BARCELONA AIRPORT
Airport Visual Aids Facilities.
Preparing the pavement recess. Aligning the light base assembly with the
runway.
Preparing the epoxy resin. Bidirectional inset light installed.
Drilling the hole using a diamond bit.
Photos - Benjamin Pineda
The wire ways have been sawed using a 3/8-in.
thick diamond-faced saw.
Preparing the surface of the pavement with
an appropriate joint sealing fiber.
Building the comb like groove conduits for
the runway and taxiway’s primary cabling. Preparing the comb like groove conduits.
Preparing the Isolation Transformer Base. Power Regulator Chambers equipped with:
MV and LV, air conditioning, fire system and
dimmers switches for runway lights.
Photos - Benjamin Pineda
A services gallery for the primary cabling.
Front view: Multifunctional building. Rear view: Multifunctional building.
New Terminal Building in Barcelona Airport. Patching and wiring of communication
racks in the New Terminal of Barcelona
Airport.
Preparing lights of a platform lamp.
Photos - Benjamin Pineda
VARIOUS
The Sant Esteve Sesrovires theatre.
The new Formació i Treball headquarters,
(Barcelona).
Renovation works of Seu d’Urgell Hospital. Air conditioning and refrigeration
equipment. Seu d’Urgell.
Photovoltaic Power Station in LesBorges
Blanques village.
Construction a solar tracker base. Les Borges
Blanques (Lleida).
Photos - Benjamin Pineda
22@ Buildings in Sant Cugat del Vallès
(Barcelona).
Drinking water equipment (22@ Buildings).
Completed Metro Tunnel facilities. New
Barcelona Metro Line no.9.
Advance drilling of MetroTunnel in the
Barcelona Metro Line no.9.
Provision and mounting of: high and medium
voltage substations; control boards and cells,
protection and measurement; high voltage
electric wiring. New Metro Line 9 of Barcelona.
Backhoes loader hauling material on train
tracks. New Barcelona Metro Line no.9.