72 B Cast Operations at INTEC2

Post on 21-Jan-2018

83 views 0 download

Transcript of 72 B Cast Operations at INTEC2

72 B Cast Operations at INTEC

Richard S. Leavitt

Backing trailer and cast into building 659 at INTEC

Setting up trailer for removal of impact limiters

Shipping Remote Handled Transuranic Waste

Impact limiters removed and placed in cradle

Hydraulics attached in preparation for up righting of cast

Shipping Remote Handled Transuranic Waste

Cast with Impact limiters removed

Lifting yoke use for removal of 72B cast from trailer

Shipping Remote Handled Transuranic Waste

72B cast in up right position

Cast engaged with lifting yoke and being removed from trailer

Shipping Remote Handled Transuranic Waste

72B cast being moved to work platform

72B cast being installed in work platform

Shipping Remote Handled Transuranic Waste

Work platform center being reinstalled

ICV lid being removed from cast

Shipping Remote Handled Transuranic Waste

Rad-con personnel check cast for contamination ICV lid bolt being removed

Shipping Remote Handled Transuranic Waste

Radcon personnel checking ICV lid for contamination

Radcon personnel checking inside of cast for contamination

Shipping Remote Handled Transuranic Waste

Loading of RLC into castLeak test ICV and OCV lid of cast

Shipping Remote Handled Transuranic Waste

Installing of leak tested cast back onto trailer

Install of impact limiters onto cast

Shipping Remote Handled Transuranic Waste

Loaded 72B castRemoval of 72B cast from building 659 at INTEC

Shipping Remote Handled Transuranic Waste