Post on 30-Jul-2018
PATSAOURAS BUS PLAZA
METROLINK & AMTRAK
PLATFORMS
1
2
3
4
1
2
3
4
METRO BUS LINES 33, 68, 70, 71, 78, 79, 378, 733
METRO BUS LINES 33, 40, 68, 70, 71, 78, 79, 378, 442, 733
METRO BUS LINES 40, 68, 70, 71, 78, 79, 378, 770
DISCHARCHE ONLY METRO BUS LINES 40, 442
IMPROVEMENT SITES
TRANSIT PAVILION
SITE
5 5
TRANSIT PAVILION SITE METRO BUS LINES 68, 70, 71, 78, 79, 378, 770
6 UNDERPASS LIGHTING AND WAYFINDING TREATMENT (OPTIONAL)
6
METRO GOLD LINE
METRO RED/PURPLE LINE
METRO SILVER LINE 1
Cesar Chavez Bus Stop Improvements Project Metro Technical Advisory Committee | January 4, 2017
200’ 50’
2
Cesar Chavez Bus Stop Improvements Project VICINITY SITE PLAN
METRO BUS LINES: 33, 68, 70, 71, 78, 79, 378, 733
METRO BUS LINES: 33, 40, 68, 70, 71, 78, 79, 378, 442, 733
METRO BUS LINES: 40, 68, 70, 71, 78, 79, 378, 770
DISCHARCHE ONLY METRO BUS LINES: 40, 442
TRANSIT PAVILION SITE METRO BUS LINES: 68, 70, 71, 78, 79, 378, 770
UNDERPASS LIGHTING AND WAYFINDING TREATMENT
METROLINK + AMTRAK PLATFORMS
CONTINENTAL CROSSWALKS
PATSAOURAS BUS PLAZA
IMPROVEMENT SITES
N
AMENITIES 1. Shade structure 2. Seating for transit riders 3. System maps & real time signage 4. Bicycle lockers 5. Bicycle racks 6. Bike share kiosk 7. Enhanced landscaping
2
1
6 5
3
4
7
6
Cesar Chavez Bus Stop Improvements Project PROJECT SCOPE: Transit Pavilion – Elements to be included
• Designer chosen – Gensler
• Task 1: Site analysis – completed
• Outreach meeting #1 – completed
• Task 2: Precedent studies, Metro design criteria, and design vision – in progress
7
Cesar Chavez Bus Stop Improvements Project PROJECT STATUS
9
Cesar Chavez Bus Stop Improvements Project PROJECT GOALS
The space should be:
• SAFE
• COMFORTABLE
• INTUITIVE
• INFORMATIVE
• MAINTAINABLE
• BEAUTIFUL
11
Cesar Chavez Bus Stop Improvements Project OUTREACH MEETING #1 RESULTS
Landscape Seating
0
5
10
15
20
25
30
Existing trees Hardscape Green space
0
5
10
15
20
25
30
35
40
Traditional Non-Traditional Innovative
0
5
10
15
20
25
Traditional Integrated Flexible
0
5
10
15
20
25
30
Bike racks Bike storage Bike share
Shelters Bike Facilities
12
Cesar Chavez Bus Stop Improvements Project OUTREACH MEETING #1 RESULTS
0
5
10
15
Coffee cart Food cart Fruit cart Food truck
0
5
10
15
20
Emergencycommunication
SecurityCameras
On-site secutiry0
5
10
15
20
25
30
Area Wayfinding Real-time digitalsignage
Interactive transitinformation
0
5
10
15
20
Enhancedlighting
Charging stations Web Access
Amenities/Special Features
Visual Guides Safety
Vendors
DESIGN VISION:
• Build a strong conceptual design that satisfies operational and maintenance needs.
OUTREACH
• Host onsite Community Meeting #2 – to be held in late January for one peak period.
• Increase online presence, including a survey.
35% DESIGN
• Gensler to prepare 35% Design from selected vision.
• Metro to circulate 35% Design to review team.
13
Cesar Chavez Bus Stop Improvements Project NEXT STEPS
Task 2: Precedent Studies,
Design Vision
Task 3: 35% Design
Task 4: 85% Design
Task 5: 100% Design
Task 6: Final AFC Design
Dec Jan Feb Mar Apr May June July Aug Sep
Metro Review of Draft Deliverable
Construction Procurement Process
14
Task 1: Site Analysis
Complete
Cesar Chavez Bus Stop Improvements Project DESIGN SCHEDULE & PROCESS
2016 2017