Minutes of 22"d SLTC Meeting for AMRUT under the Chairmanship of Principal Secretary UD &
UHD & Chairman, SLTC- AMRUT
Date: 15.10.2018
Time: 11:30 Hrs.
Place: Conference room, UD & UHD, g th floor, Block No-14, New Sachivalay, Gandhinagar, Gujarat
Following members attended the meeting:
Mission Director (AMRUT) & Addl. CEO, GUDM
CEO, GMFB (Representative)
Project Director & Chief Engineer (GWSSB)
Principal Secretary (Energy & Petrochemical) (Representative)
Secretary, Finance Department (Expenditure) (Representative)
Secretary, Road & Building Departm ent (Representative)
Member Secretary, GPCB (Representative)
Deputy Secretary, (Revenue Department - Land) (Representative)
Team Leader PDMC- TCEL & PWC Consortium
The meeting started with a welcome note from the Member Secretary to the Chairman, Committee
Members, and Representative from various Departments.
Agenda 1: Confirmation of Minutes of 21st SLTC Meeting
M inutes of 21st SLTC with Action take report was circulated to all the committee members. No correction/
changes were suggested by the members, hence committee resolved to approve minutes of meeting.
Agenda 2: Action taken report on 21st SLTC held on date: 04.09.2018
No. Title SAAP Amount (Rs.) Action Taken
1 DPR - Patan Municipality Water Supply
2017-20 2,98,32,000 Tender Published Scheme
DPR - Gandhinagar Municipal 2 Corporation Storm Water Drainage 2017-20 4,92,35,060
DPR Approved;
Project (Recharging of ground water) DTP under preparation
3 DPR - Godhra M unicipality Water Supply
2017-20 29,96,96,000 Tender Published Project
4 DPR - Junagadh M unicipal Corporation
2017-20 10,53,26,455 DPR Approved sewerage network project (central area)
DPR - Rajkot Municipal Corporation DPR Approved; 5
Water Supply project for Navalnagar 2017-20 5,66,17,900
DTP under preparation
DPR-Bhavnagar Municipal Corporation DPR Approved;
6 Strom Water Drainage project for 2017-20 5,57,56,641.94 DTP under preparation
Kaliyabid area
DPR - Bhavnagar Municipal Corporation DPR Approved;
7 Strom Water Drainage project for 150 ft. 2017-20 4,69,69,279.30 DTP under preparation
ring road area
DPR - Bhavnagar Municipal Corporation DPR Approved;
8 Strom Water Drainage project for 2016-17 1,06,05,899.63 DTP under preparation
Bharatnagar area
9 DPR - Godhra Municipality Strom Water
2016-17 2,60,08,000 Tender Published Drainage project (SAAP 2016-17)
DPR - Mehsana M unicipality Strom 10
Water Drainage project 2017-20 4,62,52,120.02 Tender Published
DPR- Bharuch Municipality Strom Water DPR Approved;
11 Drainage project (SAAP 2017-20) 2017-20 3,03,07,645 DTP under preparation
DPR- Bharuch M unicipality Underground 2016-17
DPR Approved; 12 & 2017- 27,00,67,200
sewerage network project (missing links) 20
DTP under preparation
DPR Approved;
DPR -Anand Municipality Water Supply DTP submitted by
13 2017-20 10,02,08,000 TCEL; Project
NIT w ill be published by tomorrow
DPR Valsad Municipality Sewerage 2015-16
DPR Approved; -14
Project (Phase-11) & 2017- 30,14,77,581
DTP under preparation 20
DPR Rajkot M unicipal Corporation DPR Approved; -
15 Underground Drainage project 2017-20 21,96,87,560 DTP submitted by
TCEL; (Upgradation of existing drainage system)
NIT will be published
Chairman, SLTC & PS, UD& UHD instructed to expedite the process of publishing the tenders.
Agenda No. 3: DPR - Vadodara Municipal Corporation Underground drainage (SO MLD STP @
Chhani, upgrdation of Sama old, Sama new, Shashtrinagar APS) (SAAP 2017-20)
Under the allocation of Rs.168 Crore under SAAP 2017-20 for Under Ground Drainage, the details of the
projects proposed by Vadodara Municipal Corporation is as under:
No. Project Details Est. Cost
(Rs. In Cr.)
1 Construction of New STP (60 M LD capacity) at Kapurai with MPS, APS near
90.00 Highway with pressure & gravity line network.
2 Construction of new APS at Bahucharaji- NagarwadaKaans 10.00
3 Interception & Treatment of Sewage inletting in river Vishwamitri 38.00
4 Existing STP up gradation 30.00
Total 168.00
For the projects on Sr. No. 1 & 2, Vadodra Municipal Corporation has already awarded both t he works. For
the projects on Sr. No. 3 & 4, Vadodra Municipal Corpopration has requested to change both the projects as
under:
Sr. Proposed
No. Name Estimated Cost
(Rs. in Cr)
Construction of SO MLD STP at chhani with upgradation of sama old APS, 1 sama new APS and shashtri bridge APS with its rising main up to chhani STP, 71.36
Vadodara
2 Augmentation of lndrapuri APS & its pressure main 7.1S
Total 78.51
For t he above both projects Vadodara M unicipal Corporation has also requested to revise the SAAP
allocation as under:
Saving/ Sr.
Name SAAP Allocation Awarded Excess
Remarks No (Cr.) Cost (Cr.) amount
(Cr.)
1 Rajivnagar STP 78 MLD 2016-17 90 88.S +1.SO
2 Construction of New STP (60 M LD capacity) at Kapurai with
2017-20 90 73.12 +16.88 M PS, APS near Highway with pressure & gravity line network.
3 Construction of new APS at 2017-10 8.79 +1.21
Bahucharajee - Nagarwada Kaans 20
Total Saving +19.59
4 Construction of SO M LD STP at chhani with upgradation of sama old APS, Sam a new APS and 2017- 68 Placed in this shashtri bridge APS with its rising 20 (for 71.36
SLTC main up to chhani STP, Vadodara previously -10.51
(New Proposed) proposed projects)
s Augmentation of lndrapuri APS & 2017-7.15
Under Review/ its pressure main (New Proposed) 20 Compliance
As per the above details, from the saving of Rs. 19.59 Cr (of previous projects under various SAAPs), we may
re-allocate the total of Rs. 78.51 Cr (for newly proposed projects) as per the above details. After this re
allocation, Rs . 9.08 Cr will be balance with Vadodara Municipal Corporation under UGD Sector.
In view of above, proposal of Construction of STP of SO MLD Capacity and up-gradation of Sama Old, Sama
New, Shashtrinagar APS of Vadodara M unicipal Corporation under AMRUT Mission SAAP 2017-20 has
been submitted for approval. The DPR was appraised in detail; technical detail of project were presented
& discussed.
Components of project are as under:
• Construction of SO MLD STP at Chhani
• Rising main from Sarna old APS, Sarna new APS and Shastri bridge APS to proposed Chhani STP
• Sarna old APS, Sarna new APS and Shastri Bridge APS Upgradation.
Sr.No Name of pumping
Present Capacity Proposed Capacity Station
1. Sarna Old 3 no.s 200 cum/ hr- 15 m head 2 no. 250 cum/ hr and 2 no. 500 (2w+1s) cum/ hr with 30m head (2 w+2s)
2. Sarna New 3 no.s 350 cum/ hr- 20 m head 2 no. 250 cum/ hr and 2 no. 500 (2w+1s) cum/ hr with 30m head (2 w+2s)
2 no (lw+1s) 1200 cum/ hr- 16 2 no. 450 cum/ hr and 2 no. 900
3. Shashtrinagar m head and 1 no. 600 cum/ hr - cum/ hr with 30m head (2 w+2s)
20m head
Particulars:
SR.NO. DESCRIPTION TOTAL COST (IN Rs.)
A UPGRADATION of Three APS
1 Sarna OLD APS includ ing Civil and Electro mechanical work 2,71,42,736
2 Sarna NEW APS including Civil and Electro mechanical work 1,55,61,137
3 Shashtri Bridge APS including Civil and Electro mechanical work 2,39,94,585
Total A 6,66,98,458
B PRESSURE MAIN
Combined pressure mains for new Chhani STP from all three APS with 18,20,80,204
Road restoration work
Total B 18,20,80,204
c SO MLD STP AT CHHANI NEAR OLD STP SITE 46,48,36,600
Total C 46,48,36,600
Total A+B+C 71,36,15,262
-(minus) Cost of Compound wall -66,94,000
CAPITAL COST 70,69,21,262
D Operation & Maintenance cost including manpower, spares excluding 23,23,50,000
the cost of power for 10 years for STP and three APS and pressure mains
Consultancy fee 3% (PMC+ TPI) on Capital cost 2,14,08,458
SAY GARNO TOTAL 96,06,79,720
Fund Allocation under AMRUT = Rs. 168,00,00,000 (Under SAAP 2017-20)
Estimated project cost
Implementation Agency
= Rs. 70,69,21,262 (excluding 0 & M)
= Vadodara Municipal Corporation
Funding Arrangement:
Project Cost (Rs.)
