Post on 20-May-2020
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 1
Mary Ellen McCrillis HQDA, G-3/5/7 (Proponent)
Dolat G. Desai OACSIM (Co-Chair)
David Carr IMCOM (Housing)
Chip Williams TRADOC, G-4
Goldie Bailey ACES
Dwain Scott, R.L.A. USACE, COS
AIT Barracks & Support Facilities (Fort Worth District)
William J. Lawrence, R.A. USACE, Architecture Section
(Fort Worth District)
David Gary, P.E. USACE, COS Dining Facility
(Norfolk District)
AIT Complex Facility Design Team
5-STORY AIT B/COF – Ft. Lee, VA
1300 PN DFAC – Fort Jackson, SC
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 2
AIT Complex B/COF Living Quarters
In lieu of 100% of the Living Quarters designed to accommodate the Peak Design Capacity (PDC) of 3 Occupants per Sleeping Area only 50% of the Living Quarters will accommodate PDC
Relocation of structural Grid lines removes column from built-in wardrobe closets
Length of the Vanity Counter extended from 3'-0" to 4'-0"
Width of Toilet/Shower Room extended to provide more separation between toilet and shower
Redesigned Living Quarters to address reduced Peak Design Capacity
Current Floor Plan Proposed Floor Plan 2
1
4
3
Design Criteria • Base Design Capacity (BDC) BDC = 2 Occupants per Sleeping Area in 50%
of the Living Quarters
• Peak Design Capacity (PDC) PDC = 3 Occupants per Sleeping Area in 50%
of the Living Quarters
• Allocated Space per Occupant Base Design Capacity (BDC): 90 NSF
Peak Design Capacity (PDC): 72 NSF
Sleeping Area (3PN)
Toilet Mech
SH
Sleeping Area (2PN)
Sleeping Area (3PN)
Sleeping Area (3PN)
1 1
1
1
Toilet Mech
SH 3 3 3 3 4 4 4 4
2
2
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 3
AIT Complex B/COF Standard Design
Grouping of Laundry, Day Rooms, and Computer Learning Lab to create Trainee Support Modules
Two Laundry Rooms provide gender separation for enhanced safety and security
Corridor
Learning Lab
Day Room (Media)
Day Room (Games)
Laundry
Jan
Stor
Laundry
5
Central location of the Trainee Support Module among the Living Quarters provides improved trainee access to laundry rooms and recreational spaces
Relocation of the laundry and recreational spaces from the building’s central core to the housing wings allows for natural day-lighting
Two Day Rooms provide for separation of trainee recreational uses, Media (Quiet) and Games (Noisy)
Corridor width increased to minimize congestion at entrances to laundry rooms and trainee recreational spaces
4
2
3 3
Trainee Support Module
KEY PLAN
Proposed Design 1 1
2
1
4
3
5
Cust
2
2 2
4
2
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 4
Covered Training
Covered Training
Multi Purpose
W
M W
M
AV
ST
Mech Mech
Scrub Scrub
Mech
Supply Supply
ST ST
ST
AV AV
AV
C J
Elect Fire Prot Recycle Recycle
Comm Comm
Vend Vend
Recovery Recovery
CQ
W M
Stair Elev Elev
Lobby
Wait Wait
CO CO XO XO
OPS 1st Sgt Vest
OPS 1st Sgt
Vault Vault
CS CS
Corridor
Corridor Corridor
Plt Sgt
Plt Sgt
KEY PLAN
Training and Instruction Module
Proposed Design
AIT Complex
Reorganization of Administrative and Training /Instructional Areas to create a Training and Instruction Module
Company COFs have been redesigned and remain at the front of the building. COFs are adjacent yet separated by and accessible from a single main entrance to the building
Placement of the CQ Station to maximize visual site lines for enhanced safety and security
B/COF Standard Design
Adjacency of Multi-Purpose/Instructional Areas for each Company provide maximum flexibility through the use of operable walls to partition instructional areas
2
1
3
3
2
1
Main Entrance
1st Sgt
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 5
AIT Complex B/COF Proposed Standard Design
2
1
3
B/COF Proposed Standard Design Building footprint options
Standardization and Sustainability
The Standardization of Building Program Components advances the concept of 'Standardization'
The Trainee Support Module can be reorganized to serve as a transitional space to support multiple 'Building Organizational Concepts'
These 'Building Organizational Concepts' will provide Installations with the ability to consider multiple site configurations in the development of their Installation Master Plan
This additional level of 'Standardization' will provide the opportunity to select a 'Building Organization Concept‘ and Site that consider building orientation and placement minimizing site development costs while addressing sustainability requirements to maximize day-lighting and energy efficiencies
