Aundh Street Programmefrom Road to ‘Street’

Pune Municipal Corporation

Urban Planner: IBI/Prasanna Desai Architects Technical Consultants: Pavtech Consultants Contractor: Nikhil Construction Ltd.

Pune Smart City Journey…252 sq. km – Area under PMC

35 Lakhs+ – Population of PMC

17,000+ – Employees working with PMC

INR 5,700 crores– Annual Budget of PMC

2

Pan city initiative

Area development

ENVISION(17th - 29th

September,2015)

DIAGNOSE(3rd-12th

October,2015)

Citizen decided(online/offline)the AREA to be

developed

HH’s filled the form and data digitized to decidecitizen’s VISION andidentify the ISSUES

Citizen gave input(online/offline)

for GOALS prioritization

More thannumber of votes received to identify the goals fromSIX PRIORITY SECTORS

1.4 mn0.3 mn

0.8 mn 0.1 mn

Area Survey(20th-26th

October,2015)

23,393Citizen decided (online/offline) the AREA to be developed

Transportation & Mobility 30%

Water Supply 25%

22%Waste & Sanitation

Key Problem issues listed

0.3 Million Citizens input all achieved in 45 days.

Mobility Development InitiativesMix of Policy Interventions, Database creation & Infrastructure Development Initiatives

Road Maintenance Van and Mobile App

Road Safety Audit (R.S.A.)

Urban Street Design Guidelines for Pune City

(USDG)

Pedestrian Policy

Road Asset Management System (R.A.M.S.)

Parking Policy / I.T.M.S.

Trenching Policy

Road Redesigning Pilot Project

Pune Street Programme

B.R.T.S. Network

Pune Bicycle Plan

H.C.M.T.R.

3

Policy Related

Maintenance and Database creation

Infrastructure Development

4

Aundh Baner Balewadi (Pilot) Area Road Map

HIGHWAY

CUMMINSROAD

Balewadi MainRoad

5

Western entry Point of the City

Pedestrian Plaza Mock Up • Convert 500 m stretch into a one way

pedestrian street plaza.• Traffic to move in a circular

movement.• Width of Pedestrian plaza to be about

12 m.• One way carriage way reduced to 7 m.• Parking space to be given on parallel

road.• A walkway to be created adjoining the

two streets.• A footfall of 7000+ citizens visited.• Kids with Cycles roamed freely.• Elder and the disabled enjoyed the

space.• Udaan – Battery operated 3-wheelers

provided free transportation option.

Police Line

D.P.Road

6

7

Plan ran into trouble….

8

• A complaint of Heavy traffic jam from residents staying around the area.• Shopkeepers complained of Parking woes.• The Street was only 25% filled up during the Day.• One way created mobility problems for residents, especially Hospitals.

Back to the tables and a Citizen dialogue initiated…

9

March,2017.

10

• Two way street design to be adopted.• Parking to be provided. Parking has been

increased from 30% to 60%.• Original existing width of the Road was 24

m.• In the new DP, the proposed road width is

30 m. Hence, Corporators asked PMC to modify design to 30 m.

• Citizens whole heartedly gave away their land.

• Hon City Engineer in one of the visits instructed to appeal to the shop keepers to hand over their setback area for development as per footpath design so that the road looks uniform throughout. The Shopkeepers agreed and gave away their setback area, Hence the width of the final Road now ground has gone up from 24 m to 30 m to 36 m at places.

Suggestions that came up….

11

Construction of Phase 1 of 500 m Stretch out of 1.5 km began on April,01,2017….All Utility lines like Water, Drainage, SWM, Gas pipes, OFC were newly laid….

12

13AFTERBEFORE

14

BEFOREAFTER

15

BEFORE AFTER

16

17

18

Phase 2Open theatre

Walkway

8 Kms of Street development

19

Pune Street Programme• All important streets need to be redesigned in a way that promotes safety of

pedestrians and cyclists, creates quality public spaces along the edges, exhibits high quality craftsmanship for street elements and carves out spaces for various street activities such as hawkers, parking and many such.

• Total 4 Packages for 100 kms of Roads

ItisjustthebeginningofalongJourney….

20

Hon. Mayor Mukta Tilak Hon. Commissioner Kunal Kumar

It is just the beginning of a long Journey….

Thank You….

PMC team of Engineers, Designers and Contractors