Software Engineering Software Engineering andand
Best PracticesBest Practices
Sources: Various. Sources: Various. Rational Software Corporation slides, Rational Software Corporation slides,
OOSE textbook slides, Per Kroll talk, How to Fail OOSE textbook slides, Per Kroll talk, How to Fail with the RUP article, textbookswith the RUP article, textbooks
Most slides have been modified considerablyMost slides have been modified considerably
30 2
Fundamental Terms / Fundamental Terms / ConceptsConcepts
►Science and EngineeringScience and Engineering Discover Discover
►Relationships that exist but are not foundRelationships that exist but are not found►Formulas; chemical composition, d=r*t; calories in Formulas; chemical composition, d=r*t; calories in
fats, carbohydrates, proteins; experimentation;fats, carbohydrates, proteins; experimentation;►Astrophysics – origins of the universeAstrophysics – origins of the universe
BuildBuild►Apply principles of science and mathematics to real Apply principles of science and mathematics to real
needs, commodities, structures, products, etc.needs, commodities, structures, products, etc.
►Software Engineering; Software Software Engineering; Software DevelopmentDevelopment
30 3
Fundamental Concepts / Terms Fundamental Concepts / Terms (2)(2)
►Software Engineering; Software Software Engineering; Software DevelopmentDevelopment
► Job positions: Job positions: Software developerSoftware developer ProgrammerProgrammer Software engineerSoftware engineer Analyst / ProgrammerAnalyst / Programmer Senior … what have you…Senior … what have you…
30 4
What is Software What is Software Engineering?Engineering?
►The process of solving customers’ problems The process of solving customers’ problems by the systematic development and by the systematic development and evolution of large, high-quality software evolution of large, high-quality software systems within cost, time and other systems within cost, time and other constraintsconstraints
►Note:Note: Process, systematic (not ad hoc), evolutionary… Process, systematic (not ad hoc), evolutionary… Constraints: high quality, cost, time, meets Constraints: high quality, cost, time, meets
user requirementsuser requirements
30 5
Analysis of the Definition:Analysis of the Definition:► Systematic development and evolutionSystematic development and evolution
An engineering process involves applying An engineering process involves applying well understood techniqueswell understood techniques in a in a organizedorganized and and disciplineddisciplined way way
Many Many well-accepted practices have been formally standardizedwell-accepted practices have been formally standardized► e.g. by the IEEE or ISOe.g. by the IEEE or ISO
Most development work is Most development work is evolutionaryevolutionary
► Large, high quality software systemsLarge, high quality software systems Software engineering techniques are needed because large systems Software engineering techniques are needed because large systems
cannot be completely understoodcannot be completely understood by one person by one person TeamworkTeamwork and co-ordination are required and co-ordination are required Key challenge: Dividing up the work and ensuring that the parts of the Key challenge: Dividing up the work and ensuring that the parts of the
system work properly togethersystem work properly together The end-product that is produced must be of sufficient qualityThe end-product that is produced must be of sufficient quality
► Cost, time and other constraintsCost, time and other constraints Finite resourcesFinite resources The benefit must outweigh the costThe benefit must outweigh the cost Others are competing to do the job cheaper and fasterOthers are competing to do the job cheaper and faster Inaccurate estimates of cost and time have caused many project Inaccurate estimates of cost and time have caused many project
failuresfailures
30 6
Comments:Comments:► $250 billion annually in US.$250 billion annually in US.► Over 175,000 projects!Over 175,000 projects!► Complexity, size, distribution, importance push Complexity, size, distribution, importance push
our limits.our limits.► Business pushes these limits:Business pushes these limits:
Great demands for Great demands for rapid development and deploymentrapid development and deployment► Incredible pressure: develop systems that are:Incredible pressure: develop systems that are:
On time, On time, Within budget, Within budget, Meets the users’ requirementsMeets the users’ requirements
► Figures in the late 90s indicated that at mostFigures in the late 90s indicated that at most 70% of projects completed70% of projects completed Over 50% ran over twice the intended budgetOver 50% ran over twice the intended budget $81 billion dollars spent in cancelled projects!!$81 billion dollars spent in cancelled projects!!
► Getting better, but we need better tools and Getting better, but we need better tools and techniques! techniques!
