Post on 21-Jan-2021
Table of Contents Index
166-369A Update Installation
NTA607HD or NTA2007HD6 Meter No-Till Air Drills
Manufacturing, Inc.www.greatplainsmfg.com
EN
Read the update manual entirely. When you see this symbol, thesubsequent instructions and warnings are serious - follow withoutexception. Your life and the lives of others depend on it!
Illustrations may show optional equipment not supplied with standard unit.
32109
© Copyright 2011 Printed 05/25/2011 166-370M
Table of Contents Index
Table of Contents Index
Table of Contents Index
Great Plains Manufacturing, Inc. Cover Index iii
Table of Contents
Important Safety Information ......................................1General Information .....................................................3Related Documents........................................................3Notations and Conventions ............................................3
Call-Outs ....................................................................3Tools Required ...............................................................4Regarding Parts .............................................................4
About New Parts ........................................................4About Existing Parts ...................................................4
Pre-Assembly Preparation .............................................4Work Location ............................................................4
Update Underside Weldments ....................................5Configure Implement ......................................................5Tack Rear Bottom Gussets ............................................5
LH Rear Bottom Gussets............................................5RH Rear Bottom Gussets ...........................................6
Install Nut Blocks............................................................7Install LH Nut Block ....................................................7Install RH Nut Block....................................................7Finish Weld Blocks and Gussets ................................7
Install Box Plates............................................................8Install Corner Gussets....................................................8Disconnect Implement .................................................9Prepare Implement.........................................................9Disconnect Primary Hoses .............................................9Clear Weight Transfer Cylinders ..................................10Clear Link Lift Cylinders ...............................................10Recover Pull Link Components ....................................11Release Lift-Assist Link ................................................11Uncouple Cart ..............................................................12Remove Pull Link .........................................................12Dismount Hoppers .....................................................13Disconnect Sensors and Chain ....................................13
Disconnect Level Sensors ........................................13Dismount Rate Sensor .............................................13Dismount Final Drive Chain......................................13
Dismount Meters ..........................................................14Disconnect Meter Inlet Elbows .................................14Remove Meters ........................................................14
Hoist Hoppers...............................................................15Release Hopper Mount.............................................15Remove Hopper Assembly.......................................15
Update Meters.............................................................16Remove Existing Top Seal ...........................................16
Remove Meter Flute Shaft ........................................... 16Remove Old Flanges ............................................... 16
Enlarge Mounting Slots................................................ 17Drill Weep Holes .......................................................... 17Install Meter Seal Flange ............................................. 18Replace Meter Shaft Mount Plates .............................. 18
Replace Right End Plates ........................................ 18Replace Left End Plates........................................... 19Install New Top Seal ................................................ 19
Update Cart................................................................. 21Cart Frame Update Overview ...................................... 21
Rear Gusset Plates (page 22).................................. 21Front Gusset Triangles (page 23) ............................ 21Pull Bar Anchors (page 25) ...................................... 21Meter Mount Tabs (page 27).................................... 21
Install Rear Gussets..................................................... 22Install Left Rear Gusset............................................ 22Install Right Rear Gusset ......................................... 22
Install Front Gussets .................................................... 23Install Right Front Gusset......................................... 23Install Left Front Gusset ........................................... 23
Install Pull Bar Attach Points........................................ 24Install Pull Bar Plate ................................................. 24Install Pull Bar Anchors ............................................ 25
Install Left Anchor ................................................ 25Install Right Anchor .............................................. 25
Update Meter Mounts .................................................. 26Position New Meter Mounts ..................................... 26
Prepare Tab Welding Sites .................................. 26Mark Tab Welding Sites ....................................... 27
Attach New Front Tabs ............................................ 27Install New Meter Mounts......................................... 27
Re-Install Meters.......................................................... 28Install Hopper Supports............................................ 28
Install Pull Bars ............................................................ 28Assemble Pull Bars .................................................. 28Attach Pull Bars........................................................ 29
Update Cart Hydraulics................................................ 30Route Dedicated Fold Hose ..................................... 32Mark Dedicated Fan Hose ....................................... 32Re-Route Fold Hose ................................................ 32Disconnect Bypass Hose ......................................... 32Re-Configure Inlet Fittings ....................................... 32Re-connect Fan Hoses ............................................ 32
Re-Install Hoppers ....................................................... 33
05/25/2011 Cover Index 166-370M
© Copyright 2011 All rights Reserved
Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has beentaken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed fordamages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products asit sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.
Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.Registered Trademarks of Great Plains Manufacturing, Inc. include:
Air-Pro, Clear-Shot, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand, Whirlfilter, Yield-Pro.Brand and Product Names that appear and are owned by others are trademarks of their respective owners.
Printed in the United States of America
iv NTA607HD, NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Align Meters ............................................................. 33Re-Install Final Drive Chain ..................................... 34Re-Connect Inlets/Outlets ........................................ 34Re-Install Gears ....................................................... 34Re-Install Sensors.................................................... 34
Update Hopper Lids ..................................................... 35Update Implement Frame .......................................... 36Dismount Lift-Assist ..................................................... 36
Disconnect Lights..................................................... 36Release Lift Link ...................................................... 36Dismount Parallel Arms............................................ 37Remove Pull Link ..................................................... 37
Update Rear Link Anti-Rotation ................................... 37Update Wing Pivot Anti-Rotation ................................. 38Update Wing Pivot Extension Tops ............................. 39
Update Front Extension Tops .................................. 39Update Rear Extension Tops................................... 40
Update Harness.......................................................... 41Dismount Existing Harnesses ...................................... 41Enumerate WSMBs ..................................................... 42Install WSMBs.............................................................. 43
Mount Center WSMBs ............................................. 43Mount Tower B WSMB......................................... 43Mount Tower C WSMB ........................................ 43
Mount Wing WSMBs................................................ 44Mount Tower A (Left Wing) WSMBs .................... 44Mount Tower D (Right Wing) WSMBs.................. 44
Install Row Harnesses ................................................. 45Connector ID............................................................ 45Connect WSMB #1 .................................................. 46Connect WSMB #4 .................................................. 47Connect WSMB #2 .................................................. 48Connect WSMB #5 .................................................. 49Connect WSMB #3 .................................................. 50Connect New WSMB #6 .......................................... 51
Install Rear Pull Link.................................................. 52Pin Link to Main Frame ................................................ 52Connect Lift-Assist Link ............................................... 52Connect Lift Assist ....................................................... 53Re-Install Parallel Arms ............................................... 53Re-Connect Lights ....................................................... 53Update Implement Hydraulics .................................. 54Extend Valve Hoses..................................................... 54Relocate Valve Group.................................................. 54Protect Hose Extensions.............................................. 55Re-Hitch Implement ................................................... 57Install Front Pull Link.................................................... 57Re-Connect Lift Link .................................................... 57Connect Cart and Implement ....................................... 58Re-Install Link Components......................................... 58
Store Spacers .......................................................... 58Store New Lift Pins .................................................. 58
Re-Install Link Lift Cylinders ........................................ 59
Re-Install Weight Transfer Cylinders............................59Route Hoses and Harnesses........................................60
Hose ID for Pull Link Clamping.............................61Connect Hoses and Harnesses....................................61Update Markers...........................................................62Remove Tension Spring ...............................................62Release Swing Pivot.....................................................62Release Cylinder ..........................................................62Remove Arm.................................................................62Remove Old Pivot Frame .............................................63Install New Pivot Frame................................................63Re-Install Arm...............................................................64Re-Attach Spring ..........................................................64Update Coulters..........................................................65Prepare Implement .......................................................65Replace Coulter Bars ...................................................65
Remove Existing Bar ................................................65Install New Bar..........................................................66
Close-Out ....................................................................67Reconfigure Monitor .....................................................67Appendix A - Reference Information ........................68Chain Setup..................................................................68
Chain Clip Orientation...............................................68Chain Slack...............................................................68
Torque Values Chart ....................................................69Hydraulic Connectors and Torque................................70Appendix D - Drawings ..............................................71160-795D PIN RETAINER TAB....................................71160-801D FRAME NUT BLOCK...................................72160-802D FRAME EXT BOT GUSSET LH REWORK .73160-803D FRAME EXT BOX PLATE ...........................74160-804D FRAME EXT BOT GUSSET LH REWORK .75160-805D FRAME EXT BOT GUSSET REWORK......76160-806D FRAME EXT BOT GUSSET REWORK.......77160-807D FRAME EXT CORNER GUSSET................78160-808D FRAME EXT 100 DEG GUSSET.................79160-809D FR EXT 100 DEG GUSSET REWORK .......80160-810D FR EXT 100 DEG GUSSET REWORK .......81160-811D WING HINGE PIN ROTATION STOP .........82Appendix G - Glossary...............................................83Part Descriptor Abbreviations.......................................83Appendix H - Harness ................................................85Tower ID .......................................................................85Secondary Hose Routing, 40-Row ...............................86
Turrets, 40-Row, Double-Shoot, Seed..................86Turrets, 40-Row, Double-Shoot, Fertilizer ............87
Harness (LH) ................................................................88Appendix P - Part Lists ..............................................90
Existing Parts Affected..............................................90166-369A New Parts.................................................94
Index ............................................................................97
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 1
Important Safety Information
Look for Safety SymbolThe SAFETY ALERT SYMBOL indicates there is apotential hazard to personal safety involved and extrasafety precaution must be taken. When you see thissymbol, be alert and carefully read the message that fol-lows it. In addition to design and configuration of equip-ment, hazard control and accident prevention aredependent upon the awareness, concern, prudence andproper training of personnel involved in the operation,transport, maintenance and storage of equipment.
Be Aware of Signal WordsSignal words designate a degree or level of hazard seri-ousness.
DANGER indicates an imminently hazardous situationwhich, if not avoided, will result in death or serious injury.This signal word is limited to the most extreme situations,typically for machine components that, for functional pur-poses, cannot be guarded.
WARNING indicates a potentially hazardous situationwhich, if not avoided, could result in death or seriousinjury, and includes hazards that are exposed whenguards are removed. It may also be used to alert againstunsafe practices.
CAUTION indicates a potentially hazardous situationwhich, if not avoided, may result in minor or moderateinjury. It may also be used to alert against unsafe prac-tices.
Possible Chemical Hazard:Have chemical gloves, respirator and goggles available. Haveclean wash water available. Have the MSDSa available forrecently applied dry fertilizer. This installation requires dis-connecting one or two meters. Fertilizer can be hazardous,and can cause lung irritation, respiratory distress, sickness orpoisoning. Know what steps to take if adverse exposure occurs.
Prepare for Emergencies▲ Be prepared if a fire starts.
▲ Keep a first aid kit and fire extinguisher handy.
▲ Keep emergency numbers for doctor, ambulance, hospitaland fire department near phone. Have contact numbersavailable.
a. MSDS: Material Safety Data Sheet
05/25/2011 Table of Contents Index 166-370M
2 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Avoid High Pressure Fluids
High Pressure Fluid Hazard:Wear gloves and goggles when opening hydraulic connections.Use cardboard to check for leaks. This update requires open-ing existing hydraulic connections. Pre-installation steps maynot relieve all residual pressure. This update requires makingnew hydraulic connections. Check for leaks carefully. If anaccident occurs, seek immediate medical assistance from aphysician familiar with this type of injury.
Sharp Object Hazard:Be careful working near openers. Discs are sharp.
Be Familiar with Safety Decals▲ Read and understand the “Safety Decals” in the Operator
manual.
▲ Read all instructions noted on the decals.
▲ Keep decals clean. Replace damaged, faded and illegibledecals.
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 3
General Information
These instructions explain how to update multiple drillcomponents. The kit improves drill durability in extremelychallenging conditions, and adds some convenience fea-tures.
One kit updates drill. Applies to models:NTA607HD-4006 Option 72NTA2007HD-4006 Option 72
These instructions apply to an installation of:
• This kit applies only to dual-hopper (Option 72) drills.It does apply to single-hopper models (whether single150 bu or single 82 bu with liquid fertilizer tanks). Thekit is not fully documented for 64-row drills.
• This kit is not required for drills manufactured afterMay 2011. If the lower pull-bars are present, kitfeatures are already installed.
• This kit is not required for any NTA607- or NTA2007-(non-HD) drills.
Related DocumentsHave your drill Operator and Parts manuals available forimplement operations and parts identification. Have thePre-Delivery manual available for disassembly.
All of the above drill manuals, including Pre-Delivery, areavailable as PDF files on the Great Plains web site:Manuals > No-Till Drills > No-Till Air Drills >NTA607HD & NTA2007HD No-Till Air Drill
Notations and Conventions
Call-Outs
Kit Kit Description166-369A 6 Meter No-Till Air Drill
Figure 1Kit Installed
32109
916
91
166-283M NTA607HD/2007HD Operator166-283P NTA607HD/2007HD Parts110011512 ACC (Air Cart Control) User Level 2/3110011544 NTA607HD Quick Setup Guide166-283Q NTA607HD/2007HD Pre-Delivery113-850M 20ft Swing-Arm Marker Installation
“Left”/LH and “Right”/RH are facing inthe direction of machine travel. An ori-entation rose in the line art illustrationsshows the directions of Left, Right,Front, Back, Up, Down.
to to
Single-digit or single-letter callouts identifycomponents in the currently referencedFigure. These numbers may be reused fordifferent items from page to page.
to Three-digit callouts in the range 101 to 239reference existing parts from the list onpage 90.
to Three-digit callouts in the range 900 to 982reference new parts from the list on page 94.
U
DL
R
B
F
1 9
a z
101 239
900 982
05/25/2011 Table of Contents Index 166-370M
4 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Tools Required• suitable tractor for lowering and unfolding drill• hoist or other lifter with a capacity of at least
300 kg (660 pounds)• jacks, supports or stands with a capacity of 1500 kg
(3500 pounds), for rear frame support• fire extinguisher• wire or rod welder, and welding safety equipment• ground (earthing) rod, cable and clamp (or access to
suitable electrical safety ground reference conductor)• welding blankets• silicone sealant• clamps (for welding), covering sizes:
13 mm (1⁄2in)2.5 cm (1.0 in)21 cm (8.25 in)27 cm (10.5 in
• MSDSb for fertilizers recently applied• chemical safety equipment (see DANGER on page 1)• vehicle jack• fish line for pulling hydraulic hose through tongue• cutting wheel or grinder suitable for enlarging a slot
from 9 mm to 13mm wide• basic hand tools, including drill bit size:
6 to 7 mm (1⁄4in, letter size E)• Great Plains 821-001C green spray paint,
or green exterior enamel close to Pantone 356C,DuPont 262 or PPG 43817
Pre-Assembly Preparation1. Perform a clean-out of both hoppers. This update
requires meter removal.
Work Location
2. Move the drill to a location with:
b. Material Safety Data Sheet - consult the fertilizer supplier
• ample room to unfold and separate the implementfrom the cart
• adequate illumination• a surface that is non-flammable, and has no
deposits or residues of flammable substances• clear surface beneath for recovery of any falling or
dropped parts
Regarding Parts
About New PartsTo aid in part identification, engineering drawings formany new parts are included in “Appendix D - Draw-ings”, pages 71 to 82.
After identifying a new part, just prior to installation,remove and discard any tape or tags with part numbersthat might interfere with installation. Part numbers notremoved, or applied with grease or paint pencil, may beremoved at close-out.
A number of new cotter and roll pins are provided. Useas needed when saved parts are unserviceable.
A large number of cable ties are provided. Use asneeded to secure cables and hoses. They are not calledout at every step.
About Existing PartsThis kit relies on re-use of some parts. Follow “removeand save” instructions carefully. Parts that are “notre-used” may be salvaged or discarded. They are notreturned to Great Plains.
High Pressure Fluid Hazard:Wear gloves and goggles when opening hydraulic connections.Use cardboard to check for leaks. This update requires open-ing existing hydraulic connections. Setting circuits to Floatmay not relieve all residual pressure. This update requiresmaking new hydraulic connections. Check for leaks carefully.If an accident occurs, seek immediate medical assistance froma physician familiar with this type of injury.
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 5
Update Underside Weldments
Refer to Figure 2Gussets, nut blocks and a box plate are added to theunderside of the wing pivot extensions (4 , locations,two on each wing). This work is considerably easier withthe implement folded, and needs to be done prior tocart-implement separation.
Configure Implement3. Raise, fold and configure as if for transport (lift locks
and wing fold locks installed). Set all hydraulicremotes to Float to relieve pressure in lines.
4. Disconnect all harnesses and cables at cart hitch.
5. Take steps to protect hoses and cables near weldregions. Cover with welding blankets, or temporarilyremove, as needed.
Tack Rear Bottom Gussets
LH Rear Bottom GussetsStart with the left (LH) side. The left and right side newparts are not identical, although they are similar andinstall in mirror-image locations.
Crushing Hazard:Remove only the underside bolts. Do not remove thecross-bolts or the top side bolts. Removing all the fasteners ata joint could allow a dangerous joint separation resulting inserious injury or death, and extensive machine damage.
Refer to Figure 26. At the Back wing pivot extension joint , remove
two sets:803-027C NUT HEX 3/4-10 PLT804-023C WASHER LOCK SPRING 3/4 PLT802-910C RHSNB 3/4-10 X 2 GR5 PLT
Save the washer . The nut and bolt arenot re-used.
Refer to Figure 37. Select one each new:
160-804D FRAME EXT BOT GUSSET LH REWORK160-805D FRAME EXT BOT GUSSET REWORK
Hold these in their intended positions. Mark paint forremoval.
8. Remove paint. Tack weld gusset plates in position.Plate is to implement front, against the existingsmaller gusset. Plate is to implement rear,against the existing smaller gusset. Place both asclose to the joint and up against the wing as allowedby pre-existing weld fillets.
Equipment Damage Risk:Disconnect all electrical connections between cart and tractorprior to welding. Welding can induce high voltages and/orhigh current flows that could damage sensors, WSMB andWSMTs on the cart or implement.
Figure 2Underside Work Locations
Q0113
F B
D
UF B
174
190
179B F
Figure 3LH Rear Underside Gussets
Q0120
908
909B
179
190
174
190 179 174
908
909
908
909
05/25/2011 Table of Contents Index 166-370M
6 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
RH Rear Bottom Gussets
Crushing Hazard:Remove only the underside bolts. Do not remove thecross-bolts or the top side bolts. Removing all the fasteners ata joint could allow a dangerous joint separation resulting inserious injury or death, and extensive machine damage.
Refer to Figure 49. At the Back wing pivot extension joint , remove
two sets:803-027C NUT HEX 3/4-10 PLT804-023C WASHER LOCK SPRING 3/4 PLT802-910C RHSNB 3/4-10 X 2 GR5 PLT
Save the washer . The nut and bolt arenot re-used.
Refer to Figure 510. Select one each new:
160-802D FRAME EXT BOT GUSSET LH REWORK160-806D FRAME EXT BOT GUSSET REWORK
Hold these in the their intended positions. Markpaint for removal.
11. Remove paint. Tack weld gusset plates in position.Plate is to implement front, against the existingsmaller gusset. Plate is to implement rear,against the existing smaller gusset. Place both asclose the joint and up against the wing as allowedby pre-existing weld fillets.
Figure 4Remove RH Fasteners
Q0113
174
190
179
B F
B
179
190
174
190 179 174
Figure 5RH Rear Underside Gussets
Q0120
906910
906
910
906
910
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Underside Weldments 7
Install Nut Blocks
Install LH Nut BlockRefer to Figure 612. Select one new:
160-801D FRAME NUT BLOCKThis nut block replaces the removed individualnuts . Prepare the site for welding. Using the nutblock as a template, mark an area for a width of atleast 5 cm (2 in) along the edges of the block.Remove the paint from the pivot extension plate.
13. Select two new:802-064C HHCS 3/4-10X2 GR5
and two saved:804-023C WASHER LOCK SPRING 3/4 PLT
Hold the nut block in place with the boltsand lock washers . Tack weld the nut block to thewing and the new gussets ( and ).
Install RH Nut BlockRefer to Figure 714. Select one new:
160-801D FRAME NUT BLOCKThis nut block replaces the removed individualnuts . Prepare the site for welding. Using the nutblock as a template, mark an area for a width of atleast 5 cm (2 in) along the edges of the block.Remove the paint from the pivot extension plate.
15. Select two new:802-064C HHCS 3/4-10X2 GR5
and two saved:804-023C WASHER LOCK SPRING 3/4 PLT
Hold the nut block in place with the boltsand lock washers . Tack weld the nut block to thewing and the new gussets ( and ).
Finish Weld Blocks and Gussets16. Back off all four of the new bolts until the
threads are just emerging from the nut blocks .This protects the block threads from weld splatter,and leaves the bolts loose for checking.
