17 - it3D summit 2016 - ga - rémi visière

Post on 13-Apr-2017

66 views 0 download

Transcript of 17 - it3D summit 2016 - ga - rémi visière

Rémi VISIERE, Groupe GA

Summary

• A short story about • The Process• Case Study : Campus Thales Bordeaux

– Some numbers …– The FullBIM Process in action– From Worksite to Facility Management

• Some Visuals– The global BIM project– Timelapse of the Construction

• Forecasts

A short story about

From XIXth century …

was founded in 1875

Our Core Activity :

Turnkey Solutions for Real Estate

Our Organization :

Vertically integrated Group from Architecture to Asset Management

Headquarters – Group GA – Toulouse (FR)Credits : Darreux Jean

Key elements

Key numbers Our process Where are we from ?

LYON

NANTES

BORDEAUX

COLMAR

L’AIGLE

ROUEN

TOULOUSE

PARIS

FACTORIESCOMMERCIALS

The Process

The FullBIMProcess

We defined an Open StandardBIM Protocolbased on IFC files exchangeto allow every actorto take part efficientlyin the project

Case StudyCampus THALES Bordeaux

Case study

Some numbers …

Project+ 60 000 m²

Over 9 buildings

WorksiteConcrete 35300 m3

Rebars 2780 T

About 35a

On field+ 25 subcontractors

+ 300 people

18 months

Structural designUp to 5 engineers

Up to 10 draftsmen

11 months

Case studyThe FullBIM process in action

Structure

Civil

ArchitectureMEP

CustomerBIM ManagementTeam

Needs

BIM protocol

Case studyThe FullBIM process in action

Modelling toolsBIM

Management tools

CheckedMaster Model(Native + IFC)

BCF forModel clashes& instructions

Author native models+ IFC exports

Allowthis

Toavoid

this

Case studyFrom Worksite to Facility Management

Some visuals

The Global BIM Project

Timelapse of the Construction

Forecasts

BIM & VR for Decision-makers

BIM & MR for Design and Collaboration

BIM & MR for Facility Management

Questions

Rémi VISIERE, Groupe GA