Post on 14-Aug-2015
AHMED ALGHONDKLYae.linkedin.com/in/alghondaklyDUBAI U.A.E ✉ arch.ahmed@live.com +971554700932
Site Engineer
I experienced all architecture project life cycle, so I can design, coordinate
and manage conflicts.
Resume
My name is Ahmed Ibrahim Alghondkly, and I am currently working as a site engineer in Baytonafor contracting, Dubai, U.A.E.
As my CV indicates, I have roughly four(4) years of professional experience in architecture,interior design and construction field. In September 2011 I worked as a Junior architect in O.D.G(Omran Design Group), Cairo Egypt. I was involved in a team responsible for workshop drawingsfor Correctional facilities project in Saudi Arabia under supervision of Dar Alhandasa as a project
consultant. I was responsible for Architectural details for the project and coordinating withstructure workshop drawings team.
In March 2012 I joined Baytona for contracting company in Dubai. Over 2 years I was involved inmany villas in Dubai that I was responsible for managing all life cycle of projects ( Design review,workshop drawings, Planning, and managing Executing of construction work. I have sharpenedmy skills in linking between Architectural Design and drafting and construction work. I also gotfair knowledge to coordinate and manage conflict between different fields in the project.
In November 2013 I joined Kaian interior design company and I got much experience in interiordesign and fit out work and it weigh my sense of details caring. Also I knew much about differentmaterials.
I have much to offer in Managing projects through many skills I’ve gained from PMP course. AlsoI have just finished leadership online course from case western university which helped me muchin dealing with my team.
I’m active and I never stop learning that I keep learning and searching to improve my knowledgeand my experience as well.
I want to bring the knowledge and insight gained through these various experiences by workingfor well-managed environment as an architect.
- 1 -
Professional summary
Over 4 years I have been experiencing many fields that weighed my skills and insight aboutArchitecture.
I worked as Architect, site engineer and interior designer for many projects in Dubai and Egypt. Ihave got professional experience in coordination and managing conflict between different fieldsthat serves architecture. Motivated, ambitious and never stop learning or searching.
About to be PMP certified very soon which weigh my skills in managing projects.
Seeking implementing the knowledge and insight gained through my education andexperiences by working for well-managed environment as an architect.
AHMED ALGHONDKLY
Architect
Work History
Jan 2015 – Current
Site Engineer
Baytona for Contracting, Dubai, UAE.Personal Information
Projects Tasks• Design review.
• Workshop drawings preparation.
• Quantity surveying.
• Supervising work execution and quality
control.
• Project coordination (between sub-
contractors).
• 3 villas in Ajman and Umm Al Quwain.Dubai U.A.E
✉Arch.ahmed@live.com
+971554700932
ae.linkedin.com/in/alghondakly
Nov 2013 – Dec 2014
Interior Designer & Fit-Out Site Engineer
Kaian Interior Design & Fit-out, Dubai, UAE.
Projects
• IBM Middle East Office, Knowledge Village,.
• International Medical Corps Office, Humanitarian
City, Dubai.
• Abbott Laboratories Healthcare City.
• Sovereign Corporate Services Office, Trade Centre.
• Two floors fit-out in Vision Tower, Business Bay.
• Vitol Group office, financial center.
Tasks• Interior design.
• Preparing workshop & submittal drawings.
• Quantity surveying.
• Supervising work execution and quality control.
• Coordination between different Scopes
(fire fighting, fire alarm, air conditioning,
electrical work, gypsum work, furniture &
finishing).
Skills
Computer skills
Drafting
»AutoCAD. .........Very goodMar 2012 - Nov 2013
Site EngineerModeling
»3ds max. ........... Very good
»Revit arch. …….. Fair knowledge
Baytona for Contracting, Dubai, UAE.
Projects
• Several villas in Dubai.
• Al Habtoor resort & spa in Palm
Jumeirah Island. ( civil work as a
sub contractor.
Tasks• Supervising work execution and quality
control.
• Quantity surveying.
• Project coordination (between sub-contractors).
• Materials Purchasing.
