CA Industrial Storm Water Program Brainslam An intensive overview of the program, its key...

Post on 19-Jan-2016

212 views 0 download

Tags:

Transcript of CA Industrial Storm Water Program Brainslam An intensive overview of the program, its key...

CA Industrial Storm Water Program Brainslam

An intensive overview of the program, its key principles, and likely future –slammed into a 20 minute format.

Greg Gearheart, PECA State Water Board

916.341.5892

The view ahead….

Grand Slam Game Plan

• Two main concepts to take home from this:

1. Effluent Limitations are not the same as Receiving Water Limitations (dually enforceable under current scheme)

2. Numerics come in 4 basic varieties, but we have the technology to make new hybrids or varieties.

SW Permits

• National Pollutant Discharge Elimination System (NPDES) Permit

• Effluent Limitations – Provisions– Prohibitions– SWPPP (by extension)– Technology-based standards, mostly

• Receiving Water Limitations– Water Quality Standards (WQS)

Technology Based Standards

• Industrial and construction: BAT/BCT

• Permits may require best management practices (BMPs)

• In establishing requirements, permit writers use best professional judgment (BPJ)

• NRDC v USEPA: states establish BMP requirements

Water Quality Standards

• Water Quality Standards are made up of:– Beneficial Uses (designated to specific waterbodies),

plus– water quality criteria; and– an antidegradation policy.

• Beneficial Uses (BUs) are:• often not directly related to key water resource uses

valued by communities (it might take a suite of them to protect wetlands and streams, for example)

• Narrative or Numeric

Humboldt BayBUs:

• REC1• REC2• NAV• WILD• EST• MAR• MIGR• SPWM• SHELL

SW Effluent Limitations

Receiving Water Limitations

Narrative: reduce pollutants using BAT/BCT - technology-based standard

Do not cause or contribute to anExceedance of a water quality standard (WQS).

Numeric: could be technology- (TBEL) or water quality-based (WQBEL)

ExampleStorm Water (SW) Dischargesfrom an industrial facility toHumboldt Bay

Humboldt BayBUs:

• REC1• REC2• NAV• WILD• EST• MAR• MIGR• SPWM• SHELL

ExampleStorm Water (SW) Dischargesfrom an industrial facility toHumboldt Bay

SW Effluent Limitations

Technology-based BMPs:• Covering waste piles• Sweeping/cleaning of open areas• Treatment (basins) of solids• Etc.

Receiving Water Limitations

Numbers – TSS < 100 mg/LNarrative – “no toxics in toxic amounts”

Humboldt BayBUs:

• REC1• REC2• NAV• WILD• EST• MAR• MIGR• SPWM• SHELL

ExampleStorm Water (SW) Dischargesfrom an industrial facility toHumboldt Bay

SW Effluent Limitations

Technology-based BMPs:• Covering waste piles• Sweeping/cleaning of open areas• Treatment (basins) of solids• Etc.

Receiving Water Limitations

Numbers – TSS < 100 mg/LNarrative – “no toxics in toxic amounts”

(1) Enforce ELs

(2) Enforce RWLs

Compliance Scenarios

• ELs are violated and RWLs are fine• ELs are violated and RWLs are violated• ELs are fine and RWLs are fine• ELs are fine and RWLs are violated

• TBALs and WQBALs indicators for ELs and RWLs

• TBELs and WQBELs direct compliance measures for ELs (in the case of WQBELs these also should ensure RWL compliance)

The Challenge of Numerics

• Effluent limitations can either be “narrative” or “numeric”

• Numeric effluent limitations can either be “technology-based” or “water quality-based”

• Benchmark values are being used my many as training wheels for NELs– And just to be different, CA calls these

“Numeric Action Levels” - NALs

NELs and NALs

Water Quality Technology

Numeric Effluent Limitations

WQBELs TBELs

Numeric Action Levels WQBALs TBALs

WQBELs

• Derived from water quality standards

• Apply to the effluent at the point of discharge

• Could include mixing zone or dilution credit

• If NELs are met, water quality standards (WQS) would be met (in theory)

• Site specific!

TBELs

• Using the BAT/BCT approach, these are derived from performance data on specific BMPs (probably treatment control, but could be others, too)

• Apply to the effluent at the point of discharge

• Probably somewhat sector specific, but otherwise generally applicable

Action Levels

• aka Benchmark values in the MSGP

• These are typically a hybrid of technology- and water quality-based values

• MSGP values are derived from water quality criteria, however not site specific (nor are they CA specific)

• If exceeded these generally do not constitute a violation of the permit

CA Expert Panel on Numerics

• Recommended differentiating between TMDL based NELs and the rest of the pack

• Recommended a specific approach to setting TBALs and TBELs

• Technology-based numbers should be based on effluent characterization data – mean plus one or two standard deviations

• Panel went on to say our data was not acceptable

More on TBALs, TBELs, WQBALs and WQBELs

• Effluent data is only helpful in setting technology-based numbers if there is more known about the relationship to BAT/BCT implementation

• Some individual NPDES permits for industrial storm water have WQBELs – Boeing SSFL, refineries, etc.

Charts and graphs.

Industrial Facilities Inspected FY10/11

Industrial Facilities Inspected FY10/11

Industrial Facilities Submitting Annual Reports FY10/11

Industrial Facilities Submitting Annual Reports FY10/11

Next steps.

IGP - Next Steps

• Release new IGP draft (early November)

• Public, staff workshops (outreach) in November and December

• Public Hearing in December

• Comment period ends

• Staff digests and puts out FINAL draft for adoption

• Adoption in Spring 2012

Greg Gearheart | 916-341-5892 | ggearheart@waterboards.ca.gov