Post on 23-Dec-2015
Capacity Development for CDM Capacity Development for CDM in Mozambique
Njeri Wamukonya
Side Event June10 2003
What are the project objectives?What are the project objectives?
Develop institutional (CDM framework Develop institutional (CDM framework and internal institutional) and technical and internal institutional) and technical capacity to enable Mozambique access capacity to enable Mozambique access CDMCDM
What is the CD approach used?What is the CD approach used?
regional centre- EDRC
national institutions –Uni Eduardo Mondlane (centre for engineering studies)
Ministry of Coordination of Environmental Affairs (MICOA)
Inception meetings- introduce project
Specific objectives: define how toSpecific objectives: define how to-Establish institutional framework for CDM and -Establish institutional framework for CDM and develop relevant capacitydevelop relevant capacity-Develop technical capabilities of project -Develop technical capabilities of project developers developers -Establish a pipeline of the CDM projects-Establish a pipeline of the CDM projects
Uni Eduardo Mondlane- lead
Worked very closely with MICOA
Phase 1: Phase 1: development of a national work plan
Undertook institutional analysis for framework
How was the plan developed?How was the plan developed?
Guiding principle:
-sustainability beyond project
Process of establishing the framework was explored –transparency & inclusive
Recomendations for framework based on:
-ability to fulfil DNA role and capacity of institution
Output of institutional analysis for Output of institutional analysis for frameworkframework
Matrix indicating DNA roles, relevant institutions for each role, and capacity gaps (sketch)
Recommendations for framework- models
Project developers- analysis
How was the plan developed? (2)How was the plan developed? (2)
what project development skills should be built and who should be targeted?
Guiding principle:CDM project developer needs to sustain themselves.
Output of institutional analysis for Output of institutional analysis for project developmentproject development
Matrix indicating potential project developers and capacity
gaps (sketch)
Work plan development processWork plan development process
Draft work plan was workshopped
Stakeholder comments on DNA framework and proposals for modification
Regional project workshop
Elements of the work Elements of the work plan plan
1. 1. EEstablishment of a designated stablishment of a designated national authority (DNA) national authority (DNA)
-further work shopping proposed -further work shopping proposed structure structure
-elaboration of gaps and how to -elaboration of gaps and how to address gapsaddress gaps
-defining legal framework for DNA-defining legal framework for DNA
Political Unit
MICOA-DNAIA NATIONAL DIRECTORATE FOR ENVIRONMENTAL IMPACT ASSESSMENT lead
Technical Unit
Eduardo Mondlane
-lead
DNA SET-UP
OTHER MEMBERS
Centre for promotion investments
National directorate for industry
Energy Ministry
Forestry Directorate
2. 2. StrengthenStrengtheninging the capa the capacitycity of public of public and private sector players to identify, and private sector players to identify, formulate, and secure financing for formulate, and secure financing for CDM projectsCDM projects
2.1 2.1 updating the list of developersupdating the list of developers
2.2 imparting skills2.2 imparting skills
3. C3. Creation of a pipeline of CDM reation of a pipeline of CDM eligible projectseligible projects
3.1 elaboration of projects3.1 elaboration of projects
3.2 packaging of projects 3.2 packaging of projects
3.3 marketing projects – promotion 3.3 marketing projects – promotion materialmaterial
4. 4. Training of trainersTraining of trainers
4.1 identifying trainers4.1 identifying trainers
4.2 capacity development of 4.2 capacity development of trainers trainers
Year I –focus on DNAYear I –focus on DNAThough parallel PD activities Though parallel PD activities
Thank you