2012 Virginia Residential Fuel Gas Code & 2012 International
Fuel Gas Code Update Training
-----------------------------
Henrico County Department of
Building Construction and Inspections
Before we begin… Please turn off anything that rings, dings, sings,
clangs, bangs, buzzes or whistles Dixie
2
12/2/2014
2
Introduction
This presentation…
was prepared by Henrico County Building Inspection and Plan Review staff and will highlight and provide explanation for the most significant changes in the new codes.
3
DPOR Certification For Contractors & Tradesmen
To receive credit towards certification renewal you must present a photo ID, your current tradesmen certificate and sign the attendance form when you enter and when you leave this seminar.
A Certificate of Attendance will be provided for your records.
Registration records will be forwarded to DPOR and will be maintained by Henrico County for 5 years as required by DPOR regulations.
12/2/2014
3
Questions are Welcomed!!! You are probably not the only person with the same question.
Ask questions when the applicable slide is showing, And our panel will answer them.
There will also be additional time for questions at the end of this presentation.
Questions
5
Follow-Ups
Delinquent permits Case inactive for 63 days
• Follow-up activity automatically generated
• Inspector call or site visit
• Passed follow-up inspection does not close the case
Permit cancelled after 6 months of inactivity and no violations
• Can request permit extensions in writing
If final inspection has not been approved and/or violations are not
corrected a Notice of Violation will be issued
Court if Notice of Violation not satisfied
12/2/2014
4
Phone calls
Generally not required for someone to be on site unless ACCESS is an issue
◦ Security◦ Ladder◦ Locked doors
Phone calls Contact phone numbers
◦ Not office personnel
◦ Someone familiar with the job
Inspector time request for ACCESS purposes ONLY◦ Job to be complete prior to inspection request
◦ AM & PM requests
◦ 30 minute courtesy call
Water & Sewer (open ditches) and concrete placement inspections – we will accommodate as best we can
12/2/2014
5
Virginia Residential Code
The Virginia Residential Code (VRC) combines the 2012
IRC and the 2012 Virginia amendments into one
document
The VRC is published by the International Code Council
Available from w w w. I C C s a f e . o r g
+ =
9
Virginia Fuel Gas Code The Virginia Fuel Gas Code (VFGC) combines the 2012
International Fuel Gas Code and the 2012 Virginia amendments into one document.
The VFGC is published by the International Code Council
Available from w w w. I C C s a f e . o r g
+ =
10
12/2/2014
6
Virginia Fuel Gas Code
Comment s on the con ten t or requ i rement s o f t he new code shou ld be d i rec ted to :
Emory Rodgers
Deputy Director of Building and Fire Regulations
Dept. Of Housing & Community Development
600 East Main Street, Suite 300 Richmond, VA 23219
(804) 371-7000
emory.rodgers@dhcd.virginia.gov
11
Administration
12/2/2014
7
Administration
•The 2012 Edition of the USBC replaces the use of Chapter1 in all 2012 editions of the model codes, unless you have the Virginia versions
•Effective date of the 2012 Edition of the USBC was July 14, 2014
•You may choose to use the 2009 referenced codes until July 13, 2015 , after which the 2012 editions will be the required model codes.
Administration
Referenced Codes:•2012 International Plumbing Code•2012 International Mechanical Code•2011 NFPA 70 (National Electrical Code)•2012 International Fuel Gas Code•2012 International Energy Conservation Code•2012 International Residential Code
12/2/2014
8
Revised definitions
New definitions◦ Most significant new definitions
Chapter 24: Fuel Gas
15
Definitions
Revised definitions
◦ Point of Delivery◦ Regulator, Service Pressure
Chapter 24: Fuel Gas
16
12/2/2014
9
New definitions
◦ Excessive Flow Valve (EFV)◦ Flashback Arrestor Check Valve◦ Third-Party Agency/Certified/Tested◦ Noncombustible Material◦ Combustible Material◦ Combustible Assembly
Chapter 24: Fuel Gas
17
Excessive Flow Valve (EFV):
A valve designed to automatically close or activate when the flow rate of fuel exceeds the valves prescribed flow rate.
Significant Definitions
12/2/2014
10
Flashback Arrestor Check Valve :
A device designed to prevent the backflow passage of one gas into the supply system of another gas also preventing the passage of flame into the gas supply system.
Third-Party Agency/Certified/Tested :
The code has now defined who, how and what the material and products are to go through in order to be determined approved and in compliance with this code.
