Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
This document is the property of and contains Proprietary Informationowned by Westinghouse Electric Company LLC and/or its subcontractors
and suppliers. It is transmitted to you in confidence and trust, and youagree to treat this document in strict accordance with the terms and
conditions of the agreement under which it was provided to you.
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
2
Yves Brachet, President
Westinghouse EMEA Region
Technology Diversification - Westinghouse Experience
3
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Agenda
• Westinghouse in Europe
• Security of Fuel Supply
• Leading Through Technology
• AP1000® Plant Projects Update
• Summary
4
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Introduction
5
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Security of Supply - Experience
• Westinghouse has a long history of supplying a diverse portfolio of fuel products and services
We are a single-source provider
Engineering
Global deployment
Quality
Uranium and transport services
Safety
PWR, BWR, AGR and VVER fuel
6
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
W-BWR NFI BWRW-PWR CE-
PWRKWU/Siemens
PWRNFI PWR
Security of Supply - Fuel Products
VVER-1000VVER-440
AGR Fuel
Optima2Optima3 9x9
MOX
Pressurized Water Reactors (PWRs) Boiling WaterReactors (BWRs)
VVER (PWR)
Advanced GasReactors (AGRs)
14x1415x1516x1617x17
14x1416x16
14x1416x1618x18
14x1415x1517x17MOX
7
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Security of Supply – Flexibility
SMP - Blairsville, PAZirconium Fuel Tubing
Cranberry, PAEngineering Services
CFFF - Columbia, SCPWR, BWR, VVER Fuel Fabrication, Engineering
WZ - Ogden, UTZirconium Materials
WSE - Västerås, SwedenPWR, BWR, VVER Fuel Fabrication, Engineering
ENUSA, Madrid, SpainPWR Fuel Fabrication
SFL - Springfields, UKAGR, PWR Fuel Fabrication, Advance Uranium Asset Mgmt.
Kumatori, Japan NFI, LtdPWR Fuel Fabrication / Engineering
Tokai, Japan NFI, Ltd.BWR Fuel Fabrication / Engineering
SNWZH - Nantong, ChinaZr Sponge JV with SNPTC
KWN - Daejeon, KoreaKW Nuclear Components, JV with KEPCO Nuclear Fuel
Fuel supply on three continents; unique manufacturing redundancy
AmericasPWR, BWR, VVER
EuropePWR, BWR, VVER, AGR
AsiaPWR, BWR
TOHO – Tokai, JapanFuel Components
TOHO – Izumiotsu JapanFuel Components
8
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Security of Supply – Operational Excellence
• Fuel reliability: 95% worldwide
• Now fueling: 145 plants worldwide
• Safety and quality commitment is unparalleled
• Demonstration of technology leadership continues to result in improved reliability and performance
9
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Leading Through Operating Plant Support• Support reliable plant operation
• Maximize power output
• Safer, shorter, more efficient outages
• Applying global lessons learned
• Sustain technology innovation
10
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Leading Through Plant Life Extension
Identification of components subject to an
aging management
review
Identification of
materials and
environments
Identification of aging effects
requiring managemen
t
Identification of aging manageme
nt programs
Extension solutions beyond 60 years
11
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Leading Through Complete Life-cycle Support
• Decommissioning, Dismantling and Remediation
• Waste Management
12
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
• Advanced tooling, technology and processes to reduce outage durations, dose and costs with flawless execution
Leading Through Innovation
13
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
V.C. SUMMER
VOGTLE
HAIYANG
SANMEN
AP1000 Plant Global Project Delivery
• Eight AP1000 units under construction worldwide- Four units in China- Four units in the United States
Photos © Georgia Power Company; South Carolina Electric & Gas Company; Sanmen Nuclear Power Company Ltd.; Shandong Nuclear Power Company Ltd.All rights reserved.
14
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
China AP1000 Plant Projects
Haiyang 1&2Shandong Province
Sanmen 1&2Zhejiang Province
15
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
China AP1000 Plant Progress: SanmenUnit 1 First Concrete – March 2009 Unit 2 SG/Refueling Canal Module – December 2010
Unit 1 Reactor Vessel – August 2011
Photos © Sanmen Nuclear Power Company, Ltd. All rights reserved.
Unit 1 Conical Roof Set – November 2013
16
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
China AP1000 Plant Progress: Haiyang
Unit 1 Reactor Vessel – January 2012
Unit 2 Auxiliary Building – December 2010Unit 1 First Concrete – September 2009
Photos © Shandong Nuclear Power Company, Ltd. All rights reserved.
Unit 1 Conical Roof Set – December 2013
17
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Progress of China Projects: Summary
• Major equipment delivered and installed at Sanmen Unit 1 and Haiyang Unit 1 includes:– Reactor Vessel– Steam Generators– Reactor Vessel Internals– Polar Crane– Integrated Head Package
● Shield Building Conical Roof set at Sanmen Unit 1 and Haiyang Unit 1
● Passive Containment Cooling Water Tank set at Sanmen Unit 1 and Haiyang Unit 1
● Digital I&C turnover to Startup staff in progress● Sanmen and Haiyang operator candidates
have completed simulator training● Technology transfer well advanced
Photo © Sanmen Nuclear Power Company, Ltd. All rights reserved.
Haiyang Site – July 2014
Photo © Shandong Nuclear Power Company, Ltd. All rights reserved.
Sanmen Site – July 2014
18
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
2009 to 2014
Sanmen Site Progress: Time Lapse View
19
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
U.S. AP1000 Plant Projects
V.C. Summer 2&3Jenkinsville, South CarolinaVogtle 3&4
Waynesboro, Georgia
20
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Photos © Georgia Power Company. All rights reserved.
Unit 4 CVBH Set – May 2014
Site Overview – July 2014
Unit 3 CA20 Module Lift – March 2014
U.S. AP1000 Plant Progress: Vogtle Site
Unit 3 Turbine Island – July 2014
21
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
U.S. AP1000 Plant Progress: V.C. Summer Site
Photos © South Carolina Electric & Gas Company. All rights reserved.
Unit 2 Turbine Building – March 2014Unit 3 First Concrete Pour – November 2013
Unit 2 CV Ring 1 Lift – June 2014 Site Overview – May 2014
22
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Progress of U.S. Projects: Summary
• Nuclear Island basemat concrete pours completed for V.C. Summer Units 2&3; Vogtle Units 3&4
• Containment Vessel Bottom Head (CVBH) set in nuclear island for Vogtle Units 3&4; V.C. Summer Units 2&3
• First CV Ring set for V.C. Summer Unit 2; fabrication of additional rings continues at both sites
• Component and module fabrication proceeding; CA20 module (Auxiliary Building) set at Vogtle Unit 3 and V.C. Summer Unit 2
• Reactor Vessels delivered for initial units at each site; additional equipment and component deliveries continue to proceed
Vogtle Unit 3 Nuclear Island – July 2014
V.C. Summer Unit 2 Nuclear Island – June 2014
Photo © Georgia Power Company. All rights reserved.
Photo © South Carolina Electric & Gas Company. All rights reserved.
23
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Moorside 1, 2 & 3West Cumbria, United
Kingdom
Kozloduy 7Vratsa Province,
Bulgaria
24
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
• Toshiba and GDF SUEZ complete NuGeneration Ltd (NuGen) deal (30 June 2014).
• NuGen plans to build three AP1000 reactors in West Cumbria (Moorside Project) - largest, single proposed nuclear power plant construction project in Europe:
- Delivering 3.4 GW of safe power (nearly seven percent of U.K.’s projected electricity requirements) at a competitive strike price, due to our modular design, fewer components and smaller footprint, enabling a shorter construction schedule.
- First AP1000 reactor targeted for operation in 2024 (each reactor will take approx. four years to build), due to our modular design, existing progress in Generic Design Assessment (GDA) and progress on site evaluation.
Westinghouse AP1000 PWR Westinghouse New Build in the U.K.
25
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
• Kozloduy NPP and Westinghouse sign Kozloduy NPP - New Builds Shareholder Agreement (1 August 2014).
• Kozloduy NPP - New Builds, the project company established in 2012, plans to build one AP1000 reactor at the Kozloduy site in northwest Bulgaria.
• Shareholder Agreement is substantive step in the project by Bulgarian Energy Holding EAD (BEH EAD) following a feasibility study under public tender to enter exclusive talks in December 2013.
• AP1000 reactor is projected to be online by 2023 – providing baseload power that meets EU and Bulgarian requirements of energy security and diversification, competitive and low-carbon energy for the following 60 years.
Westinghouse AP1000 PWR Westinghouse New Build in Bulgaria
26
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Summary
• Westinghouse provides the security of supply required by the global marketplace through its: Experience Products Flexibility Operational Excellence
• Westinghouse will continue to secure its position as a technology leader
• Westinghouse AP1000 reactor is the safest, most efficient and reliable design currently available in the worldwide marketplace
27
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.