5S Project

Post on 26-Jan-2017

33 views 2 download

Transcript of 5S Project

5S ProjectISAIAH VILLALONBUSM 390R

Activity

Current Situation:

We currently spending about $1248 a year on Labor Cost alone in regular cleaning of the Recycling Center

There is a lot of unnecessary equipment and materials in the area.

No segregation of recycling materials

Before Pictures

After Pictures:

New Situation:

Organized materials in proper location Removed equipment and other unnecessary materials Savings of $624 a year for Labor Cost Segregation of Recycling Materials with appropriate signs