L O U I S I A N A O F F I C E O F C O M M U N I T Y D E V E L O P M E N T | D I S A S T E R R E C O V E R Y U N I T

Reimbursement estimates are component by component assessments of the value of completed repairs. They are produced through the use of Xactimate assessment tools and software. The Program performs reimbursement estimates on homes that have either partially completed repairs or fully completed repairs. Estimates are generated by Xactimate software based on the information collected by the Damage Assessor. Actual reimbursement amounts will be subject to the Program’s Award Calculation which also factors in elements such as duplication of benefits and tiered award based on program phase. Please refer to the Program Policies for additional information.

THE RESTORE LOUISIANAREIMBURSEMENTESTIMATE

1

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

Applicant: Louisiana Resident Home: (225) 555-5555Property: 123 Anyware St.

Baton Rouge, LA 70814Home: 123 Anyware St.

Baton Rouge, LA 70814

Assessor: Inspector

Applicant Number: 1234567REIMB Type of Loss: Flood

Date Contacted:Date of Loss: 8/13/2016 12:00 AM

Date Inspected: 5/16/2017 12:00 PM

Price List: LABR8X_MAY17RLARestoration/Service/Remodel

Estimate: 1234567_REIMBURSEMEN

2

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 2

1234567_REIMBURSEMEN

Main LevelMain Level

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------GENERAL ITEMS------------------------------1. Final cleaning - construction - Residential 2,039.06 SF @ 0.21 = 428.20------------------------------INSULATION------------------------------2. Remove Batt insulation - 4" - R13 - paper faced - wall 2,367.47 SF @ 0.22 = 520.84

Foyer/Entry Height: 8'

Missing Wall 3' 3" X 8' Opens into LIVING_ROOM

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------3. Apply anti-microbial agent to more than the walls 210.21 SF @ 0.27 = 56.764. Seal stud wall for odor control (shellac) 179.33 SF @ 0.80 = 143.465. Remove 1/2" drywall - hung, taped, floated, ready for paint 210.21 SF @ 0.37 = 77.786. Remove Baseboard - 2 1/4" 22.42 LF @ 0.37 = 8.30------------------------------DOORS & WINDOWS------------------------------7a. Remove Exterior door - metal - insulated - Standard grade 1.00 EA @ 18.96 = 18.967b. Exterior door - metal - insulated - Standard grade 1.00 EA @ 210.11 = 210.118. Door lockset & deadbolt - exterior - Standard grade 1.00 EA @ 56.37 = 56.379. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59------------------------------INSULATION------------------------------10. Remove Blown-in insulation - 12" depth - R30 - ceiling 30.88 SF @ 0.87 = 26.87------------------------------ELECTRICAL------------------------------11. Remove Light fixture - Standard grade 1.00 EA @ 7.37 = 7.37

Coat closet Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------12. Apply anti-microbial agent to more than the walls 75.54 SF @ 0.27 = 20.4013. Seal stud wall for odor control (shellac) 70.67 SF @ 0.80 = 56.5414. Remove 1/2" drywall - hung, taped, floated, ready for paint 75.54 SF @ 0.37 = 27.9515. Remove Baseboard - 2 1/4" 8.83 LF @ 0.37 = 3.27------------------------------SHELVING------------------------------16. Remove Shelving - wire (vinyl coated) 2.25 LF @ 2.89 = 6.50

Living Room Height: 8'

3

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 3

Missing Wall 3' 3/16" X 8' Opens into HALL_2

Missing Wall 3' 7" X 8' Opens into HALL

Missing Wall 3' 3" X 8' Opens into FOYER_ENTRY

Missing Wall - Goes to Floor 4' 3" X 6' 8" Opens into KITCHEN

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------17. Apply anti-microbial agent to more than the walls 709.95 SF @ 0.27 = 191.6918. Seal stud wall for odor control (shellac) 431.53 SF @ 0.80 = 345.2219. Remove 1/2" drywall - hung, taped, floated, ready for paint 431.53 SF @ 0.37 = 159.6720. Remove Baseboard - 2 1/4" 53.23 LF @ 0.37 = 19.70------------------------------DOORS & WINDOWS------------------------------21. Remove Door opening (jamb & casing) - 32"to36"wide - paint grade 2.00 EA @ 5.56 = 11.1222. Remove Door opening (jamb & casing) - 36"to60"wide - paint grade 1.00 EA @ 5.56 = 5.56

Hall Height: 8'

Missing Wall 3' 7" X 8' Opens into LIVING_ROOM

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------23. Apply anti-microbial agent to more than the walls 185.61 SF @ 0.27 = 50.1124. Seal stud wall for odor control (shellac) 158.17 SF @ 0.80 = 126.5425. Remove 1/2" drywall - hung, taped, floated, ready for paint 158.17 SF @ 0.37 = 58.5226. Remove Baseboard - 2 1/4" 19.77 LF @ 0.37 = 7.31------------------------------DOORS & WINDOWS------------------------------27. Remove Door opening (jamb & casing) - 32"to36"wide - paint grade 2.00 EA @ 5.56 = 11.12------------------------------FLOORING------------------------------28. Remove Tile floor covering - Standard grade - Minimum repair only 27.44 SF @ 2.23 = 61.19up to 25 SF------------------------------HVAC------------------------------29. Remove Cold air return cover 1.00 EA @ 5.56 = 5.56

Bedroom 1 Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------30. Apply anti-microbial agent to more than the walls 481.92 SF @ 0.27 = 130.1231. Seal stud wall for odor control (shellac) 357.33 SF @ 0.80 = 285.8632. Remove 1/2" drywall - hung, taped, floated, ready for paint 357.33 SF @ 0.37 = 132.2133. Remove Baseboard - 2 1/4" 44.67 LF @ 0.37 = 16.53------------------------------DOORS & WINDOWS------------------------------

4

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 4

CONTINUED - Bedroom 1

DESCRIPTION QNTY UNIT COST TOTAL

34. Remove Interior door unit - Standard grade 2.00 EA @ 16.59 = 33.18

Closet 1 Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------35. Apply anti-microbial agent to more than the walls 188.08 SF @ 0.27 = 50.7836. Seal stud wall for odor control (shellac) 188.08 SF @ 0.80 = 150.4637. Remove 1/2" drywall - hung, taped, floated, ready for paint 188.08 SF @ 0.37 = 69.5938. Remove Baseboard - 2 1/4" 21.17 LF @ 0.37 = 7.83------------------------------SHELVING------------------------------39. Remove Shelving - wire (vinyl coated) 8.33 LF @ 2.89 = 24.07

Bedroom 2 Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------40. Apply anti-microbial agent to more than the walls 519.51 SF @ 0.27 = 140.2741. Seal stud wall for odor control (shellac) 381.25 SF @ 0.80 = 305.0042. Remove 1/2" drywall - hung, taped, floated, ready for paint 381.25 SF @ 0.37 = 141.0643. Remove Baseboard - 2 1/4" 47.66 LF @ 0.37 = 17.6344. Remove Base shoe 47.66 LF @ 0.15 = 7.15------------------------------DOORS & WINDOWS------------------------------45. Remove Interior door unit - Standard grade 2.00 EA @ 16.59 = 33.18

Closet 2 Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------46. Apply anti-microbial agent to more than the walls 180.63 SF @ 0.27 = 48.7747. Seal stud wall for odor control (shellac) 164.08 SF @ 0.80 = 131.2648. Remove 1/2" drywall - hung, taped, floated, ready for paint 180.63 SF @ 0.37 = 66.83

5

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 5

CONTINUED - Closet 2

DESCRIPTION QNTY UNIT COST TOTAL

49. Remove Baseboard - 2 1/4" 20.51 LF @ 0.37 = 7.5950. Remove Base shoe 20.51 LF @ 0.15 = 3.08------------------------------SHELVING------------------------------51. Remove Shelving - wire (vinyl coated) 8.25 LF @ 2.89 = 23.84