17. Finish weld the gussets ( , , and ) allaround (as accessible) with a fillet of 7 mm (1⁄4 in.).Finish weld the nut blocks along any accessibleedges.
18. Clean off any slag and weld splatter.
Figure 6LH Nut Block
Q0119
905 190
943
905
905
179
943
190
905 943
190
908 909
Figure 7RH Nut Block
Q0120
905190
943
905
905
179
943
190
905 943
190
906 910
943
905
906 908 909 910
905
05/25/2011 Table of Contents Index 166-370M
8 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Install Box PlatesRefer to Figure 819. Select two new:
160-803D FRAME EXT BOX PLATEPosition each plate to fully enclose the space defineby the new gussets, the existing joint plate and thewing rear tube. Tack weld in place.
20. Finish weld all around on each box plate.
21. Clean off any weld splatter and slag.
22. Remove or mask the new bolts . Paint the newgussets and each entire welded area green.
23. Insert the new bolts . Tighten to Grade 5 torquespecification.
24. Re-connect any hydraulic hoses or cables removedfor weld protection. They may be required for unfold-ing and lowering.
Install Corner GussetsRefer to Figure 9The corner gussets are added near the jointbetween the wing and the pivot extensions, at the junc-tion between the rear-most (longer) of the existinggussets , and the front-to-back wing tie plate .
25. Remove paint at the plate and gusset edges wherethe corner gussets are to be installed.
26. Select two new:160-807D FRAME EXT CORNER GUSSET
Tack weld each at the plate/gusset junctions.
27. Finish weld with a fillet of 9 cm (3⁄8 in.).
28. Clean off all weld splatter and slag. Paint green.
Figure 8Box Plate
Q0120
907
907
943
943
Figure 9Corner Gusset
Q0121
911
12911
1 2
911
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 9
Disconnect Implement
The pull link that is the hitch between implement andcart is replaced during this update. Removing the old linkearly eases access for cart and implement updates.
Prepare Implement29. Re-connect all harnesses and cables at cart hitch.
30. Raise and unfold the implement.
31. Set jacks or stands under the rear mainframe, underthe weights. Set their height to slightly higher thanthe lowered position of the frame.
32. Lower the implement.
33. Set all hydraulic remotes to Float to relieve pres-sure.
34. Connect jack to tongue. Unhitch tractor. Disconnectall electrical connections between tractor and cart.
35. Adjust tongue height with jack until bottom edges ofhitch side plates are level.
Disconnect Primary HosesRefer to Figure 1036. Verify that each primary air hose , at the meter
end, is marked with the letter of the port to which itis connected. If any markings are missing, write theport letter on tape, and wrap it around the hose.
37. The the meter outlets, loosen eight:800-180C 2 1/2 AIR HOSE BAND CLAMP
Slide these clamps several spirals onto to thehoses . Re-tighten the clamps enough to pre-vent loss. Pull the hoses off the meter outlets.
Equipment Damage Risk:Disconnect all electrical connections between cart and tractorprior to welding. Welding can induce high voltages and/orhigh current flows that could damage sensors, WSMB andWSMTs on the cart or implement.
106
Figure 10Primary Air Hoses at Meters
Q0114
159
132
132
159
159
132
05/25/2011 Table of Contents Index 166-370M
10 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Clear Weight Transfer CylindersRefer to Figure 1138. At the bulkhead at the left rear of the cart, unplug
all hydraulic hoses and cables. Some cable con-nects may not be at the bulkhead.
39. At the cart-implement pull link, remove and savetwo sets of base end pins of the weight transfer(upper) cylinders :
2A0132 MW PIN CLIP2A0206 MW PIN SHORT
40. Release the cylinder hoses from any clamps on thepull link.
41. At the rod ends of the weight transfer cylinders,remove and save two sets:
2A0132 MW PIN CLIP805-124C PIN CLEVIS 1 X 3 11/16 GR5 PLT
42. Lift the cylinders810-219C CYL 3.5X16X2 ROD (TIE ROD)
off the pull link and rest them on the implementframe. It may not be necessary to disconnect theirhoses.
Clear Link Lift CylindersRefer to Figure 1243. Release the cylinder hoses from any clamps on the
pull link.
44. Remove and save the clevis pins at each end of the(lower) pull link lift cylinders :
2A0132 MW PIN CLIP805-124C PIN CLEVIS 1 X 3 11/16 GR5 PLT
45. Lift the cylinders810-170C CYL REP 3.5X10X1.25 ROD (TIE)
off the pull link and rest them on the implementframe. It may not be necessary to disconnect theirhoses.
46. At the lift lugs , remove and save two sets:805-104C PIN COTTER 3/16 X 1 1/2 PLT805-187C PIN CLEVIS 1 X 2 1/4 GR5 PLT
then remove and save the lugs:160-754D NTA607 PULL LINK CYLINDER LUG
Figure 11Clear Weight Transfer Cylinders
Q0047
1
197
141
140
2061
206
141
140
141
197
Figure 12Clear Link Lift Cylinders
Q0129
205
115
199
195
141197
206
205
141
197
205
115
195
199
115
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Disconnect Implement 11
Recover Pull Link ComponentsRefer to Figure 1347. Remove and save all clamps and their fasteners:
502-068D HYD HOSE CLAMP BRACKET800-052C HOSE CLIP 5/8 I.D.800-064C HOSE CLIP 13/16 ID802-007C HHCS 5/16-18X3/4 GR5802-012C HHCS 5/16-18X1 1/2 GR5802-115C HHCS 5/16-18X2 GR5804-009C WASHER LOCK SPRING 5/16 PLT
plus the:160-760D TRANSPORT LOCK PIN 1 X 8.25160-763D NTA607HD PIN STORAGE BRACKET
Release Lift-Assist LinkRefer to Figure 1448. Verify that there is no tension at the connection
between the lift-assist link and the front pull linklug .
49. Remove and save one roll pin and washer:805-117C PIN ROLL 1/4 X 2 1/2 PLT804-117C WASHER FLAT 1/4 HARD ASTMF436
then the link pin and remaining washer160-781D PIN 1 1/2 X 4 USABLE 1045804-117C WASHER FLAT 1/4 HARD ASTMF436
Figure 13Clamp Recovery
Q0068
156
158184
169 155
164
117
116
156
155
165 184
158184
155
156
158
164
165
169
184
116
117
Figure 14Lift-Assist Link
31423
112
106
196
194
118194196
112
106
196
194
118
194
05/25/2011 Table of Contents Index 166-370M
12 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Uncouple CartRefer to Figure 1550. At the forward (cart) end of the pull link , remove
and save two roll pins:805-255C PIN ROLL 3/8 X 2 1/2 PLT
51. Support the weight of the pull link front end (or theweight of the entire link), then remove and save two:
160-323H PIN WLDMNT 1.25 X 15.66 NR
Remove Pull Link
Pinch / Crush Hazards:Use an adequate hoist or lifter. Use three or more lines. Placelines where they cannot slip. The weldment weighs over270 kg (600 pounds).
Refer to Figure 1652. Remove and save two roll pins and washers:
805-255C PIN ROLL 3/8 X 2 1/2 PLT804-039C WASHER FLAT 1 1/4 SAE PLT
53. Support the weight of the pull link . Remove andsave two pivot pins:
160-201H WING PIVOT PIN WELDMENT
54. Remove the weldment:160-315H NTA607HD FRONT PULL LINK WLDMT
This weldment, and its bushings, are not re-used.It is replaced by a new 160-315H weldment atstep 331 on page 57.
Figure 15Pull Link at Cart
31422
110
110
200
200
106
106
200
110
Figure 16Remove Pull Link
Q0129
106
193104200
106
200
193
106
104
106
902
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 13
Dismount Hoppers
Hoppers and their mount, are removed to:
• provide clearance to install new hopper braces;• protect the hoppers from welding damage; and,• ease update of meter supports.The hoppers must be empty.
Supports are required. If an original export shipping rackis available, it would be ideal. Otherwise, provide twowide or four narrow supports of equal height, at least33 cm (13 in.) in height.
Disconnect Sensors and ChainDisconnect Level Sensors
Refer to Figure 1755. At each hopper, disconnect the hopper level sensor
lead from the air cart harness .
Dismount Rate Sensor
Refer to Figure 1856. At the left end of each meter box, disconnect the
sensor’s anti-rotation strap ( , not visible in Figure),from the sensor mount .
57. Cut the cable tie .
58. Loosen the thumbscrew .Swing away the rate sensor .Re-tighten the thumbscrew to prevent loss.
59. Remove and save two pins:805-155C PIN WIRE RETAIN 5/16 X 2 1/2
60. Remove and save both gears:168-243D GEAR 54 TOOTH QUICK CHANGE808-192C GEAR 17 TOOTH QUICK CHANGE
Dismount Final Drive Chain
Refer to Figure 1961. At the right end of each meter, loosen the final drive
idlers . Lift the chain off the meter inputgear . It is not necessary to remove the chainentirely. The sprocket is left installed.
Figure 17Hopper Level Sensor Lead
Q0101
151146
Figure 18Rate Sensor
31373
198
198145
162
204
130157
2139
146 151
2
162
157
162
145
198
130
204
Figure 19Final Drive Chain
Q0033
129
221102
221 102
129
05/25/2011 Table of Contents Index 166-370M
14 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Dismount MetersDisconnect Meter Inlet Elbows
Refer to Figure 20 and Figure 2162. At the meter inlets, loosen each clamp . Slide it
well onto the elbow . Re-tighten enough to pre-vent clamp loss. It may be difficult to remove elbowsuntil the meter is freed in its mounts.
63. Close the meter chute (not shown).
Remove Meters
Pinch / Crush Hazards:Use a jack or at least two strong people. The meter assemblyweighs up to 78 kg (171 pounds), with chute installed.
Refer to Figure 21 (depicting a meter with chute removed)64. Loosen the six nuts that secure the meter to
its mounts . Pull the meter back from theelbows .
65. With the loose bolts still in place, allow the meter todrop in the vertical slots of the mount. If it does notdrop, this suggests that the meter vent tubes havebonded to the vent structure inside the hopper.
66. With the meter freed from the hopper vent structure,support the full weight of the meter. At each meter,completely remove six sets (not all shown):
803-014C NUT HEX 3/8-16 PLT804-013C WASHER LOCK SPRING 3/8 PLT804-011C WASHER FLAT 3/8 USS PLT802-155C RHSNB 3/8-16X1 1/4 GR5
These fasteners are replaced by new 1⁄2in fastenersat step 158 on page 28.
67. At the rear end of the existing meter mounts ,remove and save six sets (not shown):
803-020C NUT HEX 1/2-13 PLT804-015C WASHER LOCK SPRING 1/2 PLT802-082C HHCS 1/2-13X1 3/4 GR5
and the two:266-174D METER BOX MOUNT
The mount is not re-used.
Figure 20Meter Hoses
31149
160219
124
160
219
Figure 21Lowering Meter on a Jack
Q0030
124219
160
176 138
Confined Space and Agricultural Chemical Hazards:If the meter vents have bonded to the hopper vent structure,hopper entry may be required to free the connection. Consultthe Operator manual (166-283M) for safe entry procedures.The hopper may be a low-oxygen environment with risk ofasphyxiation. Dust and chemical residues can be an inhalationand skin contact hazard, causing irritation, respiratory dis-tress, illness or death.
176 124
138
219
176
186
185
172
138
177
187
167
138
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Dismount Hoppers 15
Hoist HoppersRelease Hopper Mount
Refer to Figure 22 (shown with hoppers floating - leave hop-pers attached to mount)68. At each corner of the hopper mount , remove
and save two sets (8 sets total) of:803-020C NUT HEX 1/2-13 PLT804-015C WASHER LOCK SPRING 1/2 PLT804-017C WASHER FLAT 1/2 USS PLT802-082C HHCS 1/2-13X1 3/4 GR5
Remove Hopper Assembly
Pinch / Crush Hazards:Use an adequate hoist or lifter. Use three or more lines, eachrated for at least half the load. Place lines where they cannotslip. The assembly weighs nearly 550 kg (1200 pounds).
Refer to Figure 2369. Attach lines to the hopper assembly. Carefully lift it
off the cart frame. Set it on the supports.
Figure 22Hopper Mount at Frame
31108
122
121
167
188187
177
122
177
187
188
167
Figure 23Hoisting Hopper Mount
Q0102
05/25/2011 Table of Contents Index 166-370M
16 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Update Meters
Remove Existing Top SealRefer to Figure 2470. Remove the existing top seal:
816-662C METER TOP SEALThis part is replaced by a new seal at step 104.
71. Prepare the top panel for welding and re-sealing.Clean all top seal adhesive residue from the toppanel opening . If necessary, use sandpaper orother abrasives.
72. Prepare the top panel for tack welding. Remove a1 cm (3⁄8in) circle of paint at each corner, and half-way along each side of the top panel opening,shown as small open arrows.
Remove Meter Flute ShaftRefer to Figure 2573. At the right end of the flute shaft, release the set
screw in the bearing collar .
74. At the left end of each meter, remove the six outerscrews:
801-151C SCR HEX SELF TAP 1/4-20X1TYPEFThese screws are not re-used.
Note: The plates is usually have a silicone sealantbead around their circumference, and possibly onthe face. The bearing flange also has a sili-cone seal bead. Use a knife to cut the fillets, and asharp flat tool to pry components apart.
75. Withdraw and save the flute shaft assembly, one of:166-308S 4-OUTLET METER 2-STAR SHFT ASY166-320S 4-OUTLET METER 3-STAR SHFT ASY166-321S 4-OUTLET METER 4-STAR SHFT ASY
76. Recover and save the sensor mount:266-187D METER SENSOR MOUNT
Remove Old Flanges
77. At the right end of each meter, remove the six outerscrews:
801-151C SCR HEX SELF TAP 1/4-20X1TYPEFThese screws are not re-used.
78. Pry the flange assembly off the meter wall. Recoverand save one set:
188-009V BRG .755 HEX BORE W/S-S816-199C SEAL 1.33IDX2.23ODX.31T
79. At each plate , remove the six inner screws:801-151C SCR HEX SELF TAP 1/4-20X1TYPEF
These screws are not re-used.
80. Separate (and save) bearing flange:890-466C HSG RIBB FLG 6BOLT PLT
and mount plate (which is not saved):168-409D METER SHAFT MOUNT PLATE
81. Clean the meter wall and both bearing flangesof any silicone sealant residue. The plates arenot re-used and do not require cleaning.
Figure 24Meter Top Seal
Q0103
220
1
220
1
Figure 25Meter Flute Shaft
Q0103
163
U
DF
B
L
R
163
125
231
131163
231
131
218134 139
134
163
131
231
125
139
163
134
218
131
163
231
131
231
131
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Meters 17
Enlarge Mounting SlotsRefer to Figure 26The previous 3⁄8in (9 mm) mounting bolts are replacedwith new 1⁄2in (13 mm) bolts. The new mounts (notshown) have 13.5 mm slots, but the existing slots in themeter sidewalls do not. They need to be enlarged.
82. Use a cutting wheel, die grinder, or any suitable toolto enlarge the six 10 mm slots to 13.5 mm.
Enlarge down (away from the top edge of the metersidewall). In the Figure, cut away the gray area.
Drill Weep HolesRefer to Figure 26 and Figure 2783. Mark the meter top panel for six hole positions .
Each hole is to be 6 to 7 mm in diameter (1⁄4in). Thelocation needs to be clear of the existing outerflange, and clear of the front and back meter facesunder the top panel (so that any future drainage isoutside the meter, and so that the weep holes donot compromise air pressure control inside themeter).
84. Drill and de-burr six holes.
Figure 26Mounting Slot Enlargement
Q0108
Previously:10 mm
(0.41 in.)
Enlarge to:13.5 mm(0.53 in.)
2 2
919
Figure 27Top Panel Weep Holes
Q0103
2
22
2
22
2
05/25/2011 Table of Contents Index 166-370M
18 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Install Meter Seal FlangeRefer to Figure 28 (new holes not shown)85. For each meter, select two new:
266-306D METER SEAL FLANGE
86. Clamp the flange seals on the meter top panel,around the opening. Make sure the ends of theseals touch each other.
87. Tack weld the seal to the top panel at the corners,halfway point on front and back, and at end joints .
88. Clean off any splatter or burned paint.
89. Allow the welds to cool.
90. Touch up bare/discolored areas with green enamel.
91. Allow paint to dry. Apply a bead of silicone sealantto the inside corner of the top panel / seal flangejoint. Smooth the bead into a fillet shape.
Replace Meter Shaft Mount PlatesReplace Right End Plates
Refer to Figure 2992. For each meter, select one new:
168-472D METER SHAFT MOUNT PLATEApply a bead of silicone sealant to one face of theplate, in a circle around each outer bolt hole, and ina circle on the outer bolt hole center-lines.
93. Select six sets new:802-001C HHCS 1/4-20X3/4 SS804-033C WASHER LOCK 1/4 SS
Apply silicone sealant under bolt heads and underwasher faces. Secure the plate to the right endof the meter. Smooth excess sealant to fillet shape.
94. Select the saved flute shaft . Temporarily insertthe flute shaft from meter left.
Refer to Figure 3095. Select one set saved:
188-009V BRG .755 HEX BORE W/S-S816-199C SEAL 1.33IDX2.23ODX.31T
Add the bearing , with set screw collar to theright. Add the seal with the solid face to the out-side and the open face toward the meter.
96. Select one saved:890-466C HSG RIBB FLG 6BOLT PLT
and six sets new:802-001C HHCS 1/4-20X3/4 SS804-033C WASHER LOCK 1/4 SS
Apply silicone sealant to the outer rim of theflange . Place the flange over the bearing. Applysilicone sealant under bolt heads and under washerfaces. Secure the flange to the right end of themeter. Smooth any excess sealant into a filletshape.
Figure 28Meter Seal Flange
Q0103
924
924
3
3
Equipment Damage Risk:Check that the flute shaft ( in Figure 25 on page 16) isremoved prior to welding. Slag and splatter can rapidly andseverely damage meter flutes and fillers.
125924
924
3
3
Figure 29Right Shaft Mount Plate
Q0103
918
942
231
959
218
134
942 959U
DF
B
L
R918
942
959
918
125
134
218
Figure 30: 816-199C SealOrientation: Outside / Inside
32122218
134
218
231
942
959
231
231
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Meters 19
Replace Left End Plates
Refer to Figure 3197. For each meter, select one new:
168-472D METER SHAFT MOUNT PLATEone saved:
890-466C HSG RIBB FLG 6BOLT PLTand six sets new:
802-001C HHCS 1/4-20X3/4 SS804-033C WASHER LOCK 1/4 SS
98. Apply silicone sealant to the outer rim of theflange , under bolt heads and under washerfaces. Secure the flange to the plate .Smooth excess sealant to fillet shape.
99. Select one each saved:166-308/20/21S 4-OUTLET STAR SHAFT ASY266-187D METER SENSOR MOUNT
and one new:816-693C AIR DRILL METER SHAFT GASKET
and six sets new:802-001C HHCS 1/4-20X3/4 SS804-033C WASHER LOCK 1/4 SS
100. Insert the shaft through the gasket , left wallof meter, and bearing at right wall of meter.
101. Place lock washers on all bolts . Insert twoof the bolts through the sensor mount . Thesensor mount uses the top and top-front boltholes at the left meter wall.
102. Secure the plate to the left end of the meter withbolts and lock washers .
Install New Top Seal
Refer to Figure 32103. At each meter, clean and de-grease the top panel
in the area between the outer flange and the newinner flange.
104. Select one new:816-662C METER TOP SEAL
Before removing the release paper backing, make atrial fit of the seal on the top panel.
105. Remove the backing paper. Bond the seal tothe top panel.
Figure 31Left Shaft Mount Plate
Q0103
918
942
231
959
125
977
139
U
DF
B
L
R4
5
918
231
942
959
231
231 918
125
139
977
942
959
125 977
959 942
139
4 5
Figure 32Install Top Seal
Q0103
976
6
918
942 959
6
976
976
05/25/2011 Table of Contents Index 166-370M
20 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 21
Update Cart
Cart Frame Update OverviewTwelve new parts are welded on the cart main frame,and one on the tongue (not shown below):
Rear Gusset Plates (page 22)
266-307D REAR MAIN FRAME LAP GUSSET
Front Gusset Triangles (page 23)
266-308D FRONT MAIN FRAME CORNER GUSSET266-309D FRNT MAIN FRAME CRNR CAP PLT
Pull Bar Anchors (page 25)
266-302D NTA2007 PULL BAR ANCHORA plate (not shown)
266-300D NTA2007 PULL BAR BOLT PLTis also welded inside the tongue (page 24).
