Bloody Bloody Andrew Jackson Scenic Drafting Package · Bloody Bloody Andrew Jackson Scenic...

Post on 29-Apr-2018

247 views 4 download

Transcript of Bloody Bloody Andrew Jackson Scenic Drafting Package · Bloody Bloody Andrew Jackson Scenic...

P I A

N O

B A N DL E A D E R

B A S SG U I T A R

G U I T A R 2

S H E L V E S

C

D

E

A

B

G

F

H

I

K

N

M

LJ

T R U S S P I C K P O I N T

F.C.1

3

5E L E C T R I C # 1

78910

E L E C T R I C # 1 A

11121314T R U S S P I C K P O I N T

15E L E C T R I C # 2

1617181920212223B L A C K B O R D E R24

25E L E C T R I C # 3

262728293031323334

35E L E C T R I C # 4

3637

38

394041B L A C K D R A P E42434445

46

E L E C T R I C # 2 A

47

50

535455

4

6

2

S R T A B C U R T A I N4948

51S L T A B C U R T A I N 52

E L E C T R I C # 3A

3 B A N N E R S

S H E L V E S

S C A F F O L D I N G

D E T R I T R U S /S O U N D A B S O R P T I O N F

R I D

G E

DRUMS

Steel truss wall with agedcorrugated metal backing

Overhead stock truss

Pit elevatorat house level

Edge ofshow deck

-14"

+0"

-24"

+24"

+8"

DS platform(stack of drywall)

-43"

-42"-7"

Inset vents in fascia Pit F

ill

Black visqueen

Black visqueen

Black visqueen

Overhead extension of back wallseen over side walls

Overhead extension of back wallseen over side walls

Open web joistabove wall

Open web joistabove wall

Column AB

Column BC

Column CDColumn DE

Column EF

Column FG

Drumset platform Stock risers

Metal grateplatform

Stack of 3wooden pallets Box or crate.

Approx 1'-9" x 4' x 2'-4"

Overhead border

Overhead black drape.

Tab curtain Tab curtain

"We the People"banner

11'-1

0"

38'-4"

20'-5

"

5'-9"

Pipe on columnsfor speaker mounting

-7"

Metal stairs from stock

DetritusHazer located US.TBD by Lighting Designer.

Joist above wall Joist above wall

Stack of barrelsor crates

G r o u n d p l a nScale: 1/4" = 1'-0"1

24'-3

"

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

1

Groundplan

AEB1/4" = 1'-0"

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!

13'-0

"

PL

68

1012

1416

1820

2224

26 F

T

S e c t i o n @ C LScale: 1/2" = 1'-0"1

Open web joist

Stock truss

18'-0

"

16'-0

"

Pipe for speaker mount

T R

U S

S P

I C K

P O

I N T

F.C. 1 3 5

E L E

C T

R I

C #

1

7 8 9 10

E L E

C T

R I

C #

1 A

11 12 13 14T

R U

S S

P I C

K P

O I N

T

15E

L E C

T R

I C

# 2

16 17 18 19 20 21 22 23B

L A C

K

B O

R D

E R

24 25E

L E C

T R

I C

# 3

26 27 28 29 30 31 32 33 34 35E

L E C

T R

I C

# 4

36 37 38

E L E

C T

R I

C #

2 A

4 62

E L E

C T

R I

C #

3A

3 B

A N

N E

R S

Stock metal shelves

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

2

Section at CL

AEB1/2" = 1'-0"

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!

*See plate 11 for softgood hanging positions*

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

3

Front Elevation

AEB1/2" = 1'-0"

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!

F r o n t E l e v a t i o nScale: 1/2" = 1'-0"1

CL

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

4

Wall D (Back Wall)

AEBAs Noted

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!

A n g l e I r o n D e t a i lScale: Actual Size6

1 1/

2"

DS

1 1/2" packing

1 1/2" squaretube steel

1/8" masonite

1/8" masonite attachedafter installation of wall

3/4" MDF(top & bottom rail facing)

D e t a i l – S e c t i o nScale: Actual Size5

Corrugated metalattached to back of frames

(metal gets aged paint treatmentbefore attaching to frame)

6"

37'-11"

O P E N

W a l l D – F r o n tScale: 1/2" = 1'-0"1

Engages to Column DEEngages to Column CD

18'-

0"

7'-7"

~8'-8 1/2" typ.

