:: WORLD HEADQUARTERS ::
www.organicpotashcorporation.com | office: 905 452 8060 | fax: 905 452 8135
Organic Potash Corporation Inc.Shama & Apowah Site Surveys
:: S H A M A I N D U S T R I A L S I T E C O M M E N T A R Y ::
• Site is fairly level with apparent gentle incline west to east with fairly good drainage
• Appears to drain to the north with northern boundary being the lowest and wettest
• Site sits downhill from, and adjacent to, ZoomLion Waste Disposal Facility
• No access road to available plots
• Flora appears to be of high savannah type
• Land has soft substrate structure
• Drive time to Takoradi Port 30 to 50 minutes depending on traffic in town
• 600 meters to main Accra Road
• 3rd class road into industrial site
Available
Plots
Zeal
ZoomLion
ZoomLion Zoom
LionZoomLion
S U R V E Y D E P A R T M E N T S H A M A I N D U S T R I A L S I T E P L A N
www.organicpotashcorporation.com | office: 905 452 8060 | fax: 905 452 8135
Road Work Required
• Removal of dense vegetation over entire area (including large trees)
• 400 plus meters road construction needed to access two plots ($175k potential cost before land clearing costs)
• Top ground surface is mostly soft wet laterite…tough work in last half of rainy season
:: S H A M A S I T E :: :: I M M E D I A T E W O R K R E Q U I R E D ::
• 400 meters to gain access to Water/Electricity
• Topsoil will need to be removed and ground leveled
Zeal
www.organicpotashcorporation.com | office: 905 452 8060 | fax: 905 452 8135
:: S H A M A I N D U S T R I A L S I T E ::
www.organicpotashcorporation.com | office: 905 452 8060 | fax: 905 452 8135
Western Boundary
Available PlotsProposed Road
:: S H A M A I N D U S T R I A L S I T E ::
:: G H A N A C O C O A B O A R D S I T E :: :: C O M M E N T A R Y ::
• Excellent drainage
• Low savannah zone flora
• 0.6 kilometers – distance from New Ghana Cocoa Board 100,00 Tonnes Warehouse Complex to temporary site entrance
• Site 150 to 200 meters from the 2nd class road (mostly tarmac) between Apowah Township and on north pass the GCB site
• Water and electricity running along main road to GCB site from Apowah, within 200 meters from site
• Gently rolling and sloping hill from north end of rectangular plot to south
• Elevation difference from north to south end 20 meters
• Land has a solid dry sandy sub-base structure
• Takoradi Port travel time 20 minutes
• Can see GCB Warehouses from topmost elevation of site
Main Road to G
CBRoad Right - Away
C O C O A B O A R D S I T E P L A N
www.organicpotashcorporation.com | office: 905 452 8060 | fax: 905 452 8135
:: G H A N A C O C O A B O A R D S I T E :::: I M M E D I A T E W O R K R E Q U I R E D ::
• Renovating and upgrading existing site temporary access…or
• Plotting and build new road along plotted access route (200 meters)
• Utility hookups
• Land clearing of mostly grass and shrubs
• Removal of topsoil
• Cut and fill for leveling
Northern boundary & road right-away
:: G H A N A C O C O A B O A R D S I T E ::
:: G H A N A C O C O A B O A R D S I T E ::
GCB Warehouse Complex
www.organicpotashcorporation.com | office: 905 452 8060 | fax: 905 452 8135
:: G H A N A C O C O A B O A R D S I T E ::