SAAP allocation 2017-20 168,00,00,000.00 Project Sharing
No. Amount to Sanction 70,69,21,262.00
Fund Sharing Capital Cost (Rs.) 0 & M Cost (Rs.)
1 Central Share 33% 23,32,84,016.50 --2 State Share 37% 26,15,60,866.90 --3 ULB Share 30% 21,20,76,378.60 23,23,50,000.00
Total 100% 70,69,21,262.00 23,23,50,000.00
The SLTC discussed the project and found the proposal to be acceptable under AMRUT. Therefore, following
resolution was passed.
" It is resolved unanimously that Construction of STP of SO MLD Capacity and up-gradation of Sama Old,
Sama New and Shashtrinagar APS of Vadodara Municipal Corporation amounting Rs. 70,69,21,262 is
approved with condition that ULB shall have to bear the 0 & M Cost.
Further, It is also resolved that Mission Director I Member Secretary. SLTC be and is hereby authorised to
issue approval letter and accord technical sanction for Rs. 70,69,21,262 and do all the subsequent acts and
things as may be necessary till successful completion of works of Construction of STP of SO MLD Capacity
and up-gradation of Sama Old, Sama New, Shashtrinagar APS of Vadodara Municipal Corporation. Further,
it is resolved that the O&M cost must be borne by Vadodara Municipal Corporation. The resolution in this
regard should be obtained from the Vadodara Municipal Corporation."
Agenda No. 4: Approval of DPR- Palanpur Municipality Sewerage Project (SAAP 2016-17 & 2017-20)
Proposal for Sewerage project of Palanpur M unicipality under AMRUT Mission SAAP 2016-17 & 2017-20
has been submitted for approval. The DPR was appraised in detail; technical details of project were
( presented & discussed.
Components of project are as under:
Sewer Collecting Network for Zone A, B & C {150 mm to 350 mm dia. RCC NP 3) 1,26,967mtr.
Repairing of Ashok Nagar Pumping Station (Zone A) 1 No.
Renovation of Meera Darwaja Pumping Station (Zone B) 1 No.
Pumping Main from Meera Darwaja Pumping Station to existing Gravity Main 2500 mtr.
(Zone B) {150mm Dia 01-K-9)
Total House Connection Chambers (Zone A,B & C) 3600 Nos.
Particulars:
No. Details of Tasks Amount (Rs.)
1 Sewer Collecting Network for Zone A, B & C including HC chambers and road 29,34,97,577 restoration
2 Estimate of Repairing of Ashok Nagar Pumping Station (Zone A) 14,85,822
3 Estimate of Renovation of Meera Darwaja Pumping Station (Zone-B) 1,03,174 4 Mechanical Works for Meera Darwaja PS (Zone-B) 23,03,000 5 Electrical Works for Meera Darwaja PS (Zone-B) 9,04,000 6 Pumping Main of 150mm dia DI-K-9 of 2500mtr length from Meera Darwaja 44,97,380
Pumping Station to existing Gravity Main of 2500 mm length
Total Rs. 30,27,90,953 Cost of 0 & M Works for 5 years 1,60,00,000
Gross Total 31,87,90,953
Fund Allocation under AMRUT
Estimated project cost
Implementation Agency
Funding Arrangement:
= Rs. 27,00,00,000 (Under SAAP 2016-17 & 2017-20)
= Rs. 30,27,90,953 (excluding 0 & M)
= Gujarat Urban Development Company Limited (GUDC}
Project Cost (Rs.)
SAAP allocation 2016·17 & 2017-20 27,00,00,000.00 Project Sharing
No. DPR cost 30,27,90,953.00
Fund Sharing Capital Cost {Rs.) 0 & M Cost {Rs.)
1 Central Share 50% 13,50,00,000.00 --2 State Share 40% 10,80,00,000.00 --3 ULB Share 10% 2,70,00,000.00 1,60,00,000
(10% ULB share+ Excess +3,27,90,953.00
than SAAP allocation) 5,97,90,953.00
Total 100% 30,27,90,953.00 1,60,00,000
The SLTC discussed the project and found the proposal to be acceptable under AMRUT. Therefore, following
resolution was passed.
"It is resolved unanimously that- Sewerage Project for Palanpur Municipality, amounting Rs. 30,27,90,953
is approved with condition that ULB shall have to bear the 0 & M Cost.
Further, It is also resolved that Mission Director I Member Secretary. SLTC be and is hereby authorised to
issue approval letter and accord technical sanction for Rs. 30,27,90,953 and do all the subsequent acts and
things as may be necessary till successful completion of works of sewerage project for Palanpur
Municipality. Further, it is resolved that the O&M cost and additional cost beyond available allocated cost
must be borne by Palanpur Municipality. The resolution in this regard should be obtained from the
Palanpur Municipality."
(
Agenda No.5: Approval of DPR- Veraval Municipality Urban Transport Project (SAAP 2016-17
& 2017-20)
Proposal for urban transport project of Verava l Municipality Project under AM RUT Mission SAAP 2016-
17 & 2017-20 has been submitted for approval. The DPR was appraised in detail; technical details of
project were presented & discussed.
Components of project are as under:
Total 12.03 km of footpaths have been proposed at various 151ocations in Veraval City.
Particulars:
Sr. no. Location Cost (Rs.)
1 Navdurga Roa d 14,99,546.70
2 80 feet Railway crossing to Talala highway 53,11,862.60
3 60 feet Vidhyutnagar Road 48,28,966.00
4 ABPS Road 18,35,007.08
5 Bajaj Show Room to Busstop 57,94,759.20
6 Junagadh road to Dabhor road 19,31,586.40
7 Bihari nagar to Vidhyutnagar City Busstop 7 2,43,449.00
8 Golarana Chokdi to Community hall 33,80,276.20
9 80ft road to Golarana Chokdi 24,14,483.00
10 Water tank road near chowpaty & Chowpaty to veg market 28,97,379.60 11 Veraval Talala Road 70,02,000.70 12 Public Garden to Bajaj showroom (Junagadh Road) 67,60,552.40
13 Public Garden to Bajaj showroom (Junagadh Road) (One side) 12,07,241.50
14 Bhalka Road 24,14,483.00
15 Taluka Sangh to Talala road junction 8,45,069.05
Total 5,53,66,662.43 Fund Allocation under AMRUT = Rs. 5,50,00,000 (Under SAAP 2016-17 & 2017-20)
Estimated project cost
Implementation Agency
Funding Arrangement:
No. Project Sharing
1 Central Share
2 State Share
3 ULB Share
Total
= Rs. 5,53,66,662.43 (excluding 0 & M )
= Veraval Municipality
Project Cost (Rs.)
SAAP allocation2016-17 & 2017-20 5,50,00,000.00
DPR cost 5,53,66,662.43
Fund Sharing Capital Cost (Rs.) 0 & M Cost (Rs.)
SO% 2,75,00,000.00 --40% 2,20,00,000.00 --10% 55,00,000.00 --
(10% ULB share+ Excess + 3,66,662.43 than SAAP al location) 58,66,662.43
100% 5,53,66,662.43 --The SLTC discussed the project and found the proposal to be acceptable under AMRUT. Therefore, following
resolution was passed.
" It is resolved unanimously that- urban transport project for Veraval Municipality amounting Rs.
5,53,66,662.43 is approved with condition that ULB shall have to bear the 0 & M Cost.
Further, It is also resolved that Mission Director I Member Secretary. SLTC be and is hereby authorised to
issue approval letter and accord technical sanction for Rs. 5,53,66,662.43 and do all the subsequent acts
and things as may be necessary till successful completion of works of urban transport project for Veraval
Municipality. Further, it is resolved that the O&M cost and additional cost beyond available allocated cost
must be borne by Veraval Municipality. The resolution in this regard should be obtained from the Veraval
Municipality."
Agenda No. 6: Approval of DPR - Mehsana Municipality Underground Drainage Project
(Sewerage Collection Network) (SAAP 2017-20)
Proposal of underground drainage project (Sewerage Collection Network) for Mehsana Municipality under
AMRUT M ission SAAP 2017-20 has been submitted for approval. The DPR was appraised in detail; technica l
details of project were presented & discussed.
Components of project are as under:
The sewer sub lines of 200 mm- 250 mm dia. of total8756 m have been proposed in Zone- 2, 3, 4 & 6. The
details of the same are as under:
Component
Zone Name of Society Collection Network in mtr. House Connection
(RCC NP 3, 200 mm to 250 mm Chamber (Nos.)
dia.)
2 Shrial Bungalows 177.50 11
Narayan Nagar Society 47.13 3
3 Swastik Homes I Shivala Vatika 569.48 38 Sai Villa Society 424.00 28 New Sonal Ambanagar Society 97.20 7
Patel Nagar 192.44 13
Surya Mandir Complex 51.22 4
Abhinav Society 1624.50 108
Lacky Park Society 35.22 3
4 Balaji Residency 1121.50 75
Swastik Duplex 449.67 30
Jilla Karmachari Society 258.00 18
Nar Narayan (1 & 2) Society 409.91 28
Akhardham Town Ship 74.92 5
Shiv Kutir Township 841.30 56
Takshsila Township 270.13 17
Amarnath Bunglows (1 & 2) 42.05 2
Alak Nanda Township 104.50 6
Ambika Nagar 49.74 3
Sai Ram Bungalows 94.50 6
Shubh Golden & Tulshi Park 449.00 29
Aarzoo Park 438.50 29
(
(
o?IC-D
Component
Zone Name of Society Collection Network in mtr. House Connection
(RCC NP 3, 200 mm t o 250 mm dia.)
Chamber (Nos.)
Bapunagar Co. Society 61.00 4
Riddhi Residency 170.00 11
6 D G Nagar 151.00 10
Rushi Nagar 551.47 36
Tot al 8755.88 580
Particulars:
No. Components Estimated Cost (Rs.)
(1) Sewer Collection Network
1.1 Sewer Collection Network in Zone - 2 11,18,927
1.2 Sewer Collection Network in Zone - 3 1,49,14,019
1.3 Sewer Collection Network in Zone - 4 2,40,82,719
1.4 Sewer Collection Network in Zone - 6 34,99,145
Total (1) 4,36,14,810
(2) House Connection Chamber in Zone - 2,3,4 & 6 87,17,120
(3) Road Restoration Zone - 2,3,4 & 6 1,76,36,010
Net total Cost 6,12,50,820
0 & M for 5 years 30,62,541
Gross t otal Cost 6,43,13,361
Fund Allocation under AMRUT = Rs. 5,00,00,000 (Under SAAP 2017-20)
= Rs. 6,12,50,820 (excluding 0 & M) Estimated project cost
Implementation Agency
Funding Arrangement:
= Gujarat Urban Development Company Limited (GUDC)
Proj ect Cost (Rs.)
SAAP allocation 2017-20 5,00,00,000.00
No. Project Sharing DPR cost 6,12,50,820.00
Fund Sharing Capital Cost (Rs.) 0 & M Cost (Rs.)
1 Central Share SO% 2,50,00,000.00 --
2 State Share 40% 2,00,00,000.00 --3 ULB Share 10% 50,00,000.00 30,62,541.010
(10% ULB Share + Excess + 11121501820.00 amount than allocation) 1,62,50,820.00
Total 100% 6,12,50,820.00 30,62,541.00
The SLTC discussed the project and found the proposal to be acceptable under AMRUT. Therefore, followmg
resolution was passed.
" It is resolved unanimously that Underground Drainage Project (sewerage collection network) of
Mehsana Municipality amounting Rs. 6,12,50,820 is approved with condition that ULB shall have to bear
the 0 & M Cost.
Further, It is also resolved that Mission Director I Member Secretary. SLTC be and is hereby authorised to
issue approval letter and accord technical sanction for Rs. 6,12,50,820 and do all the subsequent acts and
things as may be necessary till successful completion of w orks of Underground Drainage Project
(sewerage collection network) for Mehsana Municipality. Further, it resolved t hat the O&M and
additional cost beyond available allocated cost must be borne by Mehsana Municipality. The resolution in
this regard should be obtained from the Mehsana Municipality."
Agenda No. 7: Approval of DPR- Veraval Municipality Garden (4nos.) Project (SAAP 2017-20)
Proposal of Construction of Garden {4 nos) in Veraval Municipality under AMRUT Mission SAAP 2017-20
has been submitted for approval. The DPR was appraised in detail; technical details of project were
presented & discussed.
Components of project are as under:
The land for gardens is available with municipality. The details of it are as under:
Sr. No. Location Area (Sq. m.) Components 1. Near Jivanjyot Society 824 Plantation Play area & 2. Near Somnath Society (TP1 plot no. 299) 1245 Equipments, Compound Wall,
3. Near Awas Masjid ( Tp1, Plot no 308) 812 LED flood light, Pathway,
4. Near ESR, Bhalka Road 11710 Irrigation system
Total Soft-scape/Piantation areas for all gardens are more than 60% of the total project area.
Particulars:
Sr.No. Component
1. Soft Scape 2. Pathway
3. Play area & equipment
4. irrigation System
5. Compound wall 6. Lighting
7. Underground Sump Total
Fund Allocation under AMRUT
Estimated project cost
Implementation Agency
Amount (Rs.)
Jivanjyot Somnath Awas Masjid Society Society
1,28,913.98 2,22,190.10 1,01,991.40 2,54,382.95 3,65,169.80 3,53,160.30 2,25,679.00 1,79,541.60 1,99,892.80
2,07,209.00 2,25, 794.00 2,06,337.00
5,42,125.12 5,11,059.00 4,73,762.80
0.00 2,31,231.40 0.00
0.00 2,50,000.00 0.00 13,58,310.05 19,84,985.90 13,35,144.30
Total
= Rs. 1,00,00,000 (Under SAAP 2017-20)
= Rs. 1,05,54,117.25 (excluding 0 & M)
= Veraval Municipality
Near ESR, Bhalka Road
12,07,395 11,18,382
3,99,676 3,96,714
27,53,510 0.00
0.00 58,75,677
1,05,54,117 .25
(
d!. ll/b
Funding Arrangement:
Project Cost {Rs.)
SAAP allocation 2017-20 1,00,00,000.00
No. Project Sharing DPR cost 1,05,54,117.25
Fund Sharing Capital Cost {Rs.) 0 & M Cost {Rs.)
1 Central Share SO% 50,00,000.00 --
2 State Share 40% 40,00,000.00 --3 ULB Share 10% 10,00,000.00 --
(10% ULB Share+ Excess +51541117.25 amount than allocation) 15,54,117.25
Total 100% 1,05,54,117 .25 --The SLTC discussed the project and found the proposal to be acceptable under AMRUT. Therefore, following
resolution was passed.
" It is resolved unanimously that- Construction of garden { 4 nos.) project of Veraval Municipality
amounting Rs. 1,05,54,117.25 is approved with condition that ULB shall have to bear the 0 & M Cost.
Further, It is also resolved that Mission Director I Member Secretary SLTC be and is hereby authorised to
issue approval letter and accord technical sanction for Rs. 1,05,54,117.25 and do all the subsequent acts
and things as may be necessary till successful completion of works of construction of garden { 4 nos)
project in Veraval Municipality. Further, it is resolved that the O&M cost and additional cost beyond
available allocated cost must be borne by Veraval Municipality. The resolution in this regard should be
obtained from the Veraval Municipality."
Agenda No. 8: Approval of DPR - Jamnagar Municipal Corporation Under Ground Drainage
(Sewerage Network For Missing Link) (SAAP 2015-16 & 2016-17}
The details of projects approved under various AMRUT Mission SAAP for water supply and underground
drainage sector are as under:
Sr.No. SAAP Name of Work DPR Tender Differenc
Year Approved Approved e/
Cost Cost Balance
Amount
Underground Drainage
Providing & construction sewer
1 2015-16 collection pipeline network in Nagarsim 20.00 15.04 4.96
& newly merged area.
Providing & Construction Underground
Drainage Pipeline Network for Sewer 2 2016-17 30.00 24.58 5.42
Collection in old fort city area &
congested area.
Providing and constructing of sewer 3 2017-20 10.00 9.29 0.71
collection network in Bedi area.
Total Balance Amount of Sewerage work - A 11.09
Water Supply
2016-17 Water Supply Network from Aji-3 dam to
4 & 2017- 73.00 64.61 2.11 Khijadiya Filter Plant Jamangar.
20
Water Supply Scheme for Newly Merged
Outer growth Dhichada/Woolen Mill area 6.28
for Jamnagar city
Total Balance Amount of W ater Supply work - B 2.11
Total Balance Amount -{A + B) 13.20
As mentioned in above table, Rs. 73.00 Cr and Rs. 60.00 Cr have been approved for Jamnagar Municipal
Corporation (JMC) under various AMRUT Mission SAAP for water supply and underground drainage sector
respectively. After tendering process, JMC is having savings of Rs. 2.11 Cr in water supply sector and savings
of Rs. 11.09 Cr in underground drainage sector. Thus, JMC is having total savings of Rs. 13.20 Cr.
With referen<;e letter: ~~l-Htl/~Jl<4/J <./~OJ/ <.09.C-9.~ rl.l. o~j9.oj<. o9.c, Jamnagar Municipal Corporation
has requested to utilize the Rs. 4.96 Cr for water supply and Rs. 8.24 Cr for underground drainage sector out
of total savings of Rs. 13.20 Cr. At present, Jamnagar Municipal Corporation has prepared t he detailed
project report for underground sector amounting Rs. 10,04,763.149.09/- against the available fund of Rs.
8.24 Cr.
Proposal of underground drainage (sewerage network for missing links) project of Jamnagar Municipal
Corporation under AMRUT Mission SAAP 2015-16 & 2016-17 has been submitted for approval. The DPR
was appraised in detail; technical details of project were presented & discussed.
Components of project are as under:
• Sewerage collection network of 23,018 m length is proposed.
• Total363 nos. of manholes are proposed
Particulars:
Sr. No. Details
1. Proposed Sewer Collecting System
1.1 Estimate of Sewer Collecting Network
Cost (Rs.)
10,04,76,149.09
Total 10,04,76,149.09
Fund Allocation under AMRUT
Estimated project cost
Implementation Agency
Funding Arrangement:
Project Sharing No.
1 Central Share
2 State Share
3 ULB Share
Total
c:R!
= Rs. 50,00,00,000 (Under SAAP 2015-16 & 2016-17)
= Rs. 10,04,76,149.09 (excluding 0 & M)
= Jamnagar Municipal Corporation
Project Cost (Rs.)
SAAP allocation 2015-16 & 2016-17 50,00,00,000.00
OPR cost 10,04,763,149.09
Available Fund for Project 8,24,00,000.00
Fund Sharing Capital Cost (Rs.) 0 & M Cost (Rs.)
50% 4,12,00,000.00 -
40% 3,29,60,000.00 --10% 82,40,000.00 --
(10% ULB Share + Excess + 1,80,76,149.00 amount than allocation) 2,63,16,149.00
100% 10 ,04, 763.149.09 --The SLTC discussed the project and found the proposal to be acceptable under AMRUT. Therefore, following
resolution was passed.
" It is resolved that, considering the total savings of Rs. 13.20 Cr under water supply and underground
drainage sector of Jamnagar Municipal Corporation; Rs. 4.96 Cr will be transferred to water supply sector
and Rs. 8.24 Cr will be utilized for underground drainage sector.
It is resolved unanimously that- underground drainage project (sewerage collection network for missing
links) for Jamnagar Municipal Corporation amounting Rs. 10,04,763.149.09 is approved with condition
that ULB shall have to bear the 0 & M Cost and additional cost beyond available of Rs. 8.24 Cr.
Further, It is also resolved that Mission Director I Member Secretary, SLTC be and is hereby authorised to
( issue approval letter and accord technical sanction for Rs. 10,04,763.149.09 and do all the subsequent acts
and things as may be necessary till successful completion of works of underground drainage project
(sewerage collection network for missing links) in Jamnagar Municipal Corporation. Further, it is resolved
that the O&M cost and additional cost beyond available fund of Rs. 8.24 Cr must be borne by Jamnagar
Municipal Corporation. The resolution in this regard should be obtained from the Jamnagar Municipal
Corporation."
Agenda No. 9: Approval of DPR - Deesa Municipality Underground Drainage Project (missing
links zone 1 to 7 and Sa & 8b) (SAAP 2017-20)
Proposal of underground drainage Project (missing links zone 1 to 7 and SA & 8B) of Deesa Municipality
under AMRUT Mission SAAP 2017-20 has been submitted for approval. The DPR was appraised in detail;
technical details of project were presented & discussed. The cost of proposed works is Rs. 15.65 Cr
against the allocation of Rs. 10.00 Cr.
It has been suggested be committee to Deesa M unicipality to propose the work within available fund limits
only under AM RUT Mission.
" It is resolved that DPR of underground drainage project ( missing links zone 1 to 7 and SA & 88) under
SAAP 2017-20 to be placed in next SLTC meeting."
Agenda No. 10: Approval of DPR - Nadiad Municipality Underground Drainage Project For
(Missing Links In Outgrowth Areas) (SAAP 2017-20)
Proposal of underground drainage project (missing links in outgrowth areas) of Nadiad Municipality under
AM RUT Mission SAAP 2017-20 has been submitted for approval. The DPR was appraised in detail;
technical details of project were presented & discussed.
Components of project are as under:
Sewer Collection Network Zone Pipe dia. in mm Pipe length in m Total
Zone 4 200mm 2776.00 5497.00
300mm 2004.00
350 mm 717.00
Zone 5 200mm 670.00 670.00
Zone 6 200 mm 572.00 572.00
Zone 7 200mm 623.00 1199.00
300 mm 576.00
Zone 8 200mm 777.00 1320.00
250mm 295.00
300mm 248.00
Zone 9 200mm 1026.00 1353.00
300mm 181.00
350mm 146.00
Pumping Station at Paras Circle
Working Discharge:- 59 M3/hrs, and 984 LPM, Head= 13 Mt . (1 Sets of 1 working & 1
A) 1DWF + standby
stand by) of 7.4 HP and 5.5 KW
Working Discharge:- 118 M3/hrs, and 1968 LPM, Head = 13 Mt. (1 Sets of 1 working & 1
B) 2DWF + standby
stand by) of 15 HP and 10.7 KW
Pumping station I Dia. ln m I Depth in m I Capacity in MLD
Proposed Paras Circle PS at Zone-8 I 4.00 I 7.61 I 1.50 Existing Pumping Machinery proosed to be replaced for following pumping station,
• Saket Pumping
• Savaliya Pumping
• Talati Baug Pumping
• Shreyas Garnala
• Khodiyar Garnala
• Vaishali Garnala
(
Rising Main Detail
DESCRIPTION MOC LENGTH DESIGNED RISING MAIN
(m DIA. (mm)
Rising main from proposed paras circle pumping station DI-K9 500.00 200.00
to existing santram pumping station
Zone-2 savliya pumping station to existing 450mm dia DI-K9 70.00 300.00
rm near maimandir chowk
Zone-1 saket pumping station to existing 450mm dia rm DI-K9 580.00 350.00
at maimandir chowk
• Road resurfacing, compound wal l and Sewer cleaning Equipment as per requirement of project.
• House Connections
Particulars:
Sr. No. Description of Tasks Cost (Rs)
1. Proposed Sewer Collecting System 5,23,18,29600
2. House connection Chamber 70,86,54600
3. Rising Main 69,63,861
4. Construction of Pumping Station 16,14,98200
5. Screen Chamber 17,56,30400
6. Pumping Machinery 76,46,034
7. Construction of Compound Wall 4,48,118
8. Road Resurfacing 2,56,40,410
9. Sewer cleaning Equipment 2,88,67,500
Total Net Cost 13,23,42,051
O&M Cost for 5 years 86,68,883
Gross Cost Rs 14,10,10,934
Fund Allocation under AMRUT = Rs. 15,00,00,000 (Under SAAP 2017-20)
= Rs. 13,23,42,015 (excluding 0 & M) Estimated project cost
Implementation Agency
Funding Arrangement:
= Gujarat Urban Development Company Limited (GUDC)
Project Cost (Rs.)
SAAP allocation 2017-20 15,00,00,000.00
No. Project Sharing DPR cost 13,23,42,015.00
Fund Sharing Capital Cost (Rs.) 0 & M Cost (Rs.)
1 Central Share SO% 6,61,71,007 .so --2 State Share 40% 52,93,68,060.00 --3 ULB Share 10% 1,32,34,201.50 86,68,883.00
Total 100% 13,23,42,015.00 86,68,883.00
The SLTC discussed the project and found the proposal to be acceptable under AMRUT. Therefore, fol lowing
resolution was passed.
" It is resolved unanimously that - underground drainage project (missing links in outgrowth areas} of
Nadiad Municipality amounting Rs. 13,23,42,015 is approved with condition that ULB shall have to bear
the 0 & M Cost .
Further, It is also resolved that M ission Director I Member Secret ary, SLTC be and is hereby authorised to
issue approval letter and accord technical sanction for Rs. 13,23,42,015 and do all the subsequent acts and
things as may be necessary till successful completion of works of underground drainage project (missing
links in outgrowth areas) of Nadiad Municipality. Further, it is resolved that the O&M cost must be borne
by Nadiad Municipality. The resolution in this regard should be obtained from the Nadiad Municipality."
Agenda No. 11: Approval of DPR- Bharuch Municipality Urban Transport {SAAP 2017-20)
Proposal of urban transport project in Bharuch Municipality under AMRUT Mission SAAP 2017-20 has
been submitted for approval. The DPR was appraised in detail; technical details of project were presented
& discussed.
