Bsspar1 s14 chapter 01_introductionto_parameterplanning_v1.1

Post on 03-Jul-2015

219 views 10 download

description

BSS Optimization

Transcript of Bsspar1 s14 chapter 01_introductionto_parameterplanning_v1.1

1 © Nokia Siemens Networks

BSSPAR1: Chapter 1Introduction to Parameter Planning

2 © Nokia Siemens Networks

Legal Notice

Intellectual Property Rights

All copyrights and intellectual property rights for Nokia Siemens Networks training documentation, product documentation and slide presentation material, all of which are forthwith known as Nokia Siemens Networks training material, are the exclusive property of Nokia Siemens Networks . Nokia Siemens Networks owns the rights to copying, modification, translation, adaptation or derivatives including any improvements or developments. Nokia Siemens Networks has the sole right to copy, distribute, amend, modify, develop, license, sublicense, sell, transfer and assign the Nokia Siemens Networks training material.

Individuals can use the Nokia Siemens Networks training material for their own personal self-development only, those same individuals cannot subsequently pass on that same Intellectual Property to others without the prior written agreement of Nokia Siemens Networks .

The Nokia Siemens Networks training material cannot be used outside of an agreed Nokia Siemens Networks training session for development of groups without the prior written agreement of Nokia Siemens Networks.

3 © Nokia Siemens Networks

At the end of the module, the participant will be able to:

• Sketch a BSS Managed Object Hierarchy

• Look up the parameters at each level, in the parameter dictionary

• Identify parameter value ranges and default settings

• Find the changes to objects and parameters, that occur with each BSS software release

Module Objectives

4 © Nokia Siemens Networks

Managed Object (MO) Hierarchy

5 © Nokia Siemens Networks

Example from Parameter Dictionary

Parameter name Rxlev Access Min

Abbreviated name rxLevAccessMin

Managed object BTS

Multiplicity 1

DescriptionWith this parameter you define the minimum power level an MS has to receive before it is allowed to access the cell.

Additional information -

Range and step -110...-47 dBm, step 1 dBm

Formula for getting internal value internal_value = (gui_value + 110)

Default value -105 dBm

Default value notes -

Required on Creation optional

Related functions -

Modification Online

Modified -

Related parameters -

Parameter relationships -

Related options -

Related features -

Interfaces•RACApp <-> RAC•Planner <-> RAC•RAC <-> Optimizer•RAC <-> BSC

References •3GPP Reference: 44.018, 45.008

MML Commands EQG, EQO

MML Abbreviated Name RXP

MML Full Name rxlev access min

Segment Level Parameter true

File Based Provisioning supported true

6 © Nokia Siemens Networks

PRFILE, FIFILE and PAFILE parameters

• PRFILE (General Parameter File)– Standard features

– Optional features

– Interrogate with MML command ZWOS

• FIFILE (Feature Information Control File)– Stores optional parameters from the PRFILE

– Interrogate with MML command ZWOI

• PAFILE (BSC Control Parameter File)– GSM-BSC parameters

– GSM Timers

– Interrogate with MML command ZEGO

7 © Nokia Siemens Networks

Features & Activation status

ZWOS command

ZWOI command

8 © Nokia Siemens Networks

GSM-BSC Parameters & Timers

ZEGO command

9 © Nokia Siemens Networks

Viewing parameters Using NetAct CM Editor

10 © Nokia Siemens Networks

Viewing parameterswith MML Commands in BSC

ZEQO Output

11 © Nokia Siemens Networks

Exporting parametersUsing NetAct CM Ops Manager

12 © Nokia Siemens Networks

New objects & parameters

13 © Nokia Siemens Networks

Call Phases (MOC case)

MS BTS BSC

AUTHENTICATION (SDCCH)Phase 2 : MM signalling

CIPHERING MODE (SDCCH)Phase 8 : Ciphering

TMSI REALLOCATION (SDCCH)

SETUP (SDCCH)

Phase 2 : MM signalling

CH. REQUEST (RACH)

IMMEDIATE ASSIGN(AGCH)

SERVICE REQUEST (SDCCH)

Phase 1 : Paging, initial MS

CH.RELEASEPhase 4 : Release

ALERTING & CONNECT (FACCH)

Phase 2 : MM signalling

CONN. ACK. and MEASUREMENTPhase 15 : Conversation

DISCONNECT & RELEASE (FACCH)

Phase 4 : Release

ASSIGNMENT (SDCCH-FACCH)Phase 3 : Basic assignment

• Signalling procedures are used during the 15 phases in a basic call

• Certain parameters influence the setting up and the release of a call