Meter Mount Tabs (page 27)
266-289D FRONT METER BOX MNT TAB
Figure 33Cart Mainframe Update Weldments
32124
927
926
927
926
920
925
923923
925
U
DR
L
B
F
925
926
927
923
922
920
05/25/2011 Table of Contents Index 166-370M
22 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Install Rear GussetsInstall Left Rear Gusset
Refer to Figure 34106. Select one new:
266-307D REAR MAIN FRAME LAP GUSSET
107. Roughly position the gusset on the bottom left rearcorner of the cart mainframe. Mark the frame usingthe right and front edges of the gusset.Remove the paint from the frame in these areas,and long the inside edge of the corner .
108. Clamp the gusset on the frame.
Set the rear edge to slightly overlap the roundedcorner of the frame tube.
Set the left edge to provide a fillet space to theexisting outside gusset plate .
Tack weld in place.
109. Finish weld with a 6 mm (1⁄4 in) fillet.
Install Right Rear Gusset
Refer to Figure 35110. Select one new:
266-307D REAR MAIN FRAME LAP GUSSET
111. Roughly position the gusset on the bottom left rearcorner of the cart mainframe. Mark the frame usingthe right and front edges of the gusset.Remove the paint from the frame in these areas,and long the inside edge of the corner .
112. Clamp the gusset on the frame.
Set the rear edge to slightly overlap the roundedcorner of the frame tube.
Set the left edge to provide a fillet space to theexisting outside gusset plate .
Tack weld in place.
113. Finish weld with a 6 mm (1⁄4 in) fillet.
114. Remove all slag and splatter. Clean and de-greaseall bare and discolored areas. Paint green.
Figure 34Left Rear Gusset (from below)
32126
925
1
3
2R L
B
F
4
5
6
925
1 2
3
4
5
6
Figure 35Right Rear Gusset (from below)
32126
925
1
3
2R L
B
F
4
5
6
925
1 2
3
4
5
6
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Cart 23
Install Front GussetsInstall Right Front Gusset
115. Remove the front reflector panels (if any) and walk-board to provide access.
Refer to Figure 36116. Select one new:
266-309D FRNT MAIN FRAME CRNR CAP PLT
Note: Despite the “CAP” descriptor, this part is used asthe base of the new gusset structure.
117. Position this plate in the outer crevice of the frontoutside tool bars. Mark the weld region along theedges. Remove paint on the tubes in the weldregions.
118. Position the plate fully into the crevice, with thebottom triangle about 6 cm (1⁄4in) higher than thebottom faces of the tube, and parallel with the tubebottom faces. Tack weld in position.
119. Finish weld all around (inside and out), except nearthe tip of the triangle (leave the tip unwelded to pro-vide a weep/breather opening). Use at least a 6 cm(1⁄4in) fillet.
120. Select one new:266-308D FRONT MAIN FRAME CORNER GUSSET
121. Position this gusset at the top of the plate justinstalled, fully into the crevice, and parallel to the topof the adjacent tubes. Tack weld in position.
122. Finish weld all around.
Install Left Front Gusset
123. Repeat step 116 through step 122 for the left side.
124. Remove all slag and splatter. Clean and de-greaseall bare and discolored areas. Paint green.
Note: To ease access to fan hydraulics, walkboardre-installation is deferred until step 184 onpage 32.
Figure 36Right Front Gusset (from below)
32126
927
926927
927
926
05/25/2011 Table of Contents Index 166-370M
24 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Install Pull Bar Attach PointsInstall Pull Bar Plate
Refer to Figure 37 and Figure 38125. Remove the hitch casting from the tongue.
126. Remove the paint from the lower inside surfaces ofthe front tongue side plates .
127. Select one new:266-300D NTA2007 PULL BAR BOLT PLT
128. Position the plate for tack welding inside the tongue.One method would be to place four 13 mm clampsalong the bottom edges of the hitch side plate. Restthe bolt plate on the clamps. Check alignment.
129. Tack weld the bolt plate to the hitch plates. Finishweld all around with a 13 mm (1⁄2in) fillet.
130. Remove all slag and splatter. Clean and de-grease.Allow welds to cool.
131. Paint all bare and discolored surfaces of the boltplate and hitch side plates.
Note: Pull bars are installed at step 161 on page 28.
Figure 37Plate and Pull Bars
Q0105
922
133
123123
133
123
922
Figure 38266-300D Plate Alignment
Q0106
922
21.1°
25.5 cm10.04in
13 mm0.5 in
13 mm0.5 in
123
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Cart 25
Install Pull Bar Anchors
Install Left Anchor
Refer to Figure 39 and Figure 40132. Jack up the side of the cart sub-frame being worked
on. Dismount the wheel for access to the weldingsite.
133. Select one new:266-302D NTA2007 PULL BAR ANCHOR
134. Position the anchor on the outside (wheel side)of the subframe leg , with the anchor’s larger holealigned with the existing hole in the leg plate.
135. Mark the left at the edges of the anchor. Removethe paint from the leg in this weld region.
136. Make sure the break in the small-hole end of theanchor is pointing forward and toward cart center,with the lower edge parallel to the cart frame. Thebreak should be pointing directly at a hole on thenew hitch pull bar plate.
137. Clamp the anchor in this position. Tack weld.
138. Finish weld all around with a 13 mm (1⁄2in) fillet.It is not necessary to weld inside the large holes.
139. Remove all slag and splatter. Clean and de-greaseall bare and discolored areas. Paint green.
140. Re-mount the removed wheel.
Install Right Anchor
141. Repeat step 132 through step 140 for the right side.
Figure 39Pull Bar Anchor Installed
Q0112
923
923
923
7
8
Figure 40Pull Bar Anchors (from below)
32126
923
923
7
8
05/25/2011 Table of Contents Index 166-370M
26 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Update Meter MountsPosition New Meter Mounts
The new meter mounts are temporarily installed to aid inplacement of the new front mount tabs.
Refer to Figure 41142. Select four new:
266-288D METER BOX MOUNTand six sets saved:
803-020C NUT HEX 1/2-13 PLT804-015C WASHER LOCK SPRING 1/2 PLT802-082C HHCS 1/2-13X1 3/4 GR5
143. Loosely attach each mount to a rear mount tab( through ), as follows:Right side of tab (for left meter)Left side of tab (for left meter)Right side of tab (for right meter)Left side of tab (for right meter).Tabs and (single center meter) are not used.
Prepare Tab Welding Sites
Refer to Figure 42144. Select one new:
266-289D FRONT METER BOX MNT TABUse this tab to mark the general locations for tabwelding on the underside of the front cartcross-tube . Remove the paint at these locations.
Figure 41New Meter Mounts
32131
919
1
23
45
6
919
167
187
177
Figure 42Front Meter Mount Tab Stations
32135
7
39.2 cm15.44 in
90.9 cm35.81 in
181.5 cm71.44 in
233.3 cm91.81 in
R L
F
B
920
919
177
187
167
919
1 6
1
2
5
6
3 4
920
7
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Cart 27
Mark Tab Welding Sites
Refer to Figure 41 and Figure 42 on page 26145. Select two sets new:
802-082C HHCS 1/2-13X1 3/4 GR5803-020C NUT HEX 1/2-13 PLT
146. Using the bolts and nuts , loosely attach themounting tab at the front slots of a metermount , flat edge up, and on the same side ofthe mount as the rear tab.
147. Consult the station layout in Figure 42. Re-markeach station position precisely on the framecross-tube . Dimensions are from the right outsideface of the right frame tube to the tab right faces.
To measure to the face of a mount , add or sub-tract the thickness of the tab (12.7mm, 0.5in).
Use the meter mount as a check against posi-tion errors. Each mount should be exactly perpen-dicular to the front cross-tube . Mark the tab sideedges on the cross-tube. Slide the tab to the centerof each mount slot. Mark the front and back edgelocation on the cross-tube.
148. Repeat step 146 and step 147 for all four tabs.
Attach New Front Tabs
Refer to Figure 43149. Remove two rear bolts from each meter mount .
Swing the mounts clear of the tab weld locations.
150. Select one new:266-289D FRONT METER BOX MNT TAB
Clamp the tab at a weld location, flat side up againstframe cross-tube . Tack weld in position.
151. Finish weld all around, using a 9 mm (3⁄8in) fillet.
152. Remove weld slag and splatter.
153. Repeat step 150 through step 152 for all four tabs.
154. Paint the tabs, and all bare or discolored metal.
Install New Meter Mounts
Wait for paint to dry. For each meter mount:
Refer to Figure 43 and Figure 44155. Select two sets new:
802-082C HHCS 1/2-13X1 3/4 GR5804-113C WASHER FLAT 1/2 USS HARD PLT804-015C WASHER LOCK SPRING 1/2 PLT803-020C NUT HEX 1/2-13 PLT
Swing the meter mount up against its new fronttab , on the same side of the tab as the rear tab.
156. Insert the bolts through the tab. Loosely add aflat washer , lock washer and nut .
157. Re-install the rear tab fasteners removed atstep 149. Tighten all nuts to Grade 5 torque.
Figure 43Front Mount Tabs
32126
920
7
944
950
944 950
920
919
7
919
919
7
919
Figure 44New Meter Mounts
32131
950960
956
944
919
920
7
944
960
956
950
919
920
944
960 956 950
05/25/2011 Table of Contents Index 166-370M
28 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Re-Install MetersMeters are loosely re-installed, with final positioning afterhoppers are re-installed. For each meter:
Refer to Figure 45158. Select one updated meter and six sets new:
802-106C RHSNB 1/2-13X1 1/2 GR5804-113C WASHER FLAT 1/2 USS HARD PLT804-015C WASHER LOCK SPRING 1/2 PLT803-020C NUT HEX 1/2-13 PLT
159. With the meter in between the mounts ,bring the meter sidewall slots into alignment with themount slots. Insert bolts from the meter side.Add a flat washer , lock washer and nut ,loosely secured (bolts at bottom of vertical slots).
Install Hopper Supports
Refer to Figure 45 (and Figure 53 on page 33)160. Select four new:
266-290D LOWER HOPPER SUPPORT ANGLEInsert the notched leg of the support angles into thetab slots of the meter mounts . These are heldin place by the hoppers (installed starting onpage 33).
Install Pull BarsAssemble Pull Bars
Refer to Figure 46161. Select two sets:
166-368H NTA2007 PULL BAR401-167H 16 ROW PULLBAR ADJUSTER803-073C NUT HEX 1 1/2-6 PLT
Spin the jam nut well onto the adjuster .Thread the adjuster a few full turns into the pullbar .
162. Remove and save the end pin components:805-412C PIN CLEVIS 1 X 4.13 USBL803-007C NUT LOCK 1/4-20 PLT402-011D SLEEVE, SPRING LINK MOUNT802-152C HHCS 1/4-20X2 GR5805-134C PIN CLEVIS 1 X 2 29/64 USABLE804-028C WASHER FLAT 1 USS PLT805-058C PIN COTTER 3/16 X 2
Figure 45Hopper Supports
32131
960
919
956
950945
124
921921
8
8
124
945
960
956
950
124 919
945
960 956 950
921
8 919
Figure 46Pull Bar Assembly & Parts ID
31098
916
928
952
967
949
946
929
965
962
958
916
928
952
952 928
916
967
949
929
946
965
958
962
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Cart 29
Attach Pull Bars
Refer to Figure 47163. Select two sets:
805-412C PIN CLEVIS 1 X 4.13 USBL804-028C WASHER FLAT 1 USS PLT805-058C PIN COTTER 3/16 X 2
164. Bring the non-adjustable ends of the pull bars intoalignment with the anchors at the main wheels.Secure with pin , washer and cotter .
Refer to Figure 48165. At the hitch, adjust the turnbuckles until the adjuster
clevis holes align with the hole in the plate .
166. Select two sets:805-134C PIN CLEVIS 1 X 2 29/64 USABLE402-011D SLEEVE, SPRING LINK MOUNT802-152C HHCS 1/4-20X2 GR5803-007C NUT LOCK 1/4-20 PLT
Insert the pin from below. Add a sleeve ,secure with bolt and lock nut .
167. With the jam nut still loose, tighten theturnbuckle nut to a torque of:136 N-m (100 foot-pounds)
168. Tighten the jam nut to just over Grade 2 torque:1336 N-m (1000 foot-pounds)
Figure 47Pull Bar on Anchor
Q0112
923
967
958
962
967
958
962
923
967 958 962
Figure 48Pull Bars on Plate
Q0105
922
928
952
929 949946
9
928 922
965
929
946
949
965 929
946 949
9528
952
05/25/2011 Table of Contents Index 166-370M
30 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Update Cart HydraulicsThis section splits the shared fan/fold hydraulic circuitinto separate dedicated circuits. Using the revised sys-tem requires an additional remote circuit on the tractor.The figure below identifies affected existing components.
Note: This hydraulic update is optional. Do not updatethe hydraulic system unless the tractor has anavailable additional remote circuit.
Figure 49Existing Cart Hydraulics
Q0107
A
B
G
C
D F
E
AB
CD
E
GF
207209
214
Existing Partsc/o Part Description
161 800-301C CABLE TIE 2 DIA MIN - YLW
207 810-345C VALVE 90 DEGREE SHUT-OFF
209 811-080C TE 3/4MJIC 3/4MORB 3/4MJIC
210 811-150C EL 3/4FJIC 3/4MJIC
211 811-195C HH1/2R1 028 3/4FJIC 3/4MORB
213 811-324C AD 3/4MORB 3/4FJIC
214 811-512C HH1/2R2 219 3/4FJIC 3/4MORB
223 841-002C AD 1 1/16MORB 3/4FORB
228 841-480C HH1/2R2 084 3/4FJIC 3/4MORB
161
161
210228
210
213
209
223
211
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Cart 31
The figure below identifies new and re-routed existingcomponents.
169. Snake a fish line through the right tongue tube,between hitch and near fan.
Note: The walkboard and left front reflector panel (if any)are presumed to be still removed from the forwardgusset update on page 23.
Figure 50Updated Cart Hydraulics
Q0132
A
B
G
C
D F
E
AB
CD
EF
G
972
978
971
937
937
New Partsc/o Part Description
936 800-301C CABLE TIE 2 DIA MIN - YLW
937 800-303C CABLE TIE 2 DIA MIN - BLK
971 811-394C CP 3/4FORB MALE QD POPPET TYPE
972 811-430C AD 3/4MJIC 3/4MJIC
978 841-555C HH1/2R2 156 3/4FJIC 3/4MORB
228
936 936
214
209
210
211
05/25/2011 Table of Contents Index 166-370M
32 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Route Dedicated Fold HoseRefer to Figure 49 and Figure 50 on page 30 and 31170. Select one new:
841-555C HH1/2R2 156 3/4FJIC 3/4MORBWith the MORB end forward (to hitch) and FJIC endto the rear, pull this hose through the tongue tubeusing the fish line.
171. Select four new:800-301C CABLE TIE 2 DIA MIN - YLW
Secure two ties to each end of hose .
Mark Dedicated Fan Hose172. Locate the (existing) fan supply hose . This hose
runs from the hitch to a tee at the fan shut-offvalve . This hose may be marked with two yellowties (or plain yellow tape). Pull on the hose from thefan end to confirm its identity.
173. Remove any yellow ties or plain yellow tape fromthe fan supply hose . Do not remove any printedlabels.
174. Select four new:800-303C CABLE TIE 2 DIA MIN - BLK
Secure two ties to each end of the fan supplyhose .
175. Disconnect fan supply hose from the tee .
Re-Route Fold Hose176. At the elbow connected to the inlet side of the
shut-off valve , disconnect the existing foldhose (which runs to rear bulkhead Port F).
177. Select one new:811-430C AD 3/4MJIC 3/4MJIC
Use this adaptor to join the ends of existing foldhose to new fold hose .
Disconnect Bypass Hose178. At the tee on the fan side of the shut-off
valve , disconnect the short spin-down loophose .
Re-Configure Inlet Fittings179. Remove and disassemble all fittings at the fan inlet.
Removed items are, from motor to hoses:841-002C AD 1 1/16MORB 3/4FORB811-324C AD 3/4MORB 3/4FJIC811-150C EL 3/4FJIC 3/4MJIC811-080C TE 3/4MJIC 3/4MORB 3/4MJIC810-345C VALVE 90 DEGREE SHUT-OFF811-080C TE 3/4MJIC 3/4MORB 3/4MJIC811-150C EL 3/4FJIC 3/4MJIC
Save the final 11⁄16in adaptor , one elbowand one tee . The other fittings are not re-used.
See “Hydraulic Connectors and Torque” on page 70.
180. Select one each saved:811-080C TE 3/4MJIC 3/4MORB 3/4MJIC811-150C EL 3/4FJIC 3/4MJIC
Connect the elbow to the MJIC side port of thetee , opposite the MORB port. When tightening,align the MJIC end of the elbow to face in the samedirection as the center MJIC port of the tee.
181. Select one saved:841-002C AD 1 1/16MORB 3/4FORB
Connect the MORB port of the tee to the FORBend of the adaptor . Connect the MORB end ofthe adaptor to the motor inlet. When tightening,point the open MJIC fittings away from the motor,and toward the hoses.
Re-connect Fan Hoses182. Connect the short loop hose to the tee at
the motor inlet.
183. Connect the fan supply hose to the elbow atthe fan motor.
184. Re-install the walkboard and any removed reflec-tors.
978
936
978
214
209
207
214
937
214
214 209
210
207
228
972
228 978
209
207
211
223
209
210
209
207
209
210
223 210
209
209
210
210
209
223
209
223
223
211 209
214 210
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Cart 33
Re-Install HoppersRefer to Figure 51185. Hoist the hopper sub-frame back into its original
position.
186. Select eight sets saved:803-020C NUT HEX 1/2-13 PLT804-015C WASHER LOCK SPRING 1/2 PLT804-017C WASHER FLAT 1/2 USS PLT802-082C HHCS 1/2-13X1 3/4 GR5
Secure the hopper sub-frame to the cart frame.
Align MetersRefer to Figure 52187. Raise each meter until the foam seal contacts
the hopper flange.
188. Adjust the front-to-rear position of the meter untilthe meter inlet is centered under the hopper open-ing.
Check that the hopper vent structure tubesmate with the vent tubes (not shown) in the meters.
189. Raise the meter another 1 to 2 cm (0.4 to 0.8 in.) topartially compress the seal, providing an air-tightconnection.
Refer to Figure 53190. Tighten the six nuts at the meter mounts.
Figure 51Re-Mount Hoppers
Q0102
177
187
188
167
Figure 52Vent Alignment
Q0111
950127976
127
Figure 53Hopper on Updated Meter
Q0110
950
950
05/25/2011 Table of Contents Index 166-370M
34 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Re-Install Final Drive ChainRefer to Figure 54191. At the right end of each meter, re-mount the
chain on the meter input gear . Engage thefinal drive idlers .
Re-Connect Inlets/OutletsRefer to Figure 55 (which has the inlet manifold removed forclarity)192. Re-connect the meter inlet elbows and primary
outlet hoses (not shown). Secure with savedclamps.
Re-Install Gears193. Re-install saved final drive gears ( and ).
Secure the driving gear with a saved pin .
Re-Install Sensors194. Place the speed sensor on the driven shaft.
Secure with saved pin . Tighten thumbscrew.
195. Re-attach the anti-rotation strap to the sensormount .
Refer to Figure 56196. At each hopper, re-connect the hopper level sensor
lead to the air cart harness .
Figure 54Install Final Drive Chain
Q0033
129
221102
102 129
221
Figure 55Meter Elbows, Sensor, Gears
Q0109
219160
198130
204
145139
219
130 204
198
145
198
139
Figure 56Hopper Level Sensor Lead
Q0101
151146
146 151
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Cart 35
Update Hopper LidsRefer to Figure 57For each hopper:
197. Unlatch the lid. At the crossbar -to-lid connec-tion, remove and save the nut and bolt:
803-147C NUT HEX NYLOCK 1/2-13802-130C HHCS 1/2-13X2 1/2 GR5
198. Swing the crossbar up to relieve tension in theexisting spring assembly. At the crossbar-to-swivel connection, remove and save the pivotnut and bolt:
803-147C NUT HEX NYLOCK 1/2-13802-130C HHCS 1/2-13X2 1/2 GR5
Remove the arm for further updating.Leave the swivel in place.
199. Remove the existing spring assembly from thecrossbar :
803-014C NUT HEX 3/8-16 PLT804-013C WASHER LOCK SPRING 3/8 PLT807-268C SPRING COMP DIE.75X.375X1.50L802-017C HHCS 3/8-16X1 GR5
These parts are not re-used.