Components of project are as under:
1. Total 52 Nos. Bus stations in Bharuch City
2. Walkway, Toilet and Compound Wall at Main Bus Station
Particulars:
Sr.No. Description of Tasks
1. Estimate of construction of Bus stands 2. Estimate of Construction For Compound wall 3. Estimate of Construction For Toilet block 4. Estimate of Construction of Walk way
Total Say
Fund Allocation under AMRUT = Rs. 2,00,00,000 (Under SAAP 2017-20)
Estimated project cost
Implementation Agency
Funding Arrangement:
No. Project Sharing
1 Central Share
2 State Share
3 ULB Share
Total
= Rs. 1,68,39,600 (excluding 0 & M)
= Bharuch Municipality
Project Cost (Rs.)
SAAP allocation 2017-20
DPR cost
Fund Sharing Capital Cost (Rs.}
50% 84,19,800.00
40% 67,35,840.00
10% 16,83,960.00
100% 1,68,39,600.00
Cost (Rs.}
1,18,38,500 10,20,916
2,04,744
37,75,400 1,68,39,560
1,68,39,600
2,00,00,000.00
1,68,39,600.00
0 & M Cost (Rs.}
--------
The SLTC discussed t he project and found the proposal to be acceptable under AMRUT. Therefore, following
resolution was passed.
"It is resolved unanimously that- urban transport project in Bharuch Municipality amounting Rs.
1,68,39,600 is approved with condition that ULB shall have to bear the 0 & M Cost.
Further, It is also resolved that Mission Director I Member Secretary, SLTC be and is hereby authorised to
issue approval letter and accord technical sanction for Rs. 1,68,39,600 and do all the subsequent acts and
things as may be necessary till successful completion of works of urban transport project in Bharuch
Municipality. Further, it is resolved that the O&M cost must be borne by Bharuch Municipality. The
resolution in this regard should be obtained from the Bharuch Municipality."
Agenda No. 12: Approval of OPR - Junagadh Municipal Corporation Water Supply Project
(SAAP 2017-20}
Proposal of water supply project for Junagadh Municipal Corporation under AMRUT Mission SAAP 2017-
20 has been submitted for approval. The DPR was appraised in detail; technical details of project were
presented & discussed.
Components of project are as under:
Zone no Zone name Proposed Water supply network length(m)
1 Timbawadi 21,714 2 Gandhigram 28,859 6 Sardarbaug 24,440 8 Khamdhrol & 66 KV area 19,537 10 Adityanagar 5,635 11 Saragwada 4,164 12 Sabalpura 23,278 13 Dolatpara 24,321 14 Dharagadh 10,477 15 Upperkot
Total 1,62,426
Proposed Storage Structure & Rising mains Zone Zone name Total Capacity of Total Capacity of Dia Rising length
no Elevated Storage Underground Main from of Rising
Reservoir (Lakh liters) Storage Reservoir UGSR to ESR Main
(Lakh liters) (mm) (m)
1 Timbawadi 20 46 350 50 2 Gandhigram 38 60 450 so 6 Sardarbaug 9.8 12 350 so 8
Khamdhrol & 66 11.15 21 400 50
KV area
10 Adityanagar 0 6.4 125 150 13 Dolatpara 3.5 6 150 40
Total 82.45 151.4 390
Particulars:
Sr.NO Zone Description Amount(Rs.) Rising Main Pipeline 2,00,000.00 Gravity Main Pipeline 2,46,00,000.00
Estimate of RCC ESR - 20 lakh litre capacity 1,45,00,000.00
1. Zone- Estimate of Pumping Machineries (Mechanical+ Electrical) 21,00,000.00
1 Estimate of Pump House 7,00,000.00
Compound wall 26,00,000.00
Water sump - 46 lakh litre capacity 88,00,000.00
ZONE-1 TOTAL: 5,35,00,000.00
Rising Main Pipeline 5,39,600.00
Gravity Main Pipeline 5, 78,41,800.00
60 Lac Lits. Capacity Sump at Dharam Aveda head works 1,25,75,300.00
Zone-38 Lac Lits. Capacity ESR at Dharam Aveda head works 2, 78,77,400.00
2. 2
Pumping Machionery at Dharam Aveda Sump for ESR 21,28,656.86
Electrical Estimate for Pumping Machionery 35,40,270.90
Pump house at Dharam Aveda head works 4,92, 700.00
Compound wall at Dharam Aveda Head works 15,72,000.00
ZONE·2 TOTAL : 10,65,67,800.00 Cost of Distribution network for Zone 6 4,81,54,877 .00
Cost of reconstruction of GSR (Zone 15) of 0.5 Lacs ltr Capacity {Nos. 2) 23,48,900.00 Cost of Construction of ESR{E-22A) {Zone 6) of 9.8 Lacs ltr capcity 1,36,41,191.00
Zone-Cost of Construction of GSR(G-17 A) (Zone 6) of 12 Lacs ltr capacity 33,12,000.00
3. 6
Cost of Construction of Pump House & Electrical Room 9,48,600.00
Cost of Mechanical Works for Proposed Pumping Station 40,74,427.00
Cost of Electrical Works for Proposed Pumping Station 12,81,042.00
Cost of Rising Main from proposed GSR to ESR 3,44,264.00
ZONE-6 TOTAL: 7,41,05,301.00 Water Distribution Network 2,75,68,100.00
Elevated Storage reservoir of 11.141akh liter and staging height 17 meter 93,76,600.00
Underground Storage Reservoir of 211akh liter capacity 96,25,700.00
Zone-Rising main from UGSR to ESR of diameter 400 mm (DI-K9) 6,10,900.00
4. 8
Electrical work for Khamdhrol UGSR 24,57,400.00
Mechanical Work for Khamdhrol UGSR 41,56,400.00
Compound wall for Khamdhrol WDS 27,31,400.00
Road works for Khamdhrol WDS 1,11,800.00
ZONE-8 TOTAL : 5,66,38,300.00 Underground Storage Reservoir of 6.4 lakh liter capacity 39,68,148.00
Rising main from UGSR-1 to Existing UGSR of 12 Lakh Liter of diameter 125 mm 2,60,950.00
(CI)
5. Zone
Mechanical Work for Adityanagar UGSR 22,50,750.50 -10
Electrical work for Adityanagar UGSR 2,35,494.10
Compound wall for Adityanagar WDS 8,48,601.00
ZONE-10 TOTAL : 75,63,943.60 Water Distribution Network 77,17,800.00
Zone-Rising main from UGSR to ESR of diameter 250 mm {DI-K9) 2,24,100.00
6. 11
Compound wall for Saragwada WDS 10,78,600.00
Retaining Wall for Saragwada WDS 58,76,630.00
ZONE-11 TOTAL: 1,48,97,130.00
Water Distribution Network 91,94,400.00
7. Zone- Rising main from UGSR to ESR of diameter 250 mm {DI-K9) 2,55,000.00
12 Compound wall for Sabalpura WDS 11,28,200.00
Retaining Wall for Sabalpura WDS 35,98,100.00
ZONE-12 TOTAL:
Water Distribution Network
Elevated Storage reservoir-2 of 3.5 lakh liter and staging height 22 meter
Underground Storage Reservoir of 61akh liter capacity
Rising main from UGSR-1 to ESR-1 of diameter 300 mm (DI-K9)
8. Zone- Rising main from UGSR-2 to ESR-2 of diameter 150 mm (DI-K9)
13 Electrical work for Dolatpra UGSR-2
Mechanical Work for Dolatpra UGSR-2
Compound wall for Dolatpara WDS-1
Compound wall for Dolatpara WDS-2
ZONE-13 TOTAL :
Zone-W ater Distribution Network
9. 14
Road Work for Dharagadh WTP area
ZONE-14 TOTAL:
10. Zone- Distribution Network of Zone - 15
15 ZONE-15 TOTAL: ZONEs -1,2,6,8,10,11,12,13, 14 &15 TOTAL :
Fund Allocation under AMRUT = Rs. 52,50,00,000 (Under SAAP 2017-20)
Estimated project cost
Implementation Agency
Funding Arrangement:
Project Sharing No.
1 Central Share
2 State Share
3 ULB Share
Total
= Rs. 43,11,53,635.60 (excluding 0 & M)
= Junagadh Municipal Corporation
Project Cost (Rs.)
SAAP allocation 2017-20
DPR cost
Fund Sharing Capital Cost (Rs.)
SO% 21,55,76,817.80
40% 17,24,61,454.20
10% 4,31,15,363.56
100% 43,11,53,635.60
1,41, 75,700.00
2,49,29,800.00 40,93,800.00
47,24,800.00
2,45,700.00
5,41,400.00
12,74,300.00
23,90,900.00
21,24,100.00
20,25,200.00
4,23,50,000.00 4,97,06,900.00 12,18,200.00
5,09,25,100.00 1,04,30,361.00
1,04,30,361.00 43,11,53,635.60
52,50,00,000.00
43,11,53,635.60
0 & M Cost (Rs.)
