Organics Processing Facilities

Year No facilities Tonnage input

2004/05 178 4.2 M

2011/12 206 5.5 M

Source: MRA Consulting

Richgro

Earthpower

ReWaste

Spring Farm

Composting Facilities 2016

Tunnel Composting is Popular

Kembla Grange - Soilco

Grafton – JR Richards & Sons

Bulla – Veolia

Tunnel Composting – Tunnel Digestion

If tunnel composting,

why not tunnel digestion?

Development of Biogas Plants and Installed Electrical

Generation Capacity [MW] in Germany

Small Proportion of AD Capacity in Germany

serves Waste Sector

Predominantly

Municipal

Organics (FOGO)

75 plants

2.4 M tpa (total)

1.9 M tpa (AD)

52 MWel

Predominantly

Commercial

Organics (FO)

38 plants

1.9 M tpa

50 MWel

2014/15

Development of FOGO Processing in Germany

40%

60%

Composting Anaerobic Digestion

Source: Bundesgütegemeinschaft Kompost

Anaerobic Digestion Processing Options

Anaerobic Digestion

mesophilic - thermophilic

Continuous process Dis-continuous process

Wet digestion

DM < 12 - 15% Dry digestion

DM > 25 - 35%

Dry digestion

DM > 33 - 50%

Single stage

process

Multi stage

process

Anaerobic Digestion Processing Options

Used for FOGO in Germany (2013)

330,350

1,028,649

537,249 491,400

0.00

200,000.00

400,000.00

600,000.00

800,000.00

1,000,000.00

1,200,000.00

Nass Trocken Trocken, kontinuierlich Trocken, diskontinuierlich

t/a

8

46

23

17

23

Wet Dry

total Dry

contin.

Dry

dis-contin.

Dry AD Technologies

- Continuous Processing

DRANCO

HITACHI ZOSSEN INOVA - KOMPOGAS

LARAN - STRABAG

THÖNI

BEKON /

Eggersmann

Dry AD Technologies

- Dis-continuous Processing

Zero

Waste

Energy

“Batch

Garage

Digesters”

Batch Garage Digesters

Key Components & Processing Schematic

Source: BEKON

CHP

Batch Garage Digesters

Processing Stages

Stage 1: Aerobic, Heating Stage 2: Anaerobic, Percolation, Methane

Generation

Stage 3: Aerobic

Source: BIOFerm

Biogas Generation at Various Temperatures

Days

Re

lati

ve

Bio

ga

s Y

ield

[%

]

Thermophilic process increases

biogas yield markedly

at any given retention time

Biogas Generation over Time

Days

Re

lati

ve

Bio

ga

s Y

ield

[%

]

0 10 20

Days

Daily Methane Yield from FOGO

[m3/m2 digester surface area]

Multiple Digesters for Constant Biogas Supply

Days

Re

lati

ve

Bio

ga

s Y

ield

[%

]

0 10 20

Days

Daily Methane Yield from FOGO

[m3/m2 digester surface area]

Date

Bio

gas

Yie

ld [

m3/d

ay]

Minimum of 4 Digesters

Biogas Yield

Rule of thumb: 1 t FOGO generates 100 m3 biogas with 60% methane

and energy content of 600 kWh

Raw Material Quantity

[m3 / t fermenter

input]

CH4

[vol.-%]

FOGO (mixture of food and

garden organics) 75 – 136 53 - 65

Food organics 123 – 178 53 - 68

Potential Options for Utilising Biogas

Purification (removal of H2O, CO2, H2S, NH3)

Biogas (crude)

CHP Unit

Heat &

Electricity

‘Aspirational Targets’

CHP Efficiency Parameter

%

Total energy 100

Electrical efficiency 33 - 45

Thermal efficiency 35 - 56

Loss 10 - 15

CHP efficiency 85 - 90

Operational use 20 - 30

Gross surplus energy 58 – 72

Curing / vehicles 25 - 30

Net surplus energy 30 – 45

Energy in generated gas 100%

Source: Clark Energy

Investment and operating costs for 18,000 tpa

dry batch digestion facility (Germany, 2012) (Converted at exchange rate of €1.00 = AUD1.35)

Total ($) Per tonne

input ($/t) Investment costs (digestion only)* 5,494,500 305

Capital costs (12 yrs, 5%) 619,650 34.43

Processing costs 486,570 26.87

Costs for digestion

(processing & capital costs) 1,103,400 61.30

Income from sale of energy

(20% - 50% of income in Germany) 139,140 – 347,760 7.73 – 19.32

Treatment costs - digestion 755,640 – 964,260 41.98 - 53.57

Treatment costs - composting 540,000 30.00

Income from sale of compost 270,000 15.00

Treatment costs - total 1,025,640 – 1,234,260 56.98 – 68.57