ENTERGY Phasor ProjectModernizing the Entergy Grid
Enhanced Wide-Area Enhanced Wide-Area Visibility:Visibility:
Finding Value in Finding Value in Phasor MeasurementPhasor Measurement
Floyd Galvan, PEFloyd Galvan, PEEntergy Entergy
CorporationCorporationPOWERWORLD USERS GROUP MEETING
Austin, TX June 2005
OverviewOverview
Overview of Eastern Overview of Eastern Interconnect Phasor Project Interconnect Phasor Project (EIPP)(EIPP)
Discussion of Entergy Phasor Discussion of Entergy Phasor SystemSystem
Review of Phasor BenefitsReview of Phasor Benefits http://phasors.pnl.govhttp://phasors.pnl.gov
August 14th BlackoutBy-The-Numbers
1 Canadian Province
3 deaths
8 U.S. states
12 airports closed
23 cases of looting in Ottawa
250+ power plants
9,266 square miles
61,800 MW of power lost
1.5 mill Cleveland residents
without water
50 million people
$4.5-10 billion in economic
activity lost
Strategic Importance
“…it's clear that the power grid needs an overhaul. It needs to be
modernized. As we go into an exciting new period of American
history, we want the most modern electricity grid for our people… we need more investment; we need
research and development…”President BushSeptember 2003
“When the lights go out, modern life as we know it grinds to a sudden halt.
Transportation is interrupted, communications fail, water systems
shut down, factory work is disrupted, food spoils, businesses lose money, and people are inconvenienced and
even endangered. ”
Secretary AbrahamApril 2004
EIPP Vision & Working EIPP Vision & Working Group Group Vision – improve power system Vision – improve power system
reliability through wide-area reliability through wide-area measurement, monitoring and measurement, monitoring and controlcontrol
EIPP Working Group Organizations (as of EIPP Working Group Organizations (as of 3/2005)3/2005)
TVA Entergy AREVAATCPowerWorld FERC NERC AEPAmeren First Energy NYISOCERTSPJM* Hydro One NYPA US DOECom Ed* IMO* Con Ed*ISO-NEDominion MAPP Southern Co.*SPP* Duke* MISOHydro Qubec* Manitoba Hydro* British Columbia Trans Comp*
• At least ten additional Work Group members are vendors of hardware or software* These organizations have expressed interest but have not fully committed.
Eastern Interconnection Eastern Interconnection Phasor Project PlanPhasor Project Plan
Phase I (Completed 12/04)
30 Instruments installed Resolve major
communications issues Begin Transfer software
tools to users Establish relationships
Phase II (2005-7) ~150 Instruments Situational awareness and
state estimator app’s demonstrated
All major corridors covered
Data available to research community to begin work on projected benefits
Phase III (2008- ) More than 350
Instruments across North America
Situational awareness and state estimator app’s realized, automatic control app’s beginning
Vendors participating at all levels
Inexpensive instruments and communications available
EIPP
Phasor Measurement Phasor Measurement Systems StructureSystems Structure
Critical Grid Locations
Reliability
Coordinators
Control Area
Operators
Software
Applications
High Frequency Data
High Bandwidth Data
GPS Time-stamped Data
Phasor Data Concentrator Phasor Data Concentrator LocationsLocations
NYISO
AEPAmeren
TVA – Super Data Concentrator
Entergy
NPYAFirst Energy
Benefits of “PhasorBenefits of “Phasor11” Data” Data
Phasor dataPhasor data Refresh rate 30 samples Refresh rate 30 samples
per secondper second All data points time tagged All data points time tagged
and easy to “line up” for and easy to “line up” for input to state estimator, input to state estimator, operator display or operator display or planning studyplanning study
Compatible with modern Compatible with modern communication technologycommunication technology
Enables action in response Enables action in response to system dynamicsto system dynamics
Prelude to automatic Prelude to automatic switching schemesswitching schemes
SCADA dataSCADA data Refresh rate 2-5 secondsRefresh rate 2-5 seconds Some data points are Some data points are
newer than others – no way newer than others – no way to tell the difference. This to tell the difference. This leads to state estimator leads to state estimator inaccuracy and uncertainty inaccuracy and uncertainty about what is “real”.about what is “real”.
Relies on legacy Relies on legacy communication communication technology, i.e. does not technology, i.e. does not take advantage of newer take advantage of newer comm. networkscomm. networks
Enables action in response Enables action in response to system staticsto system statics
1“Phasor” is in quotes to suggest that we are not talking strictly about phasors, but about high speed, accurately time-tagged data in general.