-
----
--The SLTC discussed the project and found the proposal to be acceptable under AMRUT. Therefore, following
resolution was passed.
" It is resolved unanimously that- water supply project for Junagadh Municipal Corporation amounting Rs.
43,11,53,635.60 is approved with condition that ULB shall have to bear the 0 & M Cost.
Further, It is also resolved that Mission Director I Member Secretary, Sl TC be and is hereby authorised to
issue approval letter and accord technical sanction for Rs. 43,11,53,635.60 and do all the subsequent acts
and things as may be necessary till successful completion of works of water supply project for Junagadh
Municipal Corporation. Further, it is resolved that the O&M cost must be borne by Junagadh Municipal
Corporation. The resolution in this regard should be obtained from the Junagadh Municipal Corporation."
Agenda No. 13: Approval of DPR- Veraval Municipality Storm Water Drainage (SAAP 2017-20)
Proposal of strom water drainage project for Veraval Municipality under AMRUT Mission SMP 2017-20
has been submitted for approval. The DPR was appraised in detail; technical details of project were
presented & discussed.
Components of project are as under:
Sr. No Road Name length (m) Type
Drain 1 Nagarpalika garden to Nala near Bajaj Showroom 2953 Both side RCC pipe
Drain 2 Bhalka Tirth to drain near WASPO S.J. ITI 1676.3 Bot h side RCC pipe
Drain 3 80 feet Railway crossing to Talala highway 1173.5 Single side RCC pipe
Drain 4 Somnath trust road 245 Single side RCC pipe
Drain 5 Tala la road to Bhalka police chawky 304 Single side RCC pipe
Drain 6 Aditya Birla hospital to Labela 300 Manhole on Existing RCC pipe
Drain 7 Ambedkar area 365 Single side RCC pipe
Total 7016
• The RCC NP3 pipes of dia ranging from 250 mm to 1800 mm have been proposed.
• Total 267 No's of manholes are proposed at every 30 m distance or at suitable distance. SO Nos.
of Transversal crossing manholes are proposed for collection of opposite side drain.
Particulars:
Item Description
Construction of RCC Pipe lines at Different locations of Veraval
Operation and Maintenance for Five years
Fund Allocation under AM RUT
Estimated project cost
Implementation Agency
Funding Arrangement:
Project Sharing No.
1 Central Share
2 State Share
3 ULB Share
Total
Total
= Rs. 5,00,00,000 (Under SAAP 2017-20}
= Rs. 5,02,68,928 (excluding 0 & M)
= Veraval M unicipality
Project Cost (Rs.)
SAAP allocation 2016-17
DPR cost
Fund Sharing Capital Cost (Rs.)
SO% 2,SO,OO,OOO.OO
40% 2,00,00,000.00
10% SO,OO,OOO.OO (10% ULB Share+ Excess +21681928.00
than allocation under SAAP} S2,68,928.00 100% 5,02,68,928.00
Amount (Rs)
5,02,68,928
1,25,672
5,03,94,600
S,OO,OO,OOO.OO
S,02,68,928.00
0 & M Cost (Rs.)
----
1,2S,672.00
1,25,672.00
The SLTC discussed the project and found the proposal to be acceptable under AM RUT. Therefore, following
resolution was passed.
"It is resolved unanimously that- strom water drainage project for Veraval Municipality amounting Rs.
5,02,68,928 is approved with condition that ULB shall have to bear the 0 & M Cost.
Further, It is also resolved that Mission Director I Member Secretary, SLTC be and is hereby authorised to
issue approval letter and accord technical sanction for Rs. 5,02,68,928 and do all the subsequent acts and
things as may be necessary till successful completion of works of storm water drainage project for
Veraval Municipality. Further, it is resolved that the O&M cost and additional cost beyond available
allocated cost must be borne by Veraval Municipality. The resolution in this regard should be obtained
from the Veraval Municipality."
Agenda No. 14: Approval of Tender -- Valsad Municipality Sewerage project (phase-1) (SAAP
2016-17)
The DPR amounting Rs. Rs.19,91,98,023 of sewerage project work Valsad Municipality under AMRUT
Mission SAAP 2016-17 was approved in 181h State Level Technical Committee held on 29.06.2018 under
allocation of Rs. 12.00 Cr.
Name of Work: Commissioning of pumping mains, construction of house connection chambers, providing,
lowering laying, jointing, testing and commissioning of stoneware house connection pipes
with all allied works along with O&M for (OS) five years at Valsad {Tender ID :317074)
The tender was published by Gujarat Urban Development Company Limited (GUDC) and based on technical
& financial bid evaluation done by GUDC, it was placed in 121h Scrutiny Committee held on 25.09.2018 for
the rate reasonability and Scrutiny Committee resolved as under:
"The agency quoted lowest and stands Ll is M/s P.C. Sehal Construction. Pvt. Ltd with quoted Rs.
18,67,90,086.60 which is 12.51 % lower than the estimated cost put to tender. Committee further resolved
that as t he rates quoted by Ll agency seems on lower side for certain BOQ items; therefore Ll agency M/s
P.C. Sehal Construction. Pvt. Ltd should submit the extra security deposit of Rs. 39,33,362.57 in addition to
5% security deposit as per tender conditions. Committee recommended to put up this tender for the
approval of SLTC."
It was found that the rates quoted by L1 bidder are reasonable and SLTC passed the following resolution.
" It is unanimously resolved to approve the bid of lowest bidder M/s P.C.Sehal Construction Pvt. ltd. with
final quoted cost Rs. 18,67,90,086.60 (That is 12.51% below than the estimated cost put to tender) with
condition that l1 agency M/s P.C.Sehal Construction Pvt. ltd. have to submit the extra security deposit of
Rs. 39,33,362.57; in addition to security deposit as per tender conditions. Thus l1 agency have to submit
total security deposit of Rs. 1,32,72,866.90. The O&M cost of 5 years shall be borne by Valsad
Municipality.
Further, resolved that Mission Director/ Member Secretary, SLTC be and is hereby authorised to issue
approval letter for sewerage project work and do all the subsequent acts and things as may be necessary
till successful completion of works of sewerage project of Valsad Municipality."
Agenda No. 15: Approval of Tender - Gandhidham Municipality Strom Water Drainage Project
(SAAP 2017-20)
The DPR amounting Rs. 14,54,71,300 of strom water drainage work for Gandhidham Municipality under
AMRUT Mission SAAP 2017-20 was approved in 13th State level Technical Committee held on 03.10.2017
under allocation of Rs. 15.00 Cr.
Name of Work: Designing, Constructing, Testing & Commissioning of strom water drains at Gandhidham
Nagarpalika area under Amrut Grant. Dist.:- Kutch (Tender id: 319056}
The tender was published by Gandhidham Municipality and based on technical & financial bid evaluation
done by Gandhidham Municipality, it was placed in 12th Scrutiny Committee held on 25.09.2018 for the rate
reasonability and Scrutiny Committee resolved as under:
"The agency quoted lowest and stand l1 is M/s Mamta Construction Co. with quoted Rs. 12,42,78,032.50
which is 14.05% lower than the estimated cost put to tender. Committee resolved that the rates quoted by
l1 agency seems on lower side for certain BOQ items; therefore l1 agency M/s Mamta Construction Co have
to submit the extra security deposit of Rs. 20,31,514.45 in addition to security deposit as per tender
conditions. Committee recommended to put up this tender for the approval of Sl TC."
It was found that the rates quoted by l1 bidder are reasonable and Sl TC passed the following resolution .
" It is unanimously resolved to approve the bid of lowest bidder M/s Mamta Construction Co. with final
quoted cost Rs. 12,42,78,032.50 ( That is 14.05% below than the estimated cost put to tender) with
condit ion that l1 agency M/s s Mamta Construction Co. have to submit the extra security deposit of Rs.
20,31,514.45/-; in addition to security deposit as per tender conditions. Thus L1 agency have to submit
total security deposit of Rs. 82,45,416.075. The O&M cost of 5 years shall be borne by Gandhidham
Municipality.
Further, resolved that Mission Director/ Member Secretary, SLTC be and is hereby authorised to issue
approval letter for sewerage project work and do all the subsequent acts and things as may be necessary
till successful completion of works of st rom water drainage project of Gandhidham Municipality."
Agenda No. 16: Approval of Tender- Gandhidham Municipality Underground Drainage Project
(Sewer Collection Network For Zone 3,4,5} (SAAP 2015-16 & 2016-17}
The DPR amounting Rs. 46,87,80,380 of underground drainage work for Gandhidham Municipality under
AMRUT Mission SMP 2015-16 & 2016-17 was approved in 121h State level Technical Committee held on
21.08.2017 under allocation of Rs. 45.00 Cr (Rs. 35.00 Cr under SMP 2015-16 & Rs. 10.00 Cr under SMP
2016-17}.
