Capacity Development for CDM Capacity Development for CDM in Mozambique

Njeri Wamukonya

Side Event June10 2003

What are the project objectives?What are the project objectives?

Develop institutional (CDM framework Develop institutional (CDM framework and internal institutional) and technical and internal institutional) and technical capacity to enable Mozambique access capacity to enable Mozambique access CDMCDM

What is the CD approach used?What is the CD approach used?

regional centre- EDRC

national institutions –Uni Eduardo Mondlane (centre for engineering studies)

Ministry of Coordination of Environmental Affairs (MICOA)

Inception meetings- introduce project

Specific objectives: define how toSpecific objectives: define how to-Establish institutional framework for CDM and -Establish institutional framework for CDM and develop relevant capacitydevelop relevant capacity-Develop technical capabilities of project -Develop technical capabilities of project developers developers -Establish a pipeline of the CDM projects-Establish a pipeline of the CDM projects

Uni Eduardo Mondlane- lead

Worked very closely with MICOA

Phase 1: Phase 1: development of a national work plan

Undertook institutional analysis for framework

How was the plan developed?How was the plan developed?

Guiding principle:

-sustainability beyond project

Process of establishing the framework was explored –transparency & inclusive

Recomendations for framework based on:

-ability to fulfil DNA role and capacity of institution

Output of institutional analysis for Output of institutional analysis for frameworkframework

Matrix indicating DNA roles, relevant institutions for each role, and capacity gaps (sketch)

Recommendations for framework- models

Project developers- analysis

How was the plan developed? (2)How was the plan developed? (2)

what project development skills should be built and who should be targeted?

Guiding principle:CDM project developer needs to sustain themselves.

Output of institutional analysis for Output of institutional analysis for project developmentproject development

Matrix indicating potential project developers and capacity

gaps (sketch)

Work plan development processWork plan development process

Draft work plan was workshopped

Stakeholder comments on DNA framework and proposals for modification

Regional project workshop

Elements of the work Elements of the work plan plan

1. 1. EEstablishment of a designated stablishment of a designated national authority (DNA) national authority (DNA)

-further work shopping proposed -further work shopping proposed structure structure

-elaboration of gaps and how to -elaboration of gaps and how to address gapsaddress gaps

-defining legal framework for DNA-defining legal framework for DNA

Political Unit

MICOA-DNAIA NATIONAL DIRECTORATE FOR ENVIRONMENTAL IMPACT ASSESSMENT lead

Technical Unit

Eduardo Mondlane

-lead

DNA SET-UP

OTHER MEMBERS

Centre for promotion investments

National directorate for industry

Energy Ministry

Forestry Directorate

2. 2. StrengthenStrengtheninging the capa the capacitycity of public of public and private sector players to identify, and private sector players to identify, formulate, and secure financing for formulate, and secure financing for CDM projectsCDM projects

2.1 2.1 updating the list of developersupdating the list of developers

2.2 imparting skills2.2 imparting skills

3. C3. Creation of a pipeline of CDM reation of a pipeline of CDM eligible projectseligible projects

3.1 elaboration of projects3.1 elaboration of projects

3.2 packaging of projects 3.2 packaging of projects

3.3 marketing projects – promotion 3.3 marketing projects – promotion materialmaterial

4. 4. Training of trainersTraining of trainers

4.1 identifying trainers4.1 identifying trainers

4.2 capacity development of 4.2 capacity development of trainers trainers

Year I –focus on DNAYear I –focus on DNAThough parallel PD activities Though parallel PD activities