4
Building Organizational Concept 'A'
Building Organizational Concept 'B'
Building Organizational Concept 'C'
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 6
AIT Complex 5-Story B/COF - Standard Design
Proposed Floor Plan (First Floor)
Main Entrance
LEGEND
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 7
AIT Complex
Proposed Floor Plan (Second through Fifth Floor)
5-Story B/COF - Standard Design
Main Entrance
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 8
AIT Complex 5-Story B/COF – Proposed Standard Design
Massing Model
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 9
Main Entrance
Main Entrance
AIT Complex 3-Story B/COF - Standard Design
Proposed Floor Plan (First Floor)
LEGEND
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 10
AIT Complex
Proposed Floor Plan (Second Floor)
3-Story B/COF - Standard Design
Main Entrance
Main Entrance
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 11
AIT Complex B/COF Living Quarters
Design Criteria
• Base Design Capacity (BDC) BDC = 2 Occupants per Sleeping Area in 50% of the
Living Quarters
• Peak Design Capacity (PDC) PDC = 3 Occupants per Sleeping Area in 50% of the
Living Quarters
• Authorized Furnishings per PN A. One Bed (39" x 84") B. One Night Stand (18" x 18") C. One Desk (24" x 36") D. One Chair (24" x 24")
• Authorized Personal Storage E. Built-In Wardrobe Closet (24" x 36")
Proposed Floor Plan
• Allocated Space per Occupant Base Design Capacity (BDC): 90 NSF
Peak Design Capacity (PDC): 72 NSF
A
C
B
E
D
Sleeping Area (3PN)
Toilet
Mech
SH
Toilet
SH
Sleeping Area (2PN)
LEGEND
Proposed Design
KEY PLAN
1
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 12
AIT Complex B/COF Proposed Standard Design
LEGEND
Living Quarters: 16 Room Module
Living Quarters: 14 Room Module
Placement of two pair of cross-corridor doors and internal stairs on the upper floors of each wing within the 14-Room Living Quarters Modules provides more flexibility for gender separation and enhanced Safety and Security
Grouping of individual rooms to create Living Quarters Modules
Standardization of the 14-Room and 16-Room Living Quarters Modules provides symmetry and balance of building’s massing with a more cost-effective building/roof structure.
2
KEY PLAN
1 1
Proposed Design
Number of Female Occupants per Floor: • 1 Flr 18 BDC to 24 PDC 6.0% to 6.4% • 2 Flrs 36 BDC to 48 PDC 12.0% to 12.8% • 3 Flrs 54 BDC to 72 PDC 18.0% to 19.2% • 4 Flrs 72 BDC to 96 PDC 24.0% to 25.6%
2
1
1A
1B
1B 1B 1A 1A
9 LQs / Floor for Women
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 13
AIT Complex
Corridor
Learning Lab
Day Room (Media)
Day Room (Games)
Laundry Laundry
Jan Cust
Stor
Trainee Support Module
B/COF Proposed Standard Design
Standardization and Sustainability
1 The Standardization of Building Program Components advances the concept of 'Standardization'
2 This Module can be reorganized to serve as a transitional space to support multiple 'Building Organizational Concepts'
3 These 'Building Organizational Concepts' will provide Installations with the ability to consider multiple site configurations in the development of their Installation Master Plan
4 This additional level of 'Standardization' will provide the opportunity to select a 'Building Organization Concept‘ and Site that consider building orientation and placement minimizing site development costs while addressing sustainability requirements to maximize day-lighting and energy efficiencies
Army Standard Review AIT Complex
ARMY STRONG
20 March 2014 14
AIT Complex
Covered Training
Covered Training
Multi Purpose
W
M W
M
AV
ST
Mech Mech
Scrub Scrub
Mech
Supply Supply
ST ST
ST
AV AV
AV
C J
Elect Fire Prot Recycle Recycle
Comm Comm
Vend Vend
Recovery Recovery
CQ
W M
Stair Elev Elev
Lobby
Wait Wait
CO CO XO XO
OPS 1st Sgt
Vest OPS
1st Sgt
Main Entrance
Vault Vault
CS CS
Corridor
Corridor Corridor
Training Module
Plt. Sgt
Plt. Sgt
Reorganization of the Company Multi-Purpose Rooms to provide adjacency of Instructional Areas within the Training and Instruction Module 1 Provides maximum flexibility for instruction
and assembly
Multi-Purpose Room Alternative Seating Plan
(300 PN in Chairs w/tablet arms)
Drop-down Projection Screens (2 locations)
Instructor's Podium (3 locations)
Seating Capacity 300 PN
Standing Muster 600 PN
Training and Instruction Module