Post on 20-Mar-2021
description
SAP C_S4FCF_1909
QUESTIONS AND
ANSWERS SAP S/4HANA Central Finance Certification
ABSTRACT Get complete detail on
C_S4FCF_1909 exam guide to
crack SAP Central Finance in
SAP S/4HANA. You can collect all
information on C_S4FCF_1909
tutorial, practice test, books, study
material, exam questions, and
syllabus. Firm your knowledge on
SAP Central Finance in SAP
S/4HANA and get ready to crack
C_S4FCF_1909 certification.
Explore all information on
C_S4FCF_1909 exam with
number of questions, passing
percentage and time duration to
complete test.
ERPprep.com
WWW.ERPREP.COM PDF
SAP Central Finance in SAP S/4HANA - C_S4FCF_1909 1
Introduction to SAP Certified
Application Associate - Central
Finance in SAP S/4HANA Exam
SAP Central Finance in SAP S/4HANA (C_S4FCF_1909) preparation guide helps you to
get focused on the exam. This guide also helps you to be on the C_S4FCF_1909 exam
track to get certified with a good score in the final exam.
C_S4FCF_1909 SAP Central Finance in SAP
S/4HANA Exam Summary
● Exam Name: SAP Certified Application Associate - Central Finance in SAP
S/4HANA
● Exam Code: C_S4FCF_1909
● Level: Associate
● Exam Price: $550 (USD)
WWW.ERPREP.COM PDF
SAP Central Finance in SAP S/4HANA - C_S4FCF_1909 2
● Duration: 180 mins
● Number of Questions: 80
● Passing Score: C_S4FCF_1909 - 66%
● Reference Books:
○ S4F61 (SAP S/4HANA 1909)
○ S4F60 (SAP S/4HANA 1909)
○ S4F04 (SAP S/4HANA 1809)
○ BIT300 (ERP 6.0)
○ S4F601e, SLT100, MDG100, BIT100
● Schedule Exam: SAP Training
● Sample Questions: SAP S/4HANA Central Finance Certification Sample
Question
● Recommended Practice: SAP S/4HANA Central Finance Certification
Practice Exam
Exam Syllabus: C_S4FCF_1909 SAP Certified
Application Associate - Central Finance in SAP
S/4HANA
1. Initial Load in Central Finance (> 12%)
Describe how to set a filter for the initial load of Cost Object. Resolve errors of cost
object initial load. Execute initial load of FI/CO postings. Resolve errors of FI/CO posting
initial load. Set filter for the initial load of CO internal posting, and resolve errors of CO
internal posting initial load. Define validation and reconciliation in Central Finance.
Perform reconciliation reports in Central Finance.
S4F61 (SAP S/4HANA 1909)
2. Real time Replication in Central Finance (> 12%)
Describe prerequisites to activate real time replication. Start real time replication.
Correct errors of real time replication. Explain the document flow functionality of Central
Finance. Perform document drill back from target system to source system.
S4F61 (SAP S/4HANA 1909)
3. System Landscape Transformation Server (SLT) (8% - 12%)
Describe options for activating data replication and how to transfer data, including how
to change structures to source tables during replication. Configure client specific and
cross client replication. Describe starting recording and replication.
S4F61 (SAP S/4HANA 1909)
WWW.ERPREP.COM PDF
SAP Central Finance in SAP S/4HANA - C_S4FCF_1909 3
4. SAP Master Data Governance (8% - 12%)
Describe MDG central governance and mass processing. Describe the general
concepts and capabilities of SAP MDG, central governance. Activate and configure the
default processes for MDG. Define MDG data models.
S4F601e
S4F60 (SAP S/4HANA 1909)
S4F61 (SAP S/4HANA 1909)
5. Central Finance Setup and Configuration (8% - 12%)
Configure the scope for the initial load of FI/CO posting. Define decimal places for
currencies. Differentiate between Key Mapping and Value Mapping. Define mapping
actions for Mapping Entities. Define key mapping and value mappings. Configure Cost
Object Mapping scenarios.
S4F61 (SAP S/4HANA 1909)
6. Corporate Finance Processes supported by Central Finance (8% - 12%)
Define centralization of finance operations. Describe intercompany reconciliation in
Central Finance. Determine open item management in Central Finance. Configure
central payments and central down payments. Describe AR/AP reporting in Central
Finance. Define SAP Credit Management. Describe the integration of Credit
Management with Central Finance and the relationship between Credit Management
and Central Payments.
S4F61 (SAP S/4HANA 1909)
7. Enhancements in the Controlling Area (CO-PA, WBS) (8% - 12%)
Explain improvements made when replicating from costing-based CO-PA into
Profitability Analysis in the Universal Journal. Understand account-based CO-PA COGS
split in Central Finance. Define account-based CO-PA price split in Central Finance.
Describe the new replication scenario for internal EC-PCA postings. Explain the
simulation tool for EC-PCA and the Profit Center comparison report. Describe how WBS
elements and project structures can be transferred to Central Finance to enable a
central reporting on projects.
