Arkwright Work Experience 29 Oct - 2 Nov 2012. Team 2 Design Presentation, Buro Happold.

Transcript of Arkwright Work Experience Group 2

Pinewood Studios Building ProposalGroup 2

07/11/2012

1

Who will use it?

• Employees of Pinewood Studios

• Directors and Actors

07/11/2012

2

How will it be used?

• Office space• Meetings• Functions on the ground floor

Initial design concepts

07/11/2012

3

07/11/2012

4

Final Design

07/11/2012

5

AHURoof garden

Glass atrium

Toilet and kitchen facilities on this side

Offices on this side

Main entrance

Ground investigation and Foundations

• 10m of made ground

▫ Could be contaminated

▫ Ground investigation

• We think we will use bore piling as long as the ground is safe

07/11/2012

6

Structure

07/11/2012

7

07/11/2012

8

07/11/2012

9

Site Layout

07/11/2012

10

Ground floor interior plan

07/11/2012

11

North

07/11/2012

12

First floor interior plan

07/11/2012

13

07/11/2012

14

Second floor interior plan

07/11/2012

15

Third floor interior plan

07/11/2012

16

Roof floor plan

07/11/2012

17

07/11/2012

18

Section

07/11/2012

19

Building services

• 550m2 of floor space

▫ 48kw of electricity

• Total u value of the building is 0.55

▫ 0.55 x 26 x 1042 = 14900

▫ Will lose maximum of 15kw of heat

▫ 1kwh costs 17p

• AHU on the roof 700 x 700 x 5000

▫ Ventilation duct runs down the corner of the building

07/11/2012

20

Facades

07/11/2012

21

Chosen Solution

How to attach glass to structure

07/11/2012

22

Facades Cut section of wall

07/11/2012

23

Materials

07/11/2012

24

Fritting

Fritting pattern idea

Sustainability & Environmental effects

• Rain water harvesting system

• Solar panels on all the south facing windows

• Install AHU and natural ventilation

• Use natural lighting

• Under floor heating using ground heat

These things will contribute to our BREEAM score.

07/11/2012

25

Healthy & Safety

• Fire safety

▫ Central stairs

▫ Lobby around stairs

▫ Plasterboard

▫ Sprinklers and alarms

• Safety of workers

07/11/2012

26

Inclusive Design

• Lifts and stair railings

• Braille on signs

• Wider doors and corridors

07/11/2012

27

What we learnt

07/11/2012

28