Plenum Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------HVAC------------------------------52. Remove Ductwork - hot or cold air - Large size 8.00 LF @ 1.33 = 10.64

Bath 1a Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------53. Apply anti-microbial agent to more than the walls 204.36 SF @ 0.27 = 55.1854. Seal stud wall for odor control (shellac) 174.75 SF @ 0.80 = 139.8055. Remove 1/2" drywall - hung, taped, floated, ready for paint 174.75 SF @ 0.37 = 64.6656. Remove Baseboard - 2 1/4" 21.84 LF @ 0.37 = 8.0857. Remove Base shoe 21.84 LF @ 0.15 = 3.28------------------------------DOORS & WINDOWS------------------------------58. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59------------------------------CABINETRY------------------------------59. Remove Vanity - Standard grade 5.00 LF @ 6.65 = 33.2560. Remove Vanity top - one sink - cultured marble 5.00 LF @ 1.18 = 5.90------------------------------ELECTRICAL------------------------------61. Remove Light bar - 3 lights 1.00 EA @ 17.69 = 17.69

Bath 1b Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------

6

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 6

CONTINUED - Bath 1b

DESCRIPTION QNTY UNIT COST TOTAL

62. Apply anti-microbial agent to more than the walls 202.53 SF @ 0.27 = 54.6863. Seal stud wall for odor control (shellac) 173.42 SF @ 0.80 = 138.7464. Remove 1/2" drywall - hung, taped, floated, ready for paint 29.12 SF @ 0.37 = 10.77Replaced by Shelter at Home project.65. Remove 1/2" water rock (greenboard) hung, taped ready for texture 113.42 SF @ 0.37 = 41.97Replaced by Shelter at Home project.66. Remove Baseboard - 2 1/4" 21.68 LF @ 0.37 = 8.02------------------------------DOORS & WINDOWS------------------------------67. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59Replaced by Shelter at Home project.------------------------------PLUMBING------------------------------68. Remove Toilet - Standard grade 1.00 EA @ 22.12 = 22.12Replaced by Shelter at Home project.69. Remove Fiberglass tub & shower combination - Standard grade 1.00 EA @ 73.73 = 73.73Replaced by Shelter at Home project.70. Remove Shower faucet - Standard grade 1.00 EA @ 16.59 = 16.59Replaced by Shelter at Home project.------------------------------ELECTRICAL------------------------------71. Remove Bathroom ventilation fan, light, and heater 1.00 EA @ 15.57 = 15.57

Bedroom3 Height: 8'

Missing Wall 4' X 8' Opens into ROOM5

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------72. Apply anti-microbial agent to more than the walls 540.54 SF @ 0.27 = 145.9573. Seal stud wall for odor control (shellac) 377.33 SF @ 0.80 = 301.8674. Remove 1/2" drywall - hung, taped, floated, ready for paint 377.33 SF @ 0.37 = 139.6175. Remove Baseboard - 2 1/4" 47.17 LF @ 0.37 = 17.45------------------------------DOORS & WINDOWS------------------------------76. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59------------------------------FLOORING------------------------------77. Remove Vinyl floor covering (sheet goods) - Standard grade 163.21 SF @ 0.81 = 132.20

7

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 7

Closet 3 Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------78. Apply anti-microbial agent to more than the walls 224.17 SF @ 0.27 = 60.5379. Seal stud wall for odor control (shellac) 189.33 SF @ 0.80 = 151.4680. Remove 1/2" drywall - hung, taped, floated, ready for paint 189.33 SF @ 0.37 = 70.0581. Remove Baseboard - 2 1/4" 23.67 LF @ 0.37 = 8.76------------------------------DOORS & WINDOWS------------------------------82. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59------------------------------FLOORING------------------------------83. Remove Vinyl floor covering (sheet goods) - Standard grade 34.83 SF @ 0.81 = 28.21------------------------------SHELVING------------------------------84. Remove Shelving - wire (vinyl coated) 12.67 LF @ 2.89 = 36.62

Bath 2a Height: 8'

