Ann Arbor Station Environmental Review PUBLIC MEETING

AGENDA

1. Purpose of the Meeting

2. Project Update

3. Alternatives Analysis Phase I

4. Alternatives Analysis Phase II

5. Next Steps

6. Questions

7. Public Comment

PURPOSE OF THE MEETING - Present DRAFT findings - Receive comments - Complete questionnaire

PROJECT UPDATE

EXISTING STATION

PROJECT ACTIVITY SINCE MAY 2015

– Coordination with MDOT and FRA

– Project Alignment with Corridor-wide Tier I EIS

– Reduced parking requirement

– Reduced station size

– FRA Project Manager change

PROJECT UPDATE

ALTERNATIVES ANALYSIS Phase 1

PHASE I ALTERNATIVES

ALTERNATIVES ANALYSIS Phase I

ALTERNATIVES ELIMINATED: 1, 2, 6, 7, 8

ALTERNATIVES CARRIED FORWARD: 3, 4, 5

ALTERNATIVES ANALYSIS Phase I

ALTERNATIVES ANALYSIS Phase II

Screening Criteria

– Location Within the Community

– Accessibility

– Site Assessment

Site Assessment – Environmental Factors

– Floodplain

– Hazardous Materials

– Cultural/Historic Resources

– Recreational Lands

– Property Ownership

ALTERNATIVES ANALYSIS Phase II

ALTERNATIVES ELIMINATED North Main, 3B, 3C, 3D

ALTERNATIVES ANALYSIS Phase II

ALTERNATIVES CARRIED FORWARD

ALTERNATIVES ANALYSIS Phase II

ALTERNATIVE 2A

ALTERNATIVE 2A

ALTERNATIVE 2A

– Elevated station at Depot Street

– New Traffic Signal

– Buses on Broadway and Depot

– DTE Property

ALTERNATIVES ANALYSIS Phase II

ALTERNATIVE 2B

ALTERNATIVE 2B

ALTERNATIVE 2B

– Ground station at Depot Street

– New Traffic Signal

– Buses on Broadway and Depot

– DTE Property

ALTERNATIVES ANALYSIS Phase II

ALTERNATIVE 2C

ALTERNATIVE 2C

ALTERNATIVE 2C

– Re-use of the Michigan Central Station

– New Traffic Signal

– Buses on Broadway and Depot

– DTE Property

– Michigan Central Depot

Alternatives Analysis Phase II

Alternative 3A

ALTERNATIVE 3A

ALTERNATIVE 3A

– West Fuller

– Elevated Station

– Buses on first level of parking structure

– Park Property

MEETING QUESTIONNAIRE/Survey

We’ve developed a

written and an

online version of a

survey related to

the Alternatives

Analysis

NEXT STEPS

NEXT STEPS - TIMELINE

NEXT STEPS - TIMELINE

– Public comments - Phase II Alternatives Analysis finalized

– Remaining alternatives reviewed under NEPA Regulations through EA process

– EA process includes No-Build and Remaining Alternatives

– Impacts documented and Preferred/Recommended Alternative identified in EA

document

– The EA document approved/signed for Public Review by FRA and MDOT

– A 30-day review period

– A public hearing held during the 30-day review period

– Comments received and addressed

– If no significant impacts are associated with the Preferred/Recommended

Alternative, FRA prepares the Finding of No Significant Impacts (FONSI)

document.

Eli Cooper, AICP

Transportation Program

Manager

City of Ann Arbor

ecooper@a2gov.org

734-794-6430 x.43710

Robert Gorski, PE

Project Manager

AECOM

robert.gorski@aecom.com

313-961-3418