Refer to Figure 57 and Figure 58200. Select one each new:
801-235C SCR HX SKT BUT CP 3/8-16X2 1/2807-268C SPRING COMP DIE.75X.375X1.50L
and three new:804-012C WASHER FLAT 3/8 SAE PLT
Place the new spring , then the threewashers , onto the bolt .
201. Select the saved:167-283D BIN LID TOP CROSS BAR
and one new:803-078C NUT LOCK 3/8-16 NYLON INSERT
Insert the bolt/spring/washer assembly through thelarger hole on the top of the crossbar , thenthrough the smaller bottom hole. Add the locknut . Secure just enough to remove any playfrom the spring assembly. No pre-compression ofthe spring is required.
202. Select one set saved:803-147C NUT HEX NYLOCK 1/2-13802-130C HHCS 1/2-13X2 1/2 GR5
Angle the crossbar up to allow the bar andswivel pivot holes to align. Insert bolt . Securewith lock nut .
203. Select the other set saved:803-147C NUT HEX NYLOCK 1/2-13802-130C HHCS 1/2-13X2 1/2 GR5
Re-attach the crossbar to the hopper lid. Close andlatch lid.
This completes the cart update.
Figure 57Hopper Lid Existing Hardware
Q0111
167
171181
126128
1171
181128
181
171
128
126
181
171
126
1
128
176
186
203
166
Figure 58Hopper Lid Spring Update
32137
955
126128
953
941
968
2
2
941
968
955
968
955 941
128
953
128
953
181
171
1282 171
181
181
171
05/25/2011 Table of Contents Index 166-370M
36 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Update Implement Frame
Dismount Lift-Assist
Disconnect LightsRefer to Figure 59 (depicting NTA607HD lighting)204. Disconnect the lighting harness at both rear
lights. Check that at least one leg of the cable ismarked “LEFT” or “RIGHT”. If not, apply a marking.
205. Remove the harness from the lighting structures,support tubes and lift-assist parallel arms. This mayrequire releasing clips or even dismounting supporttubes. Coil the harness up at the rear of the mainframe.
206. Recover and save any clips on the pull link .
Pinch / Crush Hazards:Follow support and hoisting instructions carefully. Removingthe lift-assist requires disconnecting large heavy parts that aremutually supporting. Unsupported parts can swing or fall atdisconnection, which could result in serious injury or death.
Release Lift LinkRefer to Figure 60207. Verify that there is no tension in the lift link .
If the front pull link was removed (step 54 onpage 12), the rear clevis should be easy to remove.
208. Remove and save one each:805-117C PIN ROLL 1/4 X 2 1/2 PLT804-117C WASHER FLAT 1/4 HARD ASTMF436
then remove the pin:160-781D PIN 1 1/2 X 4 USABLE 1045
(which has a second washer and roll pin )
Figure 59Rear Lighting Harness
Q0080
222
222
107
222
107
Figure 60Rear Lift Link
Q0122
113118
196194
113
196
194
118
194 196
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Implement Frame 37
Dismount Parallel ArmsRefer to Figure 61209. Support the lift-assist cross-tube . Once the
upper parallel arms are removed, it can tip awayfrom the wheels. The combined assembly weighsnearly 450 kg (1000 pounds).
210. At the parallel arms , remove and save four:805-255C PIN ROLL 3/8 X 2 1/2 PLT
and eight:804-039C WASHER FLAT 1 1/4 SAE PLT
211. Remove and save four:160-201H WING PIVOT PIN WELDMENT
and two:160-314H REAR PARALLEL LIFT LINK WELDMT
Remove Pull Link212. Support the rear end of the pull link . With rear
pins removed, the link is free to swing down andforward. The link weighs 150 kg (330 pounds).
213. Remove and save two sets:805-255C PIN ROLL 3/8 X 2 1/2 PLT160-324H PIN WLDMNT 1.25 X 12.34 NR
then remove and save the lift-assist .
214. Attach a hoist to the link . Remove and save two:805-255C PIN ROLL 3/8 X 2 1/2 PLT
and six:804-039C WASHER FLAT 1 1/4 SAE PLT
215. Remove and save two:160-201H WING PIVOT PIN WELDMENT
then remove the pull link:160-316H NTA607HD REAR PULL LINK WELDMT
The pull link is not re-used.
Update Rear Link Anti-RotationRefer to Figure 62 (which depicts the pull link connected -this is not done until step 311 on page 52)216. Select two new:
160-795D PIN RETAINER TABand two saved:
160-201H WING PIVOT PIN WELDMENTPosition these at the lower outside pivot holes of theLH and RH main frame rear. Mark around the outeredges of the tabs . Remove the paint from themain frame weldment in preparation for welding.
217. Tack weld the tabs to the main frame. Removeand save the pins .
218. Finish weld around the outside (only) of thetabs , fillet of 7 mm (1⁄4 in.) fillet.
219. Clean off all weld splatter and slag. Allow the weldsto cool. Paint green.
Figure 61Dismount Lift-Assist
Q0115
108
193
200
104
105
107
111
200
108
105
200
193
104
105
107
111
200
111
108
107
200
193
104
107
Figure 62Rear Lift Link
Q0123
104
904904
104
904
904
104
904
05/25/2011 Table of Contents Index 166-370M
38 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Update Wing Pivot Anti-RotationRefer to Figure 63If the existing pins are undamaged, leave the wing pivotpins in place for this update.
Pinch / Crush Hazard:If the existing pins must be removed, follow instructions care-fully. Remove only one pin at a time. Begin inserting a secondpin before the first is fully removed. Without use of additionalhoists and supports, an un-pinned wing can move or fall,which could result in injury and equipment damage.
Start with the LH rear pivot.
220. If the existing pin is undamaged, continue atstep 223.
221. At the damaged pin , remove and save one:805-255C PIN ROLL 3/8 X 2 1/2 PLT
222. Select two new:160-201H WING PIVOT PIN WELDMENT
Use one of the new pins to drive the old pinout. Then use the second new pin to drive thefirst new pin back out, with this second new pinreplacing the damaged old pin as originallyinstalled.
223. Select one new:160-811D WING HINGE PIN ROTATION STOP
224. Place the stop around the pivot shaft cap of thenew or existing pin ( or ). On the pivot exten-sion, mark around the outer edge of the stop forpaint removal. Remove paint in preparation forwelding.
225. Tack weld the stop, at the outer edges only.
226. Finish weld the stop, fillet of 7 mm (1⁄4 in.) fillet.
227. Clean off all weld splatter and slag. Allow the weldsto cool. Paint green.
228. Repeat step 220 through step 227 for the LH front,and RH wing pivot pins.
Figure 63Wing Pivot Anti-Rotation
Q0124
104
915
901
104
104
104
200
901
901 104
901
901
915
915
901 104
915
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Implement Frame 39
Update Wing Pivot Extension Tops
Update Front Extension TopsStart with the LH side. Remove and replace only the topfasteners. Leave the cross-bolt and lower fasteners inplace.
Refer to Figure 64229. Remove two sets:
803-027C NUT HEX 3/4-10 PLT804-023C WASHER LOCK SPRING 3/4 PLT802-910C RHSNB 3/4-10 X 2 GR5 PLT
Save the washers . The bolts and nutsare not re-used.
Refer to Figure 65 (which depicts the new square nutsinstalled - this is not done until step 235)230. Select one each new:
160-808D FRAME EXT 100 DEG GUSSET160-810D FR EXT 100 DEG GUSSET REWORK
The shorter gusset to the front. The longergusset is to the wing inside.
231. Position the gussets. Slide them as far toward thepivot extensions as allowed by the existing weld fil-lets. Keep them in full contact with existing gussets.Mark the wing for paint removal at all accessiblecorners and joints of each gusset. Remove paint inpreparation for welding.
232. Tack weld the gussets in position.
233. Finish weld all around each gusset, using an8 mm (5⁄16in) fillet. Keep the weld fillet small at thejoint plates, so that it won’t interfere with the newsquare nuts .
234. Clean off all weld splatter and slag. Paint the weldedarea green.
235. Select two sets new:802-064C HHCS 3/4-10X2 GR5803-047C NUT SQ 3/4-10 PLT
and two saved:804-023C WASHER LOCK SPRING 3/4 PLT
Add a lock washer to each bolt . Position thesquare nuts on the wing side of the joint plates.Insert the bolts through the joint plates, from thewing extension side, and thread into bolts. Tightenbolts to Grade 5 torque specification.
236. Repeat step 229 through step 235 for the right wingfront.
Figure 64Existing Top Front Hardware
Q0116
174
190 179179
190
174
190 174 179
951
912
914
912
914
Note: The new square nuts are NOT welded (ortack-welded) onto the wing frame.
Figure 65LH Wing Top Front Gussets
Q0126
951
912
914
951943
190
951
943
951
190
190 943
951
05/25/2011 Table of Contents Index 166-370M
40 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Update Rear Extension TopsRefer to Figure 66237. Remove two sets:
803-027C NUT HEX 3/4-10 PLT804-023C WASHER LOCK SPRING 3/4 PLT802-910C RHSNB 3/4-10 X 2 GR5 PLT
Save the washers . The bolts and nutsare not re-used.
Refer to Figure 67 (which depicts the new square nutsinstalled - this is not done until step 243)238. Select one each new:
160-808D FRAME EXT 100 DEG GUSSET160-809D FR EXT 100 DEG GUSSET REWORK
The longer gusset to the front. The shortergusset is to the wing inside.
239. Position the gussets. Slide them as far toward thepivot extensions as allowed by the existing weld fil-lets. Keep them in full contact with existing gussets.Mark the wing for paint removal at all accessiblecorners and joints of each gusset. Remove paint inpreparation for welding.
240. Tack weld the gussets in position.
241. Finish weld all around each gusset, using an8 mm (5⁄16 in) fillet. Keep the weld fillet small at thejoint plates, so that it won’t interfere with the newsquare nuts .
242. Clean off all weld splatter and slag. Paint the weldedarea green.
243. Select two sets new:802-064C HHCS 3/4-10X2 GR5803-047C NUT SQ 3/4-10 PLT
and two saved:804-023C WASHER LOCK SPRING 3/4 PLT
Add a lock washer to each bolt . Position thesquare nuts on the wing side of the joint plates.Insert the bolts through the joint plates, from thewing extension side, and thread into bolts. Tightenbolts to Grade 5 torque specification.
244. Repeat step 237 through step 243 for the right wingfront.
This completes welded updates.
245. Re-connect any hoses or cables removed for weldprotection.
Figure 66Existing Top Rear Hardware
Q0116
174
190 179
179
190
174
190 174 179
951
912
913
913
912
Note: The new square nuts are NOT welded (oreven tack-welded) onto the wing frame.
Figure 67LH Wing Top Rear Gussets
Q0124
951
913
912
951943
190
951
943
951
190
190 943
951
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 41
Update Harness
Dismount Existing HarnessesAlthough all of the existing harness components arere-used, it is both simpler and faster to completelyremove them, and then re-install them. Start at Tower Hon the right wing.
Refer to Figure 68 and Figure 69246. Locate, remove and save the CANbus terminator:
467980126 MINI CAN TERMINATORThere is only one of these. This component is con-nected to one lead of a row harness , which isplugged into a WSMB (Working Set MemBer).
247. At the WSMB, disconnect and save the row har-nesses:
467751330S1 16 ROW HARNESSDisconnect row harness leads from the block-age sensors , and from the WSMB harness .
248. Disconnect save any sensor lead extensions, whichmay be one of (not shown in Figures):
457901815 DJ HARNESS 10 FT EXT 3 PIN WP459680920 EXT. HARNESS 3’, FAN RPM459680922 EXT. HARNESS 15’ FAN RPM
Leave the blockage sensors installed.
249. Dismount and save the WSMB467981100S1 INTAG WSMB MODULE 18R
Save the following fasteners where encountered:803-006C NUT HEX 1/4-20 PLT804-006C WASHER LOCK SPRING 1/4 PLT802-370C HHCS 1/4-20X1 3/4 GR5
Where WSMBs are mounted with 1⁄4-20 hex headcap screws shorter than 13⁄4in (4.4 cm), these donot need to be saved.
The WSMB harness:467981201A INT AG HARNESS, WSMB MODULE
may be left connected to the WSMB.
Refer to Figure 70250. Dismount the WSMB mounting brackets (except at
implement weights, where the cross-bar mountmay be left in place). Save all:
803-020C NUT HEX 1/2-13 PLT804-015C WASHER LOCK SPRING 1/2 PLT806-010C U-BOLT 1/2-13 X 2 1/2 X 3 1/2
If the U-bolt is also securing the tower tube to itsmount, leave it in place. The bracket used to mountthe WSMB is not re-used.
251. Disconnect, dismount and save any CANbus exten-sion cable to the next WSMB to the left (not shownin Figures):
467980141 10’ EXT HARNESS
Figure 68CANbus and Terminator
28429
149CANbusPower CANbus
Data
149
148
152
148
148
147 153
Figure 69WSMB and Harness at Weights
Q0082
152
148
147
120
142
143
144
152
175
183
173
Figure 70Tower Mounting Near Center
Q0127
177187
201
153
120
177
187
201
150
05/25/2011 Table of Contents Index 166-370M
42 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
252. Working from right to left along the implement, dis-connect, dismount and save all WSMBs , rowharnesses , and sensor lead extensions ( ,
, ).
Refer to Figure 71At Towers B-G, also remove and save any CANbusextensions . At Tower A, do not remove theCANbus extension from the POM (PlanterOutput Module).
253. Sort the removed harness components into groupsby part number.
Enumerate WSMBsTo ease configuration and operation of theDICKEY-john® IntelliAg® console, install the WSMBs inserial number order. This causes the initial automaticsensor-to-row assignments to be correct by default.
Refer to Figure 72254. Select one new:
467981100S1 INTAG WSMB MODULE 18RApply some tape, and label this WSMB “6”. As anew module, it should have a serial number higherthan any installed modules. (If any WSMBs on thisair drill have ever been replaced, check that the newWSMB is indeed the highest number.)
255. Select all of the saved:467981100S1 INTAG WSMB MODULE 18R
Sort them in order of serial number . Label them,in ascending serial number order as “1” through “5”.Separately record the serial numbers and appliedID numbers (for use at step 392 on page 67).
Figure 71POM at Implement Center
32147
154152
148 142
143 144
150
150 154
Figure 72, WSMB-18R
31434152 934
7 6934
934
1527
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Harness 43
Install WSMBs
Mount Center WSMBsMount Tower B WSMB
Refer to Figure 73256. Select one new:
166-988D BRACKET, 45DEG MODULE MOUNTand one saved:
806-010C U-BOLT 1/2-13 X 2 1/2 X 3 1/2and two sets saved (not shown):
804-015C WASHER LOCK SPRING 1/2 PLT803-020C NUT HEX 1/2-13 PLT
Install the bracket behind Tower B (left centerseed tower), just above and parallel to the anglethat secures both towers to each other. Orient theWSMB mounting face to the outside and forward.Secure to tower with U-bolt , lock washersand nuts . To avoid crushing the tower tube,tighten only to Grade 2 torque specification.
257. Select the saved WSMB tagged as “2”:467981100S1 INTAG WSMB MODULE 18R
and two sets new or saved:803-006C NUT HEX 1/4-20 PLT
804-006C WASHER LOCK SPRING 1/4 PLT802-370C HHCS 1/4-20X1 3/4 GR5
Install WSMB on the outside (wing side) of thebracket , with the connector ports facing downand to implement rear. Insert bolts ( or )through the WSMB and bracket. Secure with lockwashers ( or ) and nuts .
Mount Tower C WSMB
Refer to Figure 74258. Select one new:
166-988D BRACKET, 45DEG MODULE MOUNTand one saved:
806-010C U-BOLT 1/2-13 X 2 1/2 X 3 1/2and two sets saved (not shown):
804-015C WASHER LOCK SPRING 1/2 PLT803-020C NUT HEX 1/2-13 PLT
Install the bracket behind Tower C (right centerseed tower), just above and parallel to the anglethat secures both towers to each other. Orient theWSMB mounting face to the outside and forward.Secure to tower with U-bolt , lock washersand nuts . To avoid crushing the tower tube,tighten only to Grade 2 torque specification.
259. Select the saved WSMB tagged as “5”:467981100S1 INTAG WSMB MODULE 18R
and two sets new or saved:803-006C NUT HEX 1/4-20 PLT
804-006C WASHER LOCK SPRING 1/4 PLT802-370C HHCS 1/4-20X1 3/4 GR5
Install WSMB on the outside (wing side) of thebracket , with the connector ports facing down and toimplement rear. Insert bolts ( or ) through theWSMB and bracket. Secure with lockwashers ( or ) and nuts
Figure 73: Tower BWSMB#2 Mounting
Q0125
917
201 152
119
175
954
947173
183
B F
#2
917
201
187
177
917
119
201 187
177
152
175
183 954
173 947
Figure 74 Tower CWSMB#5 Mounting
Q0125
917
201152
119
175
954
947 173
183
CG
#5
#2
917
173 947
183 954 175
917
201
187
177
917
119
201 187
177
152
175
183 954
173 947
#5
917
173 947
183 954 175
05/25/2011 Table of Contents Index 166-370M
44 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Mount Wing WSMBsMount Tower A (Left Wing) WSMBs
Refer to Figure 75260. Select one new:
166-988D BRACKET, 45DEG MODULE MOUNTand one saved:
806-010C U-BOLT 1/2-13 X 2 1/2 X 3 1/2and two sets saved (not shown):
804-015C WASHER LOCK SPRING 1/2 PLT803-020C NUT HEX 1/2-13 PLT
Install the bracket behind Tower A (left wingseed tower), just above and parallel to the anglethat secures both towers to each other. Orient theWSMB mounting face to the inside and rear. Secureto tower with U-bolt , lock washers andnuts . To avoid crushing the tower tube, tightenonly to Grade 2 torque specification.
261. Select the saved WSMBs tagged as “1” and “4”:467981100S1 INTAG WSMB MODULE 18R
and two sets new or saved:803-006C NUT HEX 1/4-20 PLT
804-006C WASHER LOCK SPRING 1/4 PLT802-370C HHCS 1/4-20X1 3/4 GR5
Install WSMB on the front face and WSMB onthe rear face of the bracket , with the connectorports facing down and to implement center. Insertbolts ( or ) through either WSMB, bracketand other WSMB. Secure with lockwashers ( or ) and nuts .
Mount Tower D (Right Wing) WSMBs
Refer to Figure 74262. Select one new:
166-988D BRACKET, 45DEG MODULE MOUNTand one saved:
806-010C U-BOLT 1/2-13 X 2 1/2 X 3 1/2and two sets saved (not shown):
804-015C WASHER LOCK SPRING 1/2 PLT803-020C NUT HEX 1/2-13 PLT
Install the bracket inside Tower D (right wingseed tower), just above and parallel to the anglethat secures both towers to each other. Orient theWSMB mounting face to the inside and rear. Secureto tower with U-bolt , lock washers andnuts . To avoid crushing the tower tube, tightenonly to Grade 2 torque specification.
263. Select the saved WSMB tagged as “5”:467981100S1 INTAG WSMB MODULE 18R
and the new WSMB:467981100S1 INTAG WSMB MODULE 18R
and two sets new or saved:803-006C NUT HEX 1/4-20 PLT
804-006C WASHER LOCK SPRING 1/4 PLT802-370C HHCS 1/4-20X1 3/4 GR5
Install WSMB on the front face and WSMB on therear face of the bracket , with the connector ports fac-ing down and to implement center. Insertbolts ( or ) through either WSMB, bracket andother WSMB. Secure with lock washers ( or ) andnuts .
Figure 75: Tower AWSMB#1, WSMB #4 Mounting
Q0124
E
A
#1
#4152
152
201
917
119 173 947
917
201
187
177
917
119
201 187
177
152
175
183 954
173 947
Figure 76: Tower DWSMB#3, WSMB #6 Mounting
Q0124
H
D
#3
#6 934
152
201
917
119173947
#1 #4
917
173 947
183 954 175
917
201
187
177
917
119
201 187
177
152
934
175
183 954
173 947
#3 #6
917
173 947
183 954
175
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Harness 45
Install Row HarnessesRefer to Figure 77, Figure 78 (which is part of the fullharness diagram found on page 88 and 89)
Connector ID
Harness connections are shaped, sized, polarized,keyed and color-coded to prevent mis-configuration.Each WSMB harness has eight connectors, which canbe confusing. Familiarity can save time.
