CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 1
SPIRE & PACS SORPTION COOLERS
Lionel Duband, L. Clerc, L. Miquet, L. Guillemet, R. Vallcorba, D. Guillaume, D. Communal, Patrick Dupont/Eric Dubois (BV)SERVICE DES BASSES TEMPERATURESDRFMC / DSM - CEA GRENOBLE
30 000 K
3000 K
300 K
30 K
3 K
0.3 K
INSTRUMENT BASELINE DESIGN REVIEW
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 2
COOLER STATUS - 1
DESIGN : completed(full compatibility with PACS/SPIRE)
CQM/STM Manufacturing : completed
Mechanical performance :Full numerical modelling done
All anomalies dealt with and tracedAll parts available
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 3
COOLER STATUS - 2
CQM & STM Assembling : 90% doneSTM unit
Cooler heart ready for EB welding
Slight delay due to subcontractors
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 4
GROUND SUPPORT EQUIPEMENT (MAIN)
TEST CRYOSTAT(2 "small" cryostats available)
LHeLN2
New large test cryostat delivered Feb. 2002Instrumentation in progress (wiring, thermometry, etc..)Needed for performance test (> 48 hours autonomy)
CLEAN ROOM : Implementation in progressExpected to be available April 2002
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 5
COOLER AIV PLAN
Assembling(Techmeta/SNLS/
OMG/Thermocompact/
SBT)
Proof pressure tests(20 MPa)
Thermal tests #1[Health Check ref]
One week bake out(80°C)
PackingDelivery
Thermal tests #2(health check)
Vibration tests(room T)
Thermal tests #3(health check)
Performance test(nominal)
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 6
January February Mars April May J une J uly Aug
2002CQM
PFM & FS
Autumn Winter Spring Summer Autumn Winter
2002 2003
Machining Delivery PFM Delivery FS Assembling
Qualification PFM Qualification FS
SCHEDULE
Assembling VibrationTests
Thermal Tests
ThermalVacuum
Available fordeliveryNote : Planning can
be impacted by ECR on electrical isolation
PreTests +Integration
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 7
PA PLAN - 1
• PA requirements implemented- covers all project life- Potential risks & hazards identification done- Cleanliness and contamination control- Material evaluation program in progress
(Kevlar)- DML & DPL done- Subcontractors evaluated- Non conformance reporting system
implemented- Configuration control system done- Traceability (acceptance data package)
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 8
doc. Name completion statusCooler Specifications Released Not formally approvedI CD Released Not formally approvedPA Plan Released ApprovedDevelopement Plan Released Not formally approvedDetailed Planning Released -DML/DPL Released under reviewH/W tree Released under reviewMAIV Flow Chart Released Not formally approvedAIV Plan Released Not formally approvedFMECA Released Under reviewCleanliness Philosophy Released Not formally approvedAll procedures I n progress I nternal to SBT
MAIN PROJECT DOCUMENTATION
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 9
TO DATE : PROBLEMS & SOLUTIONS
Deformation of structureafter EB welding
Deformation max. :≈ 400 µm on 150 mm plate
Impact on FM : NoneStructure modified
accordinglyNo delta qualification
expected
MRBs(internal & subcontractors)
Implementationof solution
Qualification
Anomaly spottedand traced
Angle iron added
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 10
KEVLAR TENSIONdevelopment of dedicated tool
- various solutions being evaluated
OPEN ISSUES AND CRITICAL AREAS
ELECTRICAL ISOLATIONSPIRE ECR issued - Recently agreed by PACS (Feb. 15)Impact : - need to identify/qualify solution
- but cooler already built- planning : to be evaluated, but some
marginavailable today
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/28 2002 11
CONCLUSION
• No major problems to date• CQM first thermal tests : ≈ April• STM available end of March• Electrical isolation : to be adressed• Kevlar : experiments continue
data built up• out of SBT "territory" : cryostat straps need attention