DNV 2.7-3Portable Offshore Units
Subsea Lifting OperationsKranTeknisk Forening
Per ystein Alvr
Stavanger, 28 November 2007
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
2/23
Det Norske Veritas AS. All rights reserved Slide 223 November 2007
2.7-3? What is that?
The intention of this lecture is to briefly answer: What is DNV Standard for Certification 2.7-3?
How should 2.7-3 be used?
This is done by: Clarifying why 2.7-3 has been issued
Giving a general overview of the content in 2.7-3 (June2006)
Describing what will be updated in the next revision
Indicating application of 2.7-3 for subsea
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
3/23
Det Norske Veritas AS. All rights reserved Slide 323 November 2007
International Regulations
IMOs MSC/Circ.860 Guidelines for the approval ofoffshore containers handled in open seas
proposed to IMO by Norway
states that the International Convention for Safe Containers(CSC) does not cover Offshore Containers
states that offshore containers should be approved by thecompetent authority or by organizations Duly authorized bythe Administration
states that offshore containers should be inspected annually
Refers to other standards for detail requirements, those listedare DNV 2.7-1, DNV 2.7-2, EN 12079 and BS 7072 (withdrawn)
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
4/23 Det Norske Veritas AS. All rights reserved Slide 423 November 2007
Why 2.7-3?
Experience has shown that Standard for Certification No 2.7-1 "OffshoreContainers, is being used more and more in the industry today than everbefore. As a consequence of this increased demand, DNV customershave voiced a strong requirement for a need to certify portable offshoreUnits that are not shaped like containers, according to Standard forCertification No 2.7-1.
As a result of this market demand Standard for Certification No 2.7-3 hasbeen developed, which covers all other types of portable offshore Units,other than offshore containers. DNV firmly believes that this newstandard will meet the customers need for these services and at thesame time enable DNV to expand in this market segment.
This new Standard has been developed in close co-operation with theupdate of the Standard for Certification No 2.7-1.
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
5/23
Det Norske Veritas AS. All rights reserved Slide 523 November 2007
Definition
Portable Offshore Units
Definition in SfC 2.7-3: Portable Unit or package with a maximum grossweight not exceeding 50 tonnes , for repeated or single use with aprimary service function, handled in open seas, to, from or betweenfixed and/or floating offshore installations and ships.
Also: Could be lifted subsea!
4 types defined:- Type A, skids arranged with crash frames- Type B, skids without crash frames- Type C, no dedicated skid frame
- Type D, stress skin design
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
6/23
Det Norske Veritas AS. All rights reserved Slide 623 November 2007
Content in 2.7-3
GENERALScopeDefinitionsList of symbolsDocuments for approval and informationNational authoritiesReferences
CERTIFICATION PROCEDURESIntroductionDesign ReviewTesting and inspectionCertification of existing uni tsMaintenance of certificateSummary of procedures
DESIGNStructural strengthWeldingDesign detailsUnits with tanksMaterialsPrototype Testing
MANUFACTUREGeneralWeldingSecondary structureProduction documentation
Production testingMARKINGSafety markingIdentification markings
Addi tional information markings (optional )
Other markingINFORMATION PLATESGeneralOperational limitationsInformation plateInspection plate
OPERATIONAL RESTRICTIONS
PERIODIC EXAMINATION, TESTS AND REPAIRSGeneralInspection, test and repairs on uni ts
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
7/23
Det Norske Veritas AS. All rights reserved Slide 723 November 2007
Test if SfC 2.7-3 is applicable
Tests to define type A, B, C or D
Integrated service?Use 2.7-2
Container shaped & W
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
8/23
Det Norske Veritas AS. All rights reserved Slide 823 November 2007
Procedure for Certification
Application sent to DNV.
Order confirmed and fees agreed.
Drawings, documentation and calculations reviewed and approval givenby the approval office.
Prototype offshore Unit manufactured under supervision of the Society'sSurveyor.
Unit tested according to prototype test requirements, witnessed by theSociety's Surveyor.
Production proceeds according to the agreed Quality Plan orManufacturing Survey Arrangement. Production tests according to list inSection 4.5.
DNV surveyor issues Portable Offshore Unit Certificate (form 49.06a) andaffixes emblem.