7'-5 1/4"

7'-4"

2'-0

"

7'-2

"

12'-

5"

1 1/2" square tube steel(outer frame)

1 1/2" angle iron

6

5 1/2"

5

1/2"

Space diagonals to fit

3/4" MDF facingattached to all frames

1/4" masonite on front(on 2" packing)

and back of frames.See detail below.

Corrugated metalattached to back of all frames

(metal gets aged paint treatmentbefore attaching to frame)

7'-0

1/2

"

5 1/

2"

3"

5

(use offcut fro

m horizontals)

1 1/2" squaretube steel

Reverse & Repeat FacingsS e c t i o n @ C LScale: 1/2" = 1'-0"3

6

3 1/4"

DS

R e s e a r c h E x a m p l eNote: Corrugated metal will be painted4

6"

5 1/2"

See section detail below.

W a l l D – P l a nScale: 1/2" = 1'-0"2

3'-10 1/4" B • R • E • A • K B • R • E • A • K

B • R • E • A • KB • R • E • A • K

B • R • E • A • K

B • R • E • A • K

Front masonite facing attachedafter wall is assembled in space.

Column DE.See plate 8.

Column CD.See plate 8. Wall L (See plate 5)

Wall J (See plate 5)

2'-3"

7'-7"

2'-4 3/4"

See plate 9 for columns

W a l l L – F r o n tScale: 1/2" = 1'-0"11

See plate 4 forconstruction techniques.

15'-9

"

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

5

Walls A, B, F, G, J, K, L

AEBAs Noted

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!

W a l l s A & B L a y o u tScale: 1/4" = 1'-0"1

Column AB Column BC

*See plate 8 for columns*

Horizontals align

Wall B Joist (Plate 7)

3'-6"

7'-7"

doo

rway

13'-0

"

5'-0" doorway

9'-0"

(open)

(open)

(open) (open)

(open)

(open)

(open)(open)

(open)

W a l l s A & G – F r o n tScale: 1/2" = 1'-0"3

B U I L D 2

4'-0 7

/8"

9'-4 1

/4"

16'-0

"

1'-10 1/2"

3'-9"

Drywall onUS side

W a l l B – F r o n tScale: 1/2" = 1'-0"5

W a l l s A & G – P l a nScale: 1/2" = 1'-0"4

Typical metal studwall construction

DS

W a l l B – P l a nScale: 1/2" = 1'-0"6

Drywall onUS side

DS

Drywall onUS side

W a l l F – F r o n tScale: 1/2" = 1'-0"7

Potential hole cut for lighting instrument.TBD in space.

W a l l F – P l a nScale: 1/2" = 1'-0"8

Drywall onUS side

DS

W a l l s F & G L a y o u tScale: 1/4" = 1'-0"2

Column EF Column FG

Wall F Joist (Plate 7)

10'-0

"

10'-0"

10' strip of black visqueenhung or loosely attachedto stock flats.

See Groundplan for positioning.

W a l l K – F r o n tScale: 1/2" = 1'-0"9

Column CD

W a l l J – P l a nScale: 1/2" = 1'-0"12 W a l l L – P l a n

Scale: 1/2" = 1'-0"13

Column DE

2'-3"

7'-7"

2'-4 3/4"

See plate 9 for columns

15'-9

"

See plate 4 forconstruction techniques.

W a l l J – F r o n tScale: 1/2" = 1'-0"10

Wall D (plate 4)

DS

Typical metal studwall construction

E

NM

Engages tocolumn DE 6"

W a l l E – P l a nScale: 1/2" = 1'-0"9W a l l C – P l a n

Scale: 1/2" = 1'-0"7

DS

Typical metal studwall construction

C

HI

Engages tocolumn CD6"

1

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

6

Walls C, E, H, I, M, N

AEBAs Noted

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!W a l l C – F r o n tScale: 1/2" = 1'-0"6

4'-0"

4'-0"

4'-0"

4'-0"

16'-0

"

2'-0"2'-0" typ.

19'-6"

3'-6" 4'-0" 12'-0"

P O

S S

I B

L E

B R

E A

K

Paper-covered lauan on US side. Painted/distressed.

( o p e n )

2'-0" 2'-0" typ.

19'-6"

16'-0

"

14'-0" 5'-6"4'-

0"4'-

0"4'-

0"4'-

0"

W a l l E – F r o n tScale: 1/2" = 1'-0"8

P O

S S

I B

L E

B R

E A

K

Paper-covered lauan on US side. Painted/distressed.