30 7
What Happens in PracticeWhat Happens in PracticeSequential activities: (Traditional ‘Waterfall’ Process)
Requirements Design Code Integration Test
Late DesignBreakage
100%
Project Schedule
Dev
elop
men
t Pro
gres
s(%
cod
ed)
OriginalTarget Date
IntegrationBegins
Risk inadequately addressedProcess not receptive to ChangeProblems not really ‘seen’ until near delivery date!Until then, ‘all is well…’Big Bang approach – full deliveryLong development cycles…Little user involvement, etc. etc…
30 8
Symptoms of Software Symptoms of Software Development ProblemsDevelopment Problems
► Inaccurate understandingInaccurate understanding of end-user needs of end-user needs► Inability to deal with Inability to deal with changing requirementschanging requirements► Modules that don’t fit together (integration)Modules that don’t fit together (integration)► Software that’s hard to maintain or extend (brittle)Software that’s hard to maintain or extend (brittle)► Late discovery of Late discovery of serious project flawsserious project flaws (integration) (integration)► Poor software qualityPoor software quality (architecture, risks (architecture, risks
unanticipated…)unanticipated…)► Process Process not responsive to Change (Gantt Charts…)not responsive to Change (Gantt Charts…)► Unacceptable software performance Unacceptable software performance ► Team members in each other’s way, unable to Team members in each other’s way, unable to
reconstruct who changed what, when, where, why reconstruct who changed what, when, where, why (software architecture, …(software architecture, …
► ……and we could go on and on…and we could go on and on…
30 9
► We need a We need a processprocess that that Will serve as a framework for large scale and small Will serve as a framework for large scale and small
projectsprojects Adaptive – embraces ‘change!’Adaptive – embraces ‘change!’
► Opportunity for Opportunity for improvementimprovement not identification of not identification of failurefailure!! Iterative (small, incremental ‘deliverables’)Iterative (small, incremental ‘deliverables’) Risk-driven (identify / resolve risks up front)Risk-driven (identify / resolve risks up front) Flexible, customizable process (not a burden; Flexible, customizable process (not a burden;
adaptive to projects)adaptive to projects) Architecture-centric (breaks components into Architecture-centric (breaks components into
‘layers’ or ‘layers’ or common areas of responsibility…) common areas of responsibility…) HeavyHeavy user involvement user involvement
► Identify best ways of doing things – a better Identify best ways of doing things – a better process – acknowledged by world leaders…process – acknowledged by world leaders…
Need a Better Hammer!
30 10
Develop IterativelyDevelop Iteratively
Control ChangesControl Changes
Use Use ComponentComponent
ArchitecturesArchitectures
Manage Manage RequirementsRequirements
Model Model VisuallyVisually
VerifyVerifyQualityQuality
Best Practices of Software Best Practices of Software EngineeringEngineering
Know these!
30 11
Symptomsend-user needs
changing requirements
modules don’t fit
hard to maintain
late discovery
poor quality
poor performance
colliding developers
build-and-release
Root Causesinsufficient requirements
ambiguous communications
brittle architectures
overwhelming complexity
undetected inconsistencies
poor testing
subjective assessment
waterfall development
uncontrolled change
insufficient automation
Best Practicesdevelop iteratively
manage requirements
use component architectures
model the software visually
verify quality
control changes
Addressing Root Causes Addressing Root Causes Eliminates the SymptomsEliminates the Symptoms
Symptoms of problems can be traced to having Root Causes.Best Practices are ‘practices’ designed to address the root causes of software problems.
30 12
Practice 1: Develop Software Practice 1: Develop Software Iteratively Iteratively
Develop IterativelyDevelop Iteratively
Control Changes
Use Component
Architectures
Manage Requirements
Model Visually
VerifyQuality
Considered by many practitioners to be the most significant of the six
30 13
Practice 1: Develop Software Practice 1: Develop Software IterativelyIteratively
►Until recently, developed under assumption - Until recently, developed under assumption - most requirements can be identified up most requirements can be identified up front.front.
►The research deconstructing this myth The research deconstructing this myth includes work by Capers Jones. (See next includes work by Capers Jones. (See next slide) In this very large study of 6,700 slide) In this very large study of 6,700 projects, projects, creepingcreeping requirements requirements — those not — those not anticipated near the start—are a anticipated near the start—are a very very significant fact of software development lifesignificant fact of software development life, , ranging from around 25% on average ranging from around 25% on average projects up to 50% on larger ones.projects up to 50% on larger ones.
30 15
Interestingly, Interestingly, ► An initial design will An initial design will likely be flawedlikely be flawed with respect to its with respect to its
key requirements. Requirements rarely key requirements. Requirements rarely fully knownfully known up up front!front!
► Late-phase discovery of design defectsLate-phase discovery of design defects results in costly results in costly over-runs and/or project cancellation over-runs and/or project cancellation Oftentimes requirements change – even during implementation! Oftentimes requirements change – even during implementation!
► While large projects are more prone to cost overruns, While large projects are more prone to cost overruns, medium-size/small projects are vulnerable to medium-size/small projects are vulnerable to cancellation. cancellation.
► The key reasons continue to be The key reasons continue to be poor project planning and management, poor project planning and management, shortage of technical and project management expertise, shortage of technical and project management expertise, lack of technology infrastructure, lack of technology infrastructure, disinterested senior management, and disinterested senior management, and inappropriate project teams.”inappropriate project teams.”
30 16
Waterfall Delays RisksWaterfall Delays Risks
R
I
S
K
T I M E
IntegrationSystem
Test
Code
Design
Requirements
Waterfall risk
Walker Royce, 1995
30 17
Iterative DevelopmentIterative Development
Earliest iterations address greatest risks • Each iteration produces an executable release• Each iteration includes integration, test, and assessment!• Objective Milestones: short-term focus; short term successes!
Iteration 1 Iteration 2 Iteration 3
30 18
Accelerate Risk ReductionAccelerate Risk Reduction
Iterative
T I M E
Iteration Iteration Iteration Iteration Iteration
Risk reductionRisk reduction
R
I
S
KWaterfall risk
Walker Royce, 1995
30 19
Iterative Development CharacteristicsIterative Development Characteristics► Critical risks are resolved before Critical risks are resolved before
making large investmentsmaking large investments ► Initial iterations enable early user Initial iterations enable early user
feedbackfeedback Easy to resolve problems early. Easy to resolve problems early. Encourages user feedback in meaningful waysEncourages user feedback in meaningful ways
► Testing and integration are continuousTesting and integration are continuous – assures successful integration (parts all – assures successful integration (parts all fit) fit) Continuous testing.Continuous testing.
► Objective milestones provide short-term Objective milestones provide short-term focusfocus
► Progress measured by assessing Progress measured by assessing implementationsimplementations
► Partial implementations can be Partial implementations can be deployeddeployed Waterfall method – no deliveryWaterfall method – no delivery Incremental development? May be some Incremental development? May be some
great values in delivering key parts of great values in delivering key parts of application. Critical components delivered application. Critical components delivered first?first?
► No big-bang approach!No big-bang approach!
30 20
UP Lifecycle Graph – Showing UP Lifecycle Graph – Showing IterationsIterations
In an In an iteration, , you may walk you may walk through all through all disciplinesdisciplines
CONTENT
STRUCTURE
T I M E
STUDY THIS!!!
30 21
Executable Releases
Unified Process Iterations and Unified Process Iterations and PhasesPhases
An iteration is a distinct sequence of activitieswith an established plan and evaluation criteria,
resulting in an ‘executable release.’
(There is a lot of very important ‘key’ terminology used here…(cycle, iteration, phase, milestones, core disciplines, content of iterations, etc….)
PreliminaryIteration
Architect.Iteration
Architect.Iteration
Devel. Iteration
Devel. Iteration
Devel. Iteration
TransitionIteration
TransitionIteration
Elaboration Construction TransitionInception
30 22
Enables and encouragesEnables and encourages user user feedbackfeedback
Serious Serious misunderstandingsmisunderstandings evident early in the life cycleevident early in the life cycle
Development focuses on Development focuses on critical issues – break it critical issues – break it down!down!
Objective assessment thru Objective assessment thru testing and assessment testing and assessment
Inconsistencies detected Inconsistencies detected earlyearly
Testing starts earlier – Testing starts earlier – continuous!continuous!
Risks identified and Risks identified and addressed early - via addressed early - via plannedplanned iterations! iterations!
Problems Addressed by Iterative Problems Addressed by Iterative DevelopmentDevelopment
Root CausesRoot Causes SolutionsSolutions Insufficient Insufficient
requirementsrequirements Ambiguous Ambiguous
communicationscommunications Brittle architecturesBrittle architectures Overwhelming Overwhelming
complexitycomplexity Subjective assessmentSubjective assessment Undetected Undetected
inconsistenciesinconsistencies Poor testingPoor testing Waterfall developmentWaterfall development Uncontrolled changeUncontrolled change Insufficient automationInsufficient automation
30 23
No Free LunchNo Free Lunch - Traps - Traps Abound…Abound…
► Major impacts on Project Managers, though….Major impacts on Project Managers, though….