Closer to Home
EntergyEntergy
PMU LocationsPMU Locations
11 Sites are 11 Sites are operational operational
4 sites coming 4 sites coming on-line on-line Summer 2005Summer 2005
PMU – PMU – ARBITER ARBITER 1133A, Power 1133A, Power SentinalSentinal
PDC – OSIsoft PDC – OSIsoft PI HistorianPI Historian
Entergy PMU LocationsEntergy PMU Locations
500 KV – 8 500 KV – 8 ArbitersArbiters
230 KV – 3 230 KV – 3 ArbitersArbiters
138/115 KV – 4 138/115 KV – 4 Arbiters Arbiters
Arkansas – 6 Arkansas – 6 ArbitersArbiters
Louisiana – 5 Louisiana – 5 ArbitersArbiters
Mississippi – 3 Mississippi – 3 ArbitersArbiters
TexasTexas(NON-ERCOT)(NON-ERCOT)–1 –1 ArbiterArbiter
Phasor System Configuration
Expected/RealizedExpected/Realized Phasor Data Benefits Phasor Data Benefits
Improved wide area visibility Improved wide area visibility (transparent boundaries)(transparent boundaries)
Entergy
TVA60.0040
60.0070
AMEREN60.0050
Hz
Hz
Hz
TVA, Entergy, Ameren Frequencys
5/16/2005 4:30:08 PM 5/16/2005 5:30:08 PM60.00 minutes
59.98
59.99
60
60.01
59.96
60.03
60.007
60.004
60.005
Expected/RealizedExpected/Realized Phasor Data Benefits (cont) Phasor Data Benefits (cont)
Improved real time monitoring tools for reliability Improved real time monitoring tools for reliability coordinators and system operators coordinators and system operators
Volts
Volts
Volts
El Dorado Voltage A,B,C
518500
519500
520500
521500
516500
523000
521466.500
518257.625
518542.875
Volts
Volts
Volts
Goslin-Conroe Metro
138400
139400
140400
137400
142200
141820.219
139964.641
138547.594
Volts
Volts
Volts
Waterford-NineMile
234400
234900
235400
233400
236400
235985.094
234840.000
234662.406
Hz
Hz
Hz
AMEREN, TVA, Entergy Frequencys
59.99
60
60.01
59.97
60.03
60.004
60.002
60.004
Expected/RealizedExpected/Realized Phasor Data Benefits (cont) Phasor Data Benefits (cont)
Improved ability to monitor grid dynamics and stability for Improved ability to monitor grid dynamics and stability for reliability management (phase angle difference)reliability management (phase angle difference)
\\192.168.233.244\AMR_RUSH-TYSN:ABBVH
\\192.168.233.244\ENT_EDRD-MTOV:ARBNVH
Entergy and Ameren Voltage A Phase Angle 5/16/2005 6:09:55 PM
18:01 18:03 18:05 18:07
-160
-60
40
140
-360
360
169.601
142.761
ANGLE DIFF TVA-AEP.Value
Entergy and Ameren Voltage A Phase Angle Difference 5/16/2005 6:09:55 PM
18:01 18:03 18:05 18:07 18:09
-200
-100
0
100
-400
300-22.4925
Expected/RealizedExpected/Realized Phasor Data Benefits (cont) Phasor Data Benefits (cont)
Improvements in state estimationImprovements in state estimation
Integration of Phasor Measurements into Integration of Phasor Measurements into State Estimator State Estimator – Joint project between – Joint project between Entergy, Areva, TVA, and American Entergy, Areva, TVA, and American Transmission CompanyTransmission Company
Enhanced State Estimators - Enhanced State Estimators - PSERC (Power PSERC (Power Systems Engineering Research Center)Systems Engineering Research Center)
Placement of Phasor Measurement Units for Placement of Phasor Measurement Units for State Estimation - State Estimation - PSERC (Power Systems PSERC (Power Systems Engineering Research Center)Engineering Research Center)
Expected/RealizedExpected/Realized Phasor Data Benefits (cont) Phasor Data Benefits (cont)
Dynamic system ratings for improved Dynamic system ratings for improved reliability and market performance reliability and market performance (dynamic network management)(dynamic network management)
Dynamic Line Loading using Phasor Dynamic Line Loading using Phasor MeasurementMeasurement - - NEETRAC Project NEETRAC Project (National Electric Energy Testing, (National Electric Energy Testing, Research, and Applications Center)Research, and Applications Center)
Expected/RealizedExpected/Realized Phasor Data Benefits (cont) Phasor Data Benefits (cont)
Redesign of Communications Redesign of Communications Infrastructure Infrastructure Supporters for an NSF Center of Supporters for an NSF Center of Excellence for a “Trustworthy Cyber Excellence for a “Trustworthy Cyber Infrastructure for the Power Grid” – Infrastructure for the Power Grid” – research under review for funding research under review for funding through NSF for Utility through NSF for Utility Communications and SecurityCommunications and Security
Expected Benefits from Phasor Expected Benefits from Phasor DataData
Improved wide area Improved wide area visibility (transparent visibility (transparent boundaries)boundaries)
Improved real time Improved real time monitoring tools for monitoring tools for reliability coordinators reliability coordinators and system operators and system operators (see around us)(see around us)
