety devices function properly. Yes No
Remote control function properly. Yes No
Check the alarm lamp operation Yes No
Oil pressure 0.49 to 0.64 Mpa / 5.0 to 6.5
kgf/cm2 ( during operation )Yes No
Oil pressure 0.2 to 0.29 mpa / 2 to 3kgf/cm2 ( standard pressure / no load ) Yes No
Coolant temperature gauge 70 to 80C
( during operation )Yes No
Water level at expansion tank Yes No
Check condition and level the Engine Oil Yes No
The oil filter and by pass oil filter Yes No
Condition of The Zinc Rods 500 Yes No
Condition of the V- Belt 250 Yes No
Measure Deflection of The V-Belt
( 10 to 15 mm)250 Yes No
The primary and secondary of fuel filter 500 Yes No
Fuel injection nozzle opening pressure
( 34.3 Mpa / 350 kgf/cm2 )1000 Yes No
Injection timing ( BTDC 18) 1000 Yes No
Valve Clearance
( inlet : 0.6 mm, exhaust : 0.8 mm )1000 Yes No
Damper vibration 2000 Yes No
Color of exhaust smoke Yes No
Sea water discharging volume Yes No
Tightening torque of bolts Yes No
Operate satisfactorily. Yes No
Oil pressure 4.0 to 5.0 bar
( Clutch disengaged )Yes No
Oil pressure appr. 22 bar
( Clutch engaged)Yes No
Oil level ( between " Min " and " Max" )
and condition of The Oil2000 Yes No
Oil temperature from the Thermometer
( 30 to 60 C and max 70 C )Yes No
Check the Contamination indicator for the
oil filter standard
( indicator red = filter contamination )
2000 Yes No
The contamination indicator for the oil filter
/ duplex filter2000 Yes No
The Oil cooler Anodes Yes No
Leakage Yes No
Abnormal running Yes No
Abnormal opeating noises Yes No
Tightening torque of bolts 5000 Yes No
Operate satisfactorily. Yes No
Safety devices function properly. Yes No
Remote control function properly. Yes No
Check the alarm lamp operation Yes No
PMS CHECKLIST
2 MAIN ENGINE
STARBOARD
(CUMMINS KTA 38 -
M2)
1
SATISFACTORY
MAIN ENGINE
PORTSIDE
(CUMMINS KTA 38 -
M2)
GEARBOX PORT
(TWIN DISC MGX
5321 DC)
7/24/2019 Checklist Pms tugboat 2
2/5
NO. ITEM CHECK POINTS Running
hours REMAKSSATISFACTORY
Oil pressure 0.49 to 0.64 Mpa / 5.0 to 6.5
kgf/cm2 ( during operation )Yes No
Oil pressure 0.2 to 0.29 mpa / 2 to 3
kgf/cm2 ( standard pressure / no load )Yes No
Coolant temperature gauge 70 to 80C
( during operation )Yes No
Water level at expansion tank Yes No
Check condition and level the Engine Oil Yes No
The oil filter and by pass oil filter Yes No
Condition of The Zinc Rods 500 Yes No
Condition of the V- Belt 250 Yes No
Measure Deflection of The V-Belt
(10 to 15 mm)250 Yes No
The primary and secondary of fuel filter 500 Yes No
Fuel injection nozzle opening pressure
(34.3 Mpa / 350 kgf/cm2 )1000 Yes No
Injection timing ( BTDC 18) 1000 Yes No
Valve Clearance
( inlet : 0.6 mm, exhaust : 0.8 mm )1000 Yes No
Damper vibration 2000 Yes No
Color of exhaust smoke Yes No
Sea water discharging volume Yes No
Tightening torque of bolts Yes No
Operate satisfactorily. Yes No
Oil pressure 4.0 to 5.0 bar
( Clutch disengaged )Yes No
Oil pressure appr. 22 bar
( Clutch engaged)Yes No
Oil level ( between " Min " and " Max" )
and condition of The Oil2000 Yes No
Oil temperature from the Thermometer (
30 to 60 C and max 70 C )Yes No
Check the Contamination indicator for the
oil filter standard
( indicator red = filter contamination )
2000 Yes No
The contamination indicator for the oil filter/ duplex filter
2000 Yes No
The Oil cooler Anodes Yes No
Leakage Yes No
Abnormal running Yes No
Abnormal opeating noises Yes No
Tightening torque of bolts 5000 Yes No
Operate satisfactorily. Yes No
Safety devices function properly. Yes No
Water level at Expansion Tank Yes No
Condition of the V - Belt Yes No
Measure deflection of the V - Belt
(10 mm )Yes No
Condition of the Impeller water pump 400 Yes No
Condition The Oil and Level Oil
( Full mark )Yes No
Lubricating Oil Filter Yes No
Color of exhaust smoke Yes No
3
GEARBOX PORT
(TWIN DISC MGX
5321 DC)
GENERATOR
ENGINES
PORTSIDE (
CUMMINS 6 BT5-9-
GM.83 )
7/24/2019 Checklist Pms tugboat 2
3/5
NO. ITEM CHECK POINTS Running
hours REMAKSSATISFACTORY
Sea water discharging volume Yes No
Air Filter Yes No
The Valve tip Clearance
( inlet 0.2 mm and exhaust 0.45 mm )2000 Yes No
Condition of the Viscous Damper 2000 Yes No
Lubricating Oil Pressure
( 280 kN/m2 / 2.5 kgf/cm2 )Yes No
Fuel injection nozzle opening pressure
(Mpa / kgf/cm2 )Yes No
Operate satisfactorily. Yes No
Abnormal vibration Yes No
Synchronasation system Yes No
Output voltage Yes No
Operate satisfactorily. Yes No
Safety devices function properly. Yes No
Water level at Expansion Tank Yes No
Condition of the V - Belt Yes No
Measure deflection of the V - Belt