Missing Wall 4' X 8' Opens into BEDROOM3

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------85. Apply anti-microbial agent to more than the walls 148.00 SF @ 0.27 = 39.9686. Seal stud wall for odor control (shellac) 125.33 SF @ 0.80 = 100.2687. Remove 1/2" drywall - hung, taped, floated, ready for paint 125.33 SF @ 0.37 = 46.3788. Remove Baseboard - 2 1/4" 15.67 LF @ 0.37 = 5.80------------------------------FLOORING------------------------------89. Remove Vinyl floor covering (sheet goods) - Standard grade 22.67 SF @ 0.81 = 18.36------------------------------CABINETRY------------------------------90. Remove Vanity - Standard grade 4.00 LF @ 6.65 = 26.6091. Remove Vanity top - one sink - cultured marble 4.00 LF @ 1.18 = 4.72------------------------------ELECTRICAL------------------------------92. Remove Light bar - 3 lights 1.00 EA @ 17.69 = 17.69

Bath 2b Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------93. Apply anti-microbial agent to more than the walls 195.50 SF @ 0.27 = 52.7994. Seal stud wall for odor control (shellac) 168.00 SF @ 0.80 = 134.4095. Remove 1/2" water rock (greenboard) hung, taped ready for texture 108.00 SF @ 0.37 = 39.9696. Remove Baseboard - 2 1/4" 21.00 LF @ 0.37 = 7.77------------------------------DOORS & WINDOWS------------------------------

8

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 8

CONTINUED - Bath 2b

DESCRIPTION QNTY UNIT COST TOTAL

97. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59------------------------------FLOORING------------------------------98. Remove Vinyl floor covering (sheet goods) - Standard grade 27.50 SF @ 0.81 = 22.28------------------------------PLUMBING------------------------------99. Remove Toilet - Standard grade 1.00 EA @ 22.12 = 22.12100. Remove Fiberglass tub & shower combination - Standard grade 1.00 EA @ 73.73 = 73.73101. Remove Shower faucet - Standard grade 1.00 EA @ 16.59 = 16.59------------------------------ELECTRICAL------------------------------102. Remove Bathroom ventilation fan, light, and heater 1.00 EA @ 15.57 = 15.57

Hall 2 Height: 8'

Missing Wall 3' 3/16" X 8' Opens into SITTING_AREA

Missing Wall 3' 3/16" X 8' Opens into LIVING_ROOM

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------103. Apply anti-microbial agent to more than the walls 161.14 SF @ 0.27 = 43.51104. Seal stud wall for odor control (shellac) 136.00 SF @ 0.80 = 108.80105. Remove 1/2" drywall - hung, taped, floated, ready for paint 161.14 SF @ 0.37 = 59.62106. Remove Baseboard - 2 1/4" 17.00 LF @ 0.37 = 6.29

Sitting Area Height: 8'

Missing Wall 3' 3/16" X 8' Opens into HALL_2

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------107. Apply anti-microbial agent to more than the walls 178.20 SF @ 0.27 = 48.11108. Seal stud wall for odor control (shellac) 149.20 SF @ 0.80 = 119.36109. Remove 1/2" drywall - hung, taped, floated, ready for paint 178.20 SF @ 0.37 = 65.93110. Remove Baseboard - 2 1/4" 18.65 LF @ 0.37 = 6.90------------------------------FLOORING------------------------------111. Remove Carpet pad - Standard grade 29.00 SF @ 0.10 = 2.90112. Remove Carpet - Standard grade 29.00 SF @ 0.25 = 7.25

9

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 9

CONTINUED - Sitting Area

DESCRIPTION QNTY UNIT COST TOTAL

Bedroom 4 Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------113. Apply anti-microbial agent to more than the walls 912.56 SF @ 0.27 = 246.39114. Seal stud wall for odor control (shellac) 598.67 SF @ 0.80 = 478.94115. Remove 1/2" drywall - hung, taped, floated, ready for paint 912.56 SF @ 0.37 = 337.65116. Remove Baseboard - 2 1/4" 74.83 LF @ 0.37 = 27.69------------------------------DOORS & WINDOWS------------------------------117. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59------------------------------FLOORING------------------------------118. Remove Carpet pad - Standard grade 313.89 SF @ 0.10 = 31.39119. Remove Carpet - Standard grade 313.89 SF @ 0.25 = 78.47

