IZGRADNJA VETROELEKTRANA
I PROIZVODNJA ELEKTRINE ENERGIJEIZ ENERGIJE VETRAU REPUBLICI SRBIJIVODI ZA INVESTITORE
Dr Branislava Lepoti Kovaevi, dipl.prav.Bojan Lazarevi, dipl.el.in.
CONSTRUCTION OF WIND FARMS ANDELECTRICITY GENERATIONFROM WIND ENERGYIN THE REPUBLIC OF SERBIAGUIDE FOR INVESTORSBranislava Lepotic Kovacevic, PhD LawBojan Lazarevic, BSc El. Eng.
8/3/2019 03 Vetar Elektronska Final-Engleski
2/64
ENGLISH SERBIAN
8/3/2019 03 Vetar Elektronska Final-Engleski
3/64
1
CONSTRUCTION OF WIND FARMS ANDELECTRICITY GENERATIONFROM WIND ENERGYIN THE REPUBLIC OF SERBIA
GUIDE FOR INVESTORS
2 Introduction4 Wind Farms4 Wind Farms - Investors Rights4 Relevant Legislation5 Competent Institutions
5 From and Idea to Wind Power Plant (WPP) Exploitation
6 Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)6 I Steps or obtaining the Right to Construct Wind Farms
7 Right to Construct - Acquisition Methods
8 I-1 Acquiring Inormation on the Location
8 I-2 Energy Permit
9 I-2 Obtaining the Energy Permit (EP)
10 I-3 Location Permit
10 I-3 Preparation o the Pre-Feasibil ity Study including General Design
11 I-3 Resolving the Property Rights Issues
11 I-3 Allotment / Re-allotment
12 I-3 Approval rom the Aspect o Air Trac Saety
12 I-3 Collecting the Design Requirements
13 I-3 Requirements or Connection to the Grid
14 I-3 Water Requirements
15 I-3 Acquiring the Location Permit
16 I-4 Construction Permit16 I-4 Preparation o the Feasibility Study including the Preliminary Design
17 I-4 Preparation o the Environmental Impact Assessment Study
17 I-4 App lication or the Need to Assess the Impact (Z1)
18 I-4 Application or Determining the Scope and Contents o the EIA Study (Z2)
19 I-4 Obtaining Approval or the EIA Study (Z3)
20 I-4 Preparation o the Main Design
21 I-4 Acquiring the Construction Permit
22 I-5 Operating Permit
22 I-5 Construction o the Facility
23 I-5 Obtaining the Water permit
23 I-5 Obtaining the Operating Permit
24 Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (II)24 II Steps to Acquire the Right to Engage in Power Generation
25 Right to Engage in the Activity o Power Generation - Acquisition Methods
25 II-1 Assignment Agreement
26 II-1 Assignment Agreement - Prerequisites
26 II-1 Assignment Agreement - Contents
27 II-1 Assignment Agreement vs. Concession - Main Dierences
27 II-1 Diagram o a Concession Granting Procedure
28 II-2 License
28 II-2 Obtaining the License
29 II-3 Approval or the Connection
29 II-4 Status o Privileged Producer
30 II-4 Acquiring the Status o Privileged Producer
30 II-5 Power Purchase Agreement
8/3/2019 03 Vetar Elektronska Final-Engleski
4/64
Renewable energy, such as biomass, wind, mini-hydro, and geothermal isreceiving greater attention rom governments, potential investors, andconsumers worldwide. In 2007, the European Union (EU) set a combinedmember country target that 20% o overall energy consumption will comerom renewable sources by 2020.
Serbia has signifcant renewable energy resources to meet this emergingdemand, and the Serbian Government has developed a strategy to leveragethis opportunity. To support sector growth and investment, and to meet theircommitment to the South East Europe Energy Community Treaty, the Serbiangovernment adopted several regulations by decree in November 2009,including:
Establishment of a Feed-in Tariff system whereby the Serbian governmentwill subsidize the cost o renewable electricity;
DenedtherequirementsofbecomingaPrivilegedElectricPowerProducer who uses renewable energy sources to generate electricity;
With the Serbian governments adoption o eed-in taris and other keyregulation, GTZ Project Strengthening o the Local Sel-Government(GTZ SLS) has been working with government ministries and the USAIDCompetitiveness Project private sector investors to encourage investment inrenewable energy projects.
2BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
5/64
A key activity has been to create defnitive guides to the renewable energylicensing process aimed at encouraging investors and other market actorsto become active in the sector. Representatives o the Ministry o Mining andEnergy, Ministry o Environment and Spatial Planning and Ministry oAgriculture, Forestry and Water Management together with the GTZ expertshave created our such roadmaps, which explain the licensing process or
developing projects in geothermal water, small hydro power, wind power andbiomass subsectors. The USAID Competitiveness Project has supportedGTZ SLS in the creation o investor roadmaps as part o its activities toencourage investment in the sector by providing technical assistance toprospective investors.
Each roadmap is created as a detailed document, which describes administrative procedures and identifes relevant institutions and necessary planning anddesign documents needed or investors. The roadmaps navigate the
legislative and regulatory ramework and should be utilized as a baseline orurther legislative and regulatory reorm. GTZ SLS has also prepared shortversions o roadmaps, which are executive summaries that investors can useor act fnding.
We hope that this eort will be a vehicle to acilitate dialogue between the pri-vate sector and the Government to identiy and address barriers to the growthand fnancial viability o the sector.
3 BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
6/64
4
Wind Farms - A wind arm: a wind power plant includes a single unit ormultiple production units or electricity generation usingwind. These units are interconnected and equipped so theycan be connected to the electric power grid.
Privileged power producers- Small power plants o up to 10 MW
- Power generation rom a renewable source
Wind Farms -Investors
Rights
An investor must acquire the ollowing rights
- I Right to construct Wind Farms
- II Right to generate electricity
RelevantLegislation
- The Energy Law (Ocial Gazette o the RoS No. 84/04)
- The Law on Planning and Construction (Ocial Gazette o the RoS,No. 72/09 and 81/09)
- The Law on Environmental Protection (Ocial Gazette o the RoS,No. 135/04 and 36/09)
- The Law on Waters (Ocial Gazette o the RoS, No. 30/10)
- The Law on Air Trac (Ocial Gazette o the RoS, Nos. 12/98, 5/99,44/99, 5/00, 70/01)
- The Law on Concessions (Ocial Gazette o the RoS, No. 55/03)
- The Law on Public Utility Companies and Perorming Activities oPublic Interest (Ocial Gazette o the RoS, No. 25/00, 25/02, 107/05,and 108/05)
and other relevant laws and by-laws.
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
7/64
5
- The Ministry o Mining and Energy - MME
- A Local Sel-Government Unit - LSU
- The Energy Agency- AE
- The Republic Geodetic Authority - RGA
- The Ministry o Agriculture, Forestry and Water Management - MAFWM
- The Ministry o Environment and Spatial Planning - MESP- The Republic Hydro-meteorological Service - RHMS
- The Electric Grid o Serbia - EGS
- The Electric Power Industry o Serbia - EPIS
- The Serbia and Montenegro Air Trac Services Agency
and other competent institutions in each concrete case
CompetentInstitutions
Prior activity - Selection o location
- Visiting the location
- Checking i the location is included in the planning document
*Mandatory requirement: the acility must be included in theplanning document
I Steps or obtaining the Right to Construct Wind Farms
II Steps or obtaining the Right to Generate Electricity
From an Ideato Wind PowerPlant (WPP)Exploitation
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
8/64
6
Main Steps: From an Idea toWind Power Plant (WPP)Exploitation (I)
ISteps or obtaining the Right to ConstructWind Farms
I-1 Acquiring Inormation on Location
I-2 Acquiring Energy Permit
I-3 Acquiring Location Permit Preparation o the Preliminary Feasibility Stydy including the
General Design
Resolving o Property-Rights Issues / Allotment and Re-allotment Plans
Collecting Design Requirements
I-4 Acquiring Building Permit
Preparation o the Feasibility Study including the PreliminaryDesign/Main Design
Preparation o Environmental Impact Assessment Study
I-5 Acquiring the Water Permit and the Operating Permit
Construction o the Facility
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
9/64
7
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind Farms I
Right toConstruct -Acquisition
Methods
Note:
Right to the Land/Property-rights issues/
- property rights- leasehold- ease o access- expropriation- etc.
Obtained permitsor construction
- Energy Permit- Location Permit- Construction Permit- Water Permit- Operating Permit
and
- Issuance o construction-related permits or Wind Farms (Locationpermit, Construction Permit, Operating Permit) is within the jurisdic-tion o the Local Sel-Government Unit - LSU (this case is illustratedin the ollowing diagrams).
Exceptions:
- when the wind arm is built in a national park or within the boundar-ies o a protected natural resource o outstanding signicance
- when the power equals or exceeds 10 MW- when the wind turbine/s exceed a height o 50m, in which case it
alls under the jurisdiction o the Ministry o Environment andSpatial Planning (MESP), or the competent authority o theautonomous province i it is situated at the territory o the autono-mous province (Art. 133. Law on Planning and Construction).
For acilities constructed in accordance with the above article 133preparation o the Feasibility Stydy including the General Design andthe Feasibility Study including the Preliminary Design/Main Design ismandatory and subject to review by the Review Committee.
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
10/64
8
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind FarmsI
I-1AcquiringInormationon theLocation
I-2EnergyPermit
Does the existing PlanningDocument envision construc-
tion o an energy-related acilityat the subject location?
Copy o the Lot Plan(including the list o lot owners)
Request or Inormation on the
Location Enclose: Copy o theLot Plan
LSGU - exception(see notes)
Inormation on the LocationIncluding data on:
1) planning document
2) zone
3) land use
4) regulation and building lines document
5) construction codes
6) conditions or connection to inrastructure
7) need to prepare a detailed town planningdocument, or an urban design
8) cadastral lot, whether it meets the condi-
tions or a construction lot, guidelines on
the procedure or orming the building plot
9) engineering-geological requirements
10) special and technical requirements ordesigning - list o requirements included.
Municipal Cadastre
Launching an initiativeto amend the Planning Documents
No
Yes
8 days
An Energy Permit is required only or energy-related
acilities o 1MW or larger
ENERGY PERMIT
ConstructionFeasibility Study
Bank statementdemonstrtating its
readiness to supportthe investor in
nancing
Inormationon the location
Opinion o the
energy system
operator on the
possibilities
or connection
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
11/64
9
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind Farms I
I-2Obtaining
the EnergyPermit (EP)
Prior to submitting the request or theEP, it is necessary to obtain/provide:
1) Inormation on the location ortown planning requirements(i issued)
2) Feasibility Study on Constructiono the energy-related acility(recommendation: General Designincluding Pre-easibility Study),with separate analysis o possible
impacts on the environment,including the proposal o protectionmeasures.
3) Statement o a bank conrming itsreadiness to support nancing othe construction.
4) Opinion o the transmission/distribution system operator onpossibilities to connect the acilityto the system.
The above documents must be
presented together with the Applicationor issuance o the EP.
Request or the EP - using Form O1-(small power plants):
1) Data on the applicant;
2) Data on the acility;
3) Value o the investment;
4) Applicants nancial standing
(Banks statement and evidence oapplicants solvency);
5) Liespan o the acility, etc
Ministry o Miningand Energy
Apeal - to theGovernment,
Deadline: 8 days
Decision on issuanceo Energy PermitValidity: 2 years
The request or an opinion rom theOperator:
The request shall include:
1) General ino on the applicant;
2) General ino on the acility;
3) Main characteristics o the gen-erating units and the whole plant(apparent and active power, des-ignated voltage and power, initialpower, power actor, maximumpower to be supplied to the DES,maximum power to be taken overrom the DES;
4) Power plant operating mode withrespect to the DES;
5) Planned date o connection to theDES;
6) Proo o the applicants ID;
7) Layout plan at a scale o1:500(1000) on a copy o the cadastrallot plan rom the Cadastre, incl. anexcerpt rom the Cadastre o
installations in the ground;8) A copy o the plan o a broader area;
9) Description o and possibilities toregulate the power plant;
10) Flicker coecient;
11) Higher harmonics o the current,etc.
30 days
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
12/64
10
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind FarmsI
I-3LocationPermit
I-3Preparationo thePre-easibilityStudyincludingGeneralDesign
A Location Permit contains all the requirements and dataneeded or preparation o the technical documentation and
the Main Design, in compliance with the valid
planning document
- Preeasibility Study shall defne, in particular, spatial, environmental,
social, fnancial, market, and economic justifcation o the investment or
possible alternative solutions defned in the General Design, which will
serve or decision-making on justifcation o the investment - in prelimi-
nary works or the Preliminary and the Main Design, General Design shall
include, in particular, the data on macro location o the acility, general
layout, technical-technological concept, provision o inrastructure,
possible variants o spatial and technical solutions, environmental condi-tions, environmental impact assessment, engineering, geological and
soil-mechanics eatures o the terrain rom the aspect o a general concept
and easibility o construction, site investigation works or preparation o
the Preliminary Design, protection o natural and immovable cultural
assets, unctionality and cost-eectiveness o the solution.
LOCATIONPERMIT
Requirements ordesigning collected
Technical documentationor the Wind Farm
(data on the acility /General Design)
Property-rightsissues resolved
Construction plot
ormed (allotment/
re-allotment)
Approval with respect to
air trafc saety
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
13/64
11
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind Farms I
I-3Resolving
Property-Rights
Issues
I-3Allotment/
Re-allotment
- Sale/Lease Agreement signed with the owner o the lots
- Agreement on the use o land that includes water, use o water acilities
and rendering o other services (with JVP Srbijavode, Vode Vojvodine or
Water Directorate)
Preparation o the Allotment/Re-allotment Plan
An integral part: Geodetic Survey Benchmarking
Prepared by: a licensed company, legal entity,entrepreneur
Design managed by: urban planner in-charge(Architect)
LSU - body in charge o urban planning aairs
Notication on declined design
Appeal/Objection - to theMunicipal/City Council
Deadline: 3 days
Notication on approved design
Body in charge o state survey and cadastre aairsThe Republic Geodetic Authority - RGA
Decision on orming cadastral lot(s)
Appeal: Deadline: 15 days
Request to undertake the allotmentEnclosed:
1) Evidence on resolved property-rights relations,
2) Allotment/Re-allotment Plan conrmed by thecompetent body, including the Geodetic SurveyBenchmarking.
10 days10 days
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
14/64
12
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind FarmsI
I-3Approval romthe Aspecto Air TracSaety
I-3Collectingthe DesignRequirements
Serbia and Montenegro AirTrac Services Agency
Approval with respect to air trac saety
- Request or issuing approval or theconstruction o a wind arm withrespect to saety o the Air Trac andlabeling o the Wind Farm must besubmitted to the Serbia andMontenegro Air Trafc Services Agency.
- No specic orm has been prescribed.
- The request should precisely describethe reasons or submission and theacility to be built with specic indica-tion o its position, height and shape
Obtaining the design requirements is necessary or the issuance o the Loca-
tion Permit. I the Investor does not obtain the requirements, the relevant
body shall obtain them ex ofcio, prior to issuing the Location Permit.
- Requirements or connection
- Water requirements
- Other requirements (regarding environmental protection, protection o
cultural monuments, access to inrastructure acilities, etc.)
*The list o prescribed requirements is provided in the Inormation on
the Location
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
15/64
13
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind Farms I
I-3Requirementsor Connection
to the Grid
Relevant energy entity where the acility shall be connected (EPS, EMS)
Technical Report or issuance o the technical requirements
/Establishing i energy/technical requirements are met or not./
Energy - Technical requirements or connection needed orpreparation o the technical documentation.
No appeal/complaint
allowed
Request or issuance o energy-technical requirements (or connection to the grid)or preparation o technical documentation
Enclosed:1) Ino on the Investor;
2) Energy Permit or the power plants exceeding 1MW;
3) License;
4) Copy o the plan - broader plan, i necessary;
5) Evidence on regulated property-rights issues;
6) Description o the types and method o operation o the main power drive,
generators and method o connection to the network;
7) Technical Report - Single-pole diagram o the Wind Farm;
8) Description o the main protection equipment;
9) Evidence on the ee paid or issuance o the requirements
Requirements or Connection to the Grid
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
16/64
14
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind FarmsI
I-3WaterRequirements
Opinion o the RHMZ necessary in the procedure
Opinion o the relevant PC necessary in the procedure
Ministry o Agriculture, Forestry and Water Management
Decision on issuing water requirements
Agreement on the use o water-covered land and wateracilities and provision o other types o services, signedbetween the Investor and the public water-management
company or the Ministry o Agriculture, Forestry and WaterManagement (Water Management Directorate)
Request or the Water Requirements:
1) Main data on the location;
2) Data on purpose and size o the acility;
3) I required, Preeasibiilty Studies and General Design (Preliminary Design) or
better assessment o the impact o the acility on the water regime
Enclosed:
1) Opinion o the RHMS,
2) Opinion o Srbijavode / Vode Vojvodine,3) Copy o the plan, including plotted position o the acility;
4) Excerpt rom the land registry (or the cadastral lot on which the acility will be
constructed;
5) Certifcate o resolved property-rights issues;
6) Approval by the Public Water Management Company i the acility o public inter-
est is to be constructed on the waterway;
7) Plan o use or the area (issued by the competent town-planning department o
the LSU).
I necessary, the Investor may be subsequently invited to submit additionaldocumentation.
Water Requirements
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
17/64
15
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind Farms I
I-3Acquiring
the LocationPermit
The Location Permit shall cease to bevalid unless the Investor les a requestor the building permit within 2 years
An Appeal may belodged to the Ministry
o Environment andSpatial PlanningDeadline: 8 days
(exception)
Request or the Location Permit
Enclosed:
1) Copy o the lot plan (the date stamp: max. 6months old),
2) Excerpt rom the the cadastre o installationslaid in the ground;
3) Evidence o ownership rights, or o lease onthe construction land;
4) Data on the acility (in practice - GeneralDesign);
5) Collected special and technical requirements.
LSU - Town PlanningAuthority (exception -
see notes)
Decision on Location Permit
Includes, in particular:
1) Data on the Investor;
2) Number and square area o the cadastral lot;,
3) Data on the existing buildings on the cadastral lot that should beremoved;
4) Dened access to a public trac route;
5) Use o the acility;
6) Building lines;
7) Codes o construction;
8) Requirements or service connection to the inrastructure;
9) Possible and mandatory stages in implementation o the project;
10) List o mandatory components o the Main Design,
11) Name o the planning document that served as the basis or theDecision, etc.
15 days
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
18/64
16
I-4ConstructionPermit
I-4Preparationo theFeasibilityStydyincluding thePreliminaryDesign
Upon completion o the technical supervision o the Main
Design and a positive report, a request or the Construction
Permit must be submitted to the competent authority in the
local sel-government unit
CONSTRUCTIONPERMIT
EnvironmentalImpact Assess-
ment Study
Approval o DesignDocumentation and EIA Study
Design Documentation(Preliminary Design,
Main Design)
Technical supervision
o Design Documentation
- The Feasibility Study (FS) specifes the spatial, environmental, social, fnancial,
market, and economic justifability o the investment or the selected solution
defned in the Preliminary Design, based on which a decision on justifability o
the investment should be made
- The Preliminary Design defnes: the use, layout, shape, capacity, technial-tech-
nological and unctional eatures o the acility, organisational components o
the acility and its appearance
- The Preliminary Design includes the General Layout and data on:
1) Micro-location o the acility;
2) Functional, structural, and orm-relevant characteristics o the structure;
3) Technical, technological, and exploitation characteristics o the structure;
4) Engineering, geological, and geotechnical characteristics o the terrain and soil
including the preliminary analysis o stability and saety o the structure;
5) Design o the oundation o the structure;
6) Technical, technological, and organizational elements o the construction o the
structure;
7) Measures or prevention or mitigation o negative impact on the environment;
8) Conceptual design o the inrastructure;9) Comparative analysis o the alternative technical solutions rom the aspect o
properties o the soil;
10) Functionality;
11) Stability;
12) Assessment o the impact on the environment;
13) Natural and immovable cultural assets;
14) Rationality o construction and exploitation;
15) The amount o the costs o construction, transportation, maintenance,
provisions or energy, and other costs.
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind FarmsI
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
19/64
17
I-4Preparation
o the Environ-
mental Impact
Assessment
(EIA) Study
I-4Application
or the Need to
Assess the
Impact (Z1)
- Only or power plants exceeding 10 MW
- List II - Projects or which preparation o the Impact Assessment Study maybe required
Steps:
- Application to establish i the EIA Study is required or not (Z1)
- Application to establish the scope and contents o the EIA Study (Z2)
- Preparation o the Study
- Obtaining approval or the Study (Z3)
Request or the need to assess the environ-mental impact - to be led in a separate ormand to include:
1) Data on the Investor;
2) Description o the location;
3) Description o characteristic eatures othe acility;
4) Summary o considered variants;
5) Description o environmental actors that
may be exposed to the imapct;6) Description o major detrimental impacts;
7) Description o the measures or preven-tion and mitigation o detrimental impacts.
Enclosed:
1) Ino on the location or approved urbandesign (issued within maximum 1 year/thedate stamp: max. 1 year old)
2) General Design (Conceptual Design) orPreliminary Design (Excerpt),
3) Graphical presentation o the micro- andmacro-location;
4) Requirements and approvals by othercompetent authorities and organisations;
5) Evidence on the ee paid;
6) Any other type o evidence, i requested.
Decision: EIAS IS required - The scope and contents o theEIA Study may (but need not) be stipulated in the Decision. Ithey are not stipulated, the request or stipulating the scope
and contents o the EIA Study must be led
Decision: EIASIS NOT required:
The Decision maystipulate the mini-
mum measuresor environmentalprotection as set
by the competentauthority.
MESPinorms thepublic andthe Inves-
tor on itsDecision
MESP issues a Decision on therequest
Interested members o the publicsubmit opinions to the LSU
Notication to the interested memberso the public on submitted Application
Ministry (MESP)
Complaint tothe Court
10 dana
10 dana
10 dana
3 dana
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind Farms I
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
20/64
8/3/2019 03 Vetar Elektronska Final-Engleski
21/64
19
I-4ObtainingApproval
or the EIAStudy (Z3)
Request or the approval or the Environmental Impact As-sessment Study.
The request shall be accompanied by the ollowingdocuments:
1) Environmental Impact Assessment Study (3 hard copiesplus 1 copy in electronic ormat),
2) Decision on the scope and contents o the EIA Study
Ministry (MESP)
MESP - Inorms the public on the time and placeo public access, presentation and public debate on the
EIA Study
Evaluation Report o the EIA Study and recommendationo the decision
Public debate onthe EIA Study Report, including summary o
Statements (opinions) o variousstakeholders
MESP - Decision on approval ordeclined request or approval
Technical Committeeor review o the EIAStudy is nominated
7 days
20 days
3 days30 days
10 days
10 days
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind Farms I
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
22/64
20
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind FarmsI
I-4Preparationo the MainDesign
- The Main Design specifes civil engineering, technical and technologicalexploitation eatures o the acility, including the equipment and installa-
tions, technical-technological and organizational solutions or construction
o the acility, cost o the investment and requirements to maintain the
acility
- The Main Design is subject to technical review.
Procedure or Obtaining the Water Approval
Request or approval by the Ministry o Health andthe Ministry o Environment and Spatial Planning, withinthe procedure or obtaining the Water Approval or the
construction o a Wind Farm/...No specic procedure stipulated.../
Request or the Water Approval
Enclosed:
1) Approvals by the Ministry o Health and the Ministry o
Environmental Protection;
2) Decision on issuance o Water Requirements;
3) Main Design;
4) Report by the Technical Review Committee;
5) Other documents that may be required by the Decision
on Issuance o Water Requirements.
Approval by the Ministry o Health and the Ministry oEnvironment and Spatial Planning
Ministry o Agriculture, Forestry and Water Management
Decision on issuance o the Water Approval((Unless the construction begins within 2 years rom the
date o issuance o the Water Approval, the Approval shallcease to be valid).
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
23/64
21
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind Farms I
I-4Acquiring
the ConstructionPermit
Application or the Construction Permit
Enclosed:
1) Location Permit;
2) Main Design in 3 copies including the Report on completed technical re-
view o the design;
3) Evidence on the ownership right, or the right to lease the construction land;
4) Evidence on settled relations regarding payment o the ee or the land
development;
5) Evidence o payment o the administrative ee;
6) Energy Permit (or the power plants exceeding 1MW)
Decision on issuance o the Construction Permit
Includes, in particular:
1) Data on the Investor;2) Data on the acility or which construction is permitted;
3) Data on the cadastral lot where the acility is to be built;
4) Validity o the Construction Permit and the time or completion o construction;
5) Reerence to the documents based upon which the permit is issued.
LSU - Relevant town-planning authority
Construction o the acility
Appealto the Ministry o Environment and Spatial
PlanningDeadline or the appeal: 8 days (exception)
Notication that the design is not incompliance with the Location Permit,
instructing the Investor to amend the designwithin 30 days.
Otherwise, the request shall be declined.
8 days
8 days
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
24/64
22
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind FarmsI
I-5OperatingPermit
I-5Constructiono the Facility
- The technical inspection establishes the ftness o aacility or use
- The acility may be used ater the Operating Permit has
been obtained
- Is is necessary to submit the As-Built Design during the
process o obtaining the Operating Permit
OPERATINGPERMIT
As-BuiltDesign
Water Permit
Constructiono a acility
Technical inspection o
the completed acility
- Construction o acilities or carrying out o works may be done by an economic
operator registered in the relevant Registry o Contractors or or execution o the
works (the Contractor).
- Duties o the Contractor include: prior to commencement o the works, signing
o the Main Design; issue a written decision on nomination o the contractor in
charge o carrying out o the work; urnish to the contractor in charge o work, the
Construction Contract and the documents based upon which the acility shall be
constructed; implement preventive measures or a sae and sanitary operation
in accordance with the law; carry out the work ully as outlined in the documents
presented or issuance o the Construction Permit; organize the Site enabling ap-
propriate access to the location; ensure saety o the acility and persons engaged
on the site and its vicinity; provide evidence o the quality o executed works; keep
a Construction Diary, the Construction Log; provide the Inspection Log; saeguard
the acilities and the environment in case o suspension o the works.
- The Construction Contract shall be kept on the Site at all times, as well as the
Decision on nominating the contractor in charge o the works and the Main
Design, i.e. the documents based upon which the project is implemented.
- The Investor shall provide proessional supervision o the works throughout con-
struction, i.e. execution o the works or which the Construction Permit has been
issued.
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
25/64
23
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (I)Steps or obtaining the Right to Construct Wind Farms I
I-5Obtainingthe Water
Permit
I-5Obtaining
the OperatingPermit
The Water Permit is obtained via a completed technical inspection o the acility.
An operating Permit shall not be issued without the Water Permit obtained
beorehand
Application or the Water Permit
Enclosed:
1) Decision on Water Approval;
2) MoM o the Committee in charge o techni-cal inspection o the constructed acility;
3) Agreements signed with the public water-management company;
4) Documents listed in the Decision onissuance o Water Approval.
The Investor may subsequently beinormed i additional documents need to beurnished.
Ministry o Agriculture, Forestryand Water Management
Decision on issuance othe Water Permit
Issued or a period not to exceed15 years.
Request or extension to be ledprior to the expiry date.
Request or technical inspection othe acility.
LSU - Competent town-planning authority(exception - see notes)
LSU - Forms a Committee or technical inspection(services o the Committee shall be charged to the Investor)
Report/Findings o the Committee orTechnical Inspection
Decision on the Operating Permit
8 days
I Positive
30 days rom submission o the Request
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
26/64
24
Main Steps: From an Idea toWind Power Plant (WPP)Exploitation (II)
IISteps to Acquire the Right to Engage inPower Generation
II-1 Assignment Agreement
II-2 License
II-3 Approval or ConnectionII-4 Status o a Privileged Producer
II-5 Electricity Purchase Agreement
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
27/64
25
Right toengage in the
Activity oPower
Generation- Acquisition
methods
- Any third party may conduct activities related to power generation,
provided such a party has ulflled the prescribed requirements and has
concluded an Assignment Agreement with the Government or conducting
the activities on power generation as activities o public interest.
- The procedure or concluding the Assignment Agreement is managed by
the Ministry o Mining and Energy.
II-1AssignmentAgreement
1. Investment in
afliated companies
o a public
company
2. Assigning the
right to engage in
an activity o public
interest
3. Granting
concessions
- It involves clear and relatively short procedures
- A potential problem - a parent public company isreluctant to allow a major share o the Investor
- Risk - a high degree o discretionary power o theounder o the public company
- The investor acquires the right only ater conclusiono the Assignment Agreement, and the Agreement isconcluded only ater the acility has been constructed
- In practice, a simpler procedure compared to
concessions
- Most oten applied in practice
- The Investor acquires the right through a clearlydened procedure at the very start
- The obligation to set up a new economic operator
- The lengthiest procedure
or
or
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (II)Steps to Acquire the Right to Engage in Power Generation II
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
28/64
26
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (II)Steps to Acquire the Right to Engage in Power GenerationII
II-1AssignmentAgreement -Prerequisites
II-1AssignmentAgreement -Contents
The necessary prerequisites that must be met by any party interested insigning the Assignment Agreement include the ollowing:
a) Adequate technical prerequisites (ownership or the right to use the Wind
Farm that has been constructed in compliance with the Law, technical
and other regulations);
b) Sta capacity (that persons working at the Wind Farm have the necessary
qualifcations and other prescribed skills);
c) Implementation o the prescribed saety at work;
d) Implementation o the prescribed requirements and methods o
protection and improvement o the environment.
The Assignment Agreement shall include provisions on:
1) Operation and business o the economic operator to whom the activity is
assigned;
2) Rights and obligations regarding the use o state-owned assets or
conducting an activity o public interest, as provided or under the Law;3) Obligations o the economic operator regarding provision o the
conditions or continuously and eecively meeting o needs o the users
o the products and services;
4) Mutual rights and obligations o the parties to the Agreement in the case
economic and other conditions or pursuing the activity o public interest
are not provided;
5) Rights and obligations in case there is a disruption in business operations
o the economic operator;
6) Other rights and obligations and important issues to pursue and protect
the public interest.
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
29/64
27
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (II)Steps to Acquire the Right to Engage in Power Generation II
II-1Assignment
Agreement vs.Concession
- MainDierences
II-1Diagram o a
Concession
GrantingProcedure
Assignment Agreement:
- No tendering procedure prescribed
- No obligation to speciy the place where the power generation activity
will take place (unless there is a direct reerence to the specifc acility in
the Agreement)
- No maximum time limit specifed or engaging in an activity o public
interest (unless defned in the Agreement)
- No obligation to establish the scope o engaging in the activity prescribed
- No obligation to pay any ee or engaging in an activity o public interest
prescribed
Proposal or granting a concession
Proposal or adoption o a Concession Deed
Decision on the designatedConcessionaire
Concession Agreement
Concessionary Enterprise established
ConcessionDeed
Public TenderReport o the Commission on the
Execution o the public tender
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
30/64
28
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (II)Steps to Acquire the Right to Engage in Power GenerationII
II-2License
II-2Obtainingthe License
- A license is the permit to perorm an energy-related activity; it is issuedby the Energy Agency o the Republic o Serbia.
- It is required only or 1MW acilities or larger.
Application or the License:
The ollowing conditions must be ullled:1) The entity shall be registered in the Business
Registry;
2) Fulllment o the necessary technical requirementsby the Wind Farms (concerning power generation,re protection, environmental protection) and theownership right or right to use the acility;
3) Sta qualications;
4) Available nancial resources (evidence on solvency,balance sheet...);
The Energy Agency
Decision on issuance o the License(validity: 10 years)
A Fee is paid or the issuance o the Decision.Annual compensation is paid to the Agency.
30 days
Appeal - to the Government oSerbia / Deadline: 15 days
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
31/64
29
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (II)Steps to Acquire the Right to Engage in Power Generation II
II-3Approval
or theConnection
II-4Status oPrivilegedProducer
- The priority right in an organized market specic to other producersoering electricity under equal terms and conditions
- The right to subsidies (tax, customs and other relies, as provided bythe Law)
- Incentives - Feed-in taris :
Item Power Plant Type Installed capacity P(MW)
Incentive - Feed inTari (cEUR/1 kWh)
1. Wind Power Plant 9,5
Request or the Approval to connect the acility to the electric power grid
Enclosed:
1) Data on the owner o the acility, or o the holder o the right to use the acility (ora natural person: name and place o residence, personal ID number, and or a legalentity or entrepreneur: business name or title, head oce, PIB (VAT) number, ocialregistration number, number o the account, and the responsible person);
2) Data on the acility or which the approval or connection is applied or (address, type,location o the acility and its use);
3) Estimated time to conect the aciilty;
4) Data on overall installed capacity o the acility, number and power o generatingunits, generator voltage and block transormer;
5) Estimated average annual and monthly production;6) Protection and measuring equipment;
7) Energy Permit and License or engaging in electricity generation or acilities exceed-ing the capacity o 1MW.
For constructed acilities, it is also necessary to submit the Building Permit, as well asevidence o ownership over the acility or o the assigned right to use the acility.
Relevant energy entity whose system will be used to connect the acility (EPIS, EGS)
Technical Report or issuance o the Approval or theconnection to the system
Decision on approval to connect the acility to the system
Appeal - to the EnergyAgency
Deadline: 15 days
30 days
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
32/64
30
Main Steps: From an Idea to Wind Power Plant (WPP) Exploitation (II)Steps to Acquire the Right to Engage in Power GenerationII
II-4Acquiringthe Statuso PrivilegedProducer
II-5Power
PurchaseAgreement
Application or the status o the privileged producer
Enclosed:
1 A copy o the license or engaging in electricity genera-tion, i the power plant has the capacity exceeding orequal to 1 MW;
2) A copy o the agreement signed with the licence holder,i the power plant has the capacity equal to or exceeding1 MW, and the producer is not the holder o the licence;
3) As-built Design o the constructed power plant acility;
4) A copy o the agreement signed or connection to thedistribution or the transmission system;
5) Operating Permit;6) Data on the person in charge o the power plant
management.
Minister o Mining and Energy
Decision on acquiring the status othe privileged electricity producer
Appeal - to the Government oSerbia / Deadline: 15 days
30 dana
EPS
Power Purchase AgreementTerm: 12 years
The request to sign the Power PurchaseAgreement
30 days
Limited tomaximum450 MW
BACK TO CONTENT
8/3/2019 03 Vetar Elektronska Final-Engleski
33/64
31
IZGRADNJA VETROELEKTRANAI PROIZVODNJA ELEKTRINE ENERGIJEIZ ENERGIJE VETRAU REPUBLICI SRBIJI
VODI ZA INVESTITORE
32 Uvodna re34 Elektrane na vetar34 Elektrane na vetar - Prava investitora34 Izvori prava35 Nadlene institucije
35 Od ideje do korienja vetroelektrane (VE)
36 Osnovni koraci od ideje do korienja vetroelektrane (I)36 I Koraci za sticanje prava na izgradnju i izgradnja objekta VE
37 Pravo na izgradnju - nain sticanja
38 I-1 Pribavljanje inormacije o lokaciji
38 I-2 Energetska dozvola
39 I-2 Pribavljanje energetske dozvole
40 I-3 Lokacijska dozvola
40 I-3 Prethodna studija opravdanosti sa generalnim projektom
41 I-3 Reavanje imovinsko-pravnih odnosa
41 I-3 Parcelacija i preparcelacija
42 I-3 Saglasnost sa stanovita bezbednosti vazdunog saobraaja
42 I-3 Pribavljanje uslova za prikljuenje
43 I-3 Uslovi za prikljuenje na elektroenergetsku mreu
44 I-3 Vodni uslovi
45 I-3 Pribavljanje lokacijske dozvole
46 I-4 Graevinska dozvola46 I-4 Izrada studije opravdanosti sa idejnim projektom
47 I-4 Izrada studije o uticaju na ivotnu sredinu
47 I-4 Zahtev o potrebi procene uticaja (Z1)
48 I-4 Zahtev za odreivanje obima i sadraja studije o proceni uticaja (Z2)
49 I-4 Dobijanje saglasnosti na studiju o proceni uticaja (Z3)
50 I-4 Izrada glavnog projekta
51 I-4 Pribavljanje graevinske dozvole
52 I-5 Upotrebna dozvola
52 I-5 Izgradnja objekta
53 I-5 Pribavljanje vodne dozvole
53 I-5 Pribavljanje upotrebne dozvole
54 Osnovni koraci od ideje do korienja vetroelektrane (II)54 II Koraci za sticaje prava na obavljanje delatnosti proizvodnje elektrine energije
55 Pravo na obavljanje delatnosti proizvodnje elektrine energije- nain sticanja
55 II-1 Ugovor o poveravanju
56 II-1 Ugovor o poveravanju - Uslovi
56 II-1 Ugovor o poveravanju - Sadraj
57 II-1 Ugovor o poveravanju u odnosu na koncesiju - osnovne razlike
57 II-1 ema postupka za dobijanje koncesije
58 II-2 Licenca
58 II-2 Pribavljanje licence
59 II-3 Odobrenje za prikjuenje
59 II-4 Status povlaenog proizvoaa
60 II-4 Pribavljanje statusa povlaenog proizvoaa
60 II-5 Ugovor o otkupu elektrine energije
8/3/2019 03 Vetar Elektronska Final-Engleski
34/64
Obnovljiva energija iz biomase, vetra, malih hidroelektrana i geotermalnihizvora je u centru panje drava, potencijalnih investitora i potroaa u celomsvetu. U 2007. godini, Evropska Unija (EU) postavila je cilj zemljama lanicamada, do 2020. godine, 20% energije u svakoj od zemalja treba da potekne izobnovljivih izvora energije.
Srbija ima znaajne izvore obnovljive energije kojima bi mogla da zadovoljinovonastale zahteve. Vlada Srbije je razvila strategiju kako bi iskoristila ovupriliku. Da bi podstakla razvoj i investicije u ovaj sektor i ispunila obavezu poUgovoru o energetskoj zajednici Jugoistone Evrope, Vlada Srbije je usvojilanekoliko propisa po direktivi od novembra 2009, ukljuujui:
UspostavljanjesistemapodsticajnihtarifaukomeVladaSrbijesubvencionisati troak obnovljive struje;
DenisanjezahtevazasticanjestatusaPovlaenogproizvoaa
elektrine energije koji koristi obnovljive izvore energije za proizvodnjustruje;
Od usvajanja podsticajnih taria i ostalih kljunih propisa od strane VladeSrbije,GTZProjekatJaanjelokalnesamouprave(GTZJLS)jesaraivaosa
relevantnim ministarstvima, USAID Projektom za razvoj konkurentnosti iinvestitorima u privatni sektor, kako bi podstakao investicije u obnovljiveizvore energije.
32IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
35/64
Kljuna aktivnost je bila kreiranje konanih vodia za proces izdavanjadozvola za obnovljive izvore sa ciljem podsticanja investitora i drugih trinihuesnika da postanu aktivni u ovom sektoru. Predstavnici Ministarstvarudarstva i energetike, Ministarstva zatite ivotne sredine i prostornogplaniranja i Ministarstva poljoprivrede, umarstva i vodoprivrede zajedno sastrunjacima GTZ-a su kreirali etiri takva vodia, koji objanjavaju
proces dobijanja dozvola za razvijanje projekata za podsektore geotermalnevode, malih hidroelektrana, energije vetra i biomase. USAID Projekat zarazvoj konkurentnosti je podrao GTZ JLS u kreiranju vodia za investitore kaodeo svojih aktivnosti vezanih za podsticanje investicija u sektor kroz pruanjetehnike pomoi perspektivnim investitorima.
Svaki vodi je kreiran u vidu detaljnog dokumenta, koji opisuje administra-tivne procedure i identifkuje institucije od znaaja i dokumenta vezana zaplaniranje i izradu projekata koja su neophodna za investitore. Vodii
obuhvataju i zakonski i regulatorni okvir i treba da se koriste kao osnova zadaljezakonskeiregulatornereforme.GTZJLSjetakoepripremiokrauverziju vodia, koji predstavljaju saetke vodia koje investitori mogu dakoriste za nalaenje podataka.
Nadamosedaeovajkorakbitipodstrekzadaljidijalogizmeuprivatnog
sektora i Vlade kako bi se identifkovale i uklonile prepreke razvoju ifnansijskoj odrivosti sektora.
33 IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
36/64
34
Energija izgeotermalnihizvora
- Elektrana na vetar - vetroelektrana je jedna ili vieproizvodnih jedinica za proizvodnju elektrine energije navetar koje su meusobno povezane i opremljene na nainda se mogu prikljuiti na elektroenergetsku mreu.
Povlaeni proizvoa energije- Male elektrane snage do 10 MW
- Proizvodnja iz obnovljivog izvora
Elektrane navetar - prava
investitora
Investitor mora da stekne sledea prava:
- I Pravo na izgradnju
- II Pravo na obavljanje proizvodnje elektrine energije
Izvori prava - Zakon o energetici (Sl. Glasnik RS br. 84/04)- Zakon o planiranju i izgradnji (Sl. glasnik RS br. 72/09 i 81/09)
- Zakon o zatiti ivotne sredine (Sl. glasnik RS br. 135/04 i 36/09)
- Zakon o vodama (Sl. glasnik RS br. 30/10)
- Zakon o vazdunom saobraaju(Sl. glasnik SRJ br. 12/98, 5/99,44/99, 5/00, 70/01)
- Zakon o koncesijama (Sl. glasnik RS br. 55/03)
- Zakon o javnim preduzeima i obavljanju delatnosti od opteginteresa (Sl. glasnik RS br. 25/00, 25/02, 107/05 i 108/05)
i ostali pratei zakoni i podzakonska akta
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
37/64
35
- Ministarstvo rudarstva i energetike - MRE
- Jedinica lokalne samouprave - JLS
- Agencija za energetiku - AE
- Republiki geodetski zavod - RGZ
- Ministarstvo poljoprivrede, umarstva i vodoprivrede - MPV
- Ministarstvo ivotne sredine i prostornog planiranja - MSPP- Republiki hidrometeoroloki zavod - RHMZ
- Elektromrea Srbije - EMS
- Elektroprivreda Srbije - EPS
- Agencija za kontrolu letenja Srbije i Crne Gore
i ostale nadlene institucije u konkretnom sluaju
Nadleneinstitucije
Prethodna radnja - Izbor lokacije
- Obilazak lokacije
- Provera da li je lokacija obuhvaena planskim dokumentom
*Objekat obavezno mora biti obuhvaen planskim dokumentom
I Koraci za sticanje prava na izgradnju i izgradnjaobjekta VE
II Koraci za sticanje prava na obavljanje proizvodnjeelektrine energije
Od idejedo korienjavetroelektrane(VE)
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
38/64
36
Osnovni koraci od ideje dokorienja vetroelektrane(VE) (I)
IKoraci za sticanje prava na izgradnjui izgradnja objekta VE
I-1 Pribavljanje inormacije o lokaciji
I-2 Pribavljanje energetske dozvole
I-3 Pribavljanje lokacijske dozvolePrethodna studija opravdanosti sa generalnim projektomReavanje imovinsko-pravnih odnosa / Parcelacija i preparcelacija
Prikupljanje uslova za projektovanje
I-3 Pribavljanje lokacijske dozvole
I-4 Pribavljanje graevinske dozvole
Izrada studije opravdanosti sa idejnim projektom/glavnim projektom
Izrada studije o proceni uticaja na ivotnu sredinu
I-5 Pribavljanje vodne dozvole i upotrebne dozvole
Izgradnja objekta
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
39/64
37
Osnovni koraci od ideje do korienja vetroelektrane (VE) (I)Koraci za sticanje prava na izgradnju i izgradnja objekta VE I
Pravo naizgradnju -
nainsticanja
Napomena:
Pravo nad zemljitem/imovinsko-pravni odnosi/
- pravo svojine- pravo zakupa- pravo slubenosti- eksproprijacija- itd
Dobijene dozvoleza izgradnju
- Energetska- Lokacijska- Graevinska- Vodna- Upotrebna
i
- Izdavanje dozvola za gradnju VE (lokacijske, graevinske,upotrebne) je u nadlenosti Jedinice lokalne samouprave - JLS(ovaj sluaj predstavljen je u dijagramima koji slede),
osim u sluaju:
- da se elektrana gradi u granicama nacionalnog parka ili u granicamazatite zatienog prirodnog dobra od izuzetnog znaaja
- kada je elektrana snage 10 i vie MW
- kao i kada je elektrana visine preko 50m - kada ona spada unadlenost Ministarstva ivotne sredine i prostornog planiranja(MSPP), odnosno nadlenog organa autonomne pokrajine, uko-liko se nalazi na teritoriji autonomne pokrajine (lan 133. Zakon oplaniranju i izgradnji).
Za objekte koji se grade u skladu sa navedenim lanom 133.obavezna je izrada Generalnog projekta sa Prethodnom studijomopravdanosti i Idejnog projekta sa Studijom opravdanosti, kojipodleu pregledu od strane Revizione komisije.
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
40/64
38
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-1PribavljanjeInormacije olokaciji
I-2Energetskadozvola
U postojeem planskomdokumentu je na razmatranojlokaciji predviena izgradnja
energetskog objekta
Kopija plana parcela(sa spiskom vlasnika parcela)
Zahtev za Inormaciju o lokaciji
Prilog: Kopija plana parcela
JLS (izuzetak - vidinapomene
Inormacija o lokacijiSadri podatke o:
1) planskom dokumentu
2) zoni
3) nameni zemljita
4) regulacionim i graevinskim linijama
5) pravilima graenja
6) uslovima prikljuenja na inrastrukturu
7) potrebi izrade detaljnog UP, iliurbanistikog projekta
8) katastarskoj parceli, da li ispunjava usloveza graevinsku parcelu, uputstvo opostupku za ormiranje gra. parcele
9) inenjersko geolokim uslovima
10) posebnim i tehnikim uslovima zaprojektovanje - dat spisak uslova
Katastar optine
Pokretanje inicijative za izmenuplanske dokumentacije
Ne
Da
8 dana
Energetska dozvola je potrebna samo za energetske
objekte snage 1MW i vee
ENERGETSKADOZVOLA
Elaborato izgradnji
Izjava banke o spremnostida prati investitora
u nansiranju
Inormacija olokaciji
Miljenje operatera
distributivnog sistema
o mogunostima
prikljuenja
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
41/64
39
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)
Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-2PribavljanjeEnergetske
dozvole
Pre podnoenja zahteva za EDpotrebno je pribaviti/uraditi:
1) Lokacijsku inormaciju iliurbanistike uslove (ako su izdati),
2) Elaborat o izgradnji energetskogobjekta (preporuka Generalniprojekat sa prethodnom studijomopravdanosti), koji posebno sadrianalizu moguih uticaja na ivotnusredinu sa predlogom mera
zatite3) Izjava banke da je spremna da prati
investitora u nansiranju izgradnje,
4) Miljenje operatora prenosnog/distributivnog sistema o uslovima imogunostima prikljuenjaobjekta na sistem
Navedena dokumentacija je obavezan
prilog uz Zahtev za izdavanje ED
Zahtev za izdavanje ED - na obrascuO-1 (male elektrane) ili O/2:
1) Podaci o podnosiocu zahteva;
2) podaci o objektu;
3) vrednost investicije;
4) nansijsko stanje podnosiocazahteva (izjava banke i dokaz obonitetu podnosioca);
5) vek objekta, itd;
Ministarstvorudarstva ienergetike
alba Vladi RS, rokpodnoenja 8 dana
Reenje o izdavanjuenergetske dozvole
Vanost: 2 godine
Zahtev za miljenje operatera:
Zahtev pored ostalog sadri:
1) opte podatke o podnosiocu;
2) opte podatke o objektu;
3) karakteristike pojedinanih gener-atora i elektrane u celini (prividnai aktivna snaga, naznaeni napon istruja, polazna struja, aktor snage,maksimalna snaga koja se predajeDES, maksimalna snaga koja se
uzima iz DES);4) nain rada elektrane u odnosu naDES;
5) planirani datum prikljuenja na DES;
6) dokaz o identitetu podnosiocazahteva;
7) situacioni plan u razmeri 1:500(1000) na kopiji plana katastarskeparcele, sa izvodom iz katastrapodzemnih instalacija;
8) kopiju plana ireg podruja;
9) opis i mogunost regulacije
elektrane;10) koecijent fikera;
11) struje viih harmonika, i ostalo.
30 dana
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
42/64
40
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-3Lokacijskadozvola
I-3Izradaprethodnestudijeopravdanostisa generalnimprojektom
Lokacijska dozvola sadri sve uslove i podatke potrebne zaizradu tehnike dokumentacije, glavnog projekta, a u skladu
sa vaeim planskim dokumentom
- Prethodnom studijom opravdanosti utvruje se naroito prostorna, ekoloka, drutvena,
fnansijska, trina i ekonomska opravdanost investicije za varijantna reenja defnisana
generalnim projektom na osnovu kojih se donosi odluka o opravdanosti ulaganja - u
prethodne radove za idejni i glavni projekat
- Generalni projekat sadri naroito podatke o: makrolokaciji objekata, optoj dispoziciji,
tehniko-tehnolokoj koncepciji, nainu obezbeenja inrastrukture, moguim
varijantama prostornih i tehnikih reenja, prirodnim uslovima, proceni uticaja na
ivotnu sredinu, inenjersko geolokim geotehnikim karakteristikama terena sa aspekta
utvrivanja generalne koncepcije i opravdanosti izgradnje, istranim radovima za izraduidejnog projekta, zatiti prirodnih i nepokretnih kulturnih dobara, unkcionalnosti i
racionalnosti reenja
LOKACIJSKADOZVOLA
Prikupljeni usloviza projektovanje
Tehnika dokumentacijaza objekat vetroelektrane
(podaci o objektu /generalni projekat)
Reeniimovinsko-pravniodnosi
Izvreno ormiranje
graevinske parcele
(parcelacija/
preparcelacija)
Saglasnost sa stanovita
bezbednosti vazdunog
saobraaja
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
43/64
41
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)
Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-3Reavanje
imovinsko-
pravnih odnosa
I-3Parcelacija/
preparcelacija
- Ugovor o kupoprodaji/zakupu sa vlasnikom parcela
- Ugovor o korienju vodnog zemljita, korienju vodnih objekata i
vrenju drugih usluga (sa JVP Srbijavode, Vode Vojvodine ili
Direkcijom za vode)
Izrada Projekta parcelacije/preparcelacije
Sastavni deo je: Projekat geodetskogobeleavanja
Izrauje: Ovlaeno privredno drutvo,pravno lice, preduzetnik
Izradom rukovodi: Odgovorni urbanistaarhitektonske struke
JLS - organ nadlean za poslove urbanizma
Obavetenje o odbijanju projekta
alba/Prigovor -Optinskom/gradskom
veuRok podnoenja: 3 dana
Obavetenje o potvrdi projekta
Organ nadlean za poslove dravnog premera ikatastra Republiki Geodetski Zavod - RGZ
Reenje o ormiranju katastarske/ih parcele/a
alba: Rok podnoenja: 15 dana
Zahtev za sprovoenje parcelacijeU prilogu:
1) Dokaz o reenim imovinsko pravnim odnosima,
2) Projekat parcelacije/preparcelacije potvren odnadlenog organa u ijem je sastavu Projekatgeodetskog obeleavanja.
10 dana
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
44/64
42
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-3Saglasnostsa stanovitabezbednostivazdunogsaobraaja
I-3Pribavljanjeuslova zaprikljuenje
Agencija za kontrolu letenjaSrbije i Crne Gore
Saglasnost sa stanovita bezbednostivazdunog saobraaja
- Zahtev za izdavanje saglasnosti zaizgradnju vetroelektrane sa stanovitabezbednosti
- Vazdunog saobraaja I obeleavanjavetroelektrane, podnosi se Agenciji zakontrolu letenja Srbije I Crne Gore.
- Nije propisana posebna orma.
- U zahtevu treba precizno opisati zbogega se podnosi zahtev u kome e seopisati objekat sa posebnimnaznaenjem poloaja, visine i oblika
objekta
Pre izdavanja lokacijske dozvole treba da se pribave uslovi za projektovanje.
Ako ih Investitor ne pribavi, nadleni organ za izdavanje lokacijske dozvole ih
pre izdavanja lokacijske dozvole pribavlja po slubenoj dunosti.
- Uslovi za prikljuenje
- Vodni uslovi
- Ostali uslovi (zatite ivotne sredine, zatite spomenika kulture,
povezivanje na komunalnu inastrukturu, itd)
*Spisak potrebnih uslova dat u inormaciji o lokaciji
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
45/64
43
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)
Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-3Uslovi za
prikljuenjena elektro-
energetskumreu
Nadleni energetski subjekat na iji sistem se objekat prikljuuje (EPS, EMS)
Tehniki izvetaj za izdavanje tehnikih uslova /Utvrujeda li postoje energetski / tehniki uslovi za prikljuenje/
Energetsko-tehniki uslovi za prikljuenje - za izradutehnike dokumentacije
alba/Prigovor - Nemoe se uloiti
Samo tuba sudu
Zahtev za izdavanje energetsko-tehnikih uslova (za prikljuenje objekta na elektroenergetsku mreu) za izradu tehnike dokumentacije
U prilogu:
1) Podaci o investitoru;2) Energetska dozvola za elektrane vee od 1MW;3) Licenca;4) Kopija plana - ira kopija plana ako treba;5) Dokaz o regulisanim Imovinsko-pravnim odnosima;6) Opis vrste i nain rada pogonske maine i generatora i nain prikljuenja na mreu ;
7) Tehniki izvetaj - jednopolna ema postrojenja vetroelektrane;8) Opis osnovnih ureaja zatite;9) Dokaz o uplati trokova izdavanja uslova;
Uslovi za prikljuenje na elektroenergetsku mreu
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
46/64
44
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-3Vodni uslovi
Miljenje RHMZ u postupku dobijanja vodnih uslova
Miljenje JVP u postupku dobijanja vodnih uslova
Ministarstvo za poljoprivredu, umarstvo i vodoprivredu
Reenje o izdavanju vodnih uslova
Ugovor o korienju vodnog zemljita, korienju vodnihobjekata i vrenju drugih usluga
Sklapa se izmeu Investitora i javnog vodnog preduzea
ili Ministarstva za poljoprivredu,umarstvo i vodoprivredu (Direkcija za vode)
Zahtev za dobijanje vodnih uslova:
U prilogu:
1) Osnovni podaci o lokaciji
2) podaci o nameni i veliini objekta
3) po potrebi se prilau prethodne studije izvodljivosti i generalni projekti (idejna
reenja) kojima se blie sagledava uticaj objekta na vodni reim
U prilogu:
1) Miljenje RHMZ2) Miljenje Srbijavoda / Voda Vojvodine
3) Kopija plana sa ucrtanim poloajem objekta
4) Izvod iz zemljinih knjiga (za katastarsku parcelu na kojoj se objekat gradi
5) Potvrdu o reenim imovinsko-pravnim odnosima
6) Saglasnost Javnog vodoprivrednog preduzea ako se radi o izgradnji objekta od
opteg interesa na vodnom zemljitu
7) Plan namene povrina (nadleno odeljenje za urbanizam JLS).
Ukoliko je potrebno, Investitor e biti naknadno obaveten da dopuni dokumentaciju
Vodni uslovi
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
47/64
45
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)
Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-3Pribavljanje
lokacijskedozvole
Lokacijska dozvola prestaje da vaiako Investitor u roku od 2 godine ne
podnese zahtev za izdavanje
graevinske dozvole
albaMinistarstvu ivotnesredine i prostornog
planiranjaRok podnoenja:8 dana (izuzetak)
Zahtev za dobijanje lokacijske dozvole
Prilog:
1) Kopija plana parcele (ne starija od 6 meseci)
2) Izvod iz katastra podzemnih instalacija
3) Dokaz o pravu svojine, zakupa nagraevinskom zemljitu
4) Podaci o objektu (praksa - generalniprojekat)
5) Prikupljeni posebni i tehniki uslovi
JLS - organ nadlean zaposlove urbanizma (izuzetak -
vidi napomene)
Reenje o lokacijskoj dozvoli
Sadri naroito:
1) podatke o investitoru
2) broj i povrinu katastarske parcele,
3) podatke o postojeim objektima na parceli, koje je potrebnoukloniti
4) denisan pristup javnoj saobraajnoj povrini
5) namenu objekta
6) graevinske linije
7) pravila graenja8) uslove za prikljuenje na inrastrukturu
9) mogue i obavezujue aze u realizaciji projekta
10) popis obaveznih delova glavnog projekta
11) naziv planskog dokumenta na osnovu koga se izdaje, itd
15 dana
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
48/64
46
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-4Graevinskadozvola
I-4Izrada studijeopravdanostisa idejnimprojektom
Po izvrenoj tehnikoj kontroli glavnog projekta ipozitivnom izvetaju o izvrenoj tehnikoj kontroli,
podnosi se zahtev za izdavanje graevinske dozvole
nadlenom organu jedinice lokalne samouprave
GRAEVINSKADOZVOLA
Studija oproceni uticaja na
ivotnu sredinu
Saglasnosti naprojektnu dokumentaciju
i studiju uticaja
Projektna dokumentacija(idejni projekat, glavni projekat)
Tehnika kontrola
projektne
dokumentacije
- Studijom opravdanosti odreuje se prostorna, ekoloka, drutvena, fnansijska,
trina i ekonomska opravdanost investicije za izabrano reenje, razraeno
idejnim projektom, na osnovu koje se donosi odluka o opravdanosti ulaganja.
- Idejnim projektom se odreuju: namena, poloaj, oblik, kapacitet, tehniko-tehnoloke i unkcionalne karakteristike objekta, organizacioni elementi objekta
i izgled objekta
- Idejni projekat sadri situaciono reenje i podatke o:
1) mikrolokaciji objekta;
2) unkcionalnim, konstruktivnim i oblikovnim karakteristikama objekta;
3) tehniko-tehnolokim i eksploatacionim karakteristikama objekta;
4) inenjerskogeolokim-geotehnikim karakteristikama terena i tla sa prelimi-
narnim proraunom stabilnosti i sigurnosti objekta;
5) reenju temeljenja objekta;
6) tehniko-tehnolokim i organizacionim elementima graenja objekta;
7) merama za spreavanje ili smanjenje negativnih uticaja na ivotnu sredinu;8) idejnom reenju inrastructure;
9) uporednoj analizi varijantnih tehnikih reenja sa stanovita svojstava tla, 10)
unkcionalnosti,
11) stabilnosti,
12) proceni uticaja na ivotnu sredinu,
13) prirodnim i nepokretnim kulturnim dobrima,
14) racionalnosti izgradnje i eksploatacije,
15) visini trokova izgradnje, transporta, odravanja, obezbeenja energije i drugih
trokova.
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
49/64
47
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)
Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-4Izrada studije o
proceni
uticaja na
ivotnu sredinu
I-4Zahtev o
potrebi
procene
uticaja (Z1)
- Samo za elektrane snage preko 10 MW- Lista II - projekti za koje se moe zahtevati izrada studije o proceni uticaja
na ivotnu sredinu
Koraci:
- Zahtev o potrebi procene uticaja (Z1)
- Zahtev za odreivanje obima i sadraja studije o proceni uticaja (Z2)
- Izrada studije
- Dobijanje saglasnosti na studiju (Z3)
Zahtev o potrebi procene uticaja - na poseb-nom obrascu - sadri:
1) podatke o investitoru
2) opis lokacije
3) opis karakteristika projekta
4) prikaz razmatranih alternativa
5) opis inilaca sredine koji mogu bitiizloeni uticaju
6) opis znaajnih tetnih uticaja7) opis mera za spreavanje /smanjenje
tetnih uticaja
8) druge podatke i inormacije na zahtevnadlenog organa.
U prilogu:
1) inormacija o lokaciji ili potvreniurbanistiki projekat (ne stariji od 1 god)
2) generalni projekat (idejno reenje) iliidejni projekat (izvod)
3) graki prikaz mikro i makro lokacije
4) uslovi i saglasnosti drugih nadlenihorgana i organizacija
5) dokaz o uplati takse
6) drugi dokazi na zahtev
Odluka da je potrebna procena uticaja: U samoj odluci moe(a ne mora) biti denisan obim i sadraj studije o proceni
uticaja. Ako nije denisan, mora se podneti zahtev zaodreivanje obima i sadraja studije.
Odluka da nijepotrebna pro-cena uticaja. Usamoj odluci
nadleni organmoe utvrditi
minimalne uslovezatite ivotne
sredine.
MSPPo Odluci
obavetavainvestitora i
javnost
MSPP donosi Odluku po zahtevu opotrebi procene
Zainteresovana javnost podnosimiljenje
Obavetenje zainteresovanojjavnosti o podnesenom zahtevu
Ministarstvo SPP
Tuba sudu
10 dana
10 dana
10 dana
3 dana
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
50/64
48
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-4Zahtev zaodreivanjeobima isadrajastudije o
proceniuticaja (Z2)
Zahtev za odreivanje obima i sadraja studije o proceniuticaja - na propisanom obrascu - sadri:
1) podatke o investitoru
2) opis lokacije
3) opis projekta, prikaz glavnih alternativa,
4) opis inilaca sredine koji mogu biti izloeni uticaju
5) opis tetnih uticaja
6) opis mera za spreavanje /smanjenje tetnih uticaja
7) podatke o tekoama na koje je naiao investitor priprikupljanju potrebnih podataka
8) druge podatke na zahtev nadlenog organa
Prilog:
1) inormacija o lokaciji ili potvren urbanistiki projekat
2) idejni projekat (izvod)
3) graki prikaz makro i mikro lokacije,
4) uslovi i saglasnosti drugih nadlenih organa
5) dokaz o uplati takse
6) drugi dokazi na zahtev.
Ministarstvo SPP
MSPP donosi Odluku po zahtevu
MSPP o Odluci obavetavainvestitora i javnost Tuba sudu
Izrada studije o proceni uticaja naivotnu sredinu
Obavetenje zainteresovanojjavnosti o podnesenom zahtevu
Zainteresovana javnost podnosimiljenje
10 dana
10 dana
15 dana
3 dana
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
51/64
49
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)
Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-4Dobijanje
saglasnosti nastudiju (Z3)
Zahtev za dobijanje saglasnosti na studiju o proceni uticaja.
Uz zahtev se podnosi:
1) Studija o proceni uticaja (3 primerka u papirnom i 1 uelektronskom obliku),
2) Odluka o obimu i sadraju studije
Ministarstvo SPP
MSPP - Obavetava javnost o vremenu i mestujavnog uvida, prezentacije i javne rasprave o studiji
Izvetaj sa ocenom studije o proceni uticaja i predlogom
odluke
Javna rasprava ostudiji Izvetaj sa pregledom miljenja
zainteresovanih strana
MSPP - Odluka o davanjusaglasnosti ili odbijanju zahteva za
davanje saglasnosti
Obrazuje seTehnika komisija za
pregled studije
7 dana
20 dana
3 dana30 dana
10 dana
10 dana
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
52/64
50
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-4Izradaglavnogprojekta
- Glavnim projektom se utvruju graevinsko-tehnike, tehnoloke ieksploatacione karakteristike objekta sa opremom i instalacijama,
tehniko-tehnoloka i organizaciona reenja za gradnju objekta,
investiciona vrednost objekta i uslovi odravanja objekta
- Glavni projekat podlee tehnikoj kontroli.
Postupak za dobijanje vodne saglasnosti
Zahtev za dobijanje saglasnosti od Ministarstva zdravlja iMinistarstva ivotne sredine i prostornog planiranja,
a u postupku dobijanja vodne saglasnosti za izgradnjuvetroelektrane
/...ne postoji posebno propisana procedura.../
Zahtev za dobijanje vodne saglasnosti
U prilogu:
1) Saglasnost Ministarstva zdravlja i Ministarstva zatite
ivotne sredine
2) Reenje o izdavanju vodnih uslova
3) Glavni projekat
4) Izvetaj tehnike kontrole projekta
5) ostali dokumenti koji se zahtevaju u Reenju o
izdavanju vodnih uslova.
Saglasnost Ministarstva zdravlja iMinistarstva ivotne sredine i prostornog planiranja
Ministarstvo za poljoprivredu, umarstvo i vodoprivredu
Reenje o izdavanju vodne saglasnosti(Ako se ne otpone sa izgradnjom u roku od 2 godine,
vodna saglasnost prestaje da vai)
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
53/64
51
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)
Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-4Pribavljanje
graevinskedozvole
Zahtev za izdavanje graevinske dozvole
U prilogu:
1) lokacijska dozvola
2) glavni projekat u 3 primerka sa izvetajem o izvrenoj tehnikoj kontroli
3) dokaz o pravu svojine, odnosno pravu zakupa na graevinskom zemljitu
4) dokaz o ureivanju odnosa u pogledu plaanja naknade za ureivanje
graevinskog zemljita
5) dokaz o uplati administrativne takse
6) energetska dozvola (ako je elektrana snage vee od 1MW)
Reenje o izdavanju graevinske dozvole
Sadri naroito:
1) podatke o investitoru2) podatke o objektu ije se graenje dozvoljava
3) podatke o katastarskoj parceli na kojoj se objekat gradi
4) rok vaenja graevinske dozvole i rok zavretka graenja
5) podatke o dokumentaciji na osnovu koje se izdaje
JLS - organ nadlean zaposlove urbanizma
(izuzetak - vidi napomene)
Izgradnja objekta
albaMinistarstvu zatite ivotne sredine i
prostornog planiranjaRok podnoenja: 8 dana (izuzetak)
Obavetenje da projekat nije u skladu salokacijskom dozvolom i Nalog investitoru da
projekat uskladi u roku od 30 dana.Ako ne uskladi, zahtev se odbija
8 dana
8 dana
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
54/64
52
Osnovni koraci od ideje do korienja vetroelektrane (VE) (I)Koraci za sticanje prava na izgradnju i izgradnja objekta VEI
I-5Upotrebnadozvola
I-5Izgradnjaobjekta
- Podobnost izgraenog objekta za upotrebu utvruje setehnikim pregledom
- Objekat se moe koristiti po prethodno pribavljenoj
upotrebnoj dozvoli
- U procesu dobijanja upotrebne dozvole potrebno je
priloiti projekat izvedenog stanja
UPOTREBNADOZVOLA
Projekatizvedenog
stanja
Vodna dozvola
Izgradnjaobjekta
Tehniki pregled
izgraenog objekta
- Graenje objekata, odnosno izvoenje radova moe da vri privredni subjekat
upisan u odgovarajui registar za graenje objekata, odnosno za izvoenje
radova (izvoa radova).
- Obaveze izvoaa radova su da: pre poetka radova potpie glavni projekat,
reenjem odredi odgovornog izvoaa radova, odgovornom izvoau radova
obezbedi ugovor o graenju i dokumentaciju na osnovu koje se gradi objekat,
obezbedi preventivne mere za bezbedan i zdrav rad u skladu sa zakonom, da
izvodi radove prema dokumentaciji na osnovu koje je izdata graevinska dozvo-
la, organizuje gradilite na nain kojim e obezbediti pristup lokaciji, obezbeuje
sigurnost objekta i lica na gradilitu i okoline, obezbeuje dokaz o kvalitetu
izvrenih radova, vodi graevinski dnevnik, graevinsku knjigu i obezbeuje
knjigu inspekcije, obezbeuje objekte i okolinu u sluaju prekida radova.
- Potrebno je da se na gradilitu stalno nalazi: ugovor o graenju, reenje o
odreivanju odgovornog izvoaa radova na gradilitu i glavni projekat, tj.
dokumentaciju na osnovu koje se projekat gradi.
- Investitor obezbeuje struni nadzor u toku graenja objekta, odnosno izvoenja
radova za koje je izdata graevinska dozvola.
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
55/64
53
IOsnovni koraci od ideje do korienja vetroelektrane (VE) (I)
Koraci za sticanje prava na izgradnju i izgradnja objekta VE
I-5Pribavljanje
vodnedozvole
I-5Pribavljanje
upotrebnedozvole
Pribavljanje vodne dozvole obavlja se po izvrenom tehnikompregledu objekta.
Upotrebna dozvola se ne moe izdati bez prethodno dobijene vodne dozvole
Zahtev za dobijanje vodne dozvole
U prilogu:
1) Reenje o izdavanju vodne saglasnosti
2) Zapisnik Komisije za tehniki pregledizgraenog objekta
3) Zakljueni ugovori sa javnim vodnimpreduzeem,
4) Dokumente koji se zahtevaju u Reenjuo izdavanju vodne saglasnosti
Ukoliko je potrebno, Investitor e bitinaknadno obaveten da dopuni dokumen-taciju
Ministarstvo za poljoprivredu,umarstvo i vodoprivredu
Reenje o izdavanju vodne dozvoleIzdaje se na period od najdue
15 godinaPre isteka treba produiti vanost.
Zahtev za izvrenje tehnikogpregleda objekta
JLS - organ nadlean za poslove urbanizma(izuzetak - vidi napomene)
JLS - Obrazuje Komisiju za tehniki pregled(napomene) (rad komisije plaa Investitor)
Izvetaj/Nalaz Komisije za tehniki pregled
Reenje o upotrebnoj dozvoli
8 dana
ako je nalaz pozitivan
30 dana od podnoenja zahteva
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
56/64
54
Osnovni koraci od ideje dokorienja vetroelektrane(VE) (II)
IIKoraci za sticanje prava naobavljanje delatnostiproizvodnje elektrine energije
II-1 Ugovor o poveravanju
II-2 LicencaII-3 Odobrenje za prikljuenje
II-4Statuspovlaenogproizvoaa
II-5 Ugovor o otkupu elektrine energije
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
57/64
55
IIOsnovni koraci od ideje do korienja vetroelektrane (VE) (II)
Koraci za sticanje prava na obavljanje delatnosti proizvodnje elektrine energije
Pravo naobavljanje
proizvodnjeelektrineenergije -
nainsticanja
1. Ulaganje u
zavisna drutva
javnog
preduzea
2. Poveravanje
prava obavljanja
delatnosti od
opteg interesa
3. Dodeljivanje
koncesija
- Ima jasne i relativno kratke procedure
- Potencijalni problem - matino javno preduzee tekodozvoljava veinski udeo Investitora
- Rizik - velik stepen diskrecione vlasti osnivaa javnogpreduzea
- Investitor stie pravo tek po zakljuivanju ugovora opoveravanju, a ugovor se zakljuuje tek posleizgradnje objekta
- Jednostavnija procedura u praksi u odnosu na koncesije- Najee primenjivano u praksi
- Investitor stie pravo kroz jasno denisanu proceduruna samom poetku
- Obaveza osnivanja novog privrednog subjekta
- Najdugotrajniji postupak
Ili
Ili
- Delatnost proizvodnje elektrine energije moe da obavlja bilo koje
tree lice, ako ispuni neophodne uslove i zakljui sa Vladom ugovor o
poveravanju delatnosti od opteg interesa - proizvodnje elektrine energije
- Postupak zakljuivanja ugovora o poveravanju sprovodi Ministarstvo
rudarstva i energetike
II-1Ugovor o
poveravanju
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
58/64
56
Osnovni koraci od ideje do korienja vetroelektrane (VE) (II)Koraci za sticanje prava na obavljanje delatnosti proizvodnje elektrine energijeII
II-1Ugovor opoveravanju -uslovi
II-1Ugovor opoveravanju -sadraj
Neophodni uslovi koje treba da ispuni lice zainteresovano za zakljuenjeUgovora o poveravanju su:
a) adekvatna tehnika opremljenost (pravo vlasnitva ili pravo korienja
vetroelektrane, koja je izgraena u skladu sa zakonom, tehnikim i drugim
propisima);
b) kadrovska osposobljenost (da lica koja rade u vetroelektrani imaju
neophodnu strunu spremu i druga propisana znanja);
c) sprovoenje propisane zatite na radu;
d) ostvarivanje propisanih uslova i naina zatite i unapreenja ivotnesredine.
Ugovor o poveravanju sadri odredbe o:
1) radu i poslovanju privrednog subjekta kome se poverava ova delatnost;
2) pravima i obavezama u pogledu korienja sredstava u dravnoj svojini
za obavljanje delatnosti od opteg interesa, u skladu sa zakonom;3) obavezama privrednog subjekta u pogledu obezbeivanja uslova za
kontinuirano, uredno i kvalitetno zadovoljavanje potreba korisnika
proizvoda i usluga;
4) meusobnim pravima i obavezama ugovornih strana u sluaju kada nisu
obezbeeni ekonomski i drugi uslovi za obavljanje delatnosti od opteg
interesa;
5) pravima i obavezama u sluaju poremeaja u poslovanju privrednog
subjekta;
6) drugim pravima i obavezama i pitanjima koja su od znaaja za
ostvarivanje i zatitu opteg interesa.
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
59/64
57
IIOsnovni koraci od ideje do korienja vetroelektrane (VE) (II)
Koraci za sticanje prava na obavljanje delatnosti proizvodnje elektrine energije
II-1Ugovor o
poveravanju uodnosu
na koncesiju -osnovne
razlike
II-1ema
postupka za
dobijanjekoncesije
U ugovoru o poveravanju:
- nije propisana tenderska procedura
- nije utvrena obaveza utvrivanja mesta obavljanja delatnosti
proizvod-nje elektrine energije (ukoliko se ugovorom ne vee za
konkretan objekat)
- nije utvren maksimalan rok obavljanja delatnosti od opteg interesa
(ukoliko se ugovorom ne defnie)
- nije propisana obaveza utvrivanja obima obavljanja delatnosti
- nije propisana obaveza plaanja bilo kakve naknade za obavljanje
delatnosti od opteg interesa
Predlog za davanje koncesije
Predlog za donoenje koncesionog akta
Odluka o odreivanju koncesionara
Ugovor o koncesiji
Osnivanje koncesionog preduzea
Koncesioni akt Javni tenderIzvetaj Komisije o sprovoenju
javnog tendera
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
60/64
58
Osnovni koraci od ideje do korienja vetroelektrane (VE) (II)Koraci za sticanje prava na obavljanje delatnosti proizvodnje elektrine energijeII
II-2Licenca
II-2Pribavljanjelicence
- Licenca je dozvola za obavljanje energetske delatnosti koju izdajeAgencija za energetiku Republike Srbije.
- Potrebna samo za elektrane snage od 1MW i vee
Zahtev za izdavanje licence:
Uslovi koji moraju biti ispunjeni:1) upis u registar privrednih subjekata;
2) ispunjenost tehnikih uslova u pogledusame vetroelektrane (elektroenergetski,protivpoarni i zatite ivotne sredine)i prava vlasnitva, odnosno korienjasamog objekta;
3) kadrovska osposobljenost;
4) raspolaganje nansijskim sredstvima(dokaz o bonitetu, bilans stanja...);
Agencija za energetiku
Reenje o izdavanju licence(vanost 10 godina)
Plaa se taksa za izdavanje reenjaPlaa se godinja naknada Agenciji
30 dana
alba Vladi, Rok 15 dana
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
61/64
59
IIOsnovni koraci od ideje do korienja vetroelektrane (VE) (II)
Koraci za sticanje prava na obavljanje delatnosti proizvodnje elektrine energije
II-3Odobrenje za
prikljuenje
II-4Statuspovlaenogproizvoaa
- pravo prioriteta na organizovanom tritu u odnosu na drugeproizvoae koji nude energiju pod jednakim uslovima
- pravo na subvencije (poreske, carinske i druge olakice u skladusa zakonom)
- podsticajne mere - eed-in tarie:
Redni broj Vrsta elektrane Instalisana snaga P(MW)
Mera podsticaja- otkupna cena(cEUR/1 kWh)
1. Elektarna na vetar 9,5
Zahtev za izdavanje Odobrenja za prikljuenje objekta na elektro-energetsku mreu
U prilogu podaci o:
1) vlasniku objekta, odnosno nosiocu prava korienja objekta(za ziko lice: lino ime i prebivalite, JMBG, a za pravno lice odnosno preduzetnika:poslovno ime odnosno naziv, sedite, PIB, matini broj, raun i odgovorno lice)
2) objektu za ije se prikljuenje trai izdavanje odobrenja za prikljuenje (adresa, vrsta,lokacija objekta i namena objekta)
3) vremenu kad se predvia prikljuenje objekta
4) ukupnoj instalisanoj snazi objekta, broju i snazi generatorskih jedinica, generatorskomnaponu i blok transormatoru
5) oekivanoj godinjoj i mesenoj proizvodnji6) ureajima za zatitu i merenje
7) energetska dozvola i licenca za obavljanje delatnosti proizvodnje elektrine energijeza objekte snage vee od 1 MW.
Za izgraene objekte se podnosi i graevinska dozvola, kao i dokaz o pravu svojine naobjektu ili pravu korienja objekta
Nadleni energetski subjekat na iji sistem se objekat prikljuuje (EPS, EMS)
Tehniki izvetaj za izdavanje Reenja o odobrenju zaprikljuenje na sistem
Reenje o odobrenju za prikljuenje na sistem
alba - Agencijiza energetiku /
Rok 15 dana
30 dana
IDI NA SADRAJ
8/3/2019 03 Vetar Elektronska Final-Engleski
62/64
60
Osnovni koraci od ideje do kori