Post on 28-Jul-2020
scale bar (metre)
0 10 20 30 40 50
B
R
E
E
C
H
E
S
E
N
D
112.6m
9
0
2
5
2
8
2
Ordnance Survey, (c) Crown Copyright 2014. All rights reserved. Licence number 100022432
205150
447650
447700
Copyright: lapd ltd
location plan - 1:1250
CLIENT
PROJECT
DRAWING NO.
SCALE
approval
planning
tender
construction
stage complete REVISION
as labelled86 Cumnor Hill
Oxford
OX2 9HU
Mr Mark Lawrence
DRAWING DATE
studio 24building c2culham science centreabingdonoxford ox14 3db
telephone 01865 407722fax 01865 407200enquiry@lapdarchitects.co.ukwww.lapdarchitects.co.uk
f YouTube
location plan
C151.01
October 2014
(A4)
A
A Mar'15 planning
resubmission
bedroom 1
terrace
dining
living
bedroom 2
kitchen
storage
entrance hall
en-suite
storage
terrace
master bedroom
bedroom 3
bedroom 2
en-suite
en-suite
terrace
en-suite
terrace
porch
flat 5
entrance hall
flat 6
0 1 2 3 4 5
scale bar (metre)
Copyright: lapd ltd
All dimensions and levels to bechecked on site and any
discrepancies to be reported to thearchitect before construction.
Written dimensions to be taken inpreference to scaled dimensions.
CLIENT
PROJECT
DRAWING NO.
SCALE
approval
planning
tender
construction
stage complete REVISION
as labelled86 Cumnor Hill
Oxford
OX2 9HU
Mr Mark Lawrence
DRAWING DATE
studio 24building c2culham science centreabingdonoxford ox14 3db
telephone 01865 407722fax 01865 407200enquiry@lapdarchitects.co.ukwww.lapdarchitects.co.uk
f YouTube
Proposed
Level +1 Plan,
Side Elevations &
Illustrations
C151.13
October 2014
(A1)
Level 0 floor plan - 1:100
side (S) elevation - 1:100
A Nov'14 scheme amends
B Nov'14 planning 07/11/14
side (N) elevation - 1:100
88 Cumnor Hill
GRP roofing system
Fibre cement cladding panels
Powder coated aluminium
Stainless steel &
glazed balustrade
GRP roofing system
Yellow facing brick
Powder coated aluminiumYellow facing brick
terracotta panel cladding
terracotta panel cladding
front elevation - 1:100
View of side entrances and access road
3D illustrative render - not to scale
C
C Mar'15 planning resubmission
GRP roofing system
Powder coated aluminium
Stainless steel &
glazed balustrade
Yellow facing brick
View rear entrance
3D illustrative render - not to scale
0 1 2 3 4 5
scale bar (metre)
road
screened bin store
parking
parking
2
3
4
kitchen
terrace
living
dining
double
volume
terrace
wc
study
sedum
1
5
6
7
utility
pantry
store
89
10
11
12
13
new road
Low level existing planting
Existing120m visibility splay
flat 6
10m
visibility splay to junction
23m
visibility splay
x 10 secure
covered bike
shelter
with 'sheffield
stands'
turning head
No parking zone - surface to be
paved with an alternative block
paving indicating for turning only
Private road agreement
to be entered into with OCC
2.4m from kerb
23m visibility to kerb
2.4m from kerb
salt bin
salt bin
0 1 2 3 4 5
scale bar (metre)
0 1 2 3 4 5
scale bar (metre)
Copyright: lapd ltd
All dimensions and levels to bechecked on site and any
discrepancies to be reported to thearchitect before construction.
Written dimensions to be taken inpreference to scaled dimensions.
CLIENT
PROJECT
DRAWING NO.
SCALE
approval
planning
tender
construction
stage complete REVISION
as labelled86 Cumnor Hill
Oxford
OX2 9HU
Mr Mark Lawrence
DRAWING DATE
studio 24building c2culham science centreabingdonoxford ox14 3db
telephone 01865 407722fax 01865 407200enquiry@lapdarchitects.co.ukwww.lapdarchitects.co.uk
f YouTube
Proposed
Level 0 Plan,
Site Sections &
Illustration
C151.12
October 2014
(A1)
D
A Nov'14 scheme amends
Cumnor Hill Site Section 2 - 1:200
B Nov'14 planning 07/11/14
Proposal building
84 Cumnor Hill
88 Cumnor Hill
Care Home
C Mar'15 planning resubmission
Proposal building
Care Home
Cumnor Hill Site Section 1 - 1:200
Level +1 floor plan - 1:100
app
ro
x 9m
etre
s
ap
pro
x 9
me
tre
s
View of stepped rear elevation from 88 Cumnor Hill Car Park
3D illustrative render - not to scale
as per approved
planning:
P14/V0695/RM
2 x 1100lt
1 x 660lt
1 x 140lt
6 x 7lt food bins
new planting
new planting
new landscaping and
fence to boundary
access to lower flat
parking amended
D Jul'15 site redline, parking
arrangement & bicycle
storage updated
E Jul'15 vision splays, salt
bins, turning area