MWM Canada Inc.
Biogas Experience
March 2011
8/14/2019 2011 - Engine - Klammer
2/23
ontent
Plant Examples
2
8/14/2019 2011 - Engine - Klammer
3/23
3
8/14/2019 2011 - Engine - Klammer
4/23
Company History
4
8/14/2019 2011 - Engine - Klammer
5/23
Company History - NEW
5
8/14/2019 2011 - Engine - Klammer
6/23
Company History
6
8/14/2019 2011 - Engine - Klammer
7/23
Engine Product Range 60Hz
7
8/14/2019 2011 - Engine - Klammer
8/23
Sales + Service Centres in Canada and USA
MWM Canada Inc.
210 Willmott St.
Cobourg, ON K9A 4WS
MWMoA
.
MWMoA
Salem Ohio
3883 Steve Reynolds Blvd.Norcross, GA 30093
Ph. (770) 279 6720
8
8
8/14/2019 2011 - Engine - Klammer
9/23
9
8/14/2019 2011 - Engine - Klammer
10/23
How can biogas be used?
x rac on on on ng sage e en ry
Digester Compression unit, gasconditioning and emergency flare
Combined heat and power plant substation
10
8/14/2019 2011 - Engine - Klammer
11/23
Biogas
Biogas consists of:
- Carbon dioxide CO2: 30 - 55%
- Sulphur hydrogen H2S: 5 25,000 ppm Take care
- Humidity H2O: saturatedabout it!
-
11
8/14/2019 2011 - Engine - Klammer
12/23
Critical for Biogas Engines
- Biogas - saturated with almost 100% moisture can cause:
Humidity
- Corrosion
- block pipes, filters,
H2S/Sulphur in the Biogas
- Reduced Oil lubricit
- SOx + H2O > Corrosion
- Deposits in exhaust gas heat exchanger
Clean vs.
12
Deposits +
Corrosion
8/14/2019 2011 - Engine - Klammer
13/23
Critical for Biogas Engines
Humidity - Biogas treatment gas cooling/drying
Active gas cooling:With Cooling Unit
Passive gas cooling:
Longer undergroundbiogas pipe
CHP unit
Example
Gas volume 236 Nm3/h
Elec. power for cooling system 3.6 kW
Investment costs approx. 34,500.- $
8/14/2019 2011 - Engine - Klammer
14/23
Critical for Biogas Engines
H2S Biogas treatment Desulphurization (biological)Internal H2S removal External H2S removal
Theimagecannotbedisplayed.Your computer may nothaveenough memory to open theimage,or theimagemay havebeen corrupted .Restartyour computer,and then open thefileagain.Ifthered x stillappears,you may haveto deletetheimageand then inserti tagain.M Biogas
Biogas
- For low and medium H2S - For hi h H2S contamination\
Air Water
contamination- Consider max. air volume
- H2S reduction is not constant
- The additional air increasecorrosion activity
- H2S reduction is stable
1414
- The additional air increasecorrosion activity
- Higher investment costs
8/14/2019 2011 - Engine - Klammer
15/23
Critical for Biogas Engines
H2S Biogas treatment - Desulphurization
Air dosin view inside a di ester tank
Biological desulphurisation the H2S will
be converted into sulphur
1515Source: MT-ENERGIE
8/14/2019 2011 - Engine - Klammer
16/23
What does a Biogas Engine Cost?
Investment Costs:
- ng ne ouse es gn: e
- Containerized System: 1,100 1,250 $/kWe
- Engine:
- -.
- incl. major overhaul: 7- 8 $/oh
-
- excl. major overhaul: 6.5 - 7.5 $/oh
- incl. major overhaul: 8.5 9.5 $/oh
*) Major Overhaul: after 64,000 operation hours! 16
8/14/2019 2011 - Engine - Klammer
17/23
Container and Engine House design
Seite 1717
8/14/2019 2011 - Engine - Klammer
18/23
18
8/14/2019 2011 - Engine - Klammer
19/23
Biogas Examples
Armstorf, Germany
Biogas: 1 x TCG 2016 V12; 537 kWe
Gut Kletkamp, Germany
Biogas: 1 x TCG 2016 V12; 537 kWe
,
Biogas: : 1 x TBG 616 V16 K; 647 kWe
19
8/14/2019 2011 - Engine - Klammer
20/23
Biogas Examples in Ontario (under construction)
Maryland Farms, Reaboro/Lindsay
1 x TCG 2016 V12; 500kWe
on a ner ze n
Kirchmeier Farms, St. Isidore
1 x TCG 2016 V12; 500kWe
,
1 x TCG 2016 V12; 500kWe
CHP Unit in Engine House
20
8/14/2019 2011 - Engine - Klammer
21/23
21
8/14/2019 2011 - Engine - Klammer
22/23
22
8/14/2019 2011 - Engine - Klammer
23/23
Contact information:
Gerhard Klammer - CEO
MWM Canada Inc.
210 Willmott St., Unit 4B
Cobourg, ON
P.O. Box 1120, K9A 4W5
Ph: +1 905 377 1273
Cell: +1 716 238 3534ax:
E-mail: gerhard.klammer@mwm.net
www.mwm.net
23