231448 GAZ A 001 - CEDD

Post on 26-Jun-2022

2 views 0 download

Transcript of 231448 GAZ A 001 - CEDD

PLAN NO. æ⁄ SCALE

ˇ„h« PLAN TITLE

u⁄{µ PROJECT TITLE

CIVIL ENGINEERING ANDDEVELOPMENT DEPARTMENT

g⁄ �ì⁄ �u⁄ �{

ˇ„h«

⁄g⁄ì⁄uµ{‡B ⁄gƒa⁄uµ{‡¡

LAND WORKS DIVISION

CIVIL ENGINEERING OFFICE

PLAN FOR GAZETTING UNDER

ROADS(WORKS, USE AND COMPENSATION)

ORDINANCE (CHAPTER 370)

fiÚ¾Ú¡m„D‚ô(⁄uµ{¡B¤ˇ¥˛⁄˛‚ÉÀv)–ł¤Ò¡n(†˜370‡„)

ƒÓƒb¾¸‡ł⁄‰¥‹⁄§„ˇ«h

PWP ITEM NO. 5758CL

SITE FORMATION AND ASSOCIATED

INFRASTRUCTURAL WORKS FOR DEVELOPMENT

OF COLUMBARIUM, CREMATORIUM AND RELATED

FACILITIES AT SANDY RIDGE CEMETERY

- WIDENING OF SHA LING ROAD AND

CONSTRUCTION OF ROADS A, B AND C

OFFICE¿º¤˘‡B

⁄u°¨›p„”¶µ¥Ø†˜5758CL‚„

�l”]‡X4X��œ^¤�pp��

“”⁄gƒa¥›¾ª⁄˛‹Ûˆö°ò«Ø⁄uµ{

-� �ôd˚��l”]S�˚S��œ

Ó„

Graves

13.1

12.0

13.1

13.3

13.0

13.4

52.2

54.7

51.3

CUL

CUL

CUL

CUL

CUL

CUL

7.1

7.6

7.0

7.0

6.7

7.1

6.9

10.3

10.3

6.8

10.2 12.1

6.9

6.9

12.2

12.4

10.3

12.312.7

13.3

10.313.0

12.6

13.2

11.2

12.3

12.8

13.2

12.8

13.0

12.2

12.9

12.1

L

L

L

L

L

L

L

CUL

G

GG

GG

G

GG

G

G

GG

13.953.6 6.8

6.1

33.9

6.513.612.0

8.8

13.1

11.5

6.9

12.8

8.9

12.0 10.0

13.3

37.79.5

12.0

7.813.5 26.2

13.6

20.7

22.9 8.7

37.1

32.0

8.8 11.5

8.3

39.9

25.6

39.49.4

29.8

37.6 10.843.3

10.7

7.3

54.5

35.9

7.6

ET

L

ET

E

E

H

EH

E

ET

E

E

Ó„

Ó„

CUL

CUL

Graves

CUL

Graves

G

G

G

G

G

G

G

G

G

W

W

W

PO

5.95.2

6.8

5.3

21.5

4.5 23.5

6.4

28.6

12.8

4.4

4.6

39.2

13.2

35.9

25.5

4.8

5.7

13.0

34.8

5.533.3

32.3

6.5

20.6

5.6

17.1

5.6

5.8

74.2

5.3

19.3

65.0

5.8

5.6

6.3

13.0

5.6

58.2

6.4

LE L

EL E EL

L

E

L

L

E

E

E

L

E

E

E

E

E

FB

„ˇ¤Ò:

LEGEND:

PROPOSED CARRIAGEWAY

PROPOSED FOOTPATH

PROPOSED SLOPE WORK

GAZETTE A/001-003

LIMIT OF WORKS AREA

‹I⁄u°ˇ‹É››

EXISTING CARRIAGEWAY TO BE PERMANENTLY

CLOSED AND DEMOLISHED

†{ƒ‡ƒæ⁄H‚ô–N¥ˆ⁄[«˚‡‹⁄˛§ï«Ø‹°ƒæ¤fi„D

†{ƒ‡ƒæ¤fi„D–N…¨fiÉ«˚‡‹⁄˛›««Ø

EXISTING CARRIAGEWAY TO BE TEMPORARILY

CLOSED AND RECONSTRUCTED

†{ƒ‡ƒæ⁄H‚ô–N…¨fiÉ«˚‡‹⁄˛›««Ø

EXISTING FOOTPATH TO BE TEMPORARILY

CLOSED AND RECONSTRUCTED

PROPOSED FOOTPATH ON FLYOVER

PROPOSED FLYOVER

PROPOSED CENTRAL MEDIAN

/ TRAFFIC ISLAND

EXISTING CARRIAGEWAY TO BE PERMANENTLY

CLOSED AND CONVERTED INTO FOOTPATH

EXISTING FOOTPATH TO BE PERMANENTLY

CLOSED AND CONVERTED INTO CARRIAGEWAY

PROPOSED VERTICAL

NOISE BARRIER

(APPROXIMATELY 2.5 METRES HIGH)

ÀÀ«Øƒæ¤fi„D

ÀÀ«Øƒæ¤fi⁄Ѿô

ÀÀ«Øƒæ⁄H‚ô

ÀÀ«Øƒæ¤fi⁄Ѿô⁄W“”ƒæ⁄H‚ô

ÀÀ«Ø–×'Y⁄uµ{

ÀÀ«Ø⁄⁄¥¡⁄À„j–a / ƒw¥þfiq

ÀÀ«Ø“‰¥ßƒ¡„j›µ«Ì»Ù (°“‹ø2.5ƒÌ)

†{ƒ‡ƒæ¤fi„D–N¥ˆ⁄[«˚‡‹⁄˛'

PROPOSED VERTICAL

NOISE BARRIER

(APPROXIMATELY 3 METRES HIGH)

ÀÀ«Ø“‰¥ßƒ¡„j›µ«Ì»Ù (°“‹ø3ƒÌ)

†{ƒ‡ƒæ¤fi„D–N¥ˆ⁄[«˚‡‹⁄˛§ï«Ø‹°ƒæ⁄H‚ô

61

11572

129

72

61

11572

129

72

N

ˆ„·ò

LO WU

MAN KAM TO

⁄åÀA·ç

‹I⁄u°ˇ‹É››

LOCATION PLAN

ƒì‚m„ˇ

⁄æ¤Ò SCALE

LIMIT OF

WORKS AREA

A1 1:20000

1. °£ƒb¤ä¥L⁄Ł›–«ü'w¥~¡A¥þ‡¡¥HƒÌ‹°¶q«×‡æƒì¡C

NOTE:

µø

ALL DIMENSIONS ARE IN METRES UNLESS

OTHERWISE STATED.

3. ƒpƒ‡»Ý›n¡A‹I⁄u°ˇ‹É››⁄”†{ƒ‡ƒæ¤fi„D⁄˛ƒæ⁄H‚ô

'˛•|⁄À¶¥‹q…¨fiÉ«˚‡‹¡C

SECTIONS OF THE EXISTING CARRIAGEWAYS AND

FOOTPATHS WITHIN THE LIMIT OF WORKS AREA

MAY BE TEMPORARILY CLOSED IN PHASES AS

AND WHEN REQUIRED.

2. 'Òƒ‡⁄ô¥›§¡‹°‹ø…˘,¥HƒÌ‹°‡æƒì,¤ˆƒb›»·ä⁄ô¥›

°ò•˙¥H⁄W(+)'˛¥H⁄U(-)¡C

ALL LEVELS ARE APPROXIMATE VALUES AND IN

METRES ABOVE (+) OR BELOW (-) HONG KONG

PRINCIPAL DATUM.

N

1:1000 @ A1231448/GAZ-A/001

‡s–µ‰uB-B‡s–µ„ˇ«h‰s‚„

231448/GAZ-A/003