Name of Work: Design, Construction, Testing and Commissioning of Sewer Collection Network in zone 3,4 &
5 along with maintenance for period of 5 years at Gandhidham (tender id: 317505}
The tender was published by Gandhidham Municipality and based on technical & financial bid evaluation
done by Gandhidham Municipality, it was placed in 12th Scrutiny Committee held on 25.09.2018 for the rate
reasonability and Scrutiny Committee resolved as under:
"The agency quoted lowest and stands Ll is M/s Jyantisuper Construction Pvt. Ltd. With quoted Rs.
30,85,72,628.22 which is 34.81% below than the estimated cost put to tender. L1 agency M/s Jyantisuper
Construction Pvt. Ltd. have to submit the extra security deposit of Rs. 1,51,02,598.22 in addition to the
security deposit as per tender terms condition. Committee resolved to put up this tender for the approval of
next SLTC meeting."
It was found that the rates quoted by L1 bidder are reasonable and SLTC passed the following resolution.
" It is unanimously resolved to approve the bid of lowest bidder M/s Jyant i
Super Construction Pvt. Ltd. with f inal quoted cost Rs. 30,85,72,628.22 (That is 34.81 % below than the
estimated cost put to tender) with condition that l1 agency M/s Jyanti
Super Construction Pvt. Ltd. have to submit the extra security deposit of Rs. 1,51,02,598.22; in addit ion
to security deposit as per t ender conditions. Thus l1 agency have to submit total security deposit of Rs.
3,05,31,229.63. The O&M cost of 5 years shall be borne by Gandhidham Municipality.
Further, resolved that Mission Director/ Member Secretary, SLTC be and is hereby authorised t o issue
approval letter for sewerage project work and do all the subsequent acts and things as may be necessary
till successful completion of works of strom water drainage project of Gandhidham Municipality."
Agenda No. 17: Approval of Tender - Botad Water Supply Scheme (SAAP 2017-20}
The DPR amounting Rs. 6,40,34,150/- of water supply scheme for Botad Municipality under AMRUT
Mission SAAP 2017-20 was approved in 15th State Level Technical Committee held on 26.04.2018 under
allocation of Rs. 8.00 Cr.
Name of Work: Designing, Constructing, Testing & Commissioning of underground services reservoirs
(UGSR), Elevated services reservoirs (ESR),and pump house complete with electro
mechanical works at Khodiyarnagar-2; Designing, providing, laying, Jointing main Dl K-7 of
250 mm & 300 mm dia at Khoidyarnagar; and distribution network (DI K-7 Pipeline 100 to
350 mm dia) in Khodiyarnagar area, Bhavnagar Colony area & Mochipara area including
household connections along with all allied works complete at Botad including post
completion O&M for 5 years under AMRUT Scheme (Tender ld:316527).
The tender was published by Botad Municipality and based on technica l & financial bid evaluation done by
Botad Municipality; it was placed in 121h Scrutiny Committee held on 25.09.2018 for the rate reasonability
and Scrutiny Committee resolved as under:
"The agency quoted lowest and stands Ll is M/s Uniroyal Sathapatya with quoted Rs. 6,20,02,630.07 which
is 5.41 %below than the estimated cost put to tender. Committee resolved that as the rates quoted by L1
agency seem reasonable. It is recommended to put up this tender for the approval of next SLTC."
It was found that the rates quoted by Ll bidder are reasonable and SLTC passed the following resolution.
" It is unanimously resolved to approve the bid of lowest bidder M/s Uniroyal Sathapatya with final
quoted cost Rs. 6,20,02,630.07 ( That is 5.41 % below than the estimat ed cost put to t ender). The O&M
cost of 5 years shall be borne by Botad Municipality.
Further, resolved t hat Mission Director/ M ember Secretary, SLTC be and is hereby authorised to issue
approval letter for sewerage project work and do all the subsequent acts and things as may be necessary
till successful completion of works of wat er supply project of Botad Municipality."
Agenda No. 18: Approval of Tender - Deesa Strom Water Drainage (SAAP 2016-17 & 2017-20}
The DPR amounting Rs. 11,02A8,000/- of strom water drainage for Deesa M unicipality under AMRUT
Mission SAAP 2016-17 & 2017-20 was approved in 17th State Level Technical Committee held on 24.06.2018
under allocation of Rs. 10.00 Cr (Rs. 5.00 Cr under SAAP 2016-17 & Rs. 5.00 Cr under SAAP 2017-20).
Name of Work: Designing and Construction work of strom water project at different 4 location in Deesa
Nagarpalika area under AM RUT (year 2017-20).Deesa, dist.: Banaskantha.
The tender was published by Deesa Municipality and based on technical & financial bid evaluation done by
Deesa Municipality; it was placed in lih Scrutiny Committee held on 25.09.2018 for the rate reasonability
and Scrutiny Committee resolved as under:
"A single DPR amounting Rs. 11,02,48,000/- for Deesa Storm Water Drainage under SAAP 2017-20 was
approved in 17th SLTC, but Deesa Municipality has floated different 04 tenders. Considering the following
reasons, committee decided to reject all the 04 tenders & single tender should be invited for the approved
DPR.
• The single DPR has been approved amounting Rs. 11,02,48,000; while the work has been divided in 4
parts and the different 4 no. of tenders have been invited by Deesa Municipality without prior
opinion/ permission of competent authority.
• All 04 works are of similar nature of works, also in the city limit of Deesa Municipality, also
connective drains. There is huge variation in the amount quoted by Ll agencies in each tender i.e.
ranging from 30.00% below to 9.89% below t han estimated amount put to tender
• The Splitting of tender and awarding works to agencies may lead to technical problems in
implementation of project. It also makes difficult to manage the financial flow of project.
Committee also suggested to put this resolution for the information of next SLTC."
The details of financial bid evaluation are as under:
M/s. P.M . Buildcon 1,28,59,668.57
M/s. Arhan Buildcon 1,60,15,658.31
319601 M/s. PDC lnfraprojects Pvt. 1,60,76,834.85 Ltd
M/s. Jungalkishore 1,67,35,382.31 Ramkishan Agrwal
28.53% (Below) Ll
10.99% (Below) L2
10.65% (Below) L3
6.99% (Below) L4
Infrastructure Pvt. Ltd.
M /s. P.M . Buildcon 1,89,61,190.40 30.60% (Below) L1
M/s. PDC lnfraprojects Pvt. 2,38,65,417 .60 12.65% (Below) L2
Ltd M/s Ambar Construction 2,40, 75,793.92 11.88% (Below) L3
319593 M/s. Arhan Buildcon 2,43,18,956.16 10.99% (Below) L4
M/s. Jungalkishore 2,46,14,029.44 9.91% (Below) L5
Ramkishan Agrwal Infrastructure Pvt. Ltd.
M/s. shivam Builders 2,65,01,952.00 3.00% (Below) L6
M/s Ambar Construction 2,70,05,179.63 14.51% (Below) Ll
M/s. PDC lnfraprojects Pvt. 2, 75,92,729.45 12.65% (Below) L2
Ltd
M/s. Jungalkishore 2,84,58,259.83 9.91% (Below) L3 319556 Ramkishan Agrwal
Infrastructure Pvt. Ltd.
M/s. shivam Builders 3,09,56,926.00 2.00% (Belwo) L4
M/s. Maruti lnfrastructre 3,47,12,822.43 9.89% (Above) L5
M/s. shivam Builders 3,23,36,793.00 3.00% (Belwo) L1
M/s. Jungalkishore 3,00,33,213.21 9.91% (Below) L2 Ramkishan Agrwal
319598 Infrastructure Pvt. Ltd. M/s. Maruti lnfrastructre 3,66,33,919.41 9.81% (Below) L3
M/s. PDC lnfraprojects Pvt. 2,84,53,044.15 14.65% (Below) L4 Ltd
All the above 04 (four) tenders were discussed in detai l in terms of technical details, estimated contract value,
agencies participated and rates quoted by agencies for project was discussed & SLTC passed the following
resolution.
"A single DPR amounting Rs. 11,02,48,000/- for Deesa Storm Water Drainage under SAAP 2016-17 & 2017-
20 was approved in 17th SL TC, but Deesa Municipality has floated 04 different tenders without prior
approval . Considering the following reasons, committee proposed to reject all the 04 tenders &
Municipality should invite the single tender for the approved DPR.
• The single DPR has been approved amounting Rs. 11,02,48,000; while the work has been divided
in 4 parts and the different 4 no. of tenders have been invited by Deesa Municipality without prior
opinion/ permission of competent authority.