► Trap: When the initial risks are mitigated, new ones emergeTrap: When the initial risks are mitigated, new ones emerge Do not do just the easy stuff, to look good.Do not do just the easy stuff, to look good. Keep re-planning based on all new information.Keep re-planning based on all new information.► Trap: Remember ‘some’ Trap: Remember ‘some’ ReworkRework enables you to enhance your enables you to enhance your
solutionsolution Accommodate change Accommodate change earlyearly in the project in the project► Trap: Iterative development Trap: Iterative development does does notnot mean mean never to commit to a never to commit to a
solutionsolution
► Monitor ‘scrap and rework’Monitor ‘scrap and rework’► Trap: Must Control “requirement creep, ” however… SomeTrap: Must Control “requirement creep, ” however… Some clients will now naturally recognize many ‘musts…’clients will now naturally recognize many ‘musts…’
30 24
Many Traps in Iterative Many Traps in Iterative DevelopmentDevelopment
Here is another trap: Too long initial iterationHere is another trap: Too long initial iteration
► Winning is fun. Winning teams work better than Winning is fun. Winning teams work better than loosing teamsloosing teams
► BetterBetter to have a short initial iteration, than one too to have a short initial iteration, than one too longlong Cut scope if necessary (much more later)Cut scope if necessary (much more later)
► Avoid ‘analysis-paralysis’ by Avoid ‘analysis-paralysis’ by time-boxing;time-boxing; you can you can enhance in later iterations (more later)enhance in later iterations (more later)
► Establish an Establish an even rhythmeven rhythm for project (at least w/i a for project (at least w/i a phase)phase)
► Focus on Focus on resultsresults and and deliverablesdeliverables, not activities, not activities
30 25
Iterations Are Time-boxedIterations Are Time-boxed►Work is undertaken within an Work is undertaken within an iterationiteration..►The iteration plan The iteration plan definesdefines the the artifactsartifacts to be to be delivered, delivered, rolesroles and and activitiesactivities..
►An iteration is clearly An iteration is clearly measurablemeasurable..►Iterations are Iterations are risk-drivenrisk-driven►Iterations are Iterations are plannedplanned..►Iterations are Iterations are assessedassessed!!►Generally, Generally, initialinitial iterations (in Construction) iterations (in Construction) based on based on high risk and core functionalities!high risk and core functionalities!
30 26
The Iteration Plan Defines….The Iteration Plan Defines….
TheThe deliverablesdeliverables for for that iteration.that iteration.
The The to do listto do list for the for the team membersteam members
artifacts
30 27
Problem: Problem: FixedFixed Plans Produced Upfront – Plans Produced Upfront –
Not Real Practical!Not Real Practical!►Yet, senior management wants firm, fixed plans!Yet, senior management wants firm, fixed plans!
Part of their culture / upbringing/ experiencePart of their culture / upbringing/ experience Necessary for ‘planning’ budgeting, etc. of resources, projects…. BUT:Necessary for ‘planning’ budgeting, etc. of resources, projects…. BUT:
►TrapTrap: Fine-grained planning : Fine-grained planning from start to end?from start to end? Takes too much timeTakes too much time Frustrating as change occurs (and it Frustrating as change occurs (and it will)will), if plans too fine-grained., if plans too fine-grained.
►Know that: Know that: Projects typically have some degree of Projects typically have some degree of uncertaintyuncertainty
►This makes This makes detaileddetailed plans for the plans for the entireentire project project meaninglessmeaningless
►Does not mean that we should not planDoes not mean that we should not plan
30 28
Solution: Solution: Plan With Evolving Levels of Plan With Evolving Levels of
DetailDetail
Current Iteration
Next Iteration
Phases and major milestones What and whenIterations for each phase Number of iterations Objectives and Duration
One For Entire Project
Fine-grained Plans: Iteration Plans
Coarse-grained Plan: Software Development Plan
Iterative Development does not mean less work and shorter schedule It is about greater predictability
30 29
Progress is made against Progress is made against MILESTONESMILESTONES
►In the Unified Process:In the Unified Process: Each phase is defined by a Each phase is defined by a milestonemilestone.. Progress is made by passing Progress is made by passing milestonesmilestones.. Milestones measure Milestones measure successsuccess
►PhasesPhases - NOT TIMEBOXED. - NOT TIMEBOXED.►IterationsIterations ARE TIMEBOXED. ARE TIMEBOXED.
Inception Elaboration Construction Transition
Major Milestones
30 30
SummarySummary
►Much more about iteration and Much more about iteration and iteration planning later in the course…iteration planning later in the course…
►You will see some of these again – You will see some of these again – and, more importantly, and, more importantly, useuse this this information in your own iteration information in your own iteration planning.planning.