1 of 53 Rev A.1 (03/2013) Beckman Coulter Professional Development ©2013 Beckman Coulter, Inc. THE...

Post on 29-Dec-2015

236 views 5 download

Transcript of 1 of 53 Rev A.1 (03/2013) Beckman Coulter Professional Development ©2013 Beckman Coulter, Inc. THE...

1 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

THE BECKMAN COULTER logo, COULTER, DxH, TruColor, and UniCel are trademarks of Beckman Coulter, Inc; COULTER and UniCel are registered in the USPTO.

2 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Objectives

Software OverviewSystem & Details StatusDaily Checks & ShutdownSystem MaintenanceSet-UpSample ProcessingCleaning ProceduresSample-Flow

3 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Software OverviewStatus Area

Global Icons and Navigation/Status Buttons

Alert Status IconsUtility Icons

System Icons

Local Navigation Bar

Status Bar

4 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

System Status

Active = online and readyInactive = offline and not readyDisabled = maker or stainer not available for useEnabled = maker and/or stainer available for use

LIS Status:Green = LIS Interface ONGray = LIS Interface OFF

Alert Status Icon color meaning:Red = error

Yellow = warning

Neutral = OK

Displays if unit is Online, Offline, in Diagnostics, or Stopped

Printer Status:Displays Auto Print Disabled if Disable All Auto Printed Reports is selected from Print Print Printer Setup

5 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Details Status

DATE & TIME of last DAILY CHECK and SHUTDOWN Cycles

TRANSPORT STATUS

DEFAULT SLIDE ORDERCASSETTE PREPARATIONSINGLE-TUBE PREPARATION

MAKER & STAINER STATUS

START BUTTON

TRANSFERS

6 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Daily Checks & Shutdown

7 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Supplies

Slidemaker Supplies Tab

Cleaner

Broken Slides Status

Printer Ribbon Status

Slide Status

Setup Supplies

Configure ContainersEmpty Broken Slides

Replace Ribbon

Diluent 1 & 2

8 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Supplies

Slidestainer Supplies Tab

Setup Supplies

Stain Protocol Reagents

Slidestainer Supplies Details

Bio Waste Status

Empty Basket Status

Drawer Spaces

Methanol Waste Status

Config Low LevelView Log

Slidestainer Baths

9 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Supplies - Details

10 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Loading Slides

11 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

12 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Setting up the Slidemaker

13 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Basket Settings

SMS Configuration>Basket Settings

14 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Set Pre-Stain Drying Type

SMS Configuration>Pre-Stain Drying

15 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Configure the Slide Label

SMS>Configuration>Slide Label

16 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Set up Basket Location Availability

SMS Configuration>Basket Location Availability

17 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Set up Stain Only Priority

SMS Configuration>Stain-Only Priority

18 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Set up Agitation

SMS>Configuration> Agitation Settings

19 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Set up Heater Availability

SMS Configuration>Heater Availability

20 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Set up Smear Settings

SMS Configuration> Smear Settings

21 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

22 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Setting up the Slidestainer

23 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Set Active Staining Protocol

SMS Configuration>Staining Protocols

24 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Add/Edit a Staining Protocol

SMS Configuration>Staining Protocols

25 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Configure Baths (Mapping) to the Bath Location

26 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Configure Baths (Mapping) to the Bath Location

27 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Configure Baths (Mapping) to the Bath Location

28 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Copying a Staining Protocol

• SMS Configuration>Staining Protocol

• Select a protocol• Select “Copy Protocol”• Re-Name the copy• Select “OK”

29 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Delete a Protocol

• SMS Configuration>Staining Protocol

• Select a protocol• Select “Delete Protocol”• Select “OK”

30 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Quick Rinse

Follow the procedure, when needed, to reduce stain precipitate on the slide for the Wright Giemsa QR (quick rinse) default stain protocol.

31 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Disable/Enable the Slidemaker

• Select System Status>Details Status• Select Module>Disable or Enable Maker• Select “OK”• Select “YES”

32 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Disable/Enable the Slidestainer

• Select System Status>Details Status• Select Module>Disable or Enable Stainer• Select “OK”• Select “YES”

33 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

34 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Running SamplesCassette Presentation

• Load the samples into the cassettes• Place cassettes into the input buffer

35 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Running SamplesSingle Tube Presentation

36 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

37 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Basket Management

System Status>Details Status>Basket Management

38 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Basket Details

System Status>Details Status>Basket Management>Basket Details

39 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Advance Basket

System Status>Details Status>Basket Management>Advance Basket

40 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Basket to Stain Next

System Status>Details status>Basket Management

41 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Cancel Staining

System Status>Details status>Basket Management

42 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

43 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Loading/Removing BasketsInput/Output (I/O) Drawer

The indicator lights in the I/O drawer mean the following:

• Blinking Green – when the basket is ready for you to remove it• Steady Green – when the basket is ready to be used by the system• Blinking Red – when the basket is in an error state• Blinking Blue – when a basket is loaded with slides for staining only

44 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Staining Samples ManuallyStain-Only Priority

45 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Making Slides (No Staining)

• Select “Make Slide” on the Default Test Order for the applicable cassette or single tube preparation (OR)

• Add or edit a test from the Worklist Pending tab (OR)

• Load the samples for the processing of downloaded Test Orders from the LIS

46 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

47 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Cleaning Procedures

Daily• Daily Checks• Shutdown• Cleaning Stainer Baths and Tray (Daily or as Needed)

Weekly• Cleaning Baskets• Clean Stainer Fill Probes, Drain Probes and

Level Sense ProbesAs Needed Procedures

• For additional information on As Needed Procedures refer to Instructions For Use (IFU)

48 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

49 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Specimen Transport Module (STM)

50 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

UniCel DxH SlideMaker

51 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

UniCel DxH SlideStainer

52 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Sample Aspiration Flow

53 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development

©2013 Beckman Coulter, Inc.

Any Questions?

Move your lab forwardwith Beckman Coulter.