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
9/23
Det Norske Veritas AS. All rights reserved Slide 923 November 2007
Design Requirements - General
Design to promote means for safe handling and transportation.
Selected criteria to cover a transportation event involving sea voyage andlifting offshore .
Acceptable stress, structural displacement and stiffness.
Units designed for dynamic forces generated when handled in a seastate of up to Hs = 6m , unless otherwise stated in operational limitations.
Units intended for repeated transportation events and to be mixed withother frequent handled goods shall be free from protruding parts outsidethe envelope of the Unit.
All Units in compliance with this Standard for Certification shall beevaluated with regard to the risk of uncontrolled skidding and overturningon a moving ship deck.
Consider type A, B, C or D as defined in section 1.1.
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
10/23
Det Norske Veritas AS. All rights reserved Slide 1023 November 2007
Design - Structural Strength
Calculation Methods . Only the primary structure shall be included in thedesign calculations.
Allowable Stresses . Von Mises equivalent stresses, e = 0.85C. For steel:
C = Re = minimum yield stress.Design Lifting Loads:
- Primary structure: F = 2.5 x MGW x g
- pad eye: Single padeye: RSF = 2 x F
Impact Loads:
- Horizontal impact- Vertical impact (Drop test)- Minimum thicknesses
Welding- Red. factor: Fillet = 0.5 , partial = 0.75 and full pen. = 1.0
)()1(2.1
Cosn
F RSF
=
SKL Sling angle
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
11/23
Det Norske Veritas AS. All rights reserved Slide 1123 November 2007
Pad Eyes- Not outside unit- Dim requirements: D hole < R padeye_pl Tpadeye > 75% Shackle inside width
- Strength: Req. to combined stress on net areaOther details:
- ISO-corner Castings- Drainage- Fork Lift Pockets- Walls- Equipment and Supports for equipment
- Lashing- Tugger points- Doors and hatches- Coating and Corrosion Protection
Design Details
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
12/23
Det Norske Veritas AS. All rights reserved Slide 1223 November 2007
Materials and Manufacture
Design temperature, normally -20 C
Steel quality requirements
Aluminium and other materialsWelding Qualification
Inspection of Welds
Secondary structure
Production documentation
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
13/23
Det Norske Veritas AS. All rights reserved Slide 1323 November 2007
Testing Requirements
All point lifting test- Mandatory, maybe omitted for single
transports- Test load: 2.5 x MGW
2-point Lifting- DNV decide if necessary- May not pass calculations- Test load: 1.5 x MGW
Vertical Impact Test- Drop or lowering test
- Could be substituted by calculations
less for MGW > 25t
less for MGW > 25t
Test conclusion: Spreaderframe is required!
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
14/23
Det Norske Veritas AS. All rights reserved Slide 1423 November 2007
Marking
Safety marking
Identification by Certificate number
Information Plate- Name of manufacturer.- Month/year of manufacture.- Manufacturer's serial number.
- Maximum gross weight (kg) at design sling angle.- Design temperature.- DNVs Inspector Stamp (Ref. 4.4).- Operational restrictions (if any).
Inspection PlateThe InternationalConvention for SafeContainers, CSC
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
15/23
Det Norske Veritas AS. All rights reserved Slide 1523 November 2007
The need for stricter operational restrictionsThe need for stricter operational restrictionsthan the general restrictionthan the general restriction Hs = 6.0mHs = 6.0m forforthe offshore lift shall be evaluated.the offshore lift shall be evaluated.
Limitations of sea state for the transportLimitations of sea state for the transport
event could be applicable.event could be applicable. A specially arranged procedure or A specially arranged procedure orarrangements for handling or sea fasteningarrangements for handling or sea fasteningcould be required.could be required.
It is advised that an agreement on theIt is advised that an agreement on thepossible operational restrictions ispossible operational restrictions isestablished with DNV in an early stage ofestablished with DNV in an early stage of
the enterprise.the enterprise.
Operational restrictions
Section 7 in SfC (Standard for Certification) 2.7-3 include a text thatunfortunately is rather unclear, but it generally says:
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
16/23
Det Norske Veritas AS. All rights reserved Slide 1623 November 2007
Plans for Next Revision Slide 1
Improve the definition of the border between 2.7-1 and 2.7-3 includinglimitations for units that can be certified according to 2.7-3.
It should be made mandatory to define clearly (upper) operation
limitations. The revised CN shall include (specific) guidance on how todo this. One proposal is to categorize the units into, say 3 classes withlift limitations at 6m (as 2.7-1), 4m and 2.5m . The categorization shouldbe based on the design (i.e. type A, B, C or D), single or multiple useand weight.
For (very) special units it should be stated that a handling procedureboth for sea transport and offshore lift should be made and presented forreview.
Criteria for sea transport are vaguely described. Design requirementsfor the transport to be included.
Design and documentation requirements to lifting sets should beincluded (at least) as an option.
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
17/23
Det Norske Veritas AS. All rights reserved Slide 1723 November 2007
Plans for Next Revision Slide 2
Tables showing test lift weights will be revised/corrected.
Weld type requirements and some manufacturing requirements to bereviewed.
2.7-1 includes several appendices with useful information. It will beconsidered to include something similar in 2.7-3.
Include, as for 2.7-1, a tailor made certificate form.
Description of DNV 2.7-3 emblem, as for 2.7-1, to be included.
Several typing errors and incorrect references will be corrected.
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
18/23
Det Norske Veritas AS. All rights reserved Slide 1823 November 2007
Next Revision: Chapter 3 Design
Chapter 3 Design will be considerably updated, e.g.:- The general design factor - 2.5 for lift, will be a function of, op. lim. Hs,
weight and subsea or not.
- Specific design requirements for transport will be included, normally 1g- Accept criteria for stress and stability to be clarified.
- Deflection accept criteria to be deleted/updated (clarified why).
- Recommendations for vertical impact calculations.
- Minimum thickness requirement modify considering weight & optionalimpact test.
- Padeye design criteria Clarify/update and include 2.7-1 formulae as option.
- Clarify requirements to equipment and equipment supports- Lashing and tugger points rewrite requirements
- Include more guidance on when 2-point lift test & impact test are required.
- Subsea use (next slide)
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
19/23
Det Norske Veritas AS. All rights reserved Slide 1923 November 2007
Subsea Design Factor, Lift
Design factor structure: 3.0 (2.8) This covers DAF and LF
Additional factor for padeyes as for lift in air
The following design requirements will be included to cover subsea:
In order to ensure that the unit could be installed without too strictoperational limitations the drag area and volume, including addedvolume/mass should be reasonably limited.
The revised 2.7-3 will include some guidance on how to obtain an unit thatdo not need any special procedures to be installed.
The recommendations will be further reviewed, but will be something like:
A/Ws < 1.0 where A is drag area and Ws is the submerged weight
V/Ws < 2.0 where V is the volume of the unit + added (water) mass
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
20/23
Det Norske Veritas AS. All rights reserved Slide 2023 November 2007
Subsea Design Considerations
All air filled members shall be designed for the maximum hydrostatic
pressure, or proper ventilation/water filling shall be ensured.Placing of lift points below CoG is normally not acceptable.
Lift point should be placed/designed in such a way that the risk ofdamage and/or accidental release of rigging is neglectable.
Effect of horizontal wave loads. (tilt of object in splash zone).
Local design for slamming loads.
Tugger points for horizontal and rotational control.
Guiding system for final positioning.
Retrieval loads, if applicable.
A set of additional (for subsea) design considerations, asindicated in the list below, will be included.
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
21/23
Det Norske Veritas AS. All rights reserved Slide 2123 November 2007
Subsea Operational Aspects
All assumed operational limitations shall be clearly marked on the unit. This
could be:Installation wave height/periods (if evaluated/applicable)Special considerations, e.g. pass splash zone with inclinationMaximum water depth
Allowable loads on tugger points and guiding systemsSling angles
The installation contractor needs to do a final assessment of the applicableoperation limitations based on the actual installation vessel and procedure.
Installation means on the unit, e.g. as marking, ROV grab bars, skids formonitoring systems/equipment, should be installed as agreed.
A set of additional (for subsea) operational aspects, asindicated in the list below, will be included.
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
22/23
Det Norske Veritas AS. All rights reserved Slide 2223 November 2007
http://webshop.dnv.com/global/
1
2
3
4
8/10/2019 11-DNV-2.7-3-portable-offshore-units[1].pdf
23/23
Det Norske Veritas AS. All rights reserved Slide 2323 November 2007
http://www.dnv.com/