Applied Structural Drying

Post on 11-Jan-2016

19 views 0 download

Tags:

description

Applied Structural Drying. Applied Structural Drying (ASD) & Agent Loss Ratio Sheet. WIND. WATER. Applied Structural Drying (ASD) & Agent Loss Ratio Sheet. FAN. DEHUMIDIFIER. PAD. BACKING. SUBSTRATE (PLYWOOD). Science. WATER SURFACE TENSION. WIND. THERMOCLINE. HEAT. Science. PAD. - PowerPoint PPT Presentation

Transcript of Applied Structural Drying

Applied Structural Drying

Applied Structural Drying (ASD) & Agent Loss Ratio Sheet

WATER

WIND

Applied Structural Drying (ASD) & Agent Loss Ratio Sheet

BACKING

SUBSTRATE (PLYWOOD)

PAD

FAN

DEHUMIDIFIER

Science

Freeze H2O0-32º F

Boil 212º F

ASD Primary LawHigh Heat + Agitation

WATER SURFACE TENSION WIND

HEATTHERMOCLINE

Science

CARPET

SUBSTRATE (PLYWOOD)

PAD

Science

H2O ÷ ASD = H2 / O

Heat – causes the violent agitation of molecules

Motion – breaks surface tension of standing water

Science - Water Travels In 2 Directions

1. The path of least resistance

2. From wet to dry

LIVINGROOM CARPET

BATHTUB

WATERFALL

RIVER

LAKE

The Path of Least Resistance

SIDING

JOIST

PLYWOOD

CARPET PAD

FRAMING

INS

DRY

BASE

From Wet To Dry

Qualified Measurements Relative humidity Temperature Grains per pound Relative material

standard

HEAT 105 º

WET

DRY

+

-

STRAW EFFECT

Goal

ASD is a method to reverse natural occurrence to restore a structure to pre-loss condition.

Standard Water Damage Operation Remove Wet

Materials Extract Porous

Material 1 Fan per 8-12’ ?? Dehumidification per

8F ratio

10 x 15 = 1,500 sf10’

15’

DEHU

Standard Water Damage Operation

Restoration Construction Emergency Temp

2’ Drywall $1,800

Reset Base $150

Pad $400

Re-stretch $100

Paint $1,200

Clean $100

$2,660

Profit/Over 10/10 $500

TOTAL $3,160

(5) Fans @ $25 day @ 4days $500

(1) Dehu. @ $100 day $400

Remove Pad @ 1,500 sf $750

Emergency Response – day $150

WTR Tech @ 4days $300

TOTAL $2,100

Standard Water Damage Operation

Average Loss has 2-3 rooms E-Temp Constrution

( 2 room loss) $4,200 $6,320

Loss

$10,520

(MN/Dry + MN/PNT) Plus intrusion $1,350

$11,750

Extract porous materials

Dehumidification by G.P.P. in air

Fans – water tension & dew point

Meet 72 hr dry time

A.S.D. Standard Water Loss

10’

15’

HEAT

105º

DEHU

A.S.D. Standard Water Loss

Restoration Construction Emergency Temp

Dry – MN $150

Paint Walls $1,200

TOTAL $1,350

(6) Fans @ 72 hrs $450

(1) Dehu. @ 72 hrs $300

Heat @ 72 hrs $450

Extraction $350

Emergency Response $150

WTR – Tech @ 72 hrs $250

TOTAL $2,050

A.S.D. Standard Water Loss

Construction at Intrusion Pt. $1,350

Emergency Temp $2,050

2SD Room Loss $1,650

$5,050

Water Standard $1,750

ASD Standard $5,050

$6,700 diff

57%TOTAL LOSS

Thank You!