1437 SOUTH BOULDER AVE., SUITE 1080 TULSA, OKLAHOMA 74119 918.392.5620 (P) 918.392.5621 (F) ...

Post on 05-Jan-2016

213 views 0 download

Tags:

Transcript of 1437 SOUTH BOULDER AVE., SUITE 1080 TULSA, OKLAHOMA 74119 918.392.5620 (P) 918.392.5621 (F) ...

1437 SOUTH BOULDER AVE., SUITE 1080 TULSA, OKLAHOMA 74119 918.392.5620 (P) 918.392.5621 (F) WWW.MESHEKENGR.COM

Garnett Regional Detention Facility:

A Success Story In Managing NAI With Competing Interests

Brandon Claborn, P.E., CFM

CIT

Y O

F O

WA

SS

O, O

K Location – 11 Miles Northeast of

Tulsa, OK

Population– 1990 – 11,151

– 2000 – 18,502

– 2008 – 37,328

Recent Development– 2400 Residential Lots 2002-2009

– Annual Retail Sales:

– $200 Million in 2000

– $550 Million in 2007

RA

NC

H C

REEK

BA

SIN

DR

AIN

AG

E B

AS

IN Ranch Creek – Tributary A

344 Acres to Proposed Pond

19

94

1994

20

02

2002

20

04

2004

20

06

2006

20

08

2008

EX

ISTIN

G P

RO

BLEM

S Flooding Downstream of Site

GO

ALS

FO

R D

ETEN

TIO

N Reduce Flooding Downstream

Full Development Upstream

Remove Some Existing Ponds

Sell City Owned Property

Protect Wildlife Habitat

Enhance Quality of Life

CO

MP

TETIN

G IN

TER

ES

TS

Development versus Mitigation

USACOE versus OKDEQ & EPA

Construction Costs: Developer/City

Park versus Flood Control

Maintenance versus Wetland/Habitat

DEV

ELO

PM

EN

T

PR

ESS

UR

E 118 Acres of Undeveloped Property

FLO

OD

PLA

IN M

ITIG

ATIO

N Additional Competing Interests

More Frequent versus Less Frequent Floods

Frequency Existing Proposed Reduction1 169 160 6%2 270 210 22%5 480 295 39%10 590 330 44%25 750 390 48%50 845 815 4%100 960 745 22%500 1425 1390 2%

40%PMF 3800 3455 9%

Peak Flow Rate (cfs)

PER

MIT

TIN

G IS

SU

ES

CLOMR

404 Permit– On Site Meeting Prior to Design

– Second On Site Meeting – Initial Design

Individual 404 Permit Application– 100% On Site Mitigation

– 4:1 Ratio for Overall Wetland Habitat

401 Certification (OKDEQ)– Required Additional Off Site Mitigation

Cultural Resources Investigation

Oklahoma Historical Society

CO

NS

TR

UC

TIO

N C

OS

TS

Sell Existing Detention Facilities

Fee In Lieu of Detention

Additional City Planning Required

Negotiate Purchase of Property

GEN

ER

AL S

ITE IS

SU

ES

Neighborhood Meeting

Public Meeting During Design Phase– Local Residents Expectations

Coordination With City Departments– Upgrade Sanitary Sewer

– Maintenance Access

– Security (Police)

– Stormwater Quality

SU

MM

AR

Y/R

EC

OM

MEN

DATIO

NS

Floodplain Management – Developing With No Adverse Impact

– One Piece of the Puzzle

– Reducing Flooding Is the Easy Part

– Several Competing Interests

– Coordinate City Departments

– Comprehensive Planning Is Crucial

– Leverage Resources

– Work With Developers

– Identify Permitting Needs Early

1437 SOUTH BOULDER AVE., SUITE 1080 TULSA, OKLAHOMA 74119 918.392.5620 (P) 918.392.5621 (F) WWW.MESHEKENGR.COM

Questions?

Brandon Claborn, P.E. CFMProject Manager/Associate Principal

bclaborn@meshekengr.com