12/2/2014
11
Combustible Material / Assembly
The code has specifically identified combustible material as anything that is not noncombustible. Floors , walls , ceilings having one or
more components in it not defined as noncombustible (Combustible Assembly)
Noncombustible Material:
The code has defined noncombustible material with 3 specific parameters that are required to be met during testing to deem the material noncombustible.
12/2/2014
12
Chapter 24: Fuel Gas
G2404.7 & 301.11 Flood Hazard
When systems/equipment are installed in a structure that is located in a flood hazard area these sections give direction on where to look in the code for code compliance.
23
General
24
G2404.7 & 301.11 Flood Hazard
G2404.7 IRC Section R322 of the IRC
301.11 IFGC Section 1612 of the IBC
12/2/2014
13
Chapter 24: Fuel Gas
306.5 Equipment and appliances on roofs or elevated structures.
This section has amended some items and added three requirements to the minimum design criteria’s that dictate how and where permanent ladders are to be installed.
25
General
Item #2 Rung spacing (Amended)
24” is the max. distance from the last rung up to the roof or
roof hatch.
A portable ladder shall not be used to access a permanent ladder.
12/2/2014
14
Item #7 Climbing clearance (New)
Item #8 Landing required (New)
Item #10 Access to ladders (New)
30”
Chapter 24: Fuel Gas
G2409.1 & 308.1 Scope
Gypsum board has now been included as a combustible material in this section through the earlier definition of combustible material.
28
Clearance Reduction
12/2/2014
15
Chapter 24: Fuel Gas
Gypsum board is considered to be a combustible material regardless of the type of studs that it is attached to.
29
Clearance Reduction
Chapter 24: Fuel Gas
30
Clearance Reduction
G2409.3.4 & 308.3.4 Clearance from supply ducts. (Listed Central Heating Furnaces)
The clearance from supply duct section has been rewritten for easier understanding. When supply ducts are connected to a listed central heating furnace the supply ducts shall have the same clearances from combustibles as the supply plenum has for a distance of only 3’ beyond the supply plenum.
12/2/2014
16
Chapter 24: Fuel Gas
31
Electrical BondingG2411.1.1 & 310.1.1 CSST
This changes clarifies at what point on the gas piping system the required bonding jumper is to be connected when using CSST gas piping in a system.
The bonding jumper shall connect to the metallic pipe or fitting between the point of delivery and the first downstream CSST fitting.
Chapter 24: Fuel Gas
32
Electrical Bonding
Point of DeliveryFirst CSST downstream
fitting
Bonding Jumper Connection
12/2/2014
17
Chapter 24: Fuel Gas
33
Electrical Bonding
Chapter 24: Fuel Gas
G2412.9 & 401.9 Identification
Each length of pipe & tubing, as well as each fitting being used in a fuel gas system shall bear the identification marks of the manufacture.
34
General
12/2/2014
18
35
G2412.9 & 401.9 Identification
Chapter 24: Fuel Gas
36
G2412.10 & 401.10 Third-Party Testing & Certification
All piping, tubing & fittings shall be tested by an approved third-party testing agency or certified by an approved third-party certification agency.
All piping, tubing and fittings shall comply with the applicable referenced standards, specs and performance criteria of this code.
General
12/2/2014
19
37
G2412.10 & 401.10 Third-Party Testing & Certification
Chapter 24: Fuel Gas
G2415.1 & 404.1 Installation of materialsThe piping system installation section has added language to it that mirrors others sections in the code.
It makes it very clear that all materials shall be installed in STRICT accordance with the standards under which the materials are approved and accepted into the code.
(continued)
38
Piping System Installation
12/2/2014
20
Chapter 24: Fuel Gas
If the installation procedures are not know, than codes states to follow the manufactures installation instructions.
If the referenced standards and manufactures installation instructions of a particular material do not conform to the minimum provisions of this code, than the code is to be followed and applied.
39
Piping System Installation
Chapter 24: Fuel Gas
40
Piping System Installation
G2415.2 & 404.2 CSSTThis section has been added and identifies CSST piping specifically. CSST shall be installed per the manufactures installation instructions, the conditions of its listing and this code.
As in the past the most restrictive requirements are to be followed. If the code has more restrictive requirements than a manufacture’s installation instructions the code overrules and is to be followed. And vise versa.
12/2/2014
21
Chapter 24: Fuel Gas
41
Piping System Installation
G2415.2 & 404.2 CSST
Lets review some important points aboutCSST.
Chapter 24: Fuel Gas
42
Piping System Installation
G2415.2 & 404.2 CSST
It is to be bonded as per 2012 IRC G2411.1.1
For exterior installation, the ends of exposed CSST are to be protected.
Special case hardened nail plates are to be used where applicable when subject to damage.
It is to be installed in a water tight, and properly vented sleeve when installed underground.
12/2/2014
22
Chapter 24: Fuel Gas
43
Piping System Installation
G2415.18 & 404.18 Prohibited devices
A 2nd exception has been added to this section. The code now exempts approved fitting or devices that may reduce the cross sectional area or obstruct the free flow of gas if the gas piping system has been sized to accommodate for the pressure drop caused by such approved devises or fittings.
EFV
Chapter 24: Fuel Gas
44
Piping System Installation
404.11.3 Coating application
The VCC has added this sub-section under the “Protection against corrosion” section in the IFGC only.
The gas piping joints, (fittings to piping) shall not be painted prior to the air test at rough-in stage.
12/2/2014
23
Chapter 24: Fuel Gas
G2417.1.6 & 406.1.6 Pipe clearing
This new section has been added, it requires that prior to testing the gas piping system, that all foreign material be removed from the piping.
45
Inspection, Testing & Purging
Chapter 24: Fuel Gas
G2417.7 & 406.7 Purging
The purging section has been expanded to a greater detail to include purging procedures, and elaborates on which systems may be purged indoors or out.
(continued)46
Inspection, Testing & Purging
12/2/2014
24
Chapter 24: Fuel Gas
It has also added language that addresses the use of Combustible gas indicators at the discharge end to measure the volume of gas being evacuated out of the discharge.
47
Inspection, Testing & Purging
G2417.7 & 406.7 Purging
Chapter 24: Fuel Gas
G2419.4 & 408.4 Sediment trap
The text in this section remains unchanged, but there has been an illustration added so that there is no longer a misunderstanding on how the sediment trap is to be constructed for code compliance.
48
Drips & Sloped Piping
12/2/2014
25
Chapter 24 Fuel Gas.
Bottom-most opening in Tee
Run
Branch
50
INSTALLATION OF SEDIMENT TRAPS
12/2/2014
26
Chapter 24: Fuel Gas
G2421.4 & 410.4 Excess Flow Valves
When and where excess flow control valves are installed, they are required to be listed for the application being used, and shall be sized and installed per manufacture’s instructions.
51
Flow Controls
Excessive Flow Valve (EFV)
Note: That they have a flow direction requirement.
Not required “Yet” .
Good protection during a seismic event.
Provides protection if there is a catastrophic failure of the gas piping system components.
12/2/2014
27
Chapter 24: Fuel Gas
G2421.4 & 410.4 Flashback Arrestor Check Valve
Where and when fuel gas is used with oxygen in any hot work operation, a flashback arrestor/check valve shall be installed at an approved location on both the fuel gas supply line and oxygen supply line side to ensure safe operation.
53
Flow Controls
Flashback Arrestor Check Valve
Note: That they also have a flow direction requirement.
12/2/2014
28
Chapter 24: Fuel Gas
55
Venting of Appliances
The IFGC has added a section specifically for incinerators and gives direction on how they are to be vented.
Incinerators are to be vented in accordance with NFPA 82-09.
503.2.5 Incinerators
Chapter 24: Fuel Gas
G2428.2.9 & 504.2.9 Chimney & vent locations
This section has been revised to address vent systems above the roof line that exceed the required termination height by 5’, this venting may have been extended to meet code compliance from adjacent parapets or walls.
56
Sizing of Category I Appliance Venting Systems
12/2/2014
29
57
Chimney & vent locations
The outdoor portion of the vent shall be enclosed as required by this section for vents not considered to be exposed to the outdoors or such venting system shall be engineered.
Enclose the B-vent when it extends >5’ beyond the
code required termination height above the roof, or
get it engineered.
12/2/2014
30
Chapter 24: Fuel Gas
59
Outdoor Decorative Appliances
G2454.1 & 636.1 General This new section regulates
permanently fixed-in-place outdoor decorative appliances.
Must be installed per the manufacture’s instructions.
The appliance must be test to ANSI Z21.97 Standards.
Questions?