3035 A.FS.SITE.6 Design Diplomacy 2

Post on 30-Dec-2016

224 views 4 download

Transcript of 3035 A.FS.SITE.6 Design Diplomacy 2

© c

op

yrig

ht

revi

sion

s

The information & designs on this drawing remainthe sole copyright of Constructive ThinkingStudio Ltd and may not be reproduced or copiedin sole or in part without written consent.All rights asserted under the copyrights act1988

Liverpool  Science  Park131  Mount  PleasantLiverpoolL3  5TF

Tel:       +44(0)151  705  3433email:     info@construcCvethinking.co.uk

do not scale from this drawingcontractor to check all dimensions on site and report discrepanciesto the architect.specification supersedes drawings.

Client: Welsh Streets Home Group Project: Welsh Streets Drawing: Design Diplomacy Alternative No/Rev: 3035.A.FS.SITE.6Drawn: SC/JM Checked: SC/JMDate: Aug 2012 File: Masterplan Drawing File.pln

'green  street'

(to  be  planted  not  paved

pedestrians  &  cyclists  only)

children's

play  area

'green  street'

seaCng

C1

C1

C1

C1

C1

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

A2

A2

8A2

A2

B2B2

B2

B2B2

B2B2

B2

B2B2

B2B2

B2B2

A2

C1

C1

B2

B2B2

B2

B2

B2

B2

B2

B2

B2

B2

B2B2

A2

A2

A2

A2

8

C1

A2

A2

B2

B2

B2

B2

B2

B2

B2

B2

B2B2

B2

B2

B2

A2

A2

A2

A2

A2

B2B2

B2B2

B2B2

B2

B2B2

B2B2

B2

B2

B2B2

B2

B2

B2

B2B2

B2

B2B2

A2

A2

A2

A1

A1

A1

A1

B1

B1

B1

B1C1A2

C1

A2

C1

A2

A1

A1C1

A2

B1

B1

B1

B1

C1A2

A2

B1

B1

A1

A1

4

4

4

4

4

2

2

2

1

2

2

1

4

4

4

4

4

6

55

55

5

55

5

55

5

5

4

4

4

55

5

33

2

2

2

2

33

2a

2a

11a

11a

33

1a

1

1

6

1a1a

1a1a

1a6

6

66

6

B1

B1

A1

A1

8

11

11

11

11

1

11

1

11

11

11

11

on  street  parking

exisCng  cobbles  exposed  and  repaired

on  street  parking

on  street  parking

on  street  parking

exisCng  businesses  retained

on  street  parking

exisCng  cobbles  exposed  and  repaired

exisCng  cobbles  exposed  and  repaired

play  street  area  -­‐  no  on  street  parking

play  street  area  -­‐  no  on  street  parking exisCng  cobbles  exposed  and  repaired

on  street  parking

exisCng  cobbles  exposed  and  repaired

play  street  area  -­‐  no  on  street  parking

play  street  area  -­‐  no  on  street  parking

high  park  street

kelvin  grove

wynnstay  street

voelas  street

powis  street

south  street

powis  street

madryn  street CTS  Schedule  of  AccommodaCon  -­‐  Design  Diplomacy  Alt

House  Type

1

1a

2

2a

3

4

5

6

8

A1

A2

B1

B2

C1

Conversion  Type

Straight  Refurb

Straight  Refurb  WithLoY

Side  to  SideConversion

Side  to  SideConversion  With  LoY

Back  to  BackConversion

1950s  Refurb

3  Story  Townhouse

Self  Build  Plot

New  Retail  withLive/Work  Above

∆  Architects  A1

∆  Architects  A2

∆  Architects  B1

∆  Architects  B2

∆  Architects  C1

QuanCty

26

8

9

2

6

13

15

7

3

10

25

12

76

13

225

Number  ofBedrooms

2

3

4

6

6

3

5

4

3

2

2

3

3

3

Design Diplomacy Drawing 1:500