Rendering
»V-ray. ................ Very good
»Lumion 3d. ........ Good
Sep 2011 - Mar 2012
Junior ArchitectPost production
»Photoshop. ........ Very good
ODG (Omran design group), Cairo, Egypt.
TasksProjectsQuantity survey
»AutoCAD ....Very good
» Excel. ....Very good
»Revit arch....... Fair knowledge
• Correctional facilities, ministry of interior, Saudi Arabia.• Architecture shop drawings
• Quality Control.
• Architecture details.
• Quantity surveying.
o Prototype repeated in Taif, Damam,
Riyadh & Jeddah.o Main contractor: Saudi Bin Laden group).
o Consultant: Dar al handasa.
- 1 -
2007 - 2010
Soft skills
Trainee (Site Engineer - Architect)
Ginza for construction, 6th October, Egypt, Hussein
Sabbour consulting Bureau, Cairo, Egypt.
» Leadership.
» Negotiation Skills.
» Communication Skills.
» Presentation Skills.
Education
Feb 2015
PMP "Project Management Professional"
Cambridge Institute, Dubai
» Attendance: Accomplished. » Preparation for exam
Key skills & competencies
»Leadership.
»Team work.
» Coordination.
» Discipline times.
» keeping searching.
» Keeping learning.
: Ongoing.
Jan 2015
Inspiring leadership course
Case Western University (online)
» Grade: 100% with Distinction.
Jun 2011
LanguagesBachelor of Architecture, Faculty of Engineering.
Helwan University» Arabic (native speaker).
» Accumulative rating: Good. » Graduation project: Distinction.
» English (very good).
» Urdu (little). Oct 2010 - Jun 2011
Architecture Technical Training in University To WorkInitiative
Engineering Consultants Group (ECG).
Building system.
Firefighting strategies.
BIM (Building information modeling system)\Revit.
Green architecture.
Sustainable design\introduction to LEED.
Work flow.
Hospital design.
Airport zoning.
Site visits to Cairo airport (terminal 2) & Madinty (residential
compound project).
Driving license
available. (UAE)
»» Soft skills training in University to Work Initiative. (October 2010 - June 2011)
Activities
»Member at Courser for online courses trying to get more and more knowledge especially
about management.
»Member at Rwaq for open learning.
» Architectural member at Megawra (architectural hub), Cairo, Egypt.
Hobbies
»Reading, Poetry & Internet
- 2 -
Project Management Professional
PMP "Project Management Professional"
Cambridge Institute, Dubai
Recent Certificates
» Attendance: Accomplished. » Preparation for exam : Ongoing.
Inspiring leadership course
Inspiring leadership course through Emotional Intelligence.
Case Western University (online course)
» Grade: 100% with Distinction.
- 3 -
Workshop Drawings
Sample
Project
-Correctional facilities, ministry ofinterior, Saudi Arabia.
-Prototype repeated in Taif,
Damam, Riyadh & Jeddah.
Shop Drawing Company
ODG (Omran design group),Cairo, Egypt.
Consultant
Dar al handasa.
Main Contractor
Saudi Bin Laden group
Project Scope
Electrical Infrastructure
Lighting
Air conditioning
Fire Precautions
Partitioning
Wall Finishing (Paint)
Bespoke joinery
- 4 -
Construction Sample
Project Information
Owner … Hussien Al Hammadi.
Location …….. Al barsha 3.
Consultant…… Islamic Arch.
Contractor … Baytona Contracting
Project Contents
G+1 villa
Service block
Swimming Pool
Project Area
Total Area ….. 550 m2
Project Excution Date
Start Date ……..…March 2012
Finishing Date ….. January 2013
Project Cost
Total Cost 1,200,000 DHS
- 5 -
Fit – out Sample
Project Information
IBM Middle East Office Fit out.
Contractor
Kaian Interior Design.
Project Location
Premises : 1st floor Block 2A DKV@ Knowledge Village - Dubai
Project Area
Total Area ….. 3,765 sq ft
Project Excution Duration
8 weeks
Project Scope
Electrical Infrastructure
Lighting
Air conditioning
Fire Precautions
Partitioning
Wall Finishing (Paint)
Bespoke joinery
- 6 -