These instructions have you install and completely con-nect one row harness at a time. Row harness leadsare labelled 1-16 on every harness. Having multipleleads with the same numbers nearby can lead to mis-con-nection.
GroupType (onCable)
Function
a4-pin plug
6-pina plug
a. Not all pin locations may be populated.
Upstream CANbus powerUpstream CANbus data
b4-pin receptacle
6-pina receptacleDownstream CANbus powerDownstream CANbus data
c dual 12-pinreceptacle
WSMB
d dual 12-pinplug
Local function(sensor harness in this case)
e 3-pinConnection to each
blockage sensor
Figure 77WSMB and Row Harness
32149
152
153
148147
a
b
c
d
e
148
05/25/2011 Table of Contents Index 166-370M
46 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Connect WSMB #1Refer to Figure 77 (on page 45) and Figure 78 (which is partof the full harness diagram found on page 88 and 89)264. If WSMB (on Tower A) does not have a WSMB
harness connected, select one saved:467981201A INT AG HARNESS, WSMB MODULE
Connect the 12-pin receptacle leads intoWSMB .
265. Connect the 4/6-pin CANbus plug leads into the4/6-pin CANbus receptacle leads of the existing467980141 extension harness from the POM(not shown) at implement center.
266. Select a saved:467751330S1 16 ROW HARNESS
267. Connect the WSMB’s 12-pin plug leads into the12-pin receptacle leads of the row harness .
268. Use cable ties to secure the row harness core toTower A.
269. Select two saved 3m (10ft) extensions:457901815 DJ HARNESS 10 FT EXT 3 PIN WP
connect these to harness sensor leads 11 and 12.
270. Connect the 3-pin sensor leads or extensions totheir respective seed row blockage sensors, per thechart on page 86 and the diagram on page 88.
271. Select four new (not shown):464211090 DUST PLUG
Cap the ends of the four unused harness leads(leads 13 to 16, also not shown).
Figure 78: Tower AWSMB #1 Connections
Q0118
WSMB
1WSMB
4
4677
5133
0S1
4 Le
ads
Unu
sed
4 Le
ads
Unu
sed
A
c
b b
d
a
150
148
142
e
e
e
153
152
#1
153c
#1 152
a
b
150
148
d
148
142
e
932
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Harness 47
Connect WSMB #4Refer to Figure 79 (on page 45) and Figure 79 (which is partof the full harness diagram found on page 88 and 89)272. If WSMB (on Tower A) does not have a WSMB
harness connected, select one saved:467981201A INT AG HARNESS, WSMB MODULE
Connect the 12-pin receptacle leads intoWSMB .
273. Connect the 4/6-pin CANbus plug leads into the4/6-pin CANbus receptacle leads of the467981201A WSMB harness from WSMB .
274. Select a saved:467751330S1 16 ROW HARNESS
275. Connect the WSMB’s 12-pin plug leads into the12-pin receptacle leads of the row harness .
276. Use cable ties to secure the row harness core toTower E.
277. Select two saved 3m (10ft) extensions:457901815 DJ HARNESS 10 FT EXT 3 PIN WP
Connect these to harness sensor leads 11 and 12.
278. Connect the 3-pin sensor leads or extensions totheir respective fertilizer row blockage sensors, perthe chart on page 87 and the diagram on page 88.The rows requiring extensions are off the illustrationat right - see page 89.
279. Select four new (not shown):464211090 DUST PLUG
Cap the ends of the four unused harness leads(leads 13 to 16, also not shown).
280. Select one saved:467980141 10’ EXT HARNESS
Connect the plug end of this harness to thereceptacle end of the WSMB harness .Route the cable toward Tower B. Route the cable atthe left wing pivot so that it passes through pivotcenterline, and has just enough slack for wing fold-ing.
Figure 79: Tower A/EWSMB #4 Connections
Q0118
SMB
1WSMB
4
4677
5133
0S1
4 Le
ads
Unu
sed
E
c
b
b
d
a
150
148
142
e
e
153
152
153 a
A
#4
153c
#4 152
a
b
153 #1
148
d
148
142
e
932
150a
b #4 153
05/25/2011 Table of Contents Index 166-370M
48 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Connect WSMB #2Refer to Figure 77 (on page 45) and Figure 80 (which is partof the full harness diagram found on page 88 and 89)281. If WSMB (on Tower B) does not have a WSMB
harness connected, select one saved:467981201A INT AG HARNESS, WSMB MODULE
Connect the 12-pin receptacle leads intoWSMB .
282. Connect the 4/6-pin CANbus plug leads into the4/6-pin CANbus receptacle leads of the467980141 extension harness from WSMB .
283. Select a saved:467751330S1 16 ROW HARNESS
284. Connect the WSMB’s 12-pin plug leads into the12-pin receptacle leads of the row harness .
285. Use cable ties to secure the row harness core toTower B.
286. Select eight saved 91 cm (3ft) extensions:459680920 EXT. HARNESS 3’, FAN RPM
Connect these to harness sensor leads9 through 16.
287. Connect the 3-pin sensor leads or extensions totheir respective seed row blockage sensors, per thechart on page 86 and the diagram on page 88.
Figure 80: Tower BWSMB #2 Connections
Q0118
WSMB
2
B
c
b
d
150
148
143
e
e
153
ab
152
B
#2
153c
#2 152
a
b
150 #4
148
d
148
143
e
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Harness 49
Connect WSMB #5Refer to Figure 77 (on page 45) and Figure 81 (which is partof the full harness diagram found on page 88 and 89)288. If WSMB (on Tower C) does not have a WSMB
harness connected, select one saved:467981201A INT AG HARNESS, WSMB MODULE
Connect the 12-pin receptacle leads intoWSMB .
289. Connect the 4/6-pin CANbus plug leads into the4/6-pin CANbus receptacle leads of the467981201A WSMB harness from WSMB .
290. Select a saved:467751330S1 16 ROW HARNESS
291. Connect the WSMB’s 12-pin plug leads into the12-pin receptacle leads of the row harness .
292. Use cable ties to secure the row harness core toTower G.
293. Select eight new 91 cm (3ft) extensions:459680920 EXT. HARNESS 3’, FAN RPM
Connect these to harness sensor leads9 through 16.
294. Connect the 3-pin sensor leads or extensions totheir respective fertilizer row blockage sensors, perthe chart on page 87 and the diagram on page 89.The rows requiring extensions are off the illustrationat right - see page 89.
295. Select one saved:467980141 10’ EXT HARNESS
Connect the plug end of this harness to thereceptacle end of the WSMB harness .Route the cable toward Tower B. Route the cable atthe right wing pivot so that it passes through pivotcenterline, and has just enough slack for wing fold-ing.
Figure 81: Tower C/GWSMB #5 Connections
Q0118
WSMB
5
G
c
bb
a
d
a
153
148
e
e
153150
931
152
C
#5
153c
#5 152
a
b
153 #2
148
d
148
931
e
150a
b #5 153
05/25/2011 Table of Contents Index 166-370M
50 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Connect WSMB #3Refer to Figure 77 (on page 45) and Figure 78 (which is partof the full harness diagram found on page 88 and 89)296. If WSMB (on Tower D) does not have a WSMB
harness connected, select one saved:467981201A INT AG HARNESS, WSMB MODULE
Connect the 12-pin receptacle leads intoWSMB .
297. Connect the 4/6-pin CANbus plug leads into the4/6-pin CANbus receptacle leads of the467980141 extension harness from WSMB .
298. Select a saved:467751330S1 16 ROW HARNESS
299. Connect the WSMB’s 12-pin plug leads into the12-pin receptacle leads of the row harness .
300. Use cable ties to secure the row harness core toTower D.
301. Select two saved 4.6 m (15ft) extensions:459680922 EXT. HARNESS 15’ FAN RPM
Connect these to harness sensor leads 1 and 2.
302. Connect the 3-pin sensor leads or extensions totheir respective seed row blockage sensors, per thechart on page 86 and the diagram on page 89. Therows requiring extensions are off the illustration atright - see page 89.
303. Select four new (not shown):464211090 DUST PLUG
Cap the ends of the four unused harness leads(leads 13 to 16, also not shown).
Figure 82: Tower DWSMB #3 Connections
Q0118
WSMB
5WSMB
3
4677
5133
0S1
4 Le
ads
Unu
sed
153
c
ab b
150
dD
e
e
144
#3
153c
#3 152
a
b
150 #5
148
d
148
144
e
932
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Harness 51
Connect New WSMB #6Refer to Figure 77 (on page 45) and Figure 83 (which is partof the full harness diagram found on page 88 and 89)304. Select one new:
467981201A INT AG HARNESS, WSMB MODULEConnect the 12-pin receptacle leads intoWSMB .
305. Select one saved:467980126 MINI CAN TERMINATOR
Plug this component into the 6-pin receptaclelead of the WSMB harness.
Note: The final 4-pin power connector is not terminated.
306. Select one new:467751320S1 DJ 12 ROW HARNESS
Connect the WSMB’s 12-pin plug leads into the12-pin receptacle leads of the row harness .
307. Use cable ties to secure the row harness core toTower H.
308. Select two saved 4.6 m (15ft) extensions:459680922 EXT. HARNESS 15’ FAN RPM
Connect these to harness sensor leads 1 and 2.
309. Connect the 3-pin sensor leads or extensions totheir respective fertilizer row blockage sensors, perthe chart on page 87 and the diagram on page 89.
310. Secure all harness routings with cable ties.
Figure 83: Tower HWSMB #6 Connections
Q0118
WSMB
3WSMB
6(New)
H
E
c
bb
d
a
153
933
935
e
e
149
934
144
e
150
ab
935c
#6
149
b
933d
933
144
e
05/25/2011 Table of Contents Index 166-370M
52 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Install Rear Pull Link
Pin Link to Main FrameRefer to Figure 84311. Connect a hoist to the new:
160-316H NTA607HD REAR PULL LINK WELDMTThe lug is down after installation. The weldmentmay be shipped on a pallet with the lug up.
312. Select two saved:160-201H WING PIVOT PIN WELDMENT
313. Hoist the link into alignment with the implementmain frame. Insert pins to secure.
314. Select two saved:805-255C PIN ROLL 3/8 X 2 1/2 PLT
and six:804-039C WASHER FLAT 1 1/4 SAE PLT
Place the washers on the pins just installed.Secure with roll pins .
Connect Lift-Assist LinkRefer to Figure 85315. Select one saved:
160-781D PIN 1 1/2 X 4 USABLE 1045and two sets saved:
805-117C PIN ROLL 1/4 X 2 1/2 PLT804-117C WASHER FLAT 1/4 HARD ASTMF436
316. Bring the lift link clevis into alignment with thepull link lug. Connect with pin . Secure pin with awasher and roll pin on each end.
Figure 84Install New Rear Pull Link
Q0115
193
200
104
903
903
104
903
104
200
193
193 104
200
Figure 85Re-Connect Rear Lift Link
Q0122
113118
196194
118
196
194
113
118
194 196
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Install Rear Pull Link 53
Connect Lift AssistRefer to Figure 86317. Select two saved:
160-324H PIN WLDMNT 1.25 X 12.34 NR
318. Connect a hoist to the saved:160-317H NTA607HD LIFT ASST FRAME WLMT
Bring the lower front lugs of the lift-assistweldment into alignment with the rear pivottubes of the new pull link . Insert pins .
319. Select two saved:805-255C PIN ROLL 3/8 X 2 1/2 PLT
Drive roll pins into lower pin weldments .
Re-Install Parallel ArmsRefer to Figure 86320. Select two saved:
160-314H REAR PARALLEL LIFT LINK WELDMTand four saved:
160-201H WING PIVOT PIN WELDMENTPin the parallel arm tubes to the main frame in front,and to the upper front lugs of the lift-assist weld-ment at rear.
Note: Set the lift switch whisker above the arm tube.
321. Select eight saved:804-039C WASHER FLAT 1 1/4 SAE PLT
and four saved:805-255C PIN ROLL 3/8 X 2 1/2 PLT
Add three washers to each forward pin , andone washer to each rear pin . Secure weldmentpins with roll pins .
Re-Connect LightsRefer to Figure 87 (depicting NTA607HD)322. Re-route the lighting harness dismounted at
step 204 on page 36. Connect each leg of the “Y” toits respective luminaire. Secure the harness withany clips saved at step 206.
Figure 86Connect Lift-Assist
Q0115
108
193
200
104
105
903
111
200
104
111
108
108
903 111
200
200 111
105
104
193
200
193 104
104
104 200
Figure 87Re-Route Lighting Harness
Q0080
222
222
05/25/2011 Table of Contents Index 166-370M
54 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Update Implement Hydraulics
Extend Valve HosesThe weight transfer valve group is relocated to improvevisibility from the tractor cab. Extend hoses prior to valverelocation. Extend hoses one at a time to eliminate theneed to mark hoses or trace routes. See “HydraulicConnectors and Torque” on page 70.
Refer to Figure 88323. Select one set new:
811-430C AD 3/4MJIC 3/4MJIC811-831C HH1/2R2 034 3/4FJIC
Open the 3⁄4in connection at . Insert the newhose and adaptor .
324. Select four sets new:811-315C AD 9/16MJIC811-701C HH3/8R2 033 9/16FJIC
One at a time, open a 5⁄16in connection at . Inserta new hose and adaptor . Of the five newhoses, three are clamped to the wing near the piv-ots. Route these under any existing hoses (seeFigure 90 on page 55).
Relocate Valve GroupRefer to Figure 89325. Remove and save two sets:
803-021C NUT HEX 5/8-11 PLT804-022C WASHER LOCK SPRING 5/8 PLT
and one:806-105C U-BOLT 5/8-11 X 4 1/32 X 6
326. Relocate the valve group:160-331S NTA607HD HYDRAULIC VALVE ASY
further outboard on the wing. The new U-boltcenter-line is approximately 3.8 cm (1.5 in) inboardof the inside rear face of the wing gauge wheelplate . Secure valve group with saved U-bolt ,lock washers and nuts .
327. Remove or obscure the existing operating decals:848-504C DECAL WING DOWN PRESSURE PIC848-505C DECAL FRAME BACK PRESSURE PIC
328. Clean and dry the top surface of the wing tool baron either side of the relocated valve group.
329. Select one each new:848-504C DECAL WING DOWN PRESSURE PIC848-505C DECAL FRAME BACK PRESSURE PIC
Apply 848-505C to the left of the valve group. Apply848-504C to the right. Apply to the top or front of thetool bar left of the group. Apply to the top or front ofthe tool bar at right, or to the inside face of thegauge wheel mount (clear of lock channel storage).
Figure 88Existing Valve Group Hoses
Q0128
3
9
9
99
High Pressure Fluid Hazard:Wear gloves and eye protection. Open (“crack”) hydraulicconnections slowly. Even with the systems set to Float prior tounhitching, there may still be residual pressure in some lines. ifan injury occurs, seek immediate attention from a physicianfamiliar with this type of injury.972
9743
974 972
970
9739
973 970
178189
202
Figure 89Weight Transfer Valves
Q0053
114
1
202
189
178
230
229
114
1 202189 178
229230
979
980
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Implement Hydraulics 55
Protect Hose ExtensionsRefer to Figure 90330. Select one new:
816-480C HOSE WRAP 3.0-4.5 X 24LG VELCRand three new:
800-035C CABLE TIE .31X28 8DIA 120LB
Close the wrap on itself around the three hosesclamped to the wing. Adjust the wrap position sothat the ends are across the front-to-rear wing tubenear the wing extensions, and across the next front-to-rear rib toward the outside.
Fold the wrap around itself. Secure it with the ties. Figure 90Hose Wrap
32163
975
975
938
975
05/25/2011 Table of Contents Index 166-370M
56 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 57
Re-Hitch Implement
Install Front Pull Link
Pinch / Crush Hazards:Use an adequate hoist or lifter. Use three or more lines. Placelines where they cannot slip. The weldment weighs over270 kg (600 pounds).
Refer to Figure 91331. Select one new:
160-315H NTA607HD FRONT PULL LINK WLDMTAttach a hoist.
332. Select two saved:160-201H WING PIVOT PIN WELDMENT
Hoist the pull link into alignment with the imple-ment main frame. Insert pins .
333. Select two sets saved:804-039C WASHER FLAT 1 1/4 SAE PLT805-255C PIN ROLL 3/8 X 2 1/2 PLT
Place the washers on the weldment pins .Secure with poll pins . Leave the hoist attachedto the pull link.
Re-Connect Lift LinkRefer to Figure 92334. Select one saved:
160-781D PIN 1 1/2 X 4 USABLE 1045with its two sets of:
804-117C WASHER FLAT 1/4 HARD ASTMF436805-117C PIN ROLL 1/4 X 2 1/2 PLT
Remove one washer and roll pin.
335. Use the hoist to bring the top lug of the pull linkinto alignment with the front clevis of the lift link .Insert the pin . Add a washer . Secure withroll pin .
336. Check the length of the lift link . Adjust the rearclevis turnbuckle as needed to obtain a length,clevis center-line to clevis center-line of:202.0 cm (7917⁄32in)
Note: Although the hoist could be disconnected from thepull link at this time, it may be useful for implement-cart hitching.
Figure 91Install New Front Pull Link
31238
902
193104200
902
902
104
902
104
193
200
193 104
200
Figure 92Connect Lift-Assist Link
31423
112
902
196
194
118194196
118
194
196
902
112
118 194
196
112
05/25/2011 Table of Contents Index 166-370M
58 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Connect Cart and ImplementRefer to Figure 93337. Select two saved:
160-323H PIN WLDMNT 1.25 X 15.66 NR
338. Bring the cart arm lugs into alignment with thefront pivot tubes of the new pull link . From theinside of the two inner cart lugs, insert the weldmentpins .
339. Select two saved:805-255C PIN ROLL 3/8 X 2 1/2 PLT
Secure the weldment pins with roll pins .
Re-Install Link ComponentsRefer to Figure 94340. On the new pull link , install all clamps, clips,
brackets and their fasteners removed at step 47 onpage 11. This might include:
502-068D HYD HOSE CLAMP BRACKET800-052C HOSE CLIP 5/8 I.D.800-064C HOSE CLIP 13/16 ID802-007C HHCS 5/16-18X3/4 GR5802-012C HHCS 5/16-18X1 1/2 GR5802-115C HHCS 5/16-18X2 GR5804-009C WASHER LOCK SPRING 5/16 PLT
plus the:160-760D TRANSPORT LOCK PIN 1 X 8.25160-763D NTA607HD PIN STORAGE BRACKET
Secure bolts loosely, as hoses and harnesses needto be routed.
Store Spacers341. Store the existing spacer set:
810-442C MW STOP BUSH SET 1 1/4 SBS125on the wire loops of the new pull link.
Store New Lift PinsRefer to Figure 94342. Select two new:
805-306C HITCH PIN 1X3 1/4 W/COTTERStore each these in the lug holes provided.
Figure 93Hitch Cart to Pull Link
31422
110
110
200
200
902
1
110
1
902
110
200
110 200
Figure 94Clamp Re-Installation
31238
156
158184169 155
164
117
116
156 155165184
158
184155
966 208
902
155
156
158
164
165
169
184
116
117
208
966
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Re-Hitch Implement 59
Re-Install Link Lift CylindersRefer to Figure 95343. Select two sets saved:
160-754D NTA607 PULL LINK CYLINDER LUG805-187C PIN CLEVIS 1 X 2 1/4 GR5 PLT805-104C PIN COTTER 3/16 X 1 1/2 PLT
Pin the narrow end of each lug in the rearholes of the pull link lugs. Secure pin withcotter .
344. Select the saved lift cylinders:810-170C CYL REP 3.5X10X1.25 ROD (TIE)
and four sets saved:805-124C PIN CLEVIS 1 X 3 11/16 GR5 PLT2A0132 MW PIN CLIP
Orient the cylinders with the hydraulic fittings facingup. Connect the base ends to the upper holes of themain frame plates. Connect the rod ends to the lugsinstalled at step 343. Secure pins with clips.
Re-Install Weight Transfer CylindersRefer to Figure 96345. Select the saved weight transfer cylinder
810-219C CYL 3.5X16X2 ROD (TIE ROD)that has the transfer solenoid valve . This is theright hand cylinder.
346. Orient the hydraulic fittings to center. Connect thebase end to the upper cart lug using the saved:
2A0206 MW PIN SHORT2A0132 MW PIN CLIP
347. Connect the rod end to the back pressure flexlink using the saved:
2A0132 MW PIN CLIP805-124C PIN CLEVIS 1 X 3 11/16 GR5 PLT
348. Select the other saved weight transfer cylinder:810-219C CYL 3.5X16X2 ROD (TIE ROD)
and the saved pins and clips. Orient the hydraulicfitting to center. Connect the base end of the cylin-der to the upper cart lug. Connect the rod end to theback pressure flex link . Secure pins with clips.
