Post on 21-Jan-2017
Triple Play & IBC Service DeploymentFor Prestigious Residential area,Office Building Hotel & Apartment
Mission
providehi-tech multimedia access for
high rise building & resident
Proposed SolutionGTI offer propose solution for the Residential and commercial entity on your environment business :
1. Triple play
2. In Building Cellular System
Triple Play Solution
IBC Services
IBC Solution
Benefit
Benefit for Owner and tenants
Increase the maximum service for tenant and guests
One gate provider for all telco services
Interactive TV feature and customizable
Upgrade the prestige level building so it can increase sales and occupancies
Develop value add service through the same media
Low Cost Investment, all layer distribution equipment provide by grahakomindo
Triple Play and IBC Project Experience
Triple Play - Bumi Serpong Damai (BSD) Resident – PT. Duta Pertiwi - Cervino Village Apartment + Office - Puri Park View Apartment + Office - Sunter Park View Apartment + Office - Sunter Icon Apartment + Office
IBC - Permata Kuningan Building - Manhattan Hotel - Merlyn Hotel - BSD Marketing Office
Featured and Technology Triple Play Solution
Interactive between room and servers Broadband internet TV +/- 60 channel Welcome Page Information facilities Added feature customizable etc
Featured and Technology Triple Play Solution
High bandwidth with technology supported :• GPON FTTH Appilication• Access last mile using indoor terminal (mini ONT) • Standard ITU-T G.984 1/2/3/4• Ethernet carried service• Reliable security protection
- downstream data protection - anti mac spooling - IP ACL control - packet restriction - precise location
Customized feature menu
Customizable Digital Features Included
Triple Play Solution
Welcome message or video with guest name
Main Menu
Language Sub Title
Customizable Main Menu
Video on Demand
Broadcast TV
News Feed
Room Messaging
World Time & Weather
Internet Radio
Hotel Information
Room Bill
Mini bar Posting(house keeper only)
Online Chat
Help – Quick Guide
Topology & Network Design Concept
Triple Play Solution
Basement 3
Basement 2
Basement 1
IIX
Int.Internet
@ Equinix Singapore
Sealed Closures
FO Handhold/Demarcation Point
OSP Fiber Cable
Head End
OTB
Apartement
PoP GTI BBU
ManageableSwitch/L2
Fiber Management
eth
SFU
Existing GTI Network
ODF
SC-FC Patch cored
Video Voice Data
Topology & Network Design Concept
Triple Play Solution
Home Gateway
Tenant
IPTV/ VoD
Telp / VoIP
STB
Broadband Internet
per room
Per floor
2nd floor
3rd floor
4th floor
Broadband Remote Access Radius Server
IP Core
IPTV & VoDServer
Middleware
SoftSwitch
Internet
NMS & NOC Center
Distribution Switch
Head End RoomXth next floor
Video Voice DataVideo Voice Data
Implementation Preview Triple Play Solution
Implementation Data center (head end) at Bumi Serpong Damai (BSD) resident
- clean and neat - efficient room for central service provider convergence (head end room)
Implementation Preview Triple Play Solution
Installation distribution switch and optical terminal Installation last mile per room
- placement of the device in a closed rack
- STB and I/O Customers
Implementation Preview Triple Play Solution
NOC & TS room deployment - 24 hours online per weeks/years
- integrated TS monitoring for 3play , IBS and others
Feature & Technology IBC ( In Building Cellular ) Solution
Optional or combination of active and passive DAS Multi operator capability with multiband support for
GSM900/1800, CDMA800/1900, WCDMA and up to 2,6 Ghz
Technical Effectiveness and retain manageability and realibility of DAS System ( passive and active)
Feature & Technology IBC ( In Building Cellular ) Solution
High Power, low noise, multi carrier Power Amp - high downlink power (>60dBc) - Low noise amp to improve uplink sensitivity
Master unit support up to 4 quod-bands over single core fiber optic cable - more effective use of fiber-optic infrastructure - manageable remote for configure and monitoring
Remote unit support 4-bands in a single box - up to 46dBm downlink power per band, so it can less clutter, simplify and lower CAPEX - adjustable for attenuation and gain, hence need flexibility to
achieve target radio coverage across band
Topology & Network Design Concept
IBC ( In Building Cellular ) Solution
Operator A
Operator B
Operator C
Operator D
Master Unit RemoteRadio Unit
MCPA Booster
Point of Interface/ Multi band Combiner
Operator BTS
ACTIVE-DAS Passive-DAS
RF-Coax Cable
Fiber Optic
Omni Antenna
Topology & Network Design Concept (Active Mode)
IBC ( In Building Cellular ) Solution
Internet
Access Point
GSM 1 Operator
GSM XX Operator
CDMA 1 Operator
CDMA XX Operator
3G Operator
Master Unit
POI
NMS
Remote Radio Unit
Active Booster Omni Antenna
Passive DASActive DAS
Splitter tap
Master Unit(MU) deliver RF signals over long distances to remote radio unit (RU)
via FO
Multi band Combiner (point of interface) combines multiple operators and multiple
bands into a single RF system
The NMS Monitors and manage status and parameter e.g. amplifier gain, operating
and environmental status, etc.
Remote radio unit amplifies RF signals to the Passive DAS
Topology & Network Design Concept (Passive Mode)
IBC ( In Building Cellular ) Solution
Remote Radio Unit
Passive DAS
Omni Antenna
Active Booster
Splitter tap & components Installation inside a riser
- Forms cascading network topology to distribute RF signals to the intended areas of coverage
- Fully passive which does not require electrical power and minimal maintenance
- Signal loss and uplink dictated by number of branches and antenna
- Each MCPA Booster up to 40W (46dBm) downlink per band for better flexibility in sectorisation and power planning
- Low noise amplification improves uplink sensitivity (<4dB) - Simple and neat installation in riser for ease of maintenance
Hardware Installation preview IBC ( In Building Cellular ) Solution
Installation at Permata Kuningan Building and Manhattan Hotel
- clean - single box installation in BTS room or riser
Hardware Installation preview IBC ( In Building Cellular ) Solution
Installation Combiner at Permata Kuningan Building and Manhattan Hotel Multi operator Combiner
installation, GSM 900/1800, CDMA 800/1900 andWCDMA/3G
Initial Step for proposed solution Q&A
- site and resident visit survey
Prepare Initial system Design - head end room and riser location - number of rooms and spaces per floor - floor plans with BTS and riser location - radio bands and frequency assignment - coverage area and capacity (Tx/Rx) planning - budgetary proposal
Project Planning
- acceptance for initial system design - detailed system design - prioritization and implementation planning
Thank You
wwww.grahakomindo.com