BOSTON ARTS ACADEMYSCHOOL BUILDING COMMITTEE MEETING

NOVEMBER 9, 2017

2

Introductions

Schedule

Space Summary

Design Update

Project Budget

Vote

AGENDA

Presenter
Presentation Notes
Update photo and add your agenda

3

November 9, 2017 Submit Schematic Design Package to the MSBANovember 15, 2017 Anticipate Introducing Funding Agreement to City Council for ConsiderationDecember 1, 2017 Construction Manager @ Risk InterviewsDecember 13, 2017 MSBA Board Vote & City Council VoteJanuary 2018 Funding Agreement is executed

Design Development BeginsConstruction Manager @ Risk begins work

April 2018 Early Construction Work begins at Cleveland SchoolJuly 2018 BAA begins move out of 174 Ipswich Street

Remaining Construction Work @ Cleveland School BeginsAugust 2018 Construction Complete @ Cleveland School

BAA Moves Into Swing SpaceSeptember 2018 Begin Abatement at 174 Ipswich StreetNovember 2018 Begin Demolition @ 174 Ipswich Street

BAA SCHEDULE UPDATE

Presenter
Presentation Notes
Update photo and add your agenda

4

Core Academic

Special Education

Art & Music

Vocations & Tech.

Health & Phys. Ed.

Media Ctr/Library

Auditorium

Dining & Food Serv.

Medical

Admin & Guidance

Custodial/Maint.

Other

v1499.8K NSF

149.7K GSF

SPACE SUMMARY UPDATE

24915

4680

27545

11055

7700

3755

10595

5475

660

3435

1735

465

PSR Update (v14) Schematic Design (v18)MSBA

79.8K NSF119.7K GSF

V18102.0K NSF

153.5K GSF

-60

+30

-115

+50

-50

+105

+3095

-25

0

+15

-15

+185

5

NEW BUILDINGLEVEL 1

6

HEART OF THE SCHOOL

7

AUDITORIUM LOBBY

8

NEW BUILDINGLEVEL 2

9

VIEW FROM LAST ROW OF ORCHESTRA PRIOR TO BALCONY SHIFT

VIEW FROM LAST ROW OF ORCHESTRA AFTER BALCONY SHIFT

VIEW FROM LAST ROW OF BALCONY PRIOR TO SHIFT

VIEW FROM LAST ROW OF BALCONY AFTER SHIFT

AUDITORIUM SIGHT LINES

10

SIGHTLINE SECTION WITHOUT ORCHESTRA PIT

SIGHTLINE SECTION WITH ORCHESTRA PIT AND BALCONY SHIFT

TOTAL AUDITORIUM AREA SUMMARY

LEVEL/CONFIGURATION SEAT COUNT NSF NSF/SEAT

WITHOUT ORCHESTRA PIT 496 6,418 12.9

WITH ORCHESTRA PIT 496 6,905 13.9

WITH ORCH. PIT & BALCONY SHIFT 502 7,483 14.9

AUDITORIUM SIGHT LINES55’

68’

11

GALLERY & BALCONY LOBBY

12

NEW BUILDINGCATWALK

13

NEW BUILDINGLEVEL 3

14

NEW BUILDINGLEVEL 4

15

NEW BUILDINGLEVEL 5

16

3D VIEWSVAN NESS STREET

17

3D VIEWSIPSWICH STREET

18

3D VIEWSIPSWICH STREET

19

3D VIEWSFENWAY PARK

20

SHADING STUDIESWHOLE BUILDING

NORTHWEST - BASELINE

NORTHWEST - SHADING

• 26% reduction in solar radiation gains with shading

• Saves on cooling load and energy needs

• Reduces glare and visual discomfort in core learning areas

• 41% reduction in solar radiation + glare per classroom

• Daylight Autonomy >75% still achieved

OPTI

MAL

RAN

GE

21

SHADING STUDIESWHOLE BUILDING

SOUTHEAST- BASELINE

SOUTHEAST - SHADING

• 26% reduction in solar radiation gains with shading

• Saves on cooling load and energy needs

• Reduces glare and visual discomfort in core learning areas

• 41% reduction in solar radiation + glare per classroom

• Daylight Autonomy >75% still achieved

OPTI

MAL

RAN

GE

22

SITE PLAN

23

LANDSCAPE

24

LANDSCAPE

25

PROJECT BUDGET UPDATE

Construction Cost: $95,976,807

Project Budget: $124,755,413

Presenter
Presentation Notes
Update photo and add your agenda

26

THANK YOU