Figure 95Install Link Lift Cylinders
31238
205
115
199 195
141
197
205115
199
195
199 115
195
205
197
141
Figure 96Install Weight Transfer Cylinders
Q0047
2
140
141
140
206109206
2
140
141
109
141
197
206
109
05/25/2011 Table of Contents Index 166-370M
60 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Route Hoses and Harnesses
Figure 97Cart-Implement Hydraulic Hose Routing
Q0067(4), 31273,Q0068
226
Facing Right
Facing Rear
Facing Rear
226
225
224
224
224 226
226224M M
MM
H
216
M M
HL
L,S
S H L 227
212
Facing Rear
C03
C02
C01
C04
C05
Facing Down
217
Legend:212-227 Part NumberC01-C05 hose ClampE, F, G cart portsH HarnessL LightsM Markersa
a. See manual 113-850M formarker hose installation
S lift Switch
EF
G
215
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Re-Hitch Implement 61
Refer to Figure 97 on page 60, and the table at right349. Route hydraulic hoses and harnesses through clips
and under clamps on new pull link.
Connect Hoses and HarnessesRefer to Figure 98350. At the bulkhead at the left rear of the cart, plug in all
hydraulic hoses and cables. Some cable connectsmay not be at the bulkhead.
Hose ID for Pull Link Clampingc/o Part No. Descriptor
212 811-291C HH1/2R2 072 3/4FJIC
215 811-617C HH1/2R2 140 3/4FJIC
216 811-665C HH1/2R2 208 3/4FJIC
217 811-785C HH1/2R2 168 3/4FJIC
224 841-162C HH3/8R2 184 3/4MORB 9/16FJIC
225 841-189C HH3/8R2 074 3/4MORB 9/16FJIC
226 841-451C HH1/2R2 148 3/4FJIC 3/4MORB
227 841-452C HH3/8R2 138 9/16FJIC
A Marker (option)B Marker (option)C Implement LowerD Implement LiftE Lock/FoldF Unfold/TransferG SUMP
Figure 98Cart Bulkhead Ports
848-526C
05/25/2011 Table of Contents Index 166-370M
62 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Update Markers
If markers are not installed on this air drill, continue at“Update Coulters” on page 65.
Start with the left marker.
Remove Tension SpringRefer to Figure 99351. At the marker tension spring , loosen the lower
jam nut . Disconnect the spring from the springholder . Leave the top jam nut undisturbed, sothat at re-installation, the spring tension remains atthe current setting.
Note: See the drill Operator manual for adjusting springtension.
Release Swing PivotRefer to Figure 100352. Remove and save one set:
803-342C NUT HEX TOP LOCK 1/2-13 PLT802-130C HHCS 1/2-13X2 1/2 GR5SFM-8666 HAUKAAS SPRING HOLDER SFM
Release Cylinder353. At the rod end of the cylinder , remove and save:
805-104C PIN COTTER 3/16 X 1 1/2 PLT804-029C WASHER FLAT 1 SAE
Remove Arm354. Attach a hoist to the arm assembly . Lift it off the
pivot frame . Rest the arm on the implementwing to avoid needing to disconnect hydraulics.
Figure 99Marker Tension Spring
31198
178
239
238
232
239
178
238
Figure 100Release Wing Pivot
Q0130
238
171
182
239
233
191
195
237
236
182
171
238
233
195
191
237
236
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Update Markers 63
Remove Old Pivot FrameRefer to Figure 101355. Loosen the nuts at the end bushing .
356. Support the weight of the pivot frame . On thesubframe , slide the end bushing toward themarker disc. Remove the pivot frame . The oldpivot frame is not re-used.
Install New Pivot FrameRefer to Figure 102357. Select one of the following new:
SFM-8661-R1 HAUKAAS PIVOT FRAME LEFT SFMSFM-8662-R1 HAUKAAS PIVOT FRAME RIGHT SFM
358. Insert the front pivot rod of the new pivot frame( or ) into the front bushing of thesubframe . Slide the end bushing intoengagement with the rear pivot rod.
359. Tighten nuts to secure the end bushing.
Figure 101Remove Pivot Frame (LH)
Q0130
236
182
234
235
182 235
236
234 235
236
Figure 102Install Pivot Frame (LH)
Q0131
981
182
234
235
982
981
982
981 982
234 235
182
05/25/2011 Table of Contents Index 166-370M
64 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Re-Install ArmRefer to Figure 103360. Select the arm assembly. Arms are different for left
and right. Check the orientation of the disc guard.Attach a hoist to the arm assembly . Place it onthe new pivot frame ( or ). Guide the rod endof the cylinder onto the rear vertical pin of thepivot frame.
361. At the rod end of the cylinder , place the save:804-029C WASHER FLAT 1 SAE
and secure with saved cotter:805-104C PIN COTTER 3/16 X 1 1/2 PLT
362. Select a saved:SFM-8666 HAUKAAS SPRING HOLDER SFM
Place it on the forward vertical pin of the new pivotframe ( or ), and secure with saved
802-130C HHCS 1/2-13X2 1/2 GR5803-342C NUT HEX TOP LOCK 1/2-13 PLT
Re-Attach Spring363. Attach the spring to the spring holder .
364. Tighten the lower jam nut at the eyebolt .leave the top jam nut undisturbed.
365. Repeat step 351 through step 364 for the right side.
Figure 103Re-Install Arm
Q0131
238
171
182
239
233
191
195
237
981982178
232
237
981 982
233
233
191
195
238
981 982
171
182
239 238
178 232
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 65
Update Coulters
Prepare Implement366. Hitch the air drill to a tractor, or connect the lift and
fold circuits to a hydraulic source. Raise the imple-ment. Check for hydraulic leaks.
367. See Operator manual for details on center lockingand lock channels.
368. Install lock channels.
369. Engage the center lift lock.
370. Lower implement onto locks.
371. Set hydraulic circuits to Float. Shut down tractor orhydraulic source.
Replace Coulter BarsRepeat the following steps for each row. To minimize therisk of re-assembly errors, perform a complete update toa single row before moving to another row. If multipleworkers are available, multiple drill sections may beworked on simultaneously.
Remove Existing BarRefer to Figure 104372. Make note of current coulter height. Check the loca-
tion of the bar tops with respect to the tool bar,or the distance from the bottom of the tool bar to thebottom edge of the coulter disk. Some rows may runat different heights (for tire compensation).
373. Remove and save two sets:803-049C NUT HEX 7/8-9 PLT804-037C WASHER LOCK SPRING 7/8 PLT802-126C HHCS 7/8-9X3 1/2 GR5
and the mount:221-643H HD007 OPNR MNT WLMT
then dismount the coulter assembly at thecasting .
374. Loosen the nuts at the cross-bolts betweenthe clamps .
375. Loosen the U-bolt nuts at the clamps .Remove the existing coulter bar:
204-280D 18" COULTER SPRING BAR-PAINTEDThis bar is not re-used.
Figure 104Coulter Dismounting
29353
135
180
192 170
137
136
135
178
103
177
167
High Pressure Fluid Hazard:Wear gloves and goggles when checking hydraulic connec-tions. Use cardboard to check for leaks. Check for leaks care-fully. If an accident occurs, seek immediate medical assistancefrom a physician familiar with this type of injury.
Sharp Object Hazard:Wear gloves when handling the coulter assembly . The discmay be sharp and contaminated with soil. The assembly isheavy.
137
135
180
192
170
136
137
177 167
103
178 103
135
05/25/2011 Table of Contents Index 166-370M
66 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Install New BarRefer to Figure 105376. Select one new coulter bar:
807-300C COULT SPR BAR 3/4 X 2 1/2 X 18Insert the new bar in the clamps , set to thesame height relative to the tool bar.
377. Tighten U-bolt nuts to snug. Ensure that U-boltsare perpendicular to tool bar.
378. Tighten clamp cross-bolt nuts to torque spec.Ensure that clamp faces touch.
379. Tighten U-bolt nuts to torque spec.
380. Mount the coulter assembly on the bottom ofthe new bar, using the saved mount , bolts ,lock washers and nuts . Check coulter toopener and row alignment before final tightening.
381. Repeat step 372 through step 380 for each row.
Figure 105Coulter Mounting
29353
969
180
192 170
137
136
969
178
103
177
167
969
103
178
177
178
137
136 170
192 180
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 67
Close-Out
382. Remove all part number tags, grease-pencil andpaint-pencil part numbers.
383. If a suitable tractor and field are available, test allhydraulic functions. Also perform some passes toconfirm coulter to row alignment.
Reconfigure MonitorThe DICKEY-john® IntelliAg® WSMT is still programmedwith the prior bus configuration of this air drill. When firstpowered-up after the update, the monitor is likely to dis-play an alarm when it discovers the new WSMB. Evenwithout an alarm, the sensor to row assignments areincorrect.
These instructions presume that the monitor already hasMaterials and Channels defined.
The steps below require a password to enter UserLevel 2. Consult the IntelliAg® ACC manual (110011512).
384. Set the Master Switch off.
385. Power up the monitor (turn on tractor ignition).
386. If a configuration error is detected (virtually certainon the first power-up), press the Alarm Cancel(CANCEL) softkey.
387. Press NEXT PAGE softkey until the MODULE CFGsoftkey appears.
388. Press the MODULE CFG softkey.
389. Press the AUTO CONFIG softkey.
390. Press the AUTO SORT softkey.
391. Move the WSMT-ACCGP to MODULE ADDR 1.
392. Press the ROW ASSIGN softkey. Verify that the rowassignments are as shown in the table at right. SeeACC manual for how to re-order assignments.
393. Press the CTRL SETUP softkey.
Note: Consult the factory on the next steps. A monitorfirmware update was pending when this manualwas initially released, and the exact softkey se-quences were not yet documented.
This completes the update.
Figure 106Monitor Console
25421
WSMBIDa
a. This is the hand-applied number from “EnumerateWSMBs” on page 42.
MODULE # OFROWS
ROW#’sADDR. Type
1 Noteb
b. These numbers are not shown, as they varydepending on POM and the serial numbers ofWSMB modules not used for material rate sensing.
WSMB-18R 12 1-12
2 Noteb WSMB-18R 16 13-28
3 Noteb WSMB-18R 12 29-40
4 Noteb WSMB-18R 12 41-52
5 Noteb WSMB-18R 16 53-68
6 Noteb WSMB-18R 12 69-80
05/25/2011 Table of Contents Index 166-370M
68 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Appendix A - Reference Information
Chain SetupSet chain clip orientation when mounting chains andcheck it before adjusting slack on factory-installedchains. Set or check initial slack on all chains prior todelivery.
Chain Clip Orientation
Refer to Figure 107 (arrow shows chain direction)Whenever mounting a chain, make sure the clip at theremovable link is oriented to minimize snags.
Install clip with open end facing away from direction ofchain travel (shown by gray or striped arrows in chainrouting diagrams).
Chain Slack
Refer to Figure 108, which, for clarity, greatly exaggeratesslack, and omits the idlers.1. Measure the span for allowable slack:
Locate the longest span of each chain (usually thespan which does not run through the idlers).
2. Determine the ideal slack:Long chains (over 91cm/36in): 2.1cm/m (1⁄4in per ft)Vertical short chains: 2.1cm/m (1⁄4in per foot)Horizontal short chains: 4.2cm/m (1⁄2in per foot).
3. Measure the current slack :Acting at a right angle to the chain span at the cen-ter of the span, deflect the chain in both directions.The slack is the distance of the movement.
4. Adjust the idlers for ideal slack.
Figure 107Chain Clip Orientation
26482
Figure 108Measuring Chain Slack
27264
2
11
2
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix A - Reference Information 69
Torque Values Chart
BoltSize
Bolt Head IdentificationBoltSize
Bolt Head Identification
Grade 2 Grade 5 Grade 8 Class 5.8 Class 8.8 Class 10.9in-tpi1 N-m2 ft-lb3 N-m ft-lb N-m ft-lb mm x pitch4 N-m ft-lb N-m ft-lb N-m ft-lb1⁄4-20 7.4 5.6 11 8 16 12 M 5 X 0.8 4 3 6 5 9 71⁄4-28 8.5 6 13 10 18 14 M 6 X 1 7 5 11 8 15 11
5⁄16-18 15 11 24 17 33 25 M 8 X 1.25 17 12 26 19 36 275⁄16-24 17 13 26 19 37 27 M 8 X 1 18 13 28 21 39 293⁄8-16 27 20 42 31 59 44 M10 X 1.5 33 24 52 39 72 533⁄8-24 31 22 47 35 67 49 M10 X 0.75 39 29 61 45 85 62
7⁄16-14 43 32 67 49 95 70 M12 X 1.75 58 42 91 67 125 937⁄16-20 49 36 75 55 105 78 M12 X 1.5 60 44 95 70 130 971⁄2-13 66 49 105 76 145 105 M12 X 1 90 66 105 77 145 1051⁄2-20 75 55 115 85 165 120 M14 X 2 92 68 145 105 200 150
9⁄16-12 95 70 150 110 210 155 M14 X 1.5 99 73 155 115 215 1609⁄16-18 105 79 165 120 235 170 M16 X 2 145 105 225 165 315 2305⁄8-11 130 97 205 150 285 210 M16 X 1.5 155 115 240 180 335 2455⁄8-18 150 110 230 170 325 240 M18 X 2.5 195 145 310 230 405 3003⁄4-10 235 170 360 265 510 375 M18 X 1.5 220 165 350 260 485 3553⁄4-16 260 190 405 295 570 420 M20 X 2.5 280 205 440 325 610 4507⁄8-9 225 165 585 430 820 605 M20 X 1.5 310 230 650 480 900 665
7⁄8-14 250 185 640 475 905 670 M24 X 3 480 355 760 560 1050 780
1-8 340 250 875 645 1230 910 M24 X 2 525 390 830 610 1150 845
1-12 370 275 955 705 1350 995 M30 X 3.5 960 705 1510 1120 2100 1550
11⁄8-7 480 355 1080 795 1750 1290 M30 X 2 1060 785 1680 1240 2320 1710
11⁄8-12 540 395 1210 890 1960 1440 M36 X 3.5 1730 1270 2650 1950 3660 2700
11⁄4-7 680 500 1520 1120 2460 1820 M36 X 2 1880 1380 2960 2190 4100 3220
11⁄4-12 750 555 1680 1240 2730 2010
13⁄8-6 890 655 1990 1470 3230 2380 1. in-tpi = nominal thread diameter in inches-threads per inch
13⁄8-12 1010 745 2270 1670 3680 2710 2. N· m = newton-meters
11⁄2-6 1180 870 2640 1950 4290 3160 3. ft-lb = foot pounds
11⁄2-12 1330 980 2970 2190 4820 35604. mm x pitch = nominal thread diameter in millimeters x thread
pitchTorque tolerance + 0%, -15% of torquing values. Unless otherwise specified use torque values listed above.
5.8 8.8 10.9
25199
05/25/2011 Table of Contents Index 166-370M
70 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Hydraulic Connectors and TorqueRefer to Figure 127 (a hypothetical fitting)Leave any protective caps in place until immediately priorto making a connection.
NPT - National Pipe ThreadNote tapered threads, no cone/flare, and no O-ring.Apply liquid pipe sealant for hydraulic applications(do not use tape sealant, which can foul filters).JIC - Joint Industry Conference (SAE J514)Note straight threads and the 37° cone on“M” fittings (or 37° flare on “F” fittings). Use nosealants (tape or liquid) on JIC fittings.ORB - O-Ring Boss (SAE J514)Note straight threads and elastomer O-Ring .Prior to installation, to prevent abrasion during tight-ening, lubricate O-Ring with clean hydraulic fluid.Use no sealants (tape or liquid) on JIC fittings.
ORB fittings that need orientation, such as the elldepicted, also have a washer and jam nut(“adjustable thread port stud”). Back jam nut awayfrom washer. Thread fitting into receptacle untilO-Ring contacts seat. Unscrew fitting to desiredorientation. Tighten jam nut to torque specification.
2
5
4
98
75
3Figure 109
Hydraulic Connector ID31282
Fittings Torque ValuesFitting Ft-Lbs N-m
1⁄4 NPT 1.5-3.0 turns past finger tight5⁄16 JIC 18-20 24-275⁄16 ORB w/jam nut 12-16 16-225⁄16 ORB straight 18-24 24-323⁄4 JIC 27-39 37-533⁄4 ORB w/jam nut 20-30 27-413⁄4 ORB straight 27-43 37-58
1
1
2
4 5
3
5 7
8 9
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 71
Appendix D - Drawings
160-795D PIN RETAINER TAB
Inch
05/25/2011 Table of Contents Index 166-370M
72 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
160-801D FRAME NUT BLOCK
Inch
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix D - Drawings 73
160-802D FRAME EXT BOT GUSSET LH REWORK
Inch
05/25/2011 Table of Contents Index 166-370M
74 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
160-803D FRAME EXT BOX PLATE
Inch
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix D - Drawings 75
160-804D FRAME EXT BOT GUSSET LH REWORK
Inch
05/25/2011 Table of Contents Index 166-370M
76 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
160-805D FRAME EXT BOT GUSSET REWORK
Inch
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix D - Drawings 77
160-806D FRAME EXT BOT GUSSET REWORK
Inch
05/25/2011 Table of Contents Index 166-370M
78 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
160-807D FRAME EXT CORNER GUSSET
Inch
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix D - Drawings 79
160-808D FRAME EXT 100 DEG GUSSET
Inch
05/25/2011 Table of Contents Index 166-370M
80 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
160-809D FR EXT 100 DEG GUSSET REWORK
Inch
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix D - Drawings 81
160-810D FR EXT 100 DEG GUSSET REWORK
Inch
05/25/2011 Table of Contents Index 166-370M
82 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
160-811D WING HINGE PIN ROTATION STOP
Inch
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 83
Appendix G - Glossary
Part Descriptor Abbreviations#40 Number 40 Size HYD Hydraulic
18R 18 Row I-BLT Eye-Bolt
45T 45 Tooth I.D., ID Inside Diameter
AD Adaptor IMPLMT Implement
AP Application INT AG (or INTAG) IntelliAg®
ASSY, ASY Assembly JIC Joint Industry Conference (37° flare)
ASTM American Society for Testing & Materials L Long or Length
BLK Black LB Pound
BRG Bearing LG Long or Length
BUSH Bushing LH Left Hand
BUT Button MIN Minimum
CAN ISO 11898 Controller Area Network MJIC Male JIC
CLTR Coulter (Cultivator Disc) MNT Mount
CNTRL Control or Controller MORB Male ORB
COULT Coulter (Cultivator Disc) MW Midway (brand)
CP Cap or Coupler NR Non-Rotate
CRNR Corner OPNR Opener
CYL Cylinder ORB O-Ring Boss
DBL Double PIC Pictogram
DEG Degree PLNTR Planter
DIA Diameter PLT Plated
DJ DICKEY-john® POM Planter Output Module
DRV Drive QD Quick Disconnect
EL Elbow REP Re-phasing
EU European Union RH Right Hand
EXT Extension RHSNB Round Head Shank Neck Bolt
FLG Flanged RIBB Ribbed
FR Front or Front Right RL Roller
FT Foot RPM Revolutions Per Minute
GP Great Plains S-S, SS Set Screw or Stainless Steel
GR5 Grade 5 SAE Society of Automotive Engineers (stds.)
GR8 Grade 8 SCR Screw
HEX or HX Hexagonal SFM Subframe
HH Hydraulic Hose SKT Socket
HHCS Hex Head Cap Screw SPKT Sprocket
HSG Housing SPR Spring
05/25/2011 Table of Contents Index 166-370M
84 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
SQ Square WELDMT, (or WLDMNT, WLDMT) Weldment
TE Tee WP Weather Pak
USBL Usable WRM Worm
USS United States Standard (heavy-duty) WSMT Working Set Master
VELCR Hook and loop fastening X by
W/ with YLW Yellow
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 85
Appendix H - Harness
Tower ID
32146
A
E
B
F
C
G
D
H
05/25/2011 Table of Contents Index 166-370M
86 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Secondary Hose Routing, 40-RowTurrets, 40-Row, Double-Shoot, Seed
Mapping, 40-Row, Double-Shoot, Seed
P01
P02
P03
P04
P05
P06
P07
P08
P09
P10 P01
P02
P03
P04 P05
P06
P07
P08
P09P10
P01
P02
P03
P04
P05
P06
P07
P08
P09
P10
P01
P02
P03
P04
P05
P06
P07
P08
P09
P10F
B
L RU
A U
B
U
C
UD
8
6
4
2
1
3
5 7
9
10
30
28
26
24
22
21
23 25
27
29
50
4846
44
42
41
43
45
47
49
69
70
68
66
64
62
61 63
65
67
Row Hose Length Tower Sensor Ext. Drop Row Hose Length Tower Sensor Ext. DropDrop Metric Inch -Port Lead Lead No. Drop Metric Inch -Port Lead Lead No.