( o p e n )

Engages to Wall Nfor support (see below)

10'-0"

Wall E

10' strip of black visqueenhung or loosely attachedto stock flats.6" US of Wall E opening(see plan below).

W a l l M – F r o n tScale: 1/2" = 1'-0"3

12'-0

"

10' strip of black visqueenhung or loosely attachedto stock flats.6" US of Wall C opening(see plan below).

10'-0"

Wall C

W a l l I – F r o n tScale: 1/2" = 1'-0"2

12'-0

"

B U I L D 2

W a l l s H & N – F r o n tScale: 1/2" = 1'-0"4

2'-0"

16'-0

"

Paper-covered lauan on US side. Painted/distressed.

W a l l s H & N – P l a nScale: 1/2" = 1'-0"5

C o r n e r D e t a i lScale: 6" = 1'-0"1

2'-0"

W a l l C / E J o i s t s – S e c t i o nScale: 1" = 1'-0"8

6

1'-9" 16'-0" 1'-9"

19'-6"

5 1/2"

W a l l C / E J o i s t s – S e c t i o nScale: 1" = 1'-0"9

DS

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

7

Joists

AEBAs Noted

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!

10

8

3'-0" typ.

S m

o k e

P o

c k e

t

2'-6" 4'-10" 4'-10" 4'-10" 2'-6"Joists engage tocolumn CD or DE

W a l l C / E J o i s t s – F r o n tScale: 1" = 1'-0"7

B U I L D 2

Wall C or E

9

Install with verticalson SL side

2"

3/4"

2"

D i a g o n a l s D e t a i l – S e c t i o nScale: Actual Size10

1x pine

10

2

W a l l B J o i s t – F r o n tScale: 1" = 1'-0"1

4'-0" typ.

Approx. 4'-1"

Engages to column BCat an angle

DS

W a l l B J o i s t – T o pScale: 1" = 1'-0"4

Column AB Angle to fitWall B below Column BC

W a l l B J o i s t – S e c t i o nScale: 1" = 1'-0"2

6

2'-0"

5 1/2"

W a l l F J o i s t – F r o n tScale: 1" = 1'-0"3

Engages to column EFat an angle

10

Reverse & Repeat Wall B Joist

DSW a l l B J o i s t – T o pScale: 1" = 1'-0"5

Column FGWall F belowAngle to fitColumn EF

5 1/2"

3 1/2"

1x pine

T e e s D e t a i l – S e c t i o nScale: Actual Size6

3/4"

C o l u m n CD

C

D

CL

J

9"

9"

Joist above wall

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

8

Columns

AEBAs Noted

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!

1'-4"

Angled toward house wall (approx 35°)

7 5/8"1'-9 3/4"

Edge of platform ill

-43"

C

A

B

H

C o l u m n B C

C o l u m n A B

CL

CL

Discuss this junctionwith designer

Pipe @ 9' off deck forspeaker mounting

Angled jack

Handrail

Joist above wall

+0"

PL

S M O K EP O C K E T

C o l u m n s A B & B C – P l a nScale: 1" = 1'-0"1

R e v e r s e a n d R e p e a t f o rS L c o l u m n s ( D E , E F , F G )

House Level-43"

C o l u m n s A B & F G – F r o n tScale: 1/2" = 1'-0"2

21'-7

"

Stage Level+0"

B U I L D 2

6"

C o l u m n s B C , C D , D E , & E F – P l a nScale: 1/2" = 1'-0"5

Plywood construction.Fill visible seams with joint compound.

C o l u m n s A B & F G – P l a nScale: 1/2" = 1'-0"4

Fill visible seams with joint compound

Plywood

Lauan

C o l u m n s B C , C D , D E , & E F – F r o n tScale: 1/2" = 1'-0"3

18'-0

"

B U I L D 4

9"

9'-0"

Pipe for speaker mounting(onstage side of BC and EF only)

1'-0"

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

9

Pit Fill & Stairs

AEBAs Noted

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!

Concrete paint treatment

(mea

sure

in sp

ace)

2'-0"

House Level-43"

P i t F i l l – F r o n tScale: 1/2" = 1'-0"2

CL

~ 43'-9"

Stage Level+0"

3

4'-9 1/4"2'-4"9'-6 3/4"2'-4" 16'-8" 2'-4"

DS platforms

Available at Home Depot.Six total vents needed.Build forestage to fit.

~ 3

'-7"

2'-0"

P i t F i l l – S e c t i o nScale: 1/2" = 1'-0"3

10

Possible lighting sourcebehind each vent. Coordinatewith lighting designer.

2'-11

"

S R S t a i r s – F r o n tScale: 1/2" = 1'-0"6

S R S t a i r s – P l a nScale: 1/2" = 1'-0"4

4'-7"

4'-0"

11"

typ.

7"

Metal construction.From stock.

S R S t a i r s – S i d eScale: 1/2" = 1'-0"5

typ.

2'-9"

3'-0"

S L S t a i r s – F r o n tScale: 1/2" = 1'-0"7

1'-9"

S L S t a i r s – F r o n tScale: 1/2" = 1'-0"8 S L S t a i r s – S i d e

Scale: 1/2" = 1'-0"9

11"typ

.

Metal construction.

typ.

7"

N o s i n g D e t a i lScale: Actual Size10

3/4"

5"

MDF edging withimperfect edges

3'-1

"

Concrete paint treatment

Inset louvredvents in facing

2"

P i t F i l l – P l a nScale: 1/2" = 1'-0"1

Pit elevator at house level.No pit wall.

Follow actual curve of stage edge.

MDF nosing

Date of Drawing:

THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY

P L A T E

OF 11

The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and

local Fire, Safety, Energy, and Environmental Codes.

11

Hanging Goods

AEB1/4" = 1'-0"

Director: Myrona DeLaney

Scenic Designer: Andy Broomell

Production Manager: Keith Bangs

Technical Director: Keith Bangs

Lighting Designer: Kristin Neu

Sound Designer: Matt Glenn

Costume Designer: Kaitlyn Kaufman

Stage Manager: Anne Hitt

Venue: Claire Trevor Theatre, UCI

Scale: Drawn By:

Drawing Schedule:

UPDATED 10.27.13

1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs

10. Platforms11. Hanging Goods

ATTENTION!

This drawing is approved.

BUILD from this

drawing!

PL

T R

U S

S P

I C K

P O

I N

T

F.C. 1 3 5

E L E

C T

R I C

# 1

7 8 9 10

E L E

C T

R I C

# 1

A

11 12 13 14T

R U

S S

P I C

K P

O I

N T

15E

L E C

T R

I C #

2

16 17 18 19 20 21 22 23B

L A C

K B

O R

D E

R24 25

E L E

C T

R I C

# 3

26 27 28 29 30 31 32 33 34 35E

L E C

T R

I C #

4

36 37 38 39 40 41B

L A C

K D

R A

P E

42 43 44 45 46

E L E

C T

R I C

# 2

A

47 50 53 54 554 62

S R

T A

B C

U R

T A

I N

4948 51S

L T

A B

C U

R T

A I N

52

E L E

C T

R I C

# 3

A

3 B

A N

N E

R S

18'-0

"

31'-0

"

Lineset 23.Overhead 10'x60' black border.Trim 31' to bottom of drape.

Lineset 41.Overhead 30'x60' black drape.Trim 18' to bottom of drape.

H a n g i n g G o o d s – S e c t i o nScale: 1/4" = 1'-0"2

12'-0

"

NOTE: Side withdiagonal crossbraces

should face audience.

LNES

ET 2

2

LNES

ET 1

4

T R U S S P I C K P O I N T

F.C.1

3

5E L E C T R I C # 1

78910

E L E C T R I C # 1 A

11121314T R U S S P I C K P O I N T

15E L E C T R I C # 2

1617181920212223B L A C K B O R D E R24

25E L E C T R I C # 3

262728293031323334

35E L E C T R I C # 4

3637

38

394041B L A C K D R A P E42434445

46

E L E C T R I C # 2 A

47

50

535455

4

6

2

S R T A B C U R T A I N4948

51S L T A B C U R T A I N 52

E L E C T R I C # 3A

3 B A N N E R S

Stock tab curtain SL & SR.Trim 18' to bottom of drape.

Lineset 23.Overhead 10'x60' black border.Trim 31' to bottom of drape.

Lineset 41.Overhead 30'x60' black drape.Trim 18' to bottom of drape.

H a n g i n g G o o d s – P l a nScale: 1/4" = 1'-0"1

CL

(Lineset 14) 14'-8" to CL

(Lineset 22) 6'-8" to CL

Stock 10' truss above bandHanging position for Lighting & Sound

NOTE: Side with diagonalcrossbraces should face audience