(10 mm )Yes No
Condition of the Impeller water pump 400 Yes No
Condition The Oil and Level Oil
( Full mark )Yes No
Lubricating Oil Filter Yes No
Color of exhaust smoke Yes No
Sea water discharging volume Yes No
Air Filter Yes No
The Valve tip Clearance
( inlet 0.2 mm and exhaust 0.45 mm )2000 Yes No
Condition of the Viscous Damper 2000 Yes No
Lubricating Oil Pressure( 280 kN/m2 / 2.5 kgf/cm2 ) Yes No
Fuel injection nozzle opening pressure
( Mpa / kgf/cm2 )Yes No
Operate satisfactorily. Yes No
Abnormal vibration Yes No
Synchronasation system Yes No
Output voltage Yes No
Operate satisfactorily. Yes No
Check condition and level the Engine Oil Yes No
Water level at expansion tank Yes No
Condition of the V- Belt and tension of the
V- belt ( 10 -15 mm )Yes No
Oil filter element Yes No
Fuel filter element Yes No
Sea water discharging volume Yes No
Abnormal noise and vibrate Yes No
Exhaust color of smoke Yes No
Operate satisfactorily. Yes No
6
4
GENERATOR
ENGINES
STARBOARD (
CUMMINS 6 BT5-9-
GM.83 )
ALTERNATOR
(MAGNAPLUS MPH
754)
5
ALTERNATOR
(MAGNAPLUS MPH
754)
FIRE SISTEM
7/24/2019 Checklist Pms tugboat 2
4/5
NO. ITEM CHECK POINTS Running
hours REMAKSSATISFACTORY
Abnormal noise and vibrate Yes No
leakage from the pump casing Yes No
Greasing Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
Operate satisfactorily. Yes No
leakage from the pump casing Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
Ballast pump Operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
Bilge & GS Pump operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
Sea water cooling Pump operate
satisfactorily.Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
Fuel oil Pump operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
Emergency stop operating satisfactorily Yes No
Dirty oil Pump operate satisfactorily. Yes No
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
Piping in good order. Yes No
Operate satisfactorily. Yes No
Remote and control function properly. Yes No
Meters and gauges in good order. Yes No
Operate satisfactorily. Yes No
Remote and control function properly. Yes No
Meters and gauges in good order. Yes No
Operate satisfactorily. Yes No
Remote and control function properly. Yes No
Meters and gauges in good order. Yes No
12
8
13
SEWAGE
TREATMENTPLANT
14OILY WATER
SEPARATOR
10
11
15
HYDRAULIC
POWER PACK AND
CONTROL
9
FIRE PUMP
FUEL OIL SYSTEM
DIRTY OIL SYSTEM
EMERGENCY FIRE
PUMP7
BALLAST SYSTEM
PORT & STBD
BILGE & GS
SYSTEM
SEA WATER
COOLING SYSTEM
7/24/2019 Checklist Pms tugboat 2
5/5
NO. ITEM CHECK POINTS Running
hours REMAKSSATISFACTORY
No heavy corrosion and leakage. Yes No
All valves operate satisfactorily. Yes No
17 BLOWER E/R Operate satisfactorily. Yes No
18EMERGENCY
STEERINGOperate satisfactorily. Yes No
19CONTROL
CONSOLOperate satisfactorily. Yes No
20COMMUNICATION
SYSTEMOperate satisfactorily. Yes No
21CLEANLINESS of
E/RMust be clean without rubbish or waste oil. Yes No
22 GUARDS ANDFENCING
Protection covers and/or guards in goodorder.
Yes No
Operate satisfactorily. Yes No
All valves operate satisfactorily. Yes No
All lights in good order. Yes No
Protection covers or guards in good order Yes No
All lights in good order. Yes No
Protection covers or guards in good order Yes No
All lights in good order. Yes No
Protection covers or guards in good order Yes No
27 Emergency cables
Condition in good order, no exposed wire,
heavy corrosion, especially on weather
deck.
Yes No
28 Emergency lights All lights in good order, no broken lights. Yes No
29
Anti-explosion lights
in dangerous
spaces, pump room,
battery room, paint
locker etc.
All lights in good order, no broken covers
and guards, tightening handles available
on board.
Yes No
30Insulating mats
around MSB
Available on board or insulation cement
permanently laid up on the floor.Yes No
All gauges and indicating light are
functioningYes No
The surface of panel for excessive
warmnessYes No
Unusual smell Yes No
All cable conncetion and bus Yes No
Gas detector at P.R Yes No
Fire detector Yes No
Sensor CO2 Yes No
Bilges at Engine Room Yes No
Bilges at Pump Room Yes No
Bilges at Steering Room Yes No
Daily Oil Tank Yes No
Fuel Oil Tank Yes No
Sewage tank Yes No
Bena Sopan R. Dede Mulyana
Chief Engineers Technical Superintendent
Date : 02 Mei 2015 Date : 02 Mei 2015
33
Level high / low
alarm operate
satisfactorily
26
Lighting in working
room, steering room
and other spaces
31 Main Switch Board
32Alarms operate
satisfactorily
25Lighting in Acc.
Spaces
24 Lighting in E/R
23
16 PIPING
QUICK CLOSING
VALVE