R01(S) 157 cm 62 in. A-P05 WSMB1-01 - 1 R21(S) 152 cm 60 in. C-P04 WSMB2-09 +3ft 21R02(S) 152 cm 60 in. A-P04 WSMB1-02 - 2 R22(S) 152 cm 60 in. C-P03 WSMB2-10 +3ft 22R03(S) 147 cm 58 in. A-P06 WSMB1-03 - 3 R23(S) 142 cm 56 in. C-P05 WSMB2-11 +3ft 23R04(S) 147 cm 58 in. A-P03 WSMB1-04 - 4 R24(S) 163 cm 64 in. C-P02 WSMB2-12 +3ft 24R05(S) 137 cm 54 in. A-P07 WSMB1-05 - 5 R25(S) 142 cm 56 in. C-P06 WSMB2-13 +3ft 25R06(S) 163 cm 64 in. A-P02 WSMB1-06 - 6 R26(S) 163 cm 64 in. C-P01 WSMB2-14 +3ft 26R07(S) 142 cm 56 in. A-P08 WSMB1-07 - 7 R27(S) 142 cm 56 in. C-P07 WSMB2-15 +3ft 27R08(S) 152 cm 60 in. A-P01 WSMB1-08 - 8 R28(S) 188 cm 74 in. C-P10 WSMB2-16 +3ft 28R09(S) 142 cm 56 in. A-P09 WSMB1-09 - 9 R29(S) 163 cm 64 in. C-P08 WSMB3-01 +15ft 29R10(S) 142 cm 56 in. A-P10 WSMB1-10 - 10 R30(S) 173 cm 68 in. C-P09 WSMB3-02 +15ft 30R11(S) 163 cm 64 in. B-P05 WSMB1-11 +10ft 11 R31(S) 178 cm 70 in. D-P03 WSMB3-03 - 31R12(S) 152 cm 60 in. B-P04 WSMB1-12 +10ft 12 R32(S) 157 cm 62 in. D-P02 WSMB3-04 - 32R13(S) 147 cm 58 in. B-P06 WSMB2-01 - 13 R33(S) 163 cm 64 in. D-P04 WSMB3-05 - 33R14(S) 168 cm 66 in. B-P03 WSMB2-02 - 14 R34(S) 157 cm 62 in. D-P01 WSMB3-06 - 34R15(S) 137 cm 54 in. B-P07 WSMB2-03 - 15 R35(S) 157 cm 62 in. D-P05 WSMB3-07 - 35R16(S) 152 cm 60 in. B-P02 WSMB2-04 - 16 R36(S) 173 cm 68 in. D-P10 WSMB3-08 - 36R17(S) 137 cm 54 in. B-P08 WSMB2-05 - 17 R37(S) 163 cm 64 in. D-P06 WSMB3-09 - 37R18(S) 147 cm 58 in. B-P01 WSMB2-06 - 18 R38(S) 173 cm 68 in. D-P09 WSMB3-10 - 38R19(S) 152 cm 60 in. B-P09 WSMB2-07 - 19 R39(S) 168 cm 66 in. D-P07 WSMB3-11 - 39R20(S) 157 cm 62 in. B-P10 WSMB2-08 - 20 R40(S) 173 cm 68 in. D-P08 WSMB3-12 - 40
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix H - Harness 87
Turrets, 40-Row, Double-Shoot, Fertilizer
40-Row, Fertilizer
P01
P02
P03P04
P05
P06
P07
P08 P09
P10
P01
P02 P03
P04
P05
P06
P07
P08
P09
P10
P01
P02
P03
P04P05
P06
P07
P08
P09 P10 P01
P02
P03
P04
P05P06
P07
P08
P09
P10
F
B
L R
UE
U F U
G
UH
181614
12
11
13
15
17
19
20
80
7876
74
72
71
73
75
77
79
60
58
56
54
52
51
53 55
57
59
38
3634
32
31
33
35
37
39
40
Row Hose Length Tower Sensor Ext. Drop Row Hose Length Tower Sensor Ext. DropDrop Metric Inch -Port Lead Lead No. Drop Metric Inch -Port Lead Lead No.
R01(F) 157 cm 62 in. E-P08 WSMB4-01 - 41 R21(F) 168 cm 66 in. G-P01 WSMB5-09 - 61R02(F) 152 cm 60 in. E-P07 WSMB4-02 - 42 R22(F) 137 cm 54 in. G-P10 WSMB5-10 - 62R03(F) 147 cm 58 in. E-P09 WSMB4-03 - 43 R23(F) 137 cm 54 in. G-P02 WSMB5-11 - 63R04(F) 142 cm 56 in. E-P06 WSMB4-04 - 44 R24(F) 137 cm 54 in. G-P09 WSMB5-12 - 64R05(F) 142 cm 56 in. E-P10 WSMB4-05 - 45 R25(F) 137 cm 54 in. G-P03 WSMB5-13 - 65R06(F) 142 cm 56 in. E-P05 WSMB4-06 - 46 R26(F) 142 cm 56 in. G-P08 WSMB5-14 - 66R07(F) 137 cm 54 in. E-P01 WSMB4-07 - 47 R27(F) 142 cm 56 in. G-P04 WSMB5-15 - 67R08(F) 137 cm 54 in. E-P04 WSMB4-08 - 48 R28(F) 163 cm 64 in. G-P07 WSMB5-16 - 68R09(F) 137 cm 54 in. E-P02 WSMB4-09 - 49 R29(F) 163 cm 64 in. G-P05 WSMB6-01 +15ft 69R10(F) 137 cm 54 in. E-P03 WSMB4-10 - 50 R30(F) 168 cm 66 in. G-P06 WSMB6-02 +15ft 70R11(F) 163 cm 64 in. F-P07 WSMB4-11 +15ft 51 R31(F) 173 cm 68 in. H-P10 WSMB6-03 - 71R12(F) 152 cm 60 in. F-P06 WSMB4-12 +15ft 52 R32(F) 163 cm 64 in. H-P09 WSMB6-04 - 72R13(F) 147 cm 58 in. F-P08 WSMB5-01 +3ft 53 R33(F) 157 cm 62 in. H-P01 WSMB6-05 - 73R14(F) 147 cm 58 in. F-P05 WSMB5-02 +3ft 54 R34(F) 157 cm 62 in. H-P08 WSMB6-06 - 74R15(F) 137 cm 54 in. F-P09 WSMB5-03 +3ft 55 R35(F) 152 cm 60 in. H-P02 WSMB6-07 - 75R16(F) 142 cm 56 in. F-P04 WSMB5-04 +3ft 56 R36(F) 157 cm 62 in. H-P07 WSMB6-08 - 76R17(F) 137 cm 54 in. F-P10 WSMB5-05 +3ft 57 R37(F) 163 cm 64 in. H-P03 WSMB6-09 - 77R18(F) 142 cm 56 in. F-P03 WSMB5-06 +3ft 58 R38(F) 152 cm 60 in. H-P06 WSMB6-10 - 78R19(F) 168 cm 66 in. F-P01 WSMB5-07 +3ft 59 R39(F) 163 cm 64 in. H-P04 WSMB6-11 - 79R20(F) 137 cm 54 in. F-P02 WSMB5-08 +3ft 60 R40(F) 163 cm 64 in. H-P05 WSMB6-12 - 80
05/25/2011 Table of Contents Index 166-370M
88 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Harness (LH)
WSMB
1WSMB
4WSMB
2WS
4677
5133
0S1
4 Le
ads
Unu
sed
4677
5133
0S1
4 Le
ads
Unu
sed
.eps97%
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix H - Harness 89
Harness (RH)
2011-05-02
Q0118
SMB
2WSMB
5WSMB
3WSMB
6
4677
5133
0S1
(New)
4 Le
ads
Unu
sed
.eps97%
05/25/2011 Table of Contents Index 166-370M
90 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
Appendix P - Part Lists
The part call-out numbers in this list match all Figures inthese installation instructions. Part descriptions matchthose in your updated Parts Manual.
Quantities are units (“ea”).
Existing Parts Affected
The following existing parts are involved in the kit instal-lation.
The Disposition column indicates whether the part is leftin place, moved or not re-used.
Callout
PartNumber Part Description Part Disposition
101 113-370D 1/4 MARKER HYD HOSE GUARD Removed. Re-installed.102 136-223D CHAIN RL #40 138 PITCHES Dismounted. Re-mounted.103 149-059D COULTER CLAMP BAR Loosened. Re-tightened.104 160-201H WING PIVOT PIN WELDMENT Removed. Re-installed.105 160-314H REAR PARALLEL LIFT LINK WELDMT Removed. Re-installed.106 160-315H NTA607HD FRONT PULL LINK WLDMT Removed. Replaced by new weldment.107 160-316H NTA607HD REAR PULL LINK WELDMT Removed. Not re-used.108 160-317H NTA607HD LIFT ASST FRAME WLMT Removed. Re-installed.109 160-321H BACK PRESSURE FLEX LINK WELDMT Left in place.110 160-323H PIN WLDMNT 1.25 X 15.66 NR Removed. Re-installed.111 160-324H PIN WLDMNT 1.25 X 12.34 NR Removed. Re-installed.112 160-328H LIFT ASSIST LINK WELDMENT Removed. Re-installed.113 160-329H LIFT LINK ADJUSTER TRUNNION Disconnected and re-connected.114 160-331S NTA607HD HYDRAULIC VALVE ASY Relocated.115 160-754D NTA607 PULL LINK CYLINDER LUG Removed. Re-installed.116 160-760D TRANSPORT LOCK PIN 1 X 8.25 Removed. Re-installed.117 160-763D NTA607HD PIN STORAGE BRACKET Removed. Re-installed.118 160-781D PIN 1 1/2 X 4 USABLE 1045 Removed. Re-installed.119 160-787D DOUBLE SHOOT TOWER MOUNT ANGLE Left in place.120 160-788D DBL SHOOT BLOCKAGE MONITOR MNT Left in place or removed. Not re-used.121 166-285H CART DRILL FRAME WLDMNT Modified.122 166-289H 82/82 HOPPER MOUNT Removed w/hoppers. Re-installed.123 166-297H EXTENDED TONGUE WELDMENT Modified.124 166-300K 4-OUTLET METER ASSEMBLY Removed. Re-installed.125 166-308/20/21S 4-OUTLET STAR SHAFT ASY Removed. Re-installed.125 166-308S 4-OUTLET METER 2-STAR SHFT ASY Removed. Re-installed.125 166-320S 4-OUTLET METER 3-STAR SHFT ASY Removed. Re-installed.125 166-321S 4-OUTLET METER 4-STAR SHFT ASY Removed. Re-installed.126 167-020H LID SWIVEL WELDMENT Left in place. Parts changed.127 167-091H BIN LADDER Left in place.128 167-283D BIN LID TOP CROSS BAR Removed. Updated. Re-installed.129 168-125H 45T QUICK CHANGE SPKT WELDMENT Dismounted. Re-mounted.130 168-243D GEAR 54 TOOTH QUICK CHANGE Removed. Re-installed.131 168-409D METER SHAFT MOUNT PLATE Removed. Not re-used.
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix P - Part Lists 91
132 168-463D 2 1/2 INCH AIR HOSE 25 LONG Removed. Re-installed.133 170-201D CASTING LARGE HITCH STRAP Removed. Re-installed.134 188-009V BRG .755 HEX BORE W/S-S Removed. Re-installed.135 204-280D 18" COULTER SPRING BAR-PAINTED Removed. Replaced with new bar.136 221-643H HD007 OPNR MNT WLMT Removed. Re-installed.137 249-050S CLTR CASTING ASSY Removed. Re-installed on new bar.138 266-174D METER BOX MOUNT Removed. Replaced with new mount.139 266-187D METER SENSOR MOUNT Removed. Re-installed.140 2A0206 MW PIN SHORT Removed. Re-installed.141 2A0132 MW PIN CLIP Removed. Re-installed.142 457901815 DJ HARNESS 10 FT EXT 3 PIN WP Removed. Re-installed.143 459680920 EXT. HARNESS 3’, FAN RPM Removed. Re-installed.144 459680922 EXT. HARNESS 15’ FAN RPM Removed. Re-installed.145 464360178S1 AP RATE 1’ CABLE Disconnected. Re-connected.146 466820721S1 DJ BIN LEVEL W/ CABLE GLAND Disconnected. Re-connected.147 467420701 VIGILENSE BLOCK SENSOR Left in place.148 467751330S1 16 ROW HARNESS Removed. Re-installed.149 467980126 MINI CAN TERMINATOR Removed. Re-installed.150 467980141 10’ EXT HARNESS Removed. Re-installed.151 467980856B GP WSMTII AIR CART HARNESS Disconnected. Re-connected.152 467981100S1 INTAG WSMB MODULE 18R Removed. Re-installed.153 467981201A INT AG HARNESS, WSMB MODULE Removed. Re-installed.154 467982000S1 PLNTR CNTRL OUTPUT MODULE(POM) Left in place.155 502-068D HYD HOSE CLAMP BRACKET Removed. Re-installed.156 800-052C HOSE CLIP 5/8 I.D. Removed. Re-installed.157 800-060C CABLE TIE .19X14.25 3DIA 50LB Removed. Replaced with new tie.158 800-064C HOSE CLIP 13/16 ID Removed. Re-installed.159 800-180C 2 1/2 AIR HOSE BAND CLAMP Removed. Re-installed.160 800-241C CLAMP WRM DRV #48SS (1.63-3.5) Removed. Re-installed.161 800-301C CABLE TIE 2 DIA MIN - YLW Removed. Not re-used.162 801-042C SCREW THUMB 5/16-18 X 5/8 PLT Loosened and re-tightened.163 801-151C SCR HEX SELF TAP 1/4-20X1TYPEF Removed. Not re-used.164 802-007C HHCS 5/16-18X3/4 GR5 Removed. Re-installed.165 802-012C HHCS 5/16-18X1 1/2 GR5 Removed. Re-installed.166 802-017C HHCS 3/8-16X1 GR5 Removed. Not re-used.167 802-082C HHCS 1/2-13X1 3/4 GR5 Removed. Some re-installed.168 802-106C RHSNB 1/2-13X1 1/2 GR5 Removed. Re-installed.169 802-115C HHCS 5/16-18X2 GR5 Removed. Re-installed.170 802-126C HHCS 7/8-9X3 1/2 GR5 Removed. Re-installed.171 802-130C HHCS 1/2-13X2 1/2 GR5 Removed. Some re-installed.172 802-155C RHSNB 3/8-16X1 1/4 GR5 Removed. Not re-used.173 802-370C HHCS 1/4-20X1 3/4 GR5 Removed. Some re-installed.
Callout
PartNumber Part Description Part Disposition
05/25/2011 Table of Contents Index 166-370M
92 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
174 802-910C RHSNB 3/4-10 X 2 GR5 PLT Removed. Not re-used.175 803-006C NUT HEX 1/4-20 PLT Removed. Some re-installed.176 803-014C NUT HEX 3/8-16 PLT Removed. Not re-used.177 803-020C NUT HEX 1/2-13 PLT Removed. Some re-installed.178 803-021C NUT HEX 5/8-11 PLT Removed. Re-installed.179 803-027C NUT HEX 3/4-10 PLT Removed. Some re-installed.180 803-049C NUT HEX 7/8-9 PLT Removed. Re-installed.181 803-147C NUT HEX NYLOCK 1/2-13 Removed. Some re-installed.182 803-342C NUT HEX TOP LOCK 1/2-13 PLT Removed. Re-installed.183 804-006C WASHER LOCK SPRING 1/4 PLT Removed. Some re-installed.184 804-009C WASHER LOCK SPRING 5/16 PLT Removed. Re-installed.185 804-011C WASHER FLAT 3/8 USS PLT Removed. Not re-used.186 804-013C WASHER LOCK SPRING 3/8 PLT Removed. Not re-used.187 804-015C WASHER LOCK SPRING 1/2 PLT Removed. Some re-installed.188 804-017C WASHER FLAT 1/2 USS PLT Removed. Re-installed.189 804-022C WASHER LOCK SPRING 5/8 PLT Removed. Re-installed.190 804-023C WASHER LOCK SPRING 3/4 PLT Removed. Some re-installed.191 804-029C WASHER FLAT 1 SAE Removed. Re-installed.192 804-037C WASHER LOCK SPRING 7/8 PLT Removed. Re-installed.193 804-039C WASHER FLAT 1 1/4 SAE PLT Removed. Re-installed.194 804-117C WASHER FLAT 1/4 HARD ASTMF436 Removed. Re-installed.195 805-104C PIN COTTER 3/16 X 1 1/2 PLT Removed. Re-installed.196 805-117C PIN ROLL 1/4 X 2 1/2 PLT Removed. Re-installed.197 805-124C PIN CLEVIS 1 X 3 11/16 GR5 PLT Removed. Re-installed.198 805-155C PIN WIRE RETAIN 5/16 X 2 1/2 Removed. Re-installed.199 805-187C PIN CLEVIS 1 X 2 1/4 GR5 PLT Removed. Re-installed.200 805-255C PIN ROLL 3/8 X 2 1/2 PLT Removed. Re-installed.201 806-010C U-BOLT 1/2-13 X 2 1/2 X 3 1/2 Removed. Some re-used.202 806-105C U-BOLT 5/8-11 X 4 1/32 X 6 Removed. Re-installed.203 807-268C SPRING COMP DIE.75X.375X1.50L Removed. Not re-used.204 808-192C GEAR 17 TOOTH QUICK CHANGE Removed. Re-installed.205 810-170C CYL REP 3.5X10X1.25 ROD (TIE) Removed. Re-installed.206 810-219C CYL 3.5X16X2 ROD (TIE ROD) Removed. Re-installed.207 810-345C VALVE 90 DEGREE SHUT-OFF Removed. Not re-used.208 810-442C MW STOP BUSH SET 1 1/4 SBS125 Relocated.209 811-080C TE 3/4MJIC 3/4MORB 3/4MJIC Two removed. One re-used.210 811-150C EL 3/4FJIC 3/4MJIC Two removed. One re-used.211 811-195C HH1/2R1 028 3/4FJIC 3/4MORB Disconnected and re-connected.212 811-291C HH1/2R2 072 3/4FJIC Un-clamped and re-clamped.213 811-324C AD 3/4MORB 3/4FJIC Removed. Not re-used.214 811-512C HH1/2R2 219 3/4FJIC 3/4MORB Removed and re-connected.215 811-617C HH1/2R2 140 3/4FJIC Un-clamped and re-clamped.
Callout
PartNumber Part Description Part Disposition
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix P - Part Lists 93
216 811-665C HH1/2R2 208 3/4FJIC Un-clamped and re-clamped.217 811-785C HH1/2R2 168 3/4FJIC Un-clamped and re-clamped.218 816-199C SEAL 1.33IDX2.23ODX.31T Removed. Re-installed.219 816-617C 2.5" ELBOW Removed. Re-installed.220 816-662C METER TOP SEAL Removed. Replaced with new seal.221 817-456C IDLER SPOOL #50 2.38X1.01X1.31 Loosen. Re-tightened.222 833-521C LIGHT HARNESS EU NTA607 IMPLMT Disconnected and re-connected.223 841-002C AD 1 1/16MORB 3/4FORB Left in place (re-installed if removed).224 841-162C HH3/8R2 184 3/4MORB 9/16FJIC Un-clamped and re-clamped.225 841-189C HH3/8R2 074 3/4MORB 9/16FJIC Un-clamped and re-clamped.226 841-451C HH1/2R2 148 3/4FJIC 3/4MORB Un-clamped and re-clamped.227 841-452C HH3/8R2 138 9/16FJIC Un-clamped and re-clamped.228 841-480C HH1/2R2 084 3/4FJIC 3/4MORB Re-routed.229 848-504C DECAL WING DOWN PRESSURE PIC Removed or obscured.230 848-505C DECAL FRAME BACK PRESSURE PIC Removed or obscured.231 890-466C HSG RIBB FLG 6BOLT PLT Removed. Re-installed.232 FNS-02392 HAUKAS 5/8-11X6 I-BLT(4"THREAD Removed. Re-installed.233 HYD-236801 HAUKAAS CYL 2-1/2X12PAL1200132 Removed. Re-installed.234 SFM-8657/8 HAUKAAS SUBFRAME LH/RH SFM234 SFM-8657 HAUKAAS SUBFRAME LEFT SFM Left in place.234 SFM-8658 HAUKAAS SUBFRAME RIGHT SFM Left in place.235 SFM-8659/60 HAUKAAS END BUSHING RH/LH SFM235 SFM-8659 HAUKAAS END BUSHING RIGHT SFM Moved, then repositioned.235 SFM-8660 HAUKAAS END BUSHING LEFT SFM Moved, then repositioned.236 SFM-8661/2 HAUKAAS PIVOT FRAME LEFT SFM236 SFM-8661 HAUKAAS PIVOT FRAME LEFT SFM Removed. Replaced with new part.236 SFM-8662 HAUKAAS PIVOT FRAME RIGHT SFM Removed. Replaced with new part.237 SFM-8663 HAUKAAS PRIMARY ARM SFM Removed. Re-installed.238 SFM-8666 HAUKAAS SPRING HOLDER SFM Removed. Re-installed.239 SPR-2395 HAUKAAS MEDIUM CB SPRING Removed. Re-installed.
