Ust-Luga Sea Port
Overview and structure of Ust-Luga
• Largest infrastructure project in Russia for the upcoming years:
• Ust-Luga merchant seaport
• Complex development of the adjacent territory (CDT) – six interrelated clusters
• Ust-Luga is the first project implemented under PPP
Ust-luga Seaport Location
Benefits :
Sea Port Ust-Luga is the nearest to Europe Russian port
Sea Port Ust-Luga is located at the crossing of two corridors: The «North- South» (Baltic sea, Black sea, and Caspian sea) and the «East-West» (Europe -Asia)
Convenient Railway and Highway access bypassing congested St-Petersburg transport communication
Focus on Ro-Ro cargo
Southern Port Area:
Auto – Railway Ferry Terminal
MPT YUG-2
Auto – Railway Ferry Terminal
Key benefits:
2 berths (railway and ro-ro);
highly equipped and specialized terminal;
railway and road access bypassing congested Saint-Petersburg transport communication;
convenient highway access to central Russia region;
excise customs clearance;
depths up to 10 meters. Ro-Ro cargo turnover in 2010 remained the same as in 2009 – about 2,5 thousand of cargo units
Multipurpose Terminal YUG - 2
Key benefits:
6 berths (Ro-Ro; Con-Ro vessels );
depths 10.3 – 12.8 meters;
convenient highway access to central Russia region;
railway and road access bypassing congested Saint-Petersburg transport communication;
high&heavy cargo, containers;
excise customs clearance;
Multipurpose Terminal YUG - 2
possibilities for Ocean PCTC vessel calls;
railway ramp for Ro-Ro cargo transportation;
Ro-Ro cargo turnover increase 2010/2009: + 400% (from 17 000 cars in 2009, to 65 521 cars in 2010)
2011F – 160 000 cars!Full capacity – 500 000 cars!
The first shipment of new cars by railways from multipurpose terminal YUG-2, October 2010.
2 railway ramps are available
Loading railway wagons
Ust-Luga Prospects 2011:
Auto – Railway Ferry Complex: Current services: “Ust-Luga – Baltiysk”Ferry “Baltiysk” and “Petersburg” one vessel call per 6 days
New regular services:Ust-Luga – Sasnitz (Start : 2nd quarter 2011)Ust-Luga – KielDFDS, Neva Bridge (one vessel call per week)
Logistic Center – launching the project
Multipurpose Terminal YUG-2:Ocean PCTC calls, new feeder services, completion of construction
Logistic Center
Main points:
only the one large-scale logistic center located in Russian Sea Port;
total area 100 hectares;
GLA – 400 000 sq.m.;
bonded warehouses;
consignation warehouses;
value Added Logistics
refrigerated and cool storages
Logistic Center first stage is opening at the end 2012
Ust-LugaYug-2
St.Petersburg
Future road Ust-Luga - Novgorod
Future road Narva – St.Petersburg
Novgorod
Road St.Petersburg -
Moscow
Road Ust-Luga - Moscow
Future toll road St.Petersburg -
Moscow
Highways access
Ust-Luga – Moscow 807 kmUst-Luga – St-Petersburg (Ring road) 120 km
Rosavtodor realizes three large scale projects:
Throught Petrodvorets and Ring Road
The Tallinn highway through Gatchina
Construction of a new federal highway to Veliky Novgorod (first 58 km starts 2011)
Excise customs
Sooner or later we will came to the situation when finished vehicles will not be discharged at the Baltic Customs (St.Petersburg).
Kozinitskiy V.B.February 25th 2011
WELCOME TO UST-LUGA SEA PORT!