Photo/isometric drawing

provided by manufacturer

BalconIE System

Description of Product

This is an assessment of BalconIE system

produced by BalconIE Ltd. The system

comprises of a prefabricated and pre-

engineered composite (steel/polyurethane resin

core/steel plate) sandwich panel stiffened

along the perimeter by HSS frame and steel

fascia plates to which an approved guarding

system may be fixed. The panel is fixed on top

of concrete floor by Halfen channels and bolts

or by mechanical anchors or chemical fixings.

Key Factors Assessed

Mechanical Resistance & Stability

Safety in case of Fire

Health, Hygiene and Environmental

Safety in Use

Durability serviceability and identification

Validity

This certificate was first issued on 16th September 2016 and is valid until 16th September 2019

Issue Dated 31st July 2018

Certificate No: EW691

The registered system is suitable for use in low to high rise buildings of residential and hotel accommodation where the

balcony serves a single unit (please refer to conditions of certificate for more information).

Individual design will be submitted for each balcony type required per project.

Provision of Guarding and handrails are outside of the scope of this registration. The system is designed to accommodate

the standard range of fixings. The balcony system does however cover the shear and overturning calculations for the

guarding fixing plate. Confirmation of acceptability will be forwarded by BalconIE once commissioned.

The system has a maintenance free life of over 25 years. It is protected from the environment by a double coating build up

and a waterproof membrane. It can be installed from within the building using a small crawler crane and can be reused in a

different location.

The system can be used to incorporate a winter garden. This is however, outside of the scope of this Registered Detail and

should be discussed separately with individual building control teams.

If the balcony offers alternate escape to adjoining spaces it will be outside of the scope of this registration and fire protection

will need to be considered.

In line with the amendments to Building Regulation 7 (2) which came into effect on December 21 2018, this system

cannot be used on any relevant building with a storey at least 18m above ground level and which contains one or more

dwellings; an institution; or a room for residential purposes (excluding any room in a hostel, hotel or a boarding house).

This includes student accommodation, care homes, sheltered housing, hospitals and dormitories in boarding schools. For

more information on the changes to Regulation 7 please click here -

https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/760341/AD_7_v2_amend_2.pdf

This registration is for the tray and components only and design will be provided for:

1. Location plan and the design of the floor intended to accommodate the registered detail.

2. BalconIE design and fixing details for the types proposed

3. Details of guarding and handrails proposed

4. Details of connections and specification if enclosed winter garden proposed to determine appropriate fire resistances

can be achieved

LABC consider that, BalconIE System will meet the functional requirements of the Building Regulations

(listed below) if the criteria detailed in this certificate are met;

The Building Regulations 2010 (as amended) England & Wales

Regulation 7 Materials and Workmanship

Note: The system is acceptable.

AD A Structure

Note: The system is acceptable subject to site specific design.

AD B Fire Safety

Note: Subject to limitations detailed in Conditions section.

AD C Resistance to Moisture

Note: The system is acceptable subject to site specific design.

AD K Protection from falling collision & impact

Note: Subject to limitations detailed in Conditions section.

AD L1B, 2A/B Conservation of Fuel and Power

Note: The system is acceptable in relation to thermal break provisions

The Building Regulations 2010 (as amended) England

AD L1A Conservation of Fuel and Power

Note: The system is acceptable in relation to thermal break provisions

The Building Regulations 2010 (as amended) Wales

AD L1A Conservation of Fuel and Power

Note: The system is acceptable in relation to thermal break provisions

The Building (Scotland) Regulations 2004 (as amended)

If you would like to discuss a specific use of the product in Scotland it will require an additional

assessment under the Scottish Building Regulations and accordingly you should contact the LABSS

STAS Administrator at www.labss.org

LABC Warranty

The use of the BalconIE System has not been assessed to meet the requirements of the LABC Warranty

Technical Manual. If you would like to discuss a specific use please make an enquiry to

technical.services@labcwarranty.co.uk

IE-15-1131-P1.1, P1.2, P1.3 and P1.4

IE-15-1131- P0.1, P0.2 and P0.3

0001-01-02 Rev A

BalconIE brochure

IE-2016-04-04 SPS Balconies - Design Report

SSD Peer Review Balcony system Peer Review Job: 01020 Issue Dated 10th April 2016 Revision A

BRE Report No: P104699-1007 Issue 1

BalconIE Ltd

Allen House

1 Westmead Road

Sutton

Surrey

SM1 4LA

Tel: 020 861 40775