• All 04 works are similar nature of works, also in the limit of Deesa Municipality, also connective
drains. There is huge variation in the amount quoted by l1 agencies in each tender i.e. ranging
from -30.00% to 9.89% below than estimated amount put to tender
• The Splitting of tender and awarding works t o agencies may lead to t echnical problems in
implementation of project. It also makes difficult to manage the f inancial flow of project.
Agenda No. 19: Approval of Tender - Palanpur Wat er Supply Scheme (SAAP 2017-20)
The DPR amounting Rs. 10,60,54,300/- of water supply scheme for Palanpur Municipality under AMRUT
Mission SAAP 2017-20 was approved in 171h State Level Technical Committee held on 14.06.2018 under
allocation of Rs. 12.00 Cr.
Name of Work: Water Supply Schemes in various Areas of Palanpur Municipality under AMRUT Scheme"
(tender id: 321749).
The tender was published by Palanpur Municipality and based on technica l & financial bid evaluation done
by Palanpur Municipality; it was placed in 131h Scrutiny Committee held on 08.10.2018 for the rate
reasonability and Scrutiny Committee resolved as under:
"The agency quoted lowest and stands L1 is M/s Tirupati Sarjan With quoted Rs. 11,61,24,703 which is 9.49
%higher than the estimated cost put to tender. After negotiation, the Ll agency M/s Tirupati Sarjan offered
further rebate of 3.49% i.e. Rs. 37,07,145/- and agreed to work on Rs. 11,24,17,558; which is 6% higher than
the estimated amount put to tender. Committee resolved that the rates quoted by Ll agency reasonable
with prevailing market price. Further, it is resolved that Before issuing the work order, Palanpur Municipality
has to assure the land availability for construction of proposed components and has to submit the
certificates of the same to M ission Directorate. Committee also resolved to put up this tender for the
approval of SLTC."
It was found that the rates negotiated by Ll bidder are reasonable considering the site condition and SLTC
passed the following resolution.
" It is unanimously resolved t o approve the bid of lowest bidder M/s Tirupati Sarjan with final negot iated
cost Rs. 11,24,17,558 (That is 6 % higher than the estimated cost put to tender). The O&M cost of 5 years
shall be borne by Palanpur Municipality.
Further, resolved that Mission Director/ Member Secretary, SLTC be and is hereby authorised to issue
approval letter for sewerage project work and do all the subsequent acts and things as may be necessary
till successful complet ion of w orks of w ater supply scheme of Palanpur Municipality."
Agenda No. 20: Approval of Tender - Vapi Municipality Strom Water Drainage Project {SAAP
2017-20)
The DPR amounting Rs. 6,11,72,170.15 of water supply scheme for Vapi Municipality under AMRUT
Mission SAAP 2017-20 was approved in 16th State Level Technical Committee held on 18.05.2018 under
allocation of Rs. 5.00 Cr.
Name of Work: Construction work of Box Culvert & Box Drain at different Locations in Vapi Municipality
area under AMRUT Yojana (year 2017-20). Vapi, dist.: Valsad {2nd attempt)" . (Tender ld:
320983)
(
The tender was published by Vapi Municipality and based on technical & financial bid evaluation done by
Vapi Municipality; it was placed in 13th Scrutiny Committee held on 08.10.2018 for the rate reasonability and
Scrutiny Committee resolved as under:
"The agency quoted lowest and stands Ll is M/s Joy Builders agreed to work on amount Rs. 6,72,83,270.61
which is 9.99 % higher than the estimated cost put to tender. After negotiation agency offered further
rebate of 3.99 %i.e. Rs. 24A0,769.61 and agreed to work on amount Rs. 6A8,42,501-; which is 6% higher
than estimated amount put to tender. Committee resolved that the rates quoted by Ll agency are
reasonable considering the nature of work and prevailing market price. Further, it is resolved that Before
issuing the work order, Vapi Municipality has to ensure the land availability for construction of proposed
components and has to submit the certificates of the same to Mission Directorate. Committee also resolved
to put up this tender for the approval of SLTC."
It was found that the rates negotiated by Ll bidder are reasonable and SLTC passed the following resolution.
" It is unanimously resolved to approve the bid of lowest bidder M/s Joy Builders with f inal negotiated cost
Rs. 6,48,42,501 ( That is 6 % higher than t he estimated cost put t o t ender). The O&M cost of 5 years shall
be borne by Vapi Municipality.
Further, resolved that Mission Director/ Member Secretary, SLTC be and is hereby authorised t o issue
approval letter for sewerage project work and do all the subsequent act s and things as may be necessary
till successful completion of works of strom water drainage project of Vapi Municipality."
Agenda No. 21: Approval of Tender- Mehsana Water Supply Project {SAAP 2017-20)
The DPR amounting Rs. 24,12,76,000 of water supply scheme for Mehsana Municipality under AMRUT
Mission SAAP 2017-20 was approved in 17th State Level Technical Committee held on 14.06.2018 under
allocation of Rs. 15.00 Cr.
Name of Work: Designing and Build contract of rising main, distribution system, Tube well -10 nos, pumping
machinery on tube well, ESR, Collecting chamber, pumping machinery on sump and O&M
for 5 years works for augmentation of Mehsana water supply scheme under Amrut- 2017-
20 Dist. Mehsana(Tender ld: 321614)
The tender was published by Mehsana Municipality and based on technical & financial bid evaluation done
by Mehsana Municipality; it was placed in 12th Scrutiny Committee held on 25.09.2018 for the rate
reasonability and Scrutiny Committee resolved as under:
"The agency quoted lowest and stands L1 is M/s Jalaram Projects Pvt. Ltd. with quoted Rs. 21,54,61,965.87
which is 7.56% lower than the estimated cost put to tender. Committee resolved that the rates quoted by
Ll agency seems reasonable; Further, it is recommended to put up this tender for the approval of SLTC."
It was found that the rates quoted by Ll bidder are reasonable and SLTC passed the following resolution.
"It is unanimously resolved to approve the bid of lowest bidder M/s Jalaram Projects Pvt. Ltd.with final
quoted cost Rs. 21,54,61,965.87 ( That is 7.56 % below than the estimated cost put to tender). The O&M
cost of 5 years shall be borne by Mehsana Municipality.
Further, resolved that Mission Director/ Member Secretary, SLTC be and is hereby authorised to issue
approval lett er for sewerage project work and do all the subsequent acts and things as may be necessary
till successful completion of works of strom water drainage project of Mehsana Municipality."
Agenda No. 22: Capacity Building Programme under AMRUT Mission
Proposal of capacity building programme for ULBS of Gujarat State under AMRUT Mission has been
submitted for approval. The proposal was appraised in detail; details of capacity building programme
were presented & discussed.
• MoUD has Empaneled 35 Training Institutes for Capacity Building programme
• State has to Select Institutes and sign MOU to Conduct Capacity Building Programme
• Target for the Mission Period: 2946 nos. of functionaries to be trained
• Total410 nos. of functionaries trained so far with the help of 6 training entities.
• As per page 7 of AM RUT Mission Guidelines, "The capacity building will not be limited to the Mission
Cities, but will be extended to other ULBs as well."
• Additionally, in reference to Letter No. K-14012/101 (25)/2017-CBUD dated 29th December, 2017;
the Integrated Capacity Building Framework to cover all Urban Missions viz. AMRUT, SBM, SCM,
NULM, HFA, PMAY and HRIDAY; so interpreted that Integrated Capacity Building Programme be
extended to all corresponding urban mission cities.
• As per SAAP a total of 2946 officials are being targeted to be trained by the end of mission period. Of
which 410 have been trained as on 05.03.2018 giving us proximity of 2536 personnel. To be able to
successfully meet the target, 139 non AMRUT Cities &/or Cities corresponding to other Urban
Missions need be included.
• Additionally, committee took note that source of funding for Integrated Capacity Building workshops
was one concern raised during verbal discussions with MoHUA; earlier World Bank funding was
secured through CBUD Programme of MoHUA; which is less likely to continue.
Resolution:
With the aim to achieve target of the mission period i.e. 2646 nos of functionaries to be trained and to
involve all ULBs of state; the M ission Director (AMRUT} is empowered for implementation of Capacity
Building Programme under AMRUT Mission. Further, all 139 ULBs ( other than AMRUT ULBs) of Gujarat
State may be included for capacity building programme under AMRUT from available fund under A & OE
budget head.
Further, following suggestion was made by Chairman, SLTC
• With the approval of projects of STPs, approximately all ULBs under AMRUT Mission will be
having enough capacity for treatment of wastewater. Hence, it is recommended to all ULBs
under AM RUT Mission to submit the projects considering the possible ways of reuse of treated
wastewater according to wastewater reuse policy of Government of Gujarat.
The meeting ended with vote of thanks.
Membe~,SLTC & GM (Tech), GUDM
'