WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/1

ITEM DESCRIPTION QTY UNIT RATE

CONCRETE WORKS

Reinforced Concrete

A Suspended slabs, 200mm thick 1,356 m³

B Suspended slabs, 270mm thick 453 m³

C Suspended slabs, 300mm thk. for lift pit 3 m³

D Suspended slabs 350mm, thk. for pool 80 m³

E Suspended slabs 430mm, thk. for water tank 18 m³

F Suspended slabs, 570mm thk. for pool 22 m³

G Ramps, 200mm thick 292 m³

H Ramps, 220mm thick 162 m³

J Walls, 500mm thick 13 m³

K Walls, 300mm thick 6 m³

L Water tank walls, 300mm thick 26 m³

M Lift pit walls, 400mm thick 6 m³

N Beams 785 m³

P Staircase 50 m³

Q Core walls, 300mm thick 205 m³

R Core walls, 600mm thick 682 m³

AMOUNT (US$)

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4

Reinforced poured concrete Grade 30/37 and fill in to formwork and well packed around bar reinforcements / steel sections

Reinforced poured concrete Grade 40/50 and fill in to formwork and well packed around bar reinforcements / steel sections

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/2

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Reinforced Concrete (Cont'd)

A Columns 815 m³

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

Reinforced poured concrete Grade 50/60 and fill in to formwork and well packed around bar reinforcements / steel sections

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/3

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Reinforcement

In suspended slabs including ramps,pool & water tank slabs, diameter

A 6mm 6,687 kg

B 8 mm 26,956 kg

C 10 mm 74,687 kg

D 12 mm 53,519 kg

E 16 mm 56,228 kg

F 20 mm 28,919 kg

G 25 mm 29,898 kg

H 32 mm 2,774 kg

In suspended slabs for lift pit, diameter

J 12 mm 354 kg

In walls, diameter

K 10 mm 914 kg

In water tank walls, diameter

L 10 mm 205 kg

M 12 mm 395 kg

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

High yield deformed bar reinforcement and mild steel stirrups to BS 4449 including bends, hooks, tying wire distance blocks and ordinary spacers (Laps and designed chairs included in quantities)

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/4

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

In lift pit walls, diameter

A 10 mm 157 kg

B 12 mm 208 kg

In core walls, diameter

C 8 mm 3,582 kg

D 10 mm 5,180 kg

E 12 mm 128 kg

F 16 mm 37,563 kg

G 20 mm 29,620 kg

H 32 mm 134,676 kg

In columns, diameter

J 8 mm 3,597 kg

K 10 mm 7,741 kg

L 12 mm 1,774 kg

M 16 mm 10,353 kg

N 20 mm 32,673 kg

P 25 mm 30,139 kg

Q 32 mm 49,588 kg

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/5

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

In beams, diameter

A 8 mm 16,763 kg

B 10 mm 3,119 kg

C 12 mm 19,859 kg

D 16 mm 37,230 kg

E 20 mm 24,371 kg

F 25 mm 18,546 kg

In staircases, diameter

G 6 mm 124 kg

H 8 mm 1,228 kg

I 10 mm 1,915 kg

J 12 mm 1,024 kg

K 16 mm 1,164 kg

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/6

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Formwork

Basic finish

A Sides and soffits of suspended slabs 9,072

B Sides and soffits of suspended slabs for lift pit 11

C Sides and soffits of suspended slabs for pool 298

D Sides and soffits of ramps 2,297

E Sides of walls 91

F Sides of water tank walls 41

G Sides of lift pit walls 19

H Sides of core walls 3,461

J Sides and soffits of beams 1,235

K Sides of columns 3,862

L Sides and soffits of staircases 359

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/7

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKSCOLLECTION

Page 6.4.2/1

Page 6.4.2/2

Page 6.4.2/3

Page 6.4.2/4

Page 6.4.2/5

Page 6.4.2/6

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/8

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TOTAL OF CONCRETE WORKS TO SUMMARY

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23

th

March 2015 .

6.4.2/8

ITEM DESCRIPTION QTY UNIT RATE

SUMMARY PAGE NO.

CONCRETE WORKS 6.4.2/7

AMOUNT (US$)

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23

th

March 2015 .

6.4.2/9

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 CARRIED TO GENERAL SUMMARY

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.4/1

ITEM DESCRIPTION QTY UNIT RATE

METAL WORKS

Structural steel work

H beam for composite columns

A HD 400 x 187 2,374 kg

B HD 400 x 287 18,594 kg

C HD 400 x 347 5,001 kg

D HD 400 x 421 7,107 kg

E HD 400 x 509 19,294 kg

F HD 400 x 592 8,531 kg

G HD 400 x 677 5,715 kg

H HD 400 x 744 60,005 kg

J HD 400 x 900 15,193 kg

K HD 400 x 1086 91,028 kg

AMOUNT (US$)

BILL NO 6.4.4 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.4/2

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TOTAL OF METAL WORKS TO SUMMARY

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23

th

March 2015 .

6.4.2/2

ITEM DESCRIPTION QTY UNIT RATE

SUMMARY PAGE NO.

METAL WORKS 6.4.4/1

AMOUNT (US$)

BILL NO 6.4.4 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23

th

March 2015 .

6.4.2/3

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

BILL NO 6.4.4 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 CARRIED TO GENERAL SUMMARY