S4F61 (SAP S/4HANA 1909)
8. Run Phase in Central Finance (< 8%)
Design the SAP S/4 HANA Central Finance project phases. Determine the SAP
S/4HANA Central Finance pilot approach. Describe the required organizational change
with SAP S/4HANA Central Finance. Determine the stakeholders involved in a Central
Finance project. Define the change enablers and key success factors. Design the
WWW.ERPREP.COM PDF
SAP Central Finance in SAP S/4HANA - C_S4FCF_1909 4
operation model for Central Finance, and daily operations that might be needed in
Central Finance.
S4F60 (SAP S/4HANA 1909)
S4F61 (SAP S/4HANA 1909)
9. Central Finance Landscape Architecture (< 8%)
Define options to SAP S/4HANA Central Finance Architecture links source systems to
the central finance system. Design SLT techchnical integration platform for Central
Finance. Describe MDG function in Central Finance for master harmonization. Descript
AIF as interface and monitoring for Central Finance.
S4F60 (SAP S/4HANA 1909)
10. Integration Technology ALE (< 8%)
Differentiate Application Link Enabling (ALE) from Electronic Data Interchange (ED).
Define logical system or logical system name, message type, and distribution model.
Designdistribution model. Configure logical system names and assign them to clients in
SAP systems.
S4F61 (SAP S/4HANA 1909)
11. System Integration Concepts (< 8%)
Describe technical communications modes and processes. Design the types of
communication transfer modes. Explain business scenarios and the business hierarchy
used by SAPConfigure RFC between two SAP systems, or non-SAP system.
S4F61 (SAP S/4HANA 1909)
S4F601e
SAP C_S4FCF_1909 Certification Sample
Questions and Answers
To make you familiar with SAP Central Finance in SAP S/4HANA (C_S4FCF_1909)
certification exam structure, we have prepared this sample question set. We suggest
you to try our Sample Questions for S/4HANA Central Finance C_S4FCF_1909
Certification to test your understanding of SAP C_S4FCF_1909 process with real SAP
certification exam environment.
C_S4FCF_1909SAP Central Finance in SAP S/4HANA Sample Questions:-
01. What must you do to replicate project definitions and WBS elements?
WWW.ERPREP.COM PDF
SAP Central Finance in SAP S/4HANA - C_S4FCF_1909 5
There are 2 correct answers to this question.
a) Reset the SAP Landscape Transformation staging tables.
b) Configure the inbound and outbound ALE.
c) Activate the Central Finance accounting interface.
d) Set up the Application Interface Framework.
02. What happens when you stop a replication in SAP Landscape Transformation (SLT)?
There are 2 correct answers to this question.
a) SLT configuration is deactivated.
b) Database triggers in the source are deleted.
c) Logging table in the source is deleted.
d) SLT load and replication object are reset.
03. Which of the following is a characteristic of a BAPI?
Please choose the correct answer.
a) BAPIs are closely linked to business events.
b) BAPIs can be used exclusively within the SAP system.
c) BAPIs have a presentation layer.
d) BAPIs CANNOT be changed after they are released.
04. On which level can you activate central payment?
Please choose the correct answer.
a) Business partner
b) Company code
c) Client
d) Payment run ID
05. Which settings for the FI/CO initial load do you define in the CFIN_SOURCE_SET
table in the source system?
There are 3 correct answers to this question.
a) Periods for documents
b) Substitution accounts
c) Controlling area
d) Fiscal year for balances
e) Company code
06. Which event triggers the transfer of COGS to the Central Finance system?
Please choose the correct answer.
a) Production order settlement
b) Sales order creation
c) Invoice receipt
d) Goods delivery
WWW.ERPREP.COM PDF
SAP Central Finance in SAP S/4HANA - C_S4FCF_1909 6
07. Which detail settings can you define for classic Profit Center Accounting (EC-PCA)
postings in Central Finance?
There are 3 correct answers to this question.
a) Fiscal year variant
b) Dedicated ledger group
c) Offsetting account for one-sided EC-PCA posting
d) Posting key
e) Separate document type
08. What are the capabilities of the Customer/Vendor Integration (CVI) business
function?
There are 2 correct answers to this question.
a) Allows bi-directional replication of business partner, customer master, and vendor master
b) Integrates the business partner, customer master, and vendor master
c) Checks for duplicates of business partner, customer master, and vendor master
d) Replaces the customer master and vendor master with business partners
09. What is a prerequisite to start the replication of internal CO documents?
Please choose the correct answer.
a) Cost elements in the CO document must be primary cost elements.
b) CO document must be linked to an FI document.
c) Sender system must be an SAP S/4 system.
d) CFIN_SOURCE_SET table must be configured.
10. Which of the following steps are key factors for a successful Central Finance
implementation?
There are 2 correct answers to this question.
a) Migrate from a two-tier architecture to a three-tier architecture.
b) Involve business process owners during system design.
c) Define strong master data governance processes.
d) Reorganize source systems.
Solutions:
QUESTION: 01- Answer: b, d
QUESTION: 02- Answer: b, c
QUESTION: 03- Answer: a
QUESTION: 04- Answer: b
QUESTION: 05- Answer: a, d, e
WWW.ERPREP.COM PDF
SAP Central Finance in SAP S/4HANA - C_S4FCF_1909 7
QUESTION: 06- Answer: d
QUESTION: 07- Answer: b, c, e
QUESTION: 08- Answer: a, b
QUESTION: 09- Answer: d
QUESTION: 10- Answer: b, c