Callout
PartNumber Part Description Part Disposition
05/25/2011 Table of Contents Index 166-370M
94 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
166-369A New Parts
Callout Quantity Part Number Part Description900 1 166-370M MANUAL NTA607 CART UPDATE KIT901 4 160-201H WING PIVOT PIN WELDMENT902 1 160-315H NTA607HD FRONT PULL LINK WLDMT903 1 160-316H NTA607HD REAR PULL LINK WELDMT904 2 160-795D PIN RETAINER TAB905 2 160-801D FRAME NUT BLOCK906 1 160-802D FRAME EXT BOT GUSSET LH REWORK907 2 160-803D FRAME EXT BOX PLATE908 1 160-804D FRAME EXT BOT GUSSET LH REWORK909 1 160-805D FRAME EXT BOT GUSSET REWORK910 1 160-806D FRAME EXT BOT GUSSET REWORK911 2 160-807D FRAME EXT CORNER GUSSET912 4 160-808D FRAME EXT 100 DEG GUSSET913 2 160-809D FR EXT 100 DEG GUSSET REWORK914 2 160-810D FR EXT 100 DEG GUSSET REWORK915 4 160-811D WING HINGE PIN ROTATION STOP916 2 166-368H NTA2007 PULL BAR917 4 166-988D BRACKET, 45DEG MODULE MOUNT918 4 168-472D METER SHAFT MOUNT PLATE919 4 266-288D METER BOX MOUNT920 4 266-289D FRONT METER BOX MNT TAB921 4 266-290D LOWER HOPPER SUPPORT ANGLE922 1 266-300D NTA2007 PULL BAR BOLT PLT923 2 266-302D NTA2007 PULL BAR ANCHOR924 4 266-306D METER SEAL FLANGE925 2 266-307D REAR MAIN FRAME LAP GUSSET926 2 266-308D FRONT MAIN FRAME CORNER GUSSET927 2 266-309D FRNT MAIN FRAME CRNR CAP PLT928 2 401-167H 16 ROW PULLBAR ADJUSTER929 2 402-011D SLEEVE, SPRING LINK MOUNT930 2 407-281H CYLINDER LOCK CHANNEL 1 1/2 X931 8 459680920 EXT. HARNESS 3’, FAN RPM932 16 464211090 DUST PLUG933 1 467751320S1 DJ 12 ROW HARNESS934 4 467981100S1 INTAG WSMB MODULE 18R935 1 467981201A INT AG HARNESS, WSMB MODULE936 3 800-301C CABLE TIE 2 DIA MIN - YLW937 3 800-303C CABLE TIE 2 DIA MIN - BLK938 10 800-035C CABLE TIE .31X28 8DIA 120LB939 150 800-060C CABLE TIE .19X14.25 3DIA 50LB940 50 800-112C CABLE TIE .19X7.25 1.75D 50LB941 2 801-235C SCR HX SKT BUT CP 3/8-16X2 1/2
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Appendix P - Part Lists 95
942 52 802-001C HHCS 1/4-20X3/4 SS943 16 802-064C HHCS 3/4-10X2 GR5944 8 802-082C HHCS 1/2-13X1 3/4 GR5945 12 802-106C RHSNB 1/2-13X1 1/2 GR5946 2 802-152C HHCS 1/4-20X2 GR5947 4 802-370C HHCS 1/4-20X1 3/4 GR5948 16 803-004C NUT HEX SS 1/4-20949 2 803-007C NUT LOCK 1/4-20 PLT950 20 803-020C NUT HEX 1/2-13 PLT951 8 803-047C NUT SQ 3/4-10 PLT952 2 803-073C NUT HEX 1 1/2-6 PLT953 2 803-078C NUT LOCK 3/8-16 NYLON INSERT954 4 804-006C WASHER LOCK SPRING 1/4 PLT955 6 804-012C WASHER FLAT 3/8 SAE PLT956 20 804-015C WASHER LOCK SPRING 1/2 PLT957 12 804-023C WASHER LOCK SPRING 3/4 PLT958 2 804-028C WASHER FLAT 1 USS PLT959 52 804-033C WASHER LOCK 1/4 SS960 20 804-113C WASHER FLAT 1/2 USS HARD PLT961 2 805-035C PIN BENT 1/2 X 3 W/HAIRPIN 12B962 2 805-058C PIN COTTER 3/16 X 2963 8 805-104C PIN COTTER 3/16 X 1 1/2 PLT964 2 805-117C PIN ROLL 1/4 X 2 1/2 PLT965 2 805-134C PIN CLEVIS 1 X 2 29/64 USABLE966 2 805-306C HITCH PIN 1X3 1/4 W/COTTER967 2 805-412C PIN CLEVIS 1 X 4.13 USBL968 2 807-268C SPRING COMP DIE.75X.375X1.50L969 40 807-300C COULT SPR BAR 3/4 X 2 1/2 X 18970 4 811-315C AD 9/16MJIC971 1 811-394C CP 3/4FORB MALE QD POPPET TYPE972 2 811-430C AD 3/4MJIC 3/4MJIC973 4 811-701C HH3/8R2 033 9/16FJIC974 1 811-831C HH1/2R2 034 3/4FJIC975 1 816-480C HOSE WRAP 3.0-4.5 X 24LG VELCR976 2 816-662C METER TOP SEAL977 4 816-693C AIR DRILL METER SHAFT GASKET978 1 841-555C HH1/2R2 156 3/4FJIC 3/4MORB979 1 848-504C DECAL WING DOWN PRESSURE PIC980 1 848-505C DECAL FRAME BACK PRESSURE PIC981 1 SFM-8661-R1 HAUKAAS PIVOT FRAME LEFT SFM982 1 SFM-8662-R1 HAUKAAS PIVOT FRAME RIGHT SFM
Callout Quantity Part Number Part Description
05/25/2011 Table of Contents Index 166-370M
96 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index 97
Index
AA (port) ............................................. 61ACC .......................................... 3, 67Air Cart Control .................................. 3Alarm Cancel ................................... 67anti-rotation ............................. 37, 38anti-rotation strap .................... 13, 34AUTO CONFIG ................................ 67AUTO SORT .................................... 67
BB (port) ............................................. 61back ................................................... 3backing paper .................................. 19blankets .............................................. 4bulkhead .........................10, 32, 61bushing ............................................ 63
CC (port) ............................................. 61cable tie ............................................ 13cable ties ............................................ 4callouts ............................................... 3CANbus ................................... 41, 45CANCEL .......................................... 67cart ................................................... 21CAUTION, defined ............................. 1chain ....................................... 13, 34chain clip .......................................... 68chemical ............................................. 1chute ................................................ 14clamp ..... 4, 10, 11, 14, 58, 60clip, chain ......................................... 68confined space ................................. 14console ............................................. 42cotter pins .......................................... 4coulter .............................................. 65crossbar ........................................... 35cutting wheel ............................. 4, 17cylinder ............................................. 10
DD (port) ............................................. 61DANGER, defined .............................. 1decal, ports ...................................... 61DICKEY-john® ........................ 42, 67down .................................................. 3drill ................................................... 17drill bit ................................................. 4DuPont 262 ........................................ 4dust plug .........................46, 47, 50
EE (port) .................................... 60, 61earthing .............................................. 4elbow ................................................ 14electrical ...................................... 5, 9existing parts ...................................... 3
FF (port) .................................... 60, 61fan hose ........................................... 32
fertilizer .............................................. 1fire ...................................................... 1fire extinguisher ................................. 4fish line ......................................4, 31flange ............................................... 16flange seals ..................................... 18flute shaft ......................................... 16fold ..................................................... 5fold hose .......................................... 32front ................................................... 3
GG (port) ....................................60, 61gear ................................................. 34gloves .................................1, 2, 65goggles ...............................1, 2, 65grease-pencil ................................... 67green ................................................. 4grinder .......................................4, 17ground ............................................... 4gusset ......................................22, 23gussets, underside ............................ 5gusset, cart ...................................... 22gusset, top ....................................... 39
Hharness ...........................36, 45, 60high pressure fluids ........................... 2hitch .........................................24, 31hoist ................................................... 4hopper ................... 13, 15, 28, 33hopper level sensor .................13, 34hose ................................................. 60hose wrap ........................................ 55hoses .......................................32, 34hose, hydraulic ................................. 60hose, primary ..................................... 9hydraulic .......................................... 30hydraulic connectors ........................ 70hydraulic safety .................................. 2hydraulics ......................................... 30
IIntelliAg® .................................42, 67
Jjacks .................................................. 4JIC ................................................... 70Joint Industry Conference ................ 70J514 ................................................. 70
LLEFT ................................................ 36left ...................................................... 3LH ...................................................... 3lid ..................................................... 35lift link ............................................... 57lift switch ..................................53, 60lift-assist ........................................... 36lift-assist link .................................... 11lifter .................................................... 4lighting .....................................36, 53
liquid fertilizer .....................................3
Mmarker ..................................... 60, 62markers ..............................................3Master Switch ...................................67Material Safety Data Sheet ......... 1, 4meter ....................................... 14, 28meter mount ............................ 26, 33meter vents .......................................14MODULE ADDR 1 ............................67MODULE CFG .................................67mounting slots ..................................17mount, meter ....................................26MSDS .......................................... 1, 4
NNational Pipe Thread .......................70new parts ............................................3NEXT PAGE .....................................67non-HD ...............................................3NPT ..................................................70NTA2007HD-4006 ..............................3NTA607HD-4006 ................................3nut block .............................................7
Ooperator manual .................................3Option 72 ............................................3ORB .................................................70order, WSMB ....................................42O-Ring Boss .....................................70
Ppaint .....18, 22, 23, 24, 25, 27paint-pencil .......................................67Pantone 356C ....................................4parallel arm ......................................37part number ......................................67part numbers ......................................4parts ...................................................3pivot frame ........................................63Planter Output Module .....................42POM .................................................42Port F ...............................................32PPG 43817 .........................................4Pre-Delivery .......................................3primary air hose .................................9pull bar ........................... 24, 25, 28pull link .................... 9, 36, 52, 57pull-bar ...............................................3
QQuick Setup Guide .............................3
Rrate sensor .......................................13release paper ...................................19respirator ............................................1RH ......................................................3RIGHT ..............................................36right ....................................................3roll pins ...............................................4
05/25/2011 Table of Contents 166-370M
98 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
routing, hydraulic .............................. 60ROW ASSIGN .................................. 67
SSAE J514 ......................................... 70safety information ............................... 1safety symbol ..................................... 1seal .................................16, 19, 33seal flange ....................................... 18sealant, silicone ................................. 4sensor ......................................... 5, 9sensor mount ................................... 19sensor, hopper ........................ 13, 34sensor, rate ...................................... 13sensor, speed .................................. 34serial number ................................... 42SFM-8661-R1, frame ....................... 63SFM-8662-R1, frame ....................... 63SFM-8666, holder ................... 62, 64sharp .................................................. 2silicone sealant ........4, 16, 18, 19single-hopper ..................................... 3slack, chain ...................................... 68slots ................................................. 17speed sensor ................................... 34spring ...................................... 35, 62square nut ............................... 39, 40strap, anti-rotation ............................ 13support, hopper ............................... 28switch, lift ................................ 53, 60switch, master .................................. 67symbol, safety .................................... 1
Ttables
fittings torque ............................. 70tags ........................................... 4, 67thumbscrew ............................. 13, 34tongue ..................................... 24, 31tools ................................................... 4torque ............................................... 69Tower A ...........................44, 46, 47Tower B ................................... 43, 48Tower C ................................... 43, 49Tower D ................................... 44, 50Tower G ............................................ 49Tower H ................................... 41, 51Tower B ............................................ 42turnbuckle .......................28, 29, 57
Uup ....................................................... 3
Vvalve ........................................ 32, 54vent ......................................... 14, 33
WWARNING, defined ............................ 1web site .............................................. 3weep hole ........................................ 17weight transfer ........................ 10, 54weld ..... 18, 22, 23, 24, 25, 27welder ................................................ 4welding ........................................ 5, 9welding blanket .................................. 4
wheel ................................................25wrap ..................................................55WSMB ... 5, 9, 41, 42, 43, 44,
46, ...47, 48, 49, 50, 51, 67WSMB-18R ......................................67WSMT ................................ 5, 9, 67WSMT-ACCGP .................................67
Yyellow ................................................32
Numerics110011512, manual ...................3, 67110011544, manual ............................3113-850M, manual .....................3, 6012-pin plug ........................................4512-pin receptacle ..............................45150 bu .................................................3160-201H, pin 12, 37, 38, 52, 53,
........................................................57160-314H, arm ........................37, 53160-315H, link .........................12, 57160-316H, link .........................37, 52160-317H, frame ...............................53160-323H, pin ..........................12, 58160-324H, pin ..........................37, 53160-331S, valves ..............................54160-754D, lug ..........................10, 59160-760D, pin ..........................11, 58160-763D, bracket ...................11, 58160-781D, pin ........ 11, 36, 52, 57160-795D, tab ...................................37160-801D, block ..................................7160-802D, gusset ...............................6160-803D, plate ..................................8160-804D, gusset ...............................5160-805D, gusset ...............................5160-806D, gusset ...............................6160-807D, gusset ...............................8160-808D, gusset ....................39, 40160-809D, gusset .............................40160-810D, gusset .............................39160-811D, stop .................................38166-283M, manual ..............................3166-283P, manual ...............................3166-283Q, manual ..............................3166-308S, shaft ................................16166-308/20/21S, shaft ......................19166-320S, shaft ................................16166-321S, shaft ................................16166-368H, bar ..................................28166-369A, kit ......................................3166-988D, bracket ...................43, 44167-283D, crossbar ..........................35168-243D, gear .................................13168-409D, plate ................................16168-472D, plate .......................18, 19188-009V, bearing ...................16, 182A0132, clip .............................10, 592A0206, pin .............................10, 59204-280D, bar ...................................65221-643H, mount ..............................65266-174D, mount ..............................14266-187D, mount .....................16, 19
266-288D, mount .............................. 26266-289D, tab ................. 21, 26, 27266-290D, support ........................... 28266-300D, plate ....................... 21, 24266-302D, anchor .................... 21, 25266-306D, flange .............................. 18266-307D, gusset .................... 21, 22266-308D, gusset .................... 21, 23266-309D, plate ....................... 21, 233-pin ..............45, 46, 48, 49, 514-pin ................................................. 514-pin plug ......................................... 454-pin receptacle ................................ 45401-167H, adjuster ........................... 28402-011D, sleeve .................... 28, 29457901815, extension ............. 41, 47457901815, harness ........................ 46459680920, extension .... 41, 48, 49459680922, extension .... 41, 50, 51464211090, plug ............ 46, 47, 50467751320S1, harness .................... 51467751330S1, harness 41, 46, 47,
..................................... 48, 49, 50467980126, terminator ............ 41, 51467980141, extension ..41, 46, 47,
48, ..................................... 49, 50467981100S1, WSMB ..41, 42, 43,
44467981201A, harness ..47, 48, 49,
50, .............................................. 51467981201A, WSMB ............... 46, 47502-068D, bracket ................... 11, 586-pin plug ......................................... 456-pin receptacle ................................ 45800-035C, tie .................................... 55800-052C, clip ......................... 11, 58800-064C, clip ......................... 11, 58800-180C, clamp ................................ 9800-301C, tie .................. 30, 31, 32800-303C, tie ........................... 31, 32801-151C, screw .............................. 16801-235C, screw .............................. 35802-001C, bolt ......................... 18, 19802-007C, bolt ......................... 11, 58802-012C, bolt ......................... 11, 58802-017C, bolt .................................. 35802-064C, bolt .................. 7, 39, 40802-082C, bolt 14, 15, 26, 27, 33802-106C, bolt .................................. 28802-115C, bolt ......................... 11, 58802-126C, bolt .................................. 65802-130C, bolt ................ 35, 62, 64802-152C, bolt ......................... 28, 29802-155C, bolt .................................. 14802-370C, bolt ................ 41, 43, 44802-910C, bolt ............5, 6, 39, 40803-006C, nut ................ 41, 43, 44803-007C, nut ......................... 28, 29803-014C, nut ......................... 14, 35803-020C, nut 14, 15, 26, 27, 28,
.............................33, 41, 43, 44803-021C, nut .................................. 54803-027C, nut ............5, 6, 39, 40
166-370M Table of Contents Index 05/25/2011
Great Plains Manufacturing, Inc. Table of Contents Index Index 99
803-047C, nut ......................... 39, 40803-049C, nut .................................. 65803-073C, nut .................................. 28803-078C, nut .................................. 35803-147C, nut .................................. 35803-342C, nut ......................... 62, 64804-006C, washer ...........41, 43, 44804-009C, washer ................... 11, 58804-011C, washer ............................ 14804-012C, washer ............................ 35804-013C, washer ................... 14, 35804-015C, washer 14, 15, 26, 27,
....................28, 33, 41, 43, 44804-017C, washer ................... 15, 33804-022C, washer ............................ 54804-023C, bolt ................................... 7804-023C, washer 5, 6, 7, 39, 40804-028C, washer ................... 28, 29804-029C, washer ................... 62, 64804-033C, washer ................... 18, 19804-037C, washer ............................ 65804-039C, washer 12, 37, 52, 53,
....................................................... 57804-113C, washer ................... 27, 28804-117C, washer ..11, 36, 52, 57
805-058C, pin ..........................28, 29805-104C, pin ........ 10, 59, 62, 64805-117C, pin ........ 11, 36, 52, 57805-124C, pin ..........................10, 59805-134C, pin ..........................28, 29805-155C, pin .................................. 13805-187C, pin ..........................10, 59805-255C, pin 12, 37, 38, 52, 53,
...............................................57, 58805-306C, pin .................................. 58805-412C, pin ..........................28, 29806-010C, U-bolt ............41, 43, 44806-105C, U-bolt ............................. 54807-268C, spring ............................. 35807-300C, bar .................................. 66808-192C, gear ................................ 13810-170C, cylinder ...................10, 59810-219C, cylinder ...................10, 59810-345C, valve .......................30, 32810-442C, spacers .......................... 58811-080C, tee ..........................30, 32811-150C, elbow ......................30, 32811-195C, hose ............................... 30811-291C, hose ............................... 61811-315C, adaptor ........................... 54
811-324C, adaptor .................. 30, 32811-394C, coupler ............................31811-430C, adaptor ......... 31, 32, 54811-512C, hose ................................30811-617C, hose ................................61811-665C, hose ................................61811-701C, hose ................................54811-785C, hose ................................61811-831C, hose ................................54816-199C, seal ........................ 16, 18816-480C, wrap ................................55816-662C, seal ........................ 16, 19816-693C, gasket .............................1982 bu ..................................................3821-001C, paint ..................................4841-002C, adaptor .................. 30, 32841-162C, hose ................................61841-189C, hose ................................61841-451C, hose ................................61841-452C, hose ................................61841-480C, hose ................................30841-555C, hose ....................... 31, 32848-504C, decal ...............................54848-505C, decal ...............................54890-466C, flange ............ 16, 18, 19
05/25/2011 Table of Contents Index 166-370M
100 NTA607HD or NTA2007HD Table of Contents Index Great Plains Manufacturing, Inc.
166-370M Table of Contents Index 05/25/2011
Table of Contents Index
Table of Contents Index
Great Plains Manufacturing, Inc.Corporate Office: P.O. Box 5060Salina, Kansas 67402-5060 USA
102 NTA607HD or NTA2007HD Table of Contents Index