Transcript of 070219 Terra Mar Bridge Public Presentation...

Design Considerations

Bridge Repair

Traffic control

Resident and Business Access

Utility work

Environmental Permitting

Construction Operations

Bridge Structure

Functionally Obsolete

Structurally Deficient

Bridge Structure

Construction Operations

Daytime work only

3-10 months duration

Temporary relocation of overhead electric

Bridge Repair

Bridge Repair

Seawall Repair

Seawall Repair

Traffic Control

Traffic Control

Possible staging areas

Utilities

Utilities

Permitting

4 month timeframe

US Army Corps of Engineers

Broward County

Schedule

Design Currently Underway

Construction funding available 2021