Storage Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------120. Apply anti-microbial agent to more than the walls 636.67 SF @ 0.27 = 171.90121. Seal stud wall for odor control (shellac) 453.33 SF @ 0.80 = 362.66122. Remove 1/2" drywall - hung, taped, floated, ready for paint 453.33 SF @ 0.37 = 167.73123. Remove Baseboard - 2 1/4" 56.67 LF @ 0.37 = 20.97------------------------------DOORS & WINDOWS------------------------------124. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59

Bedroom 5 Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------125. Apply anti-microbial agent to more than the walls 406.67 SF @ 0.27 = 109.80126. Seal stud wall for odor control (shellac) 314.67 SF @ 0.80 = 251.74

10

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 10

CONTINUED - Bedroom 5

DESCRIPTION QNTY UNIT COST TOTAL

127. Remove 1/2" drywall - hung, taped, floated, ready for paint 406.67 SF @ 0.37 = 150.47128. Remove Baseboard - 2 1/4" 39.33 LF @ 0.37 = 14.55------------------------------DOORS & WINDOWS------------------------------129. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59------------------------------FLOORING------------------------------130. Remove Carpet pad - Standard grade 92.00 SF @ 0.10 = 9.20131. Remove Carpet - Standard grade 92.00 SF @ 0.25 = 23.00

Kitchen Height: 8'

Missing Wall - Goes to Floor 4' 3" X 6' 8" Opens into LIVING_ROOM

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------132. Apply anti-microbial agent to more than the walls 1,032.34 SF @ 0.27 = 278.73133. Seal stud wall for odor control (shellac) 657.07 SF @ 0.80 = 525.66134. Remove 1/2" drywall - hung, taped, floated, ready for paint 1,032.34 SF @ 0.37 = 381.97135. Remove Baseboard - 2 1/4" 81.42 LF @ 0.37 = 30.13136. Remove Base shoe 81.42 LF @ 0.15 = 12.21------------------------------FLOORING------------------------------137. Remove Vinyl floor covering (sheet goods) - Standard grade 375.27 SF @ 0.81 = 303.97------------------------------INSULATION------------------------------138. Remove Blown-in insulation - 12" depth - R30 - ceiling 375.27 SF @ 0.87 = 326.48------------------------------PLUMBING------------------------------139. Remove Sink - double - Standard grade 1.00 EA @ 17.69 = 17.69------------------------------CABINETRY------------------------------140. Remove Cabinetry - upper (wall) units - Standard grade 24.75 LF @ 6.65 = 164.59141. Remove Cabinetry - lower (base) units - Standard grade 25.75 LF @ 6.65 = 171.24142. Remove Countertop - post formed plastic laminate - Standard grade 27.75 LF @ 3.67 = 101.84------------------------------APPLIANCES------------------------------143. Remove Range - freestanding - gas - Standard grade 1.00 EA @ 17.81 = 17.81144. Remove Range hood - Standard grade 1.00 EA @ 11.14 = 11.14145. Remove Refrigerator - top freezer - 18 to 22 cf - Std grade 1.00 EA @ 29.49 = 29.49146. Remove Dishwasher - Standard grade 1.00 EA @ 23.70 = 23.70147. Remove Garbage disposer - Standard grade 1.00 EA @ 22.12 = 22.12148. Remove Fluorescent light fixture - Standard grade 2.00 EA @ 12.32 = 24.64------------------------------ELECTRICAL------------------------------

11

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 11

CONTINUED - Kitchen

DESCRIPTION QNTY UNIT COST TOTAL

Laundry Room Height: 8'

DESCRIPTION QNTY UNIT COST TOTAL

------------------------------WALLS & CEILINGS------------------------------149. Apply anti-microbial agent to more than the walls 356.27 SF @ 0.27 = 96.19150. Seal stud wall for odor control (shellac) 285.87 SF @ 0.80 = 228.70151. Remove 1/2" drywall - hung, taped, floated, ready for paint 285.87 SF @ 0.37 = 105.77152. Remove Baseboard - 2 1/4" 35.73 LF @ 0.37 = 13.22------------------------------DOORS & WINDOWS------------------------------153. Remove Interior door unit - Standard grade 1.00 EA @ 16.59 = 16.59------------------------------PLUMBING------------------------------154. Remove Washing machine outlet box with valves 1.00 EA @ 24.14 = 24.14------------------------------APPLIANCES------------------------------155. Remove Washer/Washing Machine - Top-loading - Standard grade 1.00 EA @ 23.70 = 23.70156. Remove Dryer - Electric - Standard grade 1.00 EA @ 17.81 = 17.81

Grand Total Areas:5,773.42 SF Walls 2,039.06 SF Ceiling SF Walls and Ceiling7,812.482,039.06 SF Floor 226.56 SY Flooring 720.26 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 728.76 LF Ceil. Perimeter

2,039.06 Floor Area 2,206.14 Total Area 5,773.42 Interior Wall Area2,367.47 Exterior Wall Area 263.05 Exterior Perimeter of

Walls

3,619.33 Surface Area 36.19 Number of Squares 525.35 Total Perimeter Length52.67 Total Ridge Length 158.56 Total Hip Length

12

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 12

Summary for DwellingLine Item Total 13,077.68

Material Sales Tax @ 10.000% 170.89

Replacement Cost Value $13,248.57Net Claim $13,248.57

13

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 13

Recap by Room

Estimate: 1234567_REIMBURSEMEN

Area: Main Level 949.04 7.26%Foyer/Entry 622.57 4.76%Coat closet 114.66 0.88%Living Room 732.96 5.60%Hall 320.35 2.45%Bedroom 1 597.90 4.57%Closet 1 302.73 2.31%Bedroom 2 644.29 4.93%Closet 2 281.37 2.15%Plenum 10.64 0.08%Bath 1a 344.43 2.63%Bath 1b 398.78 3.05%Bedroom3 753.66 5.76%Closet 3 372.22 2.85%Bath 2a 259.76 1.99%Bath 2b 401.80 3.07%Hall 2 218.22 1.67%Sitting Area 250.45 1.92%Bedroom 4 1,217.12 9.31%Storage 739.85 5.66%Bedroom 5 575.35 4.40%Kitchen 2,443.41 18.68%Laundry Room 526.12 4.02%

Area Subtotal: Main Level 100.00%13,077.68

Subtotal of Areas 100.00%13,077.68

Total 13,077.68 100.00%

14

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 14

Recap by Category

Items Total %

CLEANING 428.20 3.23%GENERAL DEMOLITION 5,703.66 43.05%DOORS 210.11 1.59%FINISH HARDWARE 56.37 0.43%HAZARDOUS MATERIAL REMEDIATION 2,092.62 15.80%PAINTING 4,586.72 34.62%

Subtotal 13,077.68 98.71%Material Sales Tax @ 10.000% 170.89 1.29%

Total 13,248.57 100.00%

15

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 15

1 1-Front

Date Taken: 5/16/2017

2 3-Street view

Date Taken: 5/16/2017

16

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 16

3 4-Street view

Date Taken: 5/16/2017

4 5-Front

Date Taken: 5/16/2017

17

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 17

5 6-Left

Date Taken: 5/16/2017

6 7-Left

Date Taken: 5/16/2017

18

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 18

7 8-Left

Date Taken: 5/16/2017

8 9-Left

Date Taken: 5/16/2017

19

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 19

9 10-Rear

Date Taken: 5/16/2017

10 11-Rear

Date Taken: 5/16/2017

20

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 20

11 12-Rear

Date Taken: 5/16/2017

12 13-Rear

Date Taken: 5/16/2017

21

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 21

13 14-Rear

Date Taken: 5/16/2017

14 15-Rear

Date Taken: 5/19/2017

22

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 22

15 16-Rear

Date Taken: 5/16/2017

16 17-Rear

Date Taken: 5/16/2017

23

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 23

17 18-Right

Date Taken: 5/16/2017

18 19-Roof

Date Taken: 5/16/2017

24

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 24

19 20-Roof

Date Taken: 5/16/2017

20 21-Roof

Date Taken: 5/16/2017

25

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 25

21 22-Roof

Date Taken: 5/16/2017

22 23-Roof

Date Taken: 5/16/2017

26

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 26

23 24-Foyer

Date Taken: 5/16/2017

24 25-Foyer closet

Date Taken: 5/16/2017

27

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 27

25 26-Living room

Date Taken: 5/16/2017

26 27-Living Room

Date Taken: 5/16/2017

28

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 28

27 28-Living Room

Date Taken: 5/16/2017

28 29-Living Room

Date Taken: 5/16/2017

29

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 29

29 30-Living Room

Date Taken: 5/16/2017

30 31-Hall 1

Date Taken: 5/16/2017

30

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 30

31 32-Hall 1

Date Taken: 5/16/2017

32 33-Hall 1

Date Taken: 5/16/2017

31

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 31

33 34-Hall

Date Taken: 5/16/2017

34 35-Hall 1

Date Taken: 5/16/2017

32

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 32

35 36-Hall 1

Date Taken: 5/16/2017

36 37-Bedroom 1

Date Taken: 5/16/2017

33

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 33

37 38-Bedroom 1

Date Taken: 5/16/2017

38 39-Bedroom 1

Date Taken: 5/16/2017

34

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 34

39 40-Bedroom 1

Date Taken: 5/16/2017

40 41-Bedroom 1

Date Taken: 5/16/2017

35

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 35

41 42-Closet 1

Date Taken: 5/16/2017

42 43-Bedroom 2

Date Taken: 5/16/2017

36

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 36

43 44-Bedroom 2

Date Taken: 5/16/2017

44 45-Bedroom2

Date Taken: 5/16/2017

37

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 37

45 46-Bedroom 2

Date Taken: 5/16/2017

46 47-Bedroom 2

Date Taken: 5/16/2017

38

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 38

47 48-Bedroom 2

Date Taken: 5/16/2017

48 49-Clos 2

Date Taken: 5/16/2017

39

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 39

49 50-Bath 1

Date Taken: 5/16/2017

50 51-Bath1

Date Taken: 5/16/2017

40

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 40

51 52-Bath 1`

Date Taken: 5/16/2017

52 53-Bath 1

Date Taken: 5/16/2017

41

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 41

53 54-Bath 1

Date Taken: 5/16/2017

54 55-Bath 1

Date Taken: 5/16/2017

42

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 42

55 56-Bedroom 3

Date Taken: 5/16/2017

56 57-Bedroom 3

Date Taken: 5/16/2017

43

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 43

57 58-Bedroom 3

Date Taken: 5/16/2017

58 59-Bedroom 3

Date Taken: 5/16/2017

44

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 44

59 60-Bedroom 3

Date Taken: 5/16/2017

60 61-Closet 3

Date Taken: 5/16/2017

45

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 45

61 62-Closet 3

Date Taken: 5/16/2017

62 63-Closet 3

Date Taken: 5/16/2017

46

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 46

63 64-Closet 3

Date Taken: 5/16/2017

64 65-Bath 2b

Date Taken: 5/16/2017

47

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 47

65 66-Bath 2b

Date Taken: 5/16/2017

66 67-Bath 2b

Date Taken: 5/16/2017

48

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 48

67 68-Hall 2

Date Taken: 5/16/2017

68 69-Hall 2

Date Taken: 5/16/2017

49

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 49

69 70-Hall 2

Date Taken: 5/16/2017

70 71-Hall 2

Date Taken: 5/16/2017

50

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 50

71 72-Bedroom 4

Date Taken: 5/16/2017

72 73-Bedroom 4

Date Taken: 5/16/2017

51

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 51

73 74-Bedroom 4

Date Taken: 5/16/2017

74 75-Bedroom 4

Date Taken: 5/16/2017

52

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 52

75 76-Bedroom 4

Date Taken: 5/16/2017

76 77-Bedroom 4

Date Taken: 5/16/2017

53

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 53

77 78-Bedroom 4

Date Taken: 5/16/2017

78 79-Bedroom 4

Date Taken: 5/16/2017

54

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 54

79 80-Storage

Date Taken: 5/16/2017

80 81-Storage

Date Taken: 5/16/2017

55

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 55

81 82-Storage

Date Taken: 5/16/2017

82 83-Storage

Date Taken: 5/16/2017

56

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 56

83 84-Bedroom 5

Date Taken: 5/16/2017

84 85-Bedroom 5

Date Taken: 5/16/2017

57

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 57

85 86-Bedroom 5

Date Taken: 5/16/2017

86 87-Kitchen

Date Taken: 5/19/2017

58

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 58

87 88-Kitchen

Date Taken: 5/19/2017

88 89-Kitchen

Date Taken: 5/19/2017

59

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 59

89 90-Kitchen

Date Taken: 5/19/2017

90 91-Kitchen

Date Taken: 5/19/2017

60

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 60

91 92-Kitchen

Date Taken: 5/19/2017

92 93-Kitchen

Date Taken: 5/19/2017

61

Reimbursement Estimate

The Restore Louisiana Homeowner Assistance Program

1234567_REIMBURSEMEN 5/30/2017 Page: 61

93 94-Laundry Room

Date Taken: 5/19/2017

94 95-Laundry Room

Date Taken: 5/19/2017

62

1234567_REIMBURSEMEN 5/30/2017 Page: 62

Main Level

Bath 2a

Foyer/Entry

Closet 1

Kitchen

Living Room

Coat closet

Bedroom 1

Plenum

Closet 2

Bedroom 2

Hall

Bath 1a

Bath 2bBath 1b

Bedroom3

Closet 3

Hall 2Sitting Area

Bedroom 4

Laundry Room Bedroom 5

Storage

Main Level

12' 8

"

1' 6"

10'

2' 9

"

2' 3

"

3' 10"

8' 4"

14' 6

"

9' 8"

3' 3

"

5' 10"

5' 4

"

5' 6"

5'

29'

12'

11' 6

"

2' 4"

2'

11' 8

"

10'

10' 6"

3' 7"

3' 3

"

4'

10' 10"

4' 8"

5' 11"

4' 1

1"

1' 8

"8' 3"

4' 4

"

4' 6

"

8' 3

"

12' 1"

24' 4"

11' 9"

3' 7

"

13' 1

0"

5'

16' 8

"

6' 4

"

5' 10"

2' 2'

12' 8

"

12' 2

"

18' 4

"

19'

8' 8"

8'

4' 9"

2' 11"

3'

3'3'

19' 1"

35' 2"

16' 2"6'

5' 10"

38' 9"

7' 8"

12'

12' 4

"

2' 3"

43' 5"

3'3'8' 9"

9' 3"

3'3'

15' 8"

15' 10"

63

1234567_REIMBURSEMEN 5/30/2017 Page: 63

Roof

Roof1

(A)F1

(B)F2

F3

F4

Roof2 (1)

F3

(B)F6

(C)F7

Roof3 (2)

F4

(B)F9

(C)F10

Roof

43' 2"

25' 1

0"

76' 8"

30' 4

"

23' 8"19' 8"

23' 8"19' 8"

11' 6

"

39' 4"

30' 9

"

11' 2"

14' 9"

30' 9

"

19' 7

"

16'

3' 10"

12' 4

"10

' 3"

12' 4

"10

' 3"

13' 2"

20' 6

"

16'

37' 4"

15'

12' 6

"15

'12

' 6"

44' 5" 25'

19' 7

"