0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

Post on 11-Feb-2017

20 views 0 download

Transcript of 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

Extreme engineering – part 2IX-2009

(Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready

1

Copyright noticeUnauthorised copying of this

presentation as whole or in parts in any form or by any means, electronic,

photocopying, recording or otherwise, without prior written

permision is prohibited.

2

ready

3

ready

4

ready

Water inflow into Icelandic rock mass:- Ólafsfjördur Tunnel

ready

6Héðinsfjarðargöng Project - leakage at the face of Ólafsfjördur Tunnel   ready

7

ready

8ready

9ready

10ready

Project description:- The TBM tunnel with HERRENKNECHT Earth Pressure Balance Type TBM (shield 6.120 mm diameter):Total length 3.300m, including ca. 1.500m marine crossing section.

The first tunnel in the world between two continents.

11readyCoast ...... “5’ to 12.00 o’clock” – Jurata (Poland) March 1993Designer and responsible for delivery of gabions

- the first site with gabions based on double twisted mesh (March 1993)First storm – April 1993After completion of works – May 1993July 1996

12Slope collapse 2002

ready

13Different stages of cliff rebuilding ready

14ready

15 15The catastrophal flood – Gdańsk (Poland) 2001

2 m

ready

16 16ready

17ready

18 18

2-3 m/s

ready

19readyConcrete repairs - waterproofing

20 20Royal Castle in Warsaw (Warszawa)

- probably the most sofisticated slope protection, waterproofing systems and drainage in the world (?)

ready

21ready

22ready

Thank You for Your attention!

Ph.D Civ. Eng. Tomasz Najder

Senior Consultant

Movägen 3, 133 36 Saltsjöbaden - Sweden

Tel: 0046 (0)8 717 5714 Fax: 0046 (0)8 717 6042 Mobil: 0046 (0)704 217 012

E-mail: tomasz.najder@hotmail.com

Org. no: 490911 – 2148

ready

23