Improved ability to Improved ability to monitor grid dynamics monitor grid dynamics and stability for and stability for reliability reliability management (phase management (phase angle difference)angle difference)
Improvements in state Improvements in state estimationestimation
Dynamic system Dynamic system ratings for improved ratings for improved reliability and market reliability and market performance (dynamic performance (dynamic network management)network management)
Redesign of Redesign of Communications Communications Infrastructure (NSF, Infrastructure (NSF, DHS, DOE,…)DHS, DOE,…)
““In a time of adversity are sown the seeds of change”…Robert LudlumIn a time of adversity are sown the seeds of change”…Robert Ludlum
QUESTIONS
Scott R. Dahman, P.E.scott@powerworld.comhttp://www.powerworld.com
2001 South First StreetChampaign, Illinois 61820+1 (217) 384.6330
Real-Time Phasor Visualization
Applications within the Eastern Interconnect Phasors Project (EIPP)
PowerWorld Users’ Group MeetingJune 24, 2005
Real-Time Phasor Visualization 23June 24, 2005
EIPP Software Applications
• Real-Time Dynamics Monitoring System (RTDMS)
• OSISoft PI Historian
• TVA DatAWare
• PowerWorld Retriever
Real-Time Phasor Visualization 24June 24, 2005
Retriever Benefits
• Real-time visualization• Provides overview of system health to enhance
situational awareness• Capture a power flow case from real-time data
for study, training, or post-mortem analysis• Independent of EMS platform• Remote access by FTP
Real-Time Phasor Visualization 25June 24, 2005
Retriever Architecture
Real-Time Phasor Visualization 26June 24, 2005
WECC Angle Displays (BPA)
Real-Time Phasor Visualization 27June 24, 2005
Phasor Combination Displays (BPA)
Real-Time Phasor Visualization 28June 24, 2005
Retriever and the EIPP
• Summer 2004: Pilot installation of PMU Visualization at TVA– ODBC connection to TVA SQL database– Phasor data retrieved from PMUs at several stations
• Cordova• Shelby• Freeport• Volunteer• Summer Shade
• Development of OPC client (ongoing)• Development of https and direct DatAWare clients (ongoing)
Real-Time Phasor Visualization 29June 24, 2005
Voltage Magnitude and Angle
SHELBY
CORDOVA
FREEPORT
SUMMER SHADE
1.10PU
0.90
1.00
1.10PU
0.90
1.001.10PU
0.90
1.00
1.10PU
0.90
1.00
5SUMMER
5LAFAYET
8SHELBY8HAYWOOD
8CORDOVA
8FREEPOR
5CORDOV1
5SHELBY1
5CORDOV25FREEPOR
8DELL 5
5SHELBY2
8LAG CRK
6FRPORT
8BENTON
5TMPKN T
20SSHADE
5WOLF CR20SSHADE
1.04 pu
1.03 pu
1.05 pu
1.03 pu
1.01 pu
1.03 pu 1.04 pu
1.05 pu
1.05 pu
1.04 pu
1.05 pu
1.05 pu
1.06 pu
1.03 pu
1.04 pu
1.05 pu
1.04 pu
1.06 pu
1.04 pu
-6.53 Deg
-9.58 Deg
-9.43 Deg
-8.03 Deg
-7.99 Deg
-12.34 Deg
-9.24 Deg
-9.44 Deg
-11.72 Deg
-11.14 Deg
-9.11 Deg
-9.12 Deg
-4.53 Deg
-19.84 Deg
-31.04 Deg -26.99 Deg
-26.19 Deg
-26.19 Deg
-26.22 Deg
60.00 Hz
60.00 Hz
Real-Time Phasor Visualization 30June 24, 2005
Angle Difference Across Lines
Real-Time Phasor Visualization 31June 24, 2005
Angle Difference Across Lines
Real-Time Phasor Visualization 32June 24, 2005
Retriever Study Mode
• Create a power flow case from real-time state estimator data
• Phasor retrieval from state estimator or PMU
• Applications– operator training for emergency operation or post-
mortem analysis– Contingency, ATC, voltage stability analysis based on
real system conditions
Real-Time Phasor Visualization 33June 24, 2005
Retriever Connection: http
Real-Time Phasor Visualization 34June 24, 2005
Retriever Connection:Secure Shell
• By setting up a VPN tunnel in another application , you can retrieve data via FTP or HTTP encrypted.
• Involves mapping requests against a particular local port to a port on a remote VPN server.
FTP
HTTP
Real-Time Phasor Visualization 35June 24, 2005
Retriever Connection: DatAWare
• Dataware is a data archiving tool written by TVA Nuclear Operations
• Provides both a client-side and a server-side API• PowerWorld has written a server-side Dataware-Retriever bridge
– Periodically queries the server for new data– Publishes the newly retrieved data to a flat file– Retriever then downloads this flat file using ftp, http, or direct disk
access
Real-Time Phasor Visualization 36June 24, 2005
Retriever Connection: OPC
• Retriever can download data from an OPC server
• Data is cached locally as it is generated at the OPC server
• Displays are refreshed at a user-specified interval
Real-Time Phasor Visualization 37June 24, 2005
Summary
• Retriever brings all the visualization techniques of PowerWorld to the on-line environment
• Advantages– Flexibility in data and display format
– Ability to communicate complex data and trends quickly, in a manner that is easily understood by engineers and management
– Visualization platform developed over several years and guided by hundreds of customers and research