Post on 15-Jan-2016
CEMEXCEMEXREDWOOD CITY CEMENT TERMINALREDWOOD CITY CEMENT TERMINAL
EQUIPMENT UPGRADE & MODIFICATION PROJECTEQUIPMENT UPGRADE & MODIFICATION PROJECT
CEMEXCEMEXREDWOOD CITY CEMENT TERMINALREDWOOD CITY CEMENT TERMINAL
EQUIPMENT UPGRADE & MODIFICATION PROJECTEQUIPMENT UPGRADE & MODIFICATION PROJECT
RMC Pacific Materials Purchased The Terminal From Ideal Cement
March 1, 2005 – CEMEX Officially Purchased RMC Standard Procedure During An Acquisition Includes
Formation Of A Post Merger Integration (PMI) Team• Evaluation Of Facility Operations And Procedures &
• Recommendations To Bring Facility In Compliance With CEMEX Standards
Improve Operations, Safety, Environmental And Community Service Improve Customer Service.
CEMEXCEMEXREDWOOD CITY CEMENT TERMINAL REDWOOD CITY CEMENT TERMINAL
UPGRADE OBJECTIVESUPGRADE OBJECTIVES
Convert Storage Silo Dedicated For Fly Ash To Cement Truck Load-Out System Upgrade And Improvement
• Upgrade Existing Truck Loading System With Up To Date Equipment And Add An Additional Load-out Spout That Will Expedite Load Times By Half;
• Install A Second Two Spout Truck Loading System; &
• Centralize Nearly All Of The Cement Storage And Loading To One Vicinity Of The Terminal That Is Away From The Pacific Shores Complex.
CURRENT TERMINAL ENTERANCE CURRENT TERMINAL ENTERANCE & TRAFFIC PATTERN& TRAFFIC PATTERN
Stockhouse D
Current Loadout
Phase 1 Loadout System
Phase 2 Loadout System
PROJECT OVERVIEW
PROPOSED TRAFFIC PATTERN PROPOSED TRAFFIC PATTERN & LOADING SYSTEM LOCATIONS& LOADING SYSTEM LOCATIONS
New Traffic Pattern
Phase 2 Loadout System
Phase 1 Loadout System
Artist conception of Phase 1 ModificationModern 2 Nozzle Loadout System Replaces Single Nozzle system
PROPOSED IMPROVEMENTPROPOSED IMPROVEMENT
PROPOSED IMPROVEMENTPROPOSED IMPROVEMENT
Artist conception of Phase 1 & 2 ModificationsViewed Facing The New Phase 2 Loadout System
Phase 2
Phase 1
PROPOSED IMPROVEMENT (cont.)PROPOSED IMPROVEMENT (cont.)
Move Truck Loading From The Small Bulk Tanks To Stock House – D;
Utilize Four Storage Silos In Stock House – D As Both Storage And Load-Out;
Replacing Inventory From Adjacent Silos Reduces Time Required To Re-fill System;
Reduce Energy Consumption And Operating Cost; Reduce Truck Loading And Waiting Time; Installation Of Modern Equipment Minimizes Emissions;
PROPOSED IMPROVEMENTS (cont.)PROPOSED IMPROVEMENTS (cont.)
Minimizes The Number Of Trucks Waiting On Seaport Blvd. Which Would Move Cement Trucks Inside The Terminal;
Moves A Majority Of The Truck Loading Operations Away From Property Line Adjacent To Pacific Shores;
Centralize Cement Storage – Minimize Transfer Of Cement From Stock House – D To Small Bulk Tanks
Pave Roads • Minimize Fugitive Dust During The Dry Season• Minimize Mud Track Out During Wet Weather Season
Any Questions?