2009 Capital Plan - Construction Industry Federation · –National Forensic Mental Health Services...

Post on 22-Jul-2020

1 views 0 download

Transcript of 2009 Capital Plan - Construction Industry Federation · –National Forensic Mental Health Services...

HSE Capital Development

Jim Curran

Head of Estates

HSE

Infrastructure and Capital Investment 2015-2019 Headlines

Capital Allocation €312m for 2015

Increased allocation in 2016 to 2018 for New Children’s Hospital

Priority Projects – New Children's Hospital

– National Forensic Mental Health Services

– NMH to SVUH

– Radiation Oncology

– Primary Care Centres

– Community Nursing Units

National Children’s Hospital

National Children’s Hospital

Planning Permission expected by end of 2015

Construction to commence in Q1 2016

Separate enabling works packages will be tendered in 2015

National Forensic Mental Health Services

National Forensic Mental Health Services

Planning Permission expected by end of Q1 2015

Project will be tendered in Q2 2015

Construction to commence in Q4 2015

24 month construction programme

National Maternity Hospital to St. Vincent’s University Hospital

Campus

National Maternity Hospital to St. Vincent’s University Hospital Campus

Design Team appointed

Design and planning period: 2 years

Phase 1 Construction of Decant building and site enabling works

Phase 2 New Maternity Hospital

National Radiation Oncology Programme

National Radiation Oncology Programme

Developments in Cork and Galway

Enabling works underway

Main project will be tendered by end of Q2 2015

Construction to commence in Cork Q3 2015 and in Galway by end of Q2 2016

Replacement of 2 Linac in St Luke’s, Rathgar to cater for anticipated demand in Dublin area on an interim basis.

Primary Care

Primary Care

Three Delivery Methods being used

– Capital Plan (14 PCC in current capital plan)

– PPP (14 locations included in ITN)

– Operational Lease (AFL’s signed for 28 PCC and letter of intent issued for 34 PCC’s)

52 PCC have been developed since 2006

Community Nursing Units

Community Nursing Units

Need to upgrade/replace existing units to meet HIQA accommodation standards

Also need for additional capacity

Total investment of €800m required

Funding for the design of 14 CNU’s included in current capital plan

Other Projects

Hospital Developments

Community Residential Units (Mental Health and Disability Services)

Ambulance Bases

Procurement Methods

Compliance with EU and National Procurement Directives

Works Category

– Minor Works (<€0.5m)

– Under EU Threshold

– Above EU Threshold

Minor Works Framework

E Tenders

Procurement Methods

Works designed by Employer

Design Build Projects

PPP Projects