...LK CM LK SW AUGUST 2013 C_130820_S3_v2 KEY: Land Available for Turbine and Associated Development...

Post on 12-Feb-2020

0 views 0 download

Transcript of ...LK CM LK SW AUGUST 2013 C_130820_S3_v2 KEY: Land Available for Turbine and Associated Development...

©Crown copyright. All rights reserved. License Number 100027856

This document has been prepared by AECOM for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and terms of reference agreed between AECOM and the Client.

Verified:Date:

Checked:Approved:Scale at A3:

Drawing Number:

Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM.

One Trinity GardensQuaysideNewcastle, NE1 2HF

Tel +44 (0) 191 224 6500Fax +44 (0) 191 224 6599

www.aecom.com

Ü

0 1,000 Metres

Drawn:

A3

Title:

Project: CAMSTER II WIND FARMENVIRONMENTAL IMPACT ASSESSMENT

FIGURE 3CONSTRAINTS PLAN

LKCM

LKSW

AUGUST 2013C_130820_S3_v2

KEY:Land Available for Turbine and Associated DevelopmentAddress Point Residential Dwelling - 1km BufferFootpathFootpath - 139m BufferRoadRoad - 139m BufferWatercourse/Water FeatureWatercourse/Water Feature - 50m BufferLink Confirmed by BTLink Confirmed by BT - 146m BufferLink Confirmed by Cable and WirelessLink Confirmed by Cable and Wireless - 146m BufferLink Confirmed by JRCLink Confirmed by JRC - 146m BufferLink Confirmed by OrangeLink Confirmed by Orange - 146m BufferRAMSARSpecial Area of ConservationSpecial Protection AreaSite of Special Scientific Interest

_̂ Listed Building (SNH Database)Scheduled Monument (SNH Database)

1:20,000

Client: