BAE SYSTEMS TOTAL REFURBISHMENT FOR DIRECTORS AND BOARD

Post on 13-Feb-2017

16 views 0 download

Transcript of BAE SYSTEMS TOTAL REFURBISHMENT FOR DIRECTORS AND BOARD

BAE SYSTEMS TOTAL REFURBISHMENT FOR DIRECTORS

AND BOARD FACILITIES

B TOMLINSON

RECEPTION AND WALK WAY THROUGH AREAS

GENERAL PLAN LAYOUT GROUND FLOOR

MD TELE-PRESENCE AND MEETING ROOM

HOSPITALITY BREAK OUT

AREA

MD OFFICEMD’s PA OFFICE

SALE PRESENTATOION AREA CINEMA EXPERIANCE

MAIN BOARD ROOM

TOILET FACILITIES

KITCHEN AND BUFFET

PREPERATION AREA

DIRECTOR

SALE PRESENTATOION AREA

CINEMA EXPERI

DIRECTOR

PA

DIRECTOR DIRECTOR

DIRECTOR

PA

PAPAPA

PA

PA

DIRECTOR

MAIN ENTRANCE

WAITING AREA

MD’s AN D BOARDROOM WAIYING AREA

OFFICE FACILTIES HUB

RECEPTION

PROJ

ECTI

ON

ROOM

WAITING AREA

(TOP) DIRECTORS OFFICES (BOTTOM) MD’s TELE PRESENCE AND MEETING ROOM ALSO WAIT SEATING AREA

DIRETORS MAIN BOARD ROOM – PARTICULAR ATTENTION PAID TO ACCOUSTICS AND INLAY OF MIROPHONES AND PERSONNEL SPEAKER INTO MEETING TABLE FABRIC, SO THAT SPEAKING FROM ONE END OF THE TABLE WAS AS CLEAR TO THE OTHER END.BOARDROOM WAS ALSO CONTRUCTED WITH SURROUND GLASS. THIS WAS WHITEW SHADE ELECTRONIC GLASS THAT COULD BE TURNED ON/OFF WHEN REQUIRED TO SUIT PRIVERSEY.BOTTOM LEFT IS HOSPITALITY BREAK OUT AREA TO SERVE THE BOARD ROOM

A POCKET HISTORY OF THE PROJECT

TYPICAL STRIP OUT AFTER YEARS OF OCCUPATION AND LOCALIZED MODIFICATIONS.MAMOUTH AMMOUNT OF DATA CABLES ABOVE THE CEILINGS.PLUS THE USUAL AMMOUNT OF THR UNKNOWN. THE BUILDING WAS STRIPPED BACK TO THE BEAR STRUCTURE, TO ENABLE ENERGY IMPROVEMENTS TO THE BUILDIN FABRIC.

CLEANED OUT NEXT STAGE

AREAS CLEARED, FIT OUT COMMENCED. M&E SERVICES BEING INSTALLED.INSULATION CLADDING ADDED TO ALL EXTERNAL WALLS. ALL WINDOWS AND FRAMES CHANGED TO DEVELOP A HIGH ENERGY SAVING HIGH SPEC FINISH BUILDING

MOVING ON

FITTING OUT COMMENCED AREAS AND ROOMS START TO TAKE SHAPE.MAJORITY OF M&E SERVICES NOW INSTALLEDCEILING GRIDS BE INSTALLED

AREA NOW SHOWING DESIGN INTENT

AREA BEING FITTED OUT OFFICES NOW FORMED AND GLAZING INSTALLED.DECORATION FINISHES IN PROGRESS

